SACHIN PARAB

5

Click here to load reader

Transcript of SACHIN PARAB

Page 1: SACHIN PARAB

Sachin Yashwant ParabCONSTRUCTION MANAGER (Civil)

Mobile: +97155-7794411,+97155-3268577

E-mail: [email protected] [email protected];

FILE

Construction Manager with more than 14+ years of progressive work experience in construction industry demonstrating core expertise in all aspects of civil engineering practice along with strong leadership traits. Possess excellent track record in handling civil engineering projects including construction of infrastructure works, commercial buildings, roads, bridges, tunnels, airports and breakwater while ensuring utmost level of quality in project deliverables, maintaining strict compliance to deadlines, specifications and quality standards. Certified with ISO 9001:2000 Internal Audit, Modern Concrete Technology and Construction Safety Management training programs. A quality driven and target oriented professional with strong analytical, problem solving, supervision, manpower management, and organizing and communication skills.

STRENGTHS

More than 11 years of work experience in Gulf Site engineering and construction management Impressive project planning and execution skills Resource mobilization and team building Inspection and technical reporting competency Clients-contractors-consultants-government liaison Outstanding performance and achievements Strive towards engineering excellence

QUALIFICATIONS

Bachelor degree in Civil Engineering, Visveswaraiah Technological University, Belgaum, India 2001

Diploma in Civil Engineering, K. J. Somaiya Polytechnic, Mumbai Board, Mumbai, India 1997

WORK EXPERIENCE

Construction Manager (Structure) Larsen & Toubro Limited

Construction Manager (Structure) Al Jaber Building LLC, Abu Dhabi, UAE

Feb 2014 to Till date

Feb 2010 – Feb 2014

Site Agent to Senior Site Engineer, Group Five Construction UK Ltd., UAE Sept 2006 – Feb 2010

Senior Site Engineer, Al Futtaim Carillion LLC, UAE Oct 2004 – Sept 2006

Marine Engineer, Hazira Marine Engineering & Construction Management Ltd., India Oct 2003 – Oct 2004

Civil Engineer (Bridge), SKEC-DODSAL Joint Venture, India Jun 2001 – Oct 2003

ACHIEVEMENTS

Successful in facilitating timely completion of projects as per contracts, specifications and client’s requirements through proper site coordination.

Gained extensive background with the Gulf construction industry. Attained good comprehension on the government regulations, the necessary documents for the site work to commence and developed excellent relationship with clients, consultants, and contractors.

Resolved effectively contract variations or discrepancies through efficient coordination.

AREAS OF EXPERTISE

Civil Engineering Provide technical advice concerning construction, design, project modifications and structural repairs. Estimate cost of equipments, labour and materials to determine project feasibility. Supervise project site to check development and ensure conformance to standards and design specifications. Lead operations, construction and inspection activities at project site. Maintain outstanding relation to management and great communications skills that able to convey concerns to

Page 1 of 4

Page 2: SACHIN PARAB

project members, contractors, project manager and consultants.

Sachin Yashwant ParabConstruction & Site Management

Supervise construction and activities to ensure deadlines are on time. Inspect and review projects to make sure its compliance with the health & safety rules and regulations. Plan, organize, and direct activities concerned with the construction of structures, facilities, and systems. Identify delays and come up with appropriate solutions to ensure the construction schedule is maintain. Organize meetings and submit report to upper management.

JOB RESPONSIBILITIES

Construction Manager ( Structure ) :- Larsen & Toubro limited In charge for the construction of the Air side Traffic Tunnel and APM (AUTOMATIC PASSENGER MOVERS) in the Midfield Terminal Project for Abu Dhabi Airport Project (ADAC)

Planned construction and resources in the tunnel. Leaded procurement of material, reinforcement, form work and subcontractors at the mobilization stage Responsible for the progress and productivity of labors Achieved all milestone successfully Leaded engineering team, at the early stage of project, in preparation of shop-drawings and method statements including detailed risk assessment).

Liaised with the Engineer to sort structural issues (design/detailing) well in advance to mitigate delay risk. Detailed project’s plan to micro level and estimated resources requirements.

Successfully achieved tight project milestones on time and to the satisfaction of both management and client Motivated team members and sub-contractors to achieve project’s safety, time, quality and cost targets.

Pre-qualified subcontractors based on experience and cost comparison Negotiated subcontractors’ rates, acceleration fees and contract terms. Member of the project’s Safety Committee responsible for educating and enforcing safety in the project. Awarded the Most EHS Conscious Construction Manager during Safety Month Celebration – May 2014-Jan 2015-April 2015

Construction Manager (Execution), Al Jaber Building LLC

Accountable for fulfilling site works such as planning; reviewing contractor’s shop drawings; coordinating with

clients, consultants, contractors and government authorities; following up with Design Engineers; supervising labor workforce, tools, providing technical help to complete the work scope according to contract needs.

