- _ _ l I l d EGsG .. .. . . =- INTERIM REPORT Accession No. Report No. EGG-EA-5347 Contract Program or Project Title: Systems Engineering Support " Subject of this Document: Safety Evaluation of the Inservice Testing Program for Pumps and Valves at the Quad Cities Station Units 1 and 2 (Docket Nos. 50-254/265) for the Period 10-18-79 through 6-17-81 for Unit 1 and 11-10-79 through 7-9-81 for Unit 2 Type of Document: Safety Evaluation Report Author (s). J. M. Fehringer g g gg{ gg}gjgg| H. C. Rockhold "' ' '""*"|81 Assistance Repor;e c 1 R:sponsitsle NRC Individual and NRC Of0 4 or Division: Victor Nerses, NRC-DE This document was prepared primarily for preliminary or internal use. it has not received full review and approval. Since there may be substantive changes, this document should not be considered final. EG&G Idaho. Inc. Idaho Falls, Idaho 83415 . en Prepared for the U.S. Nuclear Regulatory Commission Washington, D.C. Under DOE Cord act No. DE-AC07 76|D01570 NRC- 1 N o. A6258 INTERIM REPORT y o gol O'O l

Transcript of 'Safety Evaluation of Inservice Testing Program,' interim ...

Page 1: 'Safety Evaluation of Inservice Testing Program,' interim ...

- _ _

l

Il

d EGsG .. .. . .=-

INTERIM REPORT

Accession No.

Report No. EGG-EA-5347

Contract Program or Project Title:

Systems Engineering Support

"

Subject of this Document:Safety Evaluation of the Inservice Testing Program for Pumps and Valves at theQuad Cities Station Units 1 and 2 (Docket Nos. 50-254/265) for the Period 10-18-79through 6-17-81 for Unit 1 and 11-10-79 through 7-9-81 for Unit 2

Type of Document:Safety Evaluation Report

Author (s).J. M. Fehringer

g g gg{ gg}gjgg|H. C. Rockhold

"' '

'""*"|81 Assistance Repor;ec 1

R:sponsitsle NRC Individual and NRC Of0 4 or Division:

Victor Nerses, NRC-DE

This document was prepared primarily for preliminary or internal use. it has not receivedfull review and approval. Since there may be substantive changes, this document shouldnot be considered final.

EG&G Idaho. Inc.Idaho Falls, Idaho 83415

.

en

Prepared for theU.S. Nuclear Regulatory Commission

Washington, D.C.Under DOE Cord act No. DE-AC07 76|D01570

NRC- 1 N o. A6258

INTERIM REPORT

y o gol O'Ol

Page 2: 'Safety Evaluation of Inservice Testing Program,' interim ...

.I

CONTENTS

1. INTRODUCTION .................................................... 1

II. P UMP T ES T I N G P R O GR AM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

1. Al l S af e ty Re l a ted Pump s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2.

'

'2. S tandby Liquid Control Pumps 1102-1 A, 18, 2A, and 28 . . . . . . . 6

3. Diesel Generator Fuel Oil Transfer Pumps 1-5203,'2-5203, 1/2-5203 ........................................... 7

III.- VALVE TESTING PROGRAM EVALUATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

1. General Considerations ..................................... 8

1.1. Testing of Valves which Perform a PressureIsolation Function ................................... 8

1.2 ASME Code S ec tion XI Requ i remen ts . . . . . . . . . . . . . . . . . . . . 9

S t rok e dle s t'i n# C,d f/ Chec k Va l ve s . . . . . . . . . . . . . . . . . . . . . . .;67 ' l '. 3 7 9irl-

. 1,,.

1.4 S troke -jest'ing of Motor Ugerated Valves . . . . . . . . . . . . . . 9*'<f i

1.5 Tes+ Frequency of Check Valves Tested atCold Shutdowns ....................................... 10

1.6 Licensee Request for Relief to Test Valves atC o l d S h u t d own . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

1.7 Changes to the Technical Specification . . . . . . . . . . . . . . . 10

1.8 Safety Related Valves . .............................. Il

1.9 Valve Testing at Cold Shutdown ....................... 11

1.10 Category A Valve Leak Check Requirements forContainment isolation Valves (CIV) ................... 11

1.11 Application of Appendix J Testing to -

t h e I S T P o g r am . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

i 2. General Relief Raquests .................................... 12 .

2.1 Category A, A/C, and A/E Valves ...................... 12

2.1.1 Relief Request ............................... 122.1.2 Relief Request ............................... 13

2.2 Power Operated Category A a.nd B Valves ............... 14

L

|L

ii

_ _. - _ .__ _ _ _ _ _ . _ , - . _ _ . . . _ ~-_

Page 3: 'Safety Evaluation of Inservice Testing Program,' interim ...

. .

c

i: 2.2.1 Relief Request . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .142.2.2 Relief Request ............................... - 14

2.3 Category A, 6, and C Valves .......................... 15

2.3.1 Relief Request ............................... 15'

3. Control Rod.Orive .......................................... 16,

- 3.1 Category B Valves .................................... 16i

3.1.1 Relief Request ............................... .16

.

3.2 Category C Valves .................................... 17.

3.2.1 Relief Request .................. ............ 17

4. Residual Heat Remova. ...................................... 18

4.1 Category B Valve 18....................................

4.1.1 Relief RtgJest ............................... 18

4.2 Category C Valves .................................... 18

4.2.1 Relief Request ............................... 18

5. Standby Liquid Control ..................................... 19,

5.1 Category C Valves .................................... 19

5.1.1 HRelief Request ............................... 19

6. Reactor Core Isolation Cooling ............................. 20,

i

6.1 Category A/C Valves .................................. 20

6.1.1 Relief Request ............................... 20

'

7. CoreSpray................................................. 20

'7.1 Category B Valves ....................s............... 20e.

- 7.1.1 Relief Request ............................... 204

1

7.2 Category C/E Valves .................................. 21.

7.2.1 Relief Request ............................... 21 -

8. High Pressure Coolant Injection ............................ 22 ,

8.1 Category A/C Valves .................................. 22

8.1.1 Relief Request ............................... 22

i i i i

|

|,

_ . + . , m, - -- _ - . . . _ .y, -- . -- _. . _ _ . , - .,. ... , ----r--. .--e, y,. s,

y.-

Page 4: 'Safety Evaluation of Inservice Testing Program,' interim ...

8.2 Category B Valves .................................... 22

,8. 2.1 - Relief Request ............................... 22

8.3 Category C Valves .................................... 23

; 8.3.1 Relief Request ............................... 238.3.2 Relief Request ............................... .24

9. M a i n S t e am . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24-

9.1 Category C/C Valves .................................. 24. .

9.1.1 Relief Request ............................... 24

9.2 Category C Valves .................................... 26

9.2.1 Relief Request ............................... 26

10. Feedwater .................................................. 27

10.1 Category A/C and C Valves ............................ 27

10.1.1 Relief Request ............................... 27

1.11. Neut ro n Mon i tor i ng Sys tem . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28

11. 1 Category A/C Valves .................................. 28

11.1.1 Relief Request ........ ...................... 28

IV. APPENDIX A ...................................................... 29

1. Code Requirements--Valves .................................. 29!

2. Code Requirements--Pumps ................................... 29

'V. ATTACHMENT I .................................................... 30

1. Recirculation ............................................... 30

1.1 Category B Valves .................................... 30

2. Control Rod Drive .......................................... 30

t- 2.1 Category B Valves .................................... 30.

3. Residual Heat Removal ...................................... 30

3.1 Category A Valves .................................... 30

3.2 Category A Valves .................................... 31

3.3 Catepary B Valves .................................... 31

iv|t

|

. . . - - , ._ . - - _ - . . , . .. _ , . , - . . . _ . - , - - -_

Page 5: 'Safety Evaluation of Inservice Testing Program,' interim ...

3.4 Category C Valves .................................... 31

4. C o re S p r ay . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 2 -

' 4.1 Category C. Valves _.................................... 32

5. P re s su re S u pp res s i o n . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32

5.1- Category A Valves .................................... 32.

5.2 Category C-Valves .................................... 32

6. High Pressure Coolant Injection ............................ 32.

6.1 Category A Valves .................................... 32

6.2- Category C Valves .................................... 33

7. M a i n S t e am . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33

7.1 Category A Valves .................................... 33

VI. ATTACHMENT II ................................................... 34

- VII. ATTACHMENT III .................................................. 35

VIII. ATTACHMENT IV ................................................... 36

.

?

I.

r v,

i

4

Page 6: 'Safety Evaluation of Inservice Testing Program,' interim ...

~ - _. - .- - - . . .

v

I. INTRODUCTION-

Contained herein is a safety evaluation of the pump and valve inser-vice testing (IST) program submitted by the Commonwealth Edison Com ' on7-18-79 for its Quad Cities Station Units 1 and 2 nuclear plants.program applies to Unit 1 for the period 10-18-79 through 6-17-6 .a coUnit 2 for the period 11-10-79 through 7-9-81. The working sess.on withQuad Cities and Commonwealth Edison Company representatives was conducted

; on 6-25-80 and 6-26-80. The licensee resubmittal was issued on 9-30-80 and' was reviewed by EG&G Idaho Inc., to verify compliance of proposed tests of -

' safety related Class 1, 2, and 3 pumps and valves with requirements of the '

.ASME Boiler and Pressure Vessel Code, Section XI,1974 Edition, through the

'

Summer of 1975 Addenda. Commonwealth Edison Company and Quad Cities has .

also requested relief from thc ASME Code from testing specified pumps and,

valves because of practical reasons. These requests have been evaluatedi

individually to determine whether they have significant risk implications.

and whether the tests, as required, are indeed impractical.!

The evaluation of the pump testing and associated relief requests iscontained in Section II; the evaluation of the valve testing program andassociated relief requests is contained in Section III. All evaluationsfor Sections II and III are the recommendations of EG&G Idaho, Inc.

A summary of the pump and valve testing requirements is contained inAppendix A.

Category A, B, and C valves that meet the requirements of the ASMECode Section XI and are not exercised every 3 months are contained inAttachment I.

,

.

A listing of P-ID's used for this review are contained inAttachment II.

Valves that have a proposed testing interval greater than eachrefueling outage are summarized in Attachment III.

Valves that should be reviewed by the NRC to determine if they should; be Categorized A, A/C, or A/E are summarized in Attachment IV.

i

!

i *

I

I

*,

,

i

! l

. - - - _ _ -.__- -. -- - - -- _- - -- . - .

Page 7: 'Safety Evaluation of Inservice Testing Program,' interim ...

..- - .- . - - - . -

i

II. Pump Testing Program'

The IST program submitted by Commonwealth Edison for its Quad CitiesStation Units 1 and 2 was examined to verify that Class 1, 2, and 3 safety

|_ related pumps were included in the program and that those pumps are subjec-ted to the periodic tests as required by the ASME Code, Section XI. Ourreview found that Class 1, 2, and 3 safety related pumps were included inthe IST program and, except for those pumps identified below for whichspecific relief from testing has been request M, the pump tests and fre-quency of testing comply with the code. Each Commonwealth Edison basis for*

requesting specific relief from testing pumps and the EG&G evaluation ofthat request is summarized (Sections 2 through 4) below and grouped accor-ding to the system in which the pumos reside:.

