S3e Cell Sorter Daily Activities - Bio-Rad Laboratories · 2015. 12. 9. · Bulletin 6705 Ver A...

2
Bulletin 6705 Ver A 15-1225 1115 + Optional Required Optional Required Ensure loading stage is in Wash position Click Run QC button Review QC report Pass: Click check button Fail: Repeat QC Move loading stage to Run position Review drop delay Choose correct Bead Lot file Load tube containing ten drops (0.5 ml) ProLine Universal Calibration Beads Move loading stage to Wash position Click Shutdown button Move loading stage to Run position Click Yes to shut down system Click Clean System button Load tube containing 4 ml cleaning solution (10% bleach or 70% ethanol) Apply setting required Select High Pressure Clean When cleaning cycle is complete, move loading stage to Wash position Review message, then click Yes to continue Review warning, then click Yes to continue Move loading stage to Run position Load tube containing 4 ml detergent or enzyme-based solution Review warning, then click Yes to continue Click Start-Up button Select startup time After clean cycle is complete (2 min), move loading stage to Wash position and remove tube Quality Control Now proceed with Step 2 of the Daily Shutdown Procedure. 3 2 1 3 2 1 5 6 4 2 1 3 4 5 6 7 8 2 1 3 4 5 6 7 Daily Startup and Quality Control On a daily basis, the S3e Cell Sorter requires approximately 20 minutes of warm-up time before running quality control (QC) or any samples. To warm up the system: Daily Shutdown Procedure These steps should be performed after the last sort of the day: High Pressure Clean For a more stringent cleaning process, these steps should be performed after the last sort of the day: Important! Prior to shutdown, make sure that you have saved all open protocols. Important! Prior to shutdown, make sure that you have saved all open protocols. S3e Cell Sorter Daily Activities

Transcript of S3e Cell Sorter Daily Activities - Bio-Rad Laboratories · 2015. 12. 9. · Bulletin 6705 Ver A...

Bulletin 6705 Ver A 15-1225 1115

+

Optional

Required

Optional

Required

Ensure loading stage is in Wash position

Click Run QC button

Review QC reportPass: Click check button Fail: Repeat QC

Move loading stage to Run position

Review drop delayChoose correct Bead Lot file

Load tube containing ten drops (0.5 ml) ProLine™ Universal Calibration Beads

Move loading stage to Wash position

Click Shutdown button Move loading stage to Run position

Click Yes to shut down system Click Clean System button

Load tube containing 4 ml cleaning solution (10% bleach or 70% ethanol)

Apply setting required Select High Pressure Clean

When cleaning cycle is complete, move loading stage to Wash position

Review message, then click Yes to continue

Review warning, then click Yes to continue

Move loading stage to Run position

Load tube containing 4 ml detergent or enzyme-based solution

Review warning, then click Yes to continue

Click Start-Up button Select startup time

After clean cycle is complete (2 min), move loading stage to Wash position and remove tube

Quality Control

Now proceed with Step 2 of the Daily Shutdown Procedure.

321

321

5 64

21 3

4 5 6

7 8

21 3

4 5 6

7

Daily Startup and Quality Control

On a daily basis, the S3e Cell Sorter requires approximately 20 minutes of warm-up time before running quality control (QC) or any samples. To warm up the system:

Daily Shutdown Procedure

These steps should be performed after the last sort of the day:

High Pressure Clean

For a more stringent cleaning process, these steps should be performed after the last sort of the day:

Important! Prior to shutdown, make sure that you have saved all open protocols. Important! Prior to shutdown, make sure that you have saved all open protocols.

S3e™ Cell Sorter Daily Activities

S3e™ Cell Sorter Daily Activities

S3eCell Sorter

bio-rad.com/web/S3eWelcome