Quarter 4 - Fiscal Year 2019/20 July 2020 STATE HIGHWAY OPERATION & PROTECTION PROGRAM TEN-YEAR PROJECT BOOK Fiscal Years 2019/20 – 2028/29

Transcript of S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the...

Page 1: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

Quarter 4 - Fiscal Year 2019/20 July 2020

STATE HIGHWAY OPERATION & PROTECTION PROGRAM

TEN-YEAR PROJECT BOOK Fiscal Years 2019/20 – 2028/29

Page 2: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

Intentionally left blank

Page 3: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

Table of Contents 1. Introduction ...................................................................................................................................... 2

1.1 First Five Years of Projects ....................................................................................................................... 2

1.2 Last Five Years of Projects ....................................................................................................................... 2

1.3 Projects Evolve Over Time ....................................................................................................................... 2

1.4 What Is Included in the List of Projects? ................................................................................................. 2

1.5 A Fiscally Balanced and Performance-Driven Portfolio ........................................................................... 3

2. Project Book Summary ....................................................................................................................... 4

Table 1 – Activity Summary by Project Costs ................................................................................................ 4

Table 2 – Activity Summary by Number of Projects ...................................................................................... 5

Table 3 – Senate Bill q (SB 1) Priority Activity Summary by Project Costs .................................................... 6

Table 4 – District, Metropolitan Planning Organization (MPO), Regional Transportation Planning Agency (RTPA), and County Project Summary ................................................................................................. 7 and 8

Figure 1 – Map of County Project Cost Summary ......................................................................................... 9

Figure 2 – Performance from the Primary Asset Classes ............................................................................ 10

Table 5– List of Projects by County ............................................................................................................. 11

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

Table of Contents 1

Page 4: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

Intentionally left blank

Page 5: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

1. IntroductionThe California Department of Transportation (Caltrans) is currently undertaking the most ambitious 10-year highway repair program the state has seen in generations. By the end of this period, the State Highway System (SHS) should be in much better shape than it is today.

This Ten-Year Project Book (Project Book) shows how Caltrans will make that happen. It provides a list of the individual projects needed to restore the SHS to a condition that meets the 2027 performance targets enshrined into law through the Road Repair and Accountability Act of 2017 under Senate Bill 1 (SB 1).

The Project Book is a natural extension of Caltrans’ asset management framework, presented in the California Transportation Asset Management Plan (TAMP) and implemented with the State Highway System Management Plan (SHSMP). These two plans, founded on principles of performance management, form the basis to prioritize projects based on their contribution to the overall health of SHS and its many component parts. The TAMP and SHSMP articulate performance targets established by federal and state legislation and action by the California Transportation Commission (Commission).

There are more than $43 billion worth of individual projects in the Project Book, all part of Caltrans’ fix-it-first program, known as the SHOPP (State Highway Operation and Protection Program). The SHOPP is supported by state and federal taxes and fees on vehicle fuels. Over one-third of the funds comes from SB 1.

1.1 First Five Years of Projects The projects in this Project Book are at various stages of development through the end of the quarter. Those in the first five years (expected to be advertised for construction now through 2024) have completed or are near complete with formal planning, and are currently being designed or are expected to begin design in the next few years. Most have funding approval from the Commission for one or more phases of the project. These projects are well defined but could still require changes in scope, cost, or schedule as they go through the environmental and design processes.

1.2 Last Five Years of Projects Most of the projects in the last five years are still undergoing formal planning efforts. They are typically less defined than the projects in the first five years. They tend to be in a stage of development during which stakeholder input can best be incorporated. These projects typically won’t have Commission funding approval at this stage of development. Projects showing construction advertisement years beyond 2026 are considered conceptual and have the greatest potential for change. These longer-range projects reflect our best prediction of necessary investment over a longer time horizon. These projects won’t have Commission funding approval.

1.3 Projects Evolve Over Time The project development process is subject to many factors that could change the scope, cost, or schedule of projects. They could be replaced by other projects that better respond to changing needs or shifting priorities. For these reasons the Project Book is expected to evolve over time with each quarterly publication.

1.4 What Is Included in the List of Projects? The Project Book lists the project number, project location, general nature of the work, current total cost estimate, and expected advertisement year in a single line for each project. The projects are sorted by District, then by county, and then by ascending route, year, and Senate Bill 1 (SB1) eligibility. Projects that are identified as SB1 priorities may include full or partial SB1 funding.

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

Introduction 2

Page 6: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

The intent of the Project Book is to raise awareness of planned future projects, not to provide detailed project information. Each of the Caltrans’ districts maintain project level websites that provide detailed project information in their jurisdiction.

This Project Book includes the following main activities and objectives:

• Pavement: pavement on Class I, II, and III roadways (other satellite activities may include: lightingrehabilitation, overhead sign structures rehabilitation, sign panel replacement)

• Bridge: bridge health, bridge scour mitigation, bridge seismic restoration, bridge goods movementupgrades, bridge rail replacement and upgrade

• Mobility: transportation management systems (TMS), ADA pedestrian infrastructure/complete streets,operational improvements, weigh-in-motion scales (WIM), commercial vehicle enforcement facilities(CVEF), transportation management center (TMC)

• Safety: safety improvements, collision severity reduction• Major Damage: major damage (emergency opening), major damage (permanent restoration), roadway

protective betterments

• Drainage: drainage system restoration, drainage pump plants

• Sustainability: storm water mitigation, zero emission vehicle infrastructure, resiliency and climatechange

• Roadside: roadside rehabilitation, safety roadside rest area (SRRA) rehabilitation, water and wastewatertreatment at SRRAs, roadside safety improvements

• Facilities: transportation related facilities, office buildings• Advance Mitigation

• Relinquishment

Detailed project specific information can be found on the Caltrans Project Portal located at the following link: https://dot.ca.gov/programs/asset-management/caltrans-project-portal

1.5 A Fiscally Balanced and Performance Driven Portfolio The Project Book was developed by the districts under the following requirements:

• Each District’s project portfolio performance meets or exceeds the Asset Management performanceobjective targets over the last 5-year period.

• Each District’s proposed project portfolio is financially constrained and balanced over the last 5-yearperiod.

Caltrans uses this Project Book as a transparent roadmap to achieve performance targets. The information contained in the Project Book improves awareness and collaboration on transportation projects leading to better overall asset management for the people of California.

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

Introduction 3

Page 7: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

2. Project Book SummaryThe statewide project portfolio is comprised of a total of 2,173 projects, with a total project cost of approximately $43.5 billion. Table 1 and Table 2 provide summaries by activity and fiscal year. Table 3 summarizes Senate Bill 1 (SB 1) priority activities. Table 4 presents a summary of the District’s project portfolios by Metropolitan Planning Organization (MPO), Regional Transportation Planning Agency (RTPA), and County. Figure 1 presents a County level map with the estimated total cost of projects within each county. Figure 2 presents the performance for all projects in the Project Book for the four primary asset classes – pavement, bridge, drainage, and transportation management systems. Table 5 presents the complete list of projects in the Project Book.

Table 1 – Activity Summary by Project Costs ($K) Advertised Years

Activity 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 Long Lead*

Grand Total ($K)

Pavement $2,314,815 $678,920 $2,469,705 $2,505,804 $3,152,842 $1,641,434 $1,452,106 $1,727,552 $1,957,206 $2,148,232 $20,048,616

Bridge $1,733,633 $840,847 $1,494,101 $453,912 $675,902 $616,524 $264,020 $584,606 $100,583 $223,328 $661,585 $7,649,041

Mobility $443,892 $294,744 $649,261 $785,159 $714,712 $244,156 $299,384 $191,748 $212,919 $141,751 $3,977,726

ADA $88,623 $45,116 $236,076 $38,447 $111,683 $21,140 $66,507 $8,232 $8,049 $623,873

Operational Improvements $120,518 $21,229 $243,932 $108,757 $105,263 $18,665 $43,545 $23,985 $60,160 $14,460 $760,514

TMC $6,380 $4,150 $10,530

TMS $234,751 $215,073 $124,498 $626,831 $493,556 $168,251 $169,089 $149,442 $136,963 $114,982 $2,433,436

WIM Scales & CVEFs $13,326 $44,755 $4,744 $4,210 $36,100 $16,093 $10,089 $15,796 $4,260 $149,373

Safety $1,063,820 $485,341 $930,963 $371,667 $823,750 $93,283 $165,905 $65,516 $19,101 $6,094 $4,025,440

Safety Improvements $896,278 $228,770 $671,687 $254,862 $657,890 $38,443 $3,100 $2,751,030

Collision Reduction $149,151 $231,082 $259,276 $86,428 $108,359 $17,220 $116,925 $33,950 $11,441 $1,013,832

Other $18,391 $25,489 $30,377 $57,501 $37,620 $45,880 $31,566 $7,660 $6,094 $260,578

Major Damage $545,687 $647,227 $512,957 $113,911 $17,662 $135,759 $112,723 $5,600 $10,075 $2,101,601

Emergency Opening $274,782 $17,130 $291,912

Permanent Restoration $259,659 $611,242 $451,986 $113,911 $17,662 $121,655 $55,623 $5,600 $10,075 $1,647,413

Protective Betterments $11,246 $18,855 $60,971 $14,104 $57,100 $162,276

Drainage $212,272 $142,691 $154,356 $138,082 $497,641 $143,174 $173,699 $319,020 $309,433 $269,740 $2,360,108

Sustainability $99,486 $93,304 $271,581 $88,463 $86,873 $48,684 $108,997 $90,109 $33,532 $30,450 $884,100 $1,835,579

Roadside $102,392 $234,026 $111,429 $162,771 $91,806 $20,243 $21,610 $73,356 $25,105 $24,888 $867,626

Facilities $32,158 $18,100 $44,558 $27,235 $170,101 $105,832 $81,475 $38,310 $24,536 $21,867 $564,172

Advance Mitigation $8,083 $5,115 $3,701 $4,682 $4,651 $26,232

Relinquishment $15,100 $2,100 $25,065 $31,384 $3,000 $66,649

Total ($K) $6,561,338 $3,440,315 $6,644,712 $4,651,686 $6,231,289 $3,078,805 $2,598,580 $3,202,940 $2,691,015 $2,866,350 $1,555,760 $43,522,790 * Total known costs of long lead projects beyond 2029

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

Project Book Summary 4

Page 8: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

Table 2 – Activity Summary by Number of Projects Advertised Years

Activity 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 Long Lead* Grand Total

Pavement 48 21 47 51 69 52 54 62 67 85 556

Bridge 67 39 68 17 38 16 16 22 9 14 2 308

Mobility 39 29 49 35 27 14 17 16 16 10 252

ADA 12 6 26 6 8 3 4 2 1 68

Operational Improvements 7 4 13 6 6 1 3 6 6 2 54

TMC 1 1 2

TMS 20 16 7 21 12 6 8 5 7 5 107

WIM Scales & CVEFs 3 3 1 1 4 1 3 3 2 21

Safety 87 60 83 38 61 11 7 4 5 1 357

Safety Improvements 66 33 60 30 52 4 1 246

Collision Reduction 16 24 23 7 7 4 3 1 2 87

Other 5 3 1 2 3 3 3 3 1 24

Major Damage 114 28 51 13 3 9 3 1 1 223

Emergency Opening 85 4 89

Permanent Restoration 27 21 47 13 3 7 2 1 1 122

Protective Betterments 2 3 4 2 1 12

Drainage 31 10 15 9 31 11 16 27 30 28 208

Sustainability 12 10 21 10 8 9 9 10 4 5 1 99

Roadside 17 34 20 15 5 4 4 6 3 5 113

Facilities 2 1 3 4 7 8 6 3 4 2 40

Advance Mitigation 3 1 1 1 1 7

Relinquishment 1 1 5 2 1 10

Total 421 233 359 193 249 140 131 153 140 150 4 2,173 * Total known costs of long lead projects beyond 2029

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

Project Book Summary 5

Page 9: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

Table 3 – Senate Bill 1 (SB1) Priority Activity Summary by Project Costs ($K)

Advertised Years

Activity 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28 2028/29 Long Lead*

Grand Total ($K)

Planning 1,573,109 1,821,674 2,176,998 2,504,185 2,756,282 10,832,248

Pavement 1,248,141 1,305,547 1,620,783 1,957,206 2,148,232 8,279,909

Bridge 110,338 210,059 122,541 100,583 223,328 766,849

Mobility - TMS 168,251 169,089 149,442 136,963 114,982 738,727

Drainage 46,379 136,979 284,232 309,433 269,740 1,046,763

Post-Planning 4,495,471 1,877,531 4,242,660 3,724,629 4,819,941 996,274 237,240 603,622 661,585 21,658,953

Pavement 2,314,815 678,920 2,469,705 2,505,804 3,152,842 393,293 146,559 106,769 11,768,707

Bridge 1,733,633 840,847 1,494,101 453,912 675,902 506,186 53,961 462,065 661,585 6,882,192

Mobility - TMS 234,751 215,073 124,498 626,831 493,556 1,694,709

Drainage 212,272 142,691 154,356 138,082 497,641 96,795 36,720 34,788 1,313,345

Total ($K) 4,495,471 1,877,531 4,242,660 3,724,629 4,819,941 2,569,383 2,058,914 2,780,620 2,504,185 2,756,282 661,585 32,491,201 *Total known costs of long lead projects beyond 2029

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

Project Book Summary 6

Page 10: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

Table 4 – District, Metropolitan Planning Organization (MPO), Regional Transportation Planning Agency (RTPA), and County Project Summary

District MPO/RTPA County Number

of Projects

Sum of Project Cost ($K)

1 Del Norte LTC Del Norte 20 $352,381 Humboldt CAG Humboldt 62 $1,027,177 Lake CCAPC Lake 16 $212,722 Mendocino COG Mendocino 51 $1,089,706

Total D1 149 $2,681,986 2 Butte (BCAG) Butte 1 $6,089

Lassen CTC Lassen 17 $238,854 Modoc LTC Modoc 6 $63,222 Plumas CTC Plumas 13 $338,348 Shasta (SRTA) Shasta 29 $412,974 Siskiyou CLTC Siskiyou 30 $667,953 Tehama CTC Tehama 20 $244,385 Trinity CTC Trinity 22 $216,591

Total D2 138 $2,188,416 3 Butte (BCAG) Butte 26 $441,670

Colusa (CTC) Colusa 7 $147,050 Glenn CTC Glenn 9 $198,224 Nevada CTC Nevada 28 $735,042 Sacramento (SACOG)/Tahoe (TRPA) El Dorado 19 $299,494 Sacramento SACOG Placer 28 $684,739

Sacramento 47 $1,369,618 Sutter 4 $58,230 Yolo 12 $460,340 Yuba 12 $372,913

Sierra LTC Sierra 5 $44,820 Total D3 197 $4,812,140

4 Metropolitan (MTC) Alameda 86 $1,568,115 Contra Costa 35 $890,980 Marin 34 $1,256,591 Napa 46 $445,030 San Francisco 19 $479,456 San Mateo 57 $993,990 Santa Clara 55 $895,556 Solano 28 $506,524 Sonoma 66 $753,901

Total D4 426 $7,790,142 5 Monterey (AMBAG) Monterey 46 $807,829

San Benito 6 $113,408 Santa Cruz 30 $323,121

San Luis Obispo (SLOCOG) San Luis Obispo 34 $516,987 Santa Barbara (SBCAG) Santa Barbara 57 $995,567

Total D5 173 $2,756,912

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

Project Book Summary 7

Page 11: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

Table 4 – Cont’d.

District MPO/RTPA County Number

of Projects

Sum of Project Cost ($K)

6 Fresno (FCOG) Fresno 43 $1,109,551 Kern (KCOG) Kern 51 $997,616 Kings (KCAG) Kings 12 $246,245 Madera (MCTC) Madera 11 $179,468 Tulare (TCAG) Tulare 28 $462,534

Total D6 145 $2,995,414 7 Southern California (SCAG) Los Angeles 278 $5,849,446

Ventura 52 $901,613 Total D7 330 $6,751,059

8 Southern California (SCAG) Riverside 76 $2,569,205 San Bernardino 104 $1,949,533

Total D8 180 $4,518,738 9 Inyo LTC Inyo 15 $233,008

Kern (KCOG) Kern 14 $491,074 Mono LTC Mono 14 $167,653

Total D9 43 $891,735 10 Alpine LTC Alpine 10 $173,755

Amador CTC Amador 7 $90,888 Calaveras COG Calaveras 15 $227,900 Mariposa LTC Mariposa 11 $380,848 Merced (MCAG) Merced 29 $493,687 San Joaquin (SJCOG) San Joaquin 54 $1,397,594 Stanislaus (StanCOG) Stanislaus 16 $269,601 Tuolumne CTC Tuolumne 4 $60,372

Total D10 146 $3,094,645 11 San Diego (SANDAG) San Diego 103 $2,804,675

Southern California (SCAG) Imperial 19 $196,344 Total D11 122 $3,001,019

12 Southern California (SCAG) Orange 124 $2,040,584 Total D12 124 $2,040,584 Total Statewide ($K) 2,173 $43,522,790

CAG – County Association of Governments CCAPC – City/County Area Planning Council CLTC – County Local Transportation Commission COG – Council of Governments

LTC – Local Transportation Commission RPA – Regional Planning Agency RTA – Regional Transportation Agency TC-Transportation Commission

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

Project Book Summary 8

Page 12: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

Figure 1 – Map of County Project Cost Summary ($K)

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

Project Book Summary 9

Page 13: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

Figure 2 – Performance from the Primary Asset Classes

- 500,000

1,000,000 1,500,000 2,000,000 2,500,000 3,000,000 3,500,000 4,000,000 4,500,000

2019

/20

2020

/21

2021

/22

2022

/23

2023

/24

2024

/25

2025

/26

2026

/27

2027

/28

2028

/29

Deck

or L

iner

Are

a (s

qft)

Fiscal Year

Work on Fair & Poor Condition Bridges & Tunnels

-

500

1,000

1,500

2,000

2,500

3,000

3,500

2019

/20

2020

/21

2021

/22

2022

/23

2023

/24

2024

/25

2025

/26

2026

/27

2027

/28

2028

/29

Pave

men

t (la

ne m

iles)

Fiscal Year

Work on Fair & Poor Condition Pavement

- 20,000 40,000 60,000 80,000

100,000 120,000 140,000 160,000 180,000 200,000

2019

/20

2020

/21

2021

/22

2022

/23

2023

/24

2024

/25

2025

/26

2026

/27

2027

/28

2028

/29

Drai

nage

(lin

ear f

eet)

Fiscal Year

Work on Fair & Poor Condition Drainage Systems

- 200 400 600 800

1,000 1,200 1,400 1,600 1,800

2019

/20

2020

/21

2021

/22

2022

/23

2023

/24

2024

/25

2025

/26

2026

/27

2027

/28

2028

/29

TMS

Elem

ents

(eac

h)

Fiscal Year

Work on Fair & Poor Condition Transportation Management Systems (TMS)

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

Project Book Summary 10

Page 14: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

20275 1 Del Norte 101 0 46.5 Drainage Planning 2026/27 Yes22305 1 Del Norte 101 8.2 8.7 Bridge Post-Planning 2021/22 $438 Yes16494 1 Del Norte 101 12 15.5 Major Damage - Permanent Restoration Post-Planning 2030/31 $10,07521946 1 Del Norte 101 12.6 13.2 Major Damage - Permanent Restoration Planning 2026/2717537 1 Del Norte 101 21.2 Major Damage - Permanent Restoration Post-Planning 2020/21 $18,22716236 1 Del Norte 101 25.6 27.3 Mobility - ADA Post-Planning 2019/20 $10,1579014 1 Del Norte 101 35.8 36.5 Bridge Post-Planning 2020/21 $107,047 Yes

16887 1 Del Norte 101 39.8 Bridge Post-Planning 2019/20 $9,709 Yes22252 1 Del Norte 101 39.8 Bridge Post-Planning 2019/20 $300 Yes20247 1 Del Norte 101 R3.900 23.6 Pavement Post-Planning 2024/25 $42,560 Yes16414 1 Del Norte 101 R5.100 R5.600 Mobility - Operational Improvements Post-Planning 2021/22 $4,23521413 1 Del Norte 199 1.1 2.6 Drainage Post-Planning 2020/21 $4,832 Yes21401 1 Del Norte 199 6.5 36.3 Drainage Post-Planning 2019/20 $5,092 Yes17515 1 Del Norte 199 10.2 10.7 Safety Improvements Post-Planning 2019/20 $2,99021687 1 Del Norte 199 22.07 36.408 Pavement Planning 2026/27 Yes22373 1 Del Norte 199 24.1 24.3 Safety Improvements Planning 2023/2421751 1 Del Norte 199 27.2 27.6 Safety Improvements Planning 2022/2316443 1 Del Norte 199 28.1 Facilities Post-Planning 2021/22 $8,18721845 1 Del Norte 199 33.5 33.9 Major Damage - Emergency Opening Post-Planning 2019/20 $6,22016424 1 Del Norte 199 33.5 33.9 Safety Post-Planning 2020/21 $7,18620286 1 Humboldt 36 0 45.5 Drainage Planning 2027/28 Yes13533 1 Humboldt 36 0.1 1.7 Safety - Collision Reduction Post-Planning 2021/22 $16,50421406 1 Humboldt 36 3 6 Safety Improvements Planning 2021/2216442 1 Humboldt 36 10.5 10.8 Safety Improvements Post-Planning 2020/21 $6,0639246 1 Humboldt 36 11.3 34.6 Bridge Post-Planning 2021/22 $27,014 Yes

19292 1 Humboldt 36 13.5 36.1 Pavement Post-Planning 2022/23 $38,437 Yes16814 1 Humboldt 36 17.9 R23.900 Bridge Post-Planning 2021/22 $3,564 Yes13440 1 Humboldt 36 21.5 Sustainability Post-Planning 2021/22 $5,24718984 1 Humboldt 36 25.4 26 Major Damage - Permanent Restoration Post-Planning 2024/25 $17,09718986 1 Humboldt 96 27 27.4 Major Damage - Permanent Restoration Post-Planning 2021/22 $9,90613303 1 Humboldt 96 Various Various Bridge Post-Planning 2019/20 $11,235 Yes11281 1 Humboldt 96 Various Various Bridge Post-Planning 2021/22 $16,293 Yes11251 1 Humboldt 101 27.7 Bridge Post-Planning 2020/21 $23,795 Yes19296 1 Humboldt 101 56.6 R137.100 Drainage Post-Planning 2024/25 $23,246 Yes18135 1 Humboldt 101 57.1 67.8 Roadside Post-Planning 2021/22 $11,31813324 1 Humboldt 101 69.9 75.2 Pavement Post-Planning 2019/20 $30,548 Yes13472 1 Humboldt 101 75.3 77.6 Mobility - ADA Post-Planning 2019/20 $8,97116895 1 Humboldt 101 77.3 78.1 Mobility - ADA Post-Planning 2021/22 $8,79718636 1 Humboldt 101 77.9 79.5 Safety Improvements Post-Planning 2021/22 $10,53916446 1 Humboldt 101 79.5 80.2 Bridge Post-Planning 2026/27 $11,096 Yes22256 1 Humboldt 101 79.78 79.78 Bridge Planning 2026/27 Yes21605 1 Humboldt 101 79.9 86.3 Safety - Collision Reduction Post-Planning 2019/20 $2,57721701 1 Humboldt 101 80.1 84.3 Mobility - Operational Improvements Post-Planning 2019/20 $1,73422238 1 Humboldt 101 81 82.5 Major Damage - Emergency Opening Post-Planning 2019/20 $2,66021606 1 Humboldt 101 84.4 84.8 Bridge Post-Planning 2019/20 $977 Yes14178 1 Humboldt 101 87.5 89.5 Safety - Collision Reduction Post-Planning 2021/22 $9,62218006 1 Humboldt 101 87.8 R91.500 Safety Improvements Post-Planning 2019/20 $2,98316428 1 Humboldt 101 88.3 88.6 Mobility - Operational Improvements Post-Planning 2021/22 $8,60316450 1 Humboldt 101 88.3 Safety - Collision Reduction Post-Planning 2019/20 $7,117

Note: This Ten-Year Project Book is subject to change.

