s3-us-west-2.amazonaws.com · 2020-06-03 · 2. limit live load vertical deflection of trusses to...
Transcript of s3-us-west-2.amazonaws.com · 2020-06-03 · 2. limit live load vertical deflection of trusses to...
![Page 1: s3-us-west-2.amazonaws.com · 2020-06-03 · 2. limit live load vertical deflection of trusses to span / 480. 3. general contractor shall coordinate mechanical duct routing through](https://reader033.fdocuments.in/reader033/viewer/2022050413/5f89c0206233081a6279f151/html5/thumbnails/1.jpg)
![Page 2: s3-us-west-2.amazonaws.com · 2020-06-03 · 2. limit live load vertical deflection of trusses to span / 480. 3. general contractor shall coordinate mechanical duct routing through](https://reader033.fdocuments.in/reader033/viewer/2022050413/5f89c0206233081a6279f151/html5/thumbnails/2.jpg)
![Page 3: s3-us-west-2.amazonaws.com · 2020-06-03 · 2. limit live load vertical deflection of trusses to span / 480. 3. general contractor shall coordinate mechanical duct routing through](https://reader033.fdocuments.in/reader033/viewer/2022050413/5f89c0206233081a6279f151/html5/thumbnails/3.jpg)
![Page 4: s3-us-west-2.amazonaws.com · 2020-06-03 · 2. limit live load vertical deflection of trusses to span / 480. 3. general contractor shall coordinate mechanical duct routing through](https://reader033.fdocuments.in/reader033/viewer/2022050413/5f89c0206233081a6279f151/html5/thumbnails/4.jpg)
![Page 5: s3-us-west-2.amazonaws.com · 2020-06-03 · 2. limit live load vertical deflection of trusses to span / 480. 3. general contractor shall coordinate mechanical duct routing through](https://reader033.fdocuments.in/reader033/viewer/2022050413/5f89c0206233081a6279f151/html5/thumbnails/5.jpg)
![Page 6: s3-us-west-2.amazonaws.com · 2020-06-03 · 2. limit live load vertical deflection of trusses to span / 480. 3. general contractor shall coordinate mechanical duct routing through](https://reader033.fdocuments.in/reader033/viewer/2022050413/5f89c0206233081a6279f151/html5/thumbnails/6.jpg)
![Page 7: s3-us-west-2.amazonaws.com · 2020-06-03 · 2. limit live load vertical deflection of trusses to span / 480. 3. general contractor shall coordinate mechanical duct routing through](https://reader033.fdocuments.in/reader033/viewer/2022050413/5f89c0206233081a6279f151/html5/thumbnails/7.jpg)
![Page 8: s3-us-west-2.amazonaws.com · 2020-06-03 · 2. limit live load vertical deflection of trusses to span / 480. 3. general contractor shall coordinate mechanical duct routing through](https://reader033.fdocuments.in/reader033/viewer/2022050413/5f89c0206233081a6279f151/html5/thumbnails/8.jpg)
![Page 9: s3-us-west-2.amazonaws.com · 2020-06-03 · 2. limit live load vertical deflection of trusses to span / 480. 3. general contractor shall coordinate mechanical duct routing through](https://reader033.fdocuments.in/reader033/viewer/2022050413/5f89c0206233081a6279f151/html5/thumbnails/9.jpg)
![Page 10: s3-us-west-2.amazonaws.com · 2020-06-03 · 2. limit live load vertical deflection of trusses to span / 480. 3. general contractor shall coordinate mechanical duct routing through](https://reader033.fdocuments.in/reader033/viewer/2022050413/5f89c0206233081a6279f151/html5/thumbnails/10.jpg)
![Page 11: s3-us-west-2.amazonaws.com · 2020-06-03 · 2. limit live load vertical deflection of trusses to span / 480. 3. general contractor shall coordinate mechanical duct routing through](https://reader033.fdocuments.in/reader033/viewer/2022050413/5f89c0206233081a6279f151/html5/thumbnails/11.jpg)
![Page 12: s3-us-west-2.amazonaws.com · 2020-06-03 · 2. limit live load vertical deflection of trusses to span / 480. 3. general contractor shall coordinate mechanical duct routing through](https://reader033.fdocuments.in/reader033/viewer/2022050413/5f89c0206233081a6279f151/html5/thumbnails/12.jpg)
![Page 13: s3-us-west-2.amazonaws.com · 2020-06-03 · 2. limit live load vertical deflection of trusses to span / 480. 3. general contractor shall coordinate mechanical duct routing through](https://reader033.fdocuments.in/reader033/viewer/2022050413/5f89c0206233081a6279f151/html5/thumbnails/13.jpg)
Robb
Studio
Inc.3720 S. WASHINGTON ST. DENVER, CO 80113O/C 303-908-4430
COPYRIGHT 2015©
ANY UNAUTHORIZED USE OF THESEDOCUMENTS IS PROHIBITED WITHOUTTHE WRITTEN CONSENT OF ROBBSTUDIO, INC.
