S ou th C en tr al R ilw y - Indian Railways
Transcript of S ou th C en tr al R ilw y - Indian Railways
Pondugala (PDGL) 143.35
Nadikude Jn.(NDKD) 152.69
Macherla (MCLA) 130.26
Donakonda (DKD) 120.08
Nal lapadu (NLPD) 5.00
Guntur J
n.(GNT)0
.00
Krishna canal Jn..(K
CC) 423.71Miryalaguda (MRGA)114.40
Giddalur (GID) 203.78
Cumbum (CBM) 170.04
Vinukonda (VKN) 82.65
Markapur Rd. (MRK) 143.97
Narasaraopet (NRT) 45.30Repalle (RAL) 33.85
Tenali Jn.(TEL) 3
97.25
Vijayawada Jn..(BZA)
Vishnupuram (VNUP) 134.97
Nandyal (NDL) 256.98
Mangalagir i (MAG) 20.28Reddipalem (REP) 2.47
To C
henn
ai
Vejend
la (V
JA) 1
4.00
Sanga
m jaga
rlamud
i (SJL
) 8.27 Vemuru (V
MU) 13.77
Pid
ugur
alla
(PG
RL)
74.
10
Tum
mal
ache
ruvu
(TM
LU) 8
3.34
Bel
lam
kond
a (B
MKD
) 60 .
42R
eddi
gude
m (R
EM) 5
4.29
Sat
tena
palli
(SAP
) 42.
37P
edak
urap
adu
(PKP
U) 2
9.64
Siri
p ura
m (S
RPM
) 22.
96
Ban
daru
palli
(BD
PL)
13.
58
Nagireddipalli ( NRDP ) 19.44
Valigonda ( VLG ) 29.47
Ramannapet ( RMNP ) 42.12
Chityala ( CTYL ) 51.08Srirampuram ( SRMR ) 66.31
Nalgonda ( NLDA ) 76.71
Thipparti ( TPPI ) 94.11
To Kazipet
To Guntakal
Border at Km. 4.50
Border at km. 261.91
Border at km. 25.36
GNT at k
m.25.47
South Central RailwayGuntur Division - Jurisdiction mapPagidipalli ( PGDP ) 4.02
Reference
1. DEN/North/GNT Jurisdic tion
c. ADEN/West/GNT Jurisdiction
2. DEN/West/GNT Jurisdictionb. ADEN/NLDA Jurisdictiona. ADEN/North/GNT Jurisdiction
3. Double line
d. ADEN/NDL Jurisdiction
Kodrapol ( KDGL ) 125.92
Janp
ahad
(JPD
)10.
74
Kms. " B " Route " D " Route " E " Route Total 1 Route Kms. 551.41 35.01 42.80 629.22 2 Track Kms. ( Main line ) 581.77 35.01 42.80 659.58 3 Track Kms. ( Loops & S ings ) id 97.428 3.05 3.74 104.218 4 Electrified section 55.64 0 0 55.64 5 Double line 30.36 0 0 30.36
GUNTUR DIVISION – KEY STATISTICS- 2012-13
1 Track
1. Route Kilometers 629.22
Double Line 30.36
Single Line 598.86
2. Total Track Kilometers 659.58
Double Line 60.72
Single Line 598.86
3. Electrified Route Kilometers 55.64
Double Line 30.36
Single Line 25.28
2 Volume of Traffic
1. No. of passenger carrying trains (average/daily) 93
MEMU 12
DEMU 16
Conventional 65
2. Average no. of Freight Trains (Daily) 33
3. Passengers originating (2012-13) (In Millions) 25.974
4. Originating freight loading (2012-13) (In Millions Tonnes ) 3.127
3 Financial
1. Gross Traffic Receipts (2012-13) (In ` Crores) 467.76
Goods 372.42
Passenger 82.18
Others 13.15
2. Ordinary working expenses (2012-13) (In ` Crores) 205.09
3. Performance Efficiency Index (2012-13) 43.85
4 Personnel ( as on 01-07-2013 )
1. Total sanctioned 4939
2. Actual on roll 4031
3. Officers sanctioned 45
4. Officers on roll 43
5 No. of Stations 72
6 Miscellaneous
1. No. of LC gates ( as on 01-07-2013) 309
Unmanned 148
Manned 161
2. Coaches (Inclusive of consists) 174
3. No. of Stations where PRS/UTS Installed 53
4. Coaching Depot 1
5. No. of Health Units 4
INTRODUCTION
Evolution of Guntur Division
Guntur is a very ancient town. References to Guntur are found in inscriptions of 922-929 AD and 1147, 1158 AD. The original Sanskrit name (ancient Vedic culture/tradition) for Guntur was Garthapuri (a place surrounded by water ponds ('garta = gunta')). The city was founded in the mid-eighth century by the French who ruled over the city for nearly ten centuries until it was ceded permanently to the British in 1788. Guntur district occupies an area of approximately 11,391 square kilometres (4,398 sq mi).It is one of the oldest municipalities that have been constituted in 1866.
