STATUS OF THE LINAC 4 RFQ CONSTRUCTION S. Mathot – LINAC 4 BCC – 18/2/2010 1 S. Mathot Work performed by : Pierre Bourquin, André Briswalter, Thierry Callamand, Jacky Carosone, Ahmed Cherif, Christophe Delorme, A. France, Nadine Favre, Jean-Marie Geisser, Alessandra Lombardi, Vincent Maire, Marina Malabaila, Fabrice Multon, O. Piquet, Dominique Pugnat, Carlo Rossi, Philippe Richerot, Benoit Riffaud, Marc Timmins, Agostino Vacca, G. Vandoni.

Transcript of S. Mathot – LINAC 4 BCC – 18/2/2010 1 S. Mathot Work performed by : Pierre Bourquin, André...

Page 1: S. Mathot – LINAC 4 BCC – 18/2/2010 1 S. Mathot Work performed by : Pierre Bourquin, André Briswalter, Thierry Callamand, Jacky Carosone, Ahmed Cherif,

STATUS OF THE LINAC 4 RFQ CONSTRUCTION

S. Mathot – LINAC 4 BCC – 18/2/2010 1

S. Mathot

Work performed by : Pierre Bourquin, André Briswalter, Thierry Callamand, Jacky Carosone, Ahmed Cherif, Christophe Delorme, A. France, Nadine Favre, Jean-Marie Geisser, Alessandra Lombardi, Vincent Maire, Marina Malabaila, Fabrice Multon, O. Piquet, Dominique Pugnat, Carlo Rossi, Philippe Richerot, Benoit Riffaud, Marc Timmins, Agostino Vacca, G. Vandoni.

Page 2: S. Mathot – LINAC 4 BCC – 18/2/2010 1 S. Mathot Work performed by : Pierre Bourquin, André Briswalter, Thierry Callamand, Jacky Carosone, Ahmed Cherif,

OUTLINE

S. Mathot – LINAC 4 BCC – 18/2/2010 2

1) Some pictures

2) Previous experiences in RFQ assembly

3) Linac 4 RFQ design and manufacture procedure

4) Results obtained with the test piece

5) Actual situation

6) Actual schedule

Page 3: S. Mathot – LINAC 4 BCC – 18/2/2010 1 S. Mathot Work performed by : Pierre Bourquin, André Briswalter, Thierry Callamand, Jacky Carosone, Ahmed Cherif,

S. Mathot – LINAC 4 BCC – 18/2/2010 3

Page 4: S. Mathot – LINAC 4 BCC – 18/2/2010 1 S. Mathot Work performed by : Pierre Bourquin, André Briswalter, Thierry Callamand, Jacky Carosone, Ahmed Cherif,

S. Mathot – LINAC 4 BCC – 18/2/2010 4

Page 5: S. Mathot – LINAC 4 BCC – 18/2/2010 1 S. Mathot Work performed by : Pierre Bourquin, André Briswalter, Thierry Callamand, Jacky Carosone, Ahmed Cherif,

2) PREVIOUS EXPERIENCES

S. Mathot – LINAC 4 BCC – 18/2/2010 5

TRASCO

6 modules brazed at CERN, Horizontal and Vertical configurations.Movements observed for n° 1, 2 and 6.RF ok.

Page 6: S. Mathot – LINAC 4 BCC – 18/2/2010 1 S. Mathot Work performed by : Pierre Bourquin, André Briswalter, Thierry Callamand, Jacky Carosone, Ahmed Cherif,

2) PREVIOUS EXPERIENCES

S. Mathot – LINAC 4 BCC – 18/2/2010 6

IPHI

1 module repaired and 2 brazed at CERN, Horizontal and Vertical configurations.Movements observed after brazing and after heat treatment of machined electrodes.

Page 7: S. Mathot – LINAC 4 BCC – 18/2/2010 1 S. Mathot Work performed by : Pierre Bourquin, André Briswalter, Thierry Callamand, Jacky Carosone, Ahmed Cherif,

2) PREVIOUS EXPERIENCES

S. Mathot – LINAC 4 BCC – 18/2/2010 7

IPHI

Module # 5, bottom electrode after heat treatment at 800 °C: movements up to 0.08 mm.

Page 8: S. Mathot – LINAC 4 BCC – 18/2/2010 1 S. Mathot Work performed by : Pierre Bourquin, André Briswalter, Thierry Callamand, Jacky Carosone, Ahmed Cherif,

2) PREVIOUS EXPERIENCES

S. Mathot – LINAC 4 BCC – 18/2/2010 8

IFMIF

18 Modules (up to 2012), Horizontal and Vertical configurations

Page 9: S. Mathot – LINAC 4 BCC – 18/2/2010 1 S. Mathot Work performed by : Pierre Bourquin, André Briswalter, Thierry Callamand, Jacky Carosone, Ahmed Cherif,

3) LINAC 4 RFQ DESIGN AND MANUFACTURE PROCEDURE

S. Mathot – LINAC 4 BCC – 18/2/2010 9

→ Internal shape optimized for the horizontal brazing step.

