S NORTH CAROLINA D EPARTMENTOF … · state of north carolina departmentof transportation roy...

11
STATE OF NORTH CAROLINA D EPARTMENT OF T RANSPORTATION ROY COOPER JAMES H. TROGDON, III GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION ENVIRONMENT ANALYSIS UNIT 1598 MAIL SERVICE CENTER RALEIGH NC 27699-1598 Telephone: (919) 707-6000 Fax: (919) 212-5785 Customer Service: 1-877-368-4968 Website: www.ncdot.gov Location: 1020 BIRCH RIDGE DRIVE RALEIGH NC 27610 January 16, 2018 Wilmington Regulatory Field Office US Army Corps of Engineers 69 Darlington Avenue Wilmington, NC 28403 ATTN: Ms. Liz Hair NCDOT Division 6 Project Coordinator Subject: Request for Modification of Individual Section 404 and Section 401 Water Quality Certification for Fayetteville Outer Loop from I-95 South of Fayetteville to NC 24-87, Cumberland, Hoke and Robeson Counties. Federal Aid Project No. NHP-0620(031), State Project No. 34817.3.13, TIP Nos. X-002 B&C, and U-2519 AA, AB, BA, BB, CA, DA, E. Debit $570.00 from WBS 34817.3.13 References: Section 404 and 401 Individual Permit Application requested April 25, 2008 Section 404 Individual Permit Issued October 23, 2008 (SAW-2008-01413) Section 401 Water Quality Certification issued October 6, 2008 (20080737) Section 401 Wetland 401 Modification requested May 21, 2010 Section 401 Modification issued December 16, 2010 (20080737 v. 3) Section 404 Modification issued December 21, 2010 (SWA-2008-01413) Section 401 Modification issued May 22, 2014 (20080737 v. 4) Section 404 Modification issued June 24, 2014 (SAW-2008-01413) Section 401 Modification issued January 19, 2017 (20080737 v. 5) Section 401 Modification issued April 28, 2017 (20080737 v. 7) Section 404 Modification issued April 25, 2017 (SAW-2008-01413) Section 404 Modification issued April 26, 2017 (SAW-2008-01413) Section 401 Modification issued May 5, 2017 (20080737 v. 6) Dear Madam: The purpose of this modification request is to provide additional impacts as the result of the receipt of Duke Progress Energy’s (DEP) relocation of transmission lines along the Fayetteville Outer Loop. Attached are the revised utility permit drawings which includes the previously permitted sewer relocation impacts to be completed by the Fayetteville Public Works Commission. Permit Site #2 wetland impacts will increase due to DEP’s transmission line turning to go around the proposed bridge structure. The impact of permanent wetland fill is <0.01 acre (approximately 19 sf). The existing pole located at approximate station 605+85+/- will be removed.

Transcript of S NORTH CAROLINA D EPARTMENTOF … · state of north carolina departmentof transportation roy...

STATE OF NORTH CAROLINA

DEPARTMENT OF TRANSPORTATION

ROY COOPER JAMES H. TROGDON, III GOVERNOR SECRETARY

Mailing Address:

NC DEPARTMENT OF TRANSPORTATION

ENVIRONMENT ANALYSIS UNIT

1598 MAIL SERVICE CENTER

RALEIGH NC 27699-1598

Telephone: (919) 707-6000

Fax: (919) 212-5785

Customer Service: 1-877-368-4968

Website: www.ncdot.gov

Location:

1020 BIRCH RIDGE DRIVE

RALEIGH NC 27610

January 16, 2018

Wilmington Regulatory Field Office

US Army Corps of Engineers

69 Darlington Avenue

Wilmington, NC 28403

ATTN: Ms. Liz Hair

NCDOT Division 6 Project Coordinator

Subject: Request for Modification of Individual Section 404 and Section 401 Water Quality

Certification for Fayetteville Outer Loop from I-95 South of Fayetteville to NC 24-87,

Cumberland, Hoke and Robeson Counties. Federal Aid Project No. NHP-0620(031),

State Project No. 34817.3.13, TIP Nos. X-002 B&C, and U-2519 AA, AB, BA, BB, CA,

DA, E. Debit $570.00 from WBS 34817.3.13

References: Section 404 and 401 Individual Permit Application requested April 25, 2008

Section 404 Individual Permit Issued October 23, 2008 (SAW-2008-01413)

Section 401 Water Quality Certification issued October 6, 2008 (20080737)

Section 401 Wetland 401 Modification requested May 21, 2010

Section 401 Modification issued December 16, 2010 (20080737 v. 3)

Section 404 Modification issued December 21, 2010 (SWA-2008-01413)

Section 401 Modification issued May 22, 2014 (20080737 v. 4)

Section 404 Modification issued June 24, 2014 (SAW-2008-01413)

Section 401 Modification issued January 19, 2017 (20080737 v. 5)

Section 401 Modification issued April 28, 2017 (20080737 v. 7)

Section 404 Modification issued April 25, 2017 (SAW-2008-01413)

Section 404 Modification issued April 26, 2017 (SAW-2008-01413)

Section 401 Modification issued May 5, 2017 (20080737 v. 6)

Dear Madam:

The purpose of this modification request is to provide additional impacts as the result of the receipt of Duke

Progress Energy’s (DEP) relocation of transmission lines along the Fayetteville Outer Loop. Attached are the

revised utility permit drawings which includes the previously permitted sewer relocation impacts to be completed

by the Fayetteville Public Works Commission.

Permit Site #2 wetland impacts will increase due to DEP’s transmission line turning to go around the proposed

bridge structure. The impact of permanent wetland fill is <0.01 acre (approximately 19 sf). The existing pole

located at approximate station 605+85+/- will be removed.

BONES CREE

K

BONES CREEK

LIT

TLE

RO

CK

RFIS

H

CR

EE

K

LIT

TLE

RO

CK

RFIS

H

CR

EE

K

BO

NE

S

CR

EE

K

BONES CREEK

UT

TO

BO

NE

S

CR

EE

K

UT

TO

BO

NE

S

CR

EE

K

UT

TO

BO

NE

S

CR

EE

K

3GI

GTD

GTD

OO

15" RCP-III

OTCB

DU

KE

EN

ER

GY P

ROP.

TR

ANS

MISSI

ON

EAS

EM

EN

T

TRANSMISSION E

ASEMENT

DUKE ENERGY P

ROP.

TRANSMISSION E

ASEMENT

DUKE ENERGY P

ROP.

EASEMENTPROP. TRANSMIS

SION

DUKE ENERGY

TRANSMISSION EASEMENT

DUKE ENERGY PROP.

UTILITY RELOCATION BY OTHERS

TRANSMISSION EASEMENT

DUKE ENERGY PROP.

TRANSMISSION EASEMENT

DUKE ENERGY PROP.

UTILITY RELOCATION BY OTHERS

TRANSMISSION EASEMENT

DUKE ENERGY PROP.

BY OTHERS

RELOCATION

UTILITY

TRANSMISSION E

ASEMENT

DUKE ENERGY P

ROP.

TYPE B-77

TYPE B-77

GRAU 350

GRAU 350

A DC

4

5

6

17

7 89

10

11

12

1314

15

19

20

16

CUMBERLAND COUNTY

DHV

D

V

=

=

=

=

=

= MPH

ADT

ADT

0

0

0

PROFILE (HORIZONTAL)

PROJECT LENGTH

RIGHT OF WAY DATE:

LETTING DATE:

STATE STATE PROJECT REFERENCE NO.

STATE PROJ. NO. F. A. PROJ. NO. DESCRIPTION

NO.TOTALSHEETS

N.C.SHEET

1

DESIGN DATA

DIVISION OF HIGHWAYS

PROJECT ENGINEER

PROJECT DESIGN ENGINEER

GRAPHIC SCALES

PLANS

PROFILE (VERTICAL)

HYDRAULICS ENGINEER

ENGINEER

ROADWAY DESIGN

LOCATION:

TYPE OF WORK:

09/08/99

DIVISION OF HIGHWAYSSTATE OF NORTH CAROLINA

0

00

See Sheet 1-A For Index of Sheets

1000 Birch Ridge Dr., Raleigh NC, 27610

CO

NT

RA

CT:

TIP P

ROJE

CT:

PE

NT

AB

LE:

FI

LE:

\

US

ER:

JM

AS

SR

OC

DA

TE:

12/19/2017

NC

DO

T_pdf

_color_e

ng_100.plt

PL

OT

DRI

VE

R:

2:4

6:4

3 P

MTI

ME:

NC

DO

T_per

mit

s_

CO

N.t

bl

DOCUMENT NOT CONSIDERED FINAL

UNLESS ALL SIGNATURES COMPLETED

INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION

HDR Engineering, Inc. of the Carolinas

N.C.B.E.L.S. License Number: F-0116

555 Fayetteville St, Suite 900 Raleigh, N.C. 27601

50

50

25

25

50

50

100

100

10 20510

C203759

VICINITY MAP

Lake

LakeWilliams

Little

Rockfish

Creek

Creek

Bones

Raeford

Rd.

3569

Centu

ry Rd.

1104

Strickland

Bridg

e

Rd.

1104

Cliffdale Rd.

1400

Reilly

S.

Rd.

1403

Aberdeen & R

ockfish R

ailroadCl

iffdale

Rd.