.

1. All Safety Related Pumps

Core Spray Pumps 1401-1 A,18, 2A and 28; Residual Heat Removal Pumps1002-lA, 18, 1C, 2A, 28 and 2C; RHR Service Water Pumps 1-1001-65A, -658,-65C, -650, 2-1001-65A, -658, -65C, and -65D; Standby Liquid , Control Pumps110?-1A, -18, 1002-2A and -2B; High Pressure Coolant Injection Pumps 1-2302and 2-2302; Diesel Generator Cooline ater Pumps 1-3903, 2-3903, and

! 1/2-3903; and Diesel Generator Fuel 011 Transfer Pumps 1-5203, 2-5203, and'

1/2-5203'

l.1 Relief Request

The licensee has requested specific relief from measuring bearingtemperature and taking vibration readings in accordance with the require-ments of Section XI and proposed to take vibration readings in velocity(in./sec).

:

1.1.1 Code Requirement. Refer to Appendix A. j

l.1.2 Licensee's Basis for Requesting Relief. Pump vibration andbearing temperature are required to be measured to detect any changes inthe mechanical characteristics of a pump to detect developing problems so

i repairs can be initiated prior to a pump becoming inoperable (i.e. unablei to perform its function). The ASME Code minimum str dards require measure-4 ment of the vibration amplitude displacement in mils (thousands of an inchj every three months and bearing temperatures once per year.

Quad Cities Station proposes an alternate program which is believed to,

be more comprehensive than that required by 3ection XI. This program con-! sists of performing the required vibration readings in velocity rather than

mils displacement. This technique is an industry-accepted method which is* much more meaningful and sensitive to small changes that are indicative of

developing mechanical problems. These velocity measurements detect notonly high amplitude vibrations that indicate a major mechanical problems,

but also the equally harmful low amplitude-high frequency vibrations dJe tomisalighment, imbalance, or bearing wear that usually go undetected bysimple displacement measurements.-

,

| 2

.--- _ - . - . . .- - .. . .

Page 8: 'Safety Evaluation of Inservice Testing Program,' interim ...

In addition, these readings go far beyond the capabilities of a bearingtemperature monitoring program, which requires a bearing to be seriouslydegraded prior to the detection of increased heat at the bearing housing.The vibration velocity readings on a schedule of once every three monthsachieves a much higher probability of detecting developing problems thanthe once per year reading of bearing temperatures. Data gathering onbearing temperatures also is not without its cwn problems. The enforcedthirty minute run time, (i.e., IWP-3500) (b)--three successive readings

,taken at ten minute intervals that, do not vary more than 3%), causes prob-lems with pumps having'no recirculation / test loop. The temperature of the -

pumped' fluid is also meaningful when attempting to trend any developingproblems from year to year. It is easy to see that a program of bearingtemperature trends and the evaluation of the results would in some cases be .

difficult to analyze. Improper interpretations of results could result inunnecessary pump maintenance. In addition, it is impractical to measurebearing temperatures on many of the pumps in the program. Some specificexamples are as follows:

1. Core Spray l(2)A,B-1401--pu .p bearings are lubricatedby pumped fluid. Temp are of the pumped fluid wouldseriously affect the accuracy of trends.

2. RHR 1(2)A,B,C,0-1002--same as above.

3. RHR Service Water 1(2)l001-65A,B,C,D--Bearings arecontained in an oil-filled reservoir. The ambienttemperature of the pump space is changeable therebyvarying the start temperature of the data. Resultswould be difficult if not impossible to trend from testto test.

4. High Pressure Coolant Injection--This pump is driven bya steam-turbine which exhausts steam into the pressuresuppression chamber. Extended run times to stabilizebearing temperatures would create problems in keepingsuppression pool temperatures below the Technical Spec-ification limit of 950F.

5. Diesel Generator Cooling Water 1(2)(1/2)-3903--Same asRHR Service Water

6. Diesel Generator Fuel Oil Transfer 1(2)(1/2)-5203--Thesetransfer pumps pump fuel oil from the fuel oil storage

*

tank to the D/G fuel oil day tank. There is no recir-' culation test loop for these pumps, thereby, limiting| the run time necessary to gather bearing temperature

#data.;

; The foregoing reasons demonstrate that the proposed program of vibra-tion reasurements is a more practical method of testing which exceeds the'

requirements of the ASME Code.

|u

3

|

Page 9: 'Safety Evaluation of Inservice Testing Program,' interim ...

._- - - _ _ _

<

ALTERNATE TESTING: Pump vibration measurements will be taken in vibra-tion velocity (in./sec.). The evaluation of the reaoings will be perTable 1.

;

1.1.3 Evaluation. We agree with the licensee's basis and tnerefore !" ^

feel that relief should be granted for all safety related pumps from the !

requirements of Section XI to measure bearing temperature yearly and takevibration readings in mils displacement. The licensee has demonstrated

; that taking vibration readings in velocity (in/sec) is more restrictive'

than the requirements of Section XI-and will provide a better indication of.

_

pump degradation. We conclude that the proposed alternate testing methodsmore than meet the requirements of Section XI and should provide adequateinformation to determine pump degradation (the intent of Section XI).,

1.2 Relief Request

' The licensee has requested specific relief from the requirements ofSection XI to measure pump parameters monthly and proposed to run these

j pumps monthly for bearing lubrication and to run pumps quarterly and| measure the required parameters.!

j 1.2.1 ^ de Requirement. Refer to Appendix A.o

1.2.2 Licensee's Basis for Requesting Relief. Relief is requestedf rom the requirements of Subsection IWP-3400 to measure the basic pumpparameters identified in Table IWP-3100-1 on a monthly basis. Changes inthese hydraulic and mechanical parameters will not significantly changeover the period of one month because the pumps are primarily run only for>

operability and remain in a standby mode of operation. Quarterly measure-,

ment of these parameters is more than adequate in determining pumpdegradation.

The original intent to require monthly testing was based on the; premise that damage can occur to bearings if a pump remains stagnant fori long periods of time. This concern can be mitigated by running pumps on a

monthly basis to lubricate the main bearings.

A change to the Code of a similar nature, recently passed the Sec-,

j tion XI Main Comittee, will be published in a forthcoming Addenda toSection XI. It is not felt that this relief request represents a relaxa-,

1 tion in safety requirements, only that it allows more practical implemen-, tation of Section XI requirements. 4

All pumps will be exercised on a monthly basis to lubricate the-

bearings. Pump parameters will be measured quarterly.4

;

i * 1.2.3 Evaluation. We agree with the licensee's basis and therefore; feel that relief should be granted from the Secticn XI requirement to

measure pump parameters monthly. The licensee has demonstrated that their; proposed testing frequency meets the intent of the Section XI require- q

ments. We conclude that running pumps monthly to lubricate bearings, and |running pumps quarterly to measure all required parameters should provide i

'

j sufficient data to determine any pump degradation.,

j1

1

|. 4:

_ _ - _. . , - - ., _ _ -_. _ _ _ _ _ , _ . _ _ _ _

Page 10: 'Safety Evaluation of Inservice Testing Program,' interim ...

_ . . _ _ _ _ - . - - - - _ _ _ _ _ . _ - . _ _ _ _ . _ _ _ _ _ . _ . . . _ ._ . _ _ _ . . . _ _ . _ _ _ _ . _ _ . _ . . .. . . - _ , _ _. ..

k

a

: -

!

i

|' TABLE 1. . ALLOWABLE RANGES OF IEST: QUANTITIES|

~ Alert Range Required Action ' flange t

.

Acceptable Low LowQuantity Range Values' High Values Values High Values,

4 ''

v wnen 0 1vr1 0.15 in./s 0 to 0.3 in./s None 0.3 to 0.45 in./s None v > 0.45 in./s:

{ v when 0.15 in./s < vr < 0.3 in./s 0 to 0.45 in./s None 0.45 to 0.75 in./s None v > 0.75 in./si

v when 0.3 in./s < vr < 0.6 in./s 0 to 0.9 in./s None 0.9 to 1.5 in./s None v > 1.5~in./s '

:

|- v when 0.6 in./s < vr < 1.0 in./s 0 to 1.1 in./s None 1.1 to 1.5 in./s None v > 1.5 in./si4

!-

f, where:

v = velocity measured in inches /second, peak.

! vr = reference velocity measurement (initial measarement after installation or rework. !

;,

I

1,.

a

I

h

4

N

I !

!4

$d

.. e .- e ,

*_

Page 11: 'Safety Evaluation of Inservice Testing Program,' interim ...

_

l.3 Relief Request

The licensee has requested specific relief from the requirements ofSection XI, (corrective action) and proposed to use the plants " LimitingConditions for Operation" to determine required action ranges for pumps.

,

1.3.1 Code Requirement. Refer to Appendix A, IWP-3220(c), andTable IWP-3100-2.

1.3.2 Licensee's Basis for Requesting Relief. When measured pump.

parameters f all into the " Required Action Range",- pump operability and'

corrective action will be based on the limits specifieo in the LimitingConditions for Operation of the plant Technical Specifications. A pump may,

remain operable if it meets all Technical Spec.'' cation requirements and ananalysis indicates that, even though a pump paran,-Cer is in the " RequiredAction Range", the pump can still fulfill its intended functions. ,

,

Relief is requested from the requirements of IWP-3220(c) regardingcorrective action when pump parameters are found to be within the " RequiredAction Range" of Table IWP-3100-2. Some means should be allowed for con-ducting an analysis to demonstrate that the condition of a pump does nctimpair pump operability and that the pump caq still perform its intendedfunction. Later editions of the Code do address this concern by allowingsuch an analysis to serve as the corrective action.

1.3.3 Evaluation. We agree with the licensee's basis and thereforefeel that relief should be granted from the Section XI " corrective action:

4 requirements" for all safety related pumps. The licensee has demonstratedi that using pitnt " Limiting Conditions for Operation" for " Required Action

Ranges" should ensure pump availability. We conclude that aproved Techni-! cal Specifications for " Limiting Conditions of Operation" for pump testing

" Required Action Ranges" meets the intent.of the Section XI requirements.4

2. Standby Liquid Control Pumps 1102-1A, 18, 2A, and 28

2.1 Relief Request

The licensee has requested specific relief from measuring pump inletpressure in accordance with the requirements of Section XI.4

2.1.1 Code Requirement. Refer to Appendix A.

2.1.2 Licensee's Basis for Requesting Relief. It is impractical to~ measure standby liquid control pump inlet pressure in accordance with Sec-4

tion XI requirements. During pump testing, the pump suction is from a test,

tank rather than the main standby liquid control tank. No instrumentation'' is provided for measuring inlet pressure, and therefore, the only meansavailable is to correlate tank level to inlet pressure. Since these pumpsare positive displacement designs, the measurement of inlet pressure is notcritical in judging pump performance. Measuring the discharge pressure andthe flow rate is' adequate to detect changes in the hydraulic characteris-tics of the pumps. i

,

i

6-

_ ~_ , _ _ _ _ _ . _ , _ _ ._. _ __

Page 12: 'Safety Evaluation of Inservice Testing Program,' interim ...