The Guntur region played a significant role in the struggle for independence and the formation of Andhra Pradesh. India's independence came in 1947, and Madras Presidency became Madras state. The northern, Telugu-speaking districts of Madras state, including Guntur, advocated for a separate state, and the new state of Andhra Pradesh was created in 1953 from the eleven northern districts of Madras.
Guntur District –Information
Population(2011) 48,89,230
Density 429 per sq. km
Location 16.200 N 80.27
0 E
Economy Cotton, Tobacco, Chilli
Industrialisation Cement, Jute mills, Granite, Handloom, Silk, Sangam Dairy
Crops Paddy, Jowar, Cotton, Turmeric, Maize, Arhar, Chillies, Sugarcane, and Sesame
Research centres
Agricultural Research Center,Lam of ANGRAU, Institute of Pharmaceutical Sciences at Lam, Indian Tobacco Board
Educational Institutions
Acharya Nagarjuna University, Two deemed universities i.e., Vignan University & K.L. University .Hindu College,AC College, TJPS College, MBTS Polytechnic, Katuri Medical College, Jagarlamudi KuppuSwamy Chowdary College, Guntur Medical College, RVR & JC College of Engineering, NRI Medical Collegeand Bhashyam Group of Institutions.
Health Guntur Medical College, NRI Medical College, The Sankar Hospital, Kugler Hospital,
In order to strengthen the rail infrastructure of this region, Ministry of
Railways sanctioned the formation of Guntur Division in the year 1995-96. Guntur Division was operationalised on 1st April, 2003 with 618.48 Route Kilometres by amalgamating 3 sections taken from 3 Divisions viz., 369.39 Kms. from BZA Division, 141.29 from Guntakal Division and 107.88 Kms, from Secunderabad Division. Now, with the addition of 10.74 route kilometers of Vishnupuram-Janpahad section, the Division route kilometers enhanced to 629.22 Kms.
Jurisdiction
The jurisdiction of the Division is from Krishna Canal (Excl.) to Guntur Jn., Guntur Jn. to Nandyal (incl.); Repalle to Tenali Jn. (Excl.) Guntur Jn. to Pagidipalli Jn. (Excl.), Nadikude Jn. to Macherla. It has 629.22 B.G. route Kms. all on 'B' route, except Repalle-Tenali and Nadikude-Macherla (E route).
From To Distance in Kms.
Line Traction
Krishna Canal Junction [excl.] Guntur Jn. 25.36 Double Electric Guntur Jn. Nallapadu Jn. 5.00 Double Electric Tenali Jn. [excl.] Guntur Jn. 25.28 Single Electric Nallapadu Jn. Pagidipalli Jn [excl.] 238.86 Single Diesel Nallapdu Jn. Nandyal [incl.] 256.91 Single Diesel Repalle Tenali Jn. [excl.] 32.06 Single Diesel Nadikude Jn. Macherla 35.01 Single Diesel Vishnupuram Janpahad 10.74 Single Diesel
Total Kms. 629.22
Revenue Districts covered by Division
Guntur Division of South Central Railway covers four Revenue Districts of Andhra Pradesh State viz., Guntur, Nalgonda, Prakasam and Kurnool Districts.
