S&A Pamphlet Sep 2010

28
Specialists in Facility and Security Engineering Because performance matters...

description

 

Transcript of S&A Pamphlet Sep 2010

Page 1: S&A Pamphlet Sep 2010

Specialists in Facility

and Security Engineering

Because performance matters...

Page 2: S&A Pamphlet Sep 2010

Page 2

Shearer & Associat es, Inc. is an arch it ect ural/

eng ineer ing f irm sp ecializing in f acilit y and secur it y

syst em s engineer ing. Our com p any is head q uar t ered

in Hun t sville, Alab am a and w as f ound ed in 2000 t o

p rovid e services t o f ed eral, st at e and local govern-

m en t s, along w it h com m ercial o rgan izat ions. Our st af f

is p r im ar ily m ad e up o f f o rm er m ilit ary o r civil service

em p loyees w ho have jo ined us af t er years o f d ist in -

gu ished service w it h p ub lic and p r ivat e o rgan izat ions.

Shearer & Associat es DUNS num b er is 022720010 and

Cage cod e is 1SJN6. Ad d it ionally, w e m ain t ain a DoD

Secret Facilit y Clearance.

Our Capabilities

Shearer & Associat es, Inc. has t he exp er ience and resources t o assist in your p ro ject

execut ion . From p ro ject m anagem en t t o eng ineer ing d esigns, m ast er p lann ing t o

t rain ing, our f ir st p r io r it y is t o ensure our clien t s exp ect at ions are f u lly sat isf ied .

Whet her w o rking in our o f f ices in Hun t sville, Alab am a o r on -sit e as an in t egral

m em b er o f your t eam , Shearer em p loyees st r ive t o m ain t ain p ro ject scop e, sched -

u le, and b ud get w h ile d eliver ing sup er io r q ualit y. We b uild f rom t he exp er t ise o f

our st af f t o d eliver sup p o r t in t he f o llow ing service areas:

Program and Project Managem ent Services

Design and Const ruct ion Managem ent

Mast er Planning, Program m ing and Budget ing & Execut ion

Cost Engineer ing and Scheduling

Elect ronic and Physical Secur it y Syst em s Engineer ing

Energy Managem ent and Cont rol Syst em s Engineer ing

Logist ics and Sust ainabilit y Planning

Training and Facilit at ion Suppor t

Com m unicat ions Engineer ing

Shearer & Associates, Inc.

Page 3: S&A Pamphlet Sep 2010

Page 3

Our Certifications

Shearer & Associat es, Inc. and it s em p loyees, p ossess num erous p ro f essional cer t if ica-

t ions, includ ing:

Pro f essional Engineer (PE) Regist rat ion – m ult ip le st at es

Pro ject Managem en t Pro f essional (PMP)

Cer t if ied Cost Engineer ing Techn ician (CCET)

Regist ered Com m un icat ions Dist r ib ut ion Designer (RCDD)

Cer t if ied Pro t ect ion Pro f essional (CPP)

Cer t if ied Facilit y Manager (CFM)

Cer t if ied in Hom eland Secur it y (CHS)

Our Recognitions

Shearer & Associat es, Inc. has b een recogn ized f o r it s rap id grow t h and sup er io r p er -

f o rm ance since incep t ion in 2000. No t ab le ach ievem en t s includ e:

2010, 2007, and 2006 Sm all Business o f t he Year Nom inee - Hun t sville/Mad ison

Coun t y Cham b er o f Com m erce, Alab am a

2010 and 2009 Engineer ing Firm o f t he Year - Societ y o f Am er ican Milit ary Engi-

neers (SAME) Hun t sville Post

2010 Young Engineer o f t he Year - SAME

2010, 2009, 2008, and 2007 Fast est Grow ing Com p an ies - Inc 5000

2008 Jo in t Mer it o r ious Un it Aw ard - US Arm y Jo in t Pro ject Of f ice (JPO) Missile De-

f ense Agency

2007 To rch Aw ard Nom inee f o r Market p lace Et h ics – Bet t er Business Bureau (BBB),

No r t h Alab am a

2005 Ho t 100 Com pan ies - En t rep reneur Magazine

Page 4: S&A Pamphlet Sep 2010

Page 4

Our Memberships

Shearer & Associat es, Inc. is a p roud m em b er o f

t he f o llow ing o rgan izat ions:

Societ y o f Am er ican Milit ary Engineers (SAME)

Hun t sville Post

Am er ican Societ y f o r Ind ust r ial Secur it y (ASIS)

Inst it u t e o f Elect r ical and Elect ron ics Engineers

(IEEE)

Inst rum en t Societ y o f Am er ica (ISA)

Am er ican Co llege o f Fo rensics Exam iners In t ernat ional (ACFEI)

Am er ican Board f o r Cer t if icat ion in Hom eland Secur it y (ABCHS)

Associat ion o f t he Un it ed St at es Arm y (AUSA)

Arm y Aviat ion Associat ion o f Am er ica (AAAA)

Nor t h Alab am a Bet t er Business Bureau (NA BBB)

Nat ional Def ense Ind ust r ial Associat ion (NDIA)

Hun t sville/Mad ison Coun t y Cham b er o f Com m erce

Our NAICS Codes Shearer & Associat es, Inc. is reg ist ered w it h t he f o llow ing Nor t h Am er ican Indust ry

Classif icat ion Syst em (NAICS):

236220 - Com m ercial and Inst it u t ional Bu ild ing Const ruct ion

541310 - Arch it ect ural Services

541330 - Engineer ing Services

541512 - Com p ut er Syst em s Design Services

541611 - Ad m in ist rat ive Managem en t and General Managem en t Consult ing Ser -

vices

541614 – Process Physical Dist r ib ut ion and Logist ics Consult ing Services

541620 - Environm en t al Consult ing Services

541690 - Ot her Scien t if ic and Techn ical Consult ing Services

541712 - Research and Develop m en t in Physical, Engineer ing and Lif e Sciences

(excep t Bio t echno logy)

541990 - All o t her Pro f essional, Scien t if ic and Techn ical Services

561621 - Secur it y Syst em s Services (excep t Locksm it hs)

611430 - Pro f essional and Managem ent Develop m en t Train ing

Page 5: S&A Pamphlet Sep 2010

Page 5

Our Presence

Shearer and Associat es, Inc.’s co rp o rat e o f f ice is locat ed in Hun t sville, Alab am a.

