Safety Labeling and Signal Words - Sears Parts Direct · 2011. 1. 9. · comply with NFPA 720 and...

59
These instructions must be read and understood completely before attempting installation. Safety Labeling and Signal Words DANGER, WARNING, CAUTION, and NOTE The signal words DANGER, WARNING, CAUTION, and NOTE are used to identify levels of hazard seriousness. The signal word DANGER is only used on product labels to signify an immediate hazard. The signal words WARNING, CAUTION, and NOTE will be used on product labels and throughout this manual and other manual that may apply to the product. DANGER - Immediate hazards which will result in severe personal injury or death. Signal Words in Manuals The signal word WARNING is used throughout this manual in the following manner: The signal word CAUTION is used throughout this manual in the following manner: WARNING - Hazards or unsafe practices which could result in severe personal injury or death. CAUTION - Hazards or unsafe practices which may result in minor personal injury or product or property damage. NOTE - Used to highlight suggestions which will result in enhanced installation, reliability, or operation. Signal Words on Product Labeling Signal words are used in combination with colors and/or pictures or product labels. z_ Safety-alert symbol When you see this symbol on the unit and in instructions or manuals, be alert to the potential for personal injury. TABLE OF CONTENTS Safety considerations ........................... 4 Safe Installation Requirements ................... 4 Installation ..................................... 6 Combustion & Ventilation Air ..................... 10 Vent and Combustion Air Piping .................. 14 Concentric Termination .......................... 32 Gas Supply and Piping .......................... 33 Electrical Wiring ................................ 38 Ductwork and Filter ............................. 39 Checks and Adjustments ........................ 42 Furnace Maintenance ........................... 45 Sequence of Operation & Diagnostics ............. 46 Technical Support .............................. 48 Use of the AHRI Certified TM Mark indicates a manufacturer's participation in the program. For verification of certification for individual products, go to www.ahridirectory.org . International Comfort Products, LLC Lewisburg, TN 37091 U.S.A. www.icpusa.com PERSONAL INJURY, AND/OR PROPERTY DAMAGE HAZARD Failure to carefully read and follow this warning could result in equipment malfunction, property damage, personal injury and/or death. Installation or repairs made by unqualified persons could result in equipment malfunction, property damage, personal injury and/or death. The information contained in this manual is intended for use by a qualified service technician familiar with safety procedures and equipped with proper tools and test instruments. Installation must conform with local building codes and with the Natural Fuel Gas Code (NFCG) NFPA 54/ANSI Z223.1, and National standards of Canada CAN/CSA-B149.1 and .2 Natural Gas and Propane Installation Codes. INSTALLER: Affix these instructions on or adjacent to the furnace. CONSUMER: Retain these instructions for future reference. Portions of the text and tables are reprinted from NFPA 54/ANSI Z223.1-2009_, with permission of National Fire Protection Association, Quincy, MA 02269 and American Gas Association, Washington, DC 20001. This reprinted material is not the complete and official position of the NFPA or ANSi, on the referenced subject, which is represented only by the standard in its entirety. Printed inU.S.A. 440 01 1024 04 Dec. 2010

Transcript of Safety Labeling and Signal Words - Sears Parts Direct · 2011. 1. 9. · comply with NFPA 720 and...

  • These instructions must be read and understood completely before attempting installation.

    Safety Labeling and Signal WordsDANGER, WARNING, CAUTION, and NOTEThe signal words DANGER, WARNING,CAUTION, and NOTE are used to identify levels ofhazard seriousness. The signal word DANGER isonly used on product labels to signify an immediatehazard. The signal words WARNING, CAUTION,and NOTE will be used on product labels andthroughout this manual and other manual that mayapply to the product.

    DANGER - Immediate hazards which will result insevere personal injury or death.

    Signal Words in Manuals

    The signal word WARNING is used throughoutthis manual in the following manner:

    The signal word CAUTION is used throughoutthis manual in the following manner:

    WARNING - Hazards or unsafe practices whichcould result in severe personal injury or death.

    CAUTION - Hazards or unsafe practices whichmay result in minor personal injury or product orproperty damage.

    NOTE - Used to highlight suggestions which willresult in enhanced installation, reliability, oroperation.

    Signal Words on Product Labeling

    Signal words are used in combination withcolors and/or pictures or product labels.

    z_ Safety-alert symbol

    When you see this symbol on the unit and ininstructions or manuals, be alert to thepotential for personal injury.

    TABLE OF CONTENTSSafety considerations ........................... 4Safe Installation Requirements ................... 4Installation ..................................... 6Combustion & Ventilation Air ..................... 10Vent and Combustion Air Piping .................. 14Concentric Termination .......................... 32Gas Supply and Piping .......................... 33Electrical Wiring ................................ 38Ductwork and Filter ............................. 39Checks and Adjustments ........................ 42Furnace Maintenance ........................... 45Sequence of Operation & Diagnostics ............. 46Technical Support .............................. 48

    Use of the AHRI Certified TM Mark indicates amanufacturer's participation in the program.For verification of certification for individual

    products, go to www.ahridirectory.org .

    International Comfort Products, LLCLewisburg, TN 37091 U.S.A.

    www.icpusa.com

    PERSONAL INJURY, AND/OR PROPERTYDAMAGE HAZARDFailure to carefully read and follow this warning couldresult in equipment malfunction, property damage,personal injury and/or death.Installation or repairs made by unqualified persons couldresult in equipment malfunction, property damage,personal injury and/or death.The information contained in this manual is intended foruse by a qualified service technician familiar with safetyprocedures and equipped with proper tools and testinstruments.Installation must conform with local building codes andwith the Natural Fuel Gas Code (NFCG) NFPA 54/ANSIZ223.1, and National standards of CanadaCAN/CSA-B149.1 and .2 Natural Gas and PropaneInstallation Codes.

    INSTALLER: Affix these instructions on or adjacent to thefurnace.CONSUMER: Retain these instructions for futurereference.

    Portions of the text and tables are reprinted from NFPA 54/ANSI Z223.1-2009_, with permission of National Fire Protection Association, Quincy, MA 02269 and American Gas Association, Washington, DC

    20001. This reprinted material is not the complete and official position of the NFPA or ANSi, on the referenced subject, which is represented only by the standard in its entirety.

    PrintedinU.S.A. 440 01 1024 04 Dec. 2010

  • Required Notice for Massachusetts Installations

    (a)

    Important

    The Commonwealth of Massachusetts requires compliance with regulation 248 CMR as follows:

    5.08: Modifications to NFPA-54, Chapter 10

    2) Revise 10.8.3 by adding the following additional requirements:

    For all side wall horizontally vented gas fueled equipment installed in every dwelling, building or structure used in whole or in part for residentialpurposes, including those owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than seven (7) feetabove finished grade in the area of the venting, including but not limited to decks and porches, the following requirements shall be satisfied:

    1, INSTALLATION OF CARBON MONOXIDE DETECTORS. At the time of installation of the side wall horizontal vented gas fueled equipment, theinstalling plumber or gasfitter shall observe that a hard wired carbon monoxide detector with an alarm and battery back-up is installed on the floorlevel where the gas equipment is to be installed, in addition, the installing plumber or gasfitter shall observe that a battery operated or hard wiredcarbon monoxide detector with an alarm is installed on each additional level of the dwelling, building or structure served by the side wallhorizontal vented gas fueled equipment. It shall be the responsibility of the property owner to secure the services of qualified licenseprofessionals for the installation of hard wired carbon monoxide detectors.

    a. In the event that the side wall horizontally vented gas fueled equipment is installed in a crawl space or an attic, the hard wired carbonmonoxide detector with alarm and battery back-up may be installed on the next adjacent floor level.

    b. In the event that the requirements of this subdivision can not be met at the time of completion of installation, the owner shall have a period ofthirty (30) days to comply with the above requirement; provided, however, that during said thirty (30) day period, a battery operated carbonmonoxide detector with an alarm shall be installed.

    2. APPROVED CARBON MONOXIDE DETECTORS. Each carbon monoxide detector as required in accordance with the above provisions shallcomply with NFPA 720 and be ANSI/UL 2034 listed and IAS certified.

    3. SIGNAGE. A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height of eight (8) feetabove grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating appliance or equipment. The sign shallread, in print size no less than one-half (1/2) inch in size, "GAS VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS".

    4. INSPECTION. The state of local gas inspector of the side wall horizontally vented gas fueled equipment shall not approve the installation unless,upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the provisions of 248 CMR5.08(2)(a) 1 through 4.

    (b) EXEMPTIONS: The following equipment is exempt from 248 CMR 5.08(2)(a) 1 through 4:

    (c)

    (d)

    (e)

    1. The equipment listed in Chapter 10 entitled "Equipment Not Required To Be Vented" in the most current edition of NFPA 54 as adopted by theBoard; and

    2. Product Approved side wall horizontally vented gas fueled equipment installed in a room or structure separate from the dwelling, building orstructure used in whole or in part for residential purposes.

    MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING SYSTEM PROVIDED. When the manufacturer of Product Approved side wallhorizontally vented gas equipment provides a venting system design or venting system components with the equipment, the instructions provided bythe manufacturer for installation of the equipment and the venting system shall include:

    1. Detailed instructions for the installation of the venting system design or the venting system components; and

    2. A complete parts list for the venting system design or venting system.

    MANUFACTURER REQUIREMENTS - GAS EQUIPMENT VENTING SYSTEM NOT PROVIDED. When the manufacturer of a Product Approved sidewall horizontally vented gas fueled equipment does not provide the parts for venting the flue gases, but identifies "special venting systems", thefollowing requirements shall be satisfied by the manufacturer:

    1. The referenced "special venting system" instructions shall be included with the appliance or equipment installation instructions; and

    2. The "special venting systems" shall be Product Approved by the Board, and the instructions for that system shall include a parts list and detailedinstallation instructions.

    A copy of all installation instructions for all Product Approved side wall horizontally vented gas fueled equipment, all venting instructions, all parts listsfor venting instructions, and/or all venting design instructions shall remain with the appliance or equipment at the completion of the installation.

    For questions regarding these requirements, please contact the Commonwealth of Massachusetts Board of State Examiners of Plumbers and Gas

    Fitters, 239 Causeway Street, Boston, MA 02114. 617-727-9952

    440 01 1024 04 Specifications are subject to change without notice. 2

  • START-UP CHECK SHEETFor 90+ Furnace

    (This sheet is optional. Keep this page for future reference.)

    Date of Start-Up:

    Dealer Name:

    Address:

    City, State(Province), Zip or Postal Code:

    Phone:

    Owner Name:

    Address:

    City, State(Province), Zip or Postal Code:

    Model Number:

    Serial Number:

    Setup Checks

    Check the box when task is complete

    All Electrical Connections Tight?

    Have hoses been relocated for furnace application

    (upflow/horizontal)?

    Condensate Drain Connected?

    Condensate Drain Trapped?

    Manual Gas Shut-Off Upstream of Furnace/Drip-Leg?LU

    Gas Valve turned ON? Lj

    Type of Gas: Natural: Lj Propane: Lj

    Calculated Firing Rate:(See Checks and

    Section).