NDKD 152.69
MCLA 130.26
DKD
120.08
Nallapadu (NLPD) 5.00
Gun
tur J
n.(GNT)
0.00
Krishna canal J
n..(KCC) 4
23.71
MRGA 114.40
GID
203.78
CBM
170.04
MRK 1
43.97
NRT 45
.30
Repalle (R
AL) 33.85
Tenali Jn.(T
EL) 397.25
Vijayawada Jn
..(BZA)
VNUP 134.97
Nan
dyal (ND
L) 256.98
NGNT/ REP 2.47
To C
henn
ai
PG
RL 7
4.1
0
SA
P 4
2.3
7
BD
PL 1
3.5
8
NRDP 19.44
CTYL 51.08
NLDA 76.71
To Kazipet
To Guntakal
Border at Km. 4.50
Border at km. 261.91
South Central RailwayGuntur Division
Pagidipalli ( PGDP ) 4.02
Reference
1. DEN/North/GNT Jurisdiction
c . ADEN/West/GNT Jurisdiction
2. DEN/West/GNT Jurisdiction
b. ADEN/NLDA Jurisdiction
a . ADEN/North/GNT Jurisdiction
3. Double line
d. ADEN/NDL Jurisdiction
GZA
106
.98
Janpa
had
Km.10.64
G.Rice
Steel pipes
G.Rice & Quartz
G.Rice&Cement
Cement
Cem
ent
Containers &Multicommodities
G.R
ice
Tim
ber waste
G.R
ice & Fertilizers
Re - booking
Cement
FCI Siding
G.Rice
FCI Siding
G.Rice
MATRIX siding
G.Rice
India Cement Siding
Cement
Penna Cement siding
Cement
KCP Siding
Cement
Loading stations & Sidings
NDKD 152.69
MCLA 130.26
DKD
120.08
Nallapadu (NLPD) 5.00
Gun
tur J
n.(G
NT)
0.00
Krishna canal J
n..(KCC) 4
23.71
MRGA 114.40
GID
203.78
CBM
170.04
MRK 1
43.97
NRT 45
.30
Repalle (R
AL) 33.85
Tenali Jn.(T
EL) 397.25
Vijayawada Jn
..(BZA)
VNUP 134.97
Nan
dyal (ND
L) 256.98
NGNT/ REP 2.47
To C
henn
ai
PG
RL 7
4.1
0
SA
P 4
2.3
7
BD
PL 1
3.5
8
NRDP 19.44
CTYL 51.08
NLDA 76.71
To Kazipet
To Guntakal
Border at Km. 4.50
Border at km. 261.91
South Central RailwayGuntur Division
Pagidipalli ( PGDP ) 4.02
Reference
1. DEN/North/GNT Jurisdiction
c. ADEN/West/GNT Jurisdiction
2. DEN/West/GNT Jurisdiction
b. ADEN/NLDA Jurisdiction
a . ADEN/North/GNT Jurisdiction
3. Double line
d. ADEN/NDL Jurisdiction
GZA
106
.98
Janpa
had
Km.10.64
Coal,
Steel pipes
G.Rice
G.Rice& Fertilizers
Coal
Cem
ent
Fertilizers &Containers
Fertilizers
G.R
ice & Fertilizers
Coal
FCI Siding
G.Rice
FCI Siding
G.Rice
India Cement Siding
Coal
Penna Cement siding
Coal
UnLoading stations & Sidings
PDGL 143.35Coal
Passenger Amenities / Freight facilities over Guntur Division.
Model Stations 4 Nalgonda, Nadikudi, Guntur, Nandyal
Aadarsh 8 Nalgonda, Nandyal, Narasaraopet, Guntur, Sattenapalli,Pidugurall,Macherla, Vinukonda
“Touch & Feel” items Stations
5 Nalgonda, Nadikudi, Guntur , Narasaraopet, Nandyal.
Unified locations ( UTS +PRS)
27
Ramannapet, Chityala, Miryalaguda, Vishnupuram, Macherla, Nadikudi, Piduguralla, Sattenapalli, Pedakurapadu, Siripuram, New Guntur, Mangalagiri, Vejendla, Chinnaravuru, Vemuru, Bhattiprolu, Pallikona, Perecherla, Phirangipuram, Narasaraopet, Vinukonda, Kurichedu, Donakonda, Markapur Road, Cumbum, Giddalur and , Gazulapalli. ( All Thinclients)
PRS locations 4 Nalgonda, Guntur, Repalle and Nandyal (Dumb Terminals)
UTS Locations
26
Nagireddipalli, Valigonda, Srirampuram, Nalgonda, Thipparthi, Pondugula, Tummalacheruvu, Reddigudem, Bellamkonda, Bandarupalli, Nallapadu, Guntur, Nambur, Sangamjagarlamudi, Repalle, Satulur,Munumaka, Santamagulur, Savalyapuram, Gundlakamma, Gajjelakonda, Tarlupadu, Somidevipalle, Digivametta,Chelama and Nandyal. ( All Thinclients)
India Post PRS Centers
5 Miryalaguda ,Deverakonda, Santamagulur, Markapuram, Srisailam Temple PO.
Computerized PA System
19 Nalgonda, Miryalaguda, Macherla, Nadikudi, Piduguralla, Sattenapalli, Nallapadu,Guntur, Nambur, Mangalagiri, Repalle, Phirangipuram, Narasaraopet, Vinukonda, Donakonda, Markapur Road, Cumbum, Giddalur, and Nandyal.
