Safety Breakaway Coupling · 2018-01-24 · DN PN 3.4 Scope of delivery The safety breakaway...
Transcript of Safety Breakaway Coupling · 2018-01-24 · DN PN 3.4 Scope of delivery The safety breakaway...
Safety Breakaway Coupling ABV-S Series
Operating instruction
www.rs-seliger.de
RS Roman Seliger Armaturenfabrik GmbH
MADE IN GERMANY
Dear customer, Thank you very much for your purchase at RS. We are glad about your decision for one of our first class quality products and that we could convince you of our capabi-lity. Ultimate perfection is our duty… i.e. our consequent and complete quality ma-nagement throughout the whole production process guarantees that only faultless products leave our premises… quality does not allow any compromises! For further detailed information about our products or an individual solution for your scope of work, do not hesitate to contact our sales team. We will assist you with all our experience and product know-how. A visit of our sales representatives can be arranged by appointment. It’s worth it! Further information about us and our multifarious product range can be found on our web site www.rs-seliger.de. We are looking forward to continuing our cooperation with you. Yours sincerely Dr. Jens Reppenhagen Managing Direktor
Subject to design changes without prior notice September, 2017
Safety breakaway coupling ABVS Operating instruction
2
Contents Contents ........................................................................................................................................................ 2
1 Introduction ........................................................................................................................................... 3
1.1 Range of applications ....................................................................................................................... 3
1.2 Applicable documents ...................................................................................................................... 3
2 Safety notes .......................................................................................................................................... 4
2.1 Intended use ..................................................................................................................................... 4
3 Description/structure ............................................................................................................................. 5
3.1 Function ............................................................................................................................................ 5
3.2 Storage and transport ....................................................................................................................... 5
3.3 Identification ..................................................................................................................................... 6
3.4 Scope of delivery .............................................................................................................................. 6
3.5 Accessories ...................................................................................................................................... 6
3.6 Technical data .................................................................................................................................. 6
4 Installation and Initial Start-Up .............................................................................................................. 8
4.1 Initial start-up .................................................................................................................................... 9
5 Operation .............................................................................................................................................. 9
5.1 General notes ................................................................................................................................... 9
5.2 For the operator ................................................................................................................................ 9
5.3 Start-ups ......................................................................................................................................... 10
5.4 Cleaning ......................................................................................................................................... 10
5.5 Disassembly ................................................................................................................................... 10
5.6 Improper use .................................................................................................................................. 11
5.7 Maintenance / repair ....................................................................................................................... 11
5.8 Miscellaneous ................................................................................................................................. 11
6 Inspection after Release ..................................................................................................................... 11
7 Maintenance and Repair..................................................................................................................... 11
7.1 General information ........................................................................................................................ 11
7.2 Periodic tests by approved test centres ......................................................................................... 12
8 Manufacturer ....................................................................................................................................... 12
3
1 Introduction
This guide for safety breakaway couplings ABV-S is intended for operators and planners of tankers and
tank systems as well as for hose assembly workshops and hose assembly workshop maintenance
engineers. The safety breakaway coupling acts as a safety component in the supply line of mobile
refuelling systems, preventing damage to the environment whenever the supply pipe bursts during filling
or emptying due to a change in location of the tank. The coupling valves on the tank and on the supply
line immediately close whenever the housing halves break away.
ABV-S safety breakaway couplings of RS include special features:
High quality processing,
sturdy design,
low wear,
tamper-proof, safe operation,
release angle up to 90° through three pressure clamps on activation mechanism,
maintenance-friendly,
approved by TÜV (German Technical Inspection Authority),
meets ATEX standards for Zone 1,
wide spectrum of application.