How ever , as show n on t he m ap b elow , our p resence can b e f ound t h roughout t he

con t inen t al Un it ed St at es as w ell as ab road .

Em p loyee

Presence

Pro ject

Locat ions

Page 6: S&A Pamphlet Sep 2010

Page 6

PRIME CONTRACTS

GSA Cost Est im at ing , GS-05P-10-FB-A-

0008, Cost Est im at ing Services f o r

any d esign , rep air , alt erat ion and /o r

const ruct ion p rogram

GSA MOBIS (Managem en t , Organ iza-

t ional and Business Im p rovem ent

Services), GS-10F-0042N, Sup p or t s p ro ject m anagem en t , sched uling, and cost

est im at ing services f o r f ed eral clien t s

GSA PES (Pro f essional Engineer ing Services), GS-23F-0167P, Sup p or t s a f u ll range o f

f acilit y engineer ing services f o r f ed eral clien t s

USACE, Hunt sville Cent er , ESS UMCS (Elect ron ic Secur it y Syst em s Ut ilit y Mon it o r -

ing Con t ro ls Syst em s), W912DY-10-D-0021, Sup p or t s a f u ll range o f engineer ing

services f o r d eliver ing elect r on ic secur it y syst em s f o r f ed eral clien t s

SUB CONTRACTS

R23G (Rapid Response 3rd Generat ion), Pr im e CAS, W15P7T-10-D-D412, U.S. Arm y

Program Com m un icat ions-Elect ron ics Lif e Cycle Managem en t Com m and con-

t ract t o p rovid e cr it ical eq uip m ent and engineer ing services t o governm ent

syst em , p lat f o rm and it em m anagers w or ld w id e.

USACE, Mobile Dist r ict , Elect r ical Engineer ing , Pr im e Parsons In f rast ruct ure &

Techno logy Group , Inc., W91278-09-D-0046/Sub , 747274-30000, Elect r ical

Engineer ing Sup p or t f o r US Arm y Co rp s o f Engineers, Mob ile Dist r ict , Fo r t

McClellan Resid en t Of f ice, AL

USACE, Mobile Dist r ict , Project Managem ent , Pr im e MWH Am er icas, Inc.,

W91278-09-D-0073/Sub S1009232-94253-0F, Red und an t Pum p St at ion , NASA

Michoud Facilit y, New Or leans, LA

SETAB (Syst em s Engineer ing and Technical Assist ance Br idge ), Pr im e CSC,

HQ0147-08-D-0003/Sub S6440021, Sup por t s a f u ll range o f engineer ing services

f o r sup p or t Missile Def ense Program

LTAP (Long Term Acquisit ion Plan ), Pr im e CSC, HQ0006-03-C-0003/Sub S-8955,

Sup p or t t o Direct o r , Program Pro t ect ion Ground -Based Mid course Def ense

Jo in t Program Of f ice

Our Contracts

Page 7: S&A Pamphlet Sep 2010

Page 7

SETAC (Syst em s Engineer ing and Technical Assist ance Cont ract ),

Shearer & Associat es, Inc. is a t eam m em b er on t he f o llow ing Pr im es:

Syst em s St ud y and Sim ulat ion , Inc. (S3), W9113M-08-D-0002

DMD, LLC., W9113M-08-D-0003

Rad iance Techno logies, Inc., W9113M-08-D-0001

AMCOM Express, Shearer & Associat es, Inc., is a t eam m em b er on several con-

t ract s in t h is f am ily, allow ing us t o p rovid e t he f o llow ing services t o Red st one Ar -

senal and it s f ed eral t enan t s:

Program m at ic—CAS, W31P4Q-05-A-0024

Logist ics—Belzon , W31P4Q-05-A-0021

Logist ics—MSSI, W31P4Q-09-A-0011

Logist ics—Logico re, W31P4Q-09-A-0010

Techn ical—CSC, W31P4Q-05-A-0028

Business Analyt ical—ASI, W31P4Q-05-A-0017

Business Analyt ical—Navigat o r , W31P4Q-05-A-0018

CRANE, US Navy , Pr im e ITT/CAS, N00164-08-D-GR15, Sup p or t s a f u ll range o f engi-

neer ing sup p or t services t o t he US Naval Sur f ace War f are Cen t er

SeaPor t -e, US Navy , Sup p or t s a f u ll range o f engineer ing sup p or t services t o t he

US Navy and Shearer & Associat es, Inc. is a t eam m em b er on t he f o llow ing Pr im es:

CSC, N00178-04-D-4030

AMTEK, N00178-07-D-4950

Bar lingt on Bay, N00178-05-D-4209

USACE, Hunt sville Cent er , Arm y Met er ing Dat a Managem ent Syst em ,

Pr im e Calib re, W912DY-09-D-0006/Sub 14000000018

Page 8: S&A Pamphlet Sep 2010

Page 8

Program and Project Management

Shearer & Associat es, Inc. p rovid es com p rehensive

p rogram and p ro ject m anagem en t services w it h em -

p hasis on help ing clien t s successf u lly execut e t heir

p rogram s. We f ocus on m ain t ain ing t he scop e, sched -

u le, b ud get , and m ost im p or t an t ly, t he q ualit y o f any

p ro ject o f w h ich w e are a p ar t . Shearer p ersonnel are

exp er t s in t he p rocesses and req uirem en t s o f p ro ject

m anagem en t , esp ecially f o r t he governm en t , and can

seam lessly in t egrat e w it h t he p ro ject t eam t o d eliver

sup er io r resu lt s. We are p ro f icien t w it h m od ern m an-

agem en t so f t w are t oo ls and can ad ap t t hem t o t he

req uirem en t s o f our clien t s, w o rking on -sit e o r f rom

our o f f ices in Hun t sville.