→ Electrode width constant.

→ Pumping port brazed.

Page 10: S. Mathot – LINAC 4 BCC – 18/2/2010 1 S. Mathot Work performed by : Pierre Bourquin, André Briswalter, Thierry Callamand, Jacky Carosone, Ahmed Cherif,

3) LINAC 4 RFQ DESIGN AND MANUFACTURE PROCEDURE

S. Mathot – LINAC 4 BCC – 18/2/2010 10

1. First Rough Machining (Over-thickness : ~ 3 mm) (L Lf + 6 mm, TR2 : L = Lf + 6 mm)

2. Rough Machining (Over-thickness : ~ 1 mm) (L = Lf + 2 mm)

1° Thermal Treatment

3. Partial Finishing (Over-thickness : 0 and 0.15* mm) (L = Lf + 1 mm)

Internal and external surfaces, excepted the brazing surfaces* and the modulation*.

2° Thermal Treatment

4. Finishing (L = Lf + 0.5 mm)

Brazing surface and Modulation

5. 1° Brazing (Horizontal) 

6. Re-machining (L = Lf + 0.2 mm)

7. 2 ° Brazing (Vertical)

8. Final machining (L = Lf)

Page 11: S. Mathot – LINAC 4 BCC – 18/2/2010 1 S. Mathot Work performed by : Pierre Bourquin, André Briswalter, Thierry Callamand, Jacky Carosone, Ahmed Cherif,

4) RESULTS OBTAINED WITH THE TEST PIECE

S. Mathot – LINAC 4 BCC – 18/2/2010 11

X+

Z+

Y+

(0,-300,0)

(144,-300,0)

(-97,-300,0)

(-144,-300,0)

One major electrode build to test the manufacture procedure.First concern is the geometrical stability after thermal treatments.

Page 12: S. Mathot – LINAC 4 BCC – 18/2/2010 1 S. Mathot Work performed by : Pierre Bourquin, André Briswalter, Thierry Callamand, Jacky Carosone, Ahmed Cherif,

4) RESULTS OBTAINED WITH THE TEST PIECE

S. Mathot – LINAC 4 BCC – 18/2/2010 12

Heat treatments at 800 °C (brazing simulation)

on the test piece after final machining.

Before Treat.(28 mm)*

After 1° Treat.(65 mm)*

* Measured Planarity

After 2° Treat.(60 mm)*

Page 13: S. Mathot – LINAC 4 BCC – 18/2/2010 1 S. Mathot Work performed by : Pierre Bourquin, André Briswalter, Thierry Callamand, Jacky Carosone, Ahmed Cherif,

4) RESULTS OBTAINED WITH THE TEST PIECE

S. Mathot – LINAC 4 BCC – 18/2/2010 13

Observations:

Previous stabilisations at 600 °C are not

completely efficient.

A thermal treatment (brazing) at 800 °C

stabilises correctly the major electrode.

The treatment itself includes no

significant movements.

To be demonstrate by re-

machining this stabilised electrode

(Finishing) and after a new treatment at

800 °C

Page 14: S. Mathot – LINAC 4 BCC – 18/2/2010 1 S. Mathot Work performed by : Pierre Bourquin, André Briswalter, Thierry Callamand, Jacky Carosone, Ahmed Cherif,

4) RESULTS OBTAINED WITH THE TEST PIECE

S. Mathot – LINAC 4 BCC – 18/2/2010 14

Heat treatments at 800 °C (brazing

simulation) on the test piece after an

additional final machining (Finishing).

Before Treat.(15 mm)*

After Treat.(28 mm)*

* Measured Planarity

Page 15: S. Mathot – LINAC 4 BCC – 18/2/2010 1 S. Mathot Work performed by : Pierre Bourquin, André Briswalter, Thierry Callamand, Jacky Carosone, Ahmed Cherif,

4) RESULTS OBTAINED WITH THE TEST PIECE

S. Mathot – LINAC 4 BCC – 18/2/2010 15

Observations:

No significant movement after a

treatment (brazing) at 800 °C on a

correctly stabilized electrode.

The procedure :

Rough Machining

1° Thermal Treatment : 600 °C

Partial Finishing

2° Thermal Treatment : 800

°C

Finishing

is validated for the first module .....

Page 16: S. Mathot – LINAC 4 BCC – 18/2/2010 1 S. Mathot Work performed by : Pierre Bourquin, André Briswalter, Thierry Callamand, Jacky Carosone, Ahmed Cherif,

5) ACTUAL SITUATION

S. Mathot – LINAC 4 BCC – 18/2/2010 16

Suivi Pôles RFQ LINAC 4Situation 17/02/2010

Pôle Ebauche Cleaning 3 D Before 1° Treat. 3D After Semi- Finition Cleaning 3 D Before 2° Treat. 3 D After Finition 3 D Final Décapage