POET locations 14 Nalgonda, Miryalaguda, Nadikudi, Piduguralla, Sattenapalli, Guntur(4), Mangalagiri, Repalle, Narasaraopet, Markapur Road, Giddalur, Nandyal and New Guntur, Cumbum.
NTES 1 At two locations: Control office/GNT and Information Facilitation Center/GNT.
Electronic Reservation chart system
1 Guntur
Retiring Rooms/Dormitories
3 Guntur, Nandyal, Markapuram
FOIS 10 Reddipalem, Nadikude, ICL siding/VNUP, Vishnupuram, Miryalaguda, Nalgonda, Chityala, Narasaraopet, Donakonda & Nandyal
E-Payment 12 ICLV, Matrix/MRGA, FCI@NDKD, MRGA, NLDA, CTYL, NRT, Penna cements/VNUP, Deccan Cements/VNUP, MY Home Cements/MRGA, Bhavya Cement Ltd.,/NDKD, West Coast paper Mills/DKD
Exceptional Data Report(EDR)
1 Guntur. 2 more stations RAL & NDL are identified for EDR and likely to commence soon. EDRs are fed for 13 trains.
Train Indication Boards – 23
TV Display 10 Nalgonda, Miryalaguda, Nadikudi, Piduguralla, Sattenapalli, Guntur(15), Narasaraopet, Markapur Road, Giddalur and Nandyal.
LED boards 3 Guntur(3), Markapur Road, Giddalur
At a Glance 10 Nalgonda, Miryalaguda, Nadikudi, Sattenapalli, Guntur (7), Repalle, Narasaraopet, Markapur Road, Giddalur and Nandyal.
Coach Indication Boards
8 Nalgonda (2), Miryalaguda, Nadikudi (2), Guntur (7), Narasaraopet (2), Markapur Road, Giddalur and Nandyal (2).
ATM locations 4 Nalgonda,Guntur(2), Repalle ,Nandyal.
IFC 1 Guntur
Locations identified for Parcel Management System
1 Guntur
Multi Functional Complex identified
1 Guntur
Freight Facilities
STATIONS OPENED FOR FULL RAKE TRAFFIC
Description No. of Stns Stations
Stations opened for full rake traffic
13
Chityala, Nalgonda, Miryalaguda, Vishnupuram, Nadikude, Gurajala - (Outlaying siding), Reddipalem Goods shed, Narasaraopet, Vinukonda, Donakonda, Nandyal, Janpahad, Pondugala (unloading only)
SIDINGS – FULL RAKE SIDINGS
Cement 2 M/s India Cements Ltd – Vishnupuram, Penna Cement siding - Janpahad
FCI sidings 3
Food Corporation of India - Nalgonda (PFCI), Food Corporation of India – Miryalaguda (FCIM), M/s Matrix warehousing Pvt. Ltd – Miryalaguda (MWMS)
Non-functioning sidings 2
KCP (Ramakrishna) Ltd – Macherla (KCPM) & Central Warehousing Corporation – Namburu (MCWH)
CONCOR 2 Guntur Concor siding (CNGT) Miryalaguda
HALF RAKE SIDINGS: - NIL -
Major Commodities
Description Commodities
Major commodities – Loading Cement, Clinker, G.Rice, Trade Rice, Multi commodities, C.S.Husk, N.G.Bales, Boiled Rice, Timber waste, Steel pipes.