1400

401

401

Rim

162

HOPE MILLSTO

FAYETTEVILLE

TO

BraggFort

BraggFort

Hoke C

ounty

Cu

mberla

nd C

ounty

CREEKROCKFISH

LITTLE

US 401-Y1-

US 401-Y1-

RDCLIFFDALE

-SR1-

-Y23-

-SR1-

RAILROADROCKFISH

ABERDEEN &-RR- & -RR_F-

PROPOSED TRAFFIC SIGNAL

NHP-0620(031)

JUNE 21, 2016

34817.3.13

Prepared for the Office of:

2015 36,000

2040 47,700

8%

55%

70

12%*T

*(TTST 4% + DUALS 8%)

STATEWIDE TIER

-Y2- STA. 13+75.00

BEGIN CONSTRUCTION

BEGIN TIP PROJECT B-5516

-Y2- STA. 22+72.63

END CONSTRUCTION

END TIP PROJECT B-5516

-L- STA. 580+00.00

BEGIN CONSTRUCTION

BEGIN TIP PROJECT U-2519CA

2012 STANDARD SPECIFICATIONS

AR

TM

E

N

N

A

S

O H

DE

P

TOF TRA

SPO

RT

TIO

N

TA

TE

OF N RTC

A

RO

LIN

A

U-2519

CA

&

B-5516

-L-401

FUNC CLASS = FREEWAY /INTERSTATE

18

18

(TOP)

(BOTTOM)RAILROADROCKFISH

ABERDEEN &-RR- & -RR_F-

CREEKBONES

RIMLAKE

(RAEFORD RD)SR 3569

-Y2-

(RAEFORD RD)SR 3569

-Y4-(REILLY RD)

SR 1403-Y3-

TOTAL LENGTH TIP PROJECT U-2519CA = 3.127 MILES

LENGTH STRUCTURE TIP PROJECT U-2519CA = 0.565 MILE

LENGTH ROADWAY TIP PROJECT U-2519CA = 2.562 MILES

TOTAL LENGTH TIP PROJECT B-5516 = 0.170 MILE

LENGTH STRUCTURE TIP PROJECT B-5516 = 0.013 MILE

LENGTH ROADWAY TIP PROJECT B-5516 = 0.157 MILEPAUL A. MEEHAN, PE

PHILLIP E. ROGERS, PE

JAMES A. RICE, PE

ANTHONY G. THOMPSON, PE

THIS IS A CONTROLLED-ACCESS PROJECT WITH ACCESS BEING LIMITED TO INTERCHANGES.

CLEARING ON THIS PROJECT SHALL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD III.

A PORTION OF THIS PROJECT IS LOCATED WITHIN THE MUNICIPAL BOUNDARIES OF THE CITY OF FAYETTEVILLE

FUTURE

INTERSTATE

295

STATE OF NORTH CAROLINA, DIVISION OF HIGHWAYS

OF US 401 TO SOUTH OF SR 1400 (CLIFFDALE ROAD).FUTURE I-295 - FAYETTEVILLE OUTER LOOP FROM SOUTH

-L1- POT STA. 743+03.78

-L- POT STA. 745+08.65=

-Y23- POT STA. 95+72.42

-SR1- POT STA. 94+75.68=

U-2519CA

U-2519CB

-L- POT STA. 745+08.65

END TIP PROJECT U-2519CA

-L1- STA. 779+80.00 (LT.)

END CONSTRUCTION

(CLIFFDALE RD)SR 1400

U-2519CA & B-5516

JUNE 21, 2016

-L- STA. 587+69.00 (RT)

-L- STA. 587+50.00 (LT)

BEGIN BRIDGE

-L- STA. 592+62.71 (RT)

-L- STA. 592+43.71 (LT)

END BRIDGE

-L- STA. 604+37.22 (RT)

-L- STA. 603+90.00 (LT)

BEGIN BRIDGE

-L- STA. 627+33.15 (RT)

-L- STA. 627+11.40 (LT)

END BRIDGE

-L- STA. 650+82.01 (RT)

-L- STA. 650+70.92 (LT)

BEGIN BRIDGE

-L- STA. 652+83.01 (RT)

-L- STA. 652+70.71 (LT)

END BRIDGE

STRUCTURES & SIGNALSGRADING, PAVING, DRAINAGE, RETAINING WALLS,

NCDOT CONTACT:K. ZAK HAMIDI, PE

DESIGN-BUILD UNIT - PROJECT ENGINEER

SITE 2

SITE 3

ImpactsWetland & Stream

Utility

SITE 5

SHEET __ OF __PERMIT DRAWING

BARNHILL

CONTRACTINGCOMPANY

END PROJECT

BEGIN PROJECT

BRIDGE NO. 14

Rev

ised

1/1

6/20

18

JMASSROC
Typewritten Text
1
JMASSROC
Typewritten Text
9

SIGN32562

DATE32562

SIGN042084

DATE042084

SOIL

ABE

RDEE

N -

ROCKFIS

H

RR

ABE

RDEE

N -

ROCKFIS

H

RR

SOIL

SOI

L

DB 8047 P

G 83

BARKER CORPORATION

DB 8580 PG 263

BARKER CORPORATION

DB 8580 PG 263

DB 8580 PG 263

BARKER CORPORATION

BARKER CORPORATION

DB 8580 PG 263

DB 8047 P

G 83

EXIS

TIN

G

R/

W

EXIS

TIN

G

R/

W

80.00'

100.00'

SHEET __ OF __PERMIT DRAWING

0

PLANS

50 25 50 100

-L- PC Sta. 609+74.87

-L- Sta. 606+85.56, 59.00' RT

-Y1RPC- PC Sta. 10+00.00 =

-L- Sta. 609+74.87, 71.00' LT-Y1RPB- POT Sta. 10+00.00 =

-RR- POT Sta. 20+57.77

-RR- POT Sta. 18+92.72

-L- POT Sta. 605+59.79 =

-RR_F- POT Sta. 18+83.04

-L- POT Sta. 605+41.64 =

-RR_F- POT Sta. 20+62.81

605+00

610

+0015

+00

15+00

20+00

20+00

15+00

15+00

2032

2042

025

025

025

025

025

025

02

01

00 025

NAD 83

BONES CREEK

1

1

1

1

WETLANDDENOTES FILL INF F

LEGEND:

SITE 2

REM

REM

DUKE ENERGY

PROP. TRANSMISSION LINES

100'

TRANSMISSION EASEMENT

DUKE ENERGY PROP.

EASEMENTPROP. TRANSMISSIONDUKE ENERGY

NAD 83

HYDRAULICSROADWAY DESIGN

ENGINEER ENGINEER

R/W SHEET NO.

SHEET NO.PROJECT REFERENCE NO.

INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION

RE

VISIO

NS

PE

NT

AB

LE:

FI

LE:

\

US

ER:

JM

AS

SR

OC

DA

TE:

12/19/2017

NC

DO

T_pdf

_color_e

ng_100.plt

PL

OT

DRI

VE

R:

2:5

8:4

9

PM

TI

ME:

NC

DO

T_per

mit

s_

CO

N.t

bl

DOCUMENT NOT CONSIDERED FINAL

UNLESS ALL SIGNATURES COMPLETED

HDR Engineering, Inc. of the Carolinas

N.C.B.E.L.S. License Number: F-0116

555 Fayetteville St, Suite 900 Raleigh, N.C. 27601

U-2519CA 6

MA

TC

HLIN

E -L- STA. 601+

00, SEE S

HEET 5

MA

TC

HLIN

E -L- STA. 615

+00, SEE S

HEET 7

SEE SHEET 2D-1 FOR DITCH DETAILSSEE SHEET 41 FOR -Y1RPC- PROFILESEE SHEET 40 FOR -Y1RPB- PROFILE

SEE SHEET 23 FOR -L- PROFILESEE SHEET 2B-2 FOR BRIDGE SKETCH

12/08/17 -

GU

AR

DR

AIL R

EVISIO

N: R

EVIS

ED

ME

DIA

N

GU

AR

DR

AIL E

ND

UNIT

S

TO

GR

EU 350 -

AG

T

BARNHILL

CONTRACTINGCOMPANY

W/ FG

2GI

W/ FG

2GI

15" RCP-III

15" RCP-III

2GI

18" RC

P-III

W/ E

LBO

WS

18"

CSP

EST. 3 TONSCLASS 'B' RIP RAP

10 SY GEO-TEXTILE

FS

2GI W/ FG

RCP-III

15"

Rev

ised

1/1

6/20

18

JMASSROC
Typewritten Text
2
JMASSROC
Typewritten Text
9

SIGN32562

DATE32562

SIGN042084

DATE042084

SOIL

ABE

RDEE

N -

ROCKFIS

H

RR

ABE

RDEE

N -

ROCKFIS

H

RR

SOIL

SOI

L

DB 8047 P

G 83

BARKER CORPORATION

DB 8580 PG 263

BARKER CORPORATION

DB 8580 PG 263

DB 8580 PG 263

BARKER CORPORATION

BARKER CORPORATION

DB 8580 PG 263

DB 8047 P

G 83

EXIS

TIN

G

R/

W

EXIS

TIN

G

R/

W

80.00'

100.00'

140

140

140

140

140

140

140

140140

140

140

140

140

140

140

140

145

145

145

145

145

145

145

145

145

145

145

145

145

145

145

150

150

150

150

150

150

150

150

150

150

150150

150

150

150

150

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

175

175

175

175

175

175

175

175

175

180

180

180

180

180

180

180

185

185

185

185

185

SHEET __ OF __PERMIT DRAWING

0

PLANS

50 25 50 100

-L- PC Sta. 609+74.87

-L- Sta. 606+85.56, 59.00' RT

-Y1RPC- PC Sta. 10+00.00 =

-L- Sta. 609+74.87, 71.00' LT-Y1RPB- POT Sta. 10+00.00 =

-RR- POT Sta. 20+57.77

-RR- POT Sta. 18+92.72

-L- POT Sta. 605+59.79 =

-RR_F- POT Sta. 18+83.04

-L- POT Sta. 605+41.64 =

-RR_F- POT Sta. 20+62.81

605+00

610

+0015

+00

15+00

20+00

20+00

15+00

15+00

2032

2042

025

025

025

025

025

025

02

01

00 025

NAD 83

BONES CREEK

1

1

1

1

WETLANDDENOTES FILL INF F

LEGEND:

SITE 2

REM

REM

DUKE ENERGY

PROP. TRANSMISSION LINES

100'

TRANSMISSION EASEMENT

DUKE ENERGY PROP.

