Saheti School Online Utilities Management 3 0th September 2010 Prepared by Tim Stevens m. +27833892066 e. [email protected]

Transcript of Saheti proposal v1

Page 1: Saheti proposal v1

Saheti SchoolOnline Utilities Management

30th September 2010Prepared by Tim Stevens

m. +27833892066e. [email protected]

Page 2: Saheti proposal v1

Saheti:

Contents of Proposal

1. What will Power-Star do for your business?2. Benefits of Power-Star vs. other solutions3. Power-Star measurement technology3.1 Brief description of the technology and basic

architecture.3.2 Hardware specifications Power-Star unit.3.3 Hardware specification, Siemens MC55i modem.3.4 Server and hosting infrastructure.4. Power-Star web interface/software4.1 Status page4.2 Financial & Billing information4.3 Environmental page4.4 Events4.5 Reports Tab & Functionality

5. Virtual meters6. User management & access7. Event notifications, alerts and reports8. Data ownership and confidentiality9.1 Privacy policy : User information.9.2 Protecting the privacy of users.9.3 Ownership of Saheti data10. Confidence10.1 Customer references10.2 Green Building Council membership11. Proposed pricing12. Installation & Commissioning13. Bespoke development: Energy Dashboard

Page 3: Saheti proposal v1

Saheti:

1. What does Power-Star do?1.1 Measures your energy consumption in real-time.1.2 Translates energy metrics and technical data to commercial terms, cash and

the environment.1.3 Communicate wastage, consumption anomalies and excessive usage

immediately.1.4 Assesses your performance on an ongoing basis and hold managers and key

personnel accountable.1.5 Enterprise wide awareness and visibility.

2.1 Independent Class 1 Metering.2.2 Independent of on site network and IT infrastructure.2.3 Fully hosted and managed solution.2.4 No proprietary software, all data available in standard web browser.2.5 Ease of deployment, as close as possible to “Plug and play” solution.2.6 Rapid and low cost deployment.2.7 Server side product development.

2. Benefits of a Power-Star deployment vs. other?

Page 4: Saheti proposal v1

1 2 3 4 65

Power-Starunit & modem

GSM Network SQL data-baseand FTP Server

Web-Server Real-time energy data

Enterprise wideEnergy intelligence

Saheti:

3.1 Basic architecture

1. The Power-Star unit is a built for purpose data logger, with an integrated GSM modem. Based on Class 1 metering standard the unit delivers all energy metrics except harmonics.

2. Using GPRS/HSDPA/EDGE or WAP the onboard modem transfers energy readings every 60 seconds.

3. A hexi-decimal file is received on our FTP server every 60 seconds, the file is it’s binary base and processed by our SQL server. This infrastructure is secure, and independently hosted with regular intra-day backups. The process takes milli-seconds.

4. Data is packaged for the web and accessible through a standard web browser.

5. Data is updated and available within 65 - 70 seconds of actual measurement. Data includes all energy metrics, environmental information as well as financial and billing data.

6. ENTERPRISE WIDE, visibility, awareness and accountability.

Page 5: Saheti proposal v1

Saheti:

3.2 Power-Star energy measurement unit

Dimensions 150mm X 80mm X 200mmVoltage Input Range 85V ac - 260V ac (Phase to Neutral)Current Input Range 0-5ACommunication Interface RS232 & RS 485 PortCommunication Protocol MODBUS RTUAccuracy Class 1Clock Accuracy Accurate to ± 1 Minute / Year (0 C to +40 C) ̊� ̊�Power Consumption 3.5VAExpected Data Retention Minimum 5 yearsMeasuring Methods Supported 3Watt/4Wire or 2Watt/3WireParameters Recorded V, I, kW, kVA, kVar and Power Factor (Per phase & Summed)Recording Intervals 60 seconds or 1, 2, 5, 10, 15, 30, 60 Minute(s)Recording Methods Average over recording intervalWarranty 12 months

The Power-Star unit is based on proven SABS Class 1 data logger, re-engineered to deliver real time energy metrics via the internet. Customisation includes the removal of display the inclusion of an embedded GSM modem, and the migration of processing and intelligence to a central database.

