SAC Report Povilas Palunas 2/23/2012 1. Primary Mirrors Primary Aluminizing Schedule back on track...

9
SAC Report Povilas Palunas 2/23/20 12 1

Transcript of SAC Report Povilas Palunas 2/23/2012 1. Primary Mirrors Primary Aluminizing Schedule back on track...

Page 1: SAC Report Povilas Palunas 2/23/2012 1. Primary Mirrors Primary Aluminizing Schedule back on track –Baade aluminized in Jan after 4 years. 3% gain over.

SAC Report

Povilas Palunas

2/23/2012 1

Page 2: SAC Report Povilas Palunas 2/23/2012 1. Primary Mirrors Primary Aluminizing Schedule back on track –Baade aluminized in Jan after 4 years. 3% gain over.

Primary Mirrors

• Primary Aluminizing Schedule back on track– Baade aluminized in Jan after 4 years. 3% gain over

washing.– Modifying CO2 cleaning procedure to improve

uniformity

• Baade M3 washed due to failure of du Pont tank– Reflectivity 88.3% in blue compared to 91.7% for the

freshly aluminized primary.

• ADC cleaned with acetone – the coatings are failing.

2/23/2012 2

Page 3: SAC Report Povilas Palunas 2/23/2012 1. Primary Mirrors Primary Aluminizing Schedule back on track –Baade aluminized in Jan after 4 years. 3% gain over.

Earthquakes!

• Two significant earthquakes– Nov 14 end of f/5 run--starting AO commissioning

• Mag 6.1 epicenter 59km depth 61km

– Jan 30 end of Baade wash • Mag 6.7 epicenter 94km depth 47km

• Both quakes had an effect on Clay collimation– In the second quake the secondary required 1mm

offset to remove coma. In the following engineering the position values were back close to nominal.

2/23/2012 3

Page 4: SAC Report Povilas Palunas 2/23/2012 1. Primary Mirrors Primary Aluminizing Schedule back on track –Baade aluminized in Jan after 4 years. 3% gain over.

Transparency

• Started projects to monitor site transparency.– DIMM poor sky coverage but limited number of stars

and systematics

– CASCA full sky coverage more systematics and data handling

Project completion is resource limited

2/23/2012 4

Page 5: SAC Report Povilas Palunas 2/23/2012 1. Primary Mirrors Primary Aluminizing Schedule back on track –Baade aluminized in Jan after 4 years. 3% gain over.

f/5

• Changeovers becoming reasonably routine– Primary issue is scheduling Juan Gallardo

• f/11MegaCam takes more than one day but on sky engineering done on the first night

• Telescope collimation easier with MegaCam

2/23/2012 5

Page 6: SAC Report Povilas Palunas 2/23/2012 1. Primary Mirrors Primary Aluminizing Schedule back on track –Baade aluminized in Jan after 4 years. 3% gain over.

AO Run

• Guider functional but not complete• Glycol above the primary

– Controls installed to stop a system leaks

• Vibrations– Primary Mirror Cooling system glycol pump– CLIO LN2 vacuum pump (will be moved)– AO CCD cooling circuit (?)

• Rotator control problem– Rotator not tracking to spec after telescope offsets

2/23/2012 6

Page 7: SAC Report Povilas Palunas 2/23/2012 1. Primary Mirrors Primary Aluminizing Schedule back on track –Baade aluminized in Jan after 4 years. 3% gain over.

GMT

• Supported GMT primary mirror phasing camera test run

• Other– Primary mirror Temperature distribution– Adaptive optics performance– Test of coarse lenslet array– Telescope Vibration– Dust analysis– Weather

2/23/2012 7

Page 8: SAC Report Povilas Palunas 2/23/2012 1. Primary Mirrors Primary Aluminizing Schedule back on track –Baade aluminized in Jan after 4 years. 3% gain over.

Space

• We are filling up.

2/23/2012 8

To ASB

Page 9: SAC Report Povilas Palunas 2/23/2012 1. Primary Mirrors Primary Aluminizing Schedule back on track –Baade aluminized in Jan after 4 years. 3% gain over.

Safety

• Two accidents on site this year:– Chemical spill– Broken leg

• Hard hats and safety shoes required for everyone at lifts and moves.

• Working on official procedures for all major tasks• New safety system

– Cell cart scaffold– Primary mirror cover access– Inner catwalk (for 2nd changes)

2/23/2012 9