EASEMENTPROP. TRANSMISSIONDUKE ENERGY

NAD 83

HYDRAULICSROADWAY DESIGN

ENGINEER ENGINEER

R/W SHEET NO.

SHEET NO.PROJECT REFERENCE NO.

INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION

RE

VISIO

NS

PE

NT

AB

LE:

FI

LE:

\

US

ER:

JM

AS

SR

OC

DA

TE:

12/19/2017

NC

DO

T_pdf

_color_e

ng_100.plt

PL

OT

DRI

VE

R:

2:5

7:4

6

PM

TI

ME:

NC

DO

T_per

mit

s_

CO

N.t

bl

DOCUMENT NOT CONSIDERED FINAL

UNLESS ALL SIGNATURES COMPLETED

HDR Engineering, Inc. of the Carolinas

N.C.B.E.L.S. License Number: F-0116

555 Fayetteville St, Suite 900 Raleigh, N.C. 27601

U-2519CA 6

MA

TC

HLIN

E -L- STA. 601+

00, SEE S

HEET 5

MA

TC

HLIN

E -L- STA. 615

+00, SEE S

HEET 7

SEE SHEET 2D-1 FOR DITCH DETAILSSEE SHEET 41 FOR -Y1RPC- PROFILESEE SHEET 40 FOR -Y1RPB- PROFILE

SEE SHEET 23 FOR -L- PROFILESEE SHEET 2B-2 FOR BRIDGE SKETCH

12/08/17 -

GU

AR

DR

AIL R

EVISIO

N: R

EVIS

ED

ME

DIA

N

GU

AR

DR

AIL E

ND

UNIT

S

TO

GR

EU 350 -

AG

T

BARNHILL

CONTRACTINGCOMPANY

W/ FG

2GI

W/ FG

2GI

15" RCP-III

15" RCP-III

2GI

18" RC

P-III

W/ E

LBO

WS

18"

CSP

EST. 3 TONSCLASS 'B' RIP RAP

10 SY GEO-TEXTILE

FS

2GI W/ FG

RCP-III

15"

Rev

ised

1/1

6/20

18

JMASSROC
Typewritten Text
3
JMASSROC
Typewritten Text
9

SIGN32562

DATE32562

SIGN042084

DATE042084

II

4

H

bb

b

b

EXIS

TIN

G

R/

W

EXIS

TIN

G

R/

W

EXIS

TIN

G

R/

W

EXIS

TIN

G

R/

W

EXIS

TIN

G

R/

W

100' R/W

200'

R/W

EXIS

TIN

G

R/

W

EXIS

TIN

G

R/

W

EXIS

TIN

G

R/

W

WE

11' BST

SOIL

SOIL & GR

VINEYARD

R 5

11

W/LT

R10

R12

W/LT

R18

R6

POOL

SR 3569 R

AE

FO

RD

RD 30' B

ST

SB

L

NB

L

EIP

EIP

EIP

-E

Y1-

I

II

H

a

b

}

P

b

b

1003

1006

1010

W

24" D

IP

EXIS

TIN

G

R/

W

EXIS

TIN

G

R/

W

72" C

HL 3S

BW

GR

AVE

L

TO

REIL

LY R

D

14

100.00'

ER

M

ER

M

d

d

d

d

d

d

30" C

ONC

30" C

ONC

30" CONC

30" C

ON

C

18" CONC

24" C

ON

C

DB 3675 PG 120

BARKER CORPORATION

DB 3675 PG 120

BARKER CORPORATION

DB 3675 PG 120

BARKER CORPORATION

DB 2749 PG 761

NC FISH HATCHERY

DB 3675 PG 120

BARKER CORPORATION

DB 9261 PG 235 DB 3940 PG 394

WILLIAM J. GILLIS

DB 2882 PG 775

PETE G. LESLIE

DB 284 PG 528

NC FISH HATCHERY

DB 7258 PG 706

N C STATE FISH HATCHERY

DB 284 PG 528

NC FISH HATCHERY

DB 3082 PG 589

TED CHAPPELL

12-CVS-2518

DB 9261 PG 235

WILLIAM J. GILLIS

FREDDIE MCLEAN

DB 6558 PG 399

DB 3794 PG 571

BARKER CORPORATION

30" CONC

18" CONC

24" C

ON

C

REMOVE 1 WATER METER

ABANDON

0.375" THICK

ENCASEMENT BY OPEN CUT,

PROP. 242' OF 34" STEEL

42" STEEL ENCASEMENT

42" S

TE

EL

EN

CAS

EM

EN

T0.500" THICK

ENCASEMENT BY OPEN CUT,

PROP. 260' OF 42" STEEL

MH1

MH2

MH3

MH4

MH5

42" S

TE

EL

EN

CAS

EM

EN

T0.500" THICK

ENCASEMENT BY OPEN CUT,

PROP. 260' OF 42" STEEL

22 1/2°

22 1/2°

34" STEEL E

NC

ASE

ME

NT

ABANDON

ABANDON

AB

AN

DO

N

ABANDON

PLUG

PLUG

0+00

0+50

1+00

1+50

2+00

2+50

3+00

3+50

4+00

4+50

5+00

5+50

6+00

6+50

7+00

GV

ABANDON 60' OF 24" UTILITY PIPEABANDON 306' OF 24" UTILITY PIPEREMAINING EX. 24" WATERLINE TO BE ABANDONED WILLBE REMOVED WITH THE UNDERCUT

PROP. 424' OF 24" WATER LINE(RJ DI, PC 250)PROP. 298' OF 24" WATER LINE(RJ DI, PC 250) 1-24" VALVE

MANUFACTURED RESTRAINED JOINT

2-24"-22-1/2° RJ DI BENDS

MANUFACTURED RESTRAINED JOINT

2-24"-22 1/2° RJ DI BENDS

22 1/2°

22 1/2°

24" WATER LINE

LINE TO INSTALL PROP.

REMOVE EXIST. 24" WATER

24" WATER LINE

LINE TO INSTALL PROP.

REMOVE EXIST. 24" WATER

VALVE

PROP. 24" GATE

USE RESTRAINED RETAINER GLANDSTIE-IN POINTS

ONLY ON FULL BODY SLEEVES AT THE

RF

H

PROFILE 2

PROFILE 3

(RJ DI, PC 350)

30' OF 6" FH WATER LINE

1-6" FH VALVE

24" X 6" RJ DI FH TEE

RELOCATE FIRE HYDRANT

16" WATER LINE

LINE TO INSTALL PROP.

REMOVE EXIST. 16" WATER

SHEET __ OF __PERMIT DRAWING

SHEET 7A

BONES CREEK CLOMR EXCAVATION

LIMITEASEMENT

ELEV. = 145'

3:1

10'