(See unit specifications in table below)

Page 6: Saheti proposal v1

Saheti:

3.3 Siemens MC55i quad-band modemOur proven measurement technology has been partnered with the SIEMENS MC55i for the best quality of service and reliability in communications. This module has a Quad-Band GSM/GPRS baseband and TCP/IP connectivity based on Class 10 data transmission. The MC55i comes with full type approval, (FTA) enabling use across the globe

(See unit specifications in table below)

Quad-Band GSM 850/900/1800/1900MHzPower consumption 450mASupply Voltage 3.3V to 4.8VTemperature Range Normal Operation -20 degrees to +70 degreesWeight 5.5gCompliance GSM phase 2/2+GPRS data transmission Class 10 : 86kbps (DL)CSD data transmission 14.4 kbpsInternational Approvals R&TTE, FCC, UL,IC, GCF, PTCRB, CELocal approval Vodacom, MTN, Cell C, Etisalat, dU mobile

Integrated Siemens MC55i modem

Page 7: Saheti proposal v1

Saheti:

3.4 Data hosting, backup & storage.To ensure the highest level of reliability, data security and service. Our servers are hosted by Rackspace in the USA. Our SLA provides for dedicated 24/7/365 support and guaranteed network uptime. Additionally they are responsible for the management of daily backup services, performance monitoring and security.

Hardware Specification & ServicesChassis Dell PowerEdge 2950 MKIIIProcessor Dual Quad Core XEON Processor (2.5GHz)Memory 4GB DDRHard Drives 146 GB SAS X 4Raid SCSIEscalation AutomaticBackup Retention 2 WeeksBackup Daily differential, Weekly fullFirewall Cisco ASA5505 Dedicated Firewall

Data can be provided to you at regular intervals for further peace of mind (.text, CSV, Excel)Power-Star will store and maintain up to 5 years data per metering point

Page 8: Saheti proposal v1

Saheti:

4. The Power-Star web application• The Power-Star Energy Intelligence solution is web-based.• Accessible with a standard web browser, Internet Explorer 7 (IE7) or Mozilla Firefox.• Information is updated every 60 seconds.• Live intraday reporting available on all energy metrics by phase.• Live cost and/or billing analysis.• Carbon emissions updated every minute.• Live measurement against target or a typical range.• Real time event reporting and event logging.• User defined alerts with email and SMS triggers.• Highly interactive reporting.• Full user access and user management tool.

Page 9: Saheti proposal v1

Saheti:

4.1 Basic views available from the Status tabLive

Performance vs. Typical or Target

Month-to-dateCost and performance

analysisDetailed phase statistics on Demand, Power, Reactive

Power, Power Factor, Voltage, Current & Frequency

Page 10: Saheti proposal v1

Saheti:

4.1 Status tab selectorsCustomisation and adaptation of your status page allows for a user defined console view.

This interface allows for the interrogation of the most critical energy metrics, demand, consumption, power factor and load distribution

Page 11: Saheti proposal v1

Saheti:

4.1 Example of Status tab views Power factor chart Power factor

indicator

Load balance chart

Consumption chart

Consumption indicator

Load balance ALERTS

Demand chart

Demand indicator

Page 12: Saheti proposal v1

Saheti:

4.2 Financial & Billing Tabs

Daily Cost Breakdown by

component

Pro-forma bill or estimate

Cost per day R

Actual Bill vs. Estimate summary

Cost Breakdown by component %

Actual bill breakdown &

variance report

Our financial tab ensures up to the minute view of all costs associated with your consumption, on a site and per meter basis.

Additional reports include: Power Factor efficiency (R), Max demand impact on cost

Bill verification is a core component of the Power-Star solution. This interface allows you to capture actual billing information , for comparison/verification.

Additional reports include: Daily cost breakdown by component, Variance report, Download & store original bill.