Our Prog ram and Pro ject Managem en t serv ices o f f er t he f o llow ing advan t ages:

One point of responsibilit y f or all st akeholders dur ing t he lif e cycle of a

program or project

Full suit e of sof t w are and proven processes adapt able t o your require-

m ent s and organizat ion

Flexible w ork locat ion – on-sit e or of f -sit e

Focus on scope, schedule, budget and qualit y

Developm ent , m aint enance and execut ion of Project Managem ent Plan

Exper ience w it h t he processes and requirem ent s of m any Federal Govern-

m ent Agencies, allow ing seam less int egrat ion

Page 9: S&A Pamphlet Sep 2010

Page 9

Proven Experience

US Arm y Access Cont rol Point Program

(ACPP) Shearer & Associat es, Inc. p rovid es

Program Managem en t f o r all 49 CONUS inst al-

lat ions and 33 out sid e t he Con t inen t al

(OCONUS) inst allat ions in f our coun t r ies as

w ell as 10 Phase III inst allat ions.

US Arm y Facilit y Reduct ion Program (FRP)

Shearer & Associat es, Inc. w o rks w it h t he US Arm y

Inst allat ion Managem en t Com m and (IMCOM) w or ld -

w id e t o d em o lish excess f acilit ies f rom t he Real

Prop er t y inven t o ry.

Nat ional Guard Bureau Advisory and Assist ance Services

Shearer & Associat es, Inc. p rovid es services t o t he Nat ional

Guard Bureau f o r all o f t he Const ruct ion and Facilit y Manage-

m en t Of f ice (CFMO) o rgan izat ions o f t he var ious st at es, t er r it o -

r ies, and Dist r ict o f Co lum b ia.

Corporat e Secur it y f or a Major Wireless

Car r ier As a sub cont ract o r t o Kling -St ub b ins,

Shearer & Associat es, Inc. sup p o r t s t he Cor -

p o rat e Secur it y Group f o r a m ajo r w ireless

p hone service p rovid er ; includ ing t he com -

p rehensive m anagem en t o f t he r isk assess-

m en t p rocess, d esign , im p lem en t at ion , in -

st allat ion , and com m ission ing o f net w orked

elect ron ic secur it y up grad es at d at a cen t er and ret ail locat ions t h roughout t he east

and w est coast s.

Page 10: S&A Pamphlet Sep 2010

Design and Construction Management

Shearer & Associat es, Inc. can b r ing your p ro -

ject t o f ru it ion . Our d esign & const ruct ion

m anagem en t cap ab ilit ies includ e p re-

const ruct ion d esign review s t o ensure t he

b id d ab ilit y, const ruct ab ilit y, and op erab ilit y

o f a d esign , as w ell as value engineer ing as-

sessm en t s. Once t he d esign has b een re-

view ed , w e can assist in t he select ion o f

q ualif ied con t ract o rs and t he nego t iat ion o f

t he const ruct ion con t ract t h rough d esign ,

b id , b u ild and d esign /b u ild m et hod s.

Dur ing const ruct ion w e p rovid e q ualit y assurance t h rough on -sit e sup ervision , f acili-

t at ing con t inuous com m un icat ion b et w een t he con t ract o r (s) and clien t , and m on i-

t o r ing t he p ro ject b ud get and schedule. Af t er const ruct ion is com p let e, w e sup p o r t

t he occup ancy and st ar t -up t o m ake sure our clien t can accep t d elivery w it h con f i-

d ence.

Our Design & Const ruct ion Managem ent serv ices of f er t he f o llow ing advan t ages:

A-E design cont ract m anagem ent ; Bid -abilit y , Const ruct abilit y , and Operabil-

it y (BCO) review s; and Value Engineer ing Assessm ent s

Const ruct ion cont ract m anagem ent ; on -sit e qualit y assurance and over -

sight

Cash-f low , cost , and schedule m anagem ent

Occupancy and st ar t -up suppor t ; operat ion and m aint enance procedure co-

ordinat ion; w ar rant y m anagem ent ; and com plet ed f acilit y analysis.

Page 10

Page 11: S&A Pamphlet Sep 2010

Proven Experience

Kennedy Cent er f or t he Per f orm ing Ar t s Shearer & Asso -

ciat es, Inc. p rovid ed sup p o r t t o t he US Arm y Corp s o f Engi-

neers, Hun t sville Cen t er f o r t he Inst allat ion Sup p or t Facilit y

Rep air and Renew al (FRR) Program ef f o r t s at t he Kenned y

Cen t er f o r t he Per f o rm ing Ar t s in Wash ingt on , D.C.

NASA Shearer & Associat es, Inc. p rovid ed m anagem en t sup p o r t t o

t he US Arm y Corp s o f Engineers' ef f o r t t o rep air d am age t o t he Mi-

choud Facilit y in New Or leans f o llow ing Hur r icane Kat r ina.

USACE Mobile Dist r ict As a sub con t ract o r t o Thom p son Engineer ing,

Shearer & Associat es, Inc. is p rovid ing elect r ical d esign and const ruct ion m anage-

m en t sup p o r t t o t he Nor t h Alab am a Area Of f ice o f t he Const ruct ion Division , US

Arm y Corp s o f Engineers, Mob ile Dist r ict .