Table 5 - List of Projects by County

Project Book Summary 11

Page 15: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

21782 1 Humboldt 101 125.2 125.62 Safety Improvements Planning 2024/2521685 1 Humboldt 101 125.7 R131.7 Pavement Planning 2028/29 Yes18757 1 Humboldt 101 M53.900 Bridge Post-Planning 2024/25 $42,251 Yes22527 1 Humboldt 101 R102.33 R102.33 Major Damage - Emergency Opening Planning 2020/2120620 1 Humboldt 101 R11.5 R11.5 Facilities Planning 2025/2615993 1 Humboldt 101 R11.800 26.7 Drainage Post-Planning 2020/21 $6,008 Yes21137 1 Humboldt 101 R48.879 58.79 Pavement Planning 2027/28 Yes22198 1 Humboldt 101 R53.000 M54.000 Major Damage - Emergency Opening Post-Planning 2019/20 $79017275 1 Humboldt 101 R90.100 109.6 Pavement Post-Planning 2020/21 $45,573 Yes20254 1 Humboldt 101 T0.0 R10.3 Pavement Planning 2028/29 Yes19295 1 Humboldt 101 T0.000 M54.000 Drainage Post-Planning 2023/24 $27,475 Yes16431 1 Humboldt 101 Various Various Facilities Post-Planning 2020/21 $18,10018826 1 Humboldt 169 15.1 33.8 Drainage Post-Planning 2023/24 $12,815 Yes20848 1 Humboldt 169 19 33 Major Damage - Permanent Restoration Post-Planning 2021/22 $10,27021152 1 Humboldt 211 77.5 78.7 Bridge Planning 2028/29 Yes18710 1 Humboldt 254 0 43 Drainage Post-Planning 2025/26 $36,720 Yes21085 1 Humboldt 254 0.8 21 Drainage Post-Planning 2023/24 $6,989 Yes18761 1 Humboldt 254 4.2 Sustainability Post-Planning 2021/22 $17,29920851 1 Humboldt 254 4.4 4.6 Major Damage - Permanent Restoration Post-Planning 2022/23 $18,11519286 1 Humboldt 299 0 R5.700 Pavement Post-Planning 2022/23 $18,216 Yes17209 1 Humboldt 299 20.5 30.2 Safety Improvements Post-Planning 2019/20 $10,95021375 1 Humboldt 299 30.7 33.4 Safety Improvements Post-Planning 2021/22 $39,76417208 1 Humboldt 299 30.7 37.7 Safety Improvements Post-Planning 2019/20 $17,27816430 1 Humboldt 299 38.9 39.5 Safety Improvements Post-Planning 2019/20 $6,56016610 1 Humboldt 299 R1.500 R2.000 Bridge Post-Planning 2019/20 $6,630 Yes17073 1 Humboldt 299 R1.900 37.8 Drainage Post-Planning 2021/22 $8,742 Yes19288 1 Humboldt 299 R11.000 R22.500 Pavement Post-Planning 2022/23 $22,280 Yes20246 1 Humboldt 299 R11.025 R27.4 Pavement Planning 2027/28 Yes17235 1 Humboldt 299 R14.700 R15.700 Safety Improvements Post-Planning 2019/20 $3,43013439 1 Humboldt 299 R16.100 R26.600 Sustainability Post-Planning 2019/20 $4,60922312 1 Humboldt 299 R16.100 R26.600 Sustainability Post-Planning 2021/22 $46021945 1 Humboldt 299 R8.00 R8.84 Major Damage - Permanent Restoration Planning 2024/2518992 1 Humboldt 299 R8.700 R9.200 Major Damage - Permanent Restoration Post-Planning 2021/22 $37,55220872 1 Lake 20 2 2.8 Safety Improvements Post-Planning 2021/22 $24,92915709 1 Lake 20 5.1 5.8 Safety Improvements Post-Planning 2019/20 $14,50416811 1 Lake 20 5.8 Bridge Post-Planning 2019/20 $6,324 Yes13549 1 Lake 20 9.4 Bridge Post-Planning 2019/20 $3,775 Yes20288 1 Lake 20 R0.0 8.175 Pavement Planning 2026/27 Yes20277 1 Lake 29 11.89 23.6 Pavement Planning 2025/26 Yes16438 1 Lake 29 12.7 14.5 Safety Improvements Post-Planning 2019/20 $19,09016439 1 Lake 29 17.7 20.7 Safety Improvements Post-Planning 2019/20 $12,33120290 1 Lake 29 31.6 52.5 Pavement Planning 2027/28 Yes21069 1 Lake 29 50.8 Bridge Post-Planning 2020/21 $14,076 Yes20909 1 Lake 29 R34.900 R35.200 Safety Improvements Post-Planning 2021/22 $7,09016421 1 Lake 29 Various Various Mobility - TMS Post-Planning 2020/21 $4,806 Yes16419 1 Lake 53 Various Various Mobility - TMS Post-Planning 2020/21 $4,497 Yes19029 1 Lake 175 0.2 0.4 Safety Improvements Post-Planning 2021/22 $5,77021895 1 Lake 175 Various Various Major Damage - Emergency Opening Post-Planning 2019/20 $2,42022235 1 Lake 175 Various Various Major Damage - Emergency Opening Post-Planning 2019/20 $3,025

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 12

Page 16: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

15897 1 Mendocino 1 0 15 Pavement Post-Planning 2019/20 $16,602 Yes20270 1 Mendocino 1 0 105.5 Drainage Planning 2028/29 Yes17257 1 Mendocino 1 6.5 9.5 Safety Improvements Post-Planning 2020/21 $4,90720274 1 Mendocino 1 14.745 33.91 Pavement Planning 2025/26 Yes21817 1 Mendocino 1 18 23 Major Damage - Emergency Opening Post-Planning 2019/20 $3,77513550 1 Mendocino 1 31.4 Bridge Post-Planning 2021/22 $13,416 Yes19291 1 Mendocino 1 33.7 R51.000 Pavement Post-Planning 2023/24 $31,573 Yes22126 1 Mendocino 1 33.727 58.8 Pavement Planning 2028/29 Yes16451 1 Mendocino 1 41.8 42.3 Safety Improvements Post-Planning 2019/20 $5,59416448 1 Mendocino 1 42.3 42.5 Major Damage - Protective Betterments Post-Planning 2019/20 $2,52722536 1 Mendocino 1 42.4 43.3 Bridge Post-Planning 2021/22 $20,026 Yes9132 1 Mendocino 1 42.4 43.3 Bridge Post-Planning 2029/30 $61,592 Yes9133 1 Mendocino 1 43.3 44.2 Bridge Post-Planning 2022/23 $93,908 Yes

22342 1 Mendocino 1 51.8 Bridge Post-Planning 2021/22 $20,255 Yes17110 1 Mendocino 1 59.7 Bridge Post-Planning 2021/22 $22,356 Yes13454 1 Mendocino 1 59.8 62.1 Mobility - ADA Post-Planning 2020/21 $9,5989139 1 Mendocino 1 62.1 Bridge Post-Planning 2020/21 $17,816 Yes

17457 1 Mendocino 1 71.2 71.4 Safety Improvements Post-Planning 2019/20 $5,19521686 1 Mendocino 1 78.9 87.85 Pavement Planning 2028/29 Yes19290 1 Mendocino 1 87.9 105.6 Pavement Post-Planning 2022/23 $25,502 Yes18136 1 Mendocino 1 R65.100 65.5 Safety Improvements Post-Planning 2021/22 $5,04821994 1 Mendocino 20 17.283 28.7 Pavement Planning 2026/27 Yes19035 1 Mendocino 20 19.1 19.6 Safety Improvements Post-Planning 2021/22 $5,66921052 1 Mendocino 20 20 20.3 Safety Improvements Post-Planning 2021/22 $4,09417919 1 Mendocino 20 24.7 24.9 Safety Improvements Post-Planning 2019/20 $4,40213544 1 Mendocino 20 33.3 34.4 Bridge Post-Planning 2020/21 $48,806 Yes20282 1 Mendocino 20 R38.3 44.1 Pavement Planning 2027/28 Yes20852 1 Mendocino 101 1.4 1.7 Major Damage - Permanent Restoration Post-Planning 2021/22 $7,03518672 1 Mendocino 101 9.9 11.2 Mobility - ADA Post-Planning 2024/25 $15,60619289 1 Mendocino 101 21 28.6 Pavement Post-Planning 2024/25 $48,570 Yes22000 1 Mendocino 101 30.8 R33.8 Safety Improvements Planning 2023/2419408 1 Mendocino 101 41.2 Mobility - WIM Scales & CVEFs Post-Planning 2023/24 $4,21022253 1 Mendocino 101 41.8 R42.8 Safety Improvements Planning 2023/2418675 1 Mendocino 101 49 55.1 Pavement Post-Planning 2023/24 $14,163 Yes19285 1 Mendocino 101 55 64.9 Pavement Post-Planning 2023/24 $31,522 Yes11314 1 Mendocino 101 58.9 82.5 Roadside Post-Planning 2019/20 $15,38420245 1 Mendocino 101 81.4 90.77 Pavement Planning 2026/27 Yes20250 1 Mendocino 101 R103.0 T106.8 Pavement Planning 2025/26 Yes21336 1 Mendocino 101 R104.500 Drainage Post-Planning 2022/23 $3,429 Yes13636 1 Mendocino 101 R106.400 T106.800 Bridge Post-Planning 2021/22 $6,924 Yes18674 1 Mendocino 101 R33.700 R43.200 Pavement Post-Planning 2022/23 $52,888 Yes22124 1 Mendocino 128 0 50.5 Drainage Planning 2026/27 Yes20289 1 Mendocino 128 17.9 30.663 Pavement Planning 2025/26 Yes21995 1 Mendocino 128 30.663 50.902 Pavement Planning 2027/28 Yes19166 1 Mendocino 162 8.2 Bridge Post-Planning 2021/22 $13,339 Yes11178 1 Mendocino 162 11.5 11.8 Major Damage - Permanent Restoration Post-Planning 2020/21 $49,93518673 1 Mendocino 162 R0.000 25.7 Pavement Post-Planning 2023/24 $45,056 Yes21921 1 Mendocino 253 1.7 2.5 Major Damage - Permanent Restoration Post-Planning 2022/23 $30,29721146 1 Mendocino 271 17.7 18 Bridge Post-Planning 2020/21 $377 Yes

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 13

Page 17: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

20847 1 Mendocino 271 19.6 20 Major Damage - Permanent Restoration Post-Planning 2021/22 $8,43116465 1 Mendocino Various Various Various Safety - Collision Reduction Post-Planning 2019/20 $4,85511312 2 Butte 70 29.7 48 Drainage Post-Planning 2019/20 $6,089 Yes21696 2 Lassen 36 0 0.7 Safety Improvements Planning 2023/2422082 2 Lassen 36 0.5 22.2 Drainage Planning 2026/27 Yes22475 2 Lassen 36 6 14.6 Pavement Post-Planning 2019/20 $44,469 Yes21860 2 Lassen 36 12.5 13 Major Damage - Emergency Opening Post-Planning 2019/20 $2,84222488 2 Lassen 36 14.5 16.786 Safety Improvements Planning 2023/2422520 2 Lassen 36 16.5 R18.7 Major Damage - Emergency Opening Planning 2020/2119191 2 Lassen 44 0 37.2 Pavement Post-Planning 2022/23 $40,869 Yes22261 2 Lassen 44 6.5 7.1 Safety Improvements Planning 2024/2522081 2 Lassen 139 0.66 19.09 Drainage Planning 2028/29 Yes19217 2 Lassen 139 0.7 11 Pavement Post-Planning 2023/24 $15,622 Yes22039 2 Lassen 299 13.4 14.06 Bridge Planning 2025/26 Yes17119 2 Lassen 299 18.5 25.6 Pavement Post-Planning 2019/20 $25,161 Yes21284 2 Lassen 395 5.8 R21.0 Pavement Planning 2026/27 Yes22083 2 Lassen 395 28.5 59 Drainage Planning 2028/29 Yes20054 2 Lassen 395 56.5 71.2 Pavement Planning 2027/28 Yes21996 2 Lassen 395 96.5 96.5 Roadside Planning 2025/2622158 2 Lassen Various Various Various Major Damage - Emergency Opening Post-Planning 2019/20 $2,92522079 2 Modoc 139 39.5 50.7 Sustainability Planning 2028/299290 2 Modoc 139 R3.500 30.3 Drainage Post-Planning 2021/22 $3,752 Yes

22084 2 Modoc 299 40.64 56.2 Drainage Planning 2025/26 Yes20965 2 Modoc 299 56.7 58 Pavement Planning 2025/26 Yes19475 2 Modoc 395 23.07 23.07 Facilities Planning 2025/2619884 2 Modoc 395 R17.5 34 Pavement Planning 2025/26 Yes20048 2 Plumas 36 0 9.2 Pavement Planning 2027/28 Yes19184 2 Plumas 36 9.2 18.4 Pavement Post-Planning 2023/24 $33,153 Yes21694 2 Plumas 36 R13.600 R14.200 Safety Improvements Post-Planning 2022/23 $8,65820976 2 Plumas 70 0 29.9 Major Damage - Permanent Restoration Post-Planning 2020/21 $22,40313698 2 Plumas 70 0.4 29.7 Drainage Post-Planning 2019/20 $6,394 Yes19958 2 Plumas 70 33 47 Pavement Planning 2027/28 Yes16788 2 Plumas 70 36.8 R62.500 Roadside Post-Planning 2020/21 $3,07011368 2 Plumas 70 58.4 R78.400 Pavement Post-Planning 2021/22 $102,604 Yes19924 2 Plumas 70 R78.300 90.3 Pavement Post-Planning 2022/23 $19,841 Yes19287 2 Plumas 89 0 8.71 Pavement Planning 2025/26 Yes19922 2 Plumas 89 12.9 20 Pavement Post-Planning 2023/24 $12,793 Yes20045 2 Plumas 89 24 30 Pavement Planning 2026/27 Yes14187 2 Plumas 89 30.2 R42.200 Pavement Post-Planning 2023/24 $40,682 Yes21813 2 Shasta 5 43.2 43.2 Roadside Planning 2024/2519223 2 Shasta 5 58 67.019 Pavement Planning 2024/25 Yes22190 2 Shasta 5 R14.8 R20.0 Safety Planning 2024/2521981 2 Shasta 5 R20.3 R27.9 Drainage Planning 2025/26 Yes19174 2 Shasta 5 R28.800 R44.100 Pavement Post-Planning 2022/23 $31,304 Yes21982 2 Shasta 5 R29.0 R43.3 Drainage Planning 2027/28 Yes22140 2 Shasta 5 R30.55R R30.93R Bridge Planning 2025/26 Yes11315 2 Shasta 5 R31.000 R31.700 Roadside Post-Planning 2019/20 $5,73315793 2 Shasta 5 R32.000 R32.300 Bridge Post-Planning 2019/20 $3,692 Yes22116 2 Shasta 5 R43.2 R43.2 Roadside Planning 2024/25

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 14

Page 18: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

22509 2 Shasta 5 R54.6 R54.6 Major Damage - Emergency Opening Planning 2020/2122138 2 Shasta 44 0 7 Roadside Planning 2024/2520046 2 Shasta 44 43.2 57 Pavement Planning 2028/29 Yes18263 2 Shasta 44 51.6 52.2 Safety Improvements Post-Planning 2019/20 $5,40419854 2 Shasta 44 R0.0 R7.5 Pavement Planning 2028/29 Yes22067 2 Shasta 44 R26.8 71.38 Pavement Planning 2025/26 Yes19923 2 Shasta 89 22 30.6 Pavement Post-Planning 2023/24 $10,453 Yes17247 2 Shasta 273 14.9 15.7 Mobility - ADA Post-Planning 2021/22 $5,80220010 2 Shasta 299 23.89 G24.08 Pavement Planning 2027/28 Yes22069 2 Shasta 299 23.91 23.91 Bridge Planning 2027/28 Yes19180 2 Shasta 299 24.1 30.3 Pavement Post-Planning 2022/23 $23,919 Yes21980 2 Shasta 299 41.1 52.2 Drainage Planning 2025/26 Yes21390 2 Shasta 299 44.3 44.9 Safety Improvements Post-Planning 2021/22 $11,93521700 2 Shasta 299 57.5 58.7 Safety Improvements Planning 2023/2420051 2 Shasta 299 60 67.8 Pavement Planning 2026/27 Yes16679 2 Shasta 299 67.8 77.8 Pavement Post-Planning 2021/22 $17,781 Yes21976 2 Shasta 299 74.7 76.8 Drainage Planning 2028/29 Yes22087 2 Shasta 299 88.5 89.5 Major Damage - Protective Betterments Planning 2024/2521675 2 Shasta 299 R1.02 R1.63 Major Damage - Permanent Restoration Planning 2021/2222078 2 Siskiyou 3 16 38.2 Sustainability Planning 2026/2716609 2 Siskiyou 3 38 38.6 Bridge Post-Planning 2020/21 $10,887 Yes22010 2 Siskiyou 3 38.39 R46.79 Drainage Planning 2026/27 Yes16809 2 Siskiyou 3 L47.400 Facilities Post-Planning 2023/24 $8,50815879 2 Siskiyou 3 R46.800 R48.000 Pavement Post-Planning 2021/22 $73,992 Yes19974 2 Siskiyou 3 R48.00 54.187 Pavement Planning 2025/26 Yes13255 2 Siskiyou 5 0 R69.200 Safety - Collision Reduction Post-Planning 2021/22 $7,08514182 2 Siskiyou 5 2.5 3 Bridge Post-Planning 2021/22 $22,649 Yes16682 2 Siskiyou 5 2.7 R15.900 Pavement Post-Planning 2021/22 $135,825 Yes19216 2 Siskiyou 5 R25.200 R38.600 Pavement Post-Planning 2022/23 $28,035 Yes17215 2 Siskiyou 5 R25.400 R25.900 Roadside Post-Planning 2020/21 $3,41422159 2 Siskiyou 5 R58.2 R61.009 Pavement Planning 2026/27 Yes15794 2 Siskiyou 5 R8.300 Bridge Post-Planning 2020/21 $3,721 Yes19947 2 Siskiyou 5 Various Various Bridge Post-Planning 2020/21 $39,249 Yes20047 2 Siskiyou 89 0 21 Pavement Planning 2026/27 Yes19899 2 Siskiyou 89 20 R34.62 Pavement Planning 2025/26 Yes16685 2 Siskiyou 96 32.2 82.7 Drainage Post-Planning 2019/20 $5,557 Yes17233 2 Siskiyou 96 43.4 57 Bridge Post-Planning 2023/24 $19,739 Yes19484 2 Siskiyou 96 47.4 R47.8 Major Damage - Permanent Restoration Planning 2027/2816613 2 Siskiyou 96 52.48 71.23 Bridge Planning 2025/26 Yes21192 2 Siskiyou 96 60.76 60.76 Facilities Planning 2026/2721005 2 Siskiyou 96 60.8 93.8 Roadside Post-Planning 2022/23 $8,29216639 2 Siskiyou 96 76.8 78 Bridge Post-Planning 2023/24 $43,873 Yes19219 2 Siskiyou 96 R0.0 R16.0 Pavement Planning 2024/25 Yes22085 2 Siskiyou 97 0.16 54.1 Drainage Planning 2027/28 Yes19925 2 Siskiyou 97 9 25 Pavement Planning 2028/29 Yes19921 2 Siskiyou 97 45 54.1 Pavement Post-Planning 2022/23 $14,328 Yes20049 2 Siskiyou 97 L0.00 9 Pavement Planning 2027/28 Yes19970 2 Siskiyou 161 4.5 9.1 Pavement Planning 2024/25 Yes21968 2 Siskiyou 263 54.51 56.35 Bridge Planning 2024/25 Yes

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 15

Page 19: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

19441 2 Tehama 5 33.3 33.3 Roadside Planning 2026/279205 2 Tehama 5 36.3 41.6 Safety - Collision Reduction Post-Planning 2020/21 $7,8009376 2 Tehama 5 39 41.9 Mobility - WIM Scales & CVEFs Post-Planning 2021/22 $18,225

21399 2 Tehama 5 42 42 Relinquishment Planning 2024/259198 2 Tehama 5 R25.400 Bridge Post-Planning 2019/20 $23,945 Yes

16686 2 Tehama 36 1.1 37 Drainage Post-Planning 2019/20 $5,954 Yes17607 2 Tehama 36 12.6 13.1 Safety Improvements Post-Planning 2019/20 $5,15621698 2 Tehama 36 15.8 16.3 Safety Improvements Planning 2025/2619218 2 Tehama 36 20 39.7 Pavement Post-Planning 2022/23 $26,034 Yes21971 2 Tehama 36 25.54 25.54 Bridge Planning 2026/27 Yes17620 2 Tehama 36 26.6 27.6 Safety Improvements Post-Planning 2019/20 $7,74113572 2 Tehama 36 40.3 42.1 Pavement Post-Planning 2019/20 $9,332 Yes19489 2 Tehama 36 41.9 42.6 Bridge Post-Planning 2023/24 $7,109 Yes19967 2 Tehama 36 67.5 R75.10 Pavement Planning 2028/29 Yes20052 2 Tehama 36 78.4 92 Pavement Planning 2028/29 Yes22474 2 Tehama 36 87.8 89.1 Safety Improvements Post-Planning 2019/20 $8,58119182 2 Tehama 99 0 12.5 Pavement Post-Planning 2023/24 $41,774 Yes21484 2 Tehama 99 4.2 4.8 Safety Improvements Post-Planning 2023/24 $14,40715816 2 Tehama 99 9 9.3 Bridge Post-Planning 2021/22 $7,560 Yes13807 2 Tehama Various Various Various Bridge Post-Planning 2019/20 $5,067 Yes22484 2 Trinity 3 6 14 Sustainability Planning 2028/2913699 2 Trinity 3 30.4 57.9 Drainage Post-Planning 2019/20 $8,792 Yes21634 2 Trinity 3 32.6 32.6 Drainage Planning 2026/27 Yes13288 2 Trinity 3 58.7 60.7 Bridge Post-Planning 2019/20 $17,041 Yes19469 2 Trinity 3 59.6 59.6 Facilities Planning 2026/2719983 2 Trinity 3 67.7 T85.06 Pavement Planning 2024/25 Yes16672 2 Trinity 3 Various Various Bridge Post-Planning 2021/22 $10,726 Yes17434 2 Trinity 36 R34.800 R35.400 Safety Improvements Post-Planning 2019/20 $9,88716687 2 Trinity 299 1.6 45.2 Drainage Post-Planning 2021/22 $8,931 Yes13602 2 Trinity 299 1.9 2.3 Safety - Collision Reduction Post-Planning 2019/20 $8,67611319 2 Trinity 299 3.6 Roadside Post-Planning 2019/20 $2,83021970 2 Trinity 299 6.33 6.33 Bridge Planning 2026/27 Yes19845 2 Trinity 299 8.3 15 Pavement Planning 2024/25 Yes19049 2 Trinity 299 15 25.7 Pavement Post-Planning 2023/24 $23,338 Yes22297 2 Trinity 299 23.1 23.5 Major Damage - Emergency Opening Post-Planning 2019/20 $96022077 2 Trinity 299 25.77 43 Sustainability Planning 2028/2921827 2 Trinity 299 42.9 43.3 Major Damage - Protective Betterments Post-Planning 2019/20 $8,71919501 2 Trinity 299 43.7 Major Damage - Permanent Restoration Post-Planning 2019/20 $1,25019969 2 Trinity 299 49 70 Drainage Planning 2025/26 Yes16798 2 Trinity 299 64.7 71.7 Sustainability Post-Planning 2021/22 $7,08521194 2 Trinity 299 69.7 69.7 Facilities Planning 2027/289269 2 Trinity 299 Various Various Bridge Post-Planning 2019/20 $11,250 Yes

21443 3 Butte 32 0.3 5 Safety Improvements Post-Planning 2021/22 $21,85016917 3 Butte 32 5 10.2 Pavement Post-Planning 2022/23 $33,200 Yes21914 3 Butte 32 7.44 R8.62 Safety Improvements Planning 2021/2217714 3 Butte 32 7.6 7.9 Safety Improvements Post-Planning 2019/20 $6,75521796 3 Butte 32 30.8 31 Major Damage - Permanent Restoration Post-Planning 2021/22 $19,35020723 3 Butte 70 0 3.8 Safety Improvements Post-Planning 2021/22 $44,06822508 3 Butte 70 5.6 9.1 Safety Improvements Post-Planning 2019/20 $36,860

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 16

Page 20: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

22398 3 Butte 70 8.8 12.1 Safety Improvements Post-Planning 2019/20 $32,72021901 3 Butte 70 16.6 Major Damage - Emergency Opening Post-Planning 2019/20 $1,45020496 3 Butte 70 34.5 48.076 Pavement Planning 2025/26 Yes21798 3 Butte 70 34.7 39.3 Major Damage - Permanent Restoration Post-Planning 2021/22 $6,73018913 3 Butte 70 46 47 Major Damage - Permanent Restoration Post-Planning 2020/21 $58,86617030 3 Butte 70 Various Various Advance Mitigation Post-Planning 2019/20 $1,89422270 3 Butte 70 Various Various Major Damage - Permanent Restoration Post-Planning 2019/20 $23,0829247 3 Butte 99 13.3 45.9 Bridge Post-Planning 2019/20 $9,076 Yes

16293 3 Butte 99 14.9 15.7 Bridge Post-Planning 2019/20 $15,590 Yes20843 3 Butte 99 22.6 R30.3 Pavement Planning 2027/28 Yes22005 3 Butte 99 26 Major Damage - Emergency Opening Post-Planning 2019/20 $7,80016789 3 Butte 99 29.3 T37.800 Mobility - TMS Post-Planning 2020/21 $11,636 Yes16915 3 Butte 99 R3.100 5 Pavement Post-Planning 2023/24 $16,120 Yes21627 3 Butte 99 Various Various Major Damage - Emergency Opening Post-Planning 2019/20 $1,65022532 3 Butte 162 0.22 0.22 Bridge Planning 2027/28 Yes21924 3 Butte 162 3.6 Major Damage - Emergency Opening Post-Planning 2019/20 $55016387 3 Butte 162 15.6 18.4 Pavement Planning 2024/25 Yes17716 3 Butte 162 18.4 19.9 Safety Improvements Post-Planning 2019/20 $22,35221899 3 Butte 191 8.4 10.1 Major Damage - Permanent Restoration Post-Planning 2021/22 $15,51020573 3 Colusa 5 7.1 7.2 Drainage Planning 2026/27 Yes17878 3 Colusa 5 R24.1 R24.5 Roadside Planning 2024/2521505 3 Colusa 5 R32.9 R32.9 Bridge Planning 2025/26 Yes20554 3 Colusa 16 0 7.25 Pavement Planning 2028/29 Yes17593 3 Colusa 16 2.18 7 Sustainability Planning 2026/2717717 3 Colusa 20 9.8 12.4 Safety Improvements Planning 2023/2413604 3 Colusa 20 34.8 36.5 Safety - Collision Reduction Post-Planning 2021/22 $14,62020486 3 El Dorado 49 31.2 38.233 Pavement Planning 2027/28 Yes13744 3 El Dorado 50 0 80.4 Mobility - TMS Post-Planning 2019/20 $13,000 Yes20401 3 El Dorado 50 4.9 R14.0 Pavement Planning 2026/27 Yes15994 3 El Dorado 50 18.7 21.9 Pavement Planning 2024/25 Yes21965 3 El Dorado 50 28.8 39.7 Drainage Planning 2028/29 Yes19046 3 El Dorado 50 33.8 34.2 Major Damage - Permanent Restoration Post-Planning 2019/20 $18,41020649 3 El Dorado 50 36 36.4 Major Damage - Permanent Restoration Post-Planning 2019/20 $7,72021931 3 El Dorado 50 39.7 58.7 Pavement Planning 2024/25 Yes19047 3 El Dorado 50 43.6 43.7 Major Damage - Permanent Restoration Post-Planning 2019/20 $4,82521797 3 El Dorado 50 45.2 Major Damage - Permanent Restoration Post-Planning 2021/22 $2,80518420 3 El Dorado 50 58 75.5 Pavement Planning 2027/28 Yes21925 3 El Dorado 50 72.7 Major Damage - Emergency Opening Post-Planning 2019/20 $98021444 3 El Dorado 50 75.4 80.1 Safety Improvements Post-Planning 2022/23 $23,59021145 3 El Dorado 50 75.4 80.44 Pavement Planning 2024/25 Yes13701 3 El Dorado 50 R13.700 18.5 Drainage Post-Planning 2021/22 $5,500 Yes13700 3 El Dorado 50 R2.700 R13.800 Drainage Post-Planning 2021/22 $6,760 Yes20878 3 El Dorado 50 R28.500 R29.100 Bridge Post-Planning 2019/20 $11,494 Yes20799 3 El Dorado 193 26.7 Major Damage - Permanent Restoration Post-Planning 2019/20 $3,51022148 3 El Dorado Various Various Various Major Damage - Emergency Opening Post-Planning 2019/20 $3,00022357 3 Glenn 5 15.91 15.91 Major Damage - Emergency Opening Planning 2019/2021286 3 Glenn 5 R10.8 R10.8 Mobility - WIM Scales & CVEFs Planning 2026/2711321 3 Glenn 5 R14.600 Roadside Post-Planning 2019/20 $8,49521266 3 Glenn 5 R20.0 R28.8 Pavement Planning 2025/26 Yes

