s42sx
-
Upload
mihnea-bogdan-nicolaescu -
Category
Documents
-
view
215 -
download
0
Transcript of s42sx
8/12/2019 s42sx
http://slidepdf.com/reader/full/s42sx 1/4
Technical data:
SCHWING GmbHP.O. Box 20 0362D-44647 Herne/Germany (0)2325/*987-0Fax (0)2325/72922E-Mail: [email protected]://www.schwing.de
Subject to modifications in theinterest of technical progress.The exact standard scope ofdelivery is detailed in the offer.
Concrete pump Model P 2023 P 2525 H
Max. concrete output,theor.
Max. concrete pressure
Max. number of strokes per min. 30 22
Pumping cylinder( x stroke) 230 2 000 250 2500
Placing boom Model S 42 SX
Delivery line diameter DN 125
Length of end hose
Vertical reach
Horizontal reach from centerof slewing axis
Number of articulations 4
Lifting angle 93°
1st folding angle
2nd folding angle 180°
3rd folding angle 240°
Slewing range 370°
175°
SCHWING America, Inc.5900 Centerville Rd.St. Paul, MN 55127Ph: 651 429-0999Fax: 651 429-3464http://www.schwing.com
. ,.
.
. .
Truck-mountedconcrete pump
S 42 SX
196/150 213/163
psi/bars 1378/95 1233/85
ft./m
ft./m 137/41.80
ft./m 125/38.05
42'7"
1 3 ' 2 "
9" x 79 " 10" x 98"mmin.
12.5/4
cu/yd/hr/ m /h
8/12/2019 s42sx
http://slidepdf.com/reader/full/s42sx 2/4
The successful, field-proven42 m boom: now with the stabilizing system of the future.Coordination of load moment,structural weight and stabilizingwidth is a vital factor in large-boom truck-mounted concretepumps, determining onsitespace requirements. With con-
ventional designs, the neces-sary effective spans of 8 m ormore are dependent on foldingoutriggers. Unfolding thesetakes up considerable space,
a commodity in short supply ontoday’s confined sites.With this in mind, SCHWINGhas now upgraded its success-ful, field-proven standard boom,the KVM 42, with the modern
SX stabilizing system. Arc-shaped outriggers are locat -ed in longitudinal direction onthe vehicle frame, allowing
them to be longer. As they tele-scope on an orbital path, theyare extended laterally and for-ward simultaneously in thesame way as the linear X-stabi-lizer. The primary advantage
is that the stabilizers are posi-tioned parallel to each otherand not one above the other aswith the linear X-stabilizer. Thisis the only means of achieving
effective spans of 8 m or more.This layout also makes way fora lower structural height, leav-ing room for the installation ofpump assemblies with an extralong stroke. That accounts for
the other name given to thisstabilizing system:the Super-X stabilizer, in briefthe “SX”.
The opportunity to install pumpassemblies with a high maxi-mum output of up to 163 m 3 /hoffers the owner special bene-fits with a low stroke rate dur-ing the concreting operation,
meaning less wear, low fuel re-quirements, and a steady endhose during pumping.The heart of the concrete pumpis the Rock valve, a model of
pumping qualities, wear perfor-mance and operational de-pendability. The Rock valveand the integrated SCHWINGautomatic seal are patentedworldwide.
The SX stabilizer has also al-lowed the entire superstructureto be completely redesigned.It is now characterized by its
streamlining, its generousstowage space for the pumpaccessories, and smooth,large-area panel-work. In prac-tice this means:working safety and efficient,
fast cleaning of the entire su-perstructure. And even theunproblematic, operator-friend-ly 42 m placing boom with itssuccessful 4-section roll-and-
fold system excels itself withthis concept.
A structural concept that willhave a major impact on thedesign of large-boom concretepumps for many years to
come.
_ _ _
8/12/2019 s42sx
http://slidepdf.com/reader/full/s42sx 3/4
Convincing technology –the SCHWING S 42 SX in everyday operation.
long-stroke battery, and at thesame time makes for an unclut-tered superstructure.