1.1 Range of applications
Industrial Media Filling systems for:
Plant engineering
Power plant construction
Chemical industry
Food processing industry
Process technology
Tank cleaning
Lyes and acids
Fuels and oils
Gases
LPG/LNG, CNG
Materials hazardous to the
environment and water
airfields
railroad tank wagons
tank trucks
ships
tank containers
liquefied gas
The coupling may NOT1 be used for:
Temperatures below -20°C
Temperatures above 70°C
1.2 Applicable documents
Guidelines for pressure devices 2014/68/EU
German Act for pressure devices (14. GPSGV)
Facts sheet T 002 (09/2014) BGI 572 of BG Chemie
GGVSE (ADR, RID); IMDG, ICAO
1 Dependent on the used metallic and sealing materials!
4
2 Safety notes
The safety breakaway coupling, the tank and the supply line are subject to documentation and
acceptance. All approval procedures, required test specifications and test dates must be observed and
results of tests must be documented. Tests before commissioning and subsequent to repair must be
conducted by qualified persons (competent specialist staff with suitable training and experience). All
required measures for inspection, maintenance and repair must be carried out in accordance with the
national regulations of the country where the system is installed.
WARNING: Injuries or damage are possible when safety breakaway coupling is triggered!
When safety breakaway coupling is triggered, injuries or damage may be caused by the fluid being pumped. When
the safety breakaway coupling is triggered, minimal quantities of the fluid may spurt out (the volume between the
valves and the fluid that is emitted until the valve is closed).
The operator must ensure that suitable drip pans and locks are provided to prevent any danger from the
fluid that is emitted.
Operators must always carry out a risk analysis for the machine and the fluid being pumped (see BG
Chemie facts sheet). Operators must always themselves check whether the equipment is suitable for
transferring the product. This particularly applies for aggressive or abrasive fluids that are likely to
damage the safety breakaway coupling or the components of a supply line as a result of chemical
reaction, corrosion or erosion. Relevant legal regulations for safety of pressure devices must be observed
at all times.
Regulations for plants in explosive areas must always be observed. This particularly applies for
prevention of sparks due to static electricity for the grounding of plant parts and for the volume
resistances of the supply line.
2.1 Intended use
The main purpose of safety breakaway coupling ABV-S is to prevent environmental damage cause by
hose connections bursting on tankers. The coupling may only be operated by qualified persons
(qualifications: experts, technicians, vocational training, and/or job experience) after it has been mounted
on the tank and hosepipe in the proper manner and once a leak test has been conducted. Operators bear
full responsibility for the safety of the plant and are obliged to comply with the applicable regulations for
hazardous substances and highly inflammable or combustible fluids.
The safety breakaway coupling ABV-S may be used only in the temperature range -40°C to 150°C,
dependent on the used metallic and sealing materials. Before filling or emptying tanks, the pull cable must
5
be fastened to a suitable anchor point close to the filling station. Pull cable and fastening anchor must be
checked to ensure they are firm and have sufficient tensile strength.
3 Description/structure
The safety breakaway coupling ABV-S consists of two housing halves with a check valve in each. The
housings are held together by three pressure clamps and a support ring during normal operation. The two
check valves support each other during normal operation and keep the conduit open.
ABV-S, threaded connection
Description 1 Pressure clamp 2 Support ring 3 Pull cable 4 Supply line thread ABV-S 5 Spider 6 Supply line flange ABV-S 7 Tank thread ABV-S 8 Shaft 9 Check valve 10 Tank flange ABV-S
ABV-S, flange connection
3.1 Function
In case the tank wagon rolls away or someone forgot to disconnect the supply line before the truck drives
off, the ABV-S is activated as follows:
Before the supply line is stressed by undue external forces the support ring is pulled out by a pull cable
running parallel to the supply line which releases the pressure clamps. The case halves are separated
from each other and the spring-loaded check valves instantaneously close both ends of the line. One half
of the coupling remains firmly connected to the tank wagon while the other half of the coupling remains
connected to the supply line. This prevents the outflow of liquids or gases from both product carrying
ends of the line.
3.2 Storage and transport
The safety breakaway coupling ABV-S may only be transported or stored when absolutely clean. Suitable
sealing must be used for the openings to ensure no damage occurs to the surfaces/sealed areas. The
3
1
4
7
2
9
3 5
6
10
2
9
5
1
8
8
6
seals may only be removed by trained personnel. The storage location must guarantee adequate
protection from corrosion or extreme temperatures.