Implementing suitable solution on site queries. Carrying out final inspections following the snag list. Ensuring execution of works as per the approved

drawings, specification and design including compliance to set standards. Leading the Site Inspectors and monitoring their performance to ensure effective execution of the contract. Carrying out detailed review on Project Quality Manual, Quality Procedures & Forms, ITP (Inspection Test

Plan), Method Statements, Risk Assessments and Temporary Works Proposals. Meeting with the end user, consultants, sub-contractors and vendors to resolve any discrepancies. Managing planning, resource allocation, management and execution of all construction activities with necessary

safety implementations. Implementing procurement strategies for construction materials. Advising the Project Engineers and Foreman on technical issues and monitoring their performance. Supporting the Quantity Surveyor; developing joint records and checking on contractor’s claims & variations. Updating Planning Engineer on progress rate, requirement & actual resources, completed activities and dates. Maintaining compliance with Health, Safety and Environmental requirements.

Site Agent – Senior Site Engineer, Group Five Construction UK Ltd and Al Futtaim Carillion LLC Reported to the Project Manager in various site issues or work plans. Took approvals from client/consultant and statutory authorities on work permits and other site issues. In charge for ordering, monitoring and taking inventory of the construction materials, equipments and plants. Directed timely execution of construction activities; monitored site works and informed the Quantity Surveyors

/ Contract Manager on potential variations or claims. Generated various site reports including daily diaries, weekly & monthly progress reports, manpower

allocation and utilization among others.

Page 2 of 4

Page 3: SACHIN PARAB

Sachin Yashwant ParabMarine Engineer, Hazira Marine Engineering & Construction Management Ltd. Reported directly to the Project Manager. Supervised execution of work against planned progress; reviewed method statements inspection of Quality

Controlled Plan and Test Plan; generated different site reports. Coordinated with client, owner and subcontractor for the effective execution of project works.

Civil Engineer, SKEC-DODSAL Joint Venture Developed site plan and supervised execution of works as per the set schedules. Prepared construction program of various items; created work schedules and implemented effectively. Coordinated with consultant on technical queries, shop drawing approval and site discrepancies resolution. Executed monthly billing procedure with client, subcontractor and other relevant authorities. Generated site reports and provided feedback to the Site Manager.

PROJECT SUMMARY

Gulf Projects. Midfield Terminal Project ( Abu Dhabi Airport Expansion)For ADAC client ,Aecom (Consultant) Al Falah Community Project (Villa Construction 2080) for Aldar (Client) Parallel Road Project in Al Barsha for RTA (Client), Parsons International (Consultant) Dubai Police Force Housing Complex for Dubai Police (Client), Arif & Bintoak (Consultant) Al Maktoum International Airport, Jebel Ali for Dubai Civil Aviation (Client), Dar Consultants (Consultant) Dubai Festival City for Dubai Festival City (Client), HOK/Hyder Consulting (Consultant).

India Projects

LNG Terminal Construction for Shell LNG (Client). Execution of intake pump house (Cofferdam with temporary rock bund, sheet piling up to 20m depth with Struts/Waller, RCC Pump House of 15m depth below seabed level construction base foundation, wall rebar detailing works, shuttering works), Breakwater construction, Marine Outfall works including precasting activities.

Surat Manor Tollway Project for National Highway Authority of India (Client). Worked as Civil Engineer responsible for supervising the construction of flyover & major bridges with pile foundation and RCC T Girder and cast in Situ Deck Slab, void slab resting on well and open foundation; construction of major bridge viaduct underpass with length spanning to 245m, 280m and 180m and execution of substructure and superstructure activity including casting of pre-stressed post tensioned girders (I-beams), launching and casting of deck slab.

PROFESSIONAL DEVELOPMENT

Modern Concrete Technology, HCC Ltd., Mumbai, India Construction Safety Management Seminar by National Safety Council, Mumbai, India ISO 9001:2000 Internal Auditor Training Course, Bureau Veritas (BVQI), Dubai, UAE

IT SKILLS

Conversant with MS Project 2007, AutoCAD, Aconex (PMIS) and MS Office.

PERSONAL DETAILS

Nationality : IndianDate of Birth : 6th February 1979Marital Status : Married, Having 01 Daughter 08 years oldVisa Status : Employment Visa valid up to 15/07/2016Driving License : UAE Light Vehicle no. 941460,validity 10/09/2015LanguagesPassport Details

::

English, Hindi & MarathiJ4247047 Expiry on 25/09/2020

REFERENCE

Page 3 of 4

Page 4: SACHIN PARAB

Available upon request

Page 4 of 4