SAFETY SCENARIO OF LEVEL CROSSING ON
INDIAN RAILWAY
April 19, 2023 1
Presented By:Alok Kumar and Sandeep Jain
Safety Directorate, Ministry Of Railways, Government Of India
INDIAN RAILWAYSVAST SYSTEM
TRANSPORTS : Appox. 1000 MT freight traffic per year Appox. 23 million passengers per day.
TRACK STRUCTURE: around 75176 km of track is laid with 60 kg/52 kg rails 74607 km of track is laid with PSC Sleepers 65941 km (86%) track on LWR/CWR
VASTNESS: 17 Zonal Railway Headquarters & 69 Zonal Unitsemploy around 1.3 million staff
April 19, 2023 Safety Directorate, Ministry Of Railways, Government Of India
2
ACCIDENT SCENARIO
April 19, 2023 Safety Directorate, Ministry Of Railways, Government Of India
3
Course on Safety 1
19
60
s 1
39
3 (
Av
g /y
ea
r)
19
70
s 8
66
(A
vg
/ye
ar)
19
80
s 7
57
(A
vg
/ye
ar)
19
90
s 4
64
(A
vg
/ye
ar)
20
01
-06
3
19
(A
vg
/ye
ar)
20
06
-07
1
95
20
07
-08
1
94
20
08
-09
1
77
20
09
-10
1
65
20
10
-11
1
41
20
11
-12
1
31
0
200
400
600
800
1000
1200
1400
Period
No. of Conse
quenti
al
Tra
in A
ccid
ents
ACCIDENT DECREASING
April 19, 2023 Safety Directorate, Ministry Of Railways, Government Of India
4
4
Accident per Million Train Kms
5.5
21.8
0.86
0.650.23 0.22 0.2 0.18 0.15 0.14
388.1
466.5504.5
617.1
723.8856.7
882
890
910
918 935
0
1
2
3
4
5
6
1960
-61
1970
-71
1980
-81
1990
-91
2000
-01
2006
-07
2007
-08
2008
-09
2009
-10
2010
-11
2011
-12
01002003004005006007008009001000
A/MTKM MTKM
CORPORATE SAFETY PLAN LIFE CYCLE: One Decade: 2003-2013 SALIENT POINTS : Entailing multi-pronged strategy, laying
emphasis on prevention by reducing human dependence REDUCTION OF ACCIDENTS RATE : per Million Train Kilometer TARGET : bringing down the accident rate from 0.44 in 2003
to 0.17 in 2013 2012-13 ACHIEVEMENT: Excelled by touching the figure of 0.14 in
current year 2011-12.
April 19, 2023 Safety Directorate, Ministry Of Railways, Government Of India
5
RAIL ROAD CONFLICT
April 19, 2023 Safety Directorate, Ministry Of Railways, Government Of India
6
Crossing Of Road & Rail Traffic
Grade Separated Crossing
Road Over Bridge
Road Under Bridge
Level Crossing
Unmanned Level
Crossing
Manned Level
Crossing
Train Vehicle Unit(TVU) product of average number of Road Vehicle and Trains passing a crossing in 24 hours.
LEVEL CROSSING ON IR
April 19, 2023 Safety Directorate, Ministry Of Railways, Government Of India 7
18316 No Unmanned
LC13530 No Manned LC
Distribution of Unmanned & Manned Level Crossing on Indian Railway
( As On 01.04.2012)
Unmanned Manned
LC ACCIDENT: CAUSE OF CONCERN
April 19, 2023 Safety Directorate, Ministry Of Railways, Government Of India
8
Type wise Accidents since 2007-08 to 2011-12
Collisions5%
LC Accidents
41%
Fire2%
Misc.2% Derailments
50%
LC CASULITIES: CAUSE OF CONCERN
April 19, 2023 Safety Directorate, Ministry Of Railways, Government Of India
9
Collisions25%
De-rail-
ments9%
Manned LC5%
Un-manned
LC61%
Loss of Life in train accidents (2007-08 to 2011-12)
LC ELIMINATION POLICY
April 19, 2023 Safety Directorate, Ministry Of Railways, Government Of India
10
VISION 2020 : Elimination of all unmanned level crossing within a time frame of five years.
Method of Elimination of Level Crossing Road Over Bridges: high TVU LC (>0.1 MiIllion) Road Under Bridges At Bank Merger/Diversion To Adjacent LC Closure Of Low TVU LC Manning Of Unmanned LC
Bottleneck ROB: Land Acquisition , Encroachment removal RUB: Technical Feasibility Closure: Permission from Government, Public Outrage Manning: Manpower Requirement
TVU CORRELATION-UNMANNED LC
April 19, 2023 Safety Directorate, Ministry Of Railways, Government Of India 11
<500 <1000 <2000 <3000 <4000 <5000 <6000 <7000 <8000 <9000 <100004000
5000
6000
7000
8000
9000
10000
11000
12000
13000
14000
5150
7709
10701
1208312690
12962
13138
13253
13326
1338313405
CUMULATIVE NO. OF UNMANNED LC VS TVU
NO. OF LC
April 19, 2023 Safety Directorate, Ministry Of Railways, Government Of India 12
TVU CORRELATION-MANNED LC
<500<3000
<10000
<20000
<25000
<30000
<50000
<75000
<100000
<200000
<300000
<500000
<10000000
2000
4000
6000
8000
10000
12000
14000
16000
18000
20000
606 3081
7993
10872 1188212629
14329
15448
16100
17286
17722
18022
18231
CUMULATIVE NUMBER OF MANNED LC Vs TVU
NO. OF LC
OTHER MEASURES
April 19, 2023 Safety Directorate, Ministry Of Railways, Government Of India
13
TECHNOLOGICAL INNOVATIONACDTAWD
EDUCATING THE PUBLIC: School Syllabus include Chapter on LC
SAFETY CAMPAIGNS Media- TV, Cinema, Radio Advertisement Media SMS, Posters, Nukkad-Natak
SAFETY DRIVES & AMBUSH Joint Check with Police
THANKYOU
Safety Directorate, Ministry Of Railways, Government Of India