    Heating Check

    Measured Line Pressure when Firing Unit:

    Adjustments

    Measured Manifold Gas Pressure:

    Temperature of Supply Air:

    Temperature of Return Air:

    Temperature Rise (supply-return temperature): (o)__

    In Rise (see furnace rating plate)? (o)__

    Static Pressure (Ducts): Supply Air Return

    Which blower speed tap is used? (Heating)

    Optional Check: CO ? CO2 ?

    Cooling Check

    Temperature of Supply Air:

    Temperature of Return Air:

    Temperature Difference:

    Static Pressure (Ducts) cooling: Supply Air

    Blower Speed Tap used for cooling:

    Dealer Comments:

    o)__

    (o)__

    (o)__

    __ Return

    Filter Type and Size:

    3 Specifications are subject to change without notice. 440 01 1024 04

  • SAFETY CONSIDERATIONS

    Improper installation, adjustment, alteration, service,maintenance, or use can cause explosion, fire, electrical shock,or other conditions which may cause death, personal injury, orproperty damage. Consult a qualified installer, service agency,or your distributor or branch for information or assistance. Thequalified installer or agency must use factory-authorized kits oraccessories when modifying this product. Refer to the individualinstructions packaged with the kits or accessories wheninstalling.

    Follow all safety codes. Wear safety glasses, protectiveclothing, and work gloves. Use quenching cloth forbrazing operations. Have fire extinguisher available.Read these instructions thoroughly and follow allwarnings or cautions included in literature and attachedto the unit. Consult local building codes, the currenteditions of the National Fuel Gas Code (NFCG) NFPA54/ANSI Z223.1, and the National Electrical Code (NEC)NFPA 70.

    In Canada refer to the current editions of the Nationalstandards of Canada CAN/CSA-B149.1 and .2 NaturalGas and Propane Installation Codes, and CanadianElectrical Code CSA C22.1.

    Recognize safety information. This is the safety-alert

    symbol z_. When you see this symbol on the unit and ininstructions or manuals, be alert to the potential forpersonal injury. Understand these signal words;DANGER, WARNING, and CAUTION. These words areused with the safety-alert symbol. DANGER identifies themost serious hazards which will result in severe personalinjury or death. WARNING signifies hazards which couldresult in personal injury or death. CAUTION is used toidentify unsafe practices which may result in minorpersonal injury or product and property damage. NOTE isused to highlight suggestions which will result inenhanced installation, reliability, or operation.

    Safe Installation Requirements

    FIRE, EXPLOSION, AND ASPHYXIATION HAZARD

    ELECTRICALSHOCK HAZARD

    Failure to follow this warning could cause personalinjury or death.

    Before performing service or maintenance operationson unit, always turn off main power switch to unit andinstall lockout tag. Unit may have more than onepower switch.

    CARBON MONOXIDE POISONING AND FIREHAZARD

    Failure to follow safety warnings could result inpersonal injury, death, and/or property damage.

    This furnace is not designed for use in mobile homes,trailers or recreational vehicles.

    CUT HAZARD

    Failure to follow this caution may result in damagepersonal injury.

    Sheet metal parts may have sharp edges or burrs.Use care and wear appropriate protective clothing,safety glasses and gloves when handling parts andservicing furnaces.

    Improper adjustment, alteration, service,maintenance or installation could cause personalinjury, death and/or property damage.Installation or repairs made by unqualified personscould result in hazards to you and others.Installation MUST conform with local codes or, inthe absence of local codes, with codes of allgovernmental authorities having jurisdiction.The information contained in this manual isintended for use by a qualified service agency thatis experienced in such work, is familiar with allprecautions and safety procedures required insuch work, and is equipped with the proper toolsand test instruments.

    NOTE: This furnace is design-certified by the CSA International(formerly AGA and CGA) for installation in the United States andCanada. Refer to the appropriate codes, along with this manual,for proper installation.

    • Use only the Type of gas approved for this furnace (seeRating Plate on unit). Overfiring will result in failure of heatexchanger and cause dangerous operation. (Furnacescan be converted to Propane gas with approved kit.)

    • Install this furnace only in a location and position asspecified in "Installation" of these instructions.

    • Provide adequate combustion and ventilation air to thefurnace as specified in "Combustion and Ventilation Air" ofthese instructions.

    Combustion products must be discharged outdoors.Connect this furnace to an approved vent system only, asspecified in "Vent and Combustion Air Piping" of theseinstructions.

    Never test for gas leaks with an open flame. Use acommercially available soap solution made specifically forthe detection of leaks to check all connections, asspecified in "Gas Supply and Piping, Final Check" of theseinstructions.

    Always install furnace to operate within the furnace'sintended temperature-rise range with a duct system whichhas an external static pressure within the allowable range,as specified in "Technical Support Manual" of theseinstructions. See furnace rating plate.

    Specifications are subject to change without notice

    44001 102404

  • • When a furnace is installed so that supply ducts carry aircirculated by the furnace to areas outside the spacecontaining the furnace, the return air shall also be handledby a duct(s) sealed to the furnace casing and terminatingoutside the space containing the furnace.

    • A gas-fired furnace for installation in a residential garagemust be installed as specified in "Installation" of theseinstructions.

    • This furnace is not to be used for temporary heating ofbuildings or structures under construction.

    • This furnace is NOT approved for installation inmobile homes, trailers or recreation vehicles.

    • Seal around supply and return air ducts.

    • Install correct filter type and size.

    • Unit MUST be installed so electrical components areprotected from direct contact with water.

    SafetyRulesYour unit is built to provide many years of safe and dependableservice providing it is properly installed and maintained. However,abuse and/or improper use can shorten the life of the unit andcreate hazards for you, the owner.

    A. The U.S. Consumer Product Safety Commission encouragesinstallation of carbon monoxide alarms. There can be varioussources of carbon monoxide in a building or dwelling. Thesources could be gas-fired clothes dryers, gas cookingstoves, water heaters, furnaces, gas-fired fireplaces, woodfireplaces.

    Carbon monoxide can cause serious bodily injury and/ordeath. Carbon monoxide or "CO" is a colorless and odorlessgas produced when fuel is not burned completely or when theflame does not receive sufficient oxygen.

    a.

    Therefore, to help alert people of potentially dangerous carbonmonoxide levels, you should have a commercially availablecarbon monoxide alarm that is listed by a nationallyrecognized testing agency in accordance with UnderwritersLaboratories Inc. Standard for Single and Multiple StationCarbon Monoxide Alarms, ANSl/UL 2034 or the CSA 6.19-01Residential Carbon Alarming Devices installed andmaintained in the building or dwelling concurrently with thegas-fired furnace installation (see Note below). The alarmshould be installed as recommended by the alarmmanufacturer's installation instructions.

    There can be numerous sources of fire or smoke in a buildingor dwelling. Fire or smoke can cause serious bodily injury,death, and/or property damage. Therefore, in order to alertpeople of potentially dangerous fire or smoke, you should havefire extinguisher and smoke alarms listed by UnderwritersLaboratories installed and maintained in the building ordwelling (see Note below).

    Note: The manufacturer of your furnace does not test any alarmsand makes no representations regarding any brand or typeof alarms.

    C.

    1.

    2.

    To ensure safe and efficient operation of your unit, you shoulddo the following:

    Thoroughly read this manual and labels on the unit. Thiswill help you understand how your unit operates and thehazards involved with gas and electricity.

    Do not use this unit if any part has been under water.Immediately call a qualified service technician to inspect the

    unit and to replace any part of the control system and any gascontrol which has been under water.

    3. Never obstruct the vent grilles, or any ducts that provideair to the unit. Air must be provided for proper combustionand ventilation of flue gases.

    FrozenWater Pipe Hazard

    WATER DAMAGE TO PROPERTY HAZARD

    Failure to follow this caution may result in propertydamage.Do not leave your home unattended for long periodsduring freezing weather without turning off watersupply and draining water pipes or otherwiseprotecting against the risk of frozen pipes andresultant damage.

    Your furnace is designed solely to provide a safe and comfortableliving environment. The furnace is NOT designed to ensure thatwater pipes will not freeze. It is equipped with several safetydevices that are designed to turn the furnace off and prevent it fromrestarting in the event of various potentially unsafe conditions.

    If your furnace remains off for an extended time, the pipes in yourhome could freeze and burst, resulting in serious water damage.

    If the structure will be unattended during cold weather you shouldtake these precautions.

    1. Turn off the water supply to the structure and drain the waterlines if possible and add an antifreeze for potable water todrain traps and toilet tanks. Open faucets in appropriateareas.

    2.

    3.

    -or-

    Have someone check the structure frequently during coldweather to make sure it is warm enough to prevent pipesfrom freezing. Instruct them on a service agency to call toprovide service, if required.

    -or-

    Install a reliable remote sensing device that wilt notifysomebody of freezing conditions within the home.

    Winter Shutdown

    If you go away during the winter months and do not leave the heaton in your home, the plastic transition box and the condensate trapon the furnace must be protected from freeze damage.(SeeFigure 11 trough Figure 20)

    1. Disconnect the 5/8"(15.9mm) OD rubber hose from the ventdrain fitting that is located downstream of the combustionblower. Insert a funnel into the hose and pour four(4) ouncesof sanitary type (RV) antifreeze into the condensate trap.Reconnect the 5/8"(15.9mm) OD rubber hose to the stub onthe vent drain fitting. Secure with the hose clamp.

    2. Disconnect the 3/4" (15.9mm)OD rubber hose from thecondensate trap. Insert a funnel into the hose and and pourfour(4) ounces of sanitary type (RV) antifreeze into theplastic Transition box. Squeeze the hose together near theend and quickly reconnect the 3/4" (19.1mm) OD rubberhose to the stub on the condensate trap. Secure with thehose clamp.

    When you return home, your furnace will be ready to start, as it isnot necessary to drain the antifreeze from the furnace.

    440 01 102404

    Specifications are subject to change without notice

  • Installation

    CARBON MONOXIDE POISONING HAZARD

    Failure to follow this warning could result inpersonal injury or death.This furnace can NOT be common vented orconnected to any type B, BW or L vent or ventconnector, nor to any portion of a factory-built ormasonry chimney. If this furnace is replacing apreviously common-vented furnace, it may benecessary to resize the existing vent and chimney toprevent oversizing problems for the otherremaining appliance(s). See Venting and Combus-tion Air Check in Gas Vent Installation section. Thisfurnace MUST be vented to the outside.

    Location and Clearances

    1. Refer to Figure 1 or Figure 2 for typical installation andbasic connecting parts required. Refer to Figure 5 fortypical horizontal direct vent installation and basicconnecting parts required. Supply and return air plenums

    and duct are also required.

    2. If furnace is a replacement, it is usually best to install thefurnace where the old one was. Choose the location or

    evaluate the existing location based upon the minimumclearance and furnace dimensions (Figure 3).

    Typical Upflow Installationiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii

    Aluminumornon-rustingshieldrecommended.(SeeVentTerminationShieldingfordimensions).

    "8" (203.2mm) Min.20 (6.1m) Max. , _ i Couplingon endsofin same _1 I_ / _ exhaust pipe. Total

    atmospheric [_ __ !_tuP_d0n // I_\ pipe s c°upling °ut-___ 5' U_ . _ _ side structure = 8"

    zune _ _ Singleffipe / J;_/._ _-I> model) '_ (203.2omm!