* NO EXCAVATION IN WETLANDS

LIMITWETLAND

B

-Y1- Sta. 30+42.90, 12.00' LT-Y1RPB- PT Sta. 28+03.64 =

-Y1RPB- PT Sta. 16+31.03

-Y1RPAA- PC Sta. 11+25.86

-Y1- Sta. 24+82.08, 48.00' RT

-Y1RPBB- PT Sta. 14+11.13 =

-Y1RPCC- PC Sta. 11+37.94

-Y1RPC- PT Sta. 25+41.12

-Y1RPA- PC Sta. 23+46.95, 19.00' RT

-Y1RPAA- POT Sta. 10+00.00 =

C D

B

A

-Y1RPC- Sta. 26+15.80, 27.00' RT

-Y1RPCC- POT Sta. 9+92.99 =

-L- Sta. 641+17.36, 59.00' LT

-Y1RPA- POT Sta. 10+00.00 =

-Y1RPA- PT Sta. 19+81.57

-Y1RPA- PC Sta. 14+68.68

-Y1RPD- SC Sta. 11+20.00

-L- Sta. 641+87.33, 71' RT

-Y1RPD- ST Sta. 10+00.00 =

-Y1RPD- PC Sta. 23+23.59

-Y1RPA- PC Sta. 23+49.77

-Y1RPC- PC Sta. 26+15.80

-Y1RPD- PT Sta. 27+93.64

-Y1- Sta. 27+25.80, 12.00' RT

-Y1RPD- CS Sta. 14+80.40

-Y1RPD- ST Sta. 16+00.40

-Y1- Sta. 27+17.14, 36.00' LT

-Y1RPC- PT Sta. 30+53.31- =

-Y1RPD- STA. 23+16.45

-Y1RPDD- POT Sta. 10+00.00 =

-Y1RPB- PC Sta. 21+55.26

-Y1RPBB- POT Sta. 9+95.54 =

-Y1- Sta. 26+27.61, 48.00' LT-Y1RPAA- PT Sta. 13+03.48 =

-Y1- Sta. 32+34.18, 48.00' LT-Y1RPDD- PT Sta. 12+99.39=

-Y4- PT Sta. 12+

81.35

-Y4- PRC S

ta. 11+79.48

-Y4- PC S

ta. 10+60.67

-Y3

RA- POC S

ta. 11+12.06

-Y4- POT Sta. 10+

55.00 =

615

+00

620+00

625+00

630+00

635+00

640+00

20+00 25+00

10+00

20+00

25+00

30+00

20+00

15+00

15+0020+00

25+00

25+00

30+00

35+00

10

-Y1RPBB- PC Sta. 11+75.30

-Y1- Sta. 30+27.86, 36.00' RT

-Y1RPA- PT Sta. 27+65.75 =

-Y1- Sta. 31+53.88, 36.0' RT

-Y1RPCC- PT Sta. 13+30.04 =

15Sta. 16+71.48

-DR3- POT

-DR3- PT Sta. 16+04.48

Sta. 14+64.44

-DR3- PRC

-DR3- PC Sta. 12+47.35

-DR3- PT Sta. 10+94.93

-Y1- POT STA. 33+75.00

-DR3- POT Sta. 10+00.00 =

-DR3- PC Sta. 10+49.77

25

025

025

04

03

04

03

02

5

02

5

02

5

025

025

025

025

025

025 02

5

02

5

025

025

02

5

02

5

025

025

025

025

025

025

025

025

025

025

025

03

025

025

025

02

01

00

01

02

025

025

02

02

01

01

02

50

25

02

020

101

00

025

025

025

025

02

025

02

50

25

025

02

5 025

02

5

02

5

02

5

02

5

00

0102

025

03

010

02

02

02

01

020

25

01

020

25

025

025

03

04

04

03

02

50

25

01

01

00

00

01

01

02

02

02503

04

NAD 83

BO

NE

S

CR

EE

K

1

1

2

2

2

1

1

3

4

5

6

3

SITE 2

SITE 3

LEGEND:

E EIN WETLAND

DENOTES EXCAVATION

NAD 83

ATTENUATOR

04

03

04

03

025

025

025

025

025

025

025

025

025

025

025

025

025

025

025

025

03

025

025

025

025

025

02

025

025

025

03

010

02

7

MA

TC

HLIN

E -L- STA. 615

+00, SEE S

HEET 6

MA

TC

HLIN

E -L- STA. 643+

00, SEE S

HEET 8

U-2519CA

-Y1- S

TA. 22

+50, SE

E SHEET

17

MATCHLINEUS-4

01

US-401

MATCHLINE -

Y1- ST

A. 38+

00, SE

E SHEET

18

MATCHLIN

E, SE

E B-55

16 PLA

NS

RAEF

ORD R

OAD

RAEF

ORD RO

AD

MATC

HLI

NE, SEE S

HEE

T 18

SEE SHEET 2D-1 FOR DITCH DETAILSSEE SHEET 42 FOR -Y1RPDD- PROFILESEE SHEET 41 FOR -Y1RPCC- PROFILESEE SHEET 40 FOR -Y1RPBB- PROFILESEE SHEET 39 FOR -Y1RPAA- PROFILE

SEE SHEET 42 FOR -Y1RPD- PROFILESEE SHEET 41 FOR -Y1RPC- PROFILESEE SHEET 40 FOR -Y1RPB- PROFILESEE SHEET 39 FOR -Y1RPA- PROFILE

SEE SHEETS 37 & 38 FOR -Y1- PROFILESEE SHEETS 24 & 25 FOR -L- PROFILE

SEE SHEET 2B-4 FOR INTERSECTION DETAILSEE SHEET 2B-2 FOR BRIDGE SKETCH

LOCATION:

DESIGNED BY:

CHECKED BY:

COUNTY:TIP NO.:

DATE:

PLANS

02550 50 100

GRAPHIC SCALE

REVISIONS

6/2/9

9

PE

NTA

BLE:

FIL

E:

\

USER:

JMASSR

OC

DA

TE:

12/19/2

017

NC

DO

T_pdf_color_

eng_10

0.plt

PLO

T D

RIV

ER:

3:2

7:5

9 P

MTIM

E:

NC

DO

T_permits_

CO

N.tbl

END UNITS TO GREU 350 - AGT12/08/17 - GUARDRAIL REVISION: REVISED MEDIAN GUARDRAILEASEMENT ON PARCELS 2, 3 & 5. - AGT09/26/17 - ROW REVISION: ADDED PERMANENT UTILITY

INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION

DOCUMENT NOT CONSIDERED FINAL

UNLESS ALL SIGNATURES COMPLETED

HDR Engineering, Inc. of the Carolinas

N.C.B.E.L.S. License Number: F-0116

555 Fayetteville St, Suite 900 Raleigh, N.C. 27601

SHEET NO.PROJECT REFERENCE NO.

R/W SHEET NO.

ROADWAY DESIGN

ENGINEER

HYDRAULICS

ENGINEER

BARNHILL

CONTRACTINGCOMPANY

3:13:1

D

( Not to Scale)

STANDARD 4' BASE DITCH

B

d

DETAIL K

B= 4 Ft.

Max. d= 1 Ft.

Min. D= 1 Ft.

Ground

Natural

Ground

Natural

*When B is < 6.0'

Type of Liner= Class 'I' Rip-Rap

Geotextile

PLAN

F

C

RIP-RAPPED ENERGY DISSIPATOR BASIN

DETAIL L

C SECTION

2:1

2:1

Wo

CULVERT

2:1+

RIP RAP NOT SHOWN

APRON

2:1

CL

2:1

2:1+

RIP RAP NOT SHOWN

G

DISSIPATOR POOL APRON

2:1

E

2:1

CULVERT

A

Wo

D

FILL SLOPE

L

A

B

C

D

E

F

G

RIP RAP BASIN #

1

ALL DIMENSIONS APPROXIMATE

BASIN # LOCATION (AT OUTLET)

1

(ft)

DIM.

2.5

1.5

2

1.25

4

21

16

626+85 -L- LT (0735)

CL

GROUNDNATURAL

GEOTEXTILE

REMOVE

REMOVE

FS

HW

RETAIN

Slab Lid

JB w/

DI

RETAIN

W/ FG2GI

Slab Lid

JB w/

W/ FG

2GI

W/ FG

2GI

FS

18" RCP-III

DI

REMOVE

FS

W/ E

LB

OW

S

18"

CSP

75 SY GEOTEXTILE

EST. 70 TONS

CLASS 'I' RIP RAP

ENERGY DISSIPATOR BASIN

W/ FG

2GI

2GI

W/ FG

2GI

W/ FG

2GI

2GI

2GI

2GI

18" RC

P-III

CB(G)

CB(G)

15"

RCP-III

W/ FG

2GI

W/ FG

2GI

W/ FG

2GI

W/ FG

2GI

W/ ELBOWS

18" CSP

Slab Lid

JB w/

48" R

CP-IV W/ FG

2GI

FS

2GI

18" R

CP-III

18" RC

P-III

W/ FG

2GI

W/ ELBOWS

18" CSP

18" RC

P-III

15" RC

P-III

18" R

CP-III

48" RC

P-IV

18" RC

P-III

2GI

15" RC

P-III

W/ FG

2GI

48" R

CP-IV

18" RC

P-III

18" RCP-III

RCP-III

18"

W/ FG

2GI

W/ FG2GI

W/ ELBO

WS

18" CSP

FS

2GI

FS

18" RCP-III

18" RCP-III

24" RCP-III

2GI(A)

W/ FG

2GI

W/ ELBOWS15" CSP

EST. 2 TONS

CLASS 'B' RIP RAP

7 SY GEO-TEXTILE

2GI

W/ FG

2GI

W/ ELBOWS

18" CSPRCP-III

18"

EST. 3 TONS

CLASS 'B' RIP RAP

10 SY GEO-TEXTILE

W/ FG

2GI

W/ FG2GI

15" RCP-III

15" RCP-III

18"

RCP-III

CB(G)

EST. 3 TONS

CLASS 'B' RIP RAP

10 SY GEO-TEXTILE

18" R

CP-III

W/ FG

2GI

JB w/MH

RC

P-III

15"

RCP-III

15"

2GI

W/ FG

2GI

FS

FS

18" RCP-III

18" RC

P-III

15" RCP-III

W/ FG

2GI

15" RCP-III

CB(G)

SEE DETAIL 'X'

LATERAL 'V' DITCH

W/ FG

2GI

RCP-III

15"

RCP-III

15"W/ FG

2GI

2GI

CB(G)

15" RCP-III

18" RCP-III

W/ ELBOWS18" CSP

2GI W/ FG

18" RCP-III

2GI W/ FG

160 SY GEOTEXTILEEST. 72 TONSSEE DETAIL 'N'W/ CLASS 'I' RIP RAP2' BASE SPECIAL CUT DITCH

590 SY GEOTEXTILEEST. 292 TONSSEE DETAIL 'O'W/ CLASS 'I' RIP RAP2' BASE LATERAL DITCH

15" RCP-III

18" RCP-III

2GI(D)

W/ FG

2GI

18" RC

P-IV

18" RC

P-IV

SEE DETAIL 'P'

BEHIND RETAINING WALL

CONCRETE DITCH

165 SY GEOTEXTILE

EST. 75 TONS

SEE DETAIL 'Y'

W/ CLASS 'B' RIP RAP

LATERAL 'V' DITCH

NOTE: DO NOT EXCAVATE IN WETLANDSEE DETAIL

CREEK CLOMR ELEV. = 145'AREA EXCAVATED FOR BONES

RCP-III

18"

20 SY GEOTEXTILE

EST. 10 TONS

SEE DETAIL 'BB'

W/ CLASS 'B' RIP RAP

SPECIAL CUT DITCH

DI

RE

MO

VE

W/ E

LB

OW

S24" C

SP

24" RCP-III

24" RCP-III 24" RCP-III 24" RCP-III

24" RC

P-III

W/ FG

2GI(A)

