Safety Effects of Flashing Yellow Arrow Update February 2009

16
Safety Effects of Flashing Yellow Arrow Update February 2009

description

Safety Effects of Flashing Yellow Arrow Update February 2009. Presentation Overview. Background North Carolina Sites North Carolina Crash Data Monitoring Summary. North Carolina Installations. Installations by year. North Carolina Installations. Installations by year. - PowerPoint PPT Presentation

Transcript of Safety Effects of Flashing Yellow Arrow Update February 2009

Safety Effects of Flashing Yellow Arrow

Update February 2009

Presentation Overview

• Background

• North Carolina Sites

• North Carolina Crash Data Monitoring

• Summary

North Carolina Installations

• Installations by year

North Carolina Installations

• Installations by year

Planned Installations

• 50+ sites: Design complete / installation pending• 50+ sites: FYA approved / Design in progress

North Carolina Crash Data Monitoring

• FHWA requirement that these sites are monitored • All sites monitored on a yearly basis (NEW!)

– Previously monitored quarterly• Due to number of sites now online, became inefficient to monitor

quarterly

– Some sites will be monitored more frequently as requested

• Currently monitoring 43 sites

Evaluation Challenges

• Relatively new device– Few sites– Little ‘after’ data

• Other changes made to signal at time of FYA installation– Timing changes, other signal head upgrades, turn lanes,

new developments, etc…– Difficult to single out effect of FYA

• Naïve before and after

Grouped Before and After Data

PRELIMINARYBefore and After Crash Summary

Category 1: Permissive Only to FYA Protected-Permitted

PRELIMINARYBefore and After Crash Summary

Number of Sites: 3

Average Before Period: 2.1 years

Average After Period: 0.5 years

Grouped Before After Reductions

Category 1: Permissive Only to FYA Protected-Permitted

PRELIMINARYBefore and After Crash Summary

Category 2: Protected Only to FYA Protected-Permitted

PRELIMINARYBefore and After Crash Summary

Grouped Before After Reductions

Significant Increase

Category 2: Protected Only to FYA Protected-Permitted

Number of Sites: 7

Average Before Period: 3.0 years

Average After Period: 0.8 years

PRELIMINARYBefore and After Crash Summary

Category 3: “Doghouse” Protected-Permitted to FYA Protected-Permitted

PRELIMINARYBefore and After Crash Summary

Grouped Before After Reductions

Category 3: “Doghouse” Protected-Permitted to FYA Protected-Permitted

Number of Sites: 13

Average Before Period: 3.0 years

Average After Period: 1.2 years

PRELIMINARYBefore and After Crash Summary

All Categories Summarized

• Still not enough data to make conclusive safety statements

• Preliminary results seem promising• Likely will not see large crash reductions• Large increase in crashes at sites that

went from protected to FYA protected-permitted likely due to phasing change and not FYA itself

• TSU will continue to monitor and provide feedback

Key Points / Summary

Contact Information

Brian G. Murphy, PE(919) [email protected]

Traffic Safety Unit Website: http://

www.ncdot.org/doh/preconstruct/traffic/TSU/default.html