Pôle de Test √ √ √ R √ √ R √ √ √ R √ √ R √ √ R √

Pôle Majeur HAUT TR 1 (1H) √ √ √ R √ √ R √ √ √ R √ √ R √ en cours  

Pôle Majeur BAS TR 1 (1B) √ √ √ R √ √ R √ √ √ R √ √ R √ √  

Pôle mineur DROIT TR 1 (1D) √ √ √ R √ √ R √ √ √ R √ √ R      

Pôle mineur GAUCHE TR 1 (1G) √ √ √ R √ √ R √ √ √ R √      

Pôle Majeur HAUT TR 3 (3G) √ √ √ R  en cours                  

Pôle Majeur BAS TR 3 (3B) √ √ √ R                    

Pôle mineur DROIT TR 3 (3D) √                      

Pôle mineur GAUCHE TR 3 (3G) √                      

Pôle Majeur HAUT TR 2 (2H) √                        

Pôle Majeur BAS TR 2 (2B) √                        

Pôle mineur DROIT TR 2 (2D) √                        

Pôle mineur GAUCHE TR 2 (2G) √                        

R = Rapport de métrologie fait

Page 17: S. Mathot – LINAC 4 BCC – 18/2/2010 1 S. Mathot Work performed by : Pierre Bourquin, André Briswalter, Thierry Callamand, Jacky Carosone, Ahmed Cherif,

5) ACTUAL SITUATION

S. Mathot – LINAC 4 BCC – 18/2/2010 17

Module 1, Top electrode

Partial Finishing :

Measure of the brazing surfaces before

and after heat treatment at 800 °C.

Page 18: S. Mathot – LINAC 4 BCC – 18/2/2010 1 S. Mathot Work performed by : Pierre Bourquin, André Briswalter, Thierry Callamand, Jacky Carosone, Ahmed Cherif,

5) ACTUAL SITUATION

S. Mathot – LINAC 4 BCC – 18/2/2010 18

Module 1, Bottom electrode

Partial Finishing :

Measure of the brazing surfaces before

and after heat treatment at 800 °C.

Page 19: S. Mathot – LINAC 4 BCC – 18/2/2010 1 S. Mathot Work performed by : Pierre Bourquin, André Briswalter, Thierry Callamand, Jacky Carosone, Ahmed Cherif,

5) ACTUAL SITUATION

S. Mathot – LINAC 4 BCC – 18/2/2010 19

Module 1, Bottom electrode, Partial Finishing

From D. Pugnat, EDMS 1055637

Page 20: S. Mathot – LINAC 4 BCC – 18/2/2010 1 S. Mathot Work performed by : Pierre Bourquin, André Briswalter, Thierry Callamand, Jacky Carosone, Ahmed Cherif,

5) ACTUAL SITUATION

S. Mathot – LINAC 4 BCC – 18/2/2010 20

Module 1, Top electrode, Partial FinishingFrom D. Pugnat, EDMS 1054644

Page 21: S. Mathot – LINAC 4 BCC – 18/2/2010 1 S. Mathot Work performed by : Pierre Bourquin, André Briswalter, Thierry Callamand, Jacky Carosone, Ahmed Cherif,

5) ACTUAL SITUATION

S. Mathot – LINAC 4 BCC – 18/2/2010 21

Module 1, Bottom electrode, Finishing

From D. Pugnat

Maxi = +0.054Mini = -0.017

+0.054

-0.014

+0.010

-0.010

Page 22: S. Mathot – LINAC 4 BCC – 18/2/2010 1 S. Mathot Work performed by : Pierre Bourquin, André Briswalter, Thierry Callamand, Jacky Carosone, Ahmed Cherif,

0 200 400 600 800 1000-0.03

-0.02

-0.01

-2.77555756156289E-17

0.00999999999999997

0.02

0.03

Beam Axis (mm)

Mea

sure

d - M

odel

(mm

)

5) ACTUAL SITUATION

S. Mathot – LINAC 4 BCC – 18/2/2010 22Module 1, Bottom electrode, Finishing

Page 23: S. Mathot – LINAC 4 BCC – 18/2/2010 1 S. Mathot Work performed by : Pierre Bourquin, André Briswalter, Thierry Callamand, Jacky Carosone, Ahmed Cherif,

5) ACTUAL SITUATION

S. Mathot – LINAC 4 BCC – 18/2/2010 23

Module 1, Bottom electrode, Finishing From D. Pugnat

après optimisation de la modulation sans nez

+0.012-0.021

-0.037

+0.023

-0.021-0.018

-0.035

-0.019

-0.030

+0.027

-0.024

-0.043

Page 24: S. Mathot – LINAC 4 BCC – 18/2/2010 1 S. Mathot Work performed by : Pierre Bourquin, André Briswalter, Thierry Callamand, Jacky Carosone, Ahmed Cherif,

5) ACTUAL SCHEDULE

S. Mathot – LINAC 4 BCC – 18/2/2010 24

2010 2011

Mars Avril Mai Juin Juillet Aout Sept. Octobre Nov. Déc. Janvier

T1 Fin.      1°

Bras.       

2° Bras.

                                                         

T2     S/F Pôles Maj.S/F P. min.

Finition        1°

Bras.       

2° Bras.

                           

T3                                       S/F Pôles Maj.S/F P. min.

Finition    1°

Bras.     

2° Bras.