ISSUED FOR DATE
PROJECT NO. DATE
DRAWN CHECKED
SHEET TITLE
SHEET NO.
35ELATI
2015.10 08/29/15
KYSE SS
GENERAL NOTES
S0.1
CONSTRUCTION 08/29/15
![Page 14: s3-us-west-2.amazonaws.com · 2020-06-03 · 2. limit live load vertical deflection of trusses to span / 480. 3. general contractor shall coordinate mechanical duct routing through](https://reader033.fdocuments.in/reader033/viewer/2022050413/5f89c0206233081a6279f151/html5/thumbnails/14.jpg)
18
' -
0"
47' - 4 1/2"
11 7/8" TJI 210 AT 16"
1' -
4"
TYP
8"
TYP
1' - 0"
A
S3.1
B
S3.1
A
S3.1
B
S3.1
B1
B1
B3
B1
B1
B3
C
S4.1
12" Ø PIER REINFWITH (3) #4 VERT ~TYP (3) PLACES
C
S3.1
D
S3.1
D
S3.1
22' - 9 1/2"
22
' -
10
"
4" CONCRETE SLAB-ON-GRADEREINF WITH 6x6-W1.4xW1.4 WWFAT SLAB MID-DEPTH
SLOPE DOWN 1/8" PER FT
H
S3.1
H
S3.1
J
S3.1
K
S3.1
H
S3.1
JA
CK
TR
USSES A
T 2
4"
11 7/8 TJI 210 AT 16"
B1
B3B5
B4 B4
B4
B4
B4
B2B1
A11A11A12A11A12
A1
2A
12
A1
2A
11
2
2
2111
1 1 1
1 1
1 1 1 1
A
S4.1
A
S4.1
C
S4.1
B
S4.1
11
1 1
D
S4.1
H
S4.1
1
C2
3
D1
1
2x4
OU
TRIG
GER
S A
T 2
4"
RIDGE
ATTIC TO BE CLEAR OFTRUSS WEB MEMBERS ~RE: ARCH
TRUSSES AT 24"
K
S4.1
L
S4.1
PLAN REFERENCES:TOP OF FLOOR DECK 100'-0" U.N.O.GENERAL PROJECT NOTES S0.1TOP OF CONCRETE WALL 99'-9 3/4' U.N.O.
PLAN NOTES:1. FLOOR DECKING SHALL BE 23/32" THICK TONGUE AND GROOVE APA-RATED
SHEATHING. REFER TO SCHEDULE FOR NAILING REQUIREMENTS.2. EXTERIOR WALL STUDS SHALL BE 2x6 AT 16" O.C. UNLESS NOTED OTHERWISE.3. BEAMS SHALL BEAR ON (2) 2x POSTS UNLESS NOTED OTHERWISE.
BEAM TYPE BX RE: SCHEDULE S2.2
HEADER SCHEDULE
POST TYPE
XXX
X RE: SCHEDULE S2.2
RE: SCHEDULE S2.24. COORDINATE ALL CONSTRUCTION WITH ARCHITECTURAL, MECHANICAL,PLUMBING AND CIVIL DRAWINGS.
5. REFERENCE ALL OTHER DRAWINGS FOR NON-STRUCTURAL ITEMS SUCH ASEQUIPMENT PADS, DRAINS, CURBS, UNDERSLAB UTILITIES, ETC.
PLAN REFERENCES:TOP OF FLOOR DECK 110'-0" U.N.O.GENERAL PROJECT NOTES S0.1
PLAN NOTES:1. FLOOR DECKING SHALL BE 23/32" THICK TONGUE AND GROOVE APA-
RATED SHEATHING. REFER TO SCHEDULE FOR NAILING REQUIREMENTS.
2. ROOF DECKING SHALL BE 15/32" THICK APA-RATED SHEATHING. REFERTO SCHEDULE FOR NAILING REQUIREMENTS.
3. EXTERIOR WALL STUDS SHALL BE 2x6 AT 16" O.C. UNLESS NOTEDOTHERWISE.
4. BEAMS SHALL BEAR ON (2) 2x POSTS UNLESS NOTED OTHERWISE. BEAM TYPE BX RE: SCHEDULE S2.2
HEADER SCHEDULE
POST TYPE
XXX
X RE: SCHEDULE S2.2
RE: SCHEDULE S2.2
GARAGE ROOF TRUSS DESIGN CRITERIA1. TRUSS DESIGN LOADS
A. TOP CHORD DEAD LOAD ~ TYPICAL ROOF . . . . . . . . . . . . . . . . . . . . . . . . .B. TOP CHORD LIVE LOAD (SNOW) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .C. BOTTOM CHORD DEAD LOAD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .D. BOTTOM CHORD LIVE LOAD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2. LIMIT LIVE LOAD VERTICAL DEFLECTION OF TRUSSES TO SPAN / 480.