. _ _ . . -- - .

2.1.3 Evaluation. We agree with the licensee's basis and thereforefeel-that relief should be granted from the Section XI requirement tomeasure inlet pressure for these pumps. The licensee has demonstrated thatcalculating inlet pressure for a positive displacement pump will not pro-i

vide any meaningful data to analyze for pump degradation. -We conclude thatmeasuring discharge pressure and flowrate should provide adequate informa-tion to determine any hydraulic degradation of these pumps.

3. Diesel Generator Fuel Oil Transfer Pumps 1-5203, 2-5203, 1/2-5203.

3.1 Relief Request

The licensee has requested specific relief from measuring pump inlet -

pressure in accordance with the requirements of Section XI.

3.1.1 Code Requirement. Refer to Appendix A.

3.1.2 Licensee's Basis for Requesting Relief. Relief is requestedfrom the requirement of measuring pump inlet pressure curing pump tests.This pump is utilized in-transfering fuel oil from the diesel generator4

fuel oil storage tank to the diesel fuel oil day tank. The configurationof the piping is-such that the pump is located above the storage tank. Thepump is a positive displacement gear type pump not requiring a positivesuction head for proper operation. Since this pump is a positive displace-ment type, the discharge pressure is independent of the suction pressureand, therefore, inlet pressure data is not important in evaluating pump

i performance.

i 3.1.3 Evaluation. We agree with the licensee's basis and thereforefeel that rellet should be granted from the Section XI requirement tomeasure inlet pressure for these pumps. The licensee has demonstrated thatmeasuring inlet pressure for these positive displacement gear type pumpswould not provide any meaningful data that could be used to determine anypump degradation. We conclude that measuring pump discharge pressure andflowrate should provide adequate information to determine if these pumps.

are performing their design function or if any hyoraulic degradation ofthese pump; has occurred.

r,

I

h

I!

7

_ _ .

Page 13: 'Safety Evaluation of Inservice Testing Program,' interim ...

III. VALVE TESTING PROGRAM EVALUATION

The IST prcgram submitted by Commonwealth Edison Company and QuadCities was examined to verify that Class 1, 2, and 3 safety related valveswere included in the program and that those valves are suojected to theperiodic tests required by the ASME Code, Section XI, and the NRC positionsand guidelines. Our review found that Class 1, 2, and 3 safety relatedvalves were included in the IST program and, except for those valves iden-tified below for which specific relief from testing has been requested, thevalve tests and frequency of testing comply with the code requirements and-

the NRC positions and guidelines listed in General Section 1. Also,included in the General Section 1 is the NRC rasition and valve listingsfor the leak testing of valves that perform i pressure isolation function.

and a procedure for the licensee's use to i1 corporate these valves into theIST program. Each Commonwealth Edison Company and Quad Cities basis forrequesting specific relief from testing valves and the EG&G evaluation ofthat request is summarized (Sections 2 througF 11) below and groupedaccording to each specific system.

1. General Consiaerations

1.1. Testing of Valves which Perform a Pressure Isolation Function

Several safety systems connected to the reactor coolant pressure boun-dary have design pressures below the reactor coolant system operating pres-sure. Redundant isolation valves within the Class 1 bounoary forming theintc face between these high and low pressure systems prevent the low pres-sure systems from being subjected to pressures which exceed their designlimit. In this role, the valves perform a pressure isolation function.The NRC considers the redundant isolation provided by these valves to be 'important. The NRC considers it necessary to assure that the condition ofeach of these valves is adequate to maintain this redundant isolation andsystem integrity. For these reasons, the NRC and EG&G believe that somemethod, such as pressure monitoring, leak testing, radiography or ultrasonictesting, should be used to assure the condition of each valve is satisfac-tory in maintaining this pressure isolation function.

If leak testing is selected as the appropriate method for achievingthis objective, the NRC and EG&G Idaho, Inc., believe that the followingvalves should be categorized as A or AC and leak tested according toIWV-3420 of Section XI of the applicable edition of the ASME Code. Thesevalves are:

~

1(2)-1402-9A and -9B

1(2)-1402-25A and -25B3

1(2)-1001 47 and -50

1(2)-1001-68A and -688

1(2)-1001-29A and -298

8

Page 14: 'Safety Evaluation of Inservice Testing Program,' interim ...

- _ .

.

The NRC and EG&G Idaho, Inc., nave discussed this matter with thelicensee and identified the valves listed above. The licensee agreed toconsider testing and categorizing each of these valves with the appropriatedesignation depending on the testing method selected. Whatever method thelicensee selects for determining the condition of each valve, the licenseewill provide to the NRC for evaluation the details of the testing methodwhich clearly demonstrates the condition of each valve.

1.2 ASME Code Section XI Requirements,

Subsection IWV-3410(a) of the Section XI Code (which discusses fullstroke and partial stroke) requires that Code Category A and B valves beexercised once every 3 months, with the exceptions as defined in *

IWV-3410(b-1), (e), and (f). IWV-3520(a) requires that Code Category Cvalves be exercised once every 3 months, with the exceptions as defined inIWV-3520(b). IWV-3700 requires no regular testing for Code Category Evalves. Operational checks, with appropriate record entries, shall recordthe position of these valves before operations are performed and afteroperations are completed and shall verify that each valve is locked, orsealed. The limiting value of full stroke time for each power operatedvalve shall be identified by the owner and tested in accordance withIWV-3410(c). In the above exceptions, the code permits the valves to betested at cold shutdown where:

1. It is not practical to exercise the valves to the posi-tion required to fulfill their function or to the par-tial position during power operation.

2. It is not practical to observe the operation of thevalves (with fail-safe actuators) upon loss of actuatorpower.

1.3 Stroke Testing of Check Valves

The NRC stated its position to the licensee that check valves whosesafety function is to open are expected to be full stroked. If only lim-

' ited operation is possible (and it has been demonstrated by the licenseeand agreed to by the NRC) the check valve shall be partial stroked. Sincedisk position is not always observable, the NRC staff stated that verifica-

tion of the plant's safety analysis design flow rate through the checkvalve would be an adequate demonstration of the full stroke requirement.Any flow rate less than design will be considered part stroke exercisingunless it can be shown that the check valve's disk position at the lower -

flow rate would be equivalent to or greater than the design flow ratethrough the valve. The licensee agreed to conduct flow testing to satisfythe above position. e

'

1.4 Stroke Testing of Motor Operated Valves

The licensee has requested relief from the part-stroke requirement ofSection XI for all power operated valves except those identified in Attach-ment I.7.1. The licensee has stated tnat none of the Category A or B poweroperated valves identified, except those noted above, can be part stroked

| 91

.-- - --

Page 15: 'Safety Evaluation of Inservice Testing Program,' interim ...

__..

,

because of the design logic of the operating circuits. These circuits aresuch that when an open or close signal is received the valve must completea full stroke before the relay is released to allow the valve to stroke inthe other direction. We find that the above relief request from part

stroking is warranted and should be granted because the required function'

of the valves involves only full open or full closed positions.

1.5 Test Frequency of Check Valves Tested at Cold Shutdowns

The Code states that, in the case of cold shutdowns, valve testing' *

need not be performed more often than once every three months for Cate-gory A and B valves and once every nine months for Category C valves. It

is NRC's position that the Code is inconsistent and that Category C valves- S

should be tested on the same schedule as Category A and B valves. Thelicensee has agreed to modify his procedures on cold shutdowns to read, "Inthe case of frequent cold shutdowns, valve testing need not be performedmore often than once every three (3) months for Category A, B and C valves."

1.6 Licensee Request for Relief to Test Valves at Colo Shutdown

The Code permits valves to be tested at cold shutdown, and the Codei conditions under which this is permitted are noted in Appendix A. These! valves are specifically identified by the licensee and are full strokedj exercised during cold shutdowns; therefore, the licensee is meeting thej requirments of the ASME Code. Since the licensee is meeting the require-

ments of the ASME Code, it will not be necessary to grant relief; however,1

during our review of the licensee's IST program, we have verified that itwas not practical to exercise these valves during power operation and thatwe agree with the licensee's basis. It should be noted that the NRC dif-ferentiates, for valve testing purposes, between the cold shutdown mode andthe refueling mode. That is, for testing purposes the refueling mode isi

i not considered as a cold shutdown.i

1.7 Changes to the Technical Specification

In a November 1976 letter to the licensee, the NRC provided an attach-ment entitled, "NRC Guidelines for Excluding Exercising (Cycling) Tests of

; Certain Valves During Plant Operation." The attachment stated that when. one train of a redundant system such as the Emergency Core Cooling System' (ECCS) is inoperable, nonredundant valves in the remaining train should not: be cycled if their failure in a non-safe position would cause a loss ofi total system function. For example, during power operation in some plants,

there are stated minimum requirements for systems which allow certain lim-,

iting conditions for operation to exist at any one time and if the system; is not restored to meet the requirements within the time period specified

1* in a plant's Technical Specifications (T.S.), the reactor is required to beput in some other mode. Furthermore, prior to initiating repairs allvalves and interlocks in the system that provide a duplicate function are-

required to be tested to demonstrate operability immediately and periodi-,

i cally thereafter during power operation. For some plants this situation

could be contrary to the F C guideline as stated in the document mentionedabove. It should be noteo that a reduction in redundancy is not a basis,

for a T.S. change not is it by itself a basis for relief from exercising ini

|

10

_ _ _

Page 16: 'Safety Evaluation of Inservice Testing Program,' interim ...

- .- ._. _

A

4 accordance with Section ya. The licensee has agreed to review the plant'sT.S. and to consider the need to propose T.S. changes which would have the-

effect of precluding such testing. After making this. review, if the licen-see determines that the T.S. should be changed because the guidelines areapplicable,-the licensee will submit to the NRC, in conjunction with theproposed T.S. change, the inoperable condition for each system that is-affected which demonstrates that-- the valve's f ailure would cause a loss ofsystem function or if the licensee determines that the T.S. should not bechanged because the guidelines are not applicable or cannot be followed,the licensee will submit the reasons that led to their determination for *

each potentially affected section of the T.S.

'

l.8 Safety Related Valves *

:This review was limited to safety-related velves. Safety-relatedvalves are defined as those valves that are needed to mitigate the conse-quences of an accident and/or to shutdown the reactor and to maintain thereactor in a shutdown condition. Valves in this category would typicallyinclude certain ASME Code Class 1, 2 and 3 valves and could include somenon-code class valves. It should be noted that the licensee may haveincluded non-safety related valves in their Inservice Test Program as adecision on the licensee's part to expand the scope of their program.

1.9 Valve Testing at Cold Shutdown

Inservice valve testing at cold shutdown is acceptable when the fol-lowing conditions are met: It is understood that the licensee is to com-mence testing as soon as the cold shutdown condition is achieved but notlater than 48 hours after shutdown and continue until complete or the plantis ready to return to power. Completion of all valve testing is not aprerequisite to return to power. Any testing not completed at one coldshutdown should be performed during any subsequent cold shutdowns that mayoccur before refueling to meet the Code specified testing frequency. Forplanned cold shutdowns, where the licensee will complete all the valvesidentified in his IST program for testing in the cold shutdown mode, excep-tions to the 48 hours may be taken.