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 17

Page 21: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

13840 3 Glenn 5 R7.400 R17.000 Roadside Post-Planning 2020/21 $2,91616926 3 Glenn 32 L0.0 10.9 Pavement Planning 2025/26 Yes13599 3 Glenn 32 L0.000 0.9 Mobility - ADA Post-Planning 2019/20 $2,15816925 3 Glenn 162 65.2 67.2 Pavement Planning 2024/25 Yes9258 3 Glenn 162 76.3 78.6 Bridge Post-Planning 2020/21 $110,400 Yes

21961 3 Nevada 20 0 R12.2 Pavement Planning 2027/28 Yes21932 3 Nevada 20 20 46.119 Pavement Planning 2024/25 Yes16781 3 Nevada 20 25.1 25.2 Mobility - Operational Improvements Post-Planning 2020/21 $2,61916783 3 Nevada 20 28 32.4 Mobility - Operational Improvements Post-Planning 2020/21 $5,13013605 3 Nevada 20 29.7 30.9 Safety Improvements Post-Planning 2020/21 $12,49916784 3 Nevada 20 36.8 37 Mobility - Operational Improvements Post-Planning 2020/21 $3,34017718 3 Nevada 20 37.1 39.8 Safety Improvements Post-Planning 2020/21 $39,48015996 3 Nevada 20 R12.200 20 Pavement Post-Planning 2023/24 $23,990 Yes16289 3 Nevada 49 0 7.5 Drainage Post-Planning 2020/21 $5,153 Yes21966 3 Nevada 49 0 R14.48 Pavement Planning 2028/29 Yes20055 3 Nevada 49 2 2.5 Safety Improvements Post-Planning 2019/20 $3,91020056 3 Nevada 49 8.3 8.7 Safety Improvements Post-Planning 2019/20 $4,21017729 3 Nevada 49 10.8 R13.3 Safety - Collision Reduction Planning 2025/2620534 3 Nevada 49 15 R32.61 Pavement Planning 2028/29 Yes16364 3 Nevada 80 0 R2.700 Pavement Post-Planning 2022/23 $85,590 Yes16916 3 Nevada 80 13 15.5 Pavement Post-Planning 2022/23 $20,795 Yes21276 3 Nevada 80 15.5 23.4 Pavement Planning 2026/27 Yes21962 3 Nevada 80 23.4 31.78 Pavement Planning 2027/28 Yes19413 3 Nevada 80 27.6 28.5 Bridge Post-Planning 2026/27 $74,535 Yes16297 3 Nevada 80 28.3 28.7 Major Damage - Protective Betterments Post-Planning 2020/21 $8,41017862 3 Nevada 80 29.5 29.7 Major Damage - Protective Betterments Post-Planning 2020/21 $5,57015981 3 Nevada 80 31.3 31.8 Major Damage - Protective Betterments Post-Planning 2021/22 $8,73016761 3 Nevada 80 R10.000 31.7 Safety - Collision Reduction Post-Planning 2020/21 $9,33521278 3 Nevada 80 R2.7 13.1 Pavement Planning 2026/27 Yes13311 3 Nevada 80 R58.700 R60.200 Bridge Post-Planning 2022/23 $101,780 Yes20494 3 Nevada 89 1.3 8.7 Pavement Planning 2027/28 Yes13473 3 Nevada 174 9.7 10.1 Mobility - ADA Post-Planning 2020/21 $2,76616404 3 Nevada Various Various Various Mobility - TMS Post-Planning 2019/20 $13,210 Yes20491 3 Placer 28 0.1 11 Pavement Post-Planning 2022/23 $24,150 Yes17216 3 Placer 49 2.2 2.4 Safety Improvements Post-Planning 2019/20 $8,91921162 3 Placer 49 R8.700 R10.600 Safety Improvements Post-Planning 2021/22 $26,34020982 3 Placer 65 R12.900 R13.100 Major Damage - Permanent Restoration Post-Planning 2019/20 $1,72517026 3 Placer 65 R19.500 Advance Mitigation Post-Planning 2019/20 $2,63920994 3 Placer 65 R7.800 R12.000 Safety Improvements Post-Planning 2019/20 $3,14520566 3 Placer 80 0 7.1 Pavement Planning 2027/28 Yes15715 3 Placer 80 1.6 R66.500 Safety - Collision Reduction Post-Planning 2020/21 $3,75016389 3 Placer 80 2.8 Mobility - Operational Improvements Post-Planning 2019/20 $11,20020400 3 Placer 80 7.1 R19.0 Pavement Planning 2028/29 Yes16941 3 Placer 80 28.8 49.3 Pavement Planning 2024/25 Yes9292 3 Placer 80 31.5 36.9 Drainage Post-Planning 2019/20 $4,730 Yes

16940 3 Placer 80 38.3 41.5 Drainage Post-Planning 2020/21 $5,386 Yes18435 3 Placer 80 42.7 49.3 Pavement Post-Planning 2022/23 $76,860 Yes9220 3 Placer 80 46.3 R63.500 Bridge Post-Planning 2019/20 $53,235 Yes

20567 3 Placer 80 49.3 68.5 Drainage Planning 2024/25 YesNote: This Ten-Year Project Book is subject to change.

Project Book Summary 18

Page 22: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

21405 3 Placer 80 50.7 50.7 Facilities Planning 2024/2516920 3 Placer 80 R19.0 R26.5 Pavement Planning 2026/27 Yes18428 3 Placer 80 R26.500 28.8 Pavement Post-Planning 2022/23 $113,500 Yes21900 3 Placer 80 R56.900 R58.200 Major Damage - Permanent Restoration Post-Planning 2021/22 $3,15018437 3 Placer 80 R58.2 R58.712 Pavement Planning 2027/28 Yes20875 3 Placer 80 R62.900 69.7 Major Damage - Permanent Restoration Post-Planning 2019/20 $10,89018436 3 Placer 80 R64.2 R66.3 Pavement Planning 2028/29 Yes16376 3 Placer 80 Various Various Mobility - TMS Post-Planning 2019/20 $2,565 Yes20453 3 Placer 89 0 13 Pavement Planning 2028/29 Yes18460 3 Placer 89 8.9 Facilities Post-Planning 2022/23 $5,69021941 3 Placer 89 13.09 21.667 Pavement Planning 2024/25 Yes20497 3 Placer 267 0 9.9 Pavement Planning 2026/27 Yes16563 3 Sacramento 5 22 22.9 Roadside Post-Planning 2021/22 $3,77019807 3 Sacramento 5 22.1 26.7 Bridge Post-Planning 2021/22 $247,230 Yes16953 3 Sacramento 5 23.6 24.3 Bridge Post-Planning 2026/27 $51,434 Yes16363 3 Sacramento 5 25.4 34.6 Pavement Planning 2025/26 Yes22052 3 Sacramento 5 26.7 29 Major Damage - Emergency Opening Post-Planning 2019/20 $2,42514046 3 Sacramento 5 Various Various Mobility - TMS Post-Planning 2020/21 $5,040 Yes16779 3 Sacramento 12 0 0.4 Bridge Post-Planning 2021/22 $22,860 Yes18257 3 Sacramento 12 0.4 0.9 Safety Improvements Post-Planning 2019/20 $7,63020974 3 Sacramento 16 4.16 12.74 Relinquishment Planning 2021/2218745 3 Sacramento 50 12.5 Mobility - TMC Post-Planning 2022/23 $6,38016358 3 Sacramento 50 15.7 23.1 Mobility - TMS Post-Planning 2020/21 $7,005 Yes18448 3 Sacramento 50 L0.000 17.5 Mobility - TMS Post-Planning 2020/21 $46,660 Yes22128 3 Sacramento 50 L0.000 Major Damage - Emergency Opening Post-Planning 2019/20 $1,35015866 3 Sacramento 50 L0.000 L0.500 Bridge Post-Planning 2020/21 $25,610 Yes22535 3 Sacramento 50 L0.600 R5.300 Pavement Post-Planning 2019/20 $323,900 Yes17116 3 Sacramento 50 R7.700 R9.500 Mobility - Operational Improvements Post-Planning 2020/21 $10,14019270 3 Sacramento 50 R9.39 R9.39 Drainage Planning 2028/29 Yes9301 3 Sacramento 51 1.6 4.4 Roadside Post-Planning 2021/22 $5,990

13289 3 Sacramento 51 2 3.5 Bridge Post-Planning 2021/22 $163,940 Yes20560 3 Sacramento 51 5.6 5.9 Safety - Collision Reduction Post-Planning 2022/23 $4,8809312 3 Sacramento 80 M0.300 18 Mobility - TMS Post-Planning 2019/20 $16,750 Yes

21288 3 Sacramento 80 M7.1 M7.1 Drainage Planning 2027/28 Yes14153 3 Sacramento 80 M9.100 R11.400 Roadside Post-Planning 2020/21 $5,58021974 3 Sacramento 80 M9.15 M9.15 Bridge Planning 2028/29 Yes16362 3 Sacramento 80 M9.600 12.9 Pavement Post-Planning 2021/22 $18,230 Yes21252 3 Sacramento 80 R11.2 14.6 Roadside Planning 2025/2613722 3 Sacramento 80 R11.400 18 Roadside Post-Planning 2020/21 $4,27020572 3 Sacramento 99 1.6 21.4 Drainage Planning 2025/26 Yes22503 3 Sacramento 99 6.2 6.8 Bridge Planning 2024/25 Yes9141 3 Sacramento 99 7.1 9.4 Bridge Post-Planning 2019/20 $73,767 Yes

21988 3 Sacramento 99 7.1 9.4 Bridge Post-Planning 2019/20 $1,871 Yes21990 3 Sacramento 99 7.1 9.4 Bridge Post-Planning 2019/20 $11,887 Yes21991 3 Sacramento 99 7.1 9.4 Bridge Post-Planning 2019/20 $3,397 Yes22363 3 Sacramento 99 7.1 9.4 Bridge Post-Planning 2019/20 $20,210 Yes22364 3 Sacramento 99 7.1 9.4 Bridge Post-Planning 2019/20 $70,360 Yes22367 3 Sacramento 99 7.1 9.4 Bridge Post-Planning 2019/20 $10,590 Yes14047 3 Sacramento 99 10 R24.300 Mobility - TMS Post-Planning 2021/22 $12,150 Yes

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 19

Page 23: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

19757 3 Sacramento 99 12.7 16 Mobility - Operational Improvements Post-Planning 2022/23 $23,03016936 3 Sacramento 99 12.9 16.4 Mobility - Operational Improvements Planning 2028/2920399 3 Sacramento 99 21.6 R24.285 Pavement Planning 2025/26 Yes20879 3 Sacramento 99 21.9 23.6 Bridge Post-Planning 2019/20 $5,843 Yes21983 3 Sacramento 99 23.1 Safety Improvements Post-Planning 2021/22 $5,32521951 3 Sacramento 99 24 Major Damage - Emergency Opening Post-Planning 2019/20 $5709259 3 Sacramento 99 R32.100 Bridge Post-Planning 2019/20 $3,689 Yes

22533 3 Sacramento 104 0.01 0.01 Bridge Planning 2028/29 Yes15716 3 Sacramento Various Various Various Safety - Collision Reduction Post-Planning 2020/21 $2,75021907 3 Sacramento Various Various Various Safety Improvements Post-Planning 2020/21 $3,94520898 3 Sierra 49 9.2 24.7 Major Damage - Permanent Restoration Post-Planning 2019/20 $15,62518840 3 Sierra 49 44.1 44.4 Safety Improvements Post-Planning 2019/20 $3,33516780 3 Sierra 80 1.3 1.6 Major Damage - Protective Betterments Post-Planning 2021/22 $7,52021261 3 Sierra 89 0 14.2 Pavement Planning 2027/28 Yes21849 3 Sierra 89 0.6 5.1 Major Damage - Permanent Restoration Post-Planning 2021/22 $1,60020447 3 Sutter 99 24.1 30.6 Pavement Planning 2028/29 Yes22290 3 Sutter 99 31.3 31.3 Major Damage - Emergency Opening Planning 2019/2022402 3 Sutter 99 39.4 41 Pavement Post-Planning 2019/20 $26,360 Yes21910 3 Sutter 99 T35.8 36.4 Safety Improvements Planning 2023/2413750 3 Yolo 5 4.4 R28.900 Bridge Post-Planning 2020/21 $18,315 Yes21267 3 Yolo 5 R22.8 27 Pavement Planning 2028/29 Yes19808 3 Yolo 5 Various Various Bridge Post-Planning 2019/20 $22,490 Yes21354 3 Yolo 16 27.5 28.3 Safety - Collision Reduction Post-Planning 2020/21 $7,16721969 3 Yolo 16 31.84 31.84 Bridge Planning 2026/27 Yes15714 3 Yolo 50 0 3 Safety - Collision Reduction Post-Planning 2020/21 $3,52911365 3 Yolo 80 0 4.4 Pavement Planning 2028/29 Yes16390 3 Yolo 80 4.3 R11.400 Pavement Post-Planning 2023/24 $294,563 Yes9221 3 Yolo 80 R11.100 R11.700 Bridge Post-Planning 2019/20 $39,497 Yes

18105 3 Yolo 84 13.3 15.7 Major Damage - Permanent Restoration Post-Planning 2019/20 $14,36916921 3 Yolo 128 0 9.8 Pavement Planning 2028/29 Yes21263 3 Yolo 505 0 R22.3 Drainage Planning 2026/27 Yes15830 3 Yuba 1 R11.200 13.5 Bridge Post-Planning 2022/23 $13,470 Yes13124 3 Yuba 20 0.1 Bridge Post-Planning 2020/21 $36,568 Yes20904 3 Yuba 49 5.9 5.9 Major Damage - Permanent Restoration Planning 2019/2021272 3 Yuba 49 R0.0 9.3 Drainage Planning 2027/28 Yes21943 3 Yuba 65 4 R9.38 Pavement Planning 2025/26 Yes20576 3 Yuba 65 8 8 Drainage Planning 2027/28 Yes16337 3 Yuba 65 R0.500 1.8 Pavement Post-Planning 2022/23 $6,990 Yes22088 3 Yuba 65 R8.000 Major Damage - Emergency Opening Post-Planning 2019/20 $2,50016336 3 Yuba 70 14.8 15.7 Pavement Post-Planning 2021/22 $111,000 Yes14007 3 Yuba 70 16.2 25.8 Safety Improvements Post-Planning 2019/20 $109,98220461 3 Yuba 70 R0.8 R8.6 Pavement Planning 2028/29 Yes22269 3 Yuba 70 Various Various Major Damage - Permanent Restoration Post-Planning 2019/20 $29,61316804 4 Alameda 13 6.7 7.2 Safety Improvements Post-Planning 2021/22 $5,19018510 4 Alameda 13 7.9 Bridge Post-Planning 2023/24 $26,764 Yes21624 4 Alameda 13 10.7 13 Mobility - ADA Post-Planning 2021/22 $6,09513456 4 Alameda 13 10.8 12.1 Mobility - ADA Post-Planning 2019/20 $7,08014016 4 Alameda 13 Various Various Safety - Collision Reduction Post-Planning 2019/20 $8,31116757 4 Alameda 13 Various Various Safety - Collision Reduction Post-Planning 2021/22 $12,507

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 20

Page 24: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

21795 4 Alameda 24 R2.06 R5.24 Mobility - TMS Planning 2024/25 Yes20328 4 Alameda 61 14.8 19.8 Pavement Post-Planning 2023/24 $22,793 Yes21007 4 Alameda 61 16.4 18.1 Safety Improvements Post-Planning 2022/23 $4,18018161 4 Alameda 61 19 21 Safety Improvements Post-Planning 2021/22 $2,77716795 4 Alameda 61 19.8 21.2 Pavement Post-Planning 2020/21 $9,883 Yes16153 4 Alameda 80 1.9 4 Mobility - TMS Post-Planning 2019/20 $7,971 Yes21450 4 Alameda 80 2 8 Mobility - TMS Post-Planning 2022/23 $110,996 Yes16800 4 Alameda 80 4.5 R7.600 Safety Improvements Post-Planning 2019/20 $22,8379379 4 Alameda 80 5.8 Bridge Post-Planning 2019/20 $39,793 Yes

18697 4 Alameda 80 Various Various Bridge Post-Planning 2019/20 $128,449 Yes16765 4 Alameda 80 Various Various Safety Improvements Planning 2022/2321482 4 Alameda 84 10.8 R18.0 Safety Improvements Planning 2022/2322518 4 Alameda 84 13 13.6 Bridge Post-Planning 2023/24 $1,358 Yes13827 4 Alameda 84 13.09 13.5 Major Damage - Protective Betterments Planning 2024/259239 4 Alameda 84 16.9 17.5 Bridge Post-Planning 2023/24 $27,213 Yes

19021 4 Alameda 84 16.9 Drainage Post-Planning 2023/24 $9,633 Yes17835 4 Alameda 84 R0 R6.0 Pavement Planning 2027/28 Yes17372 4 Alameda 84 R0.700 R3.100 Safety Improvements Post-Planning 2019/20 $26,08020157 4 Alameda 92 2.413 6.8 Pavement Planning 2024/25 Yes20824 4 Alameda 92 6.5 Major Damage - Permanent Restoration Post-Planning 2021/22 $1,51013860 4 Alameda 123 1.9 5.2 Mobility - ADA Post-Planning 2022/23 $3,09913457 4 Alameda 185 3.2 4.9 Mobility - ADA Post-Planning 2019/20 $3,95513654 4 Alameda 185 3.2 6.5 Pavement Post-Planning 2021/22 $21,258 Yes16381 4 Alameda 185 9.8 10.1 Mobility - ADA Post-Planning 2021/22 $5,64720509 4 Alameda 238 0 7.8 Pavement Planning 2027/28 Yes16042 4 Alameda 238 16.3 16.7 Roadside Post-Planning 2020/21 $4,12022331 4 Alameda 260 R1.100 R1.900 Major Damage - Emergency Opening Post-Planning 2019/20 $6,50020510 4 Alameda 262 0 1.07 Pavement Planning 2027/28 Yes16596 4 Alameda 580 0.1 R9.000 Roadside Post-Planning 2021/22 $3,80515955 4 Alameda 580 20.7 R30.800 Pavement Post-Planning 2022/23 $73,521 Yes17164 4 Alameda 580 30.4 46.5 Mobility - TMS Post-Planning 2023/24 $49,254 Yes21275 4 Alameda 580 32.13 45.76 Safety - Collision Reduction Planning 2026/2722043 4 Alameda 580 43.48 45.74 Bridge Planning 2025/26 Yes18508 4 Alameda 580 44.5 44.51 Bridge Planning 2025/26 Yes15982 4 Alameda 580 44.8 44.8 Major Damage - Permanent Restoration Planning 2021/2218120 4 Alameda 580 R1.300 R6.000 Safety Improvements Post-Planning 2020/21 $7,07722499 4 Alameda 580 R1.300 R6.000 Safety Improvements Post-Planning 2020/21 $3,20316816 4 Alameda 580 R30.800 46.5 Mobility - TMS Post-Planning 2019/20 $26,570 Yes22482 4 Alameda 580 R35.0 R39.37 Bridge Planning 2026/27 Yes11351 4 Alameda 580 R35.000 Bridge Post-Planning 2019/20 $991 Yes20825 4 Alameda 580 R4.300 Major Damage - Permanent Restoration Post-Planning 2021/22 $6,15218505 4 Alameda 580 R41.300 44.8 Bridge Post-Planning 2023/24 $38,851 Yes9222 4 Alameda 580 R8.000 Bridge Post-Planning 2019/20 $5,792 Yes

16746 4 Alameda 580 Various Various Safety - Collision Reduction Post-Planning 2020/21 $9,12817147 4 Alameda 580 Various Various Safety - Collision Reduction Post-Planning 2020/21 $5,49217148 4 Alameda 580 Various Various Safety - Collision Reduction Post-Planning 2021/22 $4,85621089 4 Alameda 680 M0.100 Mobility - ADA Post-Planning 2022/23 $5,35120833 4 Alameda 680 M2.100 Major Damage - Permanent Restoration Post-Planning 2021/22 $5,64118955 4 Alameda 680 M6.400 R6.600 Bridge Post-Planning 2023/24 $21,809 Yes

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 21

Page 25: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

18957 4 Alameda 680 R10.200 Bridge Post-Planning 2023/24 $13,456 Yes13351 4 Alameda 680 R12.400 R21.900 Pavement Post-Planning 2019/20 $142,128 Yes17168 4 Alameda 880 0 10.496 Mobility - TMS Planning 2027/28 Yes13799 4 Alameda 880 11.3 12.3 Bridge Post-Planning 2019/20 $19,515 Yes20621 4 Alameda 880 14.54 26.61 Bridge Planning 2027/28 Yes17979 4 Alameda 880 15.6 26.5 Bridge Post-Planning 2021/22 $15,075 Yes17371 4 Alameda 880 20.9 Safety Improvements Post-Planning 2019/20 $7,99517369 4 Alameda 880 27.1 27.3 Safety Improvements Post-Planning 2022/23 $8,00113562 4 Alameda 880 27.2 Bridge Post-Planning 2021/22 $6,604 Yes22245 4 Alameda 880 28.6 Major Damage - Emergency Opening Post-Planning 2019/20 $3,48014116 4 Alameda 880 30.2 R33.600 Roadside Post-Planning 2020/21 $3,58013655 4 Alameda 880 R0.000 11.8 Pavement Post-Planning 2021/22 $71,371 Yes16947 4 Alameda 880 R0.900 24.8 Sustainability Post-Planning 2020/21 $8,71216829 4 Alameda 880 Various Various Mobility - TMS Post-Planning 2022/23 $103,149 Yes19064 4 Alameda 880 Various Various Sustainability Post-Planning 2022/23 $8,63319933 4 Alameda 880 Various Various Sustainability Post-Planning 2022/23 $1,84120149 4 Alameda 980 1.2 1.2 Mobility - TMS Planning 2025/26 Yes16815 4 Alameda 980 1.2 Mobility - TMS Post-Planning 2019/20 $4,794 Yes18758 4 Alameda 980 1.2 Mobility - TMS Post-Planning 2019/20 $3,354 Yes18071 4 Alameda 980 Various Various Mobility - TMS Post-Planning 2022/23 $9,220 Yes18265 4 Alameda Various Various Various Facilities Post-Planning 2019/20 $6,02320863 4 Alameda Various Various Various Major Damage - Permanent Restoration Post-Planning 2019/20 $10,72022332 4 Alameda Various Various Various Major Damage - Emergency Opening Post-Planning 2019/20 $1,85014017 4 Alameda Various Various Various Safety - Collision Reduction Post-Planning 2021/22 $8,97821120 4 Alameda Various Various Various Safety Improvements Post-Planning 2021/22 $5,53218532 4 Alameda Various Various Various Mobility - TMS Post-Planning 2022/23 $20,125 Yes18719 4 Alameda Various Various Various Mobility - TMS Post-Planning 2023/24 $20,865 Yes22053 4 Alameda Various Various Various Sustainability Planning 2024/2522064 4 Alameda Various Various Various Sustainability Planning 2024/2522054 4 Alameda Various Various Various Sustainability Planning 2025/2622055 4 Alameda Various Various Various Sustainability Planning 2026/2719883 4 Contra Costa 4 0 25 Sustainability Post-Planning 2023/24 $9,96813259 4 Contra Costa 4 0 R20.400 Safety - Collision Reduction Post-Planning 2021/22 $16,36218979 4 Contra Costa 4 L0.000 R14.300 Pavement Post-Planning 2022/23 $60,060 Yes17983 4 Contra Costa 4 R1.000 R9.000 Safety Improvements Post-Planning 2021/22 $11,71514063 4 Contra Costa 4 R14.300 24.3 Pavement Post-Planning 2021/22 $73,594 Yes17837 4 Contra Costa 4 R29.0 R44.4 Pavement Planning 2024/25 Yes14075 4 Contra Costa 4 R31.000 48.2 Roadside Post-Planning 2021/22 $3,46716745 4 Contra Costa 4 Various Various Safety - Collision Reduction Post-Planning 2021/22 $11,33322320 4 Contra Costa 24 R0.000 Major Damage - Emergency Opening Post-Planning 2019/20 $18,75022335 4 Contra Costa 24 R0.000 Major Damage - Emergency Opening Post-Planning 2019/20 $18,75013545 4 Contra Costa 24 R0.01 R0.01 Bridge Planning 2025/26 Yes14145 4 Contra Costa 24 R3.500 Bridge Post-Planning 2021/22 $9,643 Yes17054 4 Contra Costa 24 R4.300 Drainage Post-Planning 2022/23 $3,033 Yes22378 4 Contra Costa 24 R4.9 R5.0 Bridge Planning 2026/27 Yes19065 4 Contra Costa 80 0 11 Sustainability Post-Planning 2022/23 $13,36417370 4 Contra Costa 80 0 13.5 Safety Improvements Post-Planning 2021/22 $75,31413375 4 Contra Costa 80 0 14.1 Roadside Post-Planning 2019/20 $4,42420159 4 Contra Costa 80 7.5 7.5 Mobility - WIM Scales & CVEFs Planning 2027/28

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 22

Page 26: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

11282 4 Contra Costa 80 7.6 12.8 Bridge Post-Planning 2023/24 $24,612 Yes13352 4 Contra Costa 80 10.1 13.5 Pavement Post-Planning 2021/22 $76,759 Yes20698 4 Contra Costa 123 0 2.198 Pavement Planning 2024/25 Yes22020 4 Contra Costa 242 L0.0 3.4 Pavement Planning 2025/26 Yes14025 4 Contra Costa 242 R0.000 R1.600 Pavement Post-Planning 2019/20 $15,529 Yes9223 4 Contra Costa 580 1.2 Bridge Post-Planning 2019/20 $14,865 Yes

