S12 S12 - - D Flow D Flow - - way way Maintenance Maintenance Prepared for the TOC 21 February 2006 Susan Sylvester, LeRoy Rodgers & Fred Remen Prepared for the TOC 21 February 2006 Susan Sylvester, LeRoy Rodgers & Fred Remen

Transcript of S12-D Flow-way Maintenance...Susan Sylvester, LeRoy Rodgers & Fred Remen. Overview • Collaborative...

Page 1: S12-D Flow-way Maintenance...Susan Sylvester, LeRoy Rodgers & Fred Remen. Overview • Collaborative effort between SFWMD, USACE, and ENP. ... Current Project Activities: – Draft

S12S12--D FlowD Flow--way way MaintenanceMaintenance

Prepared for the TOC21 February 2006

Susan Sylvester, LeRoy Rodgers & Fred Remen

Prepared for the TOC21 February 2006

Susan Sylvester, LeRoy Rodgers & Fred Remen

Page 2: S12-D Flow-way Maintenance...Susan Sylvester, LeRoy Rodgers & Fred Remen. Overview • Collaborative effort between SFWMD, USACE, and ENP. ... Current Project Activities: – Draft

Overview

• Collaborative effort between SFWMD, USACE, and ENP.

• S-12D chosen because there are no operational constraints.

• Only maintenance canal cleaning and vegetation management– no new works or design modifications proposed.

• Need for routine maintenance at the S-12 structures and in the Old Tamiami Canal.

Page 3: S12-D Flow-way Maintenance...Susan Sylvester, LeRoy Rodgers & Fred Remen. Overview • Collaborative effort between SFWMD, USACE, and ENP. ... Current Project Activities: – Draft

Overview

• Vegetation and sediment has accumulated in the upstream & downstream flow-way and in the Old Tamiami Canal.

• Flow ratings for the S-12 system, particularly S-12D, indicate reduced conveyance capacity.

• Flow conveyance restriction primarily downstream (tailwater driven).

Page 4: S12-D Flow-way Maintenance...Susan Sylvester, LeRoy Rodgers & Fred Remen. Overview • Collaborative effort between SFWMD, USACE, and ENP. ... Current Project Activities: – Draft

View Looking NE from Everglades National Park toward WCA-3A

S-12D

Conveyance capacity & efficiency has been lost due to growth of vegetation and accumulation of sediment upstream, downstream of the

S-12 structures and in Old Tamiami Canal.

Page 5: S12-D Flow-way Maintenance...Susan Sylvester, LeRoy Rodgers & Fred Remen. Overview • Collaborative effort between SFWMD, USACE, and ENP. ... Current Project Activities: – Draft

Ridge and Slough Concept in Action!

1995 – 2 Meter 1999 – 2 Meter

Page 6: S12-D Flow-way Maintenance...Susan Sylvester, LeRoy Rodgers & Fred Remen. Overview • Collaborative effort between SFWMD, USACE, and ENP. ... Current Project Activities: – Draft

Methodology• Mechanical vegetation and sediment

removal at the S-12D structure and the downstream flow-way to the ENP boundary;

• Invasive vegetation control along the north and south bank of Old Tamiami Trail from S-346 to the FP&L access road;

• Assessment with recommendations on the feasibility of maintenance at the S-12A, B, & C structures will be done.

Page 7: S12-D Flow-way Maintenance...Susan Sylvester, LeRoy Rodgers & Fred Remen. Overview • Collaborative effort between SFWMD, USACE, and ENP. ... Current Project Activities: – Draft

S-346

Page 8: S12-D Flow-way Maintenance...Susan Sylvester, LeRoy Rodgers & Fred Remen. Overview • Collaborative effort between SFWMD, USACE, and ENP. ... Current Project Activities: – Draft
Page 9: S12-D Flow-way Maintenance...Susan Sylvester, LeRoy Rodgers & Fred Remen. Overview • Collaborative effort between SFWMD, USACE, and ENP. ... Current Project Activities: – Draft
Page 10: S12-D Flow-way Maintenance...Susan Sylvester, LeRoy Rodgers & Fred Remen. Overview • Collaborative effort between SFWMD, USACE, and ENP. ... Current Project Activities: – Draft

Current Project Activities:– Draft plan and inter-agency review In progress– Bathymetry, boundary survey, and ROW analysis Completed– Existing vegetation survey (SFWMD & ENP) Completed– Flow monitoring plan (USGS though USACE) Completed– Regulatory/Permitting requirements Under review

Upcoming Project Activities– Site preparation for equipment access Feb. 2006– Vegetation removal Feb. 2006– Sediment removal Mar. 2006– Post-maintenance flow ratings Apr. 2006– Post-maintenance bathymetry Apr. 2006– Assessment Jun. 2006

S-12D Flow-way Maintenance