3. GENERAL CONTRACTOR SHALL COORDINATE MECHANICAL DUCT ROUTING THROUGH
TRUSS WEB MEMBERS.
4. TRUSS DESIGNER SHALL DESIGN FOR SNOW DRIFT LOADING ACCORDING TO THE
GOVERNING BUILDING CODE.
10 PSF25 PSF5 PSF20 PSF
PLAN REFERENCES:GENERAL PROJECT NOTES S001SUBGRADE PREPARATION RE: GEOTECHNICAL REPORTSLAB-ON-GRADE JOINTING RE: G/S3.1
PLAN NOTES:1. SLAB-ON-GRADE IS TO BE 4" THICK NORMAL WEIGHT CONCRETE OVER VAPOR BARRIER AND 4 INCHES OF GRANULAR FILL UNLESS NOTED OTHERWISE. REINFORCE WITH 6x6-W1.4xW1.4 WWF CENTERED AT MID-DEPTH OF SLAB.
PROVIDE IN SHEETS ONLY.2. LOCATE SLAB-ON-GRADE CONTROL JOINTS AND CONSTRUCTION JOINTS TO
CREATEAPPROXIMATELY SQUARE PANELS MEASURING LESS THAN 200 SQ.FEET IN AREA. LOCATE JOINTS ON COLUMN CENTERLINES WHERE POSSIBLE.CONTRACTOR TO SUBMIT PROPOSED JOINT LOCATION PLAN FOR REVIEWAND APPROVAL BY ENGINEER.
3. COORDINATE ALL CONSTRUCTION WITH ARCHITECTURAL, MECHANICAL,PLUMBING AND CIVIL DRAWINGS.
4. REFERENCE ALL OTHER DRAWINGS FOR NON-STRUCTURAL ITEMS SUCH ASEQUIPMENT PADS, DRAINS, CURBS, UNDERSLAB UTILITIES, ETC.
WALL SHEATHING NOTES:
1. ALL SHEATHING SHALL BE APPLIED DIRECTLY AGAINST THE FACEOF THE STUD WITH NO AIR SPACE.
2. REFER TO ARCHITECTURAL DRAWINGS FOR COMPLETE WALLCOMPOSITION INCLUDING NON-STRUCTURAL SHEATHING,RESILIENT CHANNEL LOCATION, ETC.
3. EXTERIOR SHEATHING AT EAST AND WEST HOUSE AND GARAGEWALLS SHALL BE 15/32" APA RATED SHEATHING FASTENED WITH 8dCOMMON NAILS AT 6" O.C. AT PANEL EDGES AND 12" O.C. FIELDNAILING. PANEL EDGES SHALL BE BLOCKED.
4. BLOCKING SHALL BE 2x MATERIAL OF THE SAME DEPTH ANDSPECIES AS THE PRIMARY WALL FRAMING.
5. EXTERIOR SHEATHING AT NORTH AND SOUTH HOUSE ANDGARAGE WALLS SHALL BE 5/8" GYP BOARD FASTENED WITH 6dCOOLER NAILS AT 7" O.C. AT PANEL EDGES AND 12" O.C. FIELDNAILING. PANEL EDGES ARE NOT BLOCKED.
Robb
Studio
Inc.3720 S. WASHINGTON ST. DENVER, CO 80113O/C 303-908-4430
COPYRIGHT 2015©
ANY UNAUTHORIZED USE OF THESEDOCUMENTS IS PROHIBITED WITHOUTTHE WRITTEN CONSENT OF ROBBSTUDIO, INC.
ISSUED FOR DATE
PROJECT NO. DATE
DRAWN CHECKED
SHEET TITLE
SHEET NO.