22068 4 Contra Costa 580 5.6 6.2 Bridge Post-Planning 2019/20 $20,741 Yes22519 4 Contra Costa 580 5.6 6.2 Bridge Post-Planning 2019/20 $1,937 Yes17839 4 Contra Costa 680 0 7.7 Pavement Planning 2024/25 Yes20623 4 Contra Costa 680 18.7 25 Pavement Planning 2024/25 Yes19069 4 Contra Costa 680 R0.000 24 Sustainability Post-Planning 2023/24 $21,75620834 4 Contra Costa 680 R19.200 19.9 Major Damage - Permanent Restoration Post-Planning 2022/23 $4,37617182 4 Contra Costa 680 Various Various Mobility - TMS Post-Planning 2023/24 $131,515 Yes22056 4 Contra Costa Various Various Various Sustainability Planning 2024/2522065 4 Contra Costa Various Various Various Sustainability Planning 2024/2520390 4 Contra Costa Various Various Various Safety Planning 2027/2822057 4 Contra Costa Various Various Various Sustainability Planning 2027/2817840 4 Marin 1 0 17 Pavement Planning 2026/27 Yes14149 4 Marin 1 0.4 23 Bridge Post-Planning 2023/24 $14,681 Yes22211 4 Marin 1 5.3 5.3 Major Damage - Permanent Restoration Planning 2024/2522013 4 Marin 1 6.6 49.9 Drainage Planning 2024/25 Yes22334 4 Marin 1 8.5 9.5 Major Damage - Emergency Opening Post-Planning 2019/20 $7,43021582 4 Marin 1 10.7 11 Major Damage - Permanent Restoration Post-Planning 2020/21 $1,81022188 4 Marin 1 11.5 11.5 Major Damage - Permanent Restoration Planning 2021/2220116 4 Marin 1 13.1 44.9 Drainage Post-Planning 2023/24 $14,560 Yes13703 4 Marin 1 13.1 45.1 Drainage Post-Planning 2023/24 $9,328 Yes13573 4 Marin 1 22.8 33 Pavement Post-Planning 2021/22 $31,832 Yes21581 4 Marin 1 22.8 Major Damage - Permanent Restoration Post-Planning 2020/21 $1,96622122 4 Marin 1 24.7 24.7 Major Damage - Permanent Restoration Planning 2020/2120901 4 Marin 1 28.5 Bridge Post-Planning 2021/22 $31,262 Yes22212 4 Marin 1 37.2 37.2 Major Damage - Permanent Restoration Planning 2021/2216697 4 Marin 1 40.3 Drainage Post-Planning 2023/24 $6,793 Yes20749 4 Marin 37 14.5 Bridge Post-Planning 2023/24 $44,750 Yes13658 4 Marin 37 R11.200 14.6 Pavement Post-Planning 2023/24 $26,838 Yes20694 4 Marin 37 R11.200 14.6 Sustainability Post-Planning 2030/31 $884,10017264 4 Marin 101 0.2 Major Damage - Permanent Restoration Post-Planning 2019/20 $3,55922214 4 Marin 101 6.3 6.3 Major Damage - Permanent Restoration Planning 2021/2214050 4 Marin 101 7.4 Bridge Post-Planning 2023/24 $26,205 Yes22019 4 Marin 101 8 15.34 Pavement Planning 2024/25 Yes22042 4 Marin 101 8.47 8.47 Bridge Planning 2024/25 Yes9325 4 Marin 101 9.4 10.1 Sustainability Post-Planning 2019/20 $5,2769187 4 Marin 101 10.6 10.8 Bridge Post-Planning 2019/20 $17,681 Yes

14135 4 Marin 101 11.3 Bridge Post-Planning 2021/22 $5,652 Yes16240 4 Marin 101 13.7 Mobility - ADA Post-Planning 2021/22 $4,48422213 4 Marin 101 16.1 16.2 Major Damage - Permanent Restoration Planning 2021/2217841 4 Marin 131 0 4.4 Pavement Post-Planning 2023/24 $19,283 Yes22048 4 Marin 131 0.3 2.5 Drainage Planning 2027/28 Yes22215 4 Marin 131 1.9 2 Major Damage - Permanent Restoration Planning 2024/2522049 4 Marin 131 2.7 4.4 Drainage Planning 2028/29 Yes

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 23

Page 27: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

16699 4 Marin 131 R0.900 Mobility - ADA Post-Planning 2019/20 $4,07322333 4 Marin Various Various Various Major Damage - Emergency Opening Post-Planning 2019/20 $3,10017151 4 Napa 12 0 2.03 Safety - Collision Reduction Planning 2024/2520336 4 Napa 12 0 3.314 Pavement Planning 2026/27 Yes20827 4 Napa 12 2.1 2.6 Major Damage - Permanent Restoration Post-Planning 2021/22 $2,55720322 4 Napa 29 0 7 Pavement Planning 2024/25 Yes16241 4 Napa 29 0.2 14.6 Mobility - ADA Post-Planning 2020/21 $1,91516701 4 Napa 29 1.7 5.1 Drainage Post-Planning 2021/22 $6,558 Yes21535 4 Napa 29 3.5 5.5 Safety Improvements Planning 2022/2320828 4 Napa 29 11.6 13 Major Damage - Permanent Restoration Post-Planning 2021/22 $18,05620266 4 Napa 29 12.1 12.12 Facilities Planning 2028/2915831 4 Napa 29 14.1 19 Bridge Post-Planning 2021/22 $13,056 Yes22051 4 Napa 29 15.2 23.1 Drainage Planning 2027/28 Yes18668 4 Napa 29 15.6 22.8 Advance Mitigation Post-Planning 2022/23 $4,68217755 4 Napa 29 28.4 29.3 Bridge Post-Planning 2022/23 $8,076 Yes20661 4 Napa 29 28.499 28.499 Mobility - Operational Improvements Planning 2025/2617122 4 Napa 29 29.3 36.9 Pavement Post-Planning 2020/21 $12,811 Yes21844 4 Napa 29 33.1 Sustainability Post-Planning 2019/20 $2,46716948 4 Napa 29 33.1 Sustainability Post-Planning 2021/22 $10,27621391 4 Napa 29 38.9 42.9 Bridge Post-Planning 2020/21 $13,078 Yes17842 4 Napa 29 42.1 48.6 Pavement Planning 2028/29 Yes20829 4 Napa 29 46.13 46.13 Major Damage - Permanent Restoration Planning 2023/2420511 4 Napa 29 R7.300 13.5 Pavement Post-Planning 2023/24 $30,861 Yes20689 4 Napa 29 R8.594 R8.688 Mobility - Operational Improvements Planning 2027/2813908 4 Napa 121 0.5 1 Safety Improvements Post-Planning 2019/20 $20,46921066 4 Napa 121 0.5 1 Safety Improvements Post-Planning 2021/22 $1,90022216 4 Napa 121 4.7 4.7 Major Damage - Permanent Restoration Planning 2021/2215795 4 Napa 121 6.4 6.5 Bridge Post-Planning 2023/24 $32,972 Yes20830 4 Napa 121 6.9 12.1 Major Damage - Permanent Restoration Planning 2020/2115665 4 Napa 121 7.2 7.4 Mobility - Operational Improvements Post-Planning 2023/24 $3,90020659 4 Napa 121 7.2 7.4 Mobility - Operational Improvements Planning 2027/2822035 4 Napa 121 13.2 22 Drainage Planning 2027/28 Yes20831 4 Napa 121 13.4 20.7 Major Damage - Permanent Restoration Planning 2023/2420832 4 Napa 121 16 16.1 Major Damage - Permanent Restoration Planning 2022/2317112 4 Napa 121 18.6 Bridge Post-Planning 2019/20 $4,725 Yes20323 4 Napa 121 R4.500 10.7 Pavement Post-Planning 2023/24 $32,452 Yes20325 4 Napa 128 0 4.6 Pavement Planning 2028/29 Yes22037 4 Napa 128 0.2 8.4 Drainage Planning 2026/27 Yes20324 4 Napa 128 4.56 19.1 Pavement Planning 2027/28 Yes13624 4 Napa 128 5.1 Bridge Post-Planning 2021/22 $15,660 Yes22038 4 Napa 128 8.5 12.3 Drainage Planning 2028/29 Yes22040 4 Napa 128 12.3 15.7 Drainage Planning 2026/27 Yes22207 4 Napa 128 12.5 12.5 Major Damage - Permanent Restoration Planning 2024/2522041 4 Napa 128 15.7 24.1 Drainage Planning 2027/28 Yes21506 4 Napa 128 20.1 20.4 Bridge Post-Planning 2021/22 $1,536 Yes22045 4 Napa 128 24.7 33.3 Drainage Planning 2028/29 Yes21461 4 Napa 128 R7.400 Bridge Post-Planning 2020/21 $500 Yes20326 4 Napa 221 0 2.682 Pavement Planning 2028/29 Yes21738 4 San Francisco 1 0.9 4.01 Pavement Planning 2024/25 Yes

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 24

Page 28: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

15522 4 San Francisco 1 6 Sustainability Post-Planning 2019/20 $4,33519083 4 San Francisco 1 6.18 6.67 Bridge Planning 2026/27 Yes17149 4 San Francisco 1 R0.0 7.077 Safety - Collision Reduction Planning 2024/2516747 4 San Francisco 1 Various Various Safety - Collision Reduction Post-Planning 2019/20 $8,16418063 4 San Francisco 35 1.3 Safety Improvements Post-Planning 2021/22 $5,97021852 4 San Francisco 80 3.8 R5.000 Bridge Post-Planning 2019/20 $69,973 Yes16805 4 San Francisco 101 0 4.2 Safety Improvements Post-Planning 2019/20 $28,22020320 4 San Francisco 101 0 T4.900 Pavement Post-Planning 2023/24 $60,130 Yes16071 4 San Francisco 101 0.5 R5.200 Roadside Post-Planning 2020/21 $9,76419959 4 San Francisco 101 1.7 4.2 Roadside Planning 2025/2617980 4 San Francisco 101 2 2.9 Bridge Post-Planning 2020/21 $12,638 Yes19051 4 San Francisco 101 3.4 Bridge Post-Planning 2023/24 $6,288 Yes21851 4 San Francisco 101 4.1 R5.100 Bridge Post-Planning 2019/20 $58,049 Yes19052 4 San Francisco 101 4.1 R5.100 Bridge Post-Planning 2023/24 $44,720 Yes17020 4 San Francisco 101 4.2 Facilities Post-Planning 2021/22 $19,58822309 4 San Francisco 280 2.5 2.9 Safety Planning 2028/2917844 4 San Francisco 280 R0.000 T7.500 Pavement Post-Planning 2023/24 $105,313 Yes20545 4 San Francisco Various Various Various Safety Planning 2026/2713337 4 San Mateo 1 0 10.6 Pavement Post-Planning 2019/20 $15,292 Yes17150 4 San Mateo 1 0 R48.588 Safety - Collision Reduction Planning 2024/2522027 4 San Mateo 1 0.4 24.4 Drainage Planning 2027/28 Yes17239 4 San Mateo 1 1.1 Major Damage - Permanent Restoration Post-Planning 2021/22 $2,26220652 4 San Mateo 1 10.6 27.5 Pavement Planning 2028/29 Yes16793 4 San Mateo 1 14 Bridge Post-Planning 2021/22 $8,102 Yes11357 4 San Mateo 1 17.9 18 Bridge Planning 2024/25 Yes17547 4 San Mateo 1 26.4 R47.300 Mobility - TMS Post-Planning 2021/22 $3,792 Yes18669 4 San Mateo 1 27.5 34.8 Pavement Post-Planning 2023/24 $45,971 Yes13567 4 San Mateo 1 28.9 Bridge Post-Planning 2021/22 $6,129 Yes21695 4 San Mateo 1 36 41 Major Damage - Permanent Restoration Planning 2019/2020813 4 San Mateo 1 36.2 Major Damage - Permanent Restoration Post-Planning 2022/23 $2,64120676 4 San Mateo 1 36.5 38.3 Safety Improvements Post-Planning 2023/24 $13,62322246 4 San Mateo 1 39 Major Damage - Emergency Opening Post-Planning 2019/20 $12,50019077 4 San Mateo 1 43.46 45.12 Bridge Planning 2026/27 Yes19068 4 San Mateo 1 44 48 Sustainability Post-Planning 2022/23 $7,57522319 4 San Mateo 1 R38.600 R39.400 Major Damage - Emergency Opening Post-Planning 2019/20 $6,50022029 4 San Mateo 35 2.2 29 Drainage Planning 2028/29 Yes16833 4 San Mateo 35 22.7 31.5 Pavement Planning 2027/28 Yes18162 4 San Mateo 35 26.2 27.9 Safety Improvements Post-Planning 2022/23 $5,85120148 4 San Mateo 82 0.167 10.371 Mobility - TMS Planning 2028/29 Yes22354 4 San Mateo 82 2.614 4.511 Safety Improvements Planning 2023/2420653 4 San Mateo 82 8.6 12.3 Pavement Planning 2028/29 Yes13297 4 San Mateo 82 9.4 Bridge Post-Planning 2023/24 $4,672 Yes13686 4 San Mateo 82 12.3 15.8 Pavement Post-Planning 2023/24 $120,999 Yes13253 4 San Mateo 82 12.9 15.9 Mobility - ADA Post-Planning 2023/24 $16,18417851 4 San Mateo 82 15.8 20.8 Pavement Planning 2027/28 Yes17240 4 San Mateo 82 19.8 Major Damage - Permanent Restoration Post-Planning 2020/21 $5,07615916 4 San Mateo 82 20.8 25.2 Pavement Planning 2025/26 Yes18098 4 San Mateo 84 2.1 Major Damage - Permanent Restoration Post-Planning 2019/20 $1,87322033 4 San Mateo 84 4.1 29.3 Drainage Planning 2028/29 Yes

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 25

Page 29: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

18099 4 San Mateo 84 5.2 Major Damage - Permanent Restoration Post-Planning 2021/22 $2,62818100 4 San Mateo 84 6 Major Damage - Permanent Restoration Post-Planning 2022/23 $5,78820815 4 San Mateo 84 7.8 Major Damage - Permanent Restoration Post-Planning 2022/23 $6,49513664 4 San Mateo 84 21.5 25.7 Pavement Post-Planning 2021/22 $27,150 Yes20664 4 San Mateo 92 R12.4 R12.4 Mobility - Operational Improvements Planning 2026/2720665 4 San Mateo 92 R12.4 R12.4 Mobility - Operational Improvements Planning 2026/2717968 4 San Mateo 92 Various Various Safety - Collision Reduction Post-Planning 2023/24 $20,33420505 4 San Mateo 101 0 21.8 Pavement Post-Planning 2022/23 $216,174 Yes9250 4 San Mateo 101 0.1 23.4 Bridge Post-Planning 2021/22 $12,310 Yes9224 4 San Mateo 101 7.1 Bridge Post-Planning 2021/22 $48,480 Yes

20666 4 San Mateo 101 11.9 11.9 Mobility - Operational Improvements Planning 2027/2818233 4 San Mateo 101 12.325 12.325 Mobility - Operational Improvements Planning 2027/2822417 4 San Mateo 101 16.5 21.8 Pavement Post-Planning 2019/20 $28,543 Yes21840 4 San Mateo 101 16.5 23 Pavement Post-Planning 2019/20 $14,172 Yes22377 4 San Mateo 101 21.61 21.65 Bridge Planning 2026/27 Yes20645 4 San Mateo 101 23 26.1 Pavement Planning 2026/27 Yes13745 4 San Mateo 101 Various Various Mobility - TMS Post-Planning 2022/23 $15,686 Yes13830 4 San Mateo 280 6.7 10.5 Drainage Post-Planning 2021/22 $28,291 Yes9324 4 San Mateo 280 7 7.7 Sustainability Post-Planning 2019/20 $4,490

18837 4 San Mateo 280 25.26 25.26 Bridge Planning 2025/26 Yes14180 4 San Mateo 280 R0.000 R21.000 Bridge Post-Planning 2021/22 $20,124 Yes17222 4 San Mateo 280 R20.300 R20.600 Major Damage - Permanent Restoration Post-Planning 2019/20 $2,76916752 4 San Mateo Various Various Various Safety - Collision Reduction Post-Planning 2021/22 $9,81422058 4 San Mateo Various Various Various Sustainability Planning 2024/2522059 4 San Mateo Various Various Various Sustainability Planning 2025/2622060 4 San Mateo Various Various Various Sustainability Planning 2026/2722481 4 Santa Clara 9 3.6 6.73 Bridge Planning 2026/27 Yes9188 4 Santa Clara 9 4.9 Bridge Post-Planning 2021/22 $35,843 Yes

18093 4 Santa Clara 9 6 Major Damage - Permanent Restoration Post-Planning 2021/22 $2,07316743 4 Santa Clara 9 Various Various Safety - Collision Reduction Post-Planning 2021/22 $11,31917966 4 Santa Clara 17 0 3.4 Safety Improvements Post-Planning 2019/20 $12,49115241 4 Santa Clara 17 2.8 13.9 Pavement Post-Planning 2019/20 $63,806 Yes14169 4 Santa Clara 17 6.2 6.6 Bridge Post-Planning 2023/24 $8,521 Yes20583 4 Santa Clara 25 0 2.35 Mobility - Operational Improvements Planning 2027/2822047 4 Santa Clara 25 0.2 2.4 Drainage Planning 2027/28 Yes22046 4 Santa Clara 35 8 17 Drainage Planning 2027/28 Yes21838 4 Santa Clara 35 14.1 17.1 Safety Improvements Post-Planning 2021/22 $6,38318574 4 Santa Clara 35 14.1 17.121 Safety Improvements Planning 2021/2222375 4 Santa Clara 82 12.05 13.82 Safety Improvements Planning 2023/2421792 4 Santa Clara 82 13.9 25.9 Mobility - TMS Planning 2027/28 Yes16242 4 Santa Clara 82 18.2 26.4 Mobility - ADA Post-Planning 2021/22 $14,82613662 4 Santa Clara 82 19.2 26.4 Pavement Post-Planning 2021/22 $28,180 Yes9356 4 Santa Clara 82 R11.400 26.4 Bridge Post-Planning 2022/23 $5,197 Yes

13685 4 Santa Clara 87 0 6.1 Pavement Post-Planning 2021/22 $69,390 Yes22359 4 Santa Clara 101 0.028 3.2 Safety Improvements Planning 2022/2316754 4 Santa Clara 101 0.1 49.6 Safety - Collision Reduction Post-Planning 2023/24 $14,82616043 4 Santa Clara 101 30.7 38.1 Roadside Post-Planning 2020/21 $4,07820405 4 Santa Clara 101 34.65 35.25 Roadside Planning 2027/2819024 4 Santa Clara 101 38.1 41.1 Drainage Planning 2026/27 Yes

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 26

Page 30: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

15908 4 Santa Clara 101 40.2 52.6 Pavement Planning 2027/28 Yes17230 4 Santa Clara 101 R0.800 Major Damage - Permanent Restoration Post-Planning 2020/21 $4,57220706 4 Santa Clara 101 R18.700 Drainage Post-Planning 2022/23 $15,622 Yes20158 4 Santa Clara 101 R9.7 R9.9 Mobility - WIM Scales & CVEFs Planning 2027/289249 4 Santa Clara 101 Various Various Bridge Post-Planning 2019/20 $20,120 Yes

20356 4 Santa Clara 130 9 22.5 Pavement Planning 2028/29 Yes16826 4 Santa Clara 152 7.6 M10.200 Pavement Post-Planning 2019/20 $19,148 Yes14073 4 Santa Clara 152 11.2 R35.200 Roadside Post-Planning 2021/22 $9,14522219 4 Santa Clara 152 12.9 21.8 Safety Improvements Planning 2023/2421449 4 Santa Clara 152 20.7 21.2 Major Damage - Permanent Restoration Planning 2023/2418489 4 Santa Clara 152 R16.800 R23.300 Drainage Post-Planning 2023/24 $7,140 Yes13910 4 Santa Clara 152 R22.400 R28.700 Safety Improvements Post-Planning 2019/20 $15,90220627 4 Santa Clara 237 0 11.08 Pavement Planning 2026/27 Yes16135 4 Santa Clara 237 7 8 Mobility - Operational Improvements Post-Planning 2021/22 $79,07316957 4 Santa Clara 237 7 8 Mobility - Operational Improvements Post-Planning 2021/22 $15,17516157 4 Santa Clara 280 0.03 52.55 Mobility - TMS Planning 2026/27 Yes19025 4 Santa Clara 280 2.9 6 Drainage Planning 2027/28 Yes16799 4 Santa Clara 280 11.4 Safety Improvements Post-Planning 2019/20 $2,20922050 4 Santa Clara 280 12.1 20.6 Drainage Planning 2026/27 Yes14080 4 Santa Clara 280 R0.000 L5.400 Roadside Post-Planning 2021/22 $6,12020642 4 Santa Clara 280 R0.000 R2.700 Pavement Post-Planning 2022/23 $25,041 Yes17846 4 Santa Clara 680 0 9.9 Pavement Planning 2024/25 Yes20488 4 Santa Clara 680 M1.2 M1.9 Roadside Planning 2028/2920503 4 Santa Clara 880 0 10.502 Pavement Planning 2028/29 Yes18584 4 Santa Clara 880 1.7 1.8 Bridge Post-Planning 2022/23 $3,722 Yes22317 4 Santa Clara 880 2.8 Major Damage - Emergency Opening Post-Planning 2019/20 $65013565 4 Santa Clara Various Various Various Bridge Post-Planning 2019/20 $5,739 Yes20864 4 Santa Clara Various Various Various Major Damage - Permanent Restoration Post-Planning 2019/20 $7,83016748 4 Santa Clara Various Various Various Safety - Collision Reduction Post-Planning 2021/22 $12,55422062 4 Santa Clara Various Various Various Sustainability Planning 2024/2522063 4 Santa Clara Various Various Various Sustainability Planning 2025/2620147 4 Santa Clara Various Various Various Mobility - TMS Planning 2026/27 Yes18756 4 Solano 12 7.9 14.1 Pavement Post-Planning 2023/24 $32,383 Yes20648 4 Solano 12 14.1 20.6 Pavement Planning 2027/28 Yes21533 4 Solano 12 19.2 19.4 Safety Improvements Post-Planning 2019/20 $26011296 4 Solano 12 20.6 26.4 Pavement Post-Planning 2021/22 $102,193 Yes22189 4 Solano 12 R3.206 7.474 Safety Improvements Planning 2023/2417853 4 Solano 29 0 6 Pavement Post-Planning 2022/23 $32,085 Yes11302 4 Solano 37 0 11.2 Pavement Planning 2026/27 Yes20520 4 Solano 37 R6.85 R7.31 Mobility - Operational Improvements Planning 2028/2911336 4 Solano 80 1.1 Bridge Post-Planning 2019/20 $19,618 Yes19066 4 Solano 80 1.8 5.7 Sustainability Post-Planning 2024/25 $11,23320443 4 Solano 80 14.4 14.4 Mobility - WIM Scales & CVEFs Planning 2026/2720902 4 Solano 80 14.6 Bridge Post-Planning 2019/20 $7,690 Yes15957 4 Solano 80 15 30.7 Pavement Post-Planning 2023/24 $31,893 Yes16069 4 Solano 80 17.2 19.2 Roadside Post-Planning 2021/22 $4,90218425 4 Solano 80 22.1 23 Safety Improvements Planning 2023/2414021 4 Solano 80 34.5 Bridge Post-Planning 2020/21 $8,741 Yes19073 4 Solano 80 R11.300 38 Sustainability Post-Planning 2022/23 $10,000

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 27

Page 31: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

13248 4 Solano 84 2.5 Bridge Post-Planning 2021/22 $19,480 Yes18980 4 Solano 84 6 13.7 Pavement Planning 2024/25 Yes9111 4 Solano 84 12 12.4 Bridge Post-Planning 2019/20 $38,482 Yes

17852 4 Solano 113 0 8.5 Pavement Planning 2028/29 Yes18555 4 Solano 128 0.7 Bridge Post-Planning 2023/24 $9,030 Yes20817 4 Solano 505 R5.700 Major Damage - Permanent Restoration Post-Planning 2022/23 $2,02017238 4 Solano 680 R1.900 R2.000 Major Damage - Permanent Restoration Post-Planning 2019/20 $2,69513665 4 Solano 780 0 7.44 Pavement Planning 2026/27 Yes19072 4 Solano Various Various Various Sustainability Post-Planning 2022/23 $5,00017969 4 Solano Various Various Various Safety - Collision Reduction Post-Planning 2023/24 $8,57620885 4 Solano Various Various Various Safety - Collision Reduction Post-Planning 2023/24 $5,20013918 4 Sonoma 1 0 58.58 Safety Improvements Planning 2023/2421600 4 Sonoma 1 0 58.583 Safety - Collision Reduction Planning 2024/2517509 4 Sonoma 1 1 28.7 Drainage Post-Planning 2023/24 $6,481 Yes22014 4 Sonoma 1 3 27.1 Drainage Planning 2025/26 Yes21794 4 Sonoma 1 15.1 15.7 Major Damage - Permanent Restoration Post-Planning 2020/21 $58,52220462 4 Sonoma 1 19.3 21.8 Drainage Post-Planning 2023/24 $11,258 Yes18738 4 Sonoma 1 24.2 30.5 Pavement Planning 2025/26 Yes17396 4 Sonoma 1 26.7 27 Major Damage - Permanent Restoration Post-Planning 2020/21 $30,89222015 4 Sonoma 1 27.3 32.5 Drainage Planning 2027/28 Yes20331 4 Sonoma 1 30.5 45 Pavement Planning 2028/29 Yes17510 4 Sonoma 1 30.8 40.6 Drainage Post-Planning 2021/22 $8,504 Yes22016 4 Sonoma 1 32.9 41.3 Drainage Planning 2026/27 Yes22208 4 Sonoma 1 34.5 34.5 Major Damage - Permanent Restoration Planning 2021/2222017 4 Sonoma 1 41.4 51 Drainage Planning 2026/27 Yes17511 4 Sonoma 1 41.5 54.6 Drainage Post-Planning 2021/22 $9,090 Yes17574 4 Sonoma 1 45.4 Drainage Post-Planning 2023/24 $3,147 Yes20330 4 Sonoma 1 50.6 58.6 Pavement Planning 2027/28 Yes22018 4 Sonoma 1 51.1 55 Drainage Planning 2025/26 Yes20335 4 Sonoma 12 9.23 11 Pavement Planning 2028/29 Yes18036 4 Sonoma 12 9.29 9.52 Mobility - ADA Planning 2026/2713338 4 Sonoma 12 11 T17.400 Pavement Post-Planning 2021/22 $36,361 Yes21302 4 Sonoma 12 19.8 Safety Improvements Post-Planning 2023/24 $6,1449194 4 Sonoma 12 25.8 33.3 Bridge Post-Planning 2019/20 $25,289 Yes

21364 4 Sonoma 12 27.83 31.667 Safety Improvements Planning 2023/2413574 4 Sonoma 12 35.1 38.9 Pavement Post-Planning 2019/20 $9,444 Yes20329 4 Sonoma 12 38.9 41.36 Pavement Planning 2028/29 Yes22021 4 Sonoma 12 T17.346 17.7 Pavement Planning 2025/26 Yes16750 4 Sonoma 12 Various Various Safety - Collision Reduction Post-Planning 2021/22 $4,68313669 4 Sonoma 37 0 6.245 Pavement Planning 2026/27 Yes20581 4 Sonoma 37 3.8 4 Mobility - Operational Improvements Post-Planning 2023/24 $11,24120471 4 Sonoma 37 3.9 4.1 Mobility - Operational Improvements Post-Planning 2023/24 $18,13220150 4 Sonoma 101 6.6 13.9 Pavement Planning 2028/29 Yes22249 4 Sonoma 101 9 Major Damage - Permanent Restoration Post-Planning 2020/21 $14018935 4 Sonoma 101 13.9 21.7 Pavement Planning 2028/29 Yes22379 4 Sonoma 101 15.53 15.63 Bridge Planning 2026/27 Yes17981 4 Sonoma 101 16.5 19 Bridge Post-Planning 2021/22 $7,007 Yes20264 4 Sonoma 101 20.6 Facilities Planning 2024/2518831 4 Sonoma 101 22.8 32.8 Bridge Post-Planning 2023/24 $12,843 Yes