Sof t w are Engineer ing Direct orat e, Redst one Arsenal

Shearer & Associat es, Inc. has b een act ively sup p o r t ing t he So f t -

w are Engineer ing Direct o rat e (SED) in t he d evelop m en t o f t he

req uirem en t s (p lann ing, p rogram m ing, & b ud get ing) f o r t he

new SED f acilit y. Shearer & Associat es also p rovid es const ruc-

t ion m anagem en t sup p o r t f o r t he $40M Syst em s So f t w are Engi-

neer ing Annex (SSEA). The SSEA is a t w o p hase m ilit ary const ruct ion p ro ject ad d ing a

t h ird b u ild ing t o t he com p lex.

Arnold Engineer ing and Developm ent Cent er , Arnold AFB

Shearer & Associat es, Inc. p rovid ed const ruct ion m anage-

m en t services in sup p o r t o f t he Phase V Jet Engine Air Induc-

t ion Syst em Up grad e at Arno ld Air Force Base, US Arm y Corp s

o f Engineers, Mob ile Dist r ict .

Annist on Arm y Depot Shearer & Associat es, Inc. is p rovid ing elect r ical d esign and

const ruct ion m anagem en t sup p o r t t o t he Nor t h Alab am a Area Of f ice o f t he Con-

st ruct ion Division , US Arm y Corp s o f Engineers, Mob ile Dist r ict .

Page 11

Page 12: S&A Pamphlet Sep 2010

Page 12

Master Planning, Programming and Budgeting

Shearer & Associat es, Inc. has ext ensive exp er ience sup p o r t ing t he m ast er p lann ing

act ivit ies o f our clien t s. Our exp er t ise sp ans t he en t ire p rocess f rom ear ly concep t

st ages t h rough p rogram m ing d ocum en t at ion such as t he DD Fo rm 1391. We w ill

w o rk w it h you t o evaluat e exist ing need s, cap ab ilit ies, and resources, as w ell as f u-

t ure concerns t o est ab lish a m ast er p lan t hat consid ers t he com p lex d em ands af f ect -

ing any f acilit y eng ineer ing p ro ject .

Ou r Mast er Plann ing , Prog ram m ing , and Budget ing serv ices o f f er t he f o llow ing :

Developm ent of concept plans and requirem ent s analyses

Def init ion of design cr it er ia, sit t ing analysis, and m anagem ent of design

char ret t es

Preparat ion, and m aint enance, of project just if icat ion docum ent s, includ-

ing t he MILCON DD 1391 and ENG 3086

Conf irm at ion t hat t he project is in com pliance w it h applicable st andards,

including environm ent al com pliance and budget ary const raint s

Page 13: S&A Pamphlet Sep 2010

Page 13

Proven Experience

Modif ied Facilit y Ut ilizat ion St udy

(MFUS) For t Huachuca, Ar izona Shearer

& Associat es, Inc. per f o rm ed a Mod if ied

Facilit y Ut ilizat ion St ud y o f ap p roxi-

m at ely 1,046,000 sq uare f eet o f b u ild ing

sp ace at Fo r t Huachuca, AZ. The f acilit ies

survey consist ed o f b ar racks, ad m in ist ra-

t ive, inst ruct ional, and recreat ional

sp aces.

Facilit y Reduct ion Program (FRP), Modif ied Facilit y Ut ilizat ion St udy (MFUS) Pr o-

gram , For t Lew is, Washingt on Shearer & Associat es, Inc. p er f o rm ed engineer ing

services in sup p o r t o f FRP at Ft . Lew is, includ ing on -sit e d at a gat her ing and survey,

t echn ical d ocum ent analysis, and rep or t ing f ind ings.

Page 14: S&A Pamphlet Sep 2010

Page 14

Cost Engineering and Scheduling

Shearer & Associat es, Inc. has sub st an t ial

exp er ience in p repar ing and m ain t ain ing

cost eng ineer ing and scheduling d ocu-

m en t s using ind ust ry st and ard so f t w are.

We can p rep are b o t t om up cost est im at es

using t he clien t -p ref er red so f t w are t o d e-

liver b ud get ary o r p aram et r ic est im at es. If

necessary, our st af f can act as an ow ners'

rep resen t at ive d ur ing cost analysis and ne-

go t iat ions. Fo r sched ules, w e are w ell

versed in d et erm in ing cr it ical t asks and es-

t ab lish ing t he cr it ical p at h f o r p ro ject execut ion w it h ap p rop r iat e m ilest ones. When

asked t o m ain t ain sched ules, w e con t inually evaluat e act ual p er f o rm ance versus ex-

p ect ed p er f o rm ance and ad vise our clien t s w here co r rect ive act ion m ay b e neces-

sary t o m ain t ain sched ule.

Our Cost Eng ineering & Schedu ling services o f f er t he f o llow ing :

Met iculous budget ary and param et r ic cost est im at es using MCACES, RS

Means, and ot her syst em s

Analysis of t ask dependencies t o est ablish t echnical, procedural and im -

posed precedence

Schedule t racking t o ensure t asks required t o m eet t he cr it ical pat h sched-

ule are com plet ed on-t im e

Preparat ion and m aint enance of schedules, and resource assignm ent , using

MS Project , Pr im avera, Open Plan and ot her syst em s

Page 15: S&A Pamphlet Sep 2010

Page 15

Proven Experience

Ut ilit y Monit or ing and Cont rol Syst em s

(UMCS) Program Shearer & Associat es, Inc. p ro -

vid ed cost est im at ing services in sup p o r t o f t he

p rep arat ion , nego t iat ion , and aw ard o f con t ract

act ions f o r t he UMCS Prod uct Delivery Team , US

Arm y Corp s o f Engineers, Hun t sville Cen t er . An-

nual con t ract ob ligat ions f o r t he UMCS t eam f o r

t h is p er iod w ere in excess o f $125M.