1.10 Category A Valve Leak Check Requirements for Containment Isolation-

Valves (CIV)

All CIVs shall be classified as Category A valves. The Category Avalve leak rate test requirements of IWV-3420(a-e) have been superseded byAppendix J requirements for CIVs. The NRC has concluded that the applic-'

.

| able leak test procedures and requirements for CIVs are determined by10_CFR 50 Appendix J. Relief from paragraph IWV-3420 (a-e) for CIVs pre-sents no safety problem since the intent of IWV-3420 (a-e) is met by Appen- cdix J requirements.

,

|

The licensee shall comply with Sections f anu g of IWV-3420 untilrelief is requested from these paragraphs. It should be noted that theseparagraphs are only applicable where a Type C Appendix J leak test is per-formed. Based on the considerations discussed above the NRC concludes thatthe alternate testing proposed above will give the reasonable assurance of

L

! 11

-- ..

Page 17: 'Safety Evaluation of Inservice Testing Program,' interim ...

. . _ _.

.

valve operability intended by the Code and that the relief thus grantedwill not endanger life or property or the common defense and security ofthe public.

1.11 Application of Appendix J Testing to the IST Program

The Appendix J review for this plant is a completely separate reviewfrom the IST program review. However, the determinations made by thatreview are directly applicable to the IST program. The NRC review hasdetermined that the current IST program as submitted by the licensee cor-'

rectly reflects their interpretation of Section XI vis-a-vis Appendix J.The licensee has agreed that, should the Appendix J program be amended,they will amend their IST program accordingly.*

2. General Relief Requests,

2.1 Category A, A/C, and A/E Valves

2.1.1 Relief Request. The licensee has requested specific relieffrom leak testing all Category A valvas in accordance with the requirementsof Section XI and proposed to leak test these valves in accordance with therequirements of Appendix J.

2.1.1.1 Code Requirement. IWV-3420 Valve Leak Rate Test. Cate-gory A valves shall be leak-tested. Tests shall be' conducted at the same

j (or greater) frequency as scheduled refueling outages, but not less thanonce every two years. Valve seat leakage tests shall be made with thepressure differential in the same direction as will be applied when thevalve is performing its function with the following exceptions:

1. Any gicbe type valve may be tested with pressure under~

seat.

2. Butterfly valves may be tested in either direction,provided their seat construction is designed forsealing against pressure on either side.

4

3. Gate valves with two-piece disks may be tested by pres-! surizing them between the seats.!i 4. All valves (except check valves) may be tested ir,

either direction if the function differential pressure,

is 15 psi or less..

;

5. The use of leakage tests involving pressure differen-tials lower than function pressure differentials are

c*permitted in those types of valves in which service,

i pressure will tend to diminish the overall leakge chan-i nel opening, as by pressing the disk into or onto the| seat with greater force. Gate valves, check valves,j and globe type valves having function pressure differ-

ential applied over the seat are examples of valve.

applications satisying this requirement. When leakage

,

! 12!-

_ ._ _ _ _ _ . _ . . _ - _ _ _ _ _ _ . _ _ __ _._ . _ ._

Page 18: 'Safety Evaluation of Inservice Testing Program,' interim ...

_.- -

,

tests are made in such cases using pressure lower thanfunction maximum pressure differential, tne observedleakage shall be ad.iosted to function maximum pressuredifferential value oy calculation appropriate to the

e test media and the ratio between test and functionpressure differential assuming leakage to be directlyproportional to the pressure. differential to theone-half power.

'6. Any valves not qualifying for reduced pressure testingas defined in 3420(c) (5) shall be leak-tested at fullmaximum function pressure differential, with adjustment

: by calculation if needed to compensate for a difference *

between service and test media.;

2.1.1.2 Licensee's Basis for Requesting Relief. Primary con-tainment isolation' valves whose functional differential pressure does notexceed the primary containment accident pressure will be seat leak testedin accordance with the Appendix J requirements of 10 CFR 50. At this func-tional differential pressure Section XI testing requirements are essenti-ally equivalent to those of Appendix J. No additional information con-ce nir.g valve leakage would be gained by performing separate tests to both

,

*;ction XI_and Appendix J.

Valves will be seat leak tested in accordance with 10 CFR 50Appendix J.

2.1.1.3 Evaluation. We agree with the licensee's basis and: therefore feel that relief should be granted for all Containment Isolation

Valves (CIV's) from tee leak testing requirements of Section XI,IWV-3420(a-g). We conclude that, since the leak rate test requirements of

; IW/-3420 (a-g) have been superseded by the Appendix J requirements ana thati the applicable leak test procedures and requirements for CIV's are now

deter :ned by 10 CFR 50 Appendix J, the intent of IWV-3420(a-g) is met bythe Appendix J requirements.

2.1.2 Relief Request. The licensee has requested specific relieffrom exercisinc all Category A/C excess flow check valves in accordancewith the requirements of Section XI and proposed to verify valve' closure(their safety related position) following each refueling outage.

2.1.2.1 Code Requirement. Refer to Appendix A.,

4

.

2.1.2.2 Licensee's Basis for Requesting Relief. These valvesare currently testec per Technical Specification requirements which con-i

sists of a leakage test conducted during primary system pressure tests at o.

the completion of each refseling outage. The testing involves uncoupling-

| the instrument lines and verifying that each valve strokes to the closedi position. The operator also observes that the valve limits flow to an

acceptable level. This method and frequency of testing has been justifiedi

| in t le plant FSAR and has proven to be an adequate verification of valvej performance.

.

13

- _ _ _ . .

Page 19: 'Safety Evaluation of Inservice Testing Program,' interim ...

.

%

2.1.2.3 -Evaluation. We agree with the licensee's basis andtherefore feel that relief should be granted for all excess flow check |valves from the exercising and leak testing requirements of Section XI.The licensee has demonstrated that, due to plant design and operatinglimitations, valve closure (their safety related position) can only beverified during pressure testing per Technical Specifications followingeach refueling outage. We conclude that the proposed alternate testingmethod and frequency meets the intent of Section XI and should verifyproper valve operability.

O

2.2 Power Operated Category A and B Valves

* 2.2.1 Relief Request. The licensee has requested specific relieffrom the stroke timing accuracy requirements of Section XI for all Cate-gory A and 8 powered operated valves with stroke times less than 10 seconds.

,

2.2.1.1 Code Requirement. Refer to Appendix A.

2.2.1.2 Licensee's Basis for Requesting Relief. The coderequires that stroke timing accuracy be either to the nearest second or 10percent of tL. maximum stroke time, whichever is less. Quad Cities Stationfeels that this requirement is impractical for valves with stroke timesless than 10 seconds. For these valves, the accuracy of the measuredstroke time is less than one second which is inconsistent with the methodused for timing (i.e., hand held stopwatch) and difficult to certify.<ince the purpose for the test is to detect deterioration of valve func-tion, establishing a lower limit of one second for valve timing accuracywill have no effect on the ability to detect changes in valve performance.Recent changes in Section XI of the ASME Code have reflected this position.

As revised in later editions of the Code, the stroke time of all poweroperated valves will be measured to the nearest second, for stroke times 10seconds or less, or 10 percent of the specified limiting stroke time forfull-stroke times longer than 10 seconds.

2.2.1.3 Evaluation. We agree with the licensee's basis andtherefore feel relief should be granted for all power operated Category Aand B valves (with stroke times less than 10 seconds) from the timingrequirements of Section XI. The licensee has demonstrated that using thepresent available methods of measuring stroke times that accuracy is lim-ited and meaningful data on valve stroke time degradation cannot beobtained. We conclude that measuring stroke time to the nearest secondmeets the intent of Section XI and should provide meatlingful data to use in,

determining any valve degradation.

2.2.2 Relief Request. The lice.'see has requested specific relief,from stn ke timing Category A and B power operated valves in accordance

i with the requirements of Section XI.

2.2.2.1 Code Requirement. Refer to Appendix A.

2.2.2.2 Licensee's Basis for Requesting Relief. ParagraphIWV-3410(c) (3) requires that valve stroke times be evaluated against the

i,

14

;

, _ _ . . _ . . __ _, - . ,- - .

Page 20: 'Safety Evaluation of Inservice Testing Program,' interim ...

.. - - . - -

d

previous stroke time to determine if corrective action is required. Toestablish consistency in evaluating stroke times and make program implemen-tation more practical, Quad Cities Station proposed to establish a refer--

ence stroke time for each valve which will be usea fur evaluating perform-ance. This reference value will be determineo by averaging stroke times.

| This actually results in a tighter band of acceptable stroke times, out ismuch easier to administer. The limiting value of full stroke time for eachvalve will remain as listed in the IST Program tables.

eIn addition, it is impractical to apply the requirements of IWV-3410(c)<

(3) to valves with very short stroke times (i.e., 5. seconds) particularlysolenoid valves which typically have full stroke times under one second.For these short stroke time valves, variances of 50 percent or more can *

occur in the measured times for reasons that are in no way related to valve-performance, for example, operator reaction times. In these specific cases,verifying that the valve stroke times do not exceed 5 seconds would besufficient to evaluate valve performance.

Based on this relief request paragraph IWV-3410(c) (3) would, ineffect, read as follows:

If an increase in stroke time of 25% or more from the estab-lishmed reference value for valves with stroke times greaterthan ten seconds or 50% or more for valves with stroke timesbetween 5 and 10 seconds or 5 seconds or more for valveswith stroke times less than or equal to 5 seconds isobserved, test frequency.....

2.2.2.3 Evaluation. We agree with the licensee's basis andtherefore feel that relief should be granted for all Category A and B power

4 operated valves from the stroke timing requirements of Section XI. The -

licensee has demonstrated that the proposed valve timing requirements forvalves with stroke times greater than 5 seconds meets the intent of the,

requirements of Section XI. Also, for valves with established stroke timesof less than 5 seconds, a maximum limit should provide the required data todetermine valve degradation. We conclude that the proposed alternate stroke

' timing requirements for these valves will provide the required meaningfuldata to determine any valve degradation (the intent of Section XI).

2.3 Category A, B, and C Valves

2.3.1 Relief Request. The licensee has requested specific relief'

from declaring Category A, C, and C valves inoperable and repairing these s

valves in accordance with the requirements of Section XI and proposed touse plant Technical Specifications to determine " Limiting Conditions ofOperation". 6-

2.3.1.1 Code Requirement. If a valve fails to exhibit therequired change of valve stem or disc position by this testing, correctiveaction shall be initiated immediately. If the condition is not, or cannotbe corrected within 24 hours, the valve shall be declared incperative.When corrective action is required as a result of tests made JJring coldshutdown, the condition shall be corrected before startup. A retest

,

15.

, _ _ . _ _

Page 21: 'Safety Evaluation of Inservice Testing Program,' interim ...

. . .

O

showing acceptable operation shall be run following any required correctiveaction before the valve is returned to service.

.