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 28

Page 32: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

17092 4 Sonoma 101 24.86 24.86 Bridge Planning 2026/27 Yes20155 4 Sonoma 101 R54.201 R56.219 Pavement Planning 2026/27 Yes18107 4 Sonoma 101 R55.800 Major Damage - Permanent Restoration Post-Planning 2021/22 $4,68516820 4 Sonoma 101 Various Various Bridge Post-Planning 2021/22 $3,047 Yes21793 4 Sonoma 116 1.1 1.1 Major Damage - Permanent Restoration Planning 2020/2122024 4 Sonoma 116 5.4 31.5 Drainage Planning 2027/28 Yes13667 4 Sonoma 116 8 27.9 Pavement Planning 2026/27 Yes22209 4 Sonoma 116 9.2 9.2 Major Damage - Permanent Restoration Planning 2021/2218108 4 Sonoma 116 9.6 Major Damage - Permanent Restoration Post-Planning 2022/23 $11,66722210 4 Sonoma 116 10.4 10.4 Major Damage - Permanent Restoration Planning 2021/2216698 4 Sonoma 116 11.8 R12.200 Mobility - ADA Post-Planning 2021/22 $5,87811283 4 Sonoma 116 19.9 33.4 Bridge Post-Planning 2023/24 $9,440 Yes18990 4 Sonoma 116 22.03 R22.23 Safety Improvements Planning 2023/2421515 4 Sonoma 116 31 31.3 Safety Improvements Post-Planning 2019/20 $20020334 4 Sonoma 116 34.1 39.3 Pavement Planning 2026/27 Yes22072 4 Sonoma 116 39.15 39.3 Mobility - Operational Improvements Planning 2026/2721301 4 Sonoma 116 39.3 Safety Improvements Post-Planning 2023/24 $12,23022073 4 Sonoma 116 41.78 41.83 Mobility - Operational Improvements Planning 2026/2713917 4 Sonoma 121 3.4 6.5 Safety Improvements Post-Planning 2019/20 $51,03120662 4 Sonoma 121 6.5 7 Mobility - Operational Improvements Post-Planning 2022/23 $18,86918572 4 Sonoma 121 6.5 8.4 Bridge Post-Planning 2023/24 $14,580 Yes20821 4 Sonoma 121 9.7 10.3 Major Damage - Permanent Restoration Post-Planning 2022/23 $6,21922485 4 Sonoma 121 R7.3 10.36 Safety Improvements Planning 2024/2513668 4 Sonoma 128 0 24.8 Pavement Planning 2025/26 Yes22025 4 Sonoma 128 1.1 9.5 Drainage Planning 2027/28 Yes22318 4 Sonoma 128 5 24.7 Major Damage - Emergency Opening Post-Planning 2019/20 $6,83022026 4 Sonoma 128 11.4 24.3 Drainage Planning 2025/26 Yes20862 4 Sonoma Various Various Various Major Damage - Permanent Restoration Post-Planning 2019/20 $9,73020023 5 Monterey 1 0 39.8 Pavement Planning 2028/29 Yes22368 5 Monterey 1 8.6 8.8 Major Damage - Permanent Restoration Planning 2021/2219490 5 Monterey 1 8.7 9.1 Major Damage - Permanent Restoration Post-Planning 2022/23 $4,84211313 5 Monterey 1 20.4 Drainage Post-Planning 2019/20 $4,298 Yes13546 5 Monterey 1 20.9 21.3 Bridge Post-Planning 2024/25 $92,727 Yes20871 5 Monterey 1 21.75 22.15 Major Damage - Permanent Restoration Planning 2021/2219491 5 Monterey 1 27.5 27.7 Major Damage - Permanent Restoration Post-Planning 2024/25 $13,85213298 5 Monterey 1 43.1 Bridge Post-Planning 2021/22 $4,601 Yes21771 5 Monterey 1 44.5 Major Damage - Permanent Restoration Post-Planning 2021/22 $6,43620870 5 Monterey 1 45.4 45.6 Major Damage - Permanent Restoration Post-Planning 2021/22 $4,99019492 5 Monterey 1 55.7 55.9 Major Damage - Permanent Restoration Post-Planning 2021/22 $9,61916929 5 Monterey 1 63 Bridge Post-Planning 2020/21 $14,158 Yes17668 5 Monterey 1 63 Bridge Post-Planning 2022/23 $7,935 Yes19950 5 Monterey 1 74.6 R77.6 Pavement Planning 2026/27 Yes21156 5 Monterey 1 74.8 R102.000 Safety Improvements Post-Planning 2020/21 $2,52920024 5 Monterey 1 R85.1 R90.98 Pavement Planning 2025/26 Yes19938 5 Monterey 1 R90.98 R102.031 Pavement Planning 2025/26 Yes19084 5 Monterey 68 0.2 15.9 Drainage Post-Planning 2023/24 $17,800 Yes16705 5 Monterey 68 0.5 0.8 Mobility - ADA Post-Planning 2021/22 $2,77613670 5 Monterey 68 1.1 L4.300 Pavement Post-Planning 2020/21 $12,173 Yes18637 5 Monterey 68 3.4 3.8 Safety Improvements Post-Planning 2021/22 $12,427

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 29

Page 33: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

20025 5 Monterey 68 10.8 22.023 Pavement Planning 2027/28 Yes9189 5 Monterey 101 62.1 63.2 Bridge Post-Planning 2021/22 $16,711 Yes

13379 5 Monterey 101 73 96.8 Roadside Post-Planning 2019/20 $8,28515757 5 Monterey 101 87.4 87.8 Safety - Collision Reduction Post-Planning 2021/22 $10,19519940 5 Monterey 101 R1.9 R9.7 Bridge Planning 2028/29 Yes19957 5 Monterey 101 R22.0 R28.0 Pavement Planning 2025/26 Yes19094 5 Monterey 101 R28.200 100.3 Drainage Post-Planning 2024/25 $18,650 Yes20012 5 Monterey 101 R30.6 R36.9 Pavement Planning 2027/28 Yes20888 5 Monterey 101 R41.500 49.8 Safety - Collision Reduction Post-Planning 2021/22 $1,75419093 5 Monterey 101 R41.900 49.8 Pavement Post-Planning 2023/24 $35,305 Yes9261 5 Monterey 101 R6.700 Bridge Post-Planning 2019/20 $17,643 Yes

22221 5 Monterey 101 R6.700 Bridge Post-Planning 2023/24 $20 Yes19080 5 Monterey 101 R9.200 R22.000 Pavement Post-Planning 2026/27 $59,211 Yes9289 5 Monterey 101 R91.300 101.3 Pavement Post-Planning 2021/22 $67,124 Yes

13724 5 Monterey 101 Various Various Roadside Post-Planning 2019/20 $8,96821710 5 Monterey 146 1.485 10.08 Pavement Planning 2028/29 Yes20013 5 Monterey 156 R0.167 T5.427 Pavement Planning 2028/29 Yes9195 5 Monterey 156 R1.400 R2.000 Bridge Post-Planning 2020/21 $10,693 Yes

21708 5 Monterey 183 0 R2.1 Pavement Planning 2028/29 Yes19091 5 Monterey 183 R2.100 R8.300 Pavement Post-Planning 2022/23 $9,867 Yes17521 5 Monterey 183 R8.400 9.8 Mobility - Operational Improvements Post-Planning 2022/23 $38,00013863 5 Monterey 218 R0.200 L0.900 Mobility - ADA Post-Planning 2021/22 $5,11716900 5 Monterey Various Various Various Safety Post-Planning 2019/20 $2,68618040 5 Monterey Various Various Various Mobility - TMS Post-Planning 2019/20 $5,451 Yes22504 5 Monterey Various Various Various Major Damage - Emergency Opening Post-Planning 2019/20 $1,16120000 5 San Benito 25 17 46.57 Pavement Planning 2027/28 Yes17726 5 San Benito 25 18.8 19.2 Safety Improvements Post-Planning 2021/22 $14,19219948 5 San Benito 25 46.57 52.19 Pavement Planning 2027/28 Yes18768 5 San Benito 25 54 Safety Improvements Post-Planning 2020/21 $10,62820014 5 San Benito 25 R52.21 60.084 Pavement Planning 2026/27 Yes19160 5 San Benito 101 0 7.55 Pavement Planning 2025/26 Yes9228 5 San Luis Obispo 1 0 0.3 Bridge Post-Planning 2022/23 $50,550 Yes

21709 5 San Luis Obispo 1 0 10 Pavement Planning 2028/29 Yes15922 5 San Luis Obispo 1 10 16.8 Pavement Post-Planning 2021/22 $15,066 Yes20021 5 San Luis Obispo 1 25.7 34.4 Pavement Planning 2026/27 Yes20889 5 San Luis Obispo 1 32.6 Bridge Post-Planning 2019/20 $15,554 Yes21818 5 San Luis Obispo 1 32.6 Bridge Post-Planning 2023/24 $28 Yes20890 5 San Luis Obispo 1 34.5 Bridge Post-Planning 2019/20 $17,487 Yes21819 5 San Luis Obispo 1 34.5 Bridge Post-Planning 2023/24 $28 Yes21706 5 San Luis Obispo 1 51.4 74.32 Pavement Planning 2028/29 Yes21703 5 San Luis Obispo 1 L16.7 25.7 Pavement Planning 2027/28 Yes20893 5 San Luis Obispo 1 R66.900 R67.200 Major Damage - Protective Betterments Post-Planning 2021/22 $12,47621154 5 San Luis Obispo 1 Various Various Safety Improvements Post-Planning 2020/21 $3,80120020 5 San Luis Obispo 41 0 12.5 Pavement Planning 2027/28 Yes21163 5 San Luis Obispo 41 3.1 Major Damage - Permanent Restoration Post-Planning 2021/22 $8,48021824 5 San Luis Obispo 41 11.5 Major Damage - Emergency Opening Post-Planning 2019/20 $56020022 5 San Luis Obispo 41 43.9 50.434 Pavement Planning 2026/27 Yes19163 5 San Luis Obispo 46 29.8 32.2 Pavement Post-Planning 2022/23 $11,247 Yes20019 5 San Luis Obispo 46 R0.146 R21.969 Pavement Planning 2027/28 Yes

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 30

Page 34: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

17963 5 San Luis Obispo 46 R17.200 R17.600 Safety Improvements Post-Planning 2019/20 $9,40219162 5 San Luis Obispo 58 1.8 6.9 Pavement Post-Planning 2023/24 $15,995 Yes20891 5 San Luis Obispo 58 3.1 Bridge Post-Planning 2019/20 $14,910 Yes21820 5 San Luis Obispo 58 3.1 Bridge Post-Planning 2023/24 $28 Yes19164 5 San Luis Obispo 101 7.8 16.5 Pavement Post-Planning 2023/24 $38,512 Yes18520 5 San Luis Obispo 101 27.9 Safety Improvements Post-Planning 2020/21 $2,16122372 5 San Luis Obispo 101 28.6 29.6 Safety Improvements Planning 2023/2413853 5 San Luis Obispo 101 31.5 59.1 Mobility - TMS Post-Planning 2020/21 $5,881 Yes22486 5 San Luis Obispo 101 37 46 Major Damage - Permanent Restoration Planning 2020/2122501 5 San Luis Obispo 101 37 46 Major Damage - Emergency Opening Planning 2020/2118915 5 San Luis Obispo 101 38.5 39.4 Safety Improvements Post-Planning 2020/21 $5,3689208 5 San Luis Obispo 101 54.9 55.7 Safety - Collision Reduction Post-Planning 2019/20 $6,923

19955 5 San Luis Obispo 101 58.8 63.2 Pavement Planning 2027/28 Yes20710 5 San Luis Obispo 101 61.9 Safety Improvements Post-Planning 2021/22 $23,88121786 5 San Luis Obispo 101 Various Various Facilities Planning 2024/2520011 5 San Luis Obispo Various Various Various Facilities Post-Planning 2023/24 $74,99521349 5 Santa Barbara 1 15.6 Bridge Post-Planning 2020/21 $100 Yes20026 5 Santa Barbara 1 23 M29.891 Pavement Planning 2026/27 Yes19095 5 Santa Barbara 1 49.2 50.4 Mobility - ADA Post-Planning 2023/24 $11,07021705 5 Santa Barbara 1 49.2 50.606 Pavement Planning 2027/28 Yes22186 5 Santa Barbara 1 M29.89 R35.09 Safety Improvements Planning 2022/2313815 5 Santa Barbara 1 M29.900 49.2 Pavement Post-Planning 2019/20 $12,576 Yes9242 5 Santa Barbara 1 M33.100 Bridge Post-Planning 2021/22 $4,832 Yes

16474 5 Santa Barbara 1 R35.000 49.2 Safety - Collision Reduction Post-Planning 2023/24 $28,74822426 5 Santa Barbara 101 2.6 R4.8 Pavement Post-Planning 2019/20 $63,560 Yes22355 5 Santa Barbara 101 2.6 R4.800 Pavement Post-Planning 2020/21 $3,550 Yes22356 5 Santa Barbara 101 2.6 R4.800 Pavement Post-Planning 2021/22 $40 Yes13649 5 Santa Barbara 101 4.4 R7.700 Pavement Post-Planning 2020/21 $78,210 Yes19946 5 Santa Barbara 101 9.2 11.9 Safety - Collision Reduction Post-Planning 2022/23 $30,00013254 5 Santa Barbara 101 11 Mobility - ADA Post-Planning 2020/21 $8,05819149 5 Santa Barbara 101 12.4 22.6 Pavement Post-Planning 2025/26 $62,681 Yes22240 5 Santa Barbara 101 19.8 20.1 Major Damage - Emergency Opening Post-Planning 2019/20 $1,37513626 5 Santa Barbara 101 21.4 21.9 Bridge Post-Planning 2021/22 $17,064 Yes21651 5 Santa Barbara 101 45 R50.0 Drainage Planning 2024/25 Yes9293 5 Santa Barbara 101 45.5 Drainage Post-Planning 2019/20 $12,413 Yes

21756 5 Santa Barbara 101 45.5 Drainage Post-Planning 2019/20 $230 Yes21757 5 Santa Barbara 101 45.5 Drainage Post-Planning 2019/20 $1,034 Yes15920 5 Santa Barbara 101 46.2 R52.300 Pavement Post-Planning 2021/22 $69,203 Yes13801 5 Santa Barbara 101 55.9 R56.200 Bridge Post-Planning 2019/20 $11,242 Yes22322 5 Santa Barbara 101 55.9 R56.200 Bridge Post-Planning 2022/23 $50 Yes19147 5 Santa Barbara 101 65 84.1 Drainage Post-Planning 2023/24 $9,908 Yes16575 5 Santa Barbara 101 68.7 91 Roadside Post-Planning 2020/21 $7,60314019 5 Santa Barbara 101 70.7 71.2 Bridge Post-Planning 2019/20 $20,545 Yes20033 5 Santa Barbara 101 86.59 90.988 Pavement Planning 2028/29 Yes19096 5 Santa Barbara 101 R0.000 R52.200 Drainage Post-Planning 2026/27 $34,788 Yes11278 5 Santa Barbara 101 R36.000 R37.000 Bridge Post-Planning 2022/23 $48,942 Yes19150 5 Santa Barbara 101 R52.300 R56.100 Pavement Post-Planning 2023/24 $22,912 Yes19937 5 Santa Barbara 101 R56.09 65 Pavement Planning 2024/25 Yes13067 5 Santa Barbara 101 R56.200 58 Roadside Post-Planning 2019/20 $5,277

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 31

Page 35: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

19152 5 Santa Barbara 101 R7.300 9.2 Pavement Post-Planning 2019/20 $38,960 Yes18028 5 Santa Barbara 135 10.6 17.6 Safety Improvements Post-Planning 2021/22 $19,13515921 5 Santa Barbara 135 11.7 17.8 Pavement Post-Planning 2020/21 $20,847 Yes18671 5 Santa Barbara 135 17.3 17.6 Safety Improvements Post-Planning 2020/21 $3,78219996 5 Santa Barbara 135 L8.878 11.7 Pavement Planning 2028/29 Yes17105 5 Santa Barbara 154 22.9 23.2 Bridge Post-Planning 2020/21 $23,605 Yes21707 5 Santa Barbara 154 22.9 32.84 Pavement Planning 2028/29 Yes21153 5 Santa Barbara 154 24 29.2 Safety Improvements Post-Planning 2021/22 $5,46122195 5 Santa Barbara 154 24.5 R31.500 Major Damage - Emergency Opening Post-Planning 2019/20 $1,83019153 5 Santa Barbara 154 R0.000 32.8 Drainage Post-Planning 2023/24 $17,407 Yes9271 5 Santa Barbara 154 R2.600 Bridge Post-Planning 2021/22 $8,335 Yes

14098 5 Santa Barbara 154 R31.800 R32.100 Bridge Post-Planning 2021/22 $13,913 Yes13846 5 Santa Barbara 154 R5.800 R6.100 Mobility - Operational Improvements Post-Planning 2021/22 $11,98019949 5 Santa Barbara 166 0 8.927 Pavement Planning 2025/26 Yes20910 5 Santa Barbara 166 8.1 Safety Improvements Post-Planning 2020/21 $1,7589000 5 Santa Barbara 192 15.4 15.6 Bridge Post-Planning 2019/20 $8,099 Yes

19941 5 Santa Barbara 192 R0.019 21.032 Drainage Planning 2027/28 Yes19951 5 Santa Barbara 217 0.464 2.989 Pavement Planning 2027/28 Yes11249 5 Santa Barbara 217 0.9 1.4 Bridge Post-Planning 2021/22 $42,318 Yes20016 5 Santa Barbara 246 9.55 R20.9 Bridge Planning 2028/29 Yes20015 5 Santa Barbara 246 30.28 31.385 Bridge Planning 2026/27 Yes13671 5 Santa Barbara 246 Various Various Pavement Post-Planning 2021/22 $16,205 Yes22502 5 Santa Barbara Various Various Various Major Damage - Emergency Opening Post-Planning 2019/20 $51316475 5 Santa Barbara Various Various Various Safety - Collision Reduction Post-Planning 2020/21 $4,58019159 5 Santa Cruz 1 8.2 26 Drainage Post-Planning 2023/24 $24,021 Yes16590 5 Santa Cruz 1 13.3 Bridge Post-Planning 2021/22 $7,703 Yes17059 5 Santa Cruz 1 16.7 17 Safety Improvements Post-Planning 2019/20 $11,38119952 5 Santa Cruz 1 17.5 20.2 Pavement Planning 2025/26 Yes9294 5 Santa Cruz 1 31.9 35.7 Drainage Post-Planning 2021/22 $13,080 Yes

19158 5 Santa Cruz 1 R0.000 R7.900 Drainage Post-Planning 2023/24 $16,554 Yes19943 5 Santa Cruz 1 R2.683 R7.947 Drainage Planning 2024/25 Yes19939 5 Santa Cruz 9 0.046 7.5 Pavement Planning 2026/27 Yes13588 5 Santa Cruz 9 0.1 7.5 Sustainability Post-Planning 2019/20 $6,14619493 5 Santa Cruz 9 1 Major Damage - Permanent Restoration Post-Planning 2021/22 $18,23121693 5 Santa Cruz 9 6.3 7.2 Safety Improvements Planning 2023/2413752 5 Santa Cruz 9 8.5 25.5 Sustainability Post-Planning 2021/22 $12,55719495 5 Santa Cruz 9 10.8 Major Damage - Permanent Restoration Post-Planning 2021/22 $6,91015835 5 Santa Cruz 9 13.6 15.5 Bridge Post-Planning 2021/22 $23,210 Yes20874 5 Santa Cruz 9 15 Major Damage - Permanent Restoration Post-Planning 2019/20 $6,08219935 5 Santa Cruz 9 18.897 27.094 Pavement Planning 2024/25 Yes19496 5 Santa Cruz 9 20 Major Damage - Permanent Restoration Post-Planning 2020/21 $7,63021589 5 Santa Cruz 9 Various Various Safety Improvements Post-Planning 2021/22 $4,76120028 5 Santa Cruz 17 0 6 Pavement Planning 2026/27 Yes19156 5 Santa Cruz 17 0 12.5 Sustainability Post-Planning 2026/27 $9,50222182 5 Santa Cruz 17 3.2 3.7 Safety Improvements Planning 2022/2322239 5 Santa Cruz 17 3.5 Major Damage - Emergency Opening Post-Planning 2019/20 $55020869 5 Santa Cruz 17 8.2 Major Damage - Permanent Restoration Post-Planning 2021/22 $7,43814033 5 Santa Cruz 17 9.1 9.9 Advance Mitigation Post-Planning 2020/21 $5,11522066 5 Santa Cruz 17 11.1 Major Damage - Emergency Opening Post-Planning 2019/20 $660

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 32

Page 36: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

20029 5 Santa Cruz 129 0.56 9.998 Pavement Planning 2026/27 Yes16847 5 Santa Cruz 129 1.4 Safety Improvements Post-Planning 2019/20 $9,12919155 5 Santa Cruz 129 L0.000 0.6 Pavement Post-Planning 2023/24 $14,809 Yes15672 5 Santa Cruz 152 1.9 R2.000 Mobility - ADA Post-Planning 2021/22 $7,45221770 5 Santa Cruz 236 5.4 5.4 Major Damage - Permanent Restoration Planning 2022/2319563 6 Fresno 5 0 10 Pavement Planning 2027/28 Yes22380 6 Fresno 5 26.8 29.96 Safety Improvements Planning 2023/2421534 6 Fresno 5 30 39.9 Pavement Planning 2027/28 Yes19310 6 Fresno 5 37.2 48.8 Pavement Post-Planning 2021/22 $47,710 Yes14185 6 Fresno 5 44.4 45.4 Bridge Post-Planning 2019/20 $16,531 Yes19311 6 Fresno 5 60.1 66.2 Pavement Post-Planning 2022/23 $20,750 Yes19312 6 Fresno 33 14.7 16.7 Pavement Post-Planning 2024/25 $16,500 Yes19313 6 Fresno 33 69.4 71.5 Pavement Post-Planning 2023/24 $19,361 Yes16482 6 Fresno 33 Various Various Bridge Post-Planning 2021/22 $5,845 Yes19551 6 Fresno 41 0 6.2 Pavement Planning 2025/26 Yes21749 6 Fresno 41 M5.700 R7.100 Safety Improvements Post-Planning 2022/23 $13,60021048 6 Fresno 41 M6.000 R20.100 Safety Improvements Post-Planning 2020/21 $2,93021748 6 Fresno 41 R1.800 R2.200 Safety Improvements Post-Planning 2022/23 $13,75016163 6 Fresno 41 R20.000 33.4 Mobility - TMS Post-Planning 2020/21 $20,424 Yes13838 6 Fresno 41 R21.000 R31.000 Roadside Post-Planning 2019/20 $2,59019314 6 Fresno 41 R23.100 R31.700 Roadside Post-Planning 2022/23 $10,77617582 6 Fresno 41 R27.600 R28.300 Mobility - Operational Improvements Post-Planning 2021/22 $22,95722143 6 Fresno 41 Various Various Drainage Planning 2025/26 Yes19568 6 Fresno 63 0 8.3 Pavement Planning 2028/29 Yes19324 6 Fresno 99 19 21.1 Roadside Post-Planning 2023/24 $16,92122121 6 Fresno 99 20 21.4 Pavement Planning 2026/27 Yes19315 6 Fresno 99 21.2 24.4 Pavement Post-Planning 2023/24 $367,300 Yes19328 6 Fresno 99 23.3 Facilities Post-Planning 2023/24 $16,37015883 6 Fresno 99 R5.700 11.1 Pavement Post-Planning 2019/20 $99,925 Yes18013 6 Fresno 99 Various Various Mobility - TMS Post-Planning 2019/20 $6,478 Yes19325 6 Fresno 145 0 33.6 Safety Improvements Post-Planning 2021/22 $5,78019317 6 Fresno 145 20.2 26.1 Pavement Post-Planning 2020/21 $10,750 Yes16503 6 Fresno 168 18.6 T25.500 Pavement Post-Planning 2019/20 $12,026 Yes22115 6 Fresno 168 49 49.4 Major Damage - Permanent Restoration Planning 2024/2522366 6 Fresno 168 49.3 49.5 Major Damage - Emergency Opening Post-Planning 2019/20 $1,33016519 6 Fresno 168 R0.000 R11.700 Roadside Post-Planning 2020/21 $2,34919319 6 Fresno 168 R8.300 45.8 Drainage Post-Planning 2024/25 $28,170 Yes22254 6 Fresno 168 T24.7 T32.61 Pavement Planning 2028/29 Yes21604 6 Fresno 180 47.3 48 Safety Improvements Post-Planning 2023/24 $12,08019572 6 Fresno 180 81.7 109.52 Pavement Planning 2026/27 Yes21915 6 Fresno 180 89.6 90.7 Safety Improvements Planning 2023/2422203 6 Fresno 180 112.09 119.467 Pavement Planning 2027/28 Yes21760 6 Fresno 180 R62.9 R65.3 Safety Improvements Planning 2022/2322174 6 Fresno 198 4.34 4.34 Bridge Planning 2028/29 Yes19323 6 Fresno 198 21.19 22.66 Pavement Planning 2024/25 Yes19322 6 Fresno 198 Various Various Drainage Post-Planning 2022/23 $24,560 Yes22523 6 Fresno Various Various Various Major Damage - Emergency Opening Post-Planning 2019/20 $3,10018277 6 Fresno Various Various Various Mobility - TMS Post-Planning 2020/21 $7,480 Yes19330 6 Kern 5 0.73 1.08 Roadside Planning 2025/26