Wat er Secur it y Syst em s (WSS) Progr am Shearer & Associat es, Inc. p rovid ed cost es-

t im at es, p rep ared using Micro -com p ut er Aid ed Cost Engineer ing Syst em (MCACES),

f o r f our US Arm y Corp s o f Engineers d am p ro ject s, US Arm y Corp s o f Engineers,

Hun t sville Cen t er .

Page 16: S&A Pamphlet Sep 2010

Page 16

Electronic and Physical Security Systems Engineering

Shearer & Associat es, Inc. is p ro f icien t in t he d esign and evaluat ion o f elect ron ic and

p hysical secur it y syst em s. We are exp er ienced in p rovid ing vu lnerab ilit y assessm en t s

f ocused on a var iet y o f t h reat s and ad vising our clien t s on m it igat ion st rat eg ies t o se-

cure t heir f acilit ies, resources, and m ost im p or t an t ly, t heir p eop le.

Ou r Elect ron ic and Physical Securit y Syst em s Eng ineering serv ices o f f er:

Secur it y vulnerabilit y assessm ent s cover ing physical, e lect ronic, chem ical,

and biological t hr eat s

Evaluat ion of f ire and lif e saf et y program s, secur it y syst em int egrat ion, and

operat ional readiness

Com prehensive elect ronic secur it y syst em designs int egrat ing access con-

t rol, CCTV, alarm s, cont rols, secur it y light ing, and ot her appropr iat e t ech-

nologies

Physical secur it y consult ing based on a com plet e sit e analysis consider ing

access locat ions, t raf f ic f low , parking, and bar r ier or f ence syst em s

Training of client personnel in physical and elect ronic secur it y syst em s,

t echniques and pr ocedures

Page 17: S&A Pamphlet Sep 2010

Page 17

Proven Experience

Access Cont rol Point Program (ACPP) Secur it y Int egrat ion Design and Engineer ing – p ro -

vid ed q ualif ied p ersonnel f o r t echn ical assist ance, t rain ing, indep end en t t echn ical review and

engineer ing services t o assist t he US Arm y Engineer ing and Supp or t Cent er Hunt sville and d es-

ignat ed secur it y in t egrat o r con t ract or p ersonnel in t he develop m ent o f design p rod uct s and

syst em inst allat ion packages f o r ACPEP and AIE in f rast ruct ure, eq uip m ent and syst em s.

Access Cont rol Point Equipm ent Program (ACPEP) – supp or t ed t he ACPEP, US Arm y Corps o f

Engineers, Hunt sville Cen t er b y d evelop ing St at em ent s o f Work, Blanket Purchase Agreem ent s,

m anaging t he in f orm at ion d at ab ase, conduct ing surveys, t rain ing f ield engineers on t he st an -

d ards, and p rovid ing on -sit e assist ance. In ad d it ion , w e p rovid ed p rogram m anagem ent and

f ield engineer d esign supp or t at num erous inst allat ions.

Aviat ion & Missile Research, Developm ent , & Engineer ing Com m and (AMRDEC) – sup -

p or t ed t he AMRDEC Secur it y Up grad e Program consist ing o f a Secur it y Syst em s Mast er Plan , a

Syst em Level Concep t , and a Phase One Design .

Elect ronic Secur it y Syst em (ESS), Calif ornia Nat ional Guard – p rovided Elect ron ic Secur it y

Syst em s (ESS) secur it y engineer ing and o t her relat ed elect ron ic syst em s d esign services f o r t he

Calif o rn ia Nat ional Guard .

Picat inny Arsenal Access Cont rol Point Archit ect ural/Engineer ing (A/E) Design – p rovided

d esign services t o assist US Arm y Corp s o f Engineers w it h t he develop m ent o f d esign and sys-

t em inst allat ion f o r t he up grade and rep lacem ent o f f our (4) o f t he Inst allat ion ’s Access Con-

t ro l Po in t s.

Elect ronic Secur it y Syst em (ESS) Design, Landst uhl Regional Arm y Medical Cent er – p ro -

vid ed t he d esign , t echn ical assist ance, t rain ing, and ind epend en t t echn ical r eview services f o r

t he Land st uh l Regional Med ical Cen t er in Landst uh l, Germ any in supp or t o f USACE.

Elect ronic Secur it y Syst em (ESS) Design f or Eight US Arm y Inst allat ions in Okinaw a, Ja-

pan – d evelop ed det ailed designs f o r new b ase-w id e secur it y syst em s f or eigh t US Arm y Inst al-

lat ions in Okinaw a, Jap an .

Elect ronic Secur it y Syst em (ESS) Design f or t he President ial Palace Com plex in Kabul, Af -

ghanist an – p repared a d esign t o inst all Elect ron ic Secur it y Syst em s (ESS) at t he Presid en t ial

Palace Com p lex in Kab ul, Af ghan ist an . Syst em s includ ed closed cir cuit t elevision (CCTV) syst em s,

in t rusion d et ect ion syst em s (IDS), em ergency w arn ing syst em s (EWS), and ligh t ing syst em s.

Elect ronic Secur it y Syst em (ESS) Design f or t he Por t of Galvest on, Texas – p rovid ed de-

sign , t echn ical assist ance, t r ain ing, and indep end en t t echn ical review services t o t he Por t o f

Galvest on in sup por t o f t heir p hysical and elect ron ic secur it y syst em s up grad es.

Secur it y Assessm ent s f or Pf izer , Inc. – p rovid ed q ualif ied secur it y consult an t s t o cond uct

secur it y and ant it er ro r ism assessm ent s as p ar t o f and supp or t t o an organ ized assessm ent

t eam m anaged b y Pf izer , Inc.