2.3.1.2 Licensee's Basis for Requesting Relief. Specific relief

L is requested from requirements of paragraphs IWV-3410(g) and IWV-3520(c) ofi Section XI of the 1974 Edition of the ASME Boiler and Pressure Vessel Code

including the Addenda through Summer 1975. These paragraphs state thecorrective action; to be taken when valves fail to exhibit a required changeof disk position. These actions include. requirements to take correctiveaction prior to plant startup should a failure occur during cold shutdowntesting. Also stated are requirements to declare valves inoperable if

,

corrective action is unsuccessful within a 24 hour period.,

These paragraphs do not take into account the plant Technical Specifi-cation requirements for limiting conditions for operation whicn state theminimum conditions necessary for safe operation of the plant. The failureof a particular valve may not necessarily require a plant shutdown or pre-vent a startup. In addition, valves not capable of performing their safety-'

related function are declared inoperable as soon as that condition has been,* verified, not after a 24 hour period has elapsed.

For these reasons, Quad Cities Station will evaluate the condition ofeach valve with respect to its safety related function and take the appro-,

i priate corrective action as stated in the Technical Specification--Limiting] Condition for Operation.

; 2.3.1.3 Evaluation. We agree with the licensee's basis and'

therefore feel that relief should be granted for Category A, B, and C valvesfrom the Section XI requirement to declare valves inoperative and the repair<

i requirements that determine when the plant can be started up and poweroperation resumed. We conclude that plant technical specifications ade-,

quately address these specific conditions and should be allowed to governj the limiting conditions of operation and permit plant operation with por-i tions of their safety systems out of service for specific periods of time.4

' 3. Control Rod Drive

3.1 Category B Valves.

3.1.1 Relief Request. The licensee has requested specific relief'

from exercising Category B valves 1(2)-0305-126 and 127 (177 of each),"

" individual rod scram valves, in accordance with the requirements of Sec-i tion XI and proposed to test these valves in accordance with plant Techni-|;. cal Specifications.

3.1.1.1 Code Requirement. Refer to Appendix A.,

j 3.1.1.2 Licensee's Basis for Requesting Relief. There are 177of each of the valves listed, i.e., one for each of the 177 control rod

; drives. The proper operation of each of these valves is demonstrated duringscram testing when each drive's scram insertion time is measured. The-

Technical Specifications limit individual scram insertion times to specificvalues. This insures that the above mentioned valves are functioningproperly.;

i

i

'16

- _ _ _ _ . __

Page 22: 'Safety Evaluation of Inservice Testing Program,' interim ...

. _ . . - . - ._

Individual scram insertion tests will be performed per the TechnicalSpecifications frequency. The frequency is: 1) 100% of control rod drivesaf ter each refueling with reactor power equal to or less than 30%, and2) 50% of the CRD's every 16 to 32 weeks with 100% completed every year.

3.1.1.3 Evaluation. We agree with the licensee's basis and ,

therefore feel that relief should be granted for Category B valves1(2)-0305-126 and 127 (177 of each) from the exercising requi ements ofr

Section XI. The licensee's has demonstrated that a reactor pu er reduc- m

tion is required to conduct this testing and that a frequency more restric-tive than the one proposed would result in unnec'essary power and operatingrestrictions. We conclude that the proposed alternate testing method and efrequency should ensure these valves will properly perform their safetyfunction.

3.2 _ Category C Valves

3.2.1 Relief Request. The licensee has requested specific relieffrom exercising Category C valves 1(2)-0305-114 (177 of each), scram flowcheck valves, in accordance with the requirements of Section XI and pro-posed to test these valves in accordance with plant TechnicalSpecifications.

'3.2.1.1 Code Requirement. Refer to Appendix A.

3.2.1.2 Licensee's Basis for Requesting Relief. There are 177of each of the valves listed (i.e., one for each of the 177 control roddrives). The proper operation of each of these valves is demonstratedduring scram testing when each drive's scram insertion time is measured.

i The Technical Specifications limit individual scram insertion times tospecific values. This ensures that the above mentioned valves arefunctioning properly.

Individual scram insertion tests will be performed per the TechnicalSpecifications frequency. The frequency is: 1) 100% of control rod drives

j after each refueling with reactor power equal to or less than 30%, and2) 50% of the CRD's every 16 to 32 weeks with 100% ccmpleted every year.

3.2.1.3 Evaluation. We agree with the licensee's basis andtherefore feel that relief should be granted for Category Cvalves 1(2)-0305-114 (177 of each) from the exercising requirements ofSection XI. The licensee has demonstrated that a reactor power reduction

,'is required to conduct this testing and that a frequency more restrictivethan the one proposed would result in unnecessary power and operatingrestrictions. We conclude that the proposed alternate testing method andfrequency should ensure these valves will properly perform their safetyfunction.

,

17

-.

Page 23: 'Safety Evaluation of Inservice Testing Program,' interim ...

__ _ _

4. Residual Heat Removal

! 4.1 Category B Valves

4.1.1 Relief Request. The licensee has requested specific relieffrom timing Category B valves 1(2)-1001-18A and 188, RHR pump minimum flowrecirculation isolations in accordance with tne requirements of Section XI.

j 4.1.1.1 Code Requirement. Refer to Appendix A.

4. l'.1. 2 Licensee's Basis for Requesting Relief. Relief isrequested from measuring the stroke time of these valves. Since the valves'

O close automatically when adequate pump flow is reached, it is difficult toaccurately measure the stroke time. An equally meaningful test would be toverify that the valves do close automatically as the pump flow increases.

An operator will verify that these valves automatically close as pumpflow increases during quarterly pump operability testing.

4.1.1.3 Evaluation. We agree with the licensee's basis andtherefore feel that relief should be granted for Category Bvalves 1(2)-1001-18A and 188 from the stroke timing requirements of Sec-tion XI. The licensee has demonstrated that obtaining meaningful data to

i determine valve degradation on valves with variable stroke times is notpossible. In addition, if these valves failed in the full open positiondesign pump flow can still be achieved. We conclude that the proposedalternate test method to obse/ve these valves do close on an increase inpump flow should demonstrate proper valve operability.

4.2 Category C Valves

4.2.1 Relief Request. The licensee has requested specific relief~

from exercising Category C valves 1-1001-142A through 1420, residual heatremoval pump minimum flow checks, in accordance with the requirements ofSection XI and proposed to make plant modifications to install flow devices

,

in thec: lines for valve full stroke exercising verification.

4.2.1.1 Code Requirement. Refer to Appendix A.

4.2.1.2 Licensee's Basis for Requesting Relief. There are noprovisions in the current system design for exercising or determining theposition of these valves. Based on the record of satisfactory pump per-

,formance and lack of pump overheating problems, it is evident that these,

valves have performed in an acceptable manner. However, due to the inabil-,

ity tc demonstrate that the valves stroke open, Quad Cities Station hasinitiated system modifications to install flow instrumentation in the mini-

*; mum flow lines to indicate that the valves are, in fact, opening and pas-

sing adequate flow for pump cooling purposes. The modifications must bemade during a refueling outages because the system will be out of serviceduring the installation. The modifications will be implemented at the

.

earliest possible date which is contingent on the availability of materi-'

'a's. Relief is therefore requested from the requirement to demonstratethat the subject valves stroke open until system modifications provide the<

necessary instrumentation.,

i

18

|- __ . _ . .. --- . ,, - . . . . ,

Page 24: 'Safety Evaluation of Inservice Testing Program,' interim ...

... .. -- .- -. .. - - . . . . - - - .

-|

No specific alternate te;t is applicable during this intcrim period.

4.2.'.3 Evaluation. We agree with the licensee's basis andtherefore feel that temporary relief should be granted for Category C valves1-1001-142A through D from the exercising requirements of Section XI. The

'

licensee has demonstrated that with the present plant design a method toverify these valves open fully (their safety related position) does notexist. We conclude that the proposed plant modifications to install flowdevices will provide a meals to verify proper valve operability.

5. Standby Liquid Control =

*5.1 Category C Valves

'

5.1.1 Relief Request. The licensee has requested specific relief, from exercising category G valves 1(2)-1101-15 and 16, standby liquid con-4 trol injection checks, in accordance with the requirements of S,ection XI

and proposed to partial stroke exercise these valves during cold shutdown; and full stroke exercise these valves during refueling outages.

5.1si.! Code Requirement. Refer to Appendix A.

5.1.1.2 Licensee's Basis for Requesting Relief. Exercisingthese valves by system initiation is not feasible during operation due to,

the requirements to maintain (a) baron to reactor water separation, and (b)4

system operability per Technical Specifications.,

Since the valve operability test, in this case, must be performed withthe system out of service by injecting clean demineralized water from,someexternal source, it is more practical in terms of system availability toperform this test during cold shutdown. Currently it is not possible toachieve full flow through the valves using the method described above; only26 gpm of the required 39 can be injected. The station is confident that<

during refueling outages a method can be devised to obtain full flow throughthese valves. If necessary, although not desired, the system pumps couldbe used to provide this flow, but this would require extensive cleaning of,

the system to remove residual boron.,

These valves will be part stroke exercised during cold shutdown and-

full stroke exercised at each refueling outage.;

J

5.1.1.3 Evaluation. We agree with the licensee's basis and| therefore feel that relief should be granted for Category C valves

1(2)-1101-15 and 16 from the exercising requirements of Section XI. Thelicensee has demonstrated that exercising these valves with demineralizedwater during power operation would require removing the system from service .

thus making the system inoperable. Also, injecting baron during poweroperation could cause reactivity excursions, a reactor shutdown, and an'

extensive recirculation system clean-up to return plant chemistry to oper-ating specifications. We conclude that due to plant design only partial,

! stroke exercising of these valves during cold shutdown with deminera'ized| -water is possible. Also, we feel that full stroke exercising these a;ves'

during refueling outages should demonstrate proper valve operability.

19 ,

.. - . - . - - . .- - ._. _- . . - - - -

Page 25: 'Safety Evaluation of Inservice Testing Program,' interim ...

. . - . _ - - . - _. .- -- - - -- ._ --

6. Reactor Core Isolation Cooling

6.1 Category A/C Valves

6.1.1 Relief Request. The licensee has requested specific relietfrom exercising Category A/C valves 1(2)-1301-40 and 41, primary contain-ment isolation checks, in accordance with tb? requirements of Section XIand proposed to verify valve opening during the quarterly pump tests and4

' valve closure (their other safety related position) during refueling- outages.

,

6.1.1.1 Code Requirement. Refer to Appendix A.O,

6.1.1.2 Licensee's Basis for Requesting Relief. It is impracti-

: cal to demonstrate closure of these cneck valves curing normal operation ori cold shutdown. To verify closure upon reversal of flow a pressure test

must be performed. This requires that the systems be taken out-of-service.I The safety significance of these components is minimal since leakage past

these valves would be contained within the RCIC piping which returns to thecontainment.

3

i 'These valves will be demonstrated to close upon reversal of flow during |each refueling outage per Appendix J test.

I 6.1.1.3 Evaluation. We agree with the licensee's basis, andtherefore feel that reitet should be granted for Category A/C valves-

; 1(2)-1301-40 and 41 from the exercising requirements of Section XI. Thelicensee has demonstrated that valve full stroke opening will be accom-.