35ELATI
2015.10 08/29/15
KYSE SS
FOUNDATION AND 2NDFLOOR/ROOF FRAMING PLANS
S2.1
S2.1 1/4" = 1'-0"
1 FOUNDATION / FIRST FLOOR PLAN
S2.1 1/4" = 1'-0"
2 2ND FLOOR / GARAGE ROOF FRAMING PLAN
CONSTRUCTION 08/29/15
2
2 ADD2 02/17/16
![Page 15: s3-us-west-2.amazonaws.com · 2020-06-03 · 2. limit live load vertical deflection of trusses to span / 480. 3. general contractor shall coordinate mechanical duct routing through](https://reader033.fdocuments.in/reader033/viewer/2022050413/5f89c0206233081a6279f151/html5/thumbnails/15.jpg)
A12 A11 B23
A1
2
A11A11A11A11
A1
1A
11
A1
1
GT
GT
GT
GT
GT
GT
GT
ATTIC HATCH BELOW
ATTIC TO BECLEAR OF TRUSSWEB MEMBERS
TRUSSES AT 24" TRUSSES AT 24"
1 1
1111
RIDGE
J
S4.1
J
S4.1
K
S4.1
K
S4.1
G
S4.1
2x4
OU
TRIG
GER
S A
T 2
4"
O.C
.
2x4
OU
TRIG
GER
S A
T 2
4"
O.C
.
GT
GT
GT
GT
1
WALL HEADER AND JAMB SCHEDULEMARK SIZE REMARKS HEADER AND JAMB KEY
A
B
C
D
E
F
G
H
B12
(3) 2x6
HEADER
NO. OFTRIMMERSTUDS REQ'D
NO. OFKING STUDSREQ'D
EXAMPLE:B12 = (3)2x10 HEADERWITH (1) TRIMMERAND (2) KING STUDS
NOTE: AT 2x6 WALLS, BUILD OUT HEADERS TO A TOTAL WIDTH OF 5 1/2" BY ADDINGPLYWOOD SPACERS BETWEEN INDIVDUAL MEMBERS AND/OR 2x MEMBERS SAME DEPTHAS HEADER.
HEADER ~ RE: SCHEDULE FOR SIZE
TRIMMER AND KINGSTUDS ~ RE: SCHEDULE
TRIM
MER
S
KIN
GS
OPENING WIDTH ~ RE: ARCH
(3) 2x10
(2) 1 3/4 x 11 7/8 LVL
(2) 2x6
BEAM SCHEDULEMARK SIZE
B1
B2
B3
B4
B5
B6
B7
B8
1 3/4 x 11 7/8 LVL
(2)1 3/4 x 11 7/8 LVL
(3)1 3/4 x 11 7/8 LVL
4 x 1 0 DF-L #1
11 7/8 TJI 210
POST SCHEDULEMARK SIZE
(2) 2x6 HF
COMMENTS
STUD OR BETTER1
2
3
4
5
6
7
8
NOTES: 1. PROVIDE A MINIMUM OF (2) STUDS AT EACH BEAM SUPPORT IF NO POST IS DESIGNATED.2. ALL MULTIPLE STUD POSTS SHALL BE FASTENED TOGETHER AS SHOWN IN DIAGRAM ABOVE.3. WHERE NAILS ARE USED, EACH ADDITIONAL STUD IS NAILED TO REMAINDER OF STUD PACK AS SHOWN ABOVE.
10dCOMMONNAILS
STAGGERROWS AFTEREND NAILS
1 1/2" TYP
4"
TYP
EA
EN
D9
" TY
P
8x8 DFL NO. 1
PLAN REFERENCES:TOP OF WALL PLATE 119'-0" U.N.O.GENERAL PROJECT NOTES S0.1
PLAN NOTES:1. ROOF DECKING SHALL BE 15/32" THICK APA-RATED SHEATHING. REFER
TO SCHEDULE FOR NAILING REQUIREMENTS.
BEAM TYPE BX RE: SCHEDULE S2.2
HEADER SCHEDULE
POST TYPE
XXX
2. BEAMS SHALL BEAR ON (2) 2x POSTS UNLESS NOTED OTHERWISE.3. REFER TO SCHEDULE FOR TRUSS DESIGN LOADING CRITERIA.4. REFER TO ARCHITECTURAL DRAWINGS FOR ROOF SLOPES.5. "GT" = GIRDER TRUSS X RE: SCHEDULE S2.2
RE: SCHEDULE S2.2
ROOF TRUSS DESIGN CRITERIA1. TRUSS DESIGN LOADS
A. TOP CHORD DEAD LOAD ~ TYPICAL ROOF . . . . . . . . . . . . . . . . . . . . . . . . .B. TOP CHORD DEAD LOAD ~ OVERFRAMED ROOFS . . . . . . . . . . . . . . . . . . . .C. TOP CHORD LIVE LOAD (SNOW) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .D. BOTTOM CHORD DEAD LOAD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .E. BOTTOM CHORD LIVE LOAD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .F. MECHANICAL UNITS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2. LIMIT LIVE LOAD VERTICAL DEFLECTION OF TRUSSES TO SPAN / 480.
