CONCRETE REPORT Project: MTC Landside Primary and Secondary Roads Project No.: G-0024 Location: Abu Dhabi Airport Engineer: AECOM Main Contractor: CSCEC Pile No.: S1B-B1-PC1- 07 Pile Length Pile Diameter: 1200 Theoretical Volume of Pile Pile Type: Working Pile Date No. Depth 1 7 7.92 7.92 8 2 14 7.92 15.84 8 3 20.9 7.80 23.64 8 4 23.869 3.36 27.00 3 BAUER __________________ CSCEC__________________ Theoritica Quantity (m 3 ) Commulative Theoritical Quantity (m 3 ) Actual Quantity (m 3 ) 5 10 15 20 25 30 0 5 10 15 20 25 30 16, 14 24, 20.9 7.92, 7 15.8, 14 23.64, 20.9 27, 23.8 Depth 8, 7 27, 23.8 Concrete
-
Upload
naresh-deivasigamani -
Category
Documents
-
view
19 -
download
0
description
sdgfdgsdfgert
Transcript of S1B-B1-PC1 # 7
CONCRETE REPORTProject: MTC Landside Primary and Secondary RoadsProject No.: G-0024Location: Abu Dhabi AirportEngineer: AECOMMain Contractor: CSCECPile No.: S1B-B1-PC1- 07 Pile Length 23.869
Pile Diameter: 1200 Theoretical Volume of Pile 27.00
Pile Type: Working Pile Date 10/25/2014
No. Depth
1 7 7.92 7.92 8 8
2 14 7.92 15.84 8 16
3 20.9 7.80 23.64 8 24
4 23.869 3.36 27.00 3 27
BAUER __________________ CSCEC__________________ ENGINEER_________________
Theoritica Quantity (m3)
Commulative Theoritical
Quantity (m3)Actual Quantity (m3) Cumulative Actual (m3)
5 10 15 20 25 300
5
10
15
20
25
30
Actual
Theoritical
16, 14
24, 20.9
7.92, 7
15.8, 14
23.64, 20.9
27, 23.8
Dep
th
8, 7
27, 23.8
Concrete