,

plished during the quarterly pump test but, due to plant design the onlymethod available to verify valve closure (their other safety related posi-tion) is leak testing. These valves are not equipped with valve positionindicators and some of the required test connections are located inside thecontainment. We conclude that the proposed alternate testing frequency of ;'

| full stroke open exercising quarterly and verifying valve closure curing; the performance of leak rate testing at refueling outages should demon-

strate proper valve operability.

7. Core Spray

7.1 Category 8 Valves

7.1.1 Relief Request. The licensee has requested specific relieffrom timing Category B valves 1(2)-1402-38A and 388 core spray pumps mini- '

mum flow recirculation isolation valves in accordance with the requirements =

of Section XI.4

*7.1.1.1 Code Requirement. Refer to Appendix A.

7.1.1.2 Licensee's Basis for Requesting Relief. Relief is i

requested from measuring the stroke time of these valves. Since the valves ;

close automatically when adequate pump flow is reached, it is difficult to ;

accurately measure the stroke time. An equally meaningful test would be to,

just verify that the valves do close automatically as the pump flow

|increases.

;

20

|.

, _ _ _ - _ _ _ __ _ _ _ _ _ . _ _ _

Page 26: 'Safety Evaluation of Inservice Testing Program,' interim ...

An operator will verify that these valves automatically close as pump,

flow increases during quarterly pump operability testing.,

;

7.1.1,3 Evaluation. We agree with the licensee's basis, andtherefore feel that relief should be granted for Category 8 valves1(2)-1402-38A and 388 from the stroke timing requirements of Section XI.,

1 The licensee has demonstrated that obtaining meaningful data to determinevalve degradation on valves with variable strcke times is not possible. In,

; addition, if these valves faileo in the full open position design pump flowcan still be achieved. We conclude that the proposed alternate test method -

to observe that these valves do close on an increase in pump flow should'

demon- strate proper valve operability.9

7.2 Category C/E Valvess

7.2.1 Relief Request. The licensee has requested specific relieffrom exercising Category C/E valves 1(2)-1402-13A and 138, core spray pumpsi

| minimum flow recirculation checks, in accordance with the requirements ofSection XI and proposed to make plant modifications to install flow devices1

in these lines for valve full stroke exercising verification.-

] 7.2.1.1 Code Requirement. Refer to Appendix A.

7.2.1.2 Licensee's Basis for Requesting Relief. There are noprovisions in the current system design for exercising or determining the;

position of these valves. Based on the record of satisfactory pump perfor-:

! mance and lack of pump overheating problems, it is evident that these valveshave performed in an acceptable manner. However, due to the inability to

,demonstrate that the valves stroke open, Quad Cities Station has initiated

1 system modifications to install flow instrumentation in the minimum flow

lines-to indicate that the valves are, in fact, opening and passing adequteflow for pump cooling purposes. The modifications must be made during a,

refueling outage because the system will be out of service during the4

; installation. The modifications will be implemented at the earliest pos-! sible date which is contingent on the availability of materials. Relief is; therefore requested from the r!quirement to demonstrate that the subject! valves stroke open until system modifications provide the necessary

instrumentation.

No specific alternate test is applicable during this interim period.

7.2.1.3 Evaluation. We agree with the licensee's basis and'

therefore feel that temporary relief should be granted for Category C/E ,

valves 1-1402-13A and 138 from the exercising requirements of Section XI.| The licensee has demonstrated that with the present plant design a method

to verify these valves open fully (their safety related position) does not .exist. We conclude that the proposed plant modifications to install flow; devices will provide a means to verify proper valve operability.:

!

{

21

-__

Page 27: 'Safety Evaluation of Inservice Testing Program,' interim ...

. __ . . . _ . . . .- - - - _ - . - .. __

|

|.

!

8. High Pressure Coolant Injection;

8.1 Category A/C Valves

8.1.1 Relief Request. The licensee has requested specific relief;

from exercising Category A/C valves 1(2)-2301-34 and 45, primary contain- ;

ment isolations, in accordance with the requirements of Section XI andproposed to exercise these valves open during pump testing and to verifyvalve closure (their other safety related position) during refuelingoutages.

!'

8.1.1.1 Code Requirement. Refer to Appendix A.

8.1.1.2 Licensee's Basis for Requesting Relief. It is impracti-cal to demonstrate closure of these check valves during normal operation orcold shutdown. To verify closure upon reversal of flow a pressure testmust be performed. This requires that the systems be taken out-of-service.The safety significance of these components is minimal since leakage past ,

these valves would be contained within the HPCI piping which returns to thecontainment.

4

These valves will be demonstrated to close upon reversal of flow duringeach refueling outage per Appendix J test.

8.1.1.3 Evaluation. We agree with the licensee's basis, andtherefore feel that relief should be granted for Category A/C valves '

1(2)-1301-34 and 45 from the exercising requirements of Section XI. Thelicensee has demonstrated that valve full stroke opening will be accom-;

| plished during the quarterly pump test but, due to plant design the onlymethod available to verify valve closure (their other safety related posi-4

tion) is leak testing. These valves are not equipped with valve position,

indicators and some of the required test connections are located inside thei containment. We conclude that the proposed alternate testing frequency of' full stroke open exercising quarterly and verifying valve closure during; the performance of le&k rate testing at refueling outages should demon-

strate proper valve operability.

8.2 Category B Valves'

8.2.1 Relief Request. The licensee has requested specific relief>

from timing Category B valves 1(2)-2301-14, HPCI pump minimum flow recircu-;

lation isolations, in accordance with the requirements of Section XI.'

8.2.1.1 Code Requirement. Refer to Appendix A.

i 8.2.1.2 Licensee's Basis for Requesting Relief. Relief is,requested from measuring the stroke time of these valves. Since the valvesclose automatically when adequate pump flow is reached, it is difficult toi

accurately measure the stroke time. An equally meaningful test would be tojust verify that the valves do close automatically as the pump flowincreases.

An operator will verify tnat these valves automatically close as pumpflow increases during quarterly pump operability testing. ,

22 ,

.. - ._ . ._ . _. . ._ .

Page 28: 'Safety Evaluation of Inservice Testing Program,' interim ...

1

8.2.1.3 Evaluation. We agree with the licensee's basis, andtherefore feel that relief should be granted for Category B valves1(2)-2301-14 from the stroke timing requirements of Section XI. The licen-see has demonstrated that obtaining meaningful data to determine valvedegradation on valves with variable stroke times is not possible. In addi-tion, if these valves failed in the full open position design pump flow canstill be achieved. We conclude that the proposed alternate test method toobserve these valves do close on an increase in pump flow should demon-strate proper valve operability.

8.3 Category C Valves*

8.3.1 Relief Request. The licensee has requested specific relieffrom exercising Category C valves 1(2)-2301-39 (for function see reliefrequest basis) in accordance with the requirements of Section XI and pro-posed to disassemble these valves every third refueling outage to verifythat the disc swings freely to the open position.

8.3.1.1 Code Requirement. Refer to Appendix A.

8.3.1.2 Licensee's Basis for Requesting Relief. These valvesare designed to prevent backflow into the suppression pool in the event ofa pump suction shif t from the contaminated condensate storage tank (CCST)to the suppression pool. The safety related stroke direction of this valveis in the open direction to provide suction flow to the HPCI pump. Thereis no acceptable method for verifying this valve's ability to swing to itsfull open position. The system test circuit utilizes the CCST as the pumpsuction rather than the suppression pool. The suppression pool is not usedas the pump suction for testing because of the desire to keep the systemfree of the dirt and contamination typically found in torus water.

In lieu of the Code required full stroke test, C'ommonwealth Edisonproposes to demonstrate valve operability by disassembling the valve andverifying that the disc swings freely to the full open position. Sincethis valve is not normally used, there will be no expected wear-induceddegradation of the valve internals. Therefore disassembly and inspectionof these valves once every third refueling outage is felt adequate to ensurevalve operational readiness.

It should also be mentioned that an evaluation is being conducted todetermine if these valves can be removed from the system. If this provesto be feasible, the valve internals will be removed and this relief requestwould no longer be required.

Each valve will be disassembled every third refueling outage to verifythat the disc swings freely to the full open position. *

8.3.1.3 Evaluation. We agree with the licensee's basis andtherefore feel relief should be granted for Category C valves 1(2)-2301-39from the power operation and cold shutdown exercising requirements of Sec-tion XI. The licensee has demonstrated that the system test circuits onlypermit HPCI pump suction from the CCST which will not exercise these valves.Also, if a suction were taken from the suppression pool the HPCI system

23

Page 29: 'Safety Evaluation of Inservice Testing Program,' interim ...

. -- -- - - - -_ - ..

:

,

would be contaminated which would require removing the system from serviceto flush and cleanup the sytel. However, we' conclude that a method to fullstroke exercise these valves Jn a refueling outage basis is available (i.e.,taking a suction from the suppression pool when system availability is notrequired and cleanup flush time will not limit plant operation, or manualdisassembly and exercising each refueling outage).,

8.3.2 Relief Request. The licensee has requested specific relieffrom exercising Category C valves 1(2)-2301-40, HPCI pump minimum flow

O recirculation checks, in accordance with the requirements of Section XI and; proposed to make plant modifications to install flow devices in these lines

for valve full stroke exercising verification.i

> .8.3.2.1 Code Requirement. Refer to Appendix A.

8.3.2.2 Licensee's Basis for Requesting Relief. There are noprovisions in the current system design for exercising or determining theposition of these valves. Based on the record of satisfactory pump perfor-mance and lack of pump overheating problems, it is evident that thesevalves have performed in an acceptable manner. However, due to the inabil-ity to demonstrate that the valves stroke open, Quad Cities Station hasinitiated system modifications to install flow instrumentation in the mini-1

i mum flow lines to indicate that the valves are, in fact, opening and pas-sing adequte flow for pump cooling purposes. The modifications must be'

made during a refueling outage because the system will be out of serviceduring the installation. The modifications will be implemented at theearliest possible date which is contingent on the availability of materials.Relief is therefore requested from the requirement to demonstrate that the

,

subject valves stroke open until system modifications provide the necessary'

instrumentation.

No specific alternate test is applicable ouring this interim period.

8.3.2.3 Evaluation. We agree with the licensee's basis andtherefore feel that temporary relief should be granted for Category C valves1(2)-2301-40 from the exercising requirements of Section XI. The licensee

,

has demonstrated that with the present plant design a method to verifythese valves open fully (their safety related position) does not exist. Weconclude that the proposed plant modifications to install flow devices willprovide a means to verify proper valve operability.

| 9. Main Steam

9.1 Category B/C Valves~

9.1.1 Relief Request. The licensee has requasteo specific relieffrom exercising Category B/C valves 1(2)-203-3A through 3E, safety and*

L electromatic relief valves, in accordance with the requirements of Sec-tion XI and proposed to calibrate the pressure switches that actuate these

,

; valves and exercise these valves on the frequency specified in the relief

,

request basis.|

|

24|i

.__ . -.