3. GENERAL CONTRACTOR SHALL COORDINATE MECHANICAL DUCT ROUTING THROUGH
TRUSS WEB MEMBERS.
4. TRUSS DESIGNER SHALL DESIGN FOR SNOW DRIFT LOADING ACCORDING TO THE
GOVERNING BUILDING CODE.
12 PSF15 PSF25 PSF5 PSF10 PSF200 LBS EACH
Robb
Studio
Inc.3720 S. WASHINGTON ST. DENVER, CO 80113O/C 303-908-4430
COPYRIGHT 2015©
ANY UNAUTHORIZED USE OF THESEDOCUMENTS IS PROHIBITED WITHOUTTHE WRITTEN CONSENT OF ROBBSTUDIO, INC.
ISSUED FOR DATE
PROJECT NO. DATE
DRAWN CHECKED
SHEET TITLE
SHEET NO.
35ELATI
2015.10 08/29/15
KYSE SS
ROOF FRAMING PLAN
S2.2
S2.2 1/4" = 1'-0"
1 ROOF FRAMING PLAN
S2.2 3/4" = 1'-0"
A HEADER SCHEDULE
S2.2 3/4" = 1'-0"
B BEAM SCHEDULE
S2.2 3/4" = 1'-0"
C POST SCHEDULE
CONSTRUCTION 08/29/15
2
2
2 ADD2 02/17/16
![Page 16: s3-us-west-2.amazonaws.com · 2020-06-03 · 2. limit live load vertical deflection of trusses to span / 480. 3. general contractor shall coordinate mechanical duct routing through](https://reader033.fdocuments.in/reader033/viewer/2022050413/5f89c0206233081a6279f151/html5/thumbnails/16.jpg)
x xx x x x xx x
x xx x x x x x x x
x xx x
x xx xx xx x
T.O.F.
RE: PLAN
SHEATHING ~ RE:ARCH
2x6 AT 16"O.C. U.N.O.
FLOOR DECKING ~RE: PLAN NOTES
WOOD I-JOIST ~ RE: PLAN ~SUPPLIER TO PROVIDE WEBSTIFFENERS AS REQ'D
2x6 TREATED SILL PLATE
5/8" Ø ANCHORRODS AT 48" O.C.
SIMPSON ITS2.06/11.88HANGER AT I-JOISTS ~MIT411.88 HANGER ATLVL BEAMS
2x SILL ~ TREATED
T.O. SHEATHING
RE: PLAN
#4 CONT AT 12"O.C. HORIZ
T.O.W.
RE: PLAN
8"
3'-0
" M
IN
8"
(2) #5 CONT TOP
(2) #5 CONT
#4 x AT 16" O.C. VERT ~ALTERNATE HORIZ LEG DIR
ROUGHEN SURFACE
RE: PLAN
T.O. SHEATHING
RE: PLAN
EXTERIOR SHEATHING ~RE: ARCH
2x TREATED SILL PLATE ~ RIPTO MATCH WALL THICKNESS
2x6 AT 16" O.C. U.N.O.
FLOOR DECKING ~RE: PLAN NOTES
WOOD I-JOIST ~ RE: PLAN ~SUPPLIER TO PROVIDE WEBSTIFFENERS AS REQ'D
2x6 SILL PLATE
5/8" Ø ANCHORRODS AT 48" O.C.
I-JOIST BLOCKING AT4'-O" O.C.
SIMPSON ITS2.06/11.88HANGER
PAVING SLOPED TODRAIN ~ RE: SITE PLAN
#4 x 2'-0" AT 2'-0" O.C. ~DRILL AND EPOXY 4"
INTO WALL
(4) 10d x 1 1/2" NAILSTO BLOCKING PANEL
SLOPE DOWN
T.O.F.
RE: PLAN
T.O.W.
RE: PLAN
8"
8"
NOTES:
1. RODS SHALL BE ASTM F1554GRADE 36.
2. REDUCE ROD EMBEDMENT AS REQ'DTO SATISFY MIN. CONC. COVER ATBOTTOM OF FOOTING, ETC.
3. HOLES IN WASHER TO BE 1/16"LARGER THAN BOLT DIAMETER
3"9"5/8"
HOOKLENGTH
MINIMUMEMBEDMENT
BOLTDIA. (Ø)
PLATEWASHERS
ANCHOR ROD SCHEDULE
TYPE 1 TYPE 2
HEAVY HEX NUTOR STANDARDBOLT HEAD
WASHER ~ RE: SCHED.
HEAVY HEX NUT
PR
OJ.
