    Nosherwan Gondal

    Being a professional, willing to be a part of career oriented organization where

    Utilization of my skill and knowledge can be use for mutual interest and can add valueTo companysbusiness in order to get a new exposure.

    NAME : Nosherwan Gondal

    FATHERS NAME : Muhammad Inayet

    DATE OF BIRTH : 03/03/1987

    NIC NO : 38401-1728897-5

    MARITAL STATUS : Single

    RELIGION : Islam

    Visa Status : Transferrable iqamaINTEREST : Computer, Sports, Reading and Writing, Inter Net Surfing.

    ADRESS : Jeddah Saudi Arabia

    CONTACT : +966594986776E-MAIL : [email protected]

    (A)

    (B)

    (C)

    (D)

    1 Degree Diploma in Civil Engineer

    2 Specialization Civil Engineer

    3 Duration 2002-2005 ( Three Years )

    1 Degree B.Tech2 Specialization Civil Engineer

    3 Duration 2009-2011

    1 Course Auto Cad

    2 Specialization In Drawings

    3 Duration April 2005

    1 Degree Safety Inspector

    2 Specialization safety3 Duration 10 Aug 09 to 10 Sep 09

    OBJECTIVES

    PERSONAL INFORMATION

    UALIFICATION

    COMPUTER SKILLS

  • 7/28/2019 Safety Officer Cv 3

    2/3

    Ms Windows, Ms Word, Ms Excel, Ms Power Point, In Page, Adobe Photoshop,

    Ulead Photo Express, Ulead Video Studio, Hardware, Networking.

    .

    Particulars: In page, Scanning, Printing, Ms Office, Auto cad, Adobe Photoshop.

    Languages: Can speak fluently Urdu, English, Punjabi,Others:

    * Strong Oral and written communication ability.

    * Can drive Motorbike and Motor Car.

    (Burayadh Suadi Arabia.)

    (January, 2012 to date)

    Projects: 132/13.8 kv substation #8832 Buraydah

    Designation: Site Engineer.

    Responsibilities

    Schedule the Proj ect in the logical steps and budget time required to meet deadli ne.

    Determine labor r equi rements and dispatch workers to constructi on site.

    Study job Specif icati ons to determine appropr iate constructi on methods.

    Requisit ion Suppl ies and materi als to complete constructi on work .

    Ensuri ng materi al and equipment are requisitioned on time in correct quantities.

    Reporti ng progress to the proj ect manager.

    Ensuring Non-conformances if any are closed and taking timely preventive and corrective actions.

    Responsible for incoming qual ity of r eceived materi als and acceptance of same along wi th the designated storekeeper.

    Responsible for completing of al l punch i tems and handover of their respective areas.

    Coordinati ng between all sub-contractors.

    Making the BOQ

    Making the BBS

    Layout works

    Steel and Shuttering Supervi sion

    Coordinate with consultan t and client.

    CERTIFICATES

    ADDITIONAL SKILS

    EXPERIENCE

    Services & Solutions Company

  • 7/28/2019 Safety Officer Cv 3

    3/3

    (Saudi Pak Tower, 12th Floor, 61-A Jinnah Avenue, Blue Area, IslamabadPakistan.)

    (October, 2007 to September 2011).

    Designation: Civil Work Engineer.Duties:

    Coordinati ng between all sub-contractors.

    Making the BOQ

    Making the BBS

    Layout works

    Steel and Shuttering Supervi sion

    Coordinate with consultan t and client.

    (April 2005 to September 2007)

    Designation: Site Inspector

    Projects: 12 Multi Story Building with 3 Parking Basements (Structure)

    Job Descripti on

    Al i tower was a buil ding designed for residential purposes having four teen (14) f loors and four (4) basements for parking. I was

    deputed in H ead Off ice to monitor and update progress reports, manage correspondence regarding site issues; My duties for th i s

    project were to cover the foll owing:

    Request f or I nspections,

    Updating weekly pr ogress status,

    Checking of Bar Bending Schedule,

    Supervision of structural and layout works of bui lding,Health and safety issues

    Quality Control & Quality Assurance

    Supervision of structural and layout works of bui lding,

    Checking of Bar Bending Schedule,

    Managing daily progress record, Labor reports and stock report.