Key focus areas in Chemical Process industry
Change and Equipment Management are key ELEMENTS in Process Safety System.
Some of the World’s “News splash incidents” have involved Change Management as focal point
Equipment Management is no less importantChange Management should follow appropriate Process Hazard Analysis CCPS is an excellent reference for proper
application of Process Hazard Evaluation Techniques
Hazard Evaluation TechniquesGuideline for Hazard Evaluation Procedure –Buy CCPS Book
Typical Techniques mentioned Safety review Checklists Relative Ranking Preliminary Hazard Analysis What –If , What-If checklist HAZOP FMEA FTA ETA CCA HRA
Change Management--Essentials
Change need driverCriteria for Change : SHE, IDLH, Life
threatening, Insurance, Legal, Statutory items should get priority attention
Change initiation procedure publicationPrescribing Change processing steps Determining Change review Team compositionValidating Change acceptance criteriaSign off protocol in Change approval checklist
Preceding Activity.
Change Planning should focus on PEMEChange organising should list -Preceding/Succeeding
activityChange control, MOC,Conformance to Codes,
Fabrication qualification , Inspection types-Source, Incoming,On-site, Material Spec, OEM Spec sheets,Deviation control/Approval are key aspects before Change implementation
Change validation should be tested by PDCA prior to Change confirmation as PermanentChange benefit evaluation is necessary
Succeeding Activities
Change revision ConfirmationSOP Revision. OSEP ReviewRe-trainingRe-certification of Trained personnelP.M. List UpdateIsometrics, P & ID, related Doc UpdateSpares Identification, Inventory stipulation
Contd..
Payout trackingArchiving database
Equipment Management—Book keeping
MOC Fabrication details, Related drawings, Isometrics Flanges, Gaskets, Nuts, Bolts, Piping, Bends, Elbows,
Fittings, Insulation-- Specifications Sheet FLP/IP/FRLS/HR /ZH/--DCS, PLC, SCADA Built-in Safety devices/features List of Codes/Standards adopted MTO Installation qualification Process/Operational qualification including HAZOP study Final qualification—ID, Asset entry, Insurance
Documentation/Maintenance
Deliverables Statutory SOP O &M Manuals OEM-Recommended Spares Spares Management kardex P.M. List/NDT Schedule Work instructions History card MTBF Charts
Performance Support Needs
List of Lubricants Supply Sources—Qualifications of Suppliers –Criteria AMC/Warranty Trade supports—Electrical, Instrumentation,
EHS,Engg Performance trending Run Log Inspection-Sensorial, Instrumentation (Speed, Vibration, Fatigue, Noise, Heat and such) NDT-Methodology, Monitoring Tools
Breakdown-Impact review aids
Incident log and reportsMacro InterruptionsMicro interruptionsRCA, Component reliability analysisRecovery Time Impact analysis—Economic/Customer impact Insurance Cover—Fire/Allied, Machinery Break
down, LOP, Natural/Security perils, Human contributory
Conclusion
Change involves thinking holisticallyChange may necessitate downtime Interruption due to incidents can affect safety of
personnel and Business economics.Each change review should be situation specific. General references cannot displace internal Multi-disciplinary review and validation.Yet changes can become necessary to continually
improve Safety, Health & Environment
Abbreviations List -AL
AMC Annual Maintenance Contract CCA Cause Consequence Analysis CCPS Centre for Chemical Process Safety DCS Distributed Control System EHS Environment, Health & Safety FLP Flameproof FMEA Failure Mode and Effects Analysis FRLS Fire Resistant Low Smoke HAZOP Hazard Operability HR Heat Resistant HRA Human Reliability Analysis IDLH Immediately Dangerous to Life & Health IP Ingress Protection LOP Loss of Profit
AL
MOC Material of Construction MTBF Mean Time Between Failure MTO Material Transfer Order NDT Non Destructive Testing O & M Operation & Maintenance OEM Original Equipment Manufacturer OSEP On Site Emergency Plan P & ID Piping & Instrumentation Diagram PDCA Plan Develop Check and Act PEME People, Environment, Materials, Equipment PHA Process Hazard Analysis PLC Programme Logic Controller PM Preventive Maintenance
AL
R & D Research & Development RCA Root Cause Analysis SCADA Supervisory Control and Data Acquisition SHE Safety, Health & Environment SOP Standard Operating Procedure ZH Zero Halogen
Source credits: Publications, Experiences,
Professional contributions,
Interactions with Chemical Industry,OEMs.