EM
BED
MEN
T
Ø
3 Ø
LENGTH
HOOK
PR
OJ.
EM
BED
MEN
T4
"
3/163-SIDES
Ø
T.O.C.
RE: PLANT.O.C.
RE: PLAN
T.O.C.
RE: PLAN
T.O.SHTG
RE: PLAN
POST LOADSFROM LEVEL
(S) ABOVE
JOIST SPACEBETWEEN FLOORS
CONTINUEPOST TO POINT
OF SUPPORT
KING STUDSABOVE
TRIMMER ABOVE
BLOCK JOIST SPACEBELOW KING STUDSAND TRIMMER
BLOCK JOISTSPACE SOLID ATPOST LOAD
TYP WALLSTUDS
KING STUD
TRIMMERSTUDS
HEADER
ALL MULTIPLE STUD POSTS SHALL BEMADE CONTINUOUS BETWEEN LEVEL OFSUPPORTED MEMBER ANDFOUNDATION, BEAM OR SUPPORTINGHEADER (WHICHEVER COMES FIRST).
3'-0
" M
IN
10
"
1' - 0"
8x8 POST
SIMPSON CB88 BASE
(2) #5 CONT
PORCH SLAB ~RE: SITE DWGS
12" Ø PIER WITH (3) #4VERTS WITH 90 DEG
STD HOOK INTRIANGULAR PATTERN
T.O.F.
RE: PLAN
SHEATHING ~ RE:ARCH
2x6 AT 16"O.C. U.N.O.
2x6 TREATED SILL PLATE
5/8" Ø ANCHORRODS AT 48" O.C.
#4 CONT AT 12"O.C. HORIZ
T.O.W.
RE: PLAN
8"
3'-0
" M
IN
8"
(2) #5 CONT TOP
(2) #5 CONT
#4 x AT 16" O.C. VERT ~ALTERNATE HORIZ LEG DIR
ROUGHEN SURFACE
RE: PLAN
6"
SAW BETWEEN 4 TO 12 HOURS AFTER POURING.
RE: PLAN AND NOTES FOR SPACING OF JOINTS.
SAWCUT OR PREFORMED CONTROL JOINT
2.1.
LOCATED AT CONTRACTORS DISCRETION.
KEYED CONSTRUCTION JOINT
1.
RE: ARCH FOR JOINT TREATMENT
RE: ARCH FOR JOINT TREATMENT
DISCONTINUEWWF AT JOINT
2x CONT.KEYWAY
1/4"
RE: P
LAN
(T"
)
T"/4
1' - 0" 4" 4" 1' - 0"
RE: P
LAN
8"
MIN
. T.O.C.
RE: PLAN
T.O.C.
RE: PLAN
SHEATHING ~ RE:ARCH
2x4 AT 16" O.C.
2x4 TREATED SILL PLATE5/8" Ø ANCHORRODS AT 48" O.C.
2' -
0"
MIN
OR
AS R
EQ
'D
1'-6
" M
IN
BEAR FOOTING ONUNDISTURBED NATURAL SOIL
1' - 0"
(2) #5 CONT TOPAND BOTTOM
#3 x TIES AT 36" O.C.1'-8"
FO
R F
RO
ST
SHEATHING ~ RE:ARCH
2x4 AT 16" O.C.
2x4 TREATED SILL PLATE5/8" Ø ANCHORRODS AT 48" O.C.
2' -
0"
MIN
OR
AS R
EQ
'D
1'-6
" M
IN
BEAR FOOTING ONUNDISTURBED NATURAL SOIL
1' - 0"
(2) #5 CONT TOPAND BOTTOM
#3 x TIES AT 36" O.C.1'-8"
FO
R F
RO
ST
BEAR FOOTING ONUNDISTURBED NATURAL SOIL
1' - 0"
(2) #5 CONT TOPAND BOTTOM
#3 x TIES AT 36" O.C.1'-8"
PAVING ~ RE:SITE DWGS
RE: H/S3.1 FORADD'L INFORMATION
Robb
Studio
Inc.3720 S. WASHINGTON ST. DENVER, CO 80113O/C 303-908-4430
COPYRIGHT 2015©
ANY UNAUTHORIZED USE OF THESEDOCUMENTS IS PROHIBITED WITHOUTTHE WRITTEN CONSENT OF ROBBSTUDIO, INC.
ISSUED FOR DATE
PROJECT NO. DATE
DRAWN CHECKED
SHEET TITLE
SHEET NO.