Page 30: 'Safety Evaluation of Inservice Testing Program,' interim ...

.

9.1.1.1 Code Requirement. Refer to Appendix A.

'9.1.1.2 Licensee's Basis for Requesting Relief. Relief isrequested from the Section XI required testing frequency of once everythree months. These electromatic relief valves are not tested routinelyduring reactor operation Decause of the resultant primary system pressuretransients. In addition, a failure of any valve to close would cause anuncontrolled, rapid depressurization of the primary system resulting inundesirable thermal gradients in the reactor vessel. cxcessive testing of 6tnose valves is inadvisable because each relief valve discharge to thesuppression pool detracts from the limited life of the containment.

These valves cannot be tested at cold shutdown or refueling since a *

system pressure of greater than 150 psig is needed to actuate the valves.Surveillance testing of these valves is, therefore, completed at very lowreactor power levels. Verification of relief valve actuation is accom-plished by first opening a turbine bypass valve, actuating the reliefvalve, and then observing a corresponding closure response of the turbinebypass valve.

The frequency of such testing requested herein is that submitted byQuad Cities Station in a proposed Technical Specification change requiredby the August 3, 1977 letter from Don K. Davis (NRC-DOR) to CommonwealthEdison Company. In this Technical Specification change, a program wascommitted to which specified a variable testing frequency related to demen-strated reliability and operability. The testing interval is based on thenumber of valve failures during the required test interval. The frequencyranges from a maximum of 18 months to a minimum of 31 days. This testingfrequency is provided to ensure operability and demonstrate reliability ofthe valves. Since the frequency varies with observed valve failures, thisproposed testing scheme should result in a uniform level of reliability.

The following schedule will be used to determine the required testinterval.

Numoer of Relief Valves Founa Inoperable Next RequiredDuring Testing or Test Interval Test Interval

0 18 months 1 25%

1 184 days 1 25%

: 2 92 days 1 25%

>3 31 days 1 25%s

Additionally, stroke times for these valves will not be measured sinceI there is no position indication circuitry to show disc movement.

The electromatic relief valves and the relief function of the TargetRock valve are operated by actuation of a pilM solenoid valve which opensthe main valve by applying system pressure to _ diaphragm. The pilot valveis actuated from an electric signal from either the control sv. itch, the

l

25

. . . -

Page 31: 'Safety Evaluation of Inservice Testing Program,' interim ...

. .. - - .. . . - - .

.

auto-depressurization logic, or a pressure switch that senses systempressure.

The requirement of-IWV-3510(b) to check relief and safety. valve setpoints in accordance with PTC-25.2-1966 is not applicable in this case.Therefore, relief is requested from compliance with this requirement.

'

The pressure set point of these valves is set by calibrating the pres-i 'sure switch rather than testing the complete valve assembly. The combina-! tion of the pressure switch calibration and the exercising test for oper-~

ability (BT) satisfies the intent of paragraph IWV-3510.

s The pressure switch for each of these valves will be calibrated to'

verify the correct set point and the exercise test (BT) will verify oper-: ability of the valve.

9.1.1.3 Evaluation. We agree with the licensee's basis andtherefore feel that relief should be granted for Category B/C valves1(2)-203-3A through 3E from the exercising and timing requirements of Sec-tion XI. The licensee has demonstrated that exercising these valves duringpower operation would result in primary system pressure transients thatcould cause a reactor trip due to plant depressuriza; ion if any valve failedin the open position. During cold shutdown, primary system pressure is not-available to actuate these valves. We conclude that exercising these valves

,

more often than proposed by the licensee would re.sult in unnecessary thermal'

fatigue stresses to the containment. In addition, calibrating the pressure1 setpoints for the solenoid actuating valves and exercising the relief valves

per the proposed schedule meets the intent of Section XI and should demon-i

' strate proper valve operability. Furthermore, tne measuring of stroketimes for relief valves will not provide any meaningful data to determinevalve degradation.

11 . 2 Category C Valves

9.2.1 Relief Request. The licensee has requested specific relief. from exercising Category C relief valves 1(2)-203-4A through 4H, safety' relief valves for the primary coolant pressure boundary in accordance with

the requirements of Section XI and proposed to remove one-half of the' safetyvalves and replace these valves with valves that have been rebuilt and had

,

i their set point verified each refueling outage.

| 9.2.1.1 Code Requirement. Refer to Appendix A.

9.2.1.2 Licensee's Basis for Requesting Relief. It is impracti-cal for Quad Cities Station to meet the requirements of IWV-3510, in that

j, "as-found" set points for these safety relief valves cannot be determined.The station has no on-site facility for testing safety valve set points.

i Currently, these valves are being removed from the system, cleaned and| rebuilt, and then shipped off-site for re-verification of valve set points.: Therefore, IWV-3510(c) cannot be applied because "as found" set points are

not verified.:I

I

26

. -, . - . - .. .- .- - - - - - -

Page 32: 'Safety Evaluation of Inservice Testing Program,' interim ...

. - _ _ . -

<

The frequency of removal and maintenance of these valves, however, ison a greatly accelerated basis compared to the Section XI requirements.The Technical Specification frequency for these valves has been to removeone-half (4) of the eight safety valves each refueling outage and replacethem with valves that have been rebuilt 4.nd verified for proper set point.

This accelerated maintenance schedule provides adequate assurance thatthese valves will perform reliably.

One-half (4) of the total number of safety valves will be removed and '

replaced with valves that have been rebuilt and had their set points veri-fied each refueling outage.

9.2.1.3 Evaluation. We agree with the licensee's basis andtherefore feel that relief should be granted for Category C relief valves<

1(2)-203-4A through 4H from the "as found" set point verification requiredby Section XI. We conclude that since no means is available to test thesevalves on site that senaing valves off-site for relief function testing anoinstalling functionally tested valves with a more restrictive frequencythen that required by Section XI more than meets the intent of Section XIand should demonstrate that these valves are available to perform theirdesign safety function.

10. Feedwater'' 10. 1 Category A/C and C Valves

'

10.1.1 Relief Request. The licensee has requested specific relieffrom exercising Category A/C valves 1(2)-220-58A and 58B and 1(2)-220-62Aand 628, containment isolation feedwater checks, and Category C valves1(2)-220-598, HPCI to feedwater reverse flow checks, in accordance with therequirements of Section XI and proposed to verify valve opening during pumptesting and closure (their other safety related position) during refuelingoutages.

10.1.1.1 Code Requirement. Refer to Appendix A..

10.1.1.2 Licensee's Basis for Reauesting Relief. These checkvalves cannot be tested for ope.cability during reactor operation because

. the feedwater system is needed to maintair. primary coolant inventory. It' is impractical to test thesa valves during cold shutdown because the reac-

tor water cleanup and feedwater systems are generally required to De oper-able. In addition, to verify that these check valves stroke to the full -

| closed position, a leak rate test must be performed. Since leak ratetesting is performed only during refueling outages, these valves will be'

demonstrcted to be in the full closed position at each refueling outage. s

10.1.1.3 Evaluation. We agree with the licensee's basis, and' therefore feel that elief should be granted for Category A/C vc'"es

1(2)-220-58A and 588 and 1(2)-220-62A and 628, and Category C valvesi

i 1(2)-220-598 from the exercising requirements of Section XI. The licenseehas demonstrated that valve full stroke opening will be accomplished duringthe quarterly pump test but, due to plant design the only method available

27

.. - . _ _ . _ ._ ._

Page 33: 'Safety Evaluation of Inservice Testing Program,' interim ...

i

to verify valve closure (their other safety related position) is duringleak testing. These valves are not equipped with valve position indicatorsand some of the required test connections are located inside the contain-mant. We conclude that the proposed alternate testing frequency of fullstroke open exercising quarterly and verifying valve closure the perform-ance of leak rate testing at refueling outages should demonstrate propervalve operability.

11. Neutron Monitoring System

11. 1 Category A/C Valves

a 11.1.1 Relief Request. The licensee has requested specific relieffrom exercising Category A/C valves 1(2)-743, primary containment isola-tions for T.I.P. system nitrogen purge lines in accordance with the require-ments of Section XI and proposed to verify valve closure (their safetyrelated position) during refueling outages.

11.1.1.1 Code Requirement. Refer to Appendix A.

11.1.1.2 Licensee's Basis for Requesting Relief. These checkvalves cannot be exercised for operability every three months because theT.I.P. system is' required te be purged constantly during operation. Sincethera is no external means of position indication, the system must be takenout-of-service and a leak rate test performed to verify operability. Sinceleak rate testing is performed only during refueling outages, these valveswill be demonstrated to De in the full closed position at each refuelingoutage.

11.1.1.3 Evaluation. We agree with the licensee's basis andtherefore feel that relief shoulo be granted for Litegory A/C valves1(2)-743 from the exercising requirements of Sect,in XI. The licensee hasdemonstrated that due to plant design the only me' nod available to verifyvalve closure (their safety related position) is leak rate testing. Thesevalves are not equipped with valve position indicators and some of therequired test connections are located inside the containment. We con-clude that the proposed alternate testing frequency of verifying valveclosure during the performance of leak rate testing at refueling outagesshould verify proper valve operability.

>

28 |

Page 34: 'Safety Evaluation of Inservice Testing Program,' interim ...

. - - .. - = . . ..~. _ . -. - - _- . -_ -

'

!

-IV. APPENDIX A'

'

i 1. Code Requirements--Valvesn

Subsection IWV-3410(a) of the 1974 Edition of the Section XI ASME Code4

.(which discusses full stroke and partial stroke requirements) requires thatCode Category A and B valves be exercised every three months, with excep-4

| tions as defined in IWV-3410gd)(1), (e), and (f). IWV-3520(a) (which dis-cusses full stroke and partial stroke requirements) requires that Code

;'

Category C valves be exercised once every three months, with exceptions asdefined in IWV-3520(b). In the above cases of exceptions, the Code permitsthe valves to be tested at cold shutdown where:'

,

1. It is not practical to exercise the valves to the posi-tion required to fulfill their function or to the par- *

tial position during power operation

l 2. It is not practical to observe the operation of thevalves (with failsafe actuators) upon loss of actuatorpower.

Subsection IWV-3420(c) requires all Category A and B power-operatedvalves to be stroke time tested to the nearest second or 10% of the maximum,

{ allowable owner-specified stroke time..

| 2. Code Requirements--Pumps

An inservice test shall be conducted on all safety-related pumps,:

nominally once each month during normal plant operation. Each inservicei test shall include the measurement, observation, and recording of all' quantities in Table IWP-3100-1, except bearing temperature, which shall be

measured during at least one inservice test each year.,_

i+

|

:

,

i'

|

|, a

:|r

I

i

i 29

. . .- . - - . . . - . -. -- ._ , . - _ _

Page 35: 'Safety Evaluation of Inservice Testing Program,' interim ...