    _ _,_ "-..........VentPipes MUSTbe = .._supported _ _" ....

    = *8 2032mm) MInHorizontallyand o /. , ' 'Vertically _" i 20 6.1m) Max.

    I, " i ins_[meatmosphericzone

    * Increaseminimumfrom8"(203.2mm)to 18" (457.2mm)for coldclimates(sus-tainedtemperatures0° F (-17° C)andbelowfor24 or moreconsecutivehours),

    25-23-33

    Typical Downflow Installationiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii

    SeeVentTerminationShieldingin VentSection. Coupling on inside

    \ andoutsideof wall to\,, restrainventpipe

    InletPipe _[Z;i I_ "8" (203.2mm) Min. \ / '\ /(notusedon F [ _ 20' (6 lm_ Max in '_, / , 8" Min

    • • \" / ' \ / i _ 'S,ngle.P,pe_ L

  • InstallationRequirements1. Install furnace level.

    2. This furnace is NOT to be used for temporary heat of buildingsor structures under construction.

    3.

    4.

    5.

    6.

    7.

    Install the vent pipes as short as practical. (See Gas VentInstallation section).

    Do NOT install furnace directly on carpeting, tile or othercombustible material other than wood flooring.

    Maintain clearance for fire safety and servicing. A frontclearance of 24" (609.6mm) required and 30" (762mm)recommended for access to the burner, controls and filter.See clearance requirements in Figure 3.

    Use a raised base if the floor is damp or wet at times.

    Residential garage installations require:

    • Burners and ignition sources installed at least 18"(457.2mm) above the floor.

    8.

    9.

    Furnace must be located or physically protected frompossible damage by a vehicle.

    If the furnace is to be suspended from the floor joists in abasement or a crawl space or the rafters in an attic, it isnecessary to use steel pipe straps or an angle iron frame toattach the furnace. These straps should be attached to thefurnace with sheet metal screws and to the rafters or joistswith bolts. The preferred method is to use an angle iron framebolted to the rafters or joists.

    Local codes may require a drain pan under the entire furnaceand condensate trap when the furnace is installed in atticapplication.

    This furnace may be used for construction heat provided that allthe following conditions are met:

    The furnace is permanently installed with all electricalwiring, piping, venting and ducting installed according tothese installation instructions. A return air duct is provided,sealed to the furnace casing, and terminated outside thespace containing the furnace. This prevents a negativepressure condition as created by the circulating air blower,causing a flame rollout and/or drawing combustion productsinto the structure.

    • The furnace is controlled by a thermostat. It may not be "hotwired" to provide heat continuously to the structure withoutthermostatic control.

    Clean outside air is provided for combustion. This is tominimize the corrosive effects of adhesives, sealers andother construction materials. It also prevents theentrainment of drywall dust into combustion air, which cancause fouling and plugging of furnace components.

    The temperature of the return air to the furnace ismaintained between 55° F (13° C) and 80° F (27° C), with noevening setback or shutdown. The use of the furnace whilethe structure is under construction is deemed to beintermittent operation per our installation instructions.

    The air temperature rise is within the rated rise range on thefurnace rating plate, and the firing rate has been set to therating plate value.

    The filters used to clean the circulating air during theconstruction process must be either changed or thoroughlycleaned prior to occupancy.

    The furnace, ductwork and filters are cleaned as necessaryto remove drywall dust and construction debris from allHVAC system components after construction is completed.

    After construction is complete, verify furnace operatingconditions including ignition, input rate, temperature riseand venting according to these instructions.

    440 01 102404

    Specifications are subject to change without notice

  • Dimensions & Clearances

    --1 F

    TO P "\-

    /

    -_ E

    ........ AIR INTAKE

    _..z-Iz" fVENT (N9MPD & *9MPD)

    '_ t H

    21/_

    ]

    LEFT SIDE ,611/1__

    TRAP(KO)(COUNTERFLOW)_ _

    GAS...VENT ........_J.)

    AIR INTAKE(KO) ,/_,,

    (ALTERNATE) 4:1:_116"_J)i

    TRAP (KO) (122.2) _UPFLOW/HORIZONTAL.............

    • THERMOSTAT //'k __ 7 --_(177.8)

    215/8 I 47/8

    (549.3) (123.8)24

    (609.6)

    ELECTRICAL11/4(32)

    13/B

    (34.9)

    175/16 1913/16(439.7) (503.2)

    111/16I

    (42i9)

    A

    FRONT

    MINIMUM CLEARANCES TOCOMBUSTIBLE MATERIALS FOR ALL UNITS

    REAR 0

    FRONT (combustion air openings 3" (76.2)in furnace and in structure)

    Required For Service *24" (609.6)

    ALL SIDES Of SUPPLY PLENUM 1" (25.4)SIDES 0

    VENT 0

    TOP OF FURNACE 1" (25.4)

    *30" (762mm)dearancerecommendedforfurnaceremoval.

    Horizontalposition:Linecontactispermissibleonlybetweenlinesformedbyintersectionsoftopandtwosidesoffurnacejacket,andbuildingjoists,studsorframing.

    NOTE: Evaporator "A" coil drain pan dimensions mayvary from furnace duct opening size. Always consultevaporator specifications for duct sizerequirements.

    Furnace is designed for bottom return or sidereturn.

    Return air through back of furnace is NOT allowed,

    (31.7)

    BOTTOM

    .... 231/8C (587.4)

    CabinetUnit

    Capacity

    N9MP1040/050B̂̂

    N9MP1060/075B̂̂

    N9MP1080/100F^^

    N9MPl100/125Ĵ̂

    N9MP2050/075B̂̂

    N9MP2080/100F^^

    N9MP2100/125J^^

    N9MPD040/050F̂̂

    N9MPD060/075F̂̂

    N9MPD080/100Ĵ̂

    N9MPD125L̂̂

    *9MPD050/075F̂̂

    *9MPD080/100Ĵ̂

    *9MPD125L̂̂

    * Denotes Brand

    ^^ Cooling Air Flow

    _ 37/8(98.4)

    ALL DIMENSIONS - IN(MM)1in=25,4mm

    Bottom Top

    23/8(60)_

    11/16(27)_

    GAS ..\

    1110(10) 413/16__, (122)

    I r;I '/18 .........27

    91 /16 (6 I1)/

    {2'I}3 175/16(440) 111,

    /

    / 281/2 (724)

    r

    /' RIGHT SIDE

    ,' / TRAP (COUNTERFLOW)

    ELECTRICAL (KO)

    _- I AIR INTAKE (KO)

    _. ).......... (ALTERNATE)_J

    _/t, ' VENT (KO)

    _\]-) TRAP(KO)C- UPFLOW/HORIZONTAL

    (178) \ 21/4(57)THERMOSTAT T

    1(489)

    47/8 215/8(124) - (549)

    24(610)

    (KO)

    3L

    17/8

    (48)

    KO = KnockOut 25-23-36b

    Drawing is representative, but some models may vary

    8 44001 102404

    Specifications are subject to change without notice

  • KnockOuts for upflow and downflow installations or top to bottom for horizontalinstallations.

    CUT HAZARD

    Failure to follow this caution may result in personalinjury.Sheet metal parts may have sharp edges or burrs.Use care and wear appropriate clothing, safetyglasses and gloves when handling parts andservicing furnaces.

    Use a hammer and screwdriver to strike a sharp blow (SeeFigure 4) directly to the knockout tie points or use a hammer in theupper left corner of the desired knockout. Remove any burrs andsharp edges.

    Hammer and Screwdriver used

    iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiifor Knockout

    !'

    25-40-06

    NOTE: If a knockout does not come out after two sharp blows, pulland snip as needed to remove the knockout.

    InstallationPositions

    This furnace can be installed in an upflow, horizontal (either left orright) or downflow airflow position. DO NOT install this furnace onits back. For the upflow position, the return air ductwork can beattached to either the left or right side panel and/or the bottom. Forhorizontal and downflow positions, the return air ductwork must beattached to the bottom. The return air ductwork must never beattached to the back of the furnace.

    FurnaceInstallationConsiderations

    The installation of the furnace for a given application will dictate theposition of the furnace, the airflow, ductwork connections, vent andcombustion air piping. Consideration must be given to thefollowing:

    CondensateTrapand DrainLinesThe supplied condensate trap must be attached to the furnaceside panel on either the left or right side. For horizontalinstallations, the drain trap is vertically attached to the side panelbelow the furnace. A minimum clearance of 6" (152.4mm) belowthe furnace is required for the condensate trap. Downward slope ofthe condensate drain line from the condensate trap to the drainlocation must be provided. Adequate freeze protection of the draintrap and the drain line must be provided. See "Condensate DrainTrap" section for further details.

    LevelingProper leveling of the furnace must be provided to insure properdrainage of the condensate from the furnace. The furnace must belevel to within 1/4" (6.4mm) from front to back and from side to side

    440 01 102404

    Vent and Combustion Air Connections

    For venting information literature, call 931.270.4100 with thecomplete model and serial number of the furnace.

    Special Venting Requirements for Installations in Canada

    Installation in Canada must conform to the requirements of CSAB149 code. Vent systems must be composed of pipe, fittings,cements, and primers listed to ULC S636. The special vent fittingsand accessory concentric vent termination kits and accessoryexternal drain trap have been certified to ULC S636 for use withthose Royal Pipe and IPEX PVC vent components which havebeen certified to this standard. In Canada, the primer and cementmust be of the same manufacturer as the vent system - GVS-65Primer (Purple) for Royal Pipe or IPEX System 636, PVC/CPVCPrimer, Purple Violet for Flue Gas Venting and GVS-65 PVC

    Solvent Cement for Royal Pipe or IPEX System 636(1) ,M,PVCCement for Flue Gas Venting, rated Class IIA, 65 deg C. must beused with this venting system - do not mix primers and cementsfrom one manufacturer with a vent system from a differentmanufacturer. Follow the manufacturer's instructions in the use of

    primer and cement and never use primer or cement beyond itsexpiration date.

    The safe operation, as defined by ULC S636, of the vent system isbased on following these installation instructions, the vent systemmanufacturer's installation instructions, and proper use of primerand cement. All fire stop and roof flashing used with this systemmust be UL listed material. Acceptability under Canadianstandard CSA B149 is dependent upon full compliance with allinstallation instructions. Under this standard, it is recommendedthat the vent system be checked once a year by qualified servicepersonnel.

    The authority having jurisdiction (gas inspection authority,municipal building department, fire department, etc) should beconsulted before installation to determine the need to obtain a

    permit.

    (1) System 636 is a trademark of IPEX Inc.Consignes sp6ciales pour I'installation de ventillation auCanada

    L'installation faite au Canada doit se conformer aux exigences ducode CSA B149. Ce syst_me de ventillation doit se composer detuyaux, raccords, ciments et appr_ts conformes au ULC S636. Latuyauterie de ventillation des gaz, ses accessoires, le terminalconcentrique mural ainsi que I'ensemble du drain de condensatexterieur ont et6 certifies ULCS 636 pour I'application descomposantes Royal Pipe, IPEX PVC qui sont certifiees & cestandard. Au Canada, I'appr_t et le ciment doivent _tre du m_mefabricant que le systeme d'evacuation. Uappr_t GVS-65 (Purple)et le ciment-solvant GVS-65 doivent _tre utilise avec les RoyalPipe. Systeme IPEX 636, appr_t PVC/CPVC, Purple pourevacuation des gaz de combustion et systeme IPEX 636(1)'_,ciment PVC pour evacuation des gaz de combustion, cote classeIIA, 65 deg C. doivent _tre utilises avec le systeme d'evacuationIPEX 636 - Ne pas combiner I'appr_t et le ciment d'unmanufacturier avec un systeme d'evacuation d'un manufacturierdifferent.