W/ FG

2GI(A)

W/ FG

2GI(A)

W/ FG

2GI(A)

W/ FG

2GI(A)

2GI(D)

18" RCP-III

W/ FG2GI

18"

RCP-III

18"

RCP-IV

18" RC

P-IV

18" RC

P-IV

73 SY GEOTEXTILEEST. 54 TONSSEE DETAIL 'K'W/ CLASS 'I' RIP RAPSTANDARD 4' BASE DITCH

65 SY GEOTEXTILESEE DETAIL 'C' EST. 30 TONS2' BASE LATERAL DITCH W/ CLASS 'B' RIP RAP

2GI W/ FG

15" RCP-III 2GI W/ FG

REINFORCED SOIL SLOPE

RCP-III 18"

Rev

ised

1/1

6/20

18

JMASSROC
Typewritten Text
9
JMASSROC
Typewritten Text
4

SIGN32562

DATE32562

SIGN042084

DATE042084

II

4

H

bb

b

b

EXIS

TIN

G

R/

W

EXIS

TIN

G

R/

W

EXIS

TIN

G

R/

W

EXIS

TIN

G

R/

W

EXIS

TIN

G

R/

W

100' R/W

200'

R/W

EXIS

TIN

G

R/

W

EXIS

TIN

G

R/

W

EXIS

TIN

G

R/

W

WE

11' BST

SOIL

SOIL & GR

VINEYARD

R 5

11

W/LT

R10

R12

W/LT

R18

R6

POOL

SR 3569 R

AE

FO

RD

RD 30' B

ST

SB

L

NB

L

EIP

EIP

EIP

-E

Y1-

I

II

H

a

b

}

P

b

b

1003

1006

1010

W

24" D

IP

EXIS

TIN

G

R/

W

EXIS

TIN

G

R/

W

72" C

HL 3S

BW

GR

AVE

L

TO

REIL

LY R

D

14

100.00'

ER

M

ER

M

d

d

d

d

d

d

30" C

ONC

30" C

ONC

30" CONC

30" C

ON

C

18" CONC

24" C

ON

C

DB 3675 PG 120

BARKER CORPORATION

DB 3675 PG 120

BARKER CORPORATION

DB 3675 PG 120

BARKER CORPORATION

DB 2749 PG 761

NC FISH HATCHERY

DB 3675 PG 120

BARKER CORPORATION

DB 9261 PG 235 DB 3940 PG 394

WILLIAM J. GILLIS

DB 2882 PG 775

PETE G. LESLIE

DB 284 PG 528

NC FISH HATCHERY

DB 7258 PG 706

N C STATE FISH HATCHERY

DB 284 PG 528

NC FISH HATCHERY

DB 3082 PG 589

TED CHAPPELL

12-CVS-2518

DB 9261 PG 235

WILLIAM J. GILLIS

FREDDIE MCLEAN

DB 6558 PG 399

DB 3794 PG 571

BARKER CORPORATION

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

145

145

145

145

145

145

145

145

145

145

145

145

145

145

145

145

145

145

145

145

145

145

145

145

145

145

145

145

145

145

145

145

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

180

180

180

180

180

180

180

180

180

180

180

180

180

180

180

180

180

180

180

180

180

180

180

180

180

180

180

180

180

180

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

200

200

200

200

200

200

200

200

200

200

200200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

210

210

210

210

210

210

210

210

210

210

210

210

210

210

210210

210

210

30" CONC

18" CONC

24" C

ON

C

REMOVE 1 WATER METER

ABANDON

0.375" THICK

ENCASEMENT BY OPEN CUT,

PROP. 242' OF 34" STEEL

42" STEEL ENCASEMENT

42" S

TE

EL

EN

CAS

EM

EN

T0.500" THICK

ENCASEMENT BY OPEN CUT,

PROP. 260' OF 42" STEEL

MH1

MH2

MH3

MH4

MH5

42" S

TE

EL

EN

CAS

EM

EN

T0.500" THICK

ENCASEMENT BY OPEN CUT,

PROP. 260' OF 42" STEEL

22 1/2°

22 1/2°

34" STEEL E

NC

ASE

ME

NT

ABANDON

ABANDON

AB

AN

DO

N

ABANDON

PLUG

PLUG

0+00

0+50

1+00

1+50

2+00

2+50

3+00

3+50

4+00

4+50

5+00

5+50

6+00

6+50

7+00

GV

ABANDON 60' OF 24" UTILITY PIPEABANDON 306' OF 24" UTILITY PIPEREMAINING EX. 24" WATERLINE TO BE ABANDONED WILLBE REMOVED WITH THE UNDERCUT

PROP. 424' OF 24" WATER LINE(RJ DI, PC 250)PROP. 298' OF 24" WATER LINE(RJ DI, PC 250) 1-24" VALVE

MANUFACTURED RESTRAINED JOINT

2-24"-22-1/2° RJ DI BENDS

MANUFACTURED RESTRAINED JOINT

2-24"-22 1/2° RJ DI BENDS

22 1/2°

22 1/2°

24" WATER LINE

LINE TO INSTALL PROP.

REMOVE EXIST. 24" WATER

24" WATER LINE

LINE TO INSTALL PROP.

REMOVE EXIST. 24" WATER

VALVE

PROP. 24" GATE

USE RESTRAINED RETAINER GLANDSTIE-IN POINTS

ONLY ON FULL BODY SLEEVES AT THE

RF

H

PROFILE 2

PROFILE 3

(RJ DI, PC 350)

30' OF 6" FH WATER LINE

1-6" FH VALVE

24" X 6" RJ DI FH TEE

RELOCATE FIRE HYDRANT

16" WATER LINE

LINE TO INSTALL PROP.

REMOVE EXIST. 16" WATER

SHEET __ OF __PERMIT DRAWING

SHEET 7A

BONES CREEK CLOMR EXCAVATION

LIMITEASEMENT

ELEV. = 145'

3:1

10'

* NO EXCAVATION IN WETLANDS

LIMITWETLAND

B

-Y1- Sta. 30+42.90, 12.00' LT-Y1RPB- PT Sta. 28+03.64 =

-Y1RPB- PT Sta. 16+31.03

-Y1RPAA- PC Sta. 11+25.86

-Y1- Sta. 24+82.08, 48.00' RT

-Y1RPBB- PT Sta. 14+11.13 =

-Y1RPCC- PC Sta. 11+37.94

-Y1RPC- PT Sta. 25+41.12

-Y1RPA- PC Sta. 23+46.95, 19.00' RT

-Y1RPAA- POT Sta. 10+00.00 =

C D

B

A

-Y1RPC- Sta. 26+15.80, 27.00' RT

-Y1RPCC- POT Sta. 9+92.99 =

-L- Sta. 641+17.36, 59.00' LT

-Y1RPA- POT Sta. 10+00.00 =

-Y1RPA- PT Sta. 19+81.57

-Y1RPA- PC Sta. 14+68.68

-Y1RPD- SC Sta. 11+20.00

-L- Sta. 641+87.33, 71' RT

-Y1RPD- ST Sta. 10+00.00 =

-Y1RPD- PC Sta. 23+23.59

-Y1RPA- PC Sta. 23+49.77

-Y1RPC- PC Sta. 26+15.80

-Y1RPD- PT Sta. 27+93.64

-Y1- Sta. 27+25.80, 12.00' RT

-Y1RPD- CS Sta. 14+80.40

-Y1RPD- ST Sta. 16+00.40

-Y1- Sta. 27+17.14, 36.00' LT

-Y1RPC- PT Sta. 30+53.31- =

-Y1RPD- STA. 23+16.45

-Y1RPDD- POT Sta. 10+00.00 =

-Y1RPB- PC Sta. 21+55.26

-Y1RPBB- POT Sta. 9+95.54 =

-Y1- Sta. 26+27.61, 48.00' LT-Y1RPAA- PT Sta. 13+03.48 =

-Y1- Sta. 32+34.18, 48.00' LT-Y1RPDD- PT Sta. 12+99.39=

-Y4- PT Sta. 12+

81.35

-Y4- PRC S

ta. 11+79.48

-Y4- PC S

ta. 10+60.67

-Y3

RA- POC S

ta. 11+12.06

-Y4- POT Sta. 10+

55.00 =

615

+00

620+00

625+00

630+00

635+00

640+00

20+00 25+00

10+00

20+00

25+00

30+00

20+00

15+00

15+0020+00

25+00

25+00

30+00

35+00

10

-Y1RPBB- PC Sta. 11+75.30

-Y1- Sta. 30+27.86, 36.00' RT

-Y1RPA- PT Sta. 27+65.75 =

-Y1- Sta. 31+53.88, 36.0' RT

-Y1RPCC- PT Sta. 13+30.04 =

15Sta. 16+71.48

-DR3- POT

-DR3- PT Sta. 16+04.48

Sta. 14+64.44

-DR3- PRC

-DR3- PC Sta. 12+47.35

-DR3- PT Sta. 10+94.93

-Y1- POT STA. 33+75.00

-DR3- POT Sta. 10+00.00 =

-DR3- PC Sta. 10+49.77

25

025

025

04

03

04

03

02

5

02

5

02

5

025

025

025

025

025

025 02

5

02

5

025

025

02

5

02

5

025

025

025

025

025

025

025

025

025

025

025

03

025

025

025

02

01

00

01

02

025

025

02

02

01

01

02

50

25

02

020

101

00

025

025

025

025

02

025

02

50

25

025

02

5 025

02

5

02

5

02

5

02

5

00

0102

025

03

010

02

02

02

01

020

25

01

020

25

025

025

03

04

04

03

02

50

25

01

01

00

00

01

01

02

02

02503

04

NAD 83

BO

NE

S

CR

EE

K

1

1

2

2

2

1

1

3

4

5

6

3

SITE 2

SITE 3

LEGEND:

