Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

68
Safety instructions Overview Installation Operation Maintenance 2013 IWAKI CO., LTD. Iwaki Electromagnetic Metering Pump EJ-B(R) (North America) Instruction manual Thank you for choosing our product. Please read through this instruction manual before use. This instruction manual describes important precautions and instructions for the product. Always keep it on hand for quick reference.

Transcript of Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

Page 1: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

Safety instructionsO

verviewInstallation

Operation

Maintenance

2013 IWAKI CO., LTD.

Iwaki Electromagnetic Metering Pump EJ-B(R) (North America)

Instruction manual Thank you for choosing our product.

Please read through this instruction manual before use.

This instruction manual describes important precautions and instructions for the product. Always keep it on hand for quick reference.

Page 2: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

2

Ord

Open the package and check that the product conforms to your order. If any problem or inconsistency is found, immediately contact your distribu-tor.

a. Check if the delivery is correct.Check the nameplate to see if the information such as model codes, dis-charge capacity and discharge pressure are as ordered.

b. Check if the delivery is damaged or deformed.Check for transit damage and loose bolts.

Page 3: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

3

Contents ............................................................................................. 2

Safety instructions .......................................................................6

............................................................................................................. 7 .............................................................................................................. 9

........................................................................................13

Overview ...................................................................................... 17

.....................................................................................................17 .........................................................17

.......................................................................................................18

....................................................................................18 ...............................................................................................18

....................................................................................................19

.............................................................................................19

...................................................................................................... 20........................................................................................................... 20

........................................................................................21

............................................................... 22

....................................................................................... 23

Installation ..................................................................................24

.............................................................................................. 24 ......................................................................................................... 25

......................................................................................... 25

................................................................................ 27

.............................................................................................................. 29 .............................................................................. 29

.................................................................................31

............................................................................................ 32

Page 4: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

4

Operation .....................................................................................33

............................................................................................ 33

.................................................................................. 33

...................................................... 33

............................. 34

................................................................................................... 34

...................................................................................37

.............................. 39

............................................................................... 40

....................................................................................... 40

.........................................................................................41

............................................................................................. 43

............................................................................................ 44

................................................................................................ 45

........................................................................... 45

.............................................................................. 45

Maintenance ................................................................................46

..............................................................................................47

....................................................................................................... 48

.......................................................................................... 48

..................................................................................... 48

.................................................................................. 49

............................................................................................... 49

.................................................................................... 50

.................................................................................51

.......................................51

.......................................... 53

............................................................................. 54

Page 5: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

5

................................................................................................ 57

.............................................................................. 57

................................................................................................. 58

................................................................ 59

............................................................................................. 59

.............................................................................................. 59

............................................................................................ 60

........................................................................................... 60

.......................................................................................... 60

.........................................................................................61

........................................................61

............................................................................ 62

.......................................................................... 63

...................................................................................... 64

Page 6: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

6

Read through this section before use. This section describes important information for you to prevent personal injury or property damage.

-WARNING

-

CAUTION

Electricalshock

Caution RequirementProhibited Do not reworkor alter

Wearprotection

Grounding

Safety instructions

Page 7: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

7

Safety instructions

WARNING

WARNING

--

-

-

-

-

Requirement

Electricalshock

Prohibited

Do not reworkor alter

Page 8: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

8

Prohibited

Prohibited

Prohibited

-

-

-

Wearprotection

WARNING

Page 9: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

9

Safety instructionsCAUTION

-

-

-

-

Requirement

Caution

Prohibited

CAUTION

Page 10: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

10 CAUTION

Caution

Requirement

Prohibited

Prohibited

Page 11: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

11

Safety instructions

CAUTION

-

-

-

Requirement

Electricalshock

Prohibited

Grounding

Prohibited

Page 12: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

12

Requirement

Caution

Caution

CAUTION

-

-

Page 13: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

13

Safety instructions

-

-

– Where

Caution

Page 14: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

14

-

-

Caution

Caution

Caution

Caution

Page 15: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

15

Safety instructions

-

-

-

-

-

Caution

Caution

Page 16: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

16

-

-

Caution

Requirement

Benzine

Thinner

Caution

Page 17: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

17

Overview

OverviewPump characteristics, features and part names are described in this section.