3.3 Identification
Identification is engraved in the housing on each half of the coupling.
The following information is always available:
TÜ.AGG.214-94
CE 0575 II 2G T(x)
Manufacturer ID: RS
Art.no.:556.400400.12109-xx or 553.600600.720-xx
Serial number / Year ,manufactured
Consecutive no. / material name (housing)
DN PN
3.4 Scope of delivery
The safety breakaway coupling ABV-S will be delivered ready to use with caps for both openings and
transportation lock for pull cable.
3.5 Accessories
When assembling safety breakaway coupling ABV-S, use of an open-jawed wrench with suitable width
across flats is recommended. The open-jawed wrench must be provided by the user.
For servicing purposes, seal sets for valves and spiders may be ordered from Roman Seliger at
authorized hose assembly workshops. A special wrench for the spider can also be delivered.
3.6 Technical data
Special features:
Modular design, expandable with additional screw-on parts, e.g. flange threaded nipples with different flange
sizes
Connection side BSP foll. ISO 228 IG, G2", G3", G4". Flat-packed thread runs to tank. This must not be
sealed with PTFE tape.
release angle up to 90° through three pressure clamps on activation mechanism
Impact ring, protects against impacts
Bellow cover, catches spray water during breakaway, can protect against formation of ice during winter
approved by TÜV (German Technical Inspection Authority)
meets ATEX standards for Zone 1
Housing: In standard stainless steel 1.4571, other materials can be selected by manufacturer or operator
7
Seals: O-rings FKM or FEP sheathed, IG PTFE flat packing
Pressure level: PN25, max. rated pressure 25 bar (except DN 300: PN 10, max. 10 bar nomin. Pressure)
Nominal width, Weight and Dimensions [mm]
Nominal width Connection kg d l
DN 25 G1“ 1,06 100 108,5
DN 25 NPT 1“ 1,27 100 140,5
DN 50 G2“ 2,42 125 123,5
DN 80 G3“ 7,92 188 174,5
DN 100 G4“ 13,8 242,5 208,5
DN 150 Flange PN25/40 50,8 318 306,5
DN 200
Flange PN25
ANSI 150 PSI
ANSI 300 PSI
96,8
423
364
DN 300 Flange PN 10 266 592 600
Materials
Components Material no. Material Operating temperature
Body
Spider 1.4408 GX6CrNiMo18-10
Body
Valve
Spider
1.4571 X6CrNiMoTi17122 (AISI 316 Ti)
2.4602, 2.4600 NiCr21Mo14W
(Hastelloy C22) -40°C bis 150°C
2.4610 NiMo16Cr16Ti
Hastelloy C4)
Spring / ball 1.4401
2.4602, 2.4600
X12CrNi177
NICr21Mo14W
8
Seals
Component Material Description 2 Operating temperature
3
O-ring
NBR Perbunan -25°C to 80°C
Ethylen-Propylen-Dien
Rubber EPDM
Buna AP -40°C to 120°C
Perfluorelastomer FFKM KalrezTM
ChemrazTM
-15°C to 200°C
FEP, FKM VitonTM
-30°C to 200°C
Thread seal PTFE TeflonTM
-200°C to 200°C
4 Installation and Initial Start-Up
The ABV-S may be installed by qualified personnel only (qualifications: experts, technicians, vocational
training, and job experience). We would like to point out the professional obligations in acc. to German
law §62 WHG. The safety breakaway coupling must be connected to the nozzles and connections
provided. Avoid application of any additional forces, bending moments or vibrations at connection
nozzles. Strong cross forces should be kept by fixing supports.