35ELATI
2015.10 08/29/15
KYSE SS
FOUNDATION DETAILS
S3.1
S3.1 3/4" = 1'-0"
A FLOOR JOIST BEARING AT FDN WALLS3.1 3/4" = 1'-0"
B FLOOR JOIST PARALLEL AT DDN WALL
S3.1 3/4" = 1'-0"
E ANCHOR ROD SCHEDULES3.1 3/8" = 1'-0"
F FRAMING AT MULTI-STUD POSTS
S3.1 3/4" = 1'-0"
C PORCH COLUMN FOUNDATIONS3.1 3/4" = 1'-0"
D FOUNDATION AT EXTERIOR WALL
CONSTRUCTION 08/29/15
S3.1 3/4" = 1'-0"
G SLAB ON GRADE JOINTSS3.1 3/4" = 1'-0"
H GARAGE FOUNDATION
S3.1 3/4" = 1'-0"
J GARAGE FOUNDATIONS3.1 3/4" = 1'-0"
K GARAGE FOUNDATION
2 2
2
2 ADD2 02/17/16
![Page 17: s3-us-west-2.amazonaws.com · 2020-06-03 · 2. limit live load vertical deflection of trusses to span / 480. 3. general contractor shall coordinate mechanical duct routing through](https://reader033.fdocuments.in/reader033/viewer/2022050413/5f89c0206233081a6279f151/html5/thumbnails/17.jpg)
T.O. SHEATHING
RE: PLAN
SHEAR WALLSHEATHING ~ RE:
ARCH
2x SILL PLATE~ TYP
PANEL EDGENAILINGAT TOP AND BOTTOM
PLATES
1½ " LSL RIM BOARD ~NAIL TO EA JOIST AT TOP
AND BOTTOM CHORDS
DOUBLE TOPPLATE ~ TYP
2x6 AT 16" O.C.U.N.O.
PANEL EDGE NAILING FROMDECKING TO RIM BOARD
FLOOR DECKING ~ RE:PLAN NOTES
WOOD I-JOIST ~ RE: PLAN~ SUPPLIER TO PROVIDEWEB STIFFENERS AS REQ'D
T.O. SHEATHING
RE: PLAN
EXTERIOR SHEATHING ~RE: ARCH
2x SILL PLATE~ TYP
PANEL EDGENAILING AT TOP AND
BOTTOM PLATES
1½ " LSL RIM BOARD~ NAIL TO EA JOIST
AT TOP ANDBOTTOM CHORDS
DOUBLE TOPPLATE ~ TYP
2x6 AT 16" O.C.U.N.O.
PANEL EDGE NAILING FROMDECKING TO RIM BOARD
FLOOR DECKING ~RE: PLAN NOTES
WEB STIFFENER AT EABLOCKING PANEL
WOOD I BLOCKINGPANEL AT 48" O.C.
T.O. SHEATHING
RE: PLAN
MULTI - LVL BEAM~ RE: PLAN
SIMPSON ITS 2.06/11.88TOP FLANGE HANGER
U.N.O.
FLOOR DECKING ~RE: PLAN NOTES
WOOD I-JOIST ~ RE:PLAN ~ SUPPLIER TOPROVIDE WEB STIFFENERSAS REQ'D
NO FIELD CUTHOLES IN THISREGION
6"
6"
MIN DIST
MIN DIST
D1 2 x D2 D2
JOIST SIZEHOLE DIAMETER
MINIMUM DISTANCE TO OPENING
REFER TO MANUFACTURER'S DOCUMENTATION FORADDITIONAL INFORMATION.
2" 3" 4" 5" 6 1/2" 7" 8 7/8"
11 7/8 TJI 210 1'-0" 1'-0" 1'-0" 1'-6" 2'-6" 3'-0" 5'-6"
WALL ORBEAM
JOIST OR TRUSS PANEL JOINTS
4 1
3
2
1 EDGENAILING
2 FIELDNAILING
3 PANEL EDGE NAILINGTO BLOCKING OR BEAMS
4 BOUNDARYNAILING
BLOCKINGWHERE
SPECIFIED
DECKING FASTENING SCHEDULE
LEVELSHEATHING
MATERIAL
BLOCKED
EDGES?
FASTENER
TYPE / SPACING
ROOF
FLOORS
15/32" APA-RATEDSHEATHING
23/32" APA-RATEDSHEATHING
NO
NO
1. 8d COMMONS AT 6" O.C.2. 8d COMMONS AT 12" O.C.3. 8d COMMONS AT 6" O.C.4. 8d COMMONS AT 6" O.C.
1. 10d COMMONS AT 6" O.C.2. 10d COMMONS AT 12" O.C.3. 10d COMMONS AT 6" O.C.4. 10d COMMONS AT 6" O.C.
NOTE: FLOOR DECKING SHALL BE GLUED TO FRAMING MEMBER.