Pump structure & Operating principleThe EJ series is a diaphragm metering pump which consists of a pump head and a drive unit with a built-in controller. A diaphragm is directly driven by elec-tromagnetic force.

OUT

IN

Page 18: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

18

Features

Manual modeRun/stop the pump by the start/stop key. A stroke rate (MAN speed) can be changed in the range of 1-360spm by the up key at any time during operation or stop. See page 41 for detail.

Run Run

Stop Stop

Page 19: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

19

Overview

EXT mode

to 1 and the pump makes one shot at every input of the signal. See page 43 for detail.

STOP functionThe start/stop of the pump can be controlled by the external STOP signal. See page 44 for detail.

Run Run

Stop

Page 20: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

20

Pump

Page 21: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

21

Overview

Operational panel

-

ON LED

Page 22: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

22

-

-

-

-

Page 23: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

23

Overview

The model codes of the pump/drive units represent the following information.

EJ - B 11 VC U R - a b c d e f g h i

CodeVC

PVCFKM FKM

PTFEPTFE

+ EPDM EPDM EPDMVETC PVDF FKM FKM

VC TC VC TCNo code No code

1 42 53 6

23 2324

Page 24: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

24

This section describes the installation of the pump, tubing and wiring. Read through this section before work.

.

Select an installation location and mount the pump.

NOTE

1

2

Installation

Page 25: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

25

Installation

Connect tubes to the pump and install a check valve.

Tube connection

b.

c.

*

Tube

b

Page 26: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

26

-

b.

c.

d.

1

2

3

Tube

Tube

Page 27: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

27

InstallationCheck valve mountingInstall an optional check valve to the EJ -phon and overfeeding. In the following cases be sure to install the check valve.

Page 28: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

28

*

*

NOTE

NOTE

1

Page 29: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

29

Installation

Wiring for a power voltage, earthing and an external signal.

.

Do

-

Power voltage/Earthing

1

Page 30: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

30

NOTE

-

SUNTAN TSV14D511K

POWERON

OFF TIMEPOWER

ON

OFF TIME

Page 31: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

31

Installation

-

-

-

-

Signal wire connection

-

.

Page 32: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

32

When using an open collector:

When using a contact:

COM

*

NOTE

–OMRON G3FD-102S or G3FD-102SN

*

3

2

4

5 13

2

4

5 1

Page 33: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

33

Operation

OperationThis section describes pump operation and programming.Run the pump after plumbing and wiring is completed.

adjustment before starting operation.

Points to be checkedBefore operation, check if:

-

-

Page 34: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

34

DegassingThe gas needs to be expelled from the pump and tubing by degassing. Normal performance can not be obtained with gas in the pump. Conduct degassing in the following cases.

NOTE

b

90°

Page 35: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

35

Operation

*

*

2

1

3

ON

Page 36: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

36

4

7

5

6

8

Page 37: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

37

Operation

Flow rate adjustment

adjustment is not available). A stroke rate can be set by keypad operation from

below.

*

2

1

100 %

75

50

25

0 180 360 spm

Flow

rate

Stroke rate

Page 38: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

38

5

3

4

6

Page 39: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

39

Operation

Before a long period of stoppage (one month or more)

-

Page 40: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

40

Operation at each mode is individually set and controlled by keypad operation. Select a proper mode to make optimal operation.

Power ON while the UP key is pressed.The maintenance mode will come upafter 3 seconds.

Display flashes and diaphragmis extended to the full.

3 sec.

3 sec

3 sec

and

Power ON

spm setting

WAIT mode

EXT mode

Keypad lock (Ex.)

MAN mode operation Keypads are locked.