Major commodities – Unloading Fertilizers, Rice, Coal / Gypsum, Manganese ore, Flat Iron, Steel billets, Containers
Electronic in motion Weighbridges -
ICL/VNUP (Private) & NLPD (RLY)
Container Rail terminal - Guntur Concor siding (CNGT) Miryalaguda,
TMS Locations -
1.Miryalaguda, 2.Vishnupuram stn, 3.Nalgonda, 4.Donakonda, 5. Narasaraopet, 6.Nadikudi, 7. Chityal 8. Reddipalem 9. ICL/VNUP 10. Nandyal
PERFORMANCE HIGHLIGHTS
i) Loading: (Figures in million tonnes)
For the month of Mar’2013 Cumulative up to Mar’2013
Prop. Target
Prev Year
Current Year
Var. w.r.t Pr.yr
Prop. Target Prev Year Current Year Var.
w.r.t Pr.yr
0.421 0.337 0.431 28% 4.000 3.103 3.127 1%
ii) Originating Earnings:
(` In Crores)
Head
For the month of Mar’ 2013 Cumulative up to Mar’ 2013
Current Year B.P
Last Year
Current
Year
% Var w.r.t B.P
Cur-rent Year B.P
Last Year
Current Year
% Var. w.r.t B.P.
% Var w.r.t. Pr.Yr
Passenger 10.22 6.93 7.78 -23.92 102.68 77.60 82.18 -19.96 5.91
Other Chg 0.83 0.60 0.69 -17.28 9.22 7.45 8.50 -7.81 14.11
Goods 54.75 37.93 46.53 -15.00 475.98 298.17 372.42 -21.8 25
Sundries 0.69 0.48 0.21 -69.39 5.52 4.64 4.65 -15.81 0.34
Total 66.49 45.94 55.20 -16.97 593.40 387.85 467.76 -21.17 20.60
iii) Performance Efficiency Index (PEI %):
For the month of Mar’13 Target to end of Mar’ 2013
Cumulative up to Mar’13
Pre. Yr Curr. Yr Pre. Yr Curr. Yr
44.81% 27.75% -- 48.68% 43.85%
iv) Punctuality:
Actual 2011-12
Target 2012-13
Cumulative up to Mar 12
Cumulative Target up to Mar 13
Actual for Mar 2013
Cumulative up to Mar 2013
95.7% 95% 95.7% 95.0% 98.8% 96.3%
v) Accidents:
Actual 2011-12 Cumulative up to Mar’13 For the month of Mar’13 Remarks
03 02 NIL
vi) Terminal Detentions:
Loading Rakes Avg. Detention Unloading Rakes Avg. Detention
Mar ‘13 113 23:38 Mar ‘13 28 23:08
Mar ‘12 98 24:18 Mar ‘12 47 23:23
vii) Scrap Disposal: (in MTs.)
viii) Staff surrenders:
Sanctioned Actual Surrenders
Actual for 2011-12
Target for 2012-13
For the month of Mar’13
Cum up to Mar’13
4669 3656 50 45 - 45
Item 2011-12 2012-13 Cum. up to Mar’13 For the month of Mar’13
Target for the year 9814 12,342 11,314 1029
Disposal for the year 10,042 7,902 718
ix) Ticket Checking performance:
Particulars
For the month of Mar’13 Up to the month of Mar’13
Prop. Target
2011-12 2012-13 % Var. w.r.t. Pr.Yr
Prop. Target
2011-12 2012-13 % Var. w.r.t. Pr.Yr
Cases 16254 13245 21.361 61.27 195000 161447 190427 17.95
Amount
` in Lakhs 29.55 28.05 32.27 15.05 354.67 296.174 364.79 23.17
Others:
1. Surveillance Camera connectivity for PRS & UTS booking counters at Guntur station extended to the chambers of DRM & Sr.DCM through dedicated OFC Ethernet for monitoring.
2. Guntur Running Room was awarded Rly. Minister’s shield for Best Running Room, during the Rly. Week Awards Ceremony at New Delhi on 16th Apr’12.
3. FOIS was commissioned at NDL station on May’12. With this the total number of FOIS locations has gone up to 10 over the Division.
4. Tejaswini Squad was formed with a batch of 7 lady TTEs to conduct checks in on board trains over Guntur Division.
5. ‘Electrical Safety Week’ observed from 1st to 07th May’12 in the Division. Wide publicity was given at all the electrical depots, major stations of the Division by exhibiting Flexi banners on Electrical Safety and counselled the staff on the importance of Electrical Safety.
6. A full scale mock drill of ART/GNT and 140T BD Crane/BZA was conducted on coal loaded wagon bearing No.SE BOXN 1207061604(L) without any abnormality from 08.17 hrs to 14.00 hrs on 24th May’12 in which all concerned Officers and staff have participated.