It’s easy to see how the designprinciple of the Super-X outriggersmakes room for the impressive
to work in narrow city streets or on
restricted sites. The EASy systemis tested and certified by Germanliability insurers (BIA).
SCHWING EASy – our optional
single-sided set-up for fail-safeoperation when the pump can onlybe stabilized on one side. An ab-solute must for machines that need
The proven SCHWING 42 m boomand its work range.
Net horizontal reach
9 . 6
m u
n f o l d i n g h e
i g h t
Hose
_ _ _
8/12/2019 s42sx
http://slidepdf.com/reader/full/s42sx 4/4
Pump mechanics know thefeeling. In many cases the idealworking position just isn’t onthe cards with large-boompumps. Confined sites, fences,walls, trees and so on preventthe front outriggers from beingunfolded. Such site conditionscease to be a worst-case sce-nario with the SCHWING SXstabilizing system, thanks to
Long-stroke pump battery In addition to the obviousadvantages in outrigger tech-nology, our SX pattern hasmade it possible to build a reallong-stroke pump battery into a
concrete pump. At SCHWING,that means a battery with 2.5 mstroke!In such a battery, the sweptvolume of each concrete cylin-der is so large that the max.pumping volume of 163 m 3 /hcan be achieved with only22 strokes.On every-day jobs, where theaverage output lies by roundabout 75 m 3 /h, the stroking ratedrops to an astonishing12 per minute. And that meanscorrespondingly low wear costsper m 3 of concrete pumped.
Technical harmony – theP 2525 H long-stroke batterycombined with the E-Rock.
Concrete flows from the 250 mmdiameter cylinders through thelengthened and widened Rockwithout any corners or bottle-necks and without energy-con-suming congestion.
The ROCK Standard, G-Rock or E-Rock?The standard Rock is theclassic valve that stands forefficiency and economy inconcrete pumping circles.
The G-Rock is the extendedversion of the standard Rockand is especially suitable fordifficult, stiff concrete mixes.The E-Rock is extended andwidened to become the ideal
complement for the long-strokebattery 2525 H with 250 mmconcrete cylinders. Carbidewear parts available on optionto provide even longer servicelives.
Radio remote control in combi-nation with proportional boomhydraulics for finger-tip easycontrol without overshooting.SCHWING MPS 2-circuithydraulics for concrete pumpensure quiet and fast shifting ofthe Rock and thereby keep theend hose nice and steady.
Loads of stowage room, fold-up steps, a lockable hopperhood, working lights andnumerous safety devices inthe CE version.
The standard version of amachine that has more to offerthan normal.
the telescoping front outriggers.This system not only makesfor short set-up times but canalso add decisively to theworking range of the placingboom.
After all, the closer you get,the greater the advantagesare!
The days are now past whereheavy slew/telescope outrig-gers took up not only room onthe jobsite, but also valuablespace on the concrete pump.One cylinder plus actuation foroutrigger slew. One cylinderplus actuation for telescoping.Two slider sections with theirfriction and wear areas. Andthat not to mention the weightconcerned!Now only one moving part isneeded – and thereforeonly one actuator. Even thehydraulic cylinder has disap-peared, to be replaced by alow maintenance high-performance cable pull.Naturally the multitude ofhoses, fittings and valves hasalso disappeared, along withthe tedious greasing of pinsand bushings.
The cylinder for the outriggerleg is fully protected insideits strong square tube. And thefoot plate is rigidly weldedonto the extension tube toeliminate any risk of it sl ippingor of the cylinder rod gettingdamaged.Clearly visible in the sketch isthe strong, full-length twinframe that conducts all boomand pump reaction forcessafely into the outriggers andthen into the ground.The one-piece stabilizer arms(front and rear) achieve a fur-ther goal by eliminating themid-way telescope points thatlead to undesirable machine“bounce”.The rear right-hand outrigger ispurpose designed as a watertank. The rear left arm can beequipped as a booster tank fordiesel fuel (optional).
S 42 SX: large boom pump with no foldingoutriggers at the front. Only 8.3 m stabilizing width.
Long-stroke pump battery and E-Rock –a new dimension in concrete pumping.
_ _ _ _