The safety breakaway coupling can be installed directly in the product line and is ready for use after
removing the transport protection. The installation is as follows:
a. Remove the packaging and the tread protection caps
b. Check the coupling for damages before mounting.
c. To prevent damages during mounting a suitable wrench should be used for the intended nut flats on the
coupling
d. Connect the end of the coupling without the pull cable guide to the tank wagon and connect the
hosepipe end firmly to the coupling end with the pull cable guide (the hose may not be twisted). The
thread must not be sealed with PTFE tape.
e. Connect a suitable pull cable to the release cable of the coupling. The pull cable has to be shorter than
the supply line and must be firm enough (Stretching, pulling power).
f. Connect the pull cable to a tie rod. The tie rod of the pull cable may be positioned in a way that in any
thinkable situation the pull cable is stretched earlier than the supply line. A safe release is possible in
the range of 0° to 90° for the pull cable. Observe the minimal tensile strength of the entire cable
connection.
g. Forces on the pull cable
2 Kalrez, Viton, Teflon = registered Trademarks of DuPont
3 the temperature stability of the seal materials used must be considered separately for each individual case
9
Nominal width Release force at 25 bar nominal pressure Residual amount cm3
0° release angle 90° release angle
DN 25 -1“ 0,4 kN 0,5 kN 100
DN 50-2“ 0,3 kN 0,6 kN 160
DN 80-3“ 0,5 kN 0,9 kN 630
DN 100-4“ 1,5 kN 1,8 kN 1100
DN 150-6“ 2,4 kN 4,9 kN 3800
DN 200-8“ 3,0 kN 6,3 kN 10000
DN 300-12“ ( PN
10!)
3,0 kN k. A. 21900
h. Remove the transport protection: DN25 – DN 80: release two hexagon screws and remove red ring from
release ring. DN 100 – DN 300: release three hexagon screws und remove three red separators
4.1 Initial start-up
The start-up may take place only when the safety breakaway coupling has been mounted as instructed
and the necessary function tests and leak tests have been conducted by the approved authorities.
Operators are obliged to provide trained personnel to check the sealing of the connections, the correct
condition of the pull cable and its fitting.
5 Operation
5.1 General notes
Operators are obliged to provide qualified and trained personnel familiar with the handling of supply
pipes, safety breakaway couplings, any fluid being pumped as well as its danger potential. Such staff
must also be familiar with the applicable safety regulations and the regulations of the employer’s liability
association.
The pull cable must be shorter than the supply line and must always be tight and attached in such a way
that the safety breakaway coupling can be safely triggered.
5.2 For the operator
The safety breakaway coupling ABV-S has to be checked once a month for proper condition. The results
of the inspection have to be documented.
In so far as the safety breakaway coupling ABV-S is part of a mandatory inspected system, the safety
breakaway coupling ABV-S has to be checked by a technical expert during the first as well as all
repeating inspections.
10
Only qualified personnel may be assigned with assembling the ABV-S (qualifications: experts,
technicians, vocational training, and/or job experience).
We would like to point out the professional obligations in accordance to German law § 62 WHG.
5.3 Start-ups
CAUTION: When released, the safety breakaway coupling disconnects using considerable force! During disconnection, the fluid being pumped may suddenly spurt out. Ensure suitable protective measures are therefore in place!
The following points should be checked before any start-up:
Condition of the pull cable.
Pull cable connection and fitting.
Proper fit of support ring and the clamps.
Check the coupling for leaks.
Check the connections of the coupling's seals to the system.
Check the conductivity of the entire supply line.
The electric contact resistance of R ≤ 10 MΩ needs to be kept.
5.4 Cleaning
Check the seal of the connections before every cleaning.
In case the coupling is used for materials that harden, stick, etc., the coupling has to be cleaned of
residues after every use.
Before dismantling, the coupling always has to be cleaned with a suitable cleaning agent (regardless of
the product carried).
5.5 Disassembly
After releasing the safety breakaway coupling and on opening the locks, there is a danger that the fluid
will spurt out. Special protective measures such as personal protection equipment must therefore be
adopted. Always ensure system is cleaned in the proper manner. After cleaning, remove any residue from
the cleaning agent.