E EIN WETLAND

DENOTES EXCAVATION

NAD 83

ATTENUATOR

04

03

04

03

025

025

025

025

025

025

025

025

025

025

025

025

025

025

025

025

03

025

025

025

025

025

02

025

025

025

03

010

02

7

MA

TC

HLIN

E -L- STA. 615

+00, SEE S

HEET 6

MA

TC

HLIN

E -L- STA. 643+

00, SEE S

HEET 8

U-2519CA

-Y1- S

TA. 22

+50, SE

E SHEET

17

MATCHLINEUS-4

01

US-401

MATCHLINE -

Y1- ST

A. 38+

00, SE

E SHEET

18

MATCHLIN

E, SE

E B-55

16 PLA

NS

RAEF

ORD R

OAD

RAEF

ORD RO

AD

MATC

HLI

NE, SEE S

HEE

T 18

SEE SHEET 2D-1 FOR DITCH DETAILSSEE SHEET 42 FOR -Y1RPDD- PROFILESEE SHEET 41 FOR -Y1RPCC- PROFILESEE SHEET 40 FOR -Y1RPBB- PROFILESEE SHEET 39 FOR -Y1RPAA- PROFILE

SEE SHEET 42 FOR -Y1RPD- PROFILESEE SHEET 41 FOR -Y1RPC- PROFILESEE SHEET 40 FOR -Y1RPB- PROFILESEE SHEET 39 FOR -Y1RPA- PROFILE

SEE SHEETS 37 & 38 FOR -Y1- PROFILESEE SHEETS 24 & 25 FOR -L- PROFILE

SEE SHEET 2B-4 FOR INTERSECTION DETAILSEE SHEET 2B-2 FOR BRIDGE SKETCH

LOCATION:

DESIGNED BY:

CHECKED BY:

COUNTY:TIP NO.:

DATE:

PLANS

02550 50 100

GRAPHIC SCALE

REVISIONS

6/2/9

9

PE

NTA

BLE:

FIL

E:

\

USER:

JMASSR

OC

DA

TE:

12/19/2

017

NC

DO

T_pdf_color_

eng_10

0.plt

PLO

T D

RIV

ER:

3:2

8:2

1 P

MTIM

E:

NC

DO

T_permits_

CO

N.tbl

END UNITS TO GREU 350 - AGT12/08/17 - GUARDRAIL REVISION: REVISED MEDIAN GUARDRAILEASEMENT ON PARCELS 2, 3 & 5. - AGT09/26/17 - ROW REVISION: ADDED PERMANENT UTILITY

INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION

DOCUMENT NOT CONSIDERED FINAL

UNLESS ALL SIGNATURES COMPLETED

HDR Engineering, Inc. of the Carolinas

N.C.B.E.L.S. License Number: F-0116

555 Fayetteville St, Suite 900 Raleigh, N.C. 27601

SHEET NO.PROJECT REFERENCE NO.

R/W SHEET NO.

ROADWAY DESIGN

ENGINEER

HYDRAULICS

ENGINEER

BARNHILL

CONTRACTINGCOMPANY

3:13:1

D

( Not to Scale)

STANDARD 4' BASE DITCH

B

d

DETAIL K

B= 4 Ft.

Max. d= 1 Ft.

Min. D= 1 Ft.

Ground

Natural

Ground

Natural

*When B is < 6.0'

Type of Liner= Class 'I' Rip-Rap

Geotextile

PLAN

F

C

RIP-RAPPED ENERGY DISSIPATOR BASIN

DETAIL L

C SECTION

2:1

2:1

Wo

CULVERT

2:1+

RIP RAP NOT SHOWN

APRON

2:1

CL

2:1

2:1+

RIP RAP NOT SHOWN

G

DISSIPATOR POOL APRON

2:1

E

2:1

CULVERT

A

Wo

D

FILL SLOPE

L

A

B

C

D

E

F

G

RIP RAP BASIN #

1

ALL DIMENSIONS APPROXIMATE

BASIN # LOCATION (AT OUTLET)

1

(ft)

DIM.

2.5

1.5

2

1.25

4

21

16

626+85 -L- LT (0735)

CL

GROUNDNATURAL

GEOTEXTILE

REMOVE

REMOVE

FS

HW

RETAIN

Slab Lid

JB w/

DI

RETAIN

W/ FG2GI

Slab Lid

JB w/

W/ FG

2GI

W/ FG

2GI

FS

18" RCP-III

DI

REMOVE

FS

W/ E

LB

OW

S

18"

CSP

75 SY GEOTEXTILE

EST. 70 TONS

CLASS 'I' RIP RAP

ENERGY DISSIPATOR BASIN

W/ FG

2GI

2GI

W/ FG

2GI

W/ FG

2GI

2GI

2GI

2GI

18" RC

P-III

CB(G)

CB(G)

15"

RCP-III

W/ FG

2GI

W/ FG

2GI

W/ FG

2GI

W/ FG

2GI

W/ ELBOWS

18" CSP

Slab Lid

JB w/

48" R

CP-IV W/ FG

2GI

FS

2GI

18" R

CP-III

18" RC

P-III

W/ FG

2GI

W/ ELBOWS

18" CSP

18" RC

P-III

15" RC

P-III

18" R

CP-III

48" RC

P-IV

18" RC

P-III

2GI

15" RC

P-III

W/ FG

2GI

48" R

CP-IV

18" RC

P-III

18" RCP-III

RCP-III

18"

W/ FG

2GI

W/ FG2GI

W/ ELBO

WS

18" CSP

FS

2GI

FS

18" RCP-III

18" RCP-III

24" RCP-III

2GI(A)

W/ FG

2GI

W/ ELBOWS15" CSP

EST. 2 TONS

CLASS 'B' RIP RAP

7 SY GEO-TEXTILE

2GI

W/ FG

2GI

W/ ELBOWS

18" CSPRCP-III

18"

EST. 3 TONS

CLASS 'B' RIP RAP

10 SY GEO-TEXTILE

W/ FG

2GI

W/ FG2GI

15" RCP-III

15" RCP-III

18"

RCP-III

CB(G)

EST. 3 TONS

CLASS 'B' RIP RAP

10 SY GEO-TEXTILE

18" R

CP-III

W/ FG

2GI

JB w/MH

RC

P-III

15"

RCP-III

15"

2GI

W/ FG

2GI

FS

FS

18" RCP-III

18" RC

P-III

15" RCP-III

W/ FG

2GI

15" RCP-III

CB(G)

SEE DETAIL 'X'

LATERAL 'V' DITCH

W/ FG

2GI

RCP-III

15"

RCP-III

15"W/ FG

2GI

2GI

CB(G)

15" RCP-III

18" RCP-III

W/ ELBOWS18" CSP

2GI W/ FG

18" RCP-III

2GI W/ FG

160 SY GEOTEXTILEEST. 72 TONSSEE DETAIL 'N'W/ CLASS 'I' RIP RAP2' BASE SPECIAL CUT DITCH

590 SY GEOTEXTILEEST. 292 TONSSEE DETAIL 'O'W/ CLASS 'I' RIP RAP2' BASE LATERAL DITCH

15" RCP-III

18" RCP-III

2GI(D)

W/ FG

2GI

18" RC

P-IV

18" RC

P-IV

SEE DETAIL 'P'

BEHIND RETAINING WALL

CONCRETE DITCH

165 SY GEOTEXTILE

EST. 75 TONS

SEE DETAIL 'Y'

W/ CLASS 'B' RIP RAP

LATERAL 'V' DITCH

NOTE: DO NOT EXCAVATE IN WETLANDSEE DETAIL

CREEK CLOMR ELEV. = 145'AREA EXCAVATED FOR BONES

RCP-III

18"

20 SY GEOTEXTILE

EST. 10 TONS

SEE DETAIL 'BB'

W/ CLASS 'B' RIP RAP

SPECIAL CUT DITCH

DI

RE

MO

VE

W/ E

LB

OW

S24" C

SP

24" RCP-III

24" RCP-III 24" RCP-III 24" RCP-III

24" RC

P-III

W/ FG

2GI(A)

W/ FG

2GI(A)

W/ FG

2GI(A)

W/ FG

2GI(A)

W/ FG

2GI(A)

2GI(D)

18" RCP-III

W/ FG2GI

18"

RCP-III

18"

RCP-IV

18" RC

P-IV

18" RC

P-IV

73 SY GEOTEXTILEEST. 54 TONSSEE DETAIL 'K'W/ CLASS 'I' RIP RAPSTANDARD 4' BASE DITCH

65 SY GEOTEXTILESEE DETAIL 'C' EST. 30 TONS2' BASE LATERAL DITCH W/ CLASS 'B' RIP RAP

2GI W/ FG

15" RCP-III 2GI W/ FG

REINFORCED SOIL SLOPE

RCP-III 18"

Rev

ised

1/1

6/20

18

JMASSROC
Typewritten Text
5
JMASSROC
Typewritten Text
9

EXIS

TIN

G

R/

W

EXIS

TIN

G

R/

W

-E

Y1-

d

d

d

d

30" C

ONC

30" CONC

30" C

ON

C

24" C

ON

C

DB 3675 PG 120

BARKER CORPORATION

DB 2749 PG 761

NC FISH HATCHERY

DB 3794 PG 571

BARKER CORPORATION

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

140

145

145

145

145

145

145

145

145

145

145

145

145

145

145

145

145

145

145

145

145

145

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

150

155

155

155

155

155

155

15515

5

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

155

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

160

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

165

170

170

170

170

170

170

170

170

170

170

175

175

175

175

175

175

180

180

180

180

42" STEEL ENCASEMENT

42" S

TE

EL

EN

CAS

EM

EN

T

MH2

MH3

MH4

42" S

TE

EL

EN

CAS

EM

EN

T0.500" THICK

ENCASEMENT BY OPEN CUT,

PROP. 260' OF 42" STEEL

ABANDON

ABANDON

AB

AN

DO

N

ABANDON

PLUG

PROFILE 2

MA

TC

HLIN

E -L- STA. 615

+00, SEE S

HEET 6

-Y1- S

TA. 22

+50, SE

E SHEET

17

MATCHLINEUS-4

01

HYDRAULICSROADWAY DESIGN

ENGINEER ENGINEER

R/W SHEET NO.