Maintenance mode

MAN mode

Page 41: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

41

Operation

Manual operation

* -

2

1

Page 42: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

42

4

3

Page 43: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

43

Operation

EXT operationThe pump operation is controlled by the external (pulse) signal. In this mode, the pump runs in sync with each external signal.NOTE

*

2

1

Page 44: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

44

STOP functionThe start/stop of the pump operation can be controlled by the external stop signal. The display changes as below when the STOP signal is inputted.

Page 45: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

45

Operation

Keypad lockKeypad lock can be active in the MAN or EXT mode for the prevention of erro-neous key operation. The "LOCK" indication appears while keypads are locked.

NOTE

1

1

Page 46: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

46

MaintenanceThis section describes troubleshooting, inspection, wear part

-

-

Page 47: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

47

Maintenance

First check the following points. If the following measures do not help removing problems, contact us or your nearest distributor.

one.

down.

27.

33.

Page 48: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

48

Perform daily and periodic inspection to keep pump performance and safety.

Daily inspectionCheck the following points. Upon sensing abnormality, stop operation immedi-ately and remove problems according to "Troubleshooting".When wear parts come to the life limit, replace them with new ones. Contact us or your nearest distributor for detail.No.

1

-

2 -

3

Periodic inspectionRetighten the pump head mounting bolts evenly to the rated torque below in diagonal order (once three months).

* -

Page 49: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

49

Maintenance

To run the pump for a long period, wear parts need to be replaced periodically.It is recommended that the following parts are always stocked for immediate replacement. Contact us or your nearest distributor for detail.

--

Wear part list

1

* *

12

9

9

1110

111013

6

19

20

18

26

Page 50: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

50

Before replacementFirst release pressure from the pump head.

NOTE

NOTE

1

2

3

Page 51: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

51

Maintenance

Valve set replacement

NOTE

1

2

Page 52: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

52

*

-

*

*

3

4

5

6

5

129

1110

9111013

4

Page 53: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

53

Maintenance

NOTE

NOTE

*

*

* -

1

2

1213

91110

91110

2

3

4

5

Page 54: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

54

Diaphragm replacement

NOTE -

1

2

3

Page 55: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

55

Maintenance

*

NOTE -

*

4

5

6

7

Page 56: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

56

order.

8

9

10

Page 57: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

57

Maintenance

Pump head & Drive unitThe pump in the diagram below is completely dismantled. Do not dismantle the pump beyond the extent shown in this instruction manual.

Page 58: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

58

Pump head

No.1 12 13 34 15 16 17 18 19 410 411 412 213 214 *

15 4

16 118 119 120 124 325 326 328 4

26

26

24

24

25

25

2625

24

15

28

1

3

2

10119101191213

129

11109

111013

16

1918

8

20

4

3

53

67

14

*

Page 59: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

59

Information in this section is subject to change without notice.

PSIPower con-

W A

EJ-B09 0.30 174.0

1-360 15 0.8

3.31EJ-B11 0.48 145.0

EJ-B16 0.79 87.0

EJ-B21 1.27 43.5

EJ-B31 2.38 29.03.753.17 21.7

*

*

* * *

Page 60: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

60

ModeEXT

UP1

2

1

Buffer

3

*1

*2

*3

2

SJTW

Red

Page 61: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

61

Outer dimensions

LOCK

IN

AIROUT

3.78

"

(7.6

8")

(8.62")

(0.7

2")

(6.3

")

(1.85")

(0.94")3.01"1.44"

(7.64")

0.24

"

3.46

"

0.35" 0.65"

0.39"

1.26"

0.2" 3.94"

Page 62: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

62

LOCK

IN

AIROUT

3.78

"

(7.6

5")

(8.66")

(0.7

3")

(6.2

7")

(1.89")

(0.94")3.01"1.44"

(7.68")

0.24

"

3.46

"

0.35" 0.65"

0.39"

1.26"

0.20

" 3.94"

Page 63: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

63

OUT AIR

IN

TUBING(ID×OD)

TUBING(ID×OD)

TUBING(ID×OD)

(1.85")

(7.72")

(8.70")

(0.0

8")

3.78

"

(6.8

1") (8

.19"

)

0.20

" 3.94"

1.44" 3.01" (1.02")