How to disassemble:
a. Wear suitable personal safety equipment.
b. Make sure that the coupling halves are depressurized and empty.
c. Clean coupling before disassembly (use cleaning agent suitable for the pumped fluid).
d. Unscrew both coupling halves with a fitting wrench.
11
5.6 Improper use
The equipment should never be used in the case of visible damage or where there is prior knowledge of
damage that may lead to malfunction.
5.7 Maintenance / repair
Maintenance should be done regularly; at least once in the year. Maintenance must always be carried out
after the safety breakaway coupling ABV-S has been triggered. Maintenance and repair of the safety
breakaway coupling may be carried out only by Roman Seliger Armaturenfabrik GmbH or by companies/
technicians authorized by Roman Seliger Armaturenfabrik GmbH.
5.8 Miscellaneous
The operator is solely responsible for the installation, operation, and maintenance of the coupling. Roman
Seliger Armaturenfabrik GmbH accepts no responsibility for damages due to faulty installation, faulty
handling, as well as negligent or incorrect maintenance.
6 Inspection after Release
WARNING: Malfunction may occur due to incorrect assembly!
Whenever the system is released, it must be cleaned and sent in for assembly, otherwise the guarantee for perfect
functioning will be rendered invalid. RS also changes the seal(s) in safety breakaway couplings that are sent in.
The safety breakaway coupling ABV-S is a safety component. Maintenance tasks may be performed only
by trained personnel from an authorised professional workshop. All measures necessary for inspection,
maintenance and repair must be carried out in accordance with the national regulations of the country
where the system is installed.
7 Maintenance and Repair
7.1 General information
The safety breakaway coupling must be serviced regularly by qualified personnel to ensure it is always in
proper working order in the event of any mechanical, chemical and thermal loads caused by the
designated operating method. According to operating conditions and experiences, the operator must
12
stipulate the measures to be adopted, together with intervals for inspection and maintenance in an
operator’s guide (see recommendation of RS, chapter 5.2 and 5.7). These include, for instance, visual
inspection for leaks, function checks, water pressure checks with 1.5 fold excess pressure. All inspections
and their results must be documented. In addition, during maintenance, the implemented measures must
be documented. Any faults ascertained must be rectified immediately, else use of the equipment
discontinued permanently.
7.2 Periodic tests by approved test centres
In Germany, the owner must send the equipment for a safety test at regular intervals in compliance with
§15 of the health and safety guidelines when using equipment in the workplace (BetrSichV). In other
countries, appropriate regulations also exist.
8 Manufacturer
This list is to be filled out and countersigned by the coupling operator and vendor. For our employees industrial safety reasons, the repair can only be made according to this check list. The coupling to be repaired was used with the following product: Chemicals-/ product name: ________________________________ EG-/ CAS-/ UN-Nr. ___________________ Aggregate state:
firm liquid gaseous xxx Water hazard class : 0 1 2 3
The product is without foreign contamination:
yes no
The product reacts: yes no
Inflammable/ easily inflammable
Hazard class acc to VbF____________
Injurious to health
Toxic or very toxic
Corrosive or irritating
carcinogenic
Biological hazard possible
other
With water
With air If yes:
The developing gases / vapours are:
Ignitable/ selft inflammable
Injurious to health
Toxic or very toxic
Corrosive or irritating
carcinogenic
Check list for the repair and maintenance of Dry Disconnect– and Safety Breakaway Couplings according to BG T002 9/95
Were the couplings cleaned, and are therefore harmless to deal with?
Which rinsing media were used during production? ____________________________________________________ In which period was the coupling used? From _______ to ________ How often was the coupling used? Per day _____ per week ____ per month ______ Wurden Wartungs– und Reparaturarbeiten selbst vorgenommen?
The following preventive measures are recommended:
Other preventive measures _____________________________________________
none
Vacuum cleaning of workplace
Closed extraction unit
Sufficient room ventilation
Eye protector
Full mask
Rubber gloves
We thank you for the support of our industrial safety. Date: _____________ Operator: ________________ Distributor: _____________________
www. rs-seliger.de
RS - Reliability in Quality and Service
Dear Customer,
Our highly developed dry disconnect and breakaway couplings render reliable services as important
safety elements in many loading processes throughout the world in daily use. High stress and the
often rough ambient conditions, the couplings are exposed to, require regular inspection. This is the
only way to ensure proper functioning.