    Bien suivre les indications du manufacturier Iors de t'utilisation de

    I'appr_t et du ciment et ne pas utiliser ceux-ci si la date d'expirationest atteinte.

    Uoperation securitaire, tel que definit par ULC S636, du systemede ventilation est base sur les instructions d'installation suivantes,ainsi que I'usage approprie de I'appr_t et ciment. Tout arret feu etsolin de toit utilises avec ce systeme doivent _tre des materiauxlistes UL. Uacceptation du standard Canadien CSA B419 estdirectement relie& l'instaltation conforme aux instructions ci- haut

    Specifications are subject to change without notice

  • mentionnees. Le standard Canadien recommande I'inspectionpar un personel qualifie et ce, une fois par annee.

    Les autoritees ayant juridiction (inspecteurs de gas, inspecteursen b&timents, departement des incendies, etc) devraient _treconsultees avant I'instatlation afin de determiner si un permis estrequis.

    On the N9MPD or *9MPD furnace, the vent and combustion airpipes attach to the furnace through the top panel for the upflow andhorizontal installations. For the downflow installation, the vent andcombustion air pipes attach to the furnace through the alternatelocations on the furnace side panels.

    Note: On the N9MP2 furnace, the vent pipe attaches to the furnacethrough the side panels. The combustion air pipe attaches to thetop panel or to the alternate location on the side panel.

    On the Single Pipe furnace, the vent pipe attaches to the furnacethrough the furnace side panels.

    Note: Repositioning of the combustion blower is required for thevent pipe connection to the furnace through the "right side" panel.See "Vent and Combustion Air Piping" section for further details.

    HorizontalFurnaceInstallation

    This furnace can be installed horizontally in an attic, basement,crawl space, alcove, or suspended from a ceiling in a basement orutility room. See Figure 5. Do not install furnace on its back or inthe reverse airflow positions as safety control operation will beadversely affected.

    If the furnace is to be installed in a crawl space, consult localcodes. A suitable concrete pad or blocks are recommended forcrawl space installation on the ground.

    NOTE: 6" (152.4mm) bottom clearance required for condensatetrap.

    24"(609.6mm) between the front of the furnace and adjacentconstruction or other appliances MUST be maintained for serviceclearance. 30" (762mm) inches is required to remove furnace.

    Typical Horizontal Installation

    Att i C

    Inlet Pipe/(not....used_?_onSingle Pipemodel)

    Vent

    Pipe-_

    _ z/ Condensate

    .!_ Trap

    -%. \J_

    25-23-34

    NOTE: 6" (152.4mm)bottomclearancerequiredfor condensatetrap.Auxiliarydrain panis requiredif over a finished living space.

    Keep all insulating materials clear from Iouvered door. Insulatingmaterials may be combustible.

    The horizontal furnaces may be installed directly on combustiblewood flooring or supports as long as all required furnaceclearances are met. See Figure 5.

    This furnace MUST NOT be installed directly on carpeting or tile orother combustible material other than wood flooring or supports.

    For horizontal installation over a finished living space. A fieldfabricated auxiliary drain pan with drain pipe is required to preventdamage by overflow due to blocked condensate drain.

    Combustion & Ventilation Air

    For SinglePipeInstallation

    CARBON MONOXIDE POISONING HAZARD

    Failure to follow this warning could result inpersonal injury or death.

    Provide adequate combustion and ventilation air.

    Use methods described here to providecombustion and ventilation air.

    Furnaces require ventilation openings to provide sufficient air forproper combustion and ventilation of flue gases. All duct oropenings for supplying combustion and ventilation air mustcomply with the gas codes, or in the absence of local codes, theapplicable national codes.

    Combustion and ventilation air must be supplied in accordancewith one of the following:Note: The Combustion & Ventilation Air Section in this document,

    uses tables and information from the ANSI Z223.1/NFPA54. For use in Canada, use CSA B149.1 for this information.

    1. Section 9.3, Air for Combustion and Ventilation, of the NationalFuel Gas Code, (NFGC), ANSI Z223.1/NFPA 54-2009 in theU.S.,

    2. Sections 8.2, 8.3, 8.5, 8.6, 8.7, and 8.8 of National Standard ofCanada, Natural Gas and Propane Installation Code(NSCNGPIC), CSA B149.1-05 in Canada,

    3. Applicable provisions of the local building code.

    This furnace can NOT be common vented or connected to anytype B, BW or L vent or vent connector, nor to any portion of afactory-built or masonry chimney. Multistory venting is NOTpermitted. If this furnace is replacing a previously common-ventedfurnace, it may be necessary to resize the existing vent andchimney to prevent oversizing problems for the other remainingappliance(s). See "Venting and Combustion Air Check" in thissection. This furnace MUST be vented to the outside.

    When the installation is complete, check that all appliances haveadequate combustion air and are venting properly. See VentingAnd Combustion Air Check in "Gas Vent Installation" Section inthis manual.

    Outdoor CombustionAir MethodA space having less than 50 cubic feet per 1,000 BTUH (4.8 cubicmeters per kW) input rating for all gas appliances installed in thespace requires outdoor air for combustion and ventilation.

    Air Openingsand ConnectingDucts1. Total input rating for all gas appliances in the space MUST be

    considered when determining free area of openings.

    2. Connect ducts or openings directly to the outdoors.

    3. When screens are used to cover openings, the openingsMUST be no smaller than 1/4" (6.4mm) mesh.

    4. The minimum dimension of air ducts MUST NOT be less than

    3" (76.2mm).

    10

    Specifications are subject to change without notice

    44001 102404

  • 5. When sizing a grille, louver, or screen use the free area ofopening. If free area is NOT stamped or marked on grill orlouver, assume a 20% free area for wood and 60% for metal.Screens shall have a mesh size not smaller than 1/4" (6.4mm).

    Requirements1. Provide the space with sufficient air for proper combustion and

    ventilation of flue gases using horizontal or vertical ducts oropenings.

    2. Figure 6 illustrates how to provide combustion and ventilationair when two permanent openings, one inlet and one outlet,are used.

    a. One opening MUST commence within 12" (304.8mm) ofthe floor and the second opening MUST commencewithin 12" (304.8mm) of the ceiling.

    b. Size openings and ducts per Table 1.

    Outside Air (This is ONLY a guide. Subject to codes of country having jurisdiction.)

    GasVent

    This installation NOT approved in Canada GasVen_

    GableVent j_ _i_r "_

    _ alternat"_eInlet Air 11) A/ GableVent _ _ I'r-"li "''" "" "" "" "" ' " " " "" _)_",,,' _ Ga Ven _ -- J II II rl II Outlet

    I-" _ _ f'VentilatedAttic_ n.tlp_4 II _ _ Air(21OutletAir(1) SoffitVent f ....... "_" Ai_';1; I II 3| II II

    lOp ADOVe insulation _ _ / I rum, J.t I I I I% ............... II It1 II II2d= _ m I I _1TM J I I I I II II

    • SoffitVent Inlet InletI--I / 0utletA, r_,_ I1 I ,ir , ,..,tLM / % II I

    r_l , _ I I -- ,-_ II I MinimumOnelnletandOneOutletAirSupplyisRequired', I I I I H I May be in any CombinationShown

    _ _ ,.,^, / I ...... I,_1 I I I Inlet Air Openingmustbe within 12" (304.8mm)offloorVentilatedCrawl_ '_'.'=' _1-..I I._Z.%J _ Inl t

    A,r (1) _ 1"_°7 _ _ All(2) Outlet Air Openingmustbe within 12" (304.8mm)ofceiling(1) 1SquareInch per4000 BTUH

    (2) 1SquareInch per2000 BTUH

    alternateInletAir (1)

    c. Horizontal duct openings require 1 square inch of freearea per 2,000 BTUH (11 cm2/kW) of combined input forall gas appliances in the space (see Table 1).

    d. Vertical duct openings or openings directlycommunicating with the outdoors require 1 square inchof free area per 4,000 BTUH (5.5 cm2/kW) for combinedinput of all gas appliances in the space (see Table 1).

    3. When one permanent outdoor opening is used, the openingrequires:

    a. 1 sq. in of free area per 3,000 BTUH (7 cm2/kW) forcombined input of all gas appliances in the space (seeTable 1) and

    b. not less than the sum of the areas of all vent connectorsin the space.

    The opening shall commence within 12" (304.8mm) of the top ofthe enclosure. Appliances shall have clearances of at least 1"(25.4mm) from the sides and back and 6" (152.4mm) from thefront. The opening shall directly communicate with the outdoors or

    Free Area

    BTUH(kW)Input

    Rating

    40,000 (11.72)

    50,000 (14.65)

    60,000 (17.58)

    75,000 (21.98)

    80,000 (23.45)

    100,000 (29.31)

    125,000 (36.63)

    Two HorizontalDuctsBTUH(kW)

    sq. in./2,000(1cm2/.09)

    20sq. in. (129 cmz)

    25sq. in. (161 cmz)30 sq. in. (194 cmz)

    37.5sq. in. (242cmz)40sq. in. (258 cmz)

    50sq. in. (322 cmz)62.50sq. in. (403cmz)

    EXAMPLE: Determining Free AreaFurnace Water Heater

    100,000 + 30,00029.31 8.8

    Furnace Water Heater

    100,000 + 30,00029.31 8.8

    shall communicate through a vertical or horizontal duct to theoutdoors or spaces (crawl or attic) that freely communicate withthe outdoors.

    4. Combination of Indoor and Outdoor Air shall have:

    a. Indoor openings that comply with the

    b.

    c.

    IndoorCombustion Air Method below and

    Outdoor openings located as required in the OutdoorCombustion Air Method above and

    Outdoor openings sized as follows.

    1) Calculate the Ratio of all Indoor Space volumedivided by required volume for Indoor Combustion AirMethod.

    2) Outdoor opening size reduction Factor is I minus theRatio in 1) above.

    3) Minimum size of Outdoor openings shall be the sizerequired in Outdoor Combustion Air Method abovemultiplied by reduction Factor.