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 33

Page 37: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

19331 6 Kern 5 4.4 10.2 Pavement Post-Planning 2024/25 $95,658 Yes19332 6 Kern 5 10.2 15.9 Pavement Post-Planning 2023/24 $22,350 Yes19548 6 Kern 5 15.9 30 Pavement Planning 2025/26 Yes22264 6 Kern 5 47.55 52.09 Safety Improvements Planning 2023/2419586 6 Kern 5 52.8 62.6 Pavement Planning 2027/28 Yes15963 6 Kern 5 81.7 87 Pavement Post-Planning 2019/20 $29,330 Yes19329 6 Kern 5 R0.000 4.4 Pavement Post-Planning 2022/23 $31,350 Yes13704 6 Kern 5 R7.500 R9.000 Drainage Post-Planning 2019/20 $14,214 Yes19336 6 Kern 33 14.4 17.9 Pavement Planning 2025/26 Yes19564 6 Kern 33 17.9 21.48 Pavement Planning 2028/29 Yes19335 6 Kern 33 21.8 39.8 Drainage Post-Planning 2023/24 $11,430 Yes19337 6 Kern 33 40.4 59 Pavement Post-Planning 2022/23 $22,570 Yes17106 6 Kern 43 0.1 9.3 Pavement Post-Planning 2019/20 $14,339 Yes20927 6 Kern 43 25.2 25.4 Safety Improvements Post-Planning 2021/22 $10,10021919 6 Kern 43 R15.83 R15.83 Safety Improvements Planning 2023/2419574 6 Kern 46 33.5 46 Pavement Planning 2025/26 Yes16487 6 Kern 46 49 50.9 Pavement Post-Planning 2019/20 $7,610 Yes19588 6 Kern 46 50.8 57.78 Pavement Planning 2025/26 Yes19339 6 Kern 58 6 15.4 Pavement Post-Planning 2020/21 $15,970 Yes16571 6 Kern 58 39.9 46 Pavement Post-Planning 2021/22 $12,100 Yes16375 6 Kern 58 R53.400 Mobility - ADA Post-Planning 2021/22 $4,62019341 6 Kern 58 R64.400 67.3 Pavement Post-Planning 2022/23 $14,270 Yes19343 6 Kern 58 R64.90 R64.90 Mobility - WIM Scales & CVEFs Planning 2026/2722144 6 Kern 58 Various Various Drainage Planning 2027/28 Yes19581 6 Kern 65 0 6.9 Pavement Planning 2028/29 Yes19565 6 Kern 65 6.9 25.16 Pavement Planning 2026/27 Yes19556 6 Kern 99 0 10.5 Pavement Planning 2028/29 Yes13482 6 Kern 99 10.4 21.2 Pavement Post-Planning 2019/20 $66,740 Yes19345 6 Kern 99 21.2 24.6 Pavement Post-Planning 2025/26 $68,290 Yes21348 6 Kern 99 23.6 R28.400 Pavement Post-Planning 2021/22 $10,340 Yes19558 6 Kern 99 43.9 49.4 Pavement Planning 2028/29 Yes22167 6 Kern 99 R43.60R R43.60R Bridge Planning 2028/29 Yes21330 6 Kern 119 0.2 0.6 Safety Improvements Post-Planning 2021/22 $5,22115884 6 Kern 119 28.2 31.3 Pavement Post-Planning 2023/24 $57,300 Yes19346 6 Kern 155 R0.000 R1.300 Pavement Post-Planning 2023/24 $16,740 Yes19348 6 Kern 166 0 9 Pavement Post-Planning 2022/23 $14,540 Yes16536 6 Kern 166 17.3 17.7 Bridge Post-Planning 2021/22 $44,045 Yes19354 6 Kern 178 10.4 57 Safety Improvements Post-Planning 2020/21 $6,51319350 6 Kern 178 12.6 55.4 Drainage Post-Planning 2021/22 $13,000 Yes16506 6 Kern 184 0.8 8.6 Pavement Post-Planning 2022/23 $30,955 Yes15961 6 Kern 184 8.5 11.6 Pavement Post-Planning 2021/22 $12,140 Yes17405 6 Kern 184 L0.900 L1.100 Safety Improvements Post-Planning 2019/20 $9,05019351 6 Kern 204 2.8 Safety Improvements Post-Planning 2021/22 $4,27516510 6 Kern 204 5.1 6.7 Pavement Post-Planning 2019/20 $5,105 Yes14143 6 Kern 204 R0.000 4.6 Mobility - ADA Post-Planning 2021/22 $10,72819515 6 Kern 223 1.85 10.5 Pavement Planning 2024/25 Yes19353 6 Kern 223 20.1 21.3 Pavement Planning 2024/25 Yes21295 6 Kern 223 R16.000 Mobility - Operational Improvements Post-Planning 2022/23 $3,70016912 6 Kern Various Various Various Drainage Post-Planning 2019/20 $10,802 Yes

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 34

Page 38: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

19612 6 Kern Various Various Various Facilities Planning 2025/2619355 6 Kings 5 16.2 26.72 Pavement Planning 2028/29 Yes19356 6 Kings 41 0 15.5 Pavement Post-Planning 2024/25 $24,490 Yes21454 6 Kings 41 16.6 16.9 Safety Improvements Post-Planning 2023/24 $14,40019357 6 Kings 41 20 28.4 Pavement Post-Planning 2022/23 $23,910 Yes19358 6 Kings 41 28.4 R39.800 Pavement Post-Planning 2023/24 $23,400 Yes16476 6 Kings 41 30.6 33 Bridge Post-Planning 2021/22 $28,120 Yes19363 6 Kings 43 0 3.2 Pavement Post-Planning 2019/20 $6,900 Yes19567 6 Kings 198 5 14.8 Pavement Planning 2028/29 Yes19579 6 Kings 198 R14.80 R21.50 Pavement Planning 2026/27 Yes13718 6 Kings 198 R16.600 R21.500 Roadside Post-Planning 2020/21 $2,95913388 6 Kings 198 R19.400 22.5 Roadside Post-Planning 2020/21 $5,64817321 6 Kings Various Various Various Major Damage - Permanent Restoration Post-Planning 2019/20 $20,50013250 6 Madera 41 6.3 9.2 Pavement Post-Planning 2020/21 $27,249 Yes19555 6 Madera 41 9.3 15.4 Pavement Planning 2026/27 Yes19575 6 Madera 41 15.4 22.1 Pavement Planning 2026/27 Yes19583 6 Madera 41 22.1 34.1 Pavement Planning 2028/29 Yes22146 6 Madera 41 Various Various Drainage Planning 2028/29 Yes16910 6 Madera 99 9.7 Bridge Post-Planning 2019/20 $6,581 Yes19530 6 Madera 99 23.06 23.06 Drainage Planning 2025/26 Yes17392 6 Madera 99 R7.000 R7.500 Bridge Post-Planning 2021/22 $36,472 Yes19361 6 Madera 145 8 12 Pavement Post-Planning 2022/23 $13,430 Yes19561 6 Madera 152 0 15.6 Pavement Planning 2028/29 Yes19550 6 Madera 233 1.8 3.88 Pavement Planning 2024/25 Yes19366 6 Tulare 63 5.8 L8.000 Pavement Post-Planning 2022/23 $17,280 Yes19562 6 Tulare 63 7.9 11.85 Pavement Planning 2026/27 Yes19377 6 Tulare 63 Various Various Safety Improvements Post-Planning 2020/21 $3,16313389 6 Tulare 65 17.5 22 Roadside Post-Planning 2019/20 $7,39119369 6 Tulare 99 0 13.5 Pavement Post-Planning 2022/23 $74,335 Yes22136 6 Tulare 99 6.09 7.16 Drainage Planning 2028/29 Yes13547 6 Tulare 99 19.4 Bridge Post-Planning 2019/20 $14,434 Yes19367 6 Tulare 99 20.2 R53.900 Drainage Post-Planning 2023/24 $17,970 Yes13841 6 Tulare 99 22.3 Roadside Post-Planning 2020/21 $11,11219370 6 Tulare 99 27.6 30.6 Pavement Post-Planning 2023/24 $37,390 Yes11323 6 Tulare 99 51.6 52.2 Roadside Post-Planning 2020/21 $11,74116911 6 Tulare 99 Various Various Drainage Post-Planning 2019/20 $10,765 Yes16273 6 Tulare 99 Various Various Bridge Post-Planning 2020/21 $7,248 Yes22147 6 Tulare 99 Various Various Drainage Planning 2028/29 Yes19543 6 Tulare 137 13.7 16.6 Pavement Planning 2026/27 Yes21768 6 Tulare 190 11.3 11.5 Safety Improvements Post-Planning 2023/24 $10,10019560 6 Tulare 190 14.9 19 Pavement Planning 2026/27 Yes19547 6 Tulare 190 32.2 52.8 Pavement Planning 2027/28 Yes13707 6 Tulare 190 34.7 39.7 Drainage Post-Planning 2019/20 $5,856 Yes19372 6 Tulare 198 0 44 Drainage Post-Planning 2022/23 $23,484 Yes22202 6 Tulare 198 34.129 43.9 Pavement Planning 2028/29 Yes22180 6 Tulare 201 0 4.94 Safety Improvements Planning 2022/2319373 6 Tulare 216 0 R2.900 Pavement Post-Planning 2022/23 $25,800 Yes19374 6 Tulare 245 0 33 Drainage Post-Planning 2024/25 $18,978 Yes16272 6 Tulare 245 1.2 1.6 Bridge Post-Planning 2020/21 $25,910 Yes

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 35

Page 39: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

19376 6 Tulare Various Various Various Safety Improvements Post-Planning 2020/21 $3,94721119 6 Tulare Various Various Various Safety - Collision Reduction Post-Planning 2020/21 $4,68219450 6 Tulare Various Various Various Facilities Planning 2024/2517251 7 Los Angeles 1 0 11.5 Sustainability Planning 2024/2513675 7 Los Angeles 1 0 18 Pavement Post-Planning 2021/22 $52,560 Yes18380 7 Los Angeles 1 0.2 13.4 Mobility - TMS Post-Planning 2023/24 $14,692 Yes18603 7 Los Angeles 1 0.21 7.28 Mobility - TMS Planning 2026/27 Yes21918 7 Los Angeles 1 0.98 0.98 Bridge Planning 2027/28 Yes18272 7 Los Angeles 1 2.8 Safety Improvements Post-Planning 2019/20 $4,30621526 7 Los Angeles 1 4.511 6.59 Mobility - ADA Planning 2025/2619183 7 Los Angeles 1 4.7 6.6 Safety Improvements Post-Planning 2021/22 $9,51918182 7 Los Angeles 1 6 Safety Improvements Post-Planning 2019/20 $2,31318215 7 Los Angeles 1 7 7.2 Bridge Post-Planning 2022/23 $32,784 Yes21610 7 Los Angeles 1 11.2 Safety Improvements Post-Planning 2021/22 $3,29615933 7 Los Angeles 1 18 33.3 Pavement Post-Planning 2021/22 $68,464 Yes21607 7 Los Angeles 1 18.9 19.9 Safety Improvements Post-Planning 2020/21 $6,40621611 7 Los Angeles 1 32.71 32.71 Safety Improvements Planning 2020/2115934 7 Los Angeles 1 35.2 46.9 Pavement Planning 2025/26 Yes16007 7 Los Angeles 1 37.7 62.8 Drainage Post-Planning 2020/21 $48,954 Yes17634 7 Los Angeles 1 42.5 Major Damage - Permanent Restoration Post-Planning 2021/22 $15,90018678 7 Los Angeles 1 44.1 44.2 Safety Improvements Post-Planning 2021/22 $7,35819078 7 Los Angeles 1 44.15 44.15 Bridge Planning 2026/27 Yes15935 7 Los Angeles 1 46.9 62.9 Pavement Post-Planning 2023/24 $28,040 Yes11250 7 Los Angeles 1 56.5 56.9 Bridge Post-Planning 2020/21 $54,933 Yes17052 7 Los Angeles 1 R34.500 35.2 Mobility - TMS Post-Planning 2020/21 $24,616 Yes16850 7 Los Angeles 1 Various Various Bridge Post-Planning 2023/24 $49,634 Yes15936 7 Los Angeles 2 2.3 14.2 Pavement Post-Planning 2021/22 $31,908 Yes9344 7 Los Angeles 2 10.6 26.2 Mobility - ADA Post-Planning 2022/23 $11,6759251 7 Los Angeles 2 12.7 Bridge Post-Planning 2023/24 $12,504 Yes

13445 7 Los Angeles 2 13.1 14.3 Sustainability Post-Planning 2019/20 $12,57716008 7 Los Angeles 2 14.2 57.5 Drainage Post-Planning 2022/23 $17,601 Yes20761 7 Los Angeles 2 15 R23.200 Mobility - TMS Post-Planning 2023/24 $28,439 Yes17470 7 Los Angeles 2 15.1 78 Sustainability Planning 2026/2720760 7 Los Angeles 2 16.3 81 Mobility - TMS Post-Planning 2023/24 $118,695 Yes20752 7 Los Angeles 2 16.37 16.37 Drainage Planning 2026/27 Yes14110 7 Los Angeles 2 26.4 79.8 Safety - Collision Reduction Post-Planning 2020/21 $24,23818685 7 Los Angeles 2 68.1 82.1 Drainage Post-Planning 2022/23 $6,011 Yes22284 7 Los Angeles 2 80.1 Major Damage - Emergency Opening Post-Planning 2019/20 $1,48022277 7 Los Angeles 2 R18.600 R19.200 Major Damage - Emergency Opening Post-Planning 2019/20 $85022204 7 Los Angeles 2 R18.7 R18.7 Facilities Planning 2024/2522205 7 Los Angeles 2 R18.7 R18.7 Mobility - TMC Planning 2025/2618381 7 Los Angeles 2 R18.700 Mobility - TMS Post-Planning 2022/23 $9,228 Yes18670 7 Los Angeles 2 R18.700 Mobility - TMS Post-Planning 2022/23 $5,353 Yes17538 7 Los Angeles 5 0.8 Sustainability Post-Planning 2020/21 $5,92019267 7 Los Angeles 5 6.6 13.1 Pavement Post-Planning 2022/23 $33,840 Yes17539 7 Los Angeles 5 15.1 22.9 Mobility - Operational Improvements Post-Planning 2021/22 $24,79020205 7 Los Angeles 5 16.9 27 Mobility - TMS Planning 2025/26 Yes20844 7 Los Angeles 5 17.9 18 Safety Improvements Post-Planning 2020/21 $3,68722197 7 Los Angeles 5 19.2 28.9 Pavement Planning 2027/28 Yes

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 36

Page 40: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

16560 7 Los Angeles 5 20.1 36 Drainage Post-Planning 2020/21 $8,355 Yes17977 7 Los Angeles 5 20.8 Drainage Post-Planning 2019/20 $7,506 Yes18147 7 Los Angeles 5 22.5 Bridge Post-Planning 2022/23 $11,860 Yes17248 7 Los Angeles 5 23.2 36.3 Sustainability Post-Planning 2022/23 $11,32422329 7 Los Angeles 5 26.8 R74.7 Drainage Planning 2028/29 Yes18593 7 Los Angeles 5 27 66.5 Bridge Post-Planning 2019/20 $504,540 Yes21920 7 Los Angeles 5 30.6 31.6 Pavement Planning 2025/26 Yes21445 7 Los Angeles 5 31.6 R45.4 Pavement Planning 2026/27 Yes16388 7 Los Angeles 5 34.6 Bridge Post-Planning 2019/20 $10,949 Yes20712 7 Los Angeles 5 36 Sustainability Post-Planning 2022/23 $17,07014076 7 Los Angeles 5 39.4 R44.400 Roadside Post-Planning 2020/21 $6,25922278 7 Los Angeles 5 42.6 R47.900 Major Damage - Emergency Opening Post-Planning 2019/20 $85022279 7 Los Angeles 5 42.6 R47.900 Major Damage - Emergency Opening Post-Planning 2019/20 $22,80018234 7 Los Angeles 5 R44.43 R44.4 Bridge Planning 2026/27 Yes19227 7 Los Angeles 5 R44.800 R45.900 Safety Post-Planning 2023/24 $23,64818975 7 Los Angeles 5 R5.500 85.7 Mobility - TMS Post-Planning 2022/23 $19,162 Yes16787 7 Los Angeles 5 R54.400 R54.800 Mobility - WIM Scales & CVEFs Post-Planning 2020/21 $5,14613691 7 Los Angeles 5 R59.500 R68.100 Pavement Post-Planning 2020/21 $47,160 Yes21977 7 Los Angeles 5 R59.7R R73.7 Pavement Planning 2024/25 Yes18690 7 Los Angeles 5 R60.000 R75.000 Drainage Post-Planning 2023/24 $17,955 Yes16832 7 Los Angeles 5 R87.400 Bridge Post-Planning 2021/22 $6,376 Yes9337 7 Los Angeles 10 16.6 30.1 Sustainability Post-Planning 2019/20 $36,863

18382 7 Los Angeles 10 18.3 31.1 Mobility - TMS Planning 2026/27 Yes21772 7 Los Angeles 10 18.48 18.59 Bridge Planning 2025/26 Yes21848 7 Los Angeles 10 19.1 19.1 Mobility - ADA Planning 2024/2522507 7 Los Angeles 10 20.98 20.98 Major Damage - Emergency Opening Planning 2019/2022324 7 Los Angeles 10 21 40 Drainage Planning 2027/28 Yes13615 7 Los Angeles 10 21.6 31 Safety - Collision Reduction Post-Planning 2021/22 $9,17715972 7 Los Angeles 10 24 31.2 Pavement Planning 2027/28 Yes17154 7 Los Angeles 10 28.2 31 Bridge Post-Planning 2021/22 $18,677 Yes13824 7 Los Angeles 10 31.2 37.2 Pavement Post-Planning 2019/20 $78,485 Yes16033 7 Los Angeles 10 42.3 48.3 Safety Post-Planning 2020/21 $8,57921997 7 Los Angeles 10 42.363 48.265 Pavement Planning 2026/27 Yes20762 7 Los Angeles 10 42.4 48.26 Mobility - TMS Planning 2027/28 Yes16823 7 Los Angeles 10 46 48 Sustainability Post-Planning 2020/21 $7,81615674 7 Los Angeles 10 R12.300 R15.500 Safety Improvements Post-Planning 2019/20 $32,67817038 7 Los Angeles 10 R13.300 Bridge Post-Planning 2021/22 $8,748 Yes18356 7 Los Angeles 10 R2.200 R4.900 Roadside Post-Planning 2022/23 $6,13716213 7 Los Angeles 10 R4.500 R5.600 Sustainability Post-Planning 2021/22 $3,88613708 7 Los Angeles 10 R4.700 14.1 Drainage Post-Planning 2023/24 $10,566 Yes22281 7 Los Angeles 14 35.7 39.8 Major Damage - Emergency Opening Post-Planning 2019/20 $1,10022282 7 Los Angeles 14 35.7 39.8 Major Damage - Emergency Opening Post-Planning 2019/20 $5,90019117 7 Los Angeles 14 R24.79 33.2 Mobility - TMS Planning 2024/25 Yes18767 7 Los Angeles 14 R27.000 R28.100 Major Damage - Permanent Restoration Post-Planning 2021/22 $36,33322293 7 Los Angeles 14 R28.0 33.5 Drainage Planning 2026/27 Yes17609 7 Los Angeles 14 R28.900 R29.200 Drainage Post-Planning 2019/20 $6,451 Yes18037 7 Los Angeles 14 R29.200 R29.400 Major Damage - Protective Betterments Post-Planning 2021/22 $32,24516898 7 Los Angeles 14 R31.400 36.5 Roadside Post-Planning 2020/21 $6,11313400 7 Los Angeles 14 R54.600 R66.200 Roadside Post-Planning 2019/20 $6,083

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 37

Page 41: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

16901 7 Los Angeles 14 R60.700 R77.000 Pavement Post-Planning 2020/21 $169,950 Yes21944 7 Los Angeles 14 R70.99 R70.99 Bridge Planning 2024/25 Yes13678 7 Los Angeles 22 0 1.5 Pavement Post-Planning 2020/21 $11,898 Yes17301 7 Los Angeles 22 1.3 Mobility - Operational Improvements Post-Planning 2022/23 $1,90016437 7 Los Angeles 23 0.9 8.9 Major Damage - Permanent Restoration Planning 2021/2215937 7 Los Angeles 27 0 18.6 Pavement Post-Planning 2021/22 $48,163 Yes18763 7 Los Angeles 27 1 1.2 Major Damage - Permanent Restoration Post-Planning 2021/22 $43,70015854 7 Los Angeles 39 17.8 Bridge Post-Planning 2021/22 $31,525 Yes18313 7 Los Angeles 39 18.36 22.17 Bridge Planning 2028/29 Yes18314 7 Los Angeles 39 20.7 Bridge Post-Planning 2023/24 $4,448 Yes9351 7 Los Angeles 39 32.2 38.4 Safety - Collision Reduction Post-Planning 2020/21 $7,883

20766 7 Los Angeles 39 40 44.4 Major Damage - Protective Betterments Post-Planning 2026/27 $57,10022326 7 Los Angeles 39 D17.5 44.1 Drainage Planning 2028/29 Yes17636 7 Los Angeles 47 0.86 0.86 Bridge Planning 2028/29 Yes18388 7 Los Angeles 47 R0.0 2.3 Mobility - TMS Planning 2025/26 Yes20751 7 Los Angeles 57 0 12.2 Sustainability Planning 2026/2720315 7 Los Angeles 57 2.9 11.6 Safety Planning 2026/2714094 7 Los Angeles 57 5 5.2 Roadside Post-Planning 2020/21 $2,58722547 7 Los Angeles 57 R4.518 R12.303R Safety Planning 2024/2517040 7 Los Angeles 60 0 R21.500 Safety Post-Planning 2019/20 $6,19316224 7 Los Angeles 60 11 20 Sustainability Post-Planning 2020/21 $16,76820259 7 Los Angeles 60 11.75 R25.3 Pavement Planning 2027/28 Yes19664 7 Los Angeles 60 15.9 19.5 Bridge Post-Planning 2020/21 $54,870 Yes16225 7 Los Angeles 60 20 R26.000 Sustainability Post-Planning 2020/21 $10,58716171 7 Los Angeles 60 R0.600 11.8 Mobility - TMS Post-Planning 2020/21 $9,380 Yes15802 7 Los Angeles 60 R2.94 R3.88 Bridge Planning 2026/27 Yes18504 7 Los Angeles 60 R25.3 R30.45 Pavement Planning 2027/28 Yes20203 7 Los Angeles 60 R25.4 R30.456 Mobility - TMS Planning 2027/28 Yes16819 7 Los Angeles 60 R28.000 R30.400 Sustainability Post-Planning 2020/21 $12,62821975 7 Los Angeles 60 R4.43 8.89 Bridge Planning 2028/29 Yes21369 7 Los Angeles 66 0 3.2 Mobility - ADA Post-Planning 2021/22 $4,66116896 7 Los Angeles 72 0 6.8 Mobility - ADA Post-Planning 2021/22 $18,48118387 7 Los Angeles 90 0.921 T3.2 Mobility - TMS Planning 2026/27 Yes18404 7 Los Angeles 90 2.5 Facilities Post-Planning 2022/23 $9,31218080 7 Los Angeles 91 6 R20.700 Safety Post-Planning 2023/24 $33,85320258 7 Los Angeles 91 6.012 R12.0 Pavement Planning 2028/29 Yes13617 7 Los Angeles 91 6.3 18.1 Safety - Collision Reduction Post-Planning 2020/21 $3,44611289 7 Los Angeles 91 R10.200 R10.300 Bridge Post-Planning 2021/22 $24,788 Yes22505 7 Los Angeles 91 R10.600 Major Damage - Emergency Opening Post-Planning 2019/20 $76016661 7 Los Angeles 91 R6.100 R20.700 Mobility - TMS Post-Planning 2021/22 $24,697 Yes16166 7 Los Angeles 101 0 R17.100 Mobility - TMS Post-Planning 2021/22 $15,202 Yes18047 7 Los Angeles 101 0.65 8.05 Pavement Planning 2028/29 Yes21455 7 Los Angeles 101 0.7 2.1 Safety Planning 2024/2521508 7 Los Angeles 101 7.06 7.06 Bridge Planning 2024/25 Yes18506 7 Los Angeles 101 8.4 11.8 Pavement Post-Planning 2023/24 $20,992 Yes14106 7 Los Angeles 101 11 23.5 Roadside Post-Planning 2023/24 $8,19613983 7 Los Angeles 101 11.8 31.1 Pavement Post-Planning 2019/20 $17,234 Yes21183 7 Los Angeles 101 21.2 21.2 Facilities Planning 2028/2918386 7 Los Angeles 101 25.4 38.19 Mobility - TMS Planning 2028/29 Yes

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 38

Page 42: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

21688 7 Los Angeles 101 31.1 38.19 Safety Planning 2025/2618602 7 Los Angeles 101 17.1R 25.5 Mobility - TMS Planning 2024/25 Yes16085 7 Los Angeles 101 R6.200 R9.200 Roadside Post-Planning 2021/22 $6,72314095 7 Los Angeles 101 S0.000 1.5 Sustainability Post-Planning 2021/22 $5,16017221 7 Los Angeles 103 0.1 Drainage Post-Planning 2020/21 $32,397 Yes16885 7 Los Angeles 103 0.1 Bridge Post-Planning 2021/22 $32,684 Yes18133 7 Los Angeles 103 0.9 Bridge Post-Planning 2023/24 $10,454 Yes17471 7 Los Angeles 105 7 17.6 Sustainability Planning 2027/2822273 7 Los Angeles 105 R11.500 Major Damage - Emergency Opening Post-Planning 2019/20 $52021608 7 Los Angeles 105 R14.28 R14.28 Drainage Planning 2024/25 Yes17155 7 Los Angeles 105 R14.600 R16.400 Bridge Post-Planning 2020/21 $3,565 Yes17166 7 Los Angeles 105 R2.000 Facilities Post-Planning 2023/24 $14,80922280 7 Los Angeles 105 R2.000 R2.300 Major Damage - Emergency Opening Post-Planning 2019/20 $4,53018077 7 Los Angeles 105 R2.100 Safety Post-Planning 2022/23 $30,37722321 7 Los Angeles 105 R2.5 R16.5 Drainage Planning 2027/28 Yes13610 7 Los Angeles 105 R4.300 R5.000 Safety - Collision Reduction Post-Planning 2022/23 $8,05221371 7 Los Angeles 107 0 4.8 Mobility - ADA Post-Planning 2021/22 $9,50817048 7 Los Angeles 107 4.3 4.3 Facilities Planning 2026/2713715 7 Los Angeles 110 0 31.9 Safety Post-Planning 2020/21 $9,72420309 7 Los Angeles 110 1.25 31.87 Drainage Planning 2025/26 Yes18899 7 Los Angeles 110 3.75 10.32 Roadside Planning 2028/2911324 7 Los Angeles 110 3.9 5.9 Roadside Post-Planning 2021/22 $6,08518698 7 Los Angeles 110 9.07 18 Sustainability Planning 2028/2918901 7 Los Angeles 110 16 22.041 Roadside Planning 2026/2714051 7 Los Angeles 110 20 23.6 Roadside Post-Planning 2020/21 $5,46515837 7 Los Angeles 110 22.8 Bridge Post-Planning 2020/21 $7,835 Yes20970 7 Los Angeles 110 23.1 Major Damage - Permanent Restoration Post-Planning 2021/22 $9,11421077 7 Los Angeles 110 23.73 25.04 Mobility - Operational Improvements Planning 2025/2622294 7 Los Angeles 110 24 31.913 Drainage Planning 2026/27 Yes17382 7 Los Angeles 110 25.8 30.6 Safety Improvements Post-Planning 2020/21 $43,54418175 7 Los Angeles 110 27.08 30.1 Bridge Planning 2025/26 Yes17520 7 Los Angeles 110 31 31 Mobility - Operational Improvements Post-Planning 2021/22 $1,40122139 7 Los Angeles 110 25.34R 25.43R Bridge Planning 2024/25 Yes17786 7 Los Angeles 110 R0.700 8.8 Mobility - TMS Post-Planning 2020/21 $1,923 Yes18391 7 Los Angeles 118 R1.1 R14.4 Mobility - TMS Planning 2027/28 Yes16834 7 Los Angeles 118 R1.500 R10.200 Sustainability Post-Planning 2020/21 $16,37016836 7 Los Angeles 118 R11.000 R14.000 Sustainability Post-Planning 2021/22 $21,80018691 7 Los Angeles 118 R13.000 R13.900 Drainage Post-Planning 2023/24 $6,368 Yes18902 7 Los Angeles 118 R3.86 R10.997 Roadside Planning 2028/2913391 7 Los Angeles 118 R4.500 R9.100 Roadside Post-Planning 2021/22 $6,73422137 7 Los Angeles 126 2.368 2.368 Safety Improvements Planning 2022/2316168 7 Los Angeles 134 0 R13.300 Mobility - TMS Post-Planning 2021/22 $12,973 Yes20103 7 Los Angeles 134 0 R13.34 Safety Planning 2025/2611342 7 Los Angeles 134 2.6 4.8 Sustainability Post-Planning 2019/20 $4,66617047 7 Los Angeles 134 4.924 5.076R Facilities Planning 2024/2518539 7 Los Angeles 134 8.35 13.34 Sustainability Planning 2025/2615838 7 Los Angeles 134 R12.600 Bridge Post-Planning 2021/22 $14,630 Yes21897 7 Los Angeles 134 R5.67 R5.67 Bridge Planning 2028/29 Yes21504 7 Los Angeles 138 33 33.2 Safety Improvements Post-Planning 2023/24 $12,900