Striving to hold these service times as short as possible and thus to reduce your customers’ down-
times to a minimum, we have overworked and reorganised our service process. In this way we have
succeeded in offering you clearly reduced service throughput times. Thus future service and, if neces-
sary, repair of a dry disconnect and breakaway coupling with nominal widths DN 25 - DN 100,
equipped with FKM or EPDM seals, will be completed within one week. Service or repair of couplings
with larger nominal widths or equipped with special sealing materials may require slightly more time,
though.
To be able to return your serviced couplings immediately, we have established a cost fee and estimat-
ed amounts system. In the future, we will be able to inform you in general about the costs of the
standard service already before the inspection of the dry connect and breakaway couplings to be re-
paired. These costs include the following works:
- Disassembling the coupling an cleaning the component parts
- Inspecting all component parts and necessity of replacement check
- Replacing all O-rings and seals
- Remounting as well as leak and functional testing
Components that need to be replaced in addition will be charged separately. In the future, we will ask
you to approve an estimated amount in addition to the standard service fee. In order not to jeopardise
the service process, we will then carry out works whose overall costs are below this approved estimat-
ed amount without consulting you again.
In order to ensure a smooth and efficient process, the future service process will be as follows.
1. Notification of required service: Prior to dispatching the coupling to be serviced/repaired to
us, please contact our sales department and state the item number - and ideally the serial
number (engraved in the coupling) as well. You will receive from our sales department an offer
on the standard service as well as information on the amount of the additional cost fee within
24 hours.
2. Coupling dispatch: If you accept our offer, you will send us the couplings to be serviced
along with the according declaration of contamination. Please note that we must not work
on couplings without a declaration of contamination due to employment protection reasons!
Items without corresponding declaration will be brought to a quarantine store and will have to
be disposed of with costs as hazardous waste, unless the missing declaration will be submit-
ted within a period of 72 hours.
3. Service and return: The coupling is serviced and tested according to the submitted offer. If
the approved estimated amount is exceeded, the responsible sales staff will contact you to de-
termine further steps. After completion of the works, the coupling is immediately returned to
you.
Please find enclosed a leaflet containing all important information on how to initiate service or repair.
We already now thank you for your assistance. We shall always strive to continually optimise both our
products and processes in the future in order to be able to offer you both the best couplings and an
excellent service.
Yours sincerely
RS Roman Seliger Armaturenfabrik GmbH Dr.-Ing. Jens Reppenhagen Managing Director
Leaflet RS Roman Seliger Armaturenfabrik - Service Process
Have you got a coupling that needs service or repair? No problem! Initiate professional and
quick service/repair in two simple steps.
Step 1: notification of required service
How to do?
o By telephone: +4940 52306499
o Email: [email protected]
o Fax: +4940 52306425
What information is required?
o Item number of the coupling(s) to be serviced/repaired
o Serial number of the coupling(s) to be serviced/repaired
(Both found in the coupling gravure)
You will receive an offer for the standard service1 along with information on po-
tential service maximum costs without consultation.
Step 2: dispatch of the coupling when you accept the offer
Where?
Roman Seliger Armaturenfabrik
An´n Slagboom 20
22848 Norderstedt
What documents have to be added?
o Delivery note
o Completed declaration of contamination (see the appendix)
Caution! Due to employment protection reasons, a coupling without valid dec-
laration of contamination must not be worked on and is disposed of with costs
as hazardous waste if the declaration will not be submitted within a period of
72 hours.
Your repaired/serviced coupling will be dispatched to you by RS within one
week’s time2.
1 Dismounting, cleaning, visual inspection, replacement of gaskets and O-rings, mounting, testing
2 Subject to standard component replacement; there may be a delay in individual cases.