    MinimumFreeArea Requiredfor EachOpeningor Ductto OutdoorsSingleOpening

    BTUH(kW)sq. in./3,000(1cm2/.135)

    13.34sq. in. (86cmz)

    16.7sq. in. (108cmz)20 sq. in. (129 cmz)

    25 sq. in. (161 cmz)26.7sq. in. (172cmz)

    33.3sq. in. (215cmz)41.7sq. in. (269cmz)

    TwoVerticalDuctsor OpeningsBTUH(kW)

    sq. in./4,000(1cm2/.18)

    10 sq. in. (65cmz)

    12.5sq. in. (81cmz)15 sq. in. (97cmz)

    18.75sq. in. (121 cmz)20 sq. in, (129 cmz)

    25 sq. in, (161 cmz)31.25sq. in. (202cmz)

    RoundDuctBTUH(kW)

    sq. in./4,000(6.5cm2/.18)

    4" (101.6mm)

    4" (101.6mm)4" (101.6mm)

    5" (127mm)5" (127mm)

    6" (152.4mm)7" (177.8mm)

    Total Input

    (130,000 + 4,000)(38.11 + .18)Total Input

    (130,000 + 2,000)(38.11 + .09)

    = 32.5 S_ In. Vertical= 210 cm_ Vertical

    = 65 Sq. In. Horizontal= 423 cm2 Horizontal

    440 01 102404

    Specifications are subject to change without notice

  • IndoorCombustionAir standard method permits indoor air to be used for combustion andventilation air.

    CARBON MONOXIDE POISONING HAZARD

    Failure to follow this warning could result inpersonal injury or death.Most homes will require additional air fromoutdoors for combustion and ventilation. A spacewith at least 50 cubic feet per 1,000 BTUH (4.8 cubicmeters per kW) input rating or homes with tightconstruction may need outdoor air, suppliedthrough ducts, to supplement air infiltration forproper combustion and ventilation of flue gases.

    Standard and Known-Air-lnfiltrati0n Rate Methods© NFPA & AGA

    Indoor air is permitted for combustion and ventilation, if theStandard or Known-Air-Infiltration Rate Method is used.

    The Standard Method may be used, if the space has no lessvolume than 50 cubic feet per 1,000 BTUH (4.8 cubic meters perkW) input rating for all gas appliances installed in the space. The

    The Known Air Infiltration Rate Method shall be used if the

    infiltration rate is known to be less than 0.40 air changes per hour(ACH) and equal to or greater than 0.10 ACH. Infiltration ratesgreater than 0.60 ACH shall not be used. The minimum requiredvolume of the space varies with the number of ACH and shall bedetermined per Table 2 or Equations 1 and 2. Determine theminimum required volume for each appliance in the space, andadd the volumes together to get the total minimum requiredvolume for the space.

    CARBON MONOXIDE POISONING HAZARD

    Failure to follow this warning could result inpersonal injury or death.

    An unconfined space or homes with tightconstruction may not have adequate air infiltrationfor proper combustion and ventilation of flue gases.

    Most homes will require additional air.

    i' MINIMUM SPACE VOLUME FOR 100% COMBUSTION AND VENTILATION AIR FROM INDOORSOtherThanFan-AssistedTotal Fan-assistedTotal

    30,000BTU 40,000BTU 50,000BTU 50,000BTU 75,000BTU 100,000BTU 125,000BTUACH (8,790kW) (11,720kW) (14,650kW) (14,650kW) (21,975kW) (29,300kW) (36,625kW)

    ft3(m3)

    0.60 1,050(29.7) 1,400(39.2) 1,750(49) 1,250(35) 1,875(52.5) 2,500(70) 3,125(87.5)

    0.50 1,260(35.3) 1,680(47.04) 2,100(58.8) 1,500(42) 2,250(63) 3,000(84) 3,750(105)

    0.40 1,575(44.1) 2,100(58.8) 2,625(73.5) 1,875(52.5) 2,813(78.8) 3,750(105) 4,688(131.3)

    0.30 2,100(58.8) 2,800(78.4) 3,500(98) 2,500(70) 3,750(105) 5,000(140) 6,250(175)

    0.20 3,150(88.2) 4,200(117.6) 5,250(147) 3,750(105) 5,625(157.5) 7,500(210) 9,375(262.5)

    0.10 6,300(176.4) 8,400(235.2) 10,500(294) 7,500(210) 11,250(315) 15,000(420) 18,750(525)

    0.00 NP NP NP NP NP NP NP

    ACH = Air Changes per HourNP = Not Permitted

    Table 2 Minimum Space Volumes were determined by using thefollowing equations from the National Fuel Gas Code ANSIZ223.1/N FPA 54-2009, 9.3.2.2:

    1. For appliances other than fan-assisted appliances (suchas a draft hood-equipped water heater), calculate using thefollowing equation:

    Required Volume other _ 21ft3 ( |°ther )ACH 1000 BTU H

    where:

    I other= all appliances other than fan-assisted input in BTUH

    I fan = fan-assisted appliance input in BTUH

    AOH = air change per hour (percent of volume of spaceexchanged per hour, expressed as a decimal)

    3. For purposes of this calculation, an infiltration rate greaterthan 0.60 ACH shall not be used in the equations above.

    ! \Required Volume other _ 59 m3 _ [ other )

    ACH .293 kW

    The following requirements apply to the Standard Method and tothe Known Air Infiltration Rate Method.

    * Adjoining rooms can be considered part of a space, if thereare no ctosable doors between rooms.

    2. For fan-assisted appliances (such as this furnace),calculate using the following equation:

    Required Volume fan_ 15ft3 ( |fan )ACH 1000 BTU H

    ! \Required Volume fan _ .42 m3 _ [ fan )

    ACH .293 kW

    Combining spaces on the same story. Each opening shallhave a minimum free area of at least 1 in.2/1,000 BTUH (22cm2/kW) of the total input rating of all appliances in the spacebut not less than 100 in.2 (645 cm2). One opening shallcommence within 12 in. (304.8 mm) of the top, and oneopening shall commence within 12 in. (304.8 mm) of thebottom, of the enclosure. The minimum dimension of airopenings shall not be less than 3 in (76.2 mm).

    Combining spaces in different stories. The volumes of spaceson different stories shall be considered as communicatingspaces where such spaces are connected by one or more

    12

    Specifications are subject to change without notice

    44001 102404

  • openings in doors or floors having a total minimum free areaof 2 in.2/1,000 BTUH (44 cm2/kW) of total input rating of allappliances.

    An attic or crawl space may be considered a space that freelycommunicates with the outdoors provided there are adequateventilation openings directly to outdoors. Openings MUSTremain open and NOT have any means of being closed off.Ventilation openings to outdoors MUST be at least 1 squareinch of free area per 4,000 BTUH (5.5 cm2/kW) of total inputrating for all gas appliances in the space.

    In spaces that use the Indoor Combustion Air Method,infiltration should be adequate to provide air for combustion,ventilation and dilution of flue gases. However, in buildingswith unusually tight construction, additional air MUST beprovided using the methods described in section titledOutdoor Combustion Air Method:

    * Unusually tight construction is defined as Construction with:

    1. Walls and ceilings exposed to the outdoors have acontinuous, sealed vapor barrier. Openings aregasketed or sealed and

    2. Doors and openable windows are weather stripped and

    3. Other openings are caulked or sealed. These includejoints around window and door frames, between soleplates and floors, between wall-ceiling joints, betweenwall panels, at penetrations for plumbing, electrical andgas lines, etc.

    VentilationAirSome provincial codes and local municipalities require ventilationor make-up air be brought into the conditioned space asreplacement air. Whichever method is used, the mixed return airtemperature across the heat exchanger MUST not fall below 60°so that flue gases wilt not condense excessively in the heatexchanger. Excessive condensation will shorten the life of the heatexchanger and possibly void your warranty.

    Venting andCombustionAir Check

    Vent Check

    iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii

    T, ca:P e DratH°°OWater Heater /' \ _ _,

  • Vent and Combustion Air Piping

    CARBON MONOXIDE POISONING HAZARD

    Failure to follow this warning could result inpersonal injury or death.Use methods described here to provide combustionand ventilation air.

    Single Pipe (N9MP1 Models)This furnace is certified as a Category _V appliance. This furnacerequires ventilation openings to provide air for proper combustionand ventilation of flue gases. All duct or openings for supplyingcombustion and ventilation air must comply with the gas codes orin absence of local codes, the applicable national codes.

    When the installation is complete, see the "Venting andCombustion Air Check" in this manual.

    Dual Certified (NgMP2,NgMPDand *gMPDModels)This furnace is certified as a Category _V appliance. This furnacecan be installed as a direct vent furnace using outside air forcombustion or the furnace can use air from inside the structure forcombustion. The INLET air pipe is optional. If combustion aircomes from inside the structure, adequate make up air MUST beprovided to compensate for oxygen burned. See Confined SpaceInstallation in the Combustion and Ventilation Air chapter. Ifcombustion air is drawn from outside the structure, it MUST betaken from the same atmospheric pressure zone as the vent pipe.

    Contaminated Combustion Air

    Installations in certain areas or types of structures will increase theexposure to chemicals or halogens that may harm the furnace.

    The following areas or types of structures may contain or haveexposure to the substances listed below. The installation must beevaluated carefully as it may be necessary to provide outside airfor combustion.

    • Commercial buildings.

    • Buildings with indoor pools.

    • Furnaces installed in laundry rooms.

    • Furnaces installed in hobby or craft rooms.

    • Furnaces installed near chemical storage areas.

    • Permanent wave solutions for hair.

    • Chlorinated waxes and cleaners.

    • Chlorine based swimming pool chemicals.

    • Water softening chemicals.

    • De-icing salts or chemicals.

    • Carbon tetrachloride.

    • Halogen type refrigerants.

    • Cleaning solvents (such as perchloroethylene).

    • Printing inks, paint removers, varnishes, etc.

    • Hydrochloric acid.

    • Sulfuric Acid.

    • Solvent cements and glues.

    • Antistatic fabric softeners for clothes dryers.

    • Masonry acid washing materials.

    Vent and CombustionAir PipingGuidelinesThis furnace is approved for venting with Schedule 40 PVC,CPVC, ABS fittings, and Cellular Core and SDR-26 PVC pipe.

    Applicable ASTM Standards for Vent Materials

    Sch.40 SDR Cell Solv.Materials Pipe Pipe Core Fittings Primer Cement

    Pipe

    D2468ABS D1527 F628 & -- D2235

    D2661

    D2466PVC D1785 D2241 F891 & F656 D2564

    D2665

    CPVC F44t F442 -- F438 -- F493

    ABS to.......... D3138PVC

    NOTE: 1) In Canada, all pipe, fittings & cements must conform toapplicable CSA standards or to local codes having jurisdiction.

    2) Only use solvent cements that are marked for use withthe specific venting material.

    3) ABS to PVC transition joints REQUIRE a specialsolvent cement that meets the requirements of ASTM D3138.

    4) Refer to ASTM D2855 for general procedure to use forcementing plastic pipe and fittings.

    NOTE: In order to create a seal that allows future removal of pipe,RTV sealant MUST be used on the inlet pipe where it joins to thefurnace.

    NOTE: All vent piping MUST be installed in compliance with localcodes or ordinances, these instructions, good trade practices, andcodes of country having jurisdiction.

    1. Determine the best routing and termination for the vent pipeand air inlet pipe by referring to all of the instructions andguidelines in this Section.

    2. Determine the size required for the vent pipe and air inletpipe.

    3. Loosely assemble all venting parts without adhesive (pipejoint cement) for correct fit before final assembly.

    4. Furnace shall be installed so as to prevent the accumulationof condensate.

    5. Use of vertical piping is preferred because there will besome moisture in the flue gases that may condense as itleaves the vent pipe (See Instruction For Horizontal Vents).