SHEET NO.PROJECT REFERENCE NO.

INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION

RE

VISIO

NS

PE

NT

AB

LE:

FI

LE:

\

US

ER:

JM

AS

SR

OC

DA

TE:

12/19/2017

NC

DO

T_pdf

_color_e

ng_100.plt

PL

OT

DRI

VE

R:

3:3

1:1

5 P

MTI

ME:

NC

DO

T_per

mit

s_

CO

N.t

bl

7AU-2519CA

DOCUMENT NOT CONSIDERED FINAL

UNLESS ALL SIGNATURES COMPLETED

HDR Engineering, Inc. of the Carolinas

N.C.B.E.L.S. License Number: F-0116

555 Fayetteville St, Suite 900 Raleigh, N.C. 27601

MATCHLINE, SEE SHEET 7B

MA

TC

HLIN

E, SEE S

HEET 7

C

NAD 83

LEGEND:

SHEET __ OF __PERMIT DRAWING

BONES CREEK CLOMR EXCAVATION

LIMITEASEMENT

ELEV. = 145'

3:1

10'

* NO EXCAVATION IN WETLANDS

LIMITWETLAND

0

PLANS

50 25 50 100

E EIN WETLAND

DENOTES EXCAVATION

-Y1RPB- PT Sta. 16+31.03

-Y1RPAA- PC Sta. 11+25.86

-Y1- Sta. 24+82.08, 48.00' RT

-Y1RPBB- PT Sta. 14+11.13 =

-Y1RPC- PT Sta. 25+41.12

-Y1RPA- PC Sta. 23+46.95, 19.00' RT

-Y1RPAA- POT Sta. 10+00.00 =

C D

B

A

-Y1RPD- PC Sta. 23+23.59

-Y1RPA- PC Sta. 23+49.77

-Y1RPC- PC Sta. 26+15.80

-Y1RPD- PT Sta. 27+93.64

-Y1- Sta. 27+25.80, 12.00' RT

-Y1- Sta. 27+17.14, 36.00' LT

-Y1RPC- PT Sta. 30+53.31- =

-Y1RPB- PC Sta. 21+55.26

-Y1RPBB- POT Sta. 9+95.54 =

-Y1- Sta. 26+27.61, 48.00' LT-Y1RPAA- PT Sta. 13+03.48 =

615

+00

620+00

625+00

20+00

25+00

30+00

25+00

25+00

30+00

10

-Y1RPBB- PC Sta. 11+75.30

25

025

025

02

5

02

5

025

025 02

5

02

5

025

025

025

025

025

025

025

025

025

025

025

02

01

01

02

5

02

020

101

00

02

50

25

02

5

02

5

02

5

02

5

00

0102

025

01

020

25

01

020

25

025

025

03

04

04

03

02

50

25

01

01

00

00

01

01

02

02

02503

04

BO

NE

S

CR

EE

K

1

1

2

SITE 2

SITE 3

BARNHILL

CONTRACTINGCOMPANY

REMOVE

Slab Lid

JB w/

W/ E

LB

OW

S

18"

CSP

75 SY GEOTEXTILE

EST. 70 TONS

CLASS 'I' RIP RAP

ENERGY DISSIPATOR BASIN

W/ FG

2GI

2GI

2GI

2GI

2GI

18" RC

P-III

CB(G)

CB(G)

15"

RCP-III

W/ FG

2GI

W/ FG

2GI

W/ FG

2GI

W/ FG

2GI

Slab Lid

JB w/

48" R

CP-IV

W/ ELBOWS

18" CSP

15" RC

P-III

18" R

CP-III

48" RC

P-IV

18" RC

P-III

15" RC

P-III

18" RCP-III

W/ FG

2GI

W/ FG

2GI

W/ ELBOWS15" CSP

EST. 2 TONS

CLASS 'B' RIP RAP

7 SY GEO-TEXTILE

W/ FG

2GI

W/ ELBOWS

18" CSPRCP-III

18"

EST. 3 TONS

CLASS 'B' RIP RAP

10 SY GEO-TEXTILE

W/ FG

2GI

W/ FG2GI

15" RCP-III

15" RCP-III

18"

RCP-III

CB(G)

EST. 3 TONS

CLASS 'B' RIP RAP

10 SY GEO-TEXTILE

18" R

CP-III

W/ FG

2GI

15" RCP-III

CB(G)

W/ FG

2GI

RCP-III

15"

RCP-III

15"W/ FG

2GI

CB(G)

15" RCP-III

18" RCP-III 18" RCP-III

2GI W/ FG

W/ FG

2GI

18" RC

P-IV

18" RC

P-IV

NOTE: DO NOT EXCAVATE IN WETLANDSEE DETAIL

CREEK CLOMR ELEV. = 145'AREA EXCAVATED FOR BONES

RCP-III

18"

DI

RE

MO

VE

24" RCP-III

W/ FG

2GI(A)

W/ FG

2GI(A)

RCP-III 18"R

evis

ed 1

/16/

2018

JMASSROC
Typewritten Text
6
JMASSROC
Typewritten Text
9

SIGN32562

DATE32562

SIGN042084

DATE042084

SOIL

R

SOIL

SOIL

SOIL

SOIL

SOIL

SOIL

W/LT

SOIL

SOIL

EIP

EIP

EIP

24" C

MP

T

T

100.00'

100.00'

12-CVS-2518

DB 9261 PG 235

WILLIAM J. GILLIS

12-CVS-2518

DB 9261 PG 235

WILLIAM J. GILLIS

12-CVS-2518

DB 9261 PG 235

WILLIAM J. GILLIS

DB 2584 PG 799

JOSEPH H. GILLIS

DB 9233 PG 229

EDWARD M. BALDWIN

DB 8896 PG 629

HELEN M. GILCHRIST

DB 9233 PG 229

EDWARD M. BALDWIN

12-CVS-2518

DB 9261 PG 235

WILLIAM J. GILLIS

C/O CHRISTINE DIXON

LONA DIXON HEIRS

DB 451 PG 192

DB 451 PG 192

C/O CHRISTINE DIXON

LONA DIXON HEIRSDB 2584 PG 799

JOSEPH H. GILLIS

EUGENE MANUEL

DB 8511 PG 258

EASEMENT

CAROLINAS, INC

PROGRESS ENERGY

EASEMENT

CAROLINAS, INC

PROGRESS ENERGY

EASEMENT

CAROLINAS, INC

PROGRESS ENERGY

SHEET __ OF __PERMIT DRAWING

0

PLANS

50 25 50 100

-SR1- POT Sta. 10+00.00 660+00

665+00

670+00

(-S

R1-)

15+00

(-S

R1-)

20+00

02

02

025

025

025

025

02

02

NAD 83

UT T

O B

ONES

CR

EE

K

3

3

3

3

7

7

9

11

11

9

26

SITE 5

LEGEND:

HC HCCLEARING

DENOTES HAND

DUKE ENERGY

PROP. TRANSMISSION LINES

REM

REM

REM

DU

KE E

NER

GY PR

OP. TR

ANS

MISSI

ON E

ASE

ME

NT

TR

ANS

MISSI

ON E

ASE

ME

NT

DU

KE E

NER

GY PR

OP.

100'

50.0

0'

TR

ANS

MISSI

ON E

ASE

ME

NT

PR

OP.

DU

KE E

NER

GY

TRANSMISSION EASEMENT

DUKE ENERGY PROP.

UTILITY RELOCATION BY OTHERS

TRANSMISSION EASEMENT

DUKE ENERGY PROP.

NAD 83

HYDRAULICSROADWAY DESIGN

ENGINEER ENGINEER

R/W SHEET NO.

SHEET NO.PROJECT REFERENCE NO.

INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION

RE

VISIO

NS

PE

NT

AB

LE:

FI

LE:

\

US

ER:

JM

AS

SR

OC

DA

TE:

12/19/2017

NC

DO

T_pdf

_color_e

ng_100.plt

PL

OT

DRI

VE

R:

3:0

7:5

5 P

MTI

ME:

NC

DO

T_per

mit

s_

CO

N.t

bl

DOCUMENT NOT CONSIDERED FINAL

UNLESS ALL SIGNATURES COMPLETED

HDR Engineering, Inc. of the Carolinas

N.C.B.E.L.S. License Number: F-0116

555 Fayetteville St, Suite 900 Raleigh, N.C. 27601

U-2519CA 9

MA

TC

HLIN

E -L- STA. 657+

00, SEE S

HEET 8

MA

TC

HLIN

E -L- STA. 671+

00, SEE S

HEET 10

SEE SHEET 2D-1 FOR DITCH DETAILSDRIVEWAY RADII 10' UNLESS OTHERWISE NOTED

SEE SHEET 47 FOR -SR1- PROFILESEE SHEET 27 FOR -L- PROFILE

RE

VISIO

NS

12/0

8/17 - U

TILIT

Y

RE

VISIO

N: I

NC

ORP

OR

ATE

D

UP

DA

TE

D

AERIA

L U

TILIT

Y

DESIN

G. - A

GT

12/0

8/17 - G

UA

RD

RAIL RE

VISIO

N: I

NC

ORP

OR

ATE

D

GU

AR

DR

AIL TO

PR

OTEC

T SIG

N

STY

RU

CTU

RE 10

3. - A

GT

BARNHILL

CONTRACTINGCOMPANY

HW

RE

MO

VE

EST. 40 TONS

CLASS 'I' RIP RAP

75 SY GEO-TEXTILE

2GIFS

2GI

2GI

FS

18" RC

P-III

18" RC

P-III

2GI FS

2GI

FS

2GI FS

FS

18" RC

P-III

18" RC

P-III

18" RC

P-III

18" RC

P-III

Slab Lid

JB w/

18" RCP-III

FS

24" RCP-III

2GI(A)

FS

FS

18" RC

P-III

2GI

SEE DETAIL 'A'SPECIAL CUT DITCH

SEE DETAIL 'Q'

2' BASE LATERAL DITCH

SEE DETAIL 'A'SPECIAL CUT DITCH

70 SY GEOTEXTILEEST. 35 TONSSEE DETAIL 'R'W/ CLASS 'I' RIP RAP2' BASE LATERAL DITCH

2GI(A)

SEE DETAIL 'A'SPECIAL CUT DITCH

185 SY GEOTEXTILEEST. 85 TONS

SEE DETAIL 'C'W/ CLASS 'B' RIP RAP

2' BASE LATERAL DITCH

30" RCP-III

18" RCP-III

36" RC

P-III

36" RCP-III2GI(A)Slab Lid

JB w/

24" RC

P-III

2GI(D)

54" RCP-IV

54" R

CP-IV

54" RCP-III

W/ FG

2GI(A)W/ FG

2GI(A)

18" RCP-III

Rev

ised

1/1

6/20

18

JMASSROC
Typewritten Text
7
JMASSROC
Typewritten Text
9

SIGN32562

DATE32562

SIGN042084

DATE042084

SOIL

R

SOIL

SOIL

SOIL

SOIL

SOIL

SOIL

W/LT

SOIL

SOIL

EIP

EIP

EIP

24" C

MP

T

T

100.00'

100.00'

12-CVS-2518

DB 9261 PG 235

WILLIAM J. GILLIS

12-CVS-2518

DB 9261 PG 235

WILLIAM J. GILLIS

12-CVS-2518

DB 9261 PG 235

WILLIAM J. GILLIS

DB 2584 PG 799

JOSEPH H. GILLIS

DB 9233 PG 229

EDWARD M. BALDWIN

DB 8896 PG 629

HELEN M. GILCHRIST

DB 9233 PG 229

EDWARD M. BALDWIN

12-CVS-2518

DB 9261 PG 235

WILLIAM J. GILLIS

C/O CHRISTINE DIXON

LONA DIXON HEIRS

DB 451 PG 192

DB 451 PG 192

C/O CHRISTINE DIXON

LONA DIXON HEIRSDB 2584 PG 799

JOSEPH H. GILLIS

EUGENE MANUEL

DB 8511 PG 258

EASEMENT

CAROLINAS, INC

PROGRESS ENERGY

EASEMENT

CAROLINAS, INC

PROGRESS ENERGY

EASEMENT

CAROLINAS, INC

PROGRESS ENERGY

165

165

165

165

165

165

165

165

165

165

165

165

165

165

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

170

175

175

17517

5

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

175

180

180

180

180

180

180

180

180

180

180

180

180

180

180

180

180

180

180

180

180 180

180

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

185

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

190

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

195

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

200

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

205

210

210

210

210

210

210

210

210

210

210

210

210

210

210210

210

210

210

210

210

210

210

210

210

210

215

215

215

215

215

215

215

215

215

215

215

215

215

215

215

SHEET __ OF __PERMIT DRAWING

0

PLANS

50 25 50 100

-SR1- POT Sta. 10+00.00 660+00

665+00

670+00

(-S

R1-)

15+00

(-S

R1-)

20+00

02

02

025

025

025

025

02

02

NAD 83

UT T

O B

ONES

CR

EE

K

3

3

3

3

7

7

9

11

11

9

26

SITE 5

LEGEND:

HC HCCLEARING

DENOTES HAND

DUKE ENERGY

PROP. TRANSMISSION LINES

REM

REM

REM

DU

KE E

NER

GY PR

OP. TR

ANS

MISSI

ON E

ASE

ME

NT

TR

ANS

MISSI

ON E

ASE

ME

NT

DU

KE E

NER

GY PR

OP.

100'

50.0

0'

TR

ANS

MISSI

ON E

ASE

ME

NT

PR

OP.

DU

KE E

NER

GY

TRANSMISSION EASEMENT

DUKE ENERGY PROP.

UTILITY RELOCATION BY OTHERS

TRANSMISSION EASEMENT

DUKE ENERGY PROP.

NAD 83

HYDRAULICSROADWAY DESIGN

ENGINEER ENGINEER

R/W SHEET NO.

SHEET NO.PROJECT REFERENCE NO.

INCOMPLETE PLANSDO NOT USE FOR R/W ACQUISITION

RE

VISIO

NS

PE

NT

AB

LE:

FI

LE:

\

US

ER:

JM

AS

SR

OC

DA

TE:

12/19/2017

NC

DO

T_pdf

_color_e

ng_100.plt

PL

OT

DRI

VE

R:

3:0

7:2

9

PM

TI

ME:

NC

DO

T_per

mit

s_

CO

N.t

bl

DOCUMENT NOT CONSIDERED FINAL

UNLESS ALL SIGNATURES COMPLETED

HDR Engineering, Inc. of the Carolinas

N.C.B.E.L.S. License Number: F-0116

555 Fayetteville St, Suite 900 Raleigh, N.C. 27601

U-2519CA 9

MA

TC

HLIN

E -L- STA. 657+

00, SEE S

HEET 8

MA

TC

HLIN

E -L- STA. 671+

00, SEE S

HEET 10

SEE SHEET 2D-1 FOR DITCH DETAILSDRIVEWAY RADII 10' UNLESS OTHERWISE NOTED

SEE SHEET 47 FOR -SR1- PROFILESEE SHEET 27 FOR -L- PROFILE

RE

VISIO

NS

12/0

8/17 - U

TILIT

Y

RE

VISIO

N: I

NC

ORP

OR

ATE

D

UP

DA

TE

D

AERIA

L U

TILIT

Y

DESIN

G. - A

GT

12/0

8/17 - G

UA

RD

RAIL RE

VISIO

N: I

NC

ORP

OR

ATE

D

GU

AR

DR

AIL TO

PR

OTEC

T SIG

N

STY

RU

CTU

RE 10

3. - A

GT

BARNHILL

CONTRACTINGCOMPANY

HW

RE

MO

VE

EST. 40 TONS

CLASS 'I' RIP RAP

75 SY GEO-TEXTILE

2GIFS

2GI

2GI

FS

18" RC

P-III

18" RC

P-III

2GI FS

2GI

FS

2GI FS

FS

18" RC

P-III

18" RC

P-III

18" RC

P-III

18" RC

P-III

Slab Lid

JB w/

18" RCP-III

FS

24" RCP-III

2GI(A)

FS

FS

18" RC

P-III

2GI

SEE DETAIL 'A'SPECIAL CUT DITCH

SEE DETAIL 'Q'

2' BASE LATERAL DITCH

SEE DETAIL 'A'SPECIAL CUT DITCH

70 SY GEOTEXTILEEST. 35 TONSSEE DETAIL 'R'W/ CLASS 'I' RIP RAP2' BASE LATERAL DITCH

2GI(A)

SEE DETAIL 'A'SPECIAL CUT DITCH

185 SY GEOTEXTILEEST. 85 TONS

SEE DETAIL 'C'W/ CLASS 'B' RIP RAP

2' BASE LATERAL DITCH

30" RCP-III

18" RCP-III

36" RC

P-III

36" RCP-III2GI(A)Slab Lid

JB w/

24" RC

P-III

2GI(D)

54" RCP-IV

54" R

CP-IV

54" RCP-III

W/ FG

2GI(A)W/ FG

2GI(A)

18" RCP-III

Rev

ised

1/1

6/20

18

JMASSROC
Typewritten Text
8
JMASSROC
Typewritten Text
9

Hand Existing Existing Permanent Temp. **Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural

Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design

(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 2 608+55 -L- RT Duke Trans. Relocation < 0.01 2 621+65/621+81 -L- 30" Sewer Relocation < 0.01 3 25+39/25+69 -Y1- 30" Sewer Relocation 0.09 5 669+55/670+34 -L- RT Duke Trans. Relocation 0.23

TOTALS*: < 0.01 0.10 0.23 0 0 0

*Rounded totals are sum of actual impacts

NOTES:

Revised 2016 09 09 SHEET OF

**The proposed sewer line will be backfilled with material excavated from the wetland to the existing natural ground elevation.

WETLAND AND SURACE WATER IMPACTS SUMMARYWETLAND IMPACTS SURFACE WATER IMPACTS

Cumberland CountyU-2519CA_B-5516

34817.3.13

NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS

12/19/2017

Rev

ised

1/1

6/20

18

jmassroc
Typewritten Text
9
jmassroc
Typewritten Text
9