Page 18: S&A Pamphlet Sep 2010

Page 18

Energy Management and Control Systems Engineering

Shearer & Associat es, Inc. can help red uce your o rgan izat ion 's energy cost s. Our st af f

is exp er ienced in p rep ar ing energy -use assessm en t s w h ich consid er t he w ays energy

is used (ligh t ing, m ach inery, clim at e-con t ro l, et c.) and w here it com es f rom (elect r ic

u t ilit y, gas, o r alt ernat ive energy). By looking at b o t h t he sup p ly and d em and , w e can

m ake recom m end at ions t hat w ill result in im m ed iat e and sub st an t ial red uct ions in

energy consum p t ion and cost . We can also p rovid e ligh t ing st ud ies and saf et y analy-

ses o f your f acilit y 's elect r ical syst em s.

Our Energy Managem en t & Con t ro l Syst em s Eng ineering serv ices o f f er:

Energy audit s evaluat ing t he energy sources and uses in place at your f acil-

it y and recom m endat ions t o reduce consum pt ion

Heat ing, vent ilat ion, and air -condit ioning m odeling and analysis t o ident if y

pot ent ial savings t hat m ay be achieved t hrough sim ple cont rol syst em

changes or t he inst allat ion of high ef f iciency syst em s

Ut ilit y cost analysis and m et er ing t o ensure t hat energy charges are accu-

rat e and t hat t he best rat e is negot iat ed w it h t he provider

Lif e-cycle cost analysis f or energy savings project s consider ing t he payback

per iod and long t erm cost s of t he project

Saf et y: Arc Flash Analysis, Shor t Circuit Analysis, and Breaker Coordinat ion

St udies

Page 19: S&A Pamphlet Sep 2010

Page 19

Proven Experience

Elect r icit y Met er ing Im plem ent at ion Plan f or Naval Facilit ies Engineer ing Ser -

vice Cent er , Por t Huenem e, Calif ornia Shearer

& Associat es, Inc. help ed t he Navy f o rm ulat e

som e o f it s im p lem en t at ion p o licy f o r Ad vanced

Met er ing. Skills u t i lized in t he p er f o rm ance o f

t h is con t ract w ere sp ecialt y engineer ing and d e-

sign f o r m et er ing in t egrat ion , com m un icat ions,

p ro ject m anagem en t , and syst em s d esign f o r

aut om at ed m et er read ing f o r Navy inst allat ions.

The scop e o f w o rk f o r t h is con t ract w as as f o llow s:

Com p are elect r ic m et er ing syst em s t o includ e cap ab ilit ies, in t erop erab ilit y, dat a

t ransm ission p ro t oco ls and cost s. Id en t if y m et er ing ap p licat ions w h ich could b e

st and ard ized . Develop a list o f consid erat ions f o r id en t if ying t he elem en t s o f an in -

st allat ion m et er ing p lan .

Det erm ine t he cost o f elect r icit y m et er ing syst em s t hat m eet t he in t en t o f p ro -

p osed energy legislat ion , su it ab le f o r b illing p urp oses, and p rovid e energy m anage-

m en t cap ab ilit y. Includ e hard w are, so f t w are, com m unicat ions, sp are p ar t s, d at a co l-

lect ion and analysis, m ain t enance and use o f m et ered d at a t o af f ect consum p t ion .

Develop a gener ic m et er ing sp ecif icat ion . Th is d ocum en t should b e com p at ib le

w it h DOD in f o rm at ion t echno logy, aut om at ed con t ro l syst em s, and b illing syst em s.

It should includ e f eat ures t o cost ef f ect ively p er f o rm energy m anagem en t f unc-

t ions and ensure in t erop erab ilit y f o r d at a t ransf er and analysis. The sp ecif icat ion

should enab le DOD t o m in im ize t he num b er o f d isp arat e hard w are and so f t w are

syst em s on each inst allat ion .

Analyze m et er cost s and savings at t h ree DOD inst allat ions. List t yp es and p urp ose

o f m et ers f ound , quan t it y, m echan ical/d ig it al/p ow er p aram et ers m easured , b rand

nam e, how m et ers are read , and w hat t he m et er d at a is used f o r . Id en t if y act ual

user energy saving m easures and savings resu lt ing f rom inst allat ion o f t hese m e-

t ers. Fo r each energy saving m easure f ound , id en t if y cost s t o im p lem en t t hose

m easures and resu lt an t savings. No rm alize m et ered d at a f o r w eat her , b uild ing

hours o f op erat ion , and m ission /use change. Det erm ine exp ect ed , realist ic, no rm al-

ized savings DOD inst allat ions ach ieved versus t he cost t o im p lem en t t he savings

m easures.

Page 20: S&A Pamphlet Sep 2010

Page 20

Logistics and Sustainability

Shearer & Associat es, Inc. can help you p lan f o r t he lif e -cycle sust ainm en t o f your

eq u ip m en t and syst em s. Our logist ics p lann ing and m anagem en t st af f is exp er t in as-

sist ing cust om ers in est ab lish ing t ailo red p rogram s t o assure t he sup p ly, m ain t e-

nance, sust ainm en t and up grad e o f equ ip m en t and syst em s f o r t he d esigned lif e -

cycle and b eyond . We can assess a set o f asset s, d ef ine st ock, m ain t enance and t rain -

ing req uirem en t s and est ab lish p rocesses t o ob t ain each . Ad d it ionally, w e have t he

cap ab ilit y t o m anage t hose asset s b y m on it o r ing st ock levels, recur r ing cer t if icat ion ,

t rain ing, d ocum en t at ion , recur r ing/p reven t at ive m ain t enance visit s and assist ing w it h

rep lacem en t and up grad es as need ed .