    6. The vertical vent pipe MUST be supported so that no weightis allowed to rest on the combustion blower.

    7. Exhaust vent piping or air inlet piping diameter MUST NOTbe reduced.

    8. All exhaust vent piping from the furnace to terminationMUST slope upwards. A minimum of 1/4" per foot per(6.4mm per 304.8mm) of run is required to properly returncondensate to the furnace drain system.

    9. Use DWV type long radius elbows whenever possible, asthey provide for the minimum slope on horizontal runs andthey provide less resistance in the vent system. If DWVelbows cannot be used, use two, 45° elbows when possible.On horizontal runs the elbows can be slightly misaligned toprovide the correct slope.

    10. All horizontal pipe runs MUST be supported at least everyfive feet with galvanized strap or other rust resistantmaterial. NO sags or dips are permitted.

    14

    Specifications are subject to change without notice

    44001 102404

  • 11. All vertical pipe runs MUST be supported every six feet(1 .Sm) where accessible.

    12. The minimum vent length is 5' (1.5m) of PVC.

    13. The piping can be run in the same chase or adjacent tosupply or vent pipe for water supply or waste plumbing. Itcan also be run in the same chase with a vent from another90+ furnace.

    NOTE: In NO case can the piping be run in a chase wheretemperatures can exceed 140 ° F(60°C). or where radiatedheat from adjacent surfaces would exceed 140° F(60°C).

    14. The vent outlet MUST be installed to terminate in the sameatmospheric pressure zone as the combustion air inlet.

    15. The vent system can be installed in an existing unusedchimney provided that:

    * Both the exhaust vent and air intake run the length of thechimney.

    * No other gas fired appliance or fireplace (solid fuel) isvented into the chimney.

    * The top of the chimney MUST be sealed flush or crownedup to seal against rain or melting snow so ONLY the pipingprotrudes.

    * The termination clearances shown in Figure 8 & Figure 9are maintained.

    16. Furnace applications with vertical vents requiring ventdiameter increaser fittings must have increaser fittingsinstalled in vertical portion of the vent. Condensate will betrapped in the vent if the vent diameter is increased prior tohaving an elbow turned upward. This could cause nuisancetripping of the pressure switch.

    Combustion Air and Vent Piping InsulationGuidelinesNOTE: Use closed cell, neoprene insulation or equivalent. IfFiberglass or equivalent insulation is used it must have a vaporbarrier. Use R values of 7 up to 10' (3.1m), R-11 if exposureexceeds 10'(3.1 m). If Fiberglass insulation is used, exterior to thestructure, the pipe MUST be boxed in and sealed againstmoisture.

    1. When the vent or combustion air pipe height above the roofexceeds 30" (762mm) or if an exterior vertical riser is usedon a horizontal vent to get above snow levels, the exteriorportion MUST be insulated.

    2. When combustion air inlet piping is installed above asuspended ceiling, the pipe MUST be insulated withmoisture resistant insulation such as Armafiex or otherequivalent type of insulation.

    3. Insulate combustion air inlet piping when run in warm,humid spaces.

    SizingCombustionAir andVent PipeConsult Table 3 or Table 4 to select the proper diameter exhaustand combustion air piping. Exhaust and combustion air piping issized for each furnace Btuh size based on total linear vent length(on inlet or outlet side), and number of 90 ° elbows required. Two45° elbows can be substituted for one 90 ° elbow. The elbow orelbows used for vent termination outside the structure ARE

    counted, including elbows needed to bring termination aboveexpected snow levels. The elbow inside the furnace on theN9MPD and *9MPD IS NOT included in the count.

    Pipe Diameter Table

    N9MP1, N9MPD & *9MPD Models

    40,000, 50,000, 60,000, 75,000 & 80,000 Btuh Furnaces

    40' (12.2m) & (5) 90° elbows with 2" (50.8mm) PVC pipe or70' & (5) 90° elbows with 3" (76.2mm) PVC pipe

    100,000 Btuh Furnace

    40' (12.2m) & (5) 90° elbows with 3" (76.2mm) PVC pipe or70' & (5) 90° elbows with 3" (76.2mm) PVC pipe &

    Long Vent Kit (SeeTech. Manual)

    125,000 Btuh Furnace

    40' & (5) 90° elbows with 3" (76.2mm) PVC pipeThe minimum vent length is 5' (1.5m)of PVC. Elbows are DWVLong Radius Type for 2" (50.Smm)and 3" (76.2mm)vents.

    If more than five elbows are required, REDUCE the length ofboth the inlet and exhaust pipes 5' (1.5m) for each additionalelbow used. If less than five elbow are required, the lengthcan be INCREASED by 5' (1.5m) for each additional elbowNOT used.NOTE: It is allowable to use larger diameter pipe and fitting thanshown in the tables but not smaller diameters than shown.

    Pipe Diameter TableN9MP2 Models

    50,000 & 80,000 Btuh Furnaces

    40' (12.2m) & (5) 90° elbows with 2" (50.8mm) PVC pipe or70' (21.3m) & (5) 90° elbows with 3" (76.2mm) PVC pipe

    75,000 Btuh Furnaces

    25' & (3) 90° elbows with 2" (50.8mm) PVC pipe or40' (12.2m) & (5) 90° elbows with 2" (50.Smm)PVC pipe &

    Long Vent Kit (See Tech. Manual) or70' (21.3m) & (5) 90° elbows with 3" (76.2mm) PVC pipe

    100,000 Btuh Furnace

    40' (12.2m) & (5) 90° elbows with 3" (76.2mm) PVC pipe or70' (21.3m) & (5) 90° elbows with 3" (76.2mm)PVC pipe &

    Long Vent Kit (SeeTech. Manual)

    125,000 Btuh Furnace

    40' (12.2m) & (5) 90° elbows with 3" (76.2mm) PVC pipeThe minimum vent length is 5' (1.5m)of PVC. Elbows are DWVLong Radius Type for 2" (50.Smm)and 3" (76.2mm) vents.

    If more than five elbows are required, REDUCE the length ofboth the inlet and exhaust pipes 5' (1.5m) for each additionalelbow used. If less than five elbows are required, the lengthcan be INCREASED by 5' (1.5m) for each additional elbowNOT used.NOTE: It is allowable to use larger diameter pipe and fitting thanshown in the tables but not smaller diameters than shown.For concentric vent pipe diameter see ConcentricTermination tables in this manual.

    Vent TerminationClearances

    CARBON MONOXIDE POISONING.

    Failure to follow this warning could result inpersonal injury or death.

    Inlet and outlet pipes may NOT be vented directlyabove each other.

    1. Determine termination locations based on clearances

    specified in following steps and as shown in Figure 8,Figure 9, Figure 22, through Figure 24.

    For concentric vent termination clearances, refer toConcentric Termination Kit instructions,

    2. For Single Pipe Installation, models N9MP1, N9MP2,N9MPD or *9MPD, refer to Figure 9 for vent terminationclearances.

    3. For Direct Vent Installation, models N9MP2, N9MPD or*9MPD, refer to Figure 8 for vent termination clearances.

    440 01 102404 15

    Specifications are subject to change without notice

  • Direct Vent Termination Clearance

    (X] AIR SUPPLY INLET E_ AREA WHERE TERMINAL IS NOT PERMITEDD VENTTERMINAL \\\\\

    Item ClearanceDescription Canadian Installation (1) U.S.Installation (2)

    A Clearanceabove grade,veranda,porch, deck,balcony,or 12" (30cm)# 12" (30 cm)anticipatedsnow level

    B Clearanceto awindowor doorthat maybe opened 12" (30 cm)for appliances > 10,000Btuh (3kW)and _< 9" (23 cm)for appliances > 10,000Btuh(3 kW)and -< 50,000100,000Btuh(30 kW),36" (91 cm) for appliances > 100,000 Btuh(14.7 kW),12" (30cm) for appliances > 50,000Btuh (14.7Btuh(30 kW) kW)

    C Clearanceto a permanentlyclosedwindow * *

    D Verticalclearanceto aventilated soffitlocatedabovethe * *

    terminalwithina horizontaldistanceof 2' (61cm)from thecenterlineof the terminal

    E Clearanceto an unventilatedsoffit *

    F Clearanceto an outsidecorner *

    G Clearanceto an insidecomer *

    H Clearanceto each side of the centerlineextendedabove 3' (91 cm) within 15' (4.5 m) abovethe meter/regulator *electricalmeteror gasservice regulatorassembly assembly

    I Clearanceto serviceregulatorvent outlet 3' (91 cm)

    J Clearanceto non-mechanicalair supply inlet to building or 12" (30 cm) for appliances > 10,000Btuh (3kW) and < 9" (23 cm)for appliances > 10,000Btuh(3 kW)and _<thecombustionair inlet to any other appliance 100,000Btuh (30kW), 36" (91 cm) for appliances > 50,000Btuh(15 kW),12" (30cm) for appliances > 50,000

    100,000Btuh (30kW) Btuh(14.7 kW)

    K Clearanceto a mechanicalair supply inlet 6' (1.83 m) 3' (91 cm) aboveif within 10' (3m) horizontally

    L Clearanceunder averanda,porch, deck,or balcony 12" (30 cm) +

    M Clearanceto each side of the centerlineextendedaboveor 12" (30cm) 12" (30cm)belowvent terminal of thefurnace to adryer or water heatervent, orother appliance'sdirectvent intake orexhaust.

    N Clearanceto thevent terminalof a dryervent, water heater 3' (91 cm) 3' (91 cm)vent, orother appliancesdirectvent intake orexhaust.

    O Clearancefrom a plumbingventstack 3' (91 cm) 3' (91 cm)

    P Clearanceabove a pavedsidewalkor paveddrivewayIo- 7' (2.13 m) ** *catedon publicproperty.

    > greaterthan, _>greaterthan orequalto, < lessthan, _ lessthanor equalto(1.) In accordancewith the currentCSAB149.1, NaturalGas and PropaneInstallationCode(2.) In acccrdancewith the currentANSI Z223.1/NFPA54, NationalFuel Gas Code# 18" (46cm) aboveroof surface+ Permittedonly if veranda,porch,deck,or balconyis fully openon a minimumof twosides beneaththe floor.

    For clearancesnotspecifiedin ANSI Z223.1/NFPA54 or CSAB149.1,clearances shallbe in accordancewith local installationcodesandthe requirementsof the gas supplierand the manufacture'sinstallation instructions.

    ** A ventshall not terminatedirectly abovea sidewalk orpaveddrivewaythat is located betweentwo singlefamily dwellingsand servesboth dwellings.Notes:

    1. The vent for this applianceshall notterminatea. Over publicwalkways;orb. Near soffitvents orcrawl space ventsor otherareas wherecondensateorvapor could createa nuisance orhazardor propertydamage;orc. Wherecondensatevapor cculd cause damageor couldbe detdmentalto theoperation of regulators, reliefvalves, or otherequipment.

    2. When locatingvent terminations,considerationmust be givento prevailingwinds, location,and other conditionswhich maycause recirculationof the combustionproductsof adjacentvents.Recirculationcan cause poor combustion,inlet condensateproblems,and acceleratedcorrosionof the heat exchangers.