Page 13: Saheti proposal v1

Saheti:

4.3 Environmental Tab

Based on actual measurement we are able to report your energy carbon footprint, reports can be drawn on a per site or group level.

Environmental metrics are also available in custom reports

Daily breakdown

Carbon, Coal Ash & Water

Page 14: Saheti proposal v1

Saheti:

4.4 Events TabManagement by exception allows the technical and engineering team to focus on the continuity of your operations. Our events tab generates exception reports on the fly, and provides a feedback loop for comments or actions.

Automated exceptions include:

1. Phase balance2. Max demand3. Consumption4. Comms failure5. Power Factor

See an example of a phase imbalance report on the next slide

Date time stamp

Site or meter

Event Description

Page 15: Saheti proposal v1

Saheti:

4.4 Events Tab : Example of Phase imbalance report

AMPS per phaseRED, YELLOW, BLUE

Detailed Event ID

Load imbalanceDoughnut chart

Event Feedback & Event Blog

Summary Event Data

Detailed Event Data (Expanded)

Page 16: Saheti proposal v1

Saheti:

4.5 Reports Tab : Options

Standard Reports include : Cost Breakdown, Power Factor Inefficiency, Contribution to Max Demand, Carbon Emissions, Billing Variances, Benchmarks,

Performance vs. Target, and Events

Page 17: Saheti proposal v1

Saheti:

4.5 Reports Tab : Custom Report Options

User OptionsPredefined period selector.User defined period selector date & time.Interval ranges from 60s to monthly.Select graph type.View separate or combined phases. Comparisons optionPeriod with up to 8 other periodsAny metric with any combination of other metrics.Any site with up to 8 other sites. Data availableVoltage (Va,Vb,Vc),Current (Ia,Ib,Ic),Active power (Pa,Pb,Pc), Apparent power (Sa,Sb,Sc), Reactive power (Qa,Qb,Qc) and Power factor (pfa, pfb, pfc). Performance vs. Typical, performance vs. Target .All energy costs separate and combined.

Page 18: Saheti proposal v1

Saheti:

4.5 Reports Tab : Interactive functionality and outputs

Mouse over indicator

Mouse over indicatorDrag and

Zoom

Toggle values ON/OFF

Toggle values ON/OFF by

clicking on legend

Drag and Zoom

Email & Print

Page 19: Saheti proposal v1

Saheti:

6. Virtual Meters explained, proposed meter layout.

Irvin & Johnson (V)

Woodstock(V) South ArmOps (V)

VAP PaardenEiland (V)

Our virtual meter is the result of server-side summation. Essentially this allows us to group data from any Power-Star unit to create a new or unique view. The roll-up, or hierarchal set up below is our standard, for billing and environmental reporting. Virtual meters can be set-up across multiple sites, and include the full functionality of Power-Star.

T1 T3T2 T5T4 T1 T2 T3 T1 T2 T3

Virtual Sites orSummated Views

Page 20: Saheti proposal v1

Saheti:

7. User Management & Permissions.A user management and administration interface forms part of the Power-Star solution. User permission is based on a combination of the user’s role in the business and field of operation.

Power-Star is accessible to all Saheti staff, contractors and consultants with a valid user username and password.

Function User Type Field of viewInvite new users Site Owner SiteEdit users Contractor MeterReset user password Consultant Virtual meterDelete users Reader SiteEvent reports Technical Contact GroupEmail reports ExecutiveConfigure site access ManagerConfigure email/SMS

Page 21: Saheti proposal v1

Saheti:

7. User Management Interface.Invite new users, set access level, define meter/site views, edit personal detail, delete user access and reset passwords.