Our Log ist ics & Sust ainab ilit y Plann ing serv ices o f f er:

Lif e-Cycle Sust ainm ent Assessm ent and Planning

On-Sit e Supply Chain Managem ent and/or Developm ent

Warehouse and Supply St ock/Level Managem ent

Applicat ion of Advanced Technology in Lif e -Cycle Managem ent

Tim e-In-Mot ion St ream line in Supply, Transpor t at ion, Manuf act ur ing and

Maint enance

Door -t o-Door Transpor t at ion Coordinat ion

Page 21: S&A Pamphlet Sep 2010

Page 21

Proven Experience

US Arm y Corps of Engineers, Hunt sville Cent er ,

Access Cont rol Point Equipm ent Program

(ACPP) Shearer & Associat es, Inc. p rovid ed exp er t

m anagem en t t o assist t he US Arm y Corp s o f Engi-

neers, t he Prod uct Manager f o r Fo rce Pro t ect ion

Syst em s (PM-FPS) and t he US Arm y Of f ice o f t he

Provost Marshal General (OPMG) w it h f ield ing and

sust ain ing t housand s o f p ieces o f h igh vo lum e,

low d ensit y Fo rce Pro t ect ion Eq uip m en t .

US Arm y Nat ional Guard Bureau (USARNGB) Access Con-

t rol Point Equipm ent Program Sust ainm ent Shearer &

Associat es, Inc. p rovid es research , d evelop m en t o f req uire-

m en t s and p er f o rm ance w ork st at em en t s, m anaging t he

o rd er ing, d elivery, inst allat ion and t rain ing o f m ult ip le sys-

t em s at 53 st at es and t er r it o r ies nat ionw id e.

Page 22: S&A Pamphlet Sep 2010

Page 22

Training and Facilitation

Shearer & Associat es, Inc. can f u lf i ll all your o rgan izat ion ’s t rain ing and f acilit at ion re-

q uirem en t s. We have h igh calib er inst ruct o rs/p resen t ers availab le t o d eliver excep -

t ional t rain ing in d iverse arenas. In ad d it ion , Shearer em p loys several coo rd inat o rs

skillf u l in even t p lann ing and log ist ics aid in m eet ing f acilit at ion .

Ou r Train ing and Facilit at ion serv ices p rov ide t he f o llow ing :

Com prehensive suppor t f or on or of f -sit e t raining event s

Speakers/ Inst ruct ors t o m eet t he needs of our cust om ers

Logist ics suppor t t o ensure event s run sm oot hly

Facilit at ed discussion t o br ing t he best out of every par t icipant

Page 23: S&A Pamphlet Sep 2010

Proven Experience

Pf izer Headquar t ers, New York Cit y , New

York The Shearer & Associat es, Inc. t eam p ro -

vid ed t he necessary sup p o r t t o d evelop an

overall secur it y p lann ing d ocum en t t hat w as

m ad e availab le t o all Pf izer elem en t s t o aid in

t heir im p lem en t at ion o f ap p roved secur it y

p ract ices w it h in t he Pf izer o rgan izat ion . The

in it ial d ocum en t w as generalized in con t en t ,

lead ing t o m ore d et ailed m et hodo log ies and

p roced ures f o r im p lem en t ing all f acet s o f Se-

cur it y Plann ing. The secur it y p lann ing d ocum en t p rovid ed a p at h f o rw ard f o r exist ing

Pf izer inst allat ions, and w ill u lt im at ely p rovid e f o r recom m end ed secur it y eq u ip m en t

and p ract ices t o b e im p lem en t ed t h roughout Pf izer .

Deliverab les included : Overall Plann ing and Prep arat ions Manual; Survey Proced ures and

Req uirem en t s Def in it ion ; Migrat ion Plann ing Manual; Eq uip m en t and Pract ices Def in i-

t ion Manual; Ind ividual Sit e Survey Rep or t s

US Arm y Corps of Engineers - Hunt sville Cent er The Shearer & Associat es, Inc. t eam

d evelop ed , p resen t ed and f acilit at ed a t w o -d ay Team Lead ersh ip Ret reat t o gain self -

aw areness and b u ild relat ionsh ip s. Th is t rain ing includ ed areas such as Cond uct ing Ef -

f ect ive Meet ings; Fo rm al Train ing; Lead ing Team s and Group s; 17 Ir ref u t ab le Law s o f

Team Work; assigned read ings w it h f acilit at ed d iscussions on : One Minut e Manager

Build s High Per f o rm ing Team s; ZAP; How To Win Fr iend s and In f luence Peop le; The Wis-

d om o f Team s and ; Discover Your St rengt hs. We f acilit at ed t he d evelop m en t o f a Team

Pro ject p resen t at ion ; Facilit at e one group d iscussion at level II and st ud en t cen t r ic Per -

sonal Ref lect ion Essay.

Page 23

Page 24: S&A Pamphlet Sep 2010

Page 24

Communications Engineering

Shearer & Associat es, Inc. eng ineers p ossess t he t elecom -

m un icat ions d esign skills t o m eet your com m unicat ions

need s. We are f am iliar w it h t he govern ing cod es and

regulat ions t hat af f ect t he d esign t elecom m unicat ions

ind ust ry. We have t he essen t ial aw areness o f our clien t s’

com m unicat ions req uirem en t s. We consid er all asp ect s

o f com m un icat ions includ ing vo ice, d at a and vid eo com -

m un icat ions; bu ild ing aut om at ion syst em s; and elect r ical

p ow er in t o , out o f , and w it h in t he p rop er t y.