    3. Avoid ventingundera deck or large overhang.Recirculationcould occurand cause performanceorsystem problems.

    16 44001 102404

    Specifications are subject to change without notice

  • Other than Direct Vent Termination Clearance

    //,v //'

    I lv/

    /

    '_ VENTTERMINAL _ E_ AREAWHERETERMINALIS NOTPERMITEDAIR SUPPLY INLET

    Item ClearanceDescriptions Canadian Installation(1) U.S.Installation(2)

    A Clearanceabove grade,veranda,porch, deck,balcony,or 12" (30cm)# 12" (30 cm)anticipatedsnow level

    B Clearanceto awindowor doorthat maybe opened 12" (30 cm) for appliances > 10,000Btuh (3kW)and _< 4'(1.2 m)belowortothesideoftheopening, l'(30cm)above100,000Btuh(30 kW),36" (91 cm) for appliances > 100,000 the opening.Btuh(30 kW)

    C Clearanceto a permanentlyclosedwindow * *

    D Verticalclearanceto aventilated soffitlocatedabovethe *terminalwithina horizontaldistanceof 2' (61cm)from thecenterlineof the terminal

    E Clearanceto an unventilatedsoffit * *

    F Clearanceto an outsidecorner •

    G Clearanceto an insidecomer * *

    H Clearanceto each side of the centerlineextendedabove 3' (91 cm) within 15' (4.5 m) abovethe meter/regulator 3' (91 cm) within15' (4.5m) abovethe meter/regulatorelectricalmeteror gasservice regulatorassembly assembly assembly

    I Clearanceto serviceregulatorvent outlet 3' (91 cm) *

    J Clearanceto non=mechanicalair supply inlet to building or 12" (30 cm) for appliances > 10,000Btuh (3kW) and < 4' (1.2m) below or to the side of opening: 1' (30 cm) abovethecombustionair inlet to any other appliance 100,000Btuh (30kW), 36" (91 cm) for appliances > opening.

    100,000Btuh (30kW)

    K Clearanceto a mechanicalair supply inlet 6' (1.83 m) 3' (91 cm) aboveif within 10' (3m) horizontally

    L Clearanceunder averanda,porch, deck,or balcony 12" (30 cm)+ *

    M Clearanceto each side of the centedineextendedaboveor * *

    belowvent terminal of thefurnace to adryer or water heatervent, orother appliance'sdirectvent intake orexhaust.

    N Clearanceto thevent terminalof a dryervent, water heater * *vent, orother appliancesdirectvent intake orexhaust.

    O Clearancefrom a plumbingventstack * *

    P 7' (2.13 m) _-k 7' (2.13m)Clearanceabove a pavedsidewalkor paveddrivewaylo-catedon publicproperty.

    > greaterthan, _>greaterthan orequalto, < lessthan, < lessthanor equalto(1.) In accordancewith the currentCSAB149.1, NaturalGas and PropaneInstallationCode(2.) In accordancewith the currentANSI Z223.1/NFPA54, NationalFuel Gas Code# 18" (46cm) aboveroof surface+ Permittedonly if veranda,porch,deck,or balconyis fully openon a minimumof twosides beneaththe floor.

    For dearancesnotspecifiedin ANSIZ223.1/NFPA54 orCSAB149.1,dearancesshallbein accordancewithlocal installationcodesand therequirementsof thegas supplierand themanufacture'sinstallationinstructions.

    _* A ventshall not terminatedirectly abovea sidewalkor paveddrivewaythat is located betweentwo singlefamily dwellingsand servesboth dwellings.Notes:

    1. The vent for this applianceshall notterminatea. Over publicwalkways;orb. Near soffitvents orcrawl space ventsor otherareas wherecondensateorvapor could createa nuisance orhazardor propertydamage;orc. Wherecondensatevapor couldcause damageor couldbe detdmentalto theoperation of regulators, reliefvalves, or otherequipment.

    2. When locatingvent terminations,considerationmust be givento prevailingwinds, location,and other conditionswhich maycause recirculationof the combustionproductsof adjacentvents.Recirculationcan cause poor combustion,inlet condensateproblems,and acceleratedcorrosionof the heat exchangers.

    3. Avoid ventingundera deck or large overhang.Recirculationcould occurand cause performanceorsystem problems.

    440 01 102404 17

    Specifications are subject to change without notice

  • CondensateDrainTrapThis furnace removes both sensible and latent heat from the

    products of combustion. Removal of the latent heat results incondensation of the water vapor. The condensate is removed fromthe furnace through the drains in the plastic transition and the ventfitting. The drains connect to the externally mounted condensatedrain trap on the left or right side of the furnace.

    The startup of a new furnace will involve a cycle or two of thefurnace to properly prime the condensate trap with water. Until thetrap is fully primed, some condensate wilt be pulled into thecombustion blower. The furnace may cycle on the pressure switchconnected to the plastic transition box due to condensate buildup.After the trap is primed, the condensate will start draining from thefurnace. The combustion blower will clear out any remainingcondensate in the blower housing through the vent fittingdownstream of the blower. Note that the condensate trap can alsobe primed by pouring water into the 1/2" (12.7mm) drain hose.Remove the1/2 " (12.7mm) ID drain hose from either the gutter orthe white PVC tee trap. Using a funnel pour eight (8) ounces (236ml) of water into 1/2" (12.7mm) ID drain hose. Water will flowthrough the drain hose and into the condensate drain trap. This willprime both the vent and the transition sides of the trap. Reconnectthe 1/2" (12.7mm) ID drain hose to the original component, eitherthe gutter or the PVC tee trap.

    The condensate drain trap supplied with the furnace MUST beused. The drain connection on the condensate drain trap is sizedfor 3/4" (19.1mm) PVC or CPVC pipe, however alternate 1/2"(12.7mm) CPVC [nominal 5/8" (15.gmm) O.D.] or vinyl tubing witha minimum inner diameter (I.D.) of 5/8" (15.9mm) may also beused, as allowed by local codes. Alternate drain pipes and hosesmay be used as allowed by local codes.

    The drain line must maintain a 1/4" (6.4mm) per foot downwardslope toward the drain. 1/4" (6.4mm) per foot is recommended.Installation of an overflow line is recommended when the 1/4"(6.4mm) per foot slope to the condensate drain cannot bemaintained. A drain tube retainer clip is included in the furnace toprevent kinking/buckling of the drain tube. The retainer clip shouldremain in the furnace (between the door switch plate and theblower shelf, Figure 10) during operation. See Figure 20 forproper routing and installation of the overflow.

    Drain Tube Retainer Clip Location

    DrainTube

    BloweDoorrShelfSw,,oh

    Representative drawing only, some models may vary in appearance.

    DO NOT trap the drain line in any other location than at thecondensate drain trap supplied with the furnace.

    FROZEN AND BURST WATER PIPE HAZARD

    Failure to follow this caution may result in propertydamage.If a condensate pump is installed, a pluggedcondensate drain or a failed pump may cause thefurnace to shut down. Do not leave the homeunattended during freezing weather without turningoff water supply and draining water pipes orotherwise protecting against the risk of frozen pipes.

    If possible, DO NOT route the drain line where it may freeze. Thedrain line must terminate at an inside drain to prevent freezing ofthe condensate and possible property damage.

    1. A condensate sump pump MUST be used if required bylocal codes, or if no indoor floor drain is available. Thecondensate pump must be approved for use with acidiccondensate.

    2. A plugged condensate drain line or a failed condensatepump will atlowcondensate to spill. If the furnace is installedwhere a condensate spill could cause damage, it isrecommended that an auxiliary safety switch be installed toprevent operation of the equipment in the event of pumpfailure or plugged drain line. If used, an auxiliary safetyswitch should be installed in the R circuit (low voltage)ONLY.

    3. If the auxiliary switch in the condensate pump is used, thefurnace may shut down due to a blocked condensate line orfailed pump. To prevent frozen water pipes see the "FrozenWater Pipe Hazard" section in this manual.

    CondensateDrainTrap FreezeProtectionSpecial precautions MUST be made if installing furnace in an areawhich may drop below freezing. This can cause improperoperation or damage to the equipment. If the the furnaceenvironment has the potential of freezing, the drain trap and drainline must be protected. Use 3 to 6 watt per foot at 115 volt, 40 ° F(4°C) self-regulating shielded and waterproof heat tape. Wrap thedrain trap and drain line with the heat tape and secure with the ties.Follow the heat tape manufacturer's recommendations.

    18

    Specifications are subject to change without notice

    44001 102404

  • Upflow Installations Top Vent

    Vent Drain

    & Clamps

    Plastic Caps (2)Yellowor black

    Coupling& Clamps(Optional)

    partsbag) ,,

    CasingGrommetBlackRubber5/8"(15.9mm)ID - -(Loosepartsbag)

    /

    i,,-- ,lb

    \\

    DrainLineVentTee3/4"(18.1mm)PVCor1/2"(12.7mm)CPVC(Fieldsupplied)

    __ On SomeModelsONLY__-

    I i

    ( \

    i_ =_ o_ , Single Pressure Switch

    ,_> ReliefTube

    / f ........ _ _ BlackRubber3/16"

    i

    \ .... _ _ _I

    /

    j z- ....

    .'f

    \ i c> © i

    ,\ ', j

    Street Elbow1/2" CPVC(Looseparts bag)

    Drain TubeBlackRubber5/8"(15,9mm)ID &Clamps,Cut lengthto fit (Loose partsbag)

    Representative drawing only, some models may vary in appearance,

    25-24-80

    Upflow Installations Top Vent (SeeFigure11)Remove knockout from the side of the furnace casing where draintube will exit.

    Install casing grommet [black rubber 5/8" (15.9mm) ID grommet -in loose parts bag].

    Install the 1/2" (12.7mm) CPVC street elbow on discharge of trap

    Install the black PVC tube connector [ 3/4" (18.1mm) PVC x _/2"(12.7mm) CPVC from loose parts bag] as shown in the illustrationabove.

    Cut the black drain tube [5/8" (15.9mm) ID - in loose parts bag] tolength to fit between trap and tube connector through grommet.

    Clamp both ends of the drain tube using clamps provided.

    Glue the CPVC street elbow to the trap using appropriate cleanerand solvent cement.

    The field supplied 3/4" (18.1mm) PVC or 1/2" (12.7mm) CPVCdrain line vent tee must vent outside the furnace cabinet (seeexploded view above),

    Note: It is recommended that all PVC piping and fittingconnections be fit up and inspected before final cementing. Trapmust be primed before operation, Verify all condensate drainconnections are securely clamped. A coupling and clamps (inloose part bag) may be installed as shown for future servicing ofthe vent system.

    NOTE: "PVC" is used as a generic term. Pipe and fitting materials used must be acceptable to the local code officials havingjurisdiction.