Page 22: Saheti proposal v1

Saheti:

8. Event notification, ALERTS & scheduled reports.

Custom notification fields By Phase Trigger Update Email Alert SMSVoltages (V) Yes Event/Time 60sCurrent (A) Yes Event/Time 60sActive Power (KW) Yes Event/Time 60sApparent Power (KVA Yes Event/Time 60sReactive Power (Kvar) Yes Event/Time 60sDemand Target (KVA) Yes Event 60sConsumption Target (KWh) No Event 60sReports Hourly Daily Weekly Yes Time 60s

All Power-Star communication is user defined, and delivered via email and/or SMS, on an opt in basis, subject to user permission. ALERTS are the exception and will always be sent to the primary Technical Contact and Site Owner.

Page 23: Saheti proposal v1

Saheti:

8. Alerts Interface.Setup multiple email or SMS alerts on any meter or site

Page 24: Saheti proposal v1

Saheti:

9.1 Privacy policy: User information1. We use the information you provide about yourself to provide you with access to information on this website. 2. We do not share this information with outside parties except to the extent necessary to provide you with the

service you requested.3. We use the information you provide about someone else to give them access to information on this website. 4. We do not share this information with outside parties except to the extent necessary to provide them with the

service.5. We use non-identifying and aggregate information to better design our website and to share with advertisers. For

example, we may tell an advertiser that X number of individuals visited a certain area on our website, or that Y number of men and Z number of women filled out our registration form, but we would not disclose anything that could be used to identify those individuals.

6. Finally, we never use or share the personally identifiable information provided to us online in ways unrelated to the ones described above without also providing you an opportunity to opt-out or otherwise prohibit such unrelated uses.

1. We have put in place appropriate physical, electronic, and managerial procedures to safeguard and secure the information we collect from our users.

2. Usernames, passwords and cookies are used to publish information.

9.2 Protecting the privacy of users

Page 25: Saheti proposal v1

Saheti:

9.3 Ownership of the Saheti data.

9.3.1 All data collected, processed and stored on the Power-Star server remains the property of Saheti.

9.3.2 Except where industry data pooled to create benchmarks for the analysis of trends, this data will not be identifiable by anyone outside Irvin & Johnson Limited and/or Power-Star.

9.3.3 Data will be provided to Saheti in a standard data file (.text, Excel, CSV) on from time to time as requested. On termination we will provide you the same.

Page 26: Saheti proposal v1

Saheti:

10.1 Client references.Our clients include leading businesses in the following sectors, retail, petro-chemical, food processing, agricultural, packaging, manufacturing and hospitality industry. I have included a list of references for your convenience.

10.2 Professional membership.Our business is a registered member of the Green Building Council of South Africa, membership number POW01.

Eskom Riyaad Omer Senior DSM Consultant +2782 330 6889

One & Only Resort Michael du Toit Engineering Manager +2721 431 5007

The Mount Nelson Rob Fiander Technical Services Manager +2721 483 1986

Heinz Foods Chantelle Esterhuyse Risk +2721 883 8680

Bokomo Foods Chris Kotze Chief Engineer +27832847343

Page 27: Saheti proposal v1

Saheti:

11. Power-Star costs

Installation Cost (11 Units) Once off R 16,500.00

Monthly data charge (11 Sites) Monthly R 4,950

Enterprise user license (Unlimited) Free R 0.00

GPRS Data costs Included R 0.00

Virtual Meters Free R 0.00

Installation Cost Once off R 2,000 (1 Units)

Monthly data charge Monthly R 450 (1 Units)

11.1 Prices exclude VAT11.2 Data charge is payable is payable monthly in advance11.3 Escalation on the anniversary of the agreement CPIX

Saheti:

12. Installation & Commissioning12.1 Units will be installed within 7 days of order confirmation.12.2 Data will be available from the date of installation.12.3 Training and orientation for key personnel to be concluded within 14 days

of installation.

Page 28: Saheti proposal v1

Saheti:

13. Bespoke development: Internet/Intranet & dashboardAttached is an example of an energy dashboard developed for ESKOM and The Cape Town International Convention Center. Using the existing Power-Star metering and database infrastructure we are able to deliver custom applications for your internet, intranet or display purposes.

This five page mini-web with dynamic data and dashboard was developed for R15,000.

Bespoke development is billed at R600/per hour.