These design considerat ions include:

Media Opt ions select ion – copper , f iber and w ireless

Out side Plant Requirem ent s f rom t he proper t y dem arcat ion point f or build ing

ent ry and exit

Building Layout f or Term inat ion Requirem ent s at t he desk and t hroughout t he

f acilit y

Hor izont al Dist r ibut ion Syst em s f or code com pliance

Backbone Dist r ibut ion Syst em s t hroughout t he single st ruct ure or cam pus

st yle f acilit y

Telecom m unicat ions Equipm ent Room Layout f or m axim um ut ilizat ion of

space

Field Test ing f or inst allat ion ver if icat ion and com m issioning of t he syst em

Telecom m unicat ions Adm inist rat ion cover ing t agging, labeling and t racking of

connect ions

Telecom m unicat ions Project Managem ent f rom cradle -t o-grave project cover -

age

Fire-st opping t hr ough w alls, f loors and ceilings t o m it igat e sm oke and f ire

progression

Pow er Dist r ibut ion f or all com m unicat ions equipm ent

Grounding, Bonding and Elect r ical Prot ect ion as required by code or t he

equipm ent m anuf act urer 's recom m endat ions

Local Area Net w orking and Int ernet w orking t hat m eet s t he client s exist ing

and f ut ure needs

Page 25: S&A Pamphlet Sep 2010

Page 25

Shearer & Associat es em p loyees can p rovid e

a f u ll d esign in com p liance w it h EIA/TIA st an -

d ard s 568A-B, 569A and ap p licab le st and ard s

relat ed t o t he t elecom m un icat ions ind ust ry.

Designs includ e Out sid e Plan t t elecom m uni-

cat ions b ackb one layout s t o p rop er t y d e-

m arcat ion locat ion ; f acilit y en t rances t o t ele-

com m unicat ions room s f o r cam p us and sin -

g le b uild ing layout s; m ed ia d et erm inat ion

f o r cop p er , f ib er o r w ireless; t elecom m uni-

cat ions Room and Closet layout d esign ; b ack-

b one cab ling f rom t elecom m un icat ions

room s t o t elecom m unicat ions closet s; ho r i-

zon t al cab ling f rom t elecom m unicat ions

closet s t o d esk areas o r d ist r ib ut ion p o in t s and rout ing d esign w it h lab eling o f cab les

f rom p o in t t o p o in t d at a b ase.

Ad d it ionally, our em p loyees have exper t ise in surveying exist ing com m un icat ion in -

f rast ruct ure f o r upgrad es and im p rovem en t s in com p liance w it h st and ard s. Th is in -

clud es com ponen t level select ion f o r p ar t icu lar req u irem en t s on d at a t ransm it t al,

vo ice and closed circu it t elevision signals f o r b o t h com m ercial o f f t he shelf syst em s

and sp ecial ap p licat ions com p onen t s f o r sp ecif ic need s. Th is sp ecialt y includ es sit e

surveys f o r m ed ia inst allat ion over m ult ip le st at e, coun t y and cit y ju r isd ict ions includ -

ing rout e select ion , m ult i -d uct -b ank housing con f igurat ions f o r SONET (Synch ronous

Op t ical Net w ork) r ings; t elecom m unicat ions d esign p ackage con t ract o r b id select ion

t echn ical assist ance; cust om er rep resen t at ion as const ruct ion p ro ject m anagem en t

o f inst allat ion ; t est p roced ures w r it ing f o r cer t if icat ion o f syst em s com p liance w it h

d esign cr it er ia; syst em t est w it nessing f o r cust om er w it h em p hasis on cust om ers’

need s; and f inal d ocum en t at ion o f inst alled syst em w it h all p er t inen t in f o rm at ion

show ing, d evice labels, cab le lab els, used cab les w it h sp ares, t erm inat ion o f all w ires

t o d evices, Op erat ion & Main t enance Manuals, f inal As-Built Draw ing and p ro ject close

out .

Proven Experience

Page 26: S&A Pamphlet Sep 2010

Our mission is to be the premier engineering organization for the development of infrastructure,

modernization and protection solutions.

because performance matters...

“Shearer & Associat es has been an

excellent subcont ract or and has al-

w ays delivered out st anding prod-

uct s. The governm ent cust om er

has been ext rem ely pleased w it h

t heir per f orm ance and relies heav-

ily on t hem f or t heir exper t ise in

t he area of m ilit ary const ruct ion.”

~ Frank R. Savage, SETAC Dep ut y

“I w ant t o express m y appreciat ion f or

t he out st anding qualit y of w ork provided

f or us by Shearer & Associat es. I am

pleased w it h all t he dedicat ion and hard

w ork t hat it t ook t o design Libby Dam an

Int egrat ed Secur it y Syst em .”

~ Char lie R. Com er , Secur it y Of f icer , Lib b y

Dam Pro ject

“Shearer & Associat es w as t asked t o prepare, coordinat e and review design

st andards. The t ask involved w orking w it h m ult iple Corps of Engineers of -

f ices plus Corps of Engineers cust om ers. Shearer & Associat es at t ent ion t o

det ail, coor dinat ion skills, ef f ect ive project m anagem ent and on t im e deliv-

ery cont r ibut ed m easurably t o t he success of t he t ask. Int ergraph Solut ions

Group t hanks Shearer & Associat es f or all t heir excellent suppor t and looks

f orw ard t o w orking w it h t hem on f ut ure endeavors.”

~ Roy Willis, Sen io r Manager , In t ergrap h So lu t ions Group

Page 27: S&A Pamphlet Sep 2010

Notes:

Page 28: S&A Pamphlet Sep 2010

Phone: 256-830-1031

w w w .shearerassociat es.us

4960 Corp orat e Dr ive

Suit e 100

Hun t sville, AL, 35805

Shearer & Associates, Inc.

For m ore inf orm at ion, cont act us at :

cont act .us@ shearerassociat es.us