    440 01 102404 19

    Specifications are subject to change without notice

  • Upflow Installations Vent through Left-Side

    Plastic CapYellow or black

    2" (50.8mm)PVCCoupling

    Coupling& Clamps(Optional) i

    Either:ThePVCDrainTeeorafield

    Vent Drain& Clamps supplied 2"

    (50.8mm)PVCTee\\\

    Dual Pressure Switch Detail \

    _-_ TeeTrapWhite PVC

    (looseparts bag)

    ! DrainTube

    r_ BlackRubberi 1/2"(12,7mm)ID

    & Clamps

    DrainConnectorBlackPVC DrainTube3/4" (19,1mm)PVCX1/2" Corrugated(12,7mm)CPVC 5/8"(15,9mm)ID

    (Loosepartsbag)\ ...... --_&Clamps

    \CasingGrommet / '\BlackRubber5/8"(15,9mm)ID(Loosepartsbag)

    --\ i

    On SomeModelsONLY

    //

    Single Pressure Switch

    ii.L"

    ?'

    /

    ReliefTubeBlackRubber3/16"(4.8mm)ID

    ,r7 _,- _-.

    /'

    SIDE VIEW

    5° to 10°

    /

    _uilt-inchannel willbeangled 5°to 10° also.

    DrainLineVentTee3/4" (18,1mm)PVCor 1/2" '(12,7mm)CPVC(Fieldsupplied)

    Representative drawing only_some models may vary in appearance,

    Upflow Installations Vent through Left-Side (SeeFigure12)Remove drain tee from inducer discharge and remove black draintube 1/2" (12.7mm) ID from bottom of drain tee. (N9MPD and*9MPD models only)

    Install Vent Pipe grommet in side of casing.

    Cut an appropriate length of 2" (50.8mm) PVC pipe long enoughto exit the cabinet and connect the vent drain to either:

    • A standard field supplied 2" (50.8mm) PVC tee (N9MP1 orN9MP2 models), or

    • A 2" (50.8mm) PVC coupling fastened onto the drain tee(N9MPD and *9MPD models)

    Install tee trap into bottom of tee.

    Remove knockout from the side of the furnace casing where draintube will exit.

    Install the 1/2" (12.7mm) CPVC street elbow on discharge of trap

    25-24-81

    Install the black PVC drain connector [3/4" (19.1mm) PVC x _/2"CPVC from loose parts bag] as shown in the illustration above.

    Cut the black drain tube [5/8" (15.9mm) ID - in loose parts bag] tolength to fit between trap and tube connector through grommet.

    Clamp both ends of the drain tube using clamps provided.

    Glue the CPVC street elbow to the trap using appropriate cleanerand solvent cement.

    Connect the tee trap and the main drain line exiting the casing asshown in Figure 20.

    Note: It is recommended that all PVC piping and fittingconnections be fit up and inspected before final cementing. Boththe internal trap and the external tee trap must be primedbefore operation, Verify all condensate drain connections aresecurely clamped. A coupling and clamps (in loose part bag) maybe installed as shown for future servicing of the vent system.

    20

    Specifications are subject to change without notice

    44001 102404

  • All Models Vent through Right-Side

    P ast c Cap/ ....... _ JYellow or black _-'_-_1_

    /(_;_ _ \ _, OnSomeModels

    ,/_\ _ ONLY

    , ...................--

    __' Dual Pressure Switch

    Vent Drain , _ /:_

    &Clamps _ \. j_\.-_l \_ J b_ Relief TubeBlack Rubber3/16" (4.8ram)ID

    DrainTubeCorrugated5/8"(15,9mm)ID &Clamps

    SIDE VIEWRotate

    downward_._._ 5° to 10°

    NOT_..Built-in channel willbe angled 5° to 10° also.

    //

    /

    • ii

    7%??

    © o

    ,//

    /I,/

    /

    /'

    /!

    Either:The PVCDrainTeeor a fieldsupplied2" (50.8mm)PVCTee

    /'Single Pressure Switch Details

    TeeTrapWhitePVC/(loose partsbag)

    ElbowTubes(2) BlackRubber1/2"(12.7mm)ID &Clamps(loosepartsbag)

    BarbedCoupling,1/2"(12.7mm)OD DrainLineVentTee3/4"_ (loose partsbag) (18.1mm)PVCor1/2"

    \ (12.7mm)CPVC(Fieldsup-/ ', / plied)

    //

    DrainConnectorBlackPVC(19.1mm)PVCX 1/2"

    (12.7mm)CPVC(Loosepartsbag)

    /

    -CasingGrommetBlackRubber5/8"(15.9mm)CPVC(Loosepartsbag) 25-24-68

    All Models Vent through Right-Side (SeeFigure13)Disconnect the black drain tube between the drain vent and the

    trap.

    Rotate the inducer 180° for a right side vent after loosening the 4inducer attachment screws. Reinstall and retighten the inducerscrews to 20" pounds torque.

    Using the _/2" (12.7mm) OD barbed coupling in the loose parts bagconnect together with the two short 1/2" (12.7mm) ID elbow tubesand connect the lower discharge port of the vent drain to the trap.Secure all connections with clamps.

    Install the vent pipe grommet into the casing

    Cut an appropriate length of 2" (12.7mm) PVC pipe long enoughto exit the cabinet and connect the vent drain to either:

    • A standard field supplied 2" (12.7mm) PVC tee (N9MP1 orN9MP2 models), or

    • A 2" (12.7mm) PVC coupling fastened onto the drain tee(N9MPD and *9MPD models)

    Install tee trap into bottom section of tee.

    Remove knockout from the side of the furnace casing where draintube will exit.

    Install casing grommet [5/8" (15.9mm) ID grommet -in loose partsbag].

    Install the _/2" (12.7mm) CPVC street elbow on discharge of trap

    Install the black PVC tube connector [3/4" (19.1mm) PVC x _/2"(12.7mm) CPVC from loose parts bag as shown in the illustrationabove.

    Cut the black drain tube[5/8 " (15.9mm) ID - in loose parts bag] tolength to fit between trap and tube connector through grommet.

    Clamp both ends of the drain tube using clamps provided.

    Glue the CPVC street elbow to the trap using appropriate cleanerand solvent cement.

    Connect the tee trap and the main drain line exiting the casing asshown in Figure 20.

    Note: It is recommended that all PVC piping and fittingconnections be fit up and inspected before final cementing. Boththe internal trap and the external tee trap must be primedbefore operation, Verify all condensate drain connections aresecurely clamped. A coupling and clamps (in loose part bag) maybe installed as shown for future servicing of the vent system.

    440 01 102404

    Specifications are subject to change without notice

    21

  • Downflow Left-Side Vent and Trap

    / Plastic CapYellow or black

    Coupling& Clamps(Optional)\

    /

    Vent Drain

    &Clamps Either:ThePVCDrainTeeorafieldsupplied2"

    (50.8mm)PVC_ee

    Single Pressure Switch Detail "\

    TeeTrapWhitePVC..... INLET* ':'/(loosepartsbag)

    _| ElbowTubeBlackRubber1/2'_.//" (12,7mm)ID&Clamps(Loose

    PartsBag)

    WARNINGMoveCapstotop of trap

    DrainTube Black,5/8" (15.9mm)ID

    CorrugatedCut atstraightsectionI

    Leaveroomforclamp "Cut Here

    2" (50.8mm)PVC

    //Coupling/ DrainTube

    Black Rubber 1/2"(12.7mm)ID & Clamps

    // Dual Pressure Switch

    \

    BarbedCoupling 1/2"(12.7mm)OD (loosepartsbag)

    SIDE VIEW

    -°l°_rRotate downward

    5° to 10°

    NOT inchannelwill

    be angled 5° to 10" also.

    ReliefTubeBlackRub-

    . ._ ber3/16" (4.8mm)ID

    iOn SomeModels_,f-_ .... ONLY

    INLET _'i _

    FlexibleTubingConnector,3/16"(4.8mm)OD (loosepartsbag)

    ReliefTube,ExtensionBlackRubber,3/16" (4.8mm)ID Cuttofit (loosepartsbag)

    Trap Connection"Clampears"

    / PointedOUT

    Preassemble&insert intofurnace

    25-24-69* Combustion air pipe (either side) for N9MP2, N9MPD & *9MPD downflow installation

    Representative drawing only, some models may vary in appearance.

    Downflow Left-Side Vent and Trap (SeeFigure14)Remove the inducer mounting screws, rotate the inducer 180 °and retighten the inducer screws to 20" pounds torque.Disconnect the hoses from the trap assembly, and remove trapand trap mounting bracket from the blower compartment. Usingcover plate and gasket provided in the loose parts bag, cover thehole from the burner compartment to the blower compartment andsecure with screws.

    Move the caps to the top of the trap and mount the trap externallyto the left side of the unit using the two screws provided.Cut the 5/8" (15.9mm) ID corrugated hose as shown above andfasten the 90° bend end to the trap and fasten the straight end tothe transition drain. Secure both connections with clamps.Reconnect the 1/2" (12.7mm) ID drain hose from the vent drain tothe trap and secure with a clamp.. In some cases, additionallength will be required for this hose. Use the Black plastic 1/2"(12.7mm) OD barbed coupling and a suitable section of 1/2"(12.7mm) ID hose to make the connection. Secure all connectionswith clampsConnect the 3/16" (4.8mm) ID relief tube from the small port on thetrap to the top port of the transition as shown in the picture. In somecases, additional hose length will be needed. Use the clear plastic

    3/16" (4.8mm) OD flexible tubing connector and a suitable lengthof extra 3/18" (4.8mm) ID hose to make this connection.Install the vent pipe grommet into the casing

    Cut an appropriate length of 2" (50.8mm) PVC pipe long, enoughto exit the cabinet and connect the vent drain to either:

    • A standard field supplied 2" (50.8mm) PVC tee (N9MP1 orN9MP2), or

    • A 2" (50.8mm) PVC coupling fastened onto the drain tee(N9MPD and *9MPD models)

    Install tee trap into bottom section of tee.

    Remove knockout from the side of the furnace casing where draintube will exit.

    Connect the tee trap and the main drain line exiting the casing asshown in Figure 20.

    Note: It is recommended that all PVC piping and fittingconnections be fit up and inspected before final cementing. Boththe external trap and the external tee trap must be primedbefore operation, Verify all condensate drain connections aresecurely clamped. A coupling and clamps (in loose part bag) maybe installed as shown for future servicing of the vent system.

    22

    Specifications are subject to change without notice

    44001 102404

  • Downflow Right-Side Vent and Trap

    Capor black

    Vent Drain& Clamps

    SIDE VIEW

    '++i_ RotatedownwardL 5° to 10°

    NOTE Built-inchann;I willbe angled 5 ° to 10+ also.

    Single Pressure Switch Detail

    Or

    5/8

    E

    ]it" llS.9mm)ID &Clamps

    \.

    ElbowTubeBlackRubber1/2"(12.7mm)ID &Clamps(LoosePartsBag)

    Barbed Coupling

    1/2"(12.7mm)OD", (LoosePartsBag)

    Dual Pressure\Switch /

    ,,

    TubeCorrugatedBlack, "\ ::\

    DrainConnectorBlaq

    Trap Connection"Clampears"PointedOUT

    /

    ReliefTubeBlackRubber Preassemb]e&31 ,, (4.8mm)ID insert into furnace/16

    Coupling&Clamps+_ /(Optional)

    DrainHose _////

    BlackRubber1/2"(12.7mm)InCutto Fit&Clamps

    OnSome 2"(50.8mm)PVC

    Models __ONLY Coupling

    _Either: ThePVCF DrainTeeorafield

    _ _/ _ l+ supplied2"

    (50.8mm)