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 39

Page 43: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

13759 7 Los Angeles 138 43.4 51.4 Mobility - ADA Post-Planning 2021/22 $18,20418445 7 Los Angeles 138 43.418 46.7 Pavement Planning 2027/28 Yes19416 7 Los Angeles 138 43.8 Safety Improvements Post-Planning 2021/22 $3,80217388 7 Los Angeles 138 49.5 Safety Improvements Post-Planning 2019/20 $3,40813760 7 Los Angeles 164 1.4 6.9 Mobility - ADA Post-Planning 2021/22 $14,56917821 7 Los Angeles 164 3.98 4.97 Relinquishment Planning 2027/2817466 7 Los Angeles 164 3.98 6.9 Sustainability Planning 2026/2721172 7 Los Angeles 170 17 17 Sustainability Planning 2025/2621176 7 Los Angeles 170 17.6 17.6 Sustainability Planning 2025/2621175 7 Los Angeles 170 18 18 Sustainability Planning 2025/2621174 7 Los Angeles 170 19.4 19.4 Sustainability Planning 2025/2613725 7 Los Angeles 170 R14.500 R16.600 Roadside Post-Planning 2021/22 $6,20118390 7 Los Angeles 170 R14.500 R20.500 Mobility - TMS Post-Planning 2022/23 $17,063 Yes21483 7 Los Angeles 170 R16.600 R19.600 Safety Improvements Post-Planning 2021/22 $2,65722009 7 Los Angeles 210 R0.4 R29.0 Drainage Planning 2026/27 Yes21140 7 Los Angeles 210 R11.0 R11.5 Drainage Planning 2025/26 Yes13719 7 Los Angeles 210 R15.600 R17.400 Roadside Post-Planning 2020/21 $7,07418255 7 Los Angeles 210 R18.700 R19.700 Bridge Post-Planning 2023/24 $27,205 Yes18595 7 Los Angeles 210 R19.400 R27.000 Bridge Post-Planning 2023/24 $17,836 Yes13394 7 Los Angeles 210 R24.600 R25.300 Roadside Post-Planning 2019/20 $5,08820794 7 Los Angeles 210 R25.8 R36.5 Pavement Planning 2028/29 Yes20784 7 Los Angeles 210 R27.4 R31.9 Drainage Planning 2025/26 Yes21471 7 Los Angeles 210 R32.0 R49.1 Drainage Planning 2027/28 Yes13444 7 Los Angeles 210 R33.700 R39.800 Sustainability Post-Planning 2021/22 $6,55716208 7 Los Angeles 210 R36.000 R40.600 Sustainability Post-Planning 2021/22 $18,0959230 7 Los Angeles 210 R36.800 Bridge Post-Planning 2020/21 $28,707 Yes

14020 7 Los Angeles 210 R38.600 R38.900 Bridge Post-Planning 2019/20 $9,507 Yes20686 7 Los Angeles 210 R38.900 Drainage Post-Planning 2023/24 $3,875 Yes16209 7 Los Angeles 210 R41.300 R44.600 Sustainability Post-Planning 2021/22 $14,48620316 7 Los Angeles 210 R43.3 R46.0 Safety Planning 2025/2618383 7 Los Angeles 210 R43.900 R46.700 Mobility - TMS Post-Planning 2022/23 $10,413 Yes16210 7 Los Angeles 210 R44.700 R52.100 Sustainability Post-Planning 2021/22 $13,47713761 7 Los Angeles 210 R9.700 R51.900 Mobility - ADA Post-Planning 2021/22 $26,42821370 7 Los Angeles 213 0 8 Mobility - ADA Post-Planning 2021/22 $8,21319243 7 Los Angeles 213 0 9.984 Pavement Planning 2026/27 Yes9296 7 Los Angeles 213 2.7 3.9 Drainage Post-Planning 2019/20 $3,812 Yes

22315 7 Los Angeles 213 2.8 8.5 Drainage Planning 2027/28 Yes15968 7 Los Angeles 405 0 12.8 Pavement Post-Planning 2023/24 $89,396 Yes22283 7 Los Angeles 405 0.2 0.4 Major Damage - Emergency Opening Post-Planning 2019/20 $1,20018360 7 Los Angeles 405 2 12.8 Roadside Planning 2028/2914052 7 Los Angeles 405 7 12.9 Roadside Post-Planning 2021/22 $6,68619504 7 Los Angeles 405 7.2 Facilities Post-Planning 2022/23 $6,53315675 7 Los Angeles 405 8.8 Bridge Post-Planning 2020/21 $6,673 Yes13726 7 Los Angeles 405 12.9 R21.500 Roadside Post-Planning 2021/22 $7,19021178 7 Los Angeles 405 13.3 13.3 Facilities Planning 2027/2822295 7 Los Angeles 405 13.6 29.5 Drainage Planning 2026/27 Yes20080 7 Los Angeles 405 17.6 Bridge Post-Planning 2022/23 $9,997 Yes18977 7 Los Angeles 405 19.3 26 Mobility - TMS Post-Planning 2023/24 $46,673 Yes18608 7 Los Angeles 405 25.9 43.75 Mobility - TMS Planning 2024/25 Yes

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 40

Page 44: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

20818 7 Los Angeles 405 31.6 41.4 Pavement Post-Planning 2022/23 $153,825 Yes13739 7 Los Angeles 405 39.1 Mobility - Operational Improvements Post-Planning 2021/22 $7,33613755 7 Los Angeles 405 40.1 48.1 Sustainability Post-Planning 2020/21 $7,93618764 7 Los Angeles 405 48 48.5 Major Damage - Permanent Restoration Post-Planning 2020/21 $23,69814072 7 Los Angeles 405 Various Various Bridge Post-Planning 2021/22 $31,205 Yes13674 7 Los Angeles 605 20.2 26 Pavement Post-Planning 2021/22 $29,857 Yes20720 7 Los Angeles 605 21.08 21.08 Drainage Planning 2026/27 Yes17384 7 Los Angeles 605 23.4 23.6 Safety Improvements Post-Planning 2019/20 $7,44517046 7 Los Angeles 605 H0.879 H0.955 Facilities Planning 2024/2513690 7 Los Angeles 605 R0.000 R10.400 Pavement Post-Planning 2021/22 $73,854 Yes13727 7 Los Angeles 605 R0.000 R4.300 Roadside Post-Planning 2021/22 $4,49916838 7 Los Angeles 605 R0.000 R9.600 Sustainability Post-Planning 2021/22 $23,35615969 7 Los Angeles 605 R10.200 20.2 Pavement Post-Planning 2022/23 $208,448 Yes16842 7 Los Angeles 605 R16.500 R19.500 Sustainability Post-Planning 2021/22 $22,56916844 7 Los Angeles 605 R20.000 R26.000 Sustainability Post-Planning 2021/22 $25,36816840 7 Los Angeles 605 R9.600 R15.700 Sustainability Post-Planning 2021/22 $16,87118384 7 Los Angeles 710 5 9.5 Mobility - TMS Post-Planning 2022/23 $24,196 Yes18056 7 Los Angeles 710 5.9 7.1 Pavement Planning 2028/29 Yes16089 7 Los Angeles 710 6 14.1 Roadside Post-Planning 2023/24 $8,97022265 7 Los Angeles 710 6.3 T27.46 Safety Planning 2026/2718815 7 Los Angeles 710 9.6 T32.100 Drainage Post-Planning 2022/23 $9,886 Yes16906 7 Los Angeles 710 12.6 13 Bridge Post-Planning 2020/21 $8,764 Yes22327 7 Los Angeles 710 13.1 T27.3 Drainage Planning 2028/29 Yes22511 7 Los Angeles 710 18.7 19.55 Drainage Planning 2025/26 Yes22228 7 Los Angeles 710 19.38 21.01 Drainage Planning 2026/27 Yes17635 7 Los Angeles 710 22.2 Bridge Post-Planning 2023/24 $24,017 Yes9233 7 Los Angeles 710 22.66 22.66 Bridge Planning 2026/27 Yes

16215 7 Los Angeles 710 24.4 26.7 Sustainability Post-Planning 2021/22 $6,58622028 7 Los Angeles 710 24.7 24.7 Facilities Planning 2025/2618938 7 Los Angeles 710 25.2 T27.475 Pavement Planning 2028/29 Yes14096 7 Los Angeles 710 R15.100 21.9 Roadside Post-Planning 2021/22 $5,83416368 7 Los Angeles Various 28.3 Bridge Post-Planning 2021/22 $13,871 Yes22496 7 Los Angeles Various Various Various Major Damage - Emergency Opening Post-Planning 2019/20 $3,30022497 7 Los Angeles Various Various Various Major Damage - Emergency Opening Post-Planning 2019/20 $1,00022498 7 Los Angeles Various Various Various Major Damage - Emergency Opening Post-Planning 2019/20 $3,10016656 7 Los Angeles Various Various Various Safety - Collision Reduction Post-Planning 2020/21 $5,15516845 7 Ventura 1 0 28.5 Sustainability Post-Planning 2021/22 $19,40622506 7 Ventura 1 1.6 Major Damage - Emergency Opening Post-Planning 2019/20 $2,65016444 7 Ventura 1 2.6 10 Major Damage - Permanent Restoration Planning 2026/2722276 7 Ventura 1 3.7 4.1 Major Damage - Emergency Opening Post-Planning 2019/20 $2,85016393 7 Ventura 1 4 4.2 Major Damage - Permanent Restoration Post-Planning 2020/21 $63,40621316 7 Ventura 1 4.4 4.8 Bridge Post-Planning 2024/25 $56,344 Yes17476 7 Ventura 1 7.5 21.1 Sustainability Planning 2026/2713679 7 Ventura 1 21.3 28.4 Pavement Post-Planning 2021/22 $16,099 Yes16830 7 Ventura 1 21.5 Bridge Post-Planning 2021/22 $10,438 Yes13501 7 Ventura 1 28.2 Bridge Post-Planning 2020/21 $13,978 Yes17468 7 Ventura 23 0 24.2 Sustainability Post-Planning 2023/24 $13,94822012 7 Ventura 23 R23.374 R24.0 Drainage Planning 2026/27 Yes18600 7 Ventura 23 R3.600 T11.600 Mobility - TMS Post-Planning 2022/23 $32,367 Yes

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 41

Page 45: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

18503 7 Ventura 23 T11.55 17.8 Pavement Planning 2025/26 Yes20260 7 Ventura 33 6.3 13.49 Pavement Planning 2024/25 Yes16961 7 Ventura 33 16.1 Bridge Post-Planning 2020/21 $2,530 Yes17389 7 Ventura 33 18.9 19.1 Safety - Collision Reduction Post-Planning 2021/22 $6,85417255 7 Ventura 33 27 42.9 Sustainability Post-Planning 2023/24 $9,51518253 7 Ventura 33 30.52 32.1 Bridge Planning 2027/28 Yes17249 7 Ventura 33 T5.700 27 Sustainability Post-Planning 2023/24 $9,35818048 7 Ventura 34 6.3 17.7 Pavement Post-Planning 2023/24 $37,992 Yes18005 7 Ventura 101 0 R38.900 Safety - Collision Reduction Post-Planning 2020/21 $17,66916655 7 Ventura 101 0.9 R39.200 Safety - Collision Reduction Post-Planning 2020/21 $14,8109374 7 Ventura 101 1.6 11.1 Roadside Post-Planning 2020/21 $9,550

22330 7 Ventura 101 1.7 15.1 Drainage Planning 2028/29 Yes19118 7 Ventura 101 3 13.8 Mobility - TMS Planning 2024/25 Yes18733 7 Ventura 101 9 9 Mobility - WIM Scales & CVEFs Planning 2027/2816792 7 Ventura 101 9 9.2 Mobility - WIM Scales & CVEFs Post-Planning 2020/21 $4,43417955 7 Ventura 101 22 25.3 Sustainability Planning 2025/2621486 7 Ventura 101 30.1 30.1 Bridge Planning 2027/28 Yes22328 7 Ventura 101 31.7 R35.3 Drainage Planning 2028/29 Yes16908 7 Ventura 101 R36.300 R40.600 Pavement Post-Planning 2019/20 $52,250 Yes20263 7 Ventura 118 0.5 15.6 Pavement Planning 2025/26 Yes13762 7 Ventura 118 0.5 T18.800 Mobility - ADA Post-Planning 2021/22 $3,17917670 7 Ventura 118 1.2 1.8 Sustainability Post-Planning 2021/22 $10,65621832 7 Ventura 118 12 13.3 Major Damage - Permanent Restoration Post-Planning 2021/22 $42,05518734 7 Ventura 118 13 15 Mobility - WIM Scales & CVEFs Planning 2024/2516790 7 Ventura 118 13.3 15.6 Mobility - WIM Scales & CVEFs Post-Planning 2021/22 $5,19018049 7 Ventura 118 15.6 R17.900 Pavement Post-Planning 2023/24 $27,020 Yes22296 7 Ventura 118 16 R32.0 Drainage Planning 2026/27 Yes17477 7 Ventura 118 18.2 32.6 Sustainability Planning 2027/2818046 7 Ventura 126 0 R13.6 Pavement Planning 2027/28 Yes22032 7 Ventura 126 30.8 30.8 Mobility - WIM Scales & CVEFs Planning 2028/2917254 7 Ventura 126 R13.200 R34.500 Sustainability Post-Planning 2023/24 $14,19221507 7 Ventura 126 T16.54 T16.54 Bridge Planning 2027/28 Yes21168 7 Ventura 150 0 31.3 Pavement Planning 2026/27 Yes13865 7 Ventura 150 15.1 18.4 Mobility - ADA Post-Planning 2021/22 $8,11322275 7 Ventura 150 17.9 Major Damage - Emergency Opening Post-Planning 2019/20 $1,50018441 7 Ventura 150 31.3 34.4 Pavement Post-Planning 2023/24 $16,317 Yes13651 7 Ventura 150 R13.300 19 Pavement Post-Planning 2021/22 $9,859 Yes18413 7 Ventura 232 0.4 R4.100 Pavement Post-Planning 2023/24 $17,614 Yes22500 7 Ventura Various Various Various Major Damage - Emergency Opening Post-Planning 2019/20 $3,30019685 8 Riverside 10 4.4 8.2 Pavement Planning 2025/26 Yes20088 8 Riverside 10 15 16 Mobility - WIM Scales & CVEFs Planning 2025/2622142 8 Riverside 10 26.9 43.3 Safety Improvements Planning 2022/2321623 8 Riverside 10 32.6 44.4 Pavement Planning 2026/27 Yes21928 8 Riverside 10 104.9 Major Damage - Emergency Opening Post-Planning 2019/20 $2,60019684 8 Riverside 10 R0.0 R4.4 Pavement Planning 2024/25 Yes17354 8 Riverside 10 R104.900 R134.200 Pavement Post-Planning 2019/20 $348,373 Yes17356 8 Riverside 10 R134.000 R156.500 Pavement Post-Planning 2021/22 $255,127 Yes17158 8 Riverside 10 R16.4 R95.0 Advance Mitigation Planning 2024/2521622 8 Riverside 10 R25.1 32.6 Pavement Planning 2026/27 Yes

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 42

Page 46: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

19171 8 Riverside 10 R59.300 R59.500 Mobility - WIM Scales & CVEFs Post-Planning 2022/23 $4,74415891 8 Riverside 10 R60.900 R74.000 Pavement Post-Planning 2021/22 $196,100 Yes16756 8 Riverside 10 R71.800 R72.400 Roadside Post-Planning 2023/24 $39,44419734 8 Riverside 10 R87.900 Bridge Post-Planning 2023/24 $16,189 Yes19092 8 Riverside 10 R91.900 R115.400 Bridge Post-Planning 2022/23 $8,281 Yes17765 8 Riverside 10 R92.900 R101.100 Bridge Post-Planning 2021/22 $16,736 Yes19168 8 Riverside 10 Various Various Sustainability Post-Planning 2022/23 $9,41421763 8 Riverside 15 3 8.1 Pavement Planning 2027/28 Yes9339 8 Riverside 15 3.4 10.5 Sustainability Post-Planning 2022/23 $4,242

21417 8 Riverside 15 3.5 6.8 Mobility - Operational Improvements Post-Planning 2023/24 $53,65919697 8 Riverside 15 8.1 23.9 Pavement Planning 2027/28 Yes16097 8 Riverside 15 8.2 13.9 Roadside Post-Planning 2022/23 $5,23019099 8 Riverside 15 9.4 16.3 Mobility - ADA Post-Planning 2022/23 $4,72414070 8 Riverside 15 15.9 20.3 Sustainability Post-Planning 2023/24 $4,99219730 8 Riverside 15 16.3 52.3 Mobility - ADA Post-Planning 2023/24 $5,55822150 8 Riverside 15 30 33 Drainage Planning 2024/25 Yes17125 8 Riverside 15 38.2 51.5 Pavement Post-Planning 2019/20 $47,288 Yes18008 8 Riverside 15 42.4 46.2 Roadside Post-Planning 2022/23 $4,32018660 8 Riverside 15 50.6 52.3 Roadside Post-Planning 2022/23 $9,52717123 8 Riverside 15 R0.000 3.1 Pavement Post-Planning 2019/20 $42,305 Yes22298 8 Riverside 60 9.3 14.5 Safety Improvements Planning 2024/2519100 8 Riverside 60 13.3 19.2 Mobility - ADA Post-Planning 2022/23 $5,07119098 8 Riverside 60 16.1 22.5 Mobility - TMS Post-Planning 2022/23 $14,621 Yes16949 8 Riverside 60 R0.000 22.3 Safety Post-Planning 2019/20 $3,84820174 8 Riverside 60 R1.000 12 Mobility - TMS Post-Planning 2022/23 $16,669 Yes16052 8 Riverside 60 R6.100 8 Roadside Post-Planning 2022/23 $5,26413781 8 Riverside 62 R6.700 9.2 Pavement Post-Planning 2019/20 $46,920 Yes13947 8 Riverside 74 0 5.8 Safety Improvements Post-Planning 2019/20 $65,14913628 8 Riverside 74 2.9 3.2 Bridge Post-Planning 2021/22 $13,002 Yes21638 8 Riverside 74 5.7 11.8 Safety Improvements Post-Planning 2023/24 $115,47413554 8 Riverside 74 13.2 34 Bridge Post-Planning 2019/20 $12,880 Yes17351 8 Riverside 74 27.5 34.3 Pavement Post-Planning 2023/24 $20,641 Yes21960 8 Riverside 74 27.53 34.34 Mobility - Operational Improvements Planning 2026/2717613 8 Riverside 74 34.3 45.1 Pavement Post-Planning 2021/22 $49,729 Yes16278 8 Riverside 74 36.9 43.6 Mobility - ADA Post-Planning 2019/20 $7,09522161 8 Riverside 74 45.1 71.75 Pavement Planning 2026/27 Yes21955 8 Riverside 74 71.8 R92.3 Pavement Planning 2026/27 Yes18730 8 Riverside 74 R48.800 49.2 Major Damage - Permanent Restoration Post-Planning 2020/21 $7,33719173 8 Riverside 74 Various Various Facilities Post-Planning 2023/24 $11,43219170 8 Riverside 79 0 5.4 Safety - Collision Reduction Post-Planning 2022/23 $9,26522259 8 Riverside 79 1.3 5.8 Pavement Planning 2028/29 Yes17243 8 Riverside 79 5.4 11.4 Safety Improvements Post-Planning 2022/23 $78,92116303 8 Riverside 79 25.6 26.4 Mobility - ADA Post-Planning 2019/20 $6,63721785 8 Riverside 79 M32.3 M33.8 Safety Improvements Planning 2021/2221442 8 Riverside 79 M32.4 40.44 Pavement Planning 2028/29 Yes20065 8 Riverside 91 10 13.5 Pavement Planning 2027/28 Yes22358 8 Riverside 91 10.3 Major Damage - Emergency Opening Post-Planning 2019/20 $1,29020066 8 Riverside 91 13.5 16.8 Pavement Planning 2024/25 Yes21859 8 Riverside 91 15.6 21.6 Roadside Post-Planning 2022/23 $4,567

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 43

Page 47: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

21127 8 Riverside 91 R0.0 10 Pavement Planning 2026/27 Yes17060 8 Riverside 95 14 36.2 Major Damage - Permanent Restoration Post-Planning 2019/20 $13,12216692 8 Riverside 111 47.2 55.3 Pavement Post-Planning 2023/24 $23,960 Yes20883 8 Riverside 111 47.3 55.3 Mobility - ADA Post-Planning 2021/22 $16,24822185 8 Riverside 215 8.94 13 Safety - Collision Reduction Planning 2027/2819075 8 Riverside 215 25 R31.000 Pavement Post-Planning 2023/24 $46,643 Yes19689 8 Riverside 215 40.5 42.7 Pavement Post-Planning 2023/24 $25,748 Yes21621 8 Riverside 215 42.7 45.3 Pavement Planning 2028/29 Yes18968 8 Riverside 215 R13.500 R19.500 Pavement Post-Planning 2022/23 $34,740 Yes21620 8 Riverside 215 R19.5 25 Pavement Planning 2026/27 Yes19392 8 Riverside 215 R31.0 40.5 Pavement Planning 2025/26 Yes21492 8 Riverside 215 R36.600 R37.200 Safety Improvements Post-Planning 2020/21 $8,77313447 8 Riverside 215 R9.000 R16.000 Sustainability Post-Planning 2019/20 $11,29819729 8 Riverside 243 0 29.7 Pavement Post-Planning 2023/24 $26,214 Yes20095 8 Riverside 5711 Various Various Facilities Planning 2024/2522365 8 Riverside Various Various Various Major Damage - Emergency Opening Post-Planning 2019/20 $5,75020185 8 Riverside Various Various Various Mobility - TMS Post-Planning 2022/23 $12,120 Yes21663 8 San Bernardino 2 6.2 6.2 Mobility - TMS Planning 2025/26 Yes20172 8 San Bernardino 10 0 33.3 Mobility - TMS Planning 2024/25 Yes21952 8 San Bernardino 10 9.9 20 Pavement Planning 2028/29 Yes21905 8 San Bernardino 10 16 20.2 Safety Improvements Post-Planning 2021/22 $3,37122217 8 San Bernardino 10 30.9 31 Major Damage - Emergency Opening Post-Planning 2019/20 $1,10013414 8 San Bernardino 10 34.2 R39.100 Roadside Post-Planning 2019/20 $3,08616652 8 San Bernardino 10 R22.400 Bridge Post-Planning 2021/22 $3,589 Yes22132 8 San Bernardino 15 0 37.37 Safety - Collision Reduction Planning 2025/2622070 8 San Bernardino 15 1.738 1.738 Safety Planning 2027/2819683 8 San Bernardino 15 2.4 Bridge Post-Planning 2023/24 $20,342 Yes16102 8 San Bernardino 15 6.7 R22.300 Roadside Post-Planning 2022/23 $13,68816314 8 San Bernardino 15 7.4 Facilities Post-Planning 2019/20 $26,13521926 8 San Bernardino 15 15.9 16.07 Bridge Planning 2024/25 Yes22257 8 San Bernardino 15 31.8 Major Damage - Emergency Opening Post-Planning 2019/20 $2,45021667 8 San Bernardino 15 37.5 46 Pavement Planning 2028/29 Yes17118 8 San Bernardino 15 64.6 75.3 Pavement Post-Planning 2019/20 $30,718 Yes20071 8 San Bernardino 15 120 144 Pavement Planning 2025/26 Yes19175 8 San Bernardino 15 160.9 161.5 Roadside Post-Planning 2023/24 $18,27521939 8 San Bernardino 15 166.83 166.83 Bridge Planning 2024/25 Yes20908 8 San Bernardino 15 174.3 175.7 Safety Improvements Post-Planning 2020/21 $2,58321810 8 San Bernardino 15 177 186.23 Pavement Planning 2028/29 Yes17266 8 San Bernardino 15 R110.000 Major Damage - Permanent Restoration Post-Planning 2019/20 $4,80117498 8 San Bernardino 15 R137.2 R156.0 Pavement Planning 2028/29 Yes20855 8 San Bernardino 15 R21.500 R22.000 Safety Improvements Post-Planning 2020/21 $8,37018004 8 San Bernardino 15 R25.500 R29.000 Mobility - WIM Scales & CVEFs Post-Planning 2021/22 $21,34017117 8 San Bernardino 15 R28.600 37.5 Pavement Post-Planning 2019/20 $181,821 Yes13795 8 San Bernardino 15 R96.100 R124.300 Safety - Collision Reduction Post-Planning 2021/22 $20,08821670 8 San Bernardino 18 0 17.8 Safety Planning 2027/2820076 8 San Bernardino 18 17.8 31.65 Pavement Planning 2027/28 Yes22224 8 San Bernardino 18 17.9 19.1 Major Damage - Emergency Opening Post-Planning 2019/20 $1,09519179 8 San Bernardino 18 20.6 20.9 Major Damage - Permanent Restoration Post-Planning 2021/22 $11,76220077 8 San Bernardino 18 31.65 49.3 Pavement Planning 2027/28 Yes