- - _

- - . _ . - - --

V. ATTACHMENT I.

The following are Category A, B, and C valves that meet the require-ments of _the ASME Code Section XI and are not full stroke exercised everythree months during plant operation. These valves are specifically identi-

.fied by the owner and are full stroke exercised during cold shutdowns andrefueling outages. EG&G has reviewed all valves in this attachment and

i agrees with the licensee that testing these valves during power operationj is not possible due to the valve type and location, system design, or

because this action would place the plant in an unsafe condition. We feel,.i these valves should not be exercised during power operation. These valves! are listed below and grouped according to the system in which they are

.

located.y1

j 1. Recirculationi

1.1 Category B Valves

Category B valves 1(2)-202-5A and 58, recirculation loop .c:vaticas,cannot be full stroke or partial stroke tested during. normal operatiensince isolation of a recirculation loop would cause a recirculation pumptrip which would require a reactor trip. One loop operation is restrictedby the Technical Spet.ifications.

1

These valves wi~il be full stroke exercised during cold shutdown.

j 2. Control Rod Drive

2.1 Category B Valves

f Category.B valves 1(2)-0302-21A, 21B, and 22, scram discharge volumevents and drains, cannot be exercised during power operation. These valvesare normally in the open position to allow water which enters tne scramdischarge volume from normal CRD leakage to drain into the reactor buildingequipment drain tank. This assures that a sufficient volume is alwaysavailable to accept scram discharge water following a scram. The testingof these-valves during plant operation has the potential of isolating thescram discharge volume and the increasing water level in the volume wouldthen cause a reactor scram. Consistent with NRC staff guidelines con-cerning the cycling of valves that could potentially place the plant in anunsafe mode of operation, it is felt that these valves should be tested atcold shutdown. This applies to the vent and drain valves since the airsupply to the valves and the test circuit is common for all three valves.

,

These valves will be full stroke exercised during each cold snutdown.

!* 3. Residual Heat Removal

; 3.1 Category A Valves

Category A valves 1(2)-1001-29A and 29B, LPCI injection containmentisolations, and Category B valves 1(2)-1001-28A and 288, LPCI injectionpressure isolations, cannot be exercised durin] power operation. Both sets

30

,, _ . _ - - _ _, _ ._ . _ _ _ . _ _ _ _ - _ _ _ _ _ _ . . .

Page 36: 'Safety Evaluation of Inservice Testing Program,' interim ...

!

of valves are included because they are interlocked such that one of thetwo valves must be closed at all times to provide the pressure isolationfunction. A failure of any one of these valves in the closed positionwould render the entire LPCI function technically inoperable since botninjection loops .nust be available in the design basis accident to providecoolant to the unbroken recirculation. loop and this loop could be eitherone of the two.

To ensure that v; ve exercising procedures do not place the plant in-

an unsafe mode of operation, these valves will be full stroke exercisedonly at cold shutdowns.

'3.2 Category A Valves

Category A valves 1(2)-1001-60,63,47,ar. 50, primary contair. mentisolation valves for RHR head spray and shutdow.. ooling cannot be exer-cised during power operation. Relief is request from partial or fullstroke testing these valves during power operati These valves, whichare normally closed during plant operation, servu isolation between thehigh and low pressure piping. Protective interloc prevent opening thesevalves while the reactor is at operating pressure. he valves will beexercised during colo shutdown.

3.3 Category B Valves

Category B valves 1(2)-1001-19A and 198, RHR cross ie isolations,

should not be exercised during power operation. These s' 1es are normallyin their safety position (open) and are only closed a ver, small percentageof plant operating time when the system is in the residual i,-=t removalmode. Testing these valves during normal opeation places the piant in anunsafe mode because a failure of either valve in the closed position ren-ders the low pressure coolant injection (LPCI) function inoperable. TheLPCI function of RHR is designed such that three of the four pumps arerequired to provide makeup flow to either recirculation loop in the eventof a design basis loss of coolant accident. This requires the crosstieline to be open and, hence, both the 1001-19A and B valves. In accordancewith NRC staff guidelines on excluding the cycling of valves whose failurein a non-conservative position would cause a loss of system function, thesevalves will be exercised during cold shutdown conditions.

3.4 Category C Valves

Category C valves 1(2)-1001-68A and 688, RHR/LPCI header checks, can- t

not be exercised during power operation. These valves have air-operatorsand remote position indicators for remote testing purposes. However,during normal operation the high differential pressure across the valve *

: seats prohibits exercising. Additionally, the RHR/LPCI system valves' 1(2)-1001-68A, 688 are located inside the primary containment which is

inerted with nitrogen during normal operation. These valves will be fullstroke exercised during cold shutdown.

!!

31

!.- . . _ - - , - . .

Page 37: 'Safety Evaluation of Inservice Testing Program,' interim ...

,_-. . _ _ _ _ _ _ ._ ___ ___ _ _ __ _ _. __ _

,

4. Core Spray !

; 4.1 Category C Valves

Category C valves 1(2)-1402-9A and 98, core spray header checks, can-not be. exercised during power operation. These valves have air-operatorsand remote position indicators for remote testing purposes. However,during normal operation the high differential pressure across the valve

,

seats prohibits exercising. Additionally, the core spray system valves1(2)-1402-9A and 98 are located inside the primary containment which is'-

; inerted with nitrogen during normal operation. These valves w;11 be full

Q oke exercised during cold shutdown.

5. Pressure Suppression

! 5.1 Category A Valves

! Category A valves 1(2)-1601-20A and 208, reactor building to torusi vacuum breaker and primary containment isolations, should not be exercised'

during power operation. Exercising these valves open during normal plant,

; operation compromises primary containment integrity and reduces safetymargins by. leaving only a single check valve (1601-31A_or 8) to maintainthe primary containment boundary. These valves will be full stroke exer-cised during cold shutdown.

5.2 Category C Valves

Category C valves 1(2)-220-81A through 81E, vacuum breakers for main: steam relief valve discharge lines, cannot be exercised during power oper-! ation. These check valves have no external means of actuation for exer-

cising. The only practical method for exercising these valves open is bymanually pushing the disc from its seat using a small diameter rod. Since

; this requires access to the valves which are located within primary con-J tainment, the test must be deferred to cold shutdowns when the primary1 containment is de-inerted. These check valves will be verified to freely

l swing to their full open position at cold shutdowns when the (rywell isde-inerted.

6. High Pressure Coolant Injection;

6.1 Category A Valves

Category i valves 1(2)-230-4 and 5, primary containment isolations and' ,steam supply tc HPCI turbines, should not be exercised during power

i operation.

' -. The above valves are normally open to supply steam to the turoinedriven HPCI injection pumps. Conservatively these valves are left in the

; open position to insure that driving steam can be supplied to these tur-' bines at all times during operation. Also, these valves serve a primary

containment isolation function (Group 4).t

i

32

- -. - .- - - _ - , ... - . . .. - - . . . . - . -

Page 38: 'Safety Evaluation of Inservice Testing Program,' interim ...

.- .- - ._ ._-. -_ . - _ _ - - - - _ _ ~ _ . - . .-. .

l

Quad Cities Station feels that to close these valves during operationwould place the operation of the system in an untenable condition. Fur-ther, if either were to fail closed it would render the HPCI system inoper->

able. These valves will be full stroke exercised during cold shetdowns.

6.2 Category C Valves

Category C valves 1(2)-2301-7, HPCI header checks, cannot be exercisedduring power operation. These valves have air-operators and remo'.e posi-

,

. tion indicators for remote testing purposes. However, during normal oper- "' ation the high differential pressure across the valve seats prohibits exer-; cising. The high pressure coolant injection valve 1(2)-2301-7 is located'

inside the main steam isolation valve room which is a designated high radi- 9ation area where normal power operation radiation dose rates are one to tworem / hour. Also high temperatures exist in this area (120* to 140*F) whichfurther increases the hazards involved in eqtering the area for thisi

"

: testing. The accumulated dose to conduct this test would be approximately' 1.5 man / rem. These valves will be full stroke exercised during cold

shutdown.

7. Main Steamj

7.1 Category A Valves

Category A valves 1(2)-203-1A through 1D and 1(2)-203-2A through 20,primary containment isolations for the main steam lines, cannot beexercised during power operation. Full stroke testing these valves duringr

normal reactor operation requires isolating one of the four main steam,

; lines. Isolation of these lines results in primary system pressure spikes,reactor power fluctuations, and increased flow in the unisolated steam

: lines. This unstable operation can lead to a reactor scram and, as'

discussed in NUREG-0626, pressure transients resulting from full stroketesting MSIVs increase the chances of actuating primary system relief:

valves.

It is proposed that only partial stroke testing be performed duringpower operation and that full stroke testing be performed at cold shut-downs. These valves are provided with the circuitry to permit partialstroking to a 10% closed position. This partial stroke exercising providesan acceptable means of verifying valve performance during plant operationwithout affecting safety margins. This request also contributes to thereduction of the relief valves challenge rate as recommended in NUREG-0626.

.

These valves will be part stroke exercised every three months and full! stroke exercised during cold seutdown. The fail-safe operation of these

valves will also be checked during cold shutdown since this is done coinci- ,;dent with full stroke exercising. The fail-safe testing of valves.

i 1(2)-203-lA, B, C and D howevcc, will be completed only at cold shutdowns| When the primary containmer.c is deinerted since access to the valves to i

perform this testing requires entry into the drywell.'

,

33

, . . . - . _.- . - - _ - - . - - _ - . - . _ _ . .-

Page 39: 'Safety Evaluation of Inservice Testing Program,' interim ...

I

VI. ATTACHMENT II

The drawings listed below were used during the course of this review.

Drawings

System Unit 1 Unit 2

Main Stema ISI-13-1 and -2( A) ISI-60-1 and -2Reactor Feedwater 151-15 IS I-62Service Water / Emergency Diesel ISI-?' ISI-69Nuclear Boiler ISI-35-1 ana -2 IS I-77-1 and -2

e Core Spray ISI-36 151-78Re:idual Heat Removal ISI-37 and -39 ISI-79 and -81Standby Liquid Control 151-40 IS I-82Control Rod Drive ISI-41 151-83High Pressure Coolant Injection IS I-46 IS I-87Reactor Water Clean-up IS I-47 151-88Reactor Core Isolation Cooling 151-50 IS I-89

>

??

34

Page 40: 'Safety Evaluation of Inservice Testing Program,' interim ...

|VII. ATTACHMENT III )

i

The valves listed in Section 8.3.1 have a proposed testing frequency '

greater than each refueling outage and relief is not reconmended due to aninsufficient technical basis.

i

GP

t

/

I

!

| 35

Page 41: 'Safety Evaluation of Inservice Testing Program,' interim ...

f

VIII. ATTACHMENT V

The following valves should be reviewed by the NRC Appendix J reviewcommittee to determine if they should be categorized A, A/C, or A/E,included in the IST program, and leak tested in accoraance with therequirements of Appendix J and, thus, exercised in accordance with therequirements of Section XI or specific relief requested.

Control Rod Drives

1(2)-0301-74-95 and -98

ca Reactor Core Isolation Cooling

1(2)-1301-25, -26, and -60

Core Spray

1(2)-1402-4A,-48,-3A, -38,-9A, -98,

-25A, -258,-38A, -388

High Pressure Coolant Injection

1(2)-2301-14, -35, and -36

Instrument Air

1(2)-4722A and -47228

9

1

36