7. Staff Grievances Redressal Camp was conducted on 19th June’12 at Nandyal station. A total of 52 grievances was registered, out of which 10 have been disposed off on the spot. The pending are targeted for disposal by 20th July’12. Such Camps will be held in all major stations.
8. From the month of June’12 onwards “Man/Woman of the month Award” has been introduced for those employees who have done exemplary work done connected with safety & train operations, innovations, savings and earnings during the month. A cash Award and certificate will be handed over to the concerned employees.
9. PRS facility was provided at Srisailam temple post office on 06th July’12. With this, there are total 05 numbers of PRS functioning at Post office on this Division.
10. Second siren motor erected on the top of portico of station building with 5HP capacity motor. With this the sound of siren will be audible to all concerned in emergency, which is an important safety requirement.
11. Mega Safety Seminar was conducted at Rail Mahal, Guntur on 22nd Aug’12 on safety issues related to various branches. CSO/SC was the Chief Guest for the Seminar. About 400 employees & officers participated.
12. A total of 63 wards of the employees who had opted for LARSGESS 2011 and January’12 have been appointed (60 trackmen in Civil Engineering Department, 01 Trolley man & 2 Khalasis in S&T Department).
13. Increased the Speed limit of loop lines from 15 to 30 Kmph of the stations between NLPD-NDKD section w.e.f 21.09.12. It will help in improving the Punctuality of Passenger/Express trains.
14. Safety Drive was launched from 21st to 30th Sep’12 on opening of Relay Room and effective working of signals.
15. An Awareness camp was conducted on the occasion of “World Heart Day” at the Amaravathi Annexe, Rail Vikas Bhavan, Guntur on 28th Sep’12. The eminent cardiologists of Guntur, Sri Dr. Murali Babu Rao, Sri Dr. Michael and Smt. Dr. Sharmila, Physician explained about causes and preventive methods of Heart Diseases. Precautionary medical tests have been done to 156 employees attended the camp.
16. Work of second pit line at Guntur and Freight examination facility at Nallapadu has started.
17. Janpahad goods loading has commenced w.e.f 14th Oct’12. 4 cement rakes with 168 wagons weighing 10,668 tonnes were loaded by Deccan Cement Ltd, fetching a
freight earning of ` 1.82 cr to the Division.
18. ‘Touch Screen System’ is commissioned at Guntur Station for the facility of passengers for spot your train, PNR, Reservation Enquiry etc.
19. Payment of Imprest Cash through ATM cards was inaugurated by GM/SC on 18th Oct’12.
20. Computerised issue of passes has been inaugurated by DRM on 17th Oct’12.
21. Sending of SMS about passing of withdrawal of amount from PF of employees on their mobiles has been inaugurated by DRM on 19th Nov’12.
22. Group SMS solution has been implemented in Dec’12 at Control Office, Guntur in order to disseminate the information of unusual, accidents, failures, etc., in one click.
23. Smoke detector system provided at all three SSI Cabins of Nallapadu station.
24. ‘Child Care Assistance Booth’ first of its kind in the Zone, has been inaugurated at Guntur station on 26th January’13.
25. Speed on loop lines has been increased from 15 KMPH to 30 KMPH between PGDP-NDKD section excluding VNUP station w.e.f 26.01.13.
26. Washable Apron’ work of Plat No.5 of Guntur completed on 13th Jan’13
27. Commissioned Warning/Display systems for non-operation of points against occupied line at Nadikudi, Nagireddypalli, Nallagonda, Miryalaguda and Piduguralla stations.
28. New Running Room, Officers’ Rest House, TTE & Supervisors’ Rest House at Nandyal and Rest House for Track Machine Staff at Cumbum were inaugurated on 27th Feb’13. New AC Dormitory at Nandyal has also become operational.
29. A new Solar Powered ‘Medical Stores’ & a Canteen are opened on 20th Feb’13 in the premises of RH/GNT.
30. 24 RCC boxes have been put in for RUB at Kankaragunta ROB, Guntur.
31. Achieved highest ever originating loading & freight earning during the year 2012-13
i.e, 3.127 million tones/` 372.42 cr which surpasses the previous best of 3.103
million tones/ ` 298.17 cr respectively.
32. Best ever punctuality performance of 99.6% for Mail/Express was achieved during the month of March’13. Best ever punctuality performance of 95.5% (cumulative) for