T.O. SHEATHING
RE: PLAN
2x6 LEDGER WITH (3)12d NAILS AT EA STUD
(16" O.C.) ~ TYP
SIMPSON JB26 HANGER
RE: B/S4.1 FORADD'L INFORMATION
ROOF TRUSS
TRUSS BRG
RE: ARCH
POST BEYOND ~NOTCH AT BEAMBEARING
SIMPSON LU24 HANGER
RE: D/S4.1 FORADD'L INFORMATION
ROOF TRUSS
(2) 5/8"Ø x 0'- 5" LAGSCREWS ~ COUNTERSINKAND PLUG HOLES
CONTINUOUS BEAM~ RE: PLAN
EXTERIOR SHEATHING~ RE: ARCH
PANEL EDGE NAILINGAT TOP PLATE
DOUBLE TOPPLATE ~ TYP
2x6 AT 16" O.C.U.N.O.
ROOF SHEATHING~ RE: PLAN NOTES
ROOF TRUSS ~ RE: PLAN
SIMPSON H2.5ACLIP AT EA JOIST
DIAPHRAGMBOUNDARY NAILING
AT BLOCKING
CEILING
RE: ARCH
T.O.PLATE
RE: PLAN
12
12
PANEL EDGENAILING TO
G.E.T. AT TOPOF SHEATHING
DOUBLE TOPPLATE ~ TYP
ROOF SHEATHING ~RE: PLAN NOTES
ROOF TRUSS ~ RE: PLAN
DIAPHRAGMBOUNDARY NAILING
AT BLOCKING
T.O.PLATE
RE: PLAN
2x BLOCKINGBETWEEN
OUTRIGGERS
SIMPSON LS 50AT 24" O.C.
2x OUTRIGGERS ~RE: PLAN
SIMPSON LU SERIESJOIST HANGER
GABLE END TRUSS (G.E.T.)
RE: ARCH
COORDINATE GAPW/ RIDGE VENT REQUIREMENTS
2x4 BEVELED BLOCKING ATEA SHEATHING PANEL EDGE
TYPICAL DIAPHRAGMBOUNDARY NAILING ~ RE: ?/?
BLOCKING AT RIDGE
BLOCKING AT VALLEY
10d AT 6" O.C.
2x4 BEVELED BLOCKING2x6 BLOCKING
TYPICAL DIAPHAGMBOUNDARY NAILING ~ RE: ?/?
EXTERIOR SHEATHING~ RE: ARCH
PANEL EDGE NAILINGAT TOP PLATE
DOUBLE TOPPLATE ~ TYP
STUDS AT 16" O.C.U.N.O.
ROOF SHEATHING~ RE: PLAN NOTES
ROOF TRUSS ~ RE: PLAN
SIMPSON H2.5ACLIP AT EA JOIST
DIAPHRAGMBOUNDARY NAILING
AT BLOCKING
T.O.PLATE
RE: PLAN
8 1/2
12
Robb
Studio
Inc.3720 S. WASHINGTON ST. DENVER, CO 80113O/C 303-908-4430
COPYRIGHT 2015©
ANY UNAUTHORIZED USE OF THESEDOCUMENTS IS PROHIBITED WITHOUTTHE WRITTEN CONSENT OF ROBBSTUDIO, INC.
ISSUED FOR DATE
PROJECT NO. DATE
DRAWN CHECKED
SHEET TITLE
SHEET NO.
35ELATI
2015.10 08/29/15
KYSE SS
FRAMING DETAILS
S4.1
S4.1 3/4" = 1'-0"
A FLOOR JOIST BEARING AT EXTERIOR WALLS4.1 3/4" = 1'-0"
B FLOOR JOIST PARALLEL AT EXTERIOR WALLS4.1 3/4" = 1'-0"
C FLOOR JOIST BEARING AT OPENING
S4.1 3/4" = 1'-0"
E WEB OPENINGS IN I-JOISTSS4.1 3/4" = 1'-0"
F DECKING FASTENING SCHEDULE
S4.1 3/4" = 1'-0"
D SECOND FLOOR AT PORCH ROOF
S4.1 3/4" = 1'-0"
H PORCH ROOF AT BEAM
S4.1 3/4" = 1'-0"
J ROOF TRUSS BEARING AT EXTERIOR WALLS4.1 3/4" = 1'-0"
K ROOF TRUSS AT GABLE END / LADDER FRAMING
S4.1 3/4" = 1'-0"
G ROOF SHEATHING AT RIDGE & VALLEY
CONSTRUCTION 08/29/15
S4.1 3/4" = 1'-0"
L ROOF TRUSS BEARING AT GARAGE
2
2 ADD2 02/17/16