0.35" 0.65"

0.39"

1.26"

0.24

"

3.46

"

LOCK

Page 64: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

64

OUT AIR

IN

TUBING(ID×OD)

TUBING(ID×OD)

TUBING(ID×OD)

(1.85")

(7.72")

(8.70")

(0.0

8")

3.78

"

(6.8

1") (8

.19"

)

0.20

" 3.94"

1.44" 3.01" (1.02")

0.35" 0.65"

0.39"

1.26"

0.24

"

3.46

"

LOCK

Page 65: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

65

Page 66: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

66

Page 67: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

67

Page 68: Safety instructions Iwaki Electromagnetic Metering Pump EJ ...

http://www.iwakipumps.jp IWAKI CO.,LTD. 6-6 Kanda-Sudacho 2-chome Chiyoda-ku Tokyo 101-8558 Japan

TEL: +81 3 3254 2935 FAX: +81 3 3252 8892

/ IWAKI Europe GmbH TEL: +49 2154 9254 0 FAX: +49 2154 9254 48

Norway / IWAKI Norge AS TEL: +47 23 38 49 00 FAX: +47 23 38 49 01

Australia / IWAKI Pumps Australia Pty Ltd. TEL: +61 2 9899 2411 FAX: +61 2 9899 2421

Germany / IWAKI Europe GmbH TEL: +49 2154 9254 50 FAX: +49 2154 9254 55

Sweden / IWAKI Sverige AB TEL: +46 8 511 72900 FAX: +46 8 511 72922

China (Hong Kong) / IWAKI Pumps Co., Ltd. TEL: +852 2607 1168 FAX: +852 2607 1000

Holland / IWAKI Europe GmbH (Netherlands Branch) TEL: +31 74 2420011 FAX: +49 2154 9254 48

U.K. / IWAKI Pumps (U.K.) LTD. TEL: +44 1743 231363 FAX: +44 1743 366507

China (Guangzhou) / GFTZ IWAKI Engineering & Trading Co., Ltd. TEL: +86 20 84350603 FAX: +86 20 84359181

Italy / IWAKI Europe GmbH (Italy Branch) TEL: +39 0444 371115 FAX: +39 0444 335350

U.S.A. / IWAKI America Inc. TEL: +1 508 429 1440 FAX: +1 508 429 1386

China / IWAKI Pumps (Shanghai) Co., Ltd. TEL: +86 21 6272 7502 FAX: +86 21 6272 6929

Spain / IWAKI Europe GmbH (Spain Branch) TEL: +34 93 37 70 198 FAX: +34 93 47 40 991

Argentina / IWAKI America Inc. (Argentina Branch) TEL: +54 11 4745 4116

Korea / IWAKI Korea Co., Ltd. TEL: +82 2 2630 4800 FAX: +82 2 2630 4801

Belgium / IWAKI Belgium N.V. TEL: +32 13 670200 FAX: FAX: +32 13 672030

Singapore / IWAKI Singapore Pte Ltd. TEL: +65 6316 2028 FAX: +65 6316 3221

Taiwan / IWAKI Pumps Taiwan Co., Ltd. TEL: +886 2 8227 6900 FAX: +886 2 8227 6818

Denmark / IWAKI Nordic A/S TEL: +45 48 242345 FAX: +45 48 242346

Indonesia / IWAKI Singapore (Indonesia Branch) TEL: +62 21 6906606 FAX: +62 21 6906612

Thailand / IWAKI (Thailand) Co., Ltd. TEL: +66 2 322 2471 FAX: +66 2 322 2477

Finland / IWAKI Suomi Oy TEL: +358 9 2745810 FAX: +358 9 2742715

Malaysia / IWAKIm SDN. BHD. TEL: +60 3 7803 8807 FAX: +60 3 7803 4800

Vietnam / IWAKI Pumps Vietnam Co., Ltd. TEL: +84 613 933456 FAX: +84 613 933399

France / IWAKI France S.A. TEL: +33 1 69 63 33 70 FAX: +33 1 64 49 92 73

T841-4 '18/05