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 44

Page 48: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

19097 8 San Bernardino 18 34 44.3 Drainage Post-Planning 2023/24 $9,621 Yes13833 8 San Bernardino 18 44.3 68.5 Drainage Post-Planning 2021/22 $10,609 Yes21802 8 San Bernardino 18 57 66.9 Pavement Planning 2025/26 Yes22237 8 San Bernardino 18 65.3 69 Safety Improvements Planning 2022/2321619 8 San Bernardino 18 66.9 90.9 Pavement Planning 2024/25 Yes19081 8 San Bernardino 18 90.9 R96.600 Pavement Post-Planning 2023/24 $22,686 Yes22291 8 San Bernardino 18 95.35 95.35 Bridge Planning 2026/27 Yes13956 8 San Bernardino 18 97 99.5 Safety Improvements Post-Planning 2019/20 $13,59916691 8 San Bernardino 18 100.9 115.9 Pavement Post-Planning 2020/21 $21,102 Yes16014 8 San Bernardino 18 T8.000 R17.800 Drainage Post-Planning 2021/22 $8,612 Yes21635 8 San Bernardino 38 0 1.3 Pavement Planning 2024/25 Yes21636 8 San Bernardino 38 1.3 4.1 Pavement Planning 2025/26 Yes22157 8 San Bernardino 38 7.15 35.29 Drainage Planning 2028/29 Yes22133 8 San Bernardino 38 7.29 39.66 Safety - Collision Reduction Planning 2027/2816015 8 San Bernardino 38 47.5 59.4 Drainage Post-Planning 2019/20 $10,629 Yes19693 8 San Bernardino 40 0 R15.000 Pavement Post-Planning 2023/24 $48,439 Yes17997 8 San Bernardino 40 0.4 Major Damage - Permanent Restoration Post-Planning 2019/20 $9,12619176 8 San Bernardino 40 27.9 28.8 Roadside Planning 2026/2717458 8 San Bernardino 40 101.3 Bridge Post-Planning 2021/22 $15,571 Yes11280 8 San Bernardino 40 153.9 154.7 Bridge Post-Planning 2024/25 $44,141 Yes16942 8 San Bernardino 40 R100.000 R125.000 Safety - Collision Reduction Post-Planning 2020/21 $40,10621940 8 San Bernardino 40 R104.89 R104.89 Bridge Planning 2025/26 Yes21456 8 San Bernardino 40 R105.100 R105.900 Roadside Post-Planning 2022/23 $41,69617037 8 San Bernardino 40 R125.000 R154.600 Safety - Collision Reduction Post-Planning 2019/20 $36,85413796 8 San Bernardino 40 R25.000 R50.000 Safety - Collision Reduction Post-Planning 2021/22 $39,26314067 8 San Bernardino 40 R28.900 Mobility - WIM Scales & CVEFs Post-Planning 2020/21 $3,74620098 8 San Bernardino 60 0 R1.6 Roadside Planning 2026/2716951 8 San Bernardino 60 R0.000 R9.900 Safety Post-Planning 2019/20 $2,29719809 8 San Bernardino 60 R1.400 Bridge Post-Planning 2021/22 $18,762 Yes20882 8 San Bernardino 60 R7.300 R10.000 Mobility - Operational Improvements Post-Planning 2019/20 $42,52822369 8 San Bernardino 62 8.07 141.31 Drainage Planning 2026/27 Yes21855 8 San Bernardino 62 15.3 28.9 Safety Improvements Post-Planning 2021/22 $2,98421956 8 San Bernardino 62 29.3 40 Pavement Planning 2027/28 Yes21511 8 San Bernardino 62 94 106 Pavement Planning 2027/28 Yes22226 8 San Bernardino 62 95 96 Major Damage - Emergency Opening Post-Planning 2019/20 $89517061 8 San Bernardino 62 124 142 Major Damage - Permanent Restoration Post-Planning 2019/20 $12,98221149 8 San Bernardino 66 20.1 20.8 Mobility - ADA Planning 2025/2616693 8 San Bernardino 66 20.1 23.2 Pavement Post-Planning 2023/24 $17,904 Yes14065 8 San Bernardino 66 21.3 Bridge Post-Planning 2023/24 $13,429 Yes16104 8 San Bernardino 71 R0.000 R8.500 Mobility - TMS Post-Planning 2019/20 $14,932 Yes19904 8 San Bernardino 83 0 6 Pavement Planning 2025/26 Yes21642 8 San Bernardino 83 5.9 11.1 Safety Improvements Planning 2021/2221458 8 San Bernardino 83 6 7.6 Pavement Planning 2024/25 Yes19074 8 San Bernardino 83 7.6 11.1 Pavement Post-Planning 2023/24 $40,559 Yes16318 8 San Bernardino 95 9.6 33.6 Safety Improvements Post-Planning 2019/20 $3,23022479 8 San Bernardino 95 9.7 33.6 Pavement Post-Planning 2019/20 $27,953 Yes16340 8 San Bernardino 95 64.5 80.5 Pavement Post-Planning 2019/20 $8,744 Yes21666 8 San Bernardino 95 R57.208 64.5 Pavement Planning 2024/25 Yes16963 8 San Bernardino 127 10.5 37.7 Pavement Planning 2024/25 Yes

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 45

Page 49: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

18662 8 San Bernardino 138 0 2.3 Safety Improvements Post-Planning 2021/22 $10,36122154 8 San Bernardino 138 17.55 19.04 Drainage Planning 2027/28 Yes22156 8 San Bernardino 138 36.82 36.82 Drainage Planning 2028/29 Yes18663 8 San Bernardino 138 R14.800 R15.100 Safety Improvements Post-Planning 2021/22 $6,20822155 8 San Bernardino 173 0.78 23.04 Drainage Planning 2027/28 Yes17930 8 San Bernardino 173 18.7 Major Damage - Permanent Restoration Post-Planning 2019/20 $10,68621861 8 San Bernardino 178 5.5 R12.000 Major Damage - Emergency Opening Post-Planning 2019/20 $4,38021927 8 San Bernardino 210 20.82 20.82 Bridge Planning 2025/26 Yes16302 8 San Bernardino 215 2.4 3 Bridge Post-Planning 2019/20 $31,343 Yes19686 8 San Bernardino 215 3.6 6 Pavement Post-Planning 2022/23 $19,749 Yes17923 8 San Bernardino 215 4 17.8 Mobility - TMS Post-Planning 2019/20 $12,433 Yes18664 8 San Bernardino 215 4.5 5.8 Safety Improvements Post-Planning 2019/20 $11,11920097 8 San Bernardino 215 10 12 Roadside Planning 2027/2819062 8 San Bernardino 247 0 23 Pavement Post-Planning 2023/24 $26,276 Yes16317 8 San Bernardino 247 20.3 76.8 Safety Improvements Post-Planning 2019/20 $3,89319908 8 San Bernardino 247 73.2 78.096 Pavement Planning 2025/26 Yes21645 8 San Bernardino 259 1.1 1.2 Safety Improvements Post-Planning 2020/21 $1,66615939 8 San Bernardino 395 R4.000 49 Pavement Post-Planning 2022/23 $41,511 Yes20094 8 San Bernardino 5727 Various Various Facilities Planning 2027/2820175 8 San Bernardino Various Various Various Mobility - TMS Post-Planning 2022/23 $17,067 Yes20176 8 San Bernardino Various Various Various Mobility - TMS Post-Planning 2022/23 $19,931 Yes20184 8 San Bernardino Various Various Various Mobility - TMS Post-Planning 2022/23 $21,883 Yes19738 8 San Bernardino Various Various Various Safety - Collision Reduction Post-Planning 2023/24 $14,77421125 9 Inyo 127 21 34.5 Pavement Post-Planning 2022/23 $20,529 Yes16628 9 Inyo 168 16 17.7 Safety - Collision Reduction Post-Planning 2019/20 $2,70420431 9 Inyo 168 R0 17.5 Pavement Planning 2028/29 Yes13580 9 Inyo 178 43.4 Drainage Post-Planning 2019/20 $4,590 Yes20354 9 Inyo 190 96.8 111.6 Pavement Planning 2027/28 Yes22242 9 Inyo 190 111.6 126.1 Pavement Planning 2028/29 Yes16315 9 Inyo 395 37.6 Advance Mitigation Post-Planning 2021/22 $3,70119023 9 Inyo 395 56.8 R57.400 Mobility - ADA Post-Planning 2023/24 $3,39321136 9 Inyo 395 57.9 R59.0 Pavement Planning 2025/26 Yes21143 9 Inyo 395 73.9 Facilities Post-Planning 2022/23 $5,70018995 9 Inyo 395 91.6 100.8 Pavement Post-Planning 2023/24 $40,815 Yes18994 9 Inyo 395 115 117.8 Pavement Post-Planning 2022/23 $20,114 Yes19022 9 Inyo 395 115 Facilities Post-Planning 2023/24 $11,43616268 9 Inyo 395 117.3 117.8 Mobility - ADA Post-Planning 2023/24 $25,00918991 9 Inyo 395 R65.000 76 Pavement Post-Planning 2023/24 $53,674 Yes19012 9 Kern 14 46.2 52.8 Pavement Post-Planning 2022/23 $8,707 Yes21985 9 Kern 14 56.3 56.4 Bridge Planning 2028/29 Yes19004 9 Kern 14 R12.600 16.7 Pavement Post-Planning 2026/27 $47,558 Yes18060 9 Kern 14 R4.700 R12.600 Pavement Post-Planning 2019/20 $73,615 Yes20339 9 Kern 58 77.2 R88.600 Pavement Post-Planning 2024/25 $165,515 Yes22129 9 Kern 58 81 81.1 Mobility - WIM Scales & CVEFs Planning 2028/2921986 9 Kern 58 R138.75 R139.0 Roadside Planning 2028/2919001 9 Kern 58 R90.5 R100.0 Pavement Planning 2028/29 Yes17528 9 Kern 58 R92.000 Facilities Post-Planning 2021/22 $16,78321138 9 Kern 58 R99.8 R107.7 Pavement Planning 2026/27 Yes20351 9 Kern 178 88.6 104.6 Pavement Planning 2027/28 Yes

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 46

Page 50: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

17790 9 Kern 178 Various Various Safety - Collision Reduction Post-Planning 2020/21 $4,56217663 9 Kern 202 R4.700 R5.100 Safety - Collision Reduction Post-Planning 2021/22 $5,04420430 9 Kern 202 R5.0 12.093 Pavement Planning 2028/29 Yes20347 9 Mono 6 R16.9 26.5 Pavement Planning 2025/26 Yes22251 9 Mono 182 5.5 12.6 Pavement Planning 2028/29 Yes20357 9 Mono 203 L0.0 R8.671 Pavement Planning 2026/27 Yes13540 9 Mono 395 6.9 9.6 Safety - Collision Reduction Post-Planning 2020/21 $22,45118987 9 Mono 395 50.6 55.7 Mobility - ADA Post-Planning 2023/24 $23,63519018 9 Mono 395 55.5 58.2 Pavement Post-Planning 2022/23 $10,195 Yes16629 9 Mono 395 58.2 60.2 Safety - Collision Reduction Post-Planning 2021/22 $9,37618974 9 Mono 395 76 80.6 Pavement Post-Planning 2025/26 $15,588 Yes21131 9 Mono 395 84.1 93.4 Pavement Planning 2028/29 Yes16630 9 Mono 395 91.6 93.4 Safety - Collision Reduction Post-Planning 2022/23 $20,06021830 9 Mono 395 93.81 93.81 Facilities Planning 2027/2816632 9 Mono 395 R2.200 R69.900 Roadside Post-Planning 2020/21 $4,92519005 9 Mono 395 R9.800 R12.600 Pavement Post-Planning 2023/24 $13,543 Yes16729 9 Mono 395 Various Various Advance Mitigation Post-Planning 2019/20 $3,55021934 10 Alpine 4 15.006 31.55 Drainage Planning 2028/29 Yes17357 10 Alpine 4 26.8 31.2 Drainage Post-Planning 2024/25 $7,751 Yes21933 10 Alpine 4 R0 15 Drainage Planning 2025/26 Yes18344 10 Alpine 4 R0.000 31.7 Pavement Post-Planning 2023/24 $47,947 Yes9297 10 Alpine 4 Various Various Drainage Post-Planning 2019/20 $7,311 Yes

17279 10 Alpine 88 1.9 Facilities Post-Planning 2023/24 $32,55118755 10 Alpine 88 2 25 Mobility - TMS Post-Planning 2023/24 $33,608 Yes22524 10 Alpine 88 25.1 Major Damage - Emergency Opening Post-Planning 2019/20 $4809299 10 Alpine 88 Various Various Drainage Post-Planning 2019/20 $8,079 Yes

13803 10 Alpine 88 Various Various Bridge Post-Planning 2019/20 $12,328 Yes19026 10 Amador 49 0 R7.000 Pavement Planning 2028/29 Yes16946 10 Amador 49 Various Various Bridge Post-Planning 2021/22 $10,102 Yes11366 10 Amador 88 5.5 14.3 Pavement Post-Planning 2023/24 $16,108 Yes13623 10 Amador 88 7.9 R65.800 Safety - Collision Reduction Post-Planning 2020/21 $6,06421909 10 Amador 88 23.8 23.8 Mobility - TMS Planning 2028/29 Yes19003 10 Amador 88 R54.700 R60.800 Pavement Post-Planning 2023/24 $25,044 Yes22525 10 Amador Various Various Various Major Damage - Emergency Opening Post-Planning 2019/20 $1,74022353 10 Calaveras 4 16.05 25 Pavement Planning 2028/29 Yes18762 10 Calaveras 4 16.1 Bridge Post-Planning 2021/22 $8,078 Yes22323 10 Calaveras 4 25 R65.865 Pavement Planning 2028/29 Yes13741 10 Calaveras 4 29.2 29.4 Mobility - Operational Improvements Post-Planning 2019/20 $5,69218104 10 Calaveras 4 32.4 37.4 Drainage Post-Planning 2023/24 $6,689 Yes21913 10 Calaveras 4 R0.0 13.44 Pavement Planning 2024/25 Yes20805 10 Calaveras 4 R14.700 16.1 Pavement Post-Planning 2020/21 $10,325 Yes21402 10 Calaveras 12 10.1 10.3 Safety Improvements Post-Planning 2023/24 $9,52513804 10 Calaveras 12 17.3 Bridge Post-Planning 2023/24 $14,250 Yes21691 10 Calaveras 26 18.069 18.069 Safety Improvements Planning 2023/2413450 10 Calaveras 26 21.4 38.3 Major Damage - Permanent Restoration Post-Planning 2021/22 $18,93916769 10 Calaveras 26 30 Bridge Post-Planning 2021/22 $10,103 Yes19821 10 Calaveras 49 7.4 9.5 Mobility - ADA Post-Planning 2023/24 $10,19418336 10 Calaveras 49 8.5 9.1 Mobility - Operational Improvements Post-Planning 2024/25 $18,66518752 10 Calaveras 49 18.7 20.2 Mobility - ADA Post-Planning 2023/24 $16,640

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 47

Page 51: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

13682 10 Mariposa 49 0.3 18.5 Pavement Post-Planning 2019/20 $20,562 Yes22112 10 Mariposa 49 16.7 16.7 Mobility - TMS Planning 2025/26 Yes20981 10 Mariposa 49 22.42 48.64 Drainage Planning 2027/28 Yes15687 10 Mariposa 140 12 22.1 Pavement Post-Planning 2021/22 $23,577 Yes13542 10 Mariposa 140 21.2 21.8 Safety - Collision Reduction Post-Planning 2019/20 $3,81713681 10 Mariposa 140 25.3 51.8 Pavement Post-Planning 2021/22 $29,087 Yes17863 10 Mariposa 140 32.2 Major Damage - Protective Betterments Post-Planning 2020/21 $4,87522194 10 Mariposa 140 33.4 37.1 Major Damage - Emergency Opening Post-Planning 2019/20 $3,62014092 10 Mariposa 140 37 43.3 Bridge Post-Planning 2025/26 $41,060 Yes11180 10 Mariposa 140 42 42.7 Major Damage - Permanent Restoration Post-Planning 2020/21 $203,10022526 10 Mariposa 140 42 42.7 Major Damage - Permanent Restoration Post-Planning 2020/21 $35,00019002 10 Merced 5 0 32.477 Pavement Planning 2027/28 Yes17444 10 Merced 5 0.5 0.8 Roadside Post-Planning 2020/21 $30,97317135 10 Merced 5 Various Various Bridge Post-Planning 2020/21 $7,207 Yes18751 10 Merced 33 R0.400 1.5 Mobility - ADA Post-Planning 2022/23 $8,52718780 10 Merced 59 12.1 16.22 Pavement Planning 2025/26 Yes21562 10 Merced 59 13.6 Safety Improvements Post-Planning 2023/24 $10,14019038 10 Merced 59 R0.000 12.1 Pavement Post-Planning 2023/24 $27,554 Yes21959 10 Merced 99 0.378 R12.734 Safety Improvements Planning 2023/2419222 10 Merced 99 0.6 0.6 Mobility - WIM Scales & CVEFs Planning 2024/2521979 10 Merced 99 10.6 37.25 Mobility - TMS Planning 2028/29 Yes21646 10 Merced 99 20.1 24.3 Pavement Post-Planning 2021/22 $3,205 Yes13276 10 Merced 99 24.5 28.2 Safety - Collision Reduction Post-Planning 2022/23 $5,17813813 10 Merced 99 R12.600 17.8 Pavement Post-Planning 2019/20 $65,917 Yes11242 10 Merced 140 0 42.1 Safety - Collision Reduction Post-Planning 2019/20 $9,20513541 10 Merced 140 2.3 49 Safety - Collision Reduction Post-Planning 2021/22 $9,11318337 10 Merced 140 16 16.5 Mobility - Operational Improvements Post-Planning 2023/24 $9,87122376 10 Merced 140 43.7 43.7 Safety Improvements Planning 2020/2116612 10 Merced 152 11.3 Mobility - Operational Improvements Post-Planning 2021/22 $4,52918330 10 Merced 152 18.5 23.02 Pavement Planning 2025/26 Yes20972 10 Merced 152 21 Safety Improvements Post-Planning 2020/21 $4,04121524 10 Merced 152 26 R40.949 Pavement Planning 2028/29 Yes16545 10 Merced 152 26.3 R40.700 Safety - Collision Reduction Post-Planning 2020/21 $4,95719000 10 Merced 152 R 0.000 13.84 Pavement Planning 2027/28 Yes21958 10 Merced 152 R10.1 13.82 Safety Improvements Planning 2023/2415691 10 Merced 152 Various Various Drainage Post-Planning 2019/20 $4,173 Yes13559 10 Merced 152 Various Various Bridge Post-Planning 2022/23 $22,582 Yes13597 10 Merced 165 8.5 10.6 Mobility - ADA Post-Planning 2019/20 $7,30218789 10 Merced 165 11.7 Mobility - Operational Improvements Post-Planning 2023/24 $8,46022193 10 Merced 165 32.9 32.9 Safety Improvements Planning 2023/2417367 10 San Joaquin 4 4.1 4.9 Safety Improvements Post-Planning 2019/20 $13,50717214 10 San Joaquin 4 5.7 T13.47 Pavement Planning 2025/26 Yes18779 10 San Joaquin 4 14.2 Bridge Post-Planning 2025/26 $12,901 Yes22107 10 San Joaquin 4 15.99 R18.79 Mobility - TMS Planning 2025/26 Yes18329 10 San Joaquin 4 19.5 38.1 Pavement Post-Planning 2023/24 $48,084 Yes22250 10 San Joaquin 4 20.7 20.7 Safety Improvements Planning 2023/2417442 10 San Joaquin 4 R16.000 R19.400 Mobility - TMS Post-Planning 2022/23 $58,796 Yes13692 10 San Joaquin 4 T15.500 R16.700 Pavement Post-Planning 2019/20 $43,065 Yes16774 10 San Joaquin 4 Various Various Bridge Post-Planning 2019/20 $9,163 Yes

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 48

Page 52: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

18749 10 San Joaquin 4 Various Various Bridge Post-Planning 2023/24 $12,004 Yes13834 10 San Joaquin 5 3.5 49 Drainage Post-Planning 2019/20 $4,141 Yes21903 10 San Joaquin 5 7.4 7.4 Mobility - WIM Scales & CVEFs Planning 2024/2521061 10 San Joaquin 5 10.6 Bridge Post-Planning 2019/20 $6,733 Yes13295 10 San Joaquin 5 26.1 26.5 Bridge Post-Planning 2020/21 $22,971 Yes22176 10 San Joaquin 5 26.1 26.5 Bridge Post-Planning 2024/25 $250,000 Yes22177 10 San Joaquin 5 26.1 26.5 Bridge Post-Planning 2026/27 $325,000 Yes21942 10 San Joaquin 5 26.2 29.4 Sustainability Planning 2028/2913629 10 San Joaquin 5 26.5 27 Bridge Post-Planning 2019/20 $8,096 Yes22510 10 San Joaquin 5 28.292 28.292 Bridge Planning 2028/29 Yes21937 10 San Joaquin 5 28.34 29.56 Roadside Planning 2027/2816734 10 San Joaquin 5 32.5 49.8 Pavement Post-Planning 2022/23 $98,594 Yes18746 10 San Joaquin 5 33.4 Mobility - TMS Post-Planning 2019/20 $2,570 Yes17307 10 San Joaquin 5 R12.100 33 Mobility - TMS Post-Planning 2023/24 $13,230 Yes21978 10 San Joaquin 5 R12.361 29.56 Mobility - TMS Planning 2027/28 Yes18073 10 San Joaquin 5 R21.400 27.9 Mobility - TMS Post-Planning 2021/22 $16,263 Yes9263 10 San Joaquin 5 Various Various Bridge Post-Planning 2019/20 $13,505 Yes

16635 10 San Joaquin 5 Various Various Safety - Collision Reduction Post-Planning 2019/20 $3,40118408 10 San Joaquin 12 14.9 17.437 Mobility - ADA Planning 2025/2617950 10 San Joaquin 12 17.4 18.1 Mobility - ADA Post-Planning 2021/22 $5,15319027 10 San Joaquin 12 M5.000 27.6 Pavement Planning 2028/29 Yes17508 10 San Joaquin 12 R4.400 Bridge Post-Planning 2020/21 $6,840 Yes22191 10 San Joaquin 12 Various Various Major Damage - Emergency Opening Post-Planning 2019/20 $4,82017099 10 San Joaquin 26 1.1 Bridge Post-Planning 2020/21 $17,202 Yes20773 10 San Joaquin 26 13.1 R13.800 Mobility - Operational Improvements Post-Planning 2019/20 $3,86519020 10 San Joaquin 88 5.1 16.4 Pavement Post-Planning 2023/24 $35,941 Yes9298 10 San Joaquin 88 13.7 14 Drainage Post-Planning 2020/21 $8,256 Yes

16621 10 San Joaquin 88 22.1 Safety Improvements Post-Planning 2019/20 $9,84418914 10 San Joaquin 99 0 7 Roadside Post-Planning 2022/23 $4,33920957 10 San Joaquin 99 4.6 5.3 Mobility - Operational Improvements Post-Planning 2021/22 $29,01919220 10 San Joaquin 99 10 14 Pavement Planning 2027/28 Yes13731 10 San Joaquin 99 14.4 29.4 Roadside Post-Planning 2020/21 $4,37513855 10 San Joaquin 99 16.8 17.6 Bridge Post-Planning 2019/20 $12,492 Yes17145 10 San Joaquin 99 18.5 23.21 Pavement Planning 2028/29 Yes16964 10 San Joaquin 99 19.7 33.6 Drainage Post-Planning 2021/22 $8,746 Yes18807 10 San Joaquin 99 28.2 31.7 Roadside Post-Planning 2022/23 $8,22718811 10 San Joaquin 99 28.7 31.7 Roadside Post-Planning 2022/23 $5,77818275 10 San Joaquin 99 Various Various Mobility - TMS Post-Planning 2019/20 $13,778 Yes21502 10 San Joaquin 120 11.6 Safety Improvements Post-Planning 2023/24 $16,20421957 10 San Joaquin 120 R0.493 T6.61 Safety Improvements Planning 2023/2416180 10 San Joaquin 120 R0.600 R6.100 Mobility - TMS Post-Planning 2020/21 $7,571 Yes18276 10 San Joaquin 120 Various Various Mobility - TMS Post-Planning 2020/21 $6,306 Yes18410 10 San Joaquin 205 L0.000 R13.200 Safety - Collision Reduction Post-Planning 2022/23 $8,99321690 10 San Joaquin 205 R12.65 R12.95 Safety Improvements Planning 2021/2214039 10 San Joaquin 205 R4.500 R9.000 Mobility - TMS Post-Planning 2021/22 $39,421 Yes21300 10 Stanislaus 4 7.28 7.28 Bridge Planning 2025/26 Yes21912 10 Stanislaus 5 0 28.055 Pavement Planning 2028/29 Yes18750 10 Stanislaus 5 10.3 25.5 Bridge Post-Planning 2022/23 $14,611 Yes14034 10 Stanislaus 5 27 27.4 Roadside Post-Planning 2022/23 $26,930

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 49

Page 53: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

21249 10 Stanislaus 33 0.49 25.7 Drainage Planning 2027/28 Yes22109 10 Stanislaus 99 15.67 20.24 Mobility - TMS Planning 2028/29 Yes18744 10 Stanislaus 99 M18.5 R20.4 Safety - Collision Reduction Planning 2025/2616542 10 Stanislaus 99 R10.000 R16.800 Drainage Post-Planning 2020/21 $9,957 Yes15693 10 Stanislaus 99 R13.400 R13.800 Mobility - Operational Improvements Post-Planning 2019/20 $8,69913417 10 Stanislaus 99 R13.900 R17.500 Roadside Post-Planning 2019/20 $5,93518814 10 Stanislaus 99 R14.900 Sustainability Post-Planning 2023/24 $3,14417280 10 Stanislaus 99 R16.81 R16.81 Facilities Planning 2025/2618797 10 Stanislaus 99 R4.500 R23.300 Mobility - TMS Post-Planning 2023/24 $14,800 Yes22110 10 Stanislaus 108 23.08 38.24 Mobility - TMS Planning 2027/28 Yes21692 10 Stanislaus 108 33.38 33.38 Safety Improvements Planning 2023/2417948 10 Stanislaus 132 27.2 28 Mobility - ADA Post-Planning 2021/22 $6,39922370 10 Tuolumne 108 5 13.3 Pavement Planning 2026/27 Yes11347 10 Tuolumne 108 L1.300 53.3 Safety - Collision Reduction Post-Planning 2021/22 $8,17511306 10 Tuolumne 108 R18.900 38.8 Pavement Post-Planning 2020/21 $20,353 Yes17507 10 Tuolumne 120 R3.400 R39.800 Drainage Post-Planning 2023/24 $6,944 Yes22311 11 Imperial 7 3.8 Major Damage - Emergency Opening Post-Planning 2019/20 $50022103 11 Imperial 8 R1.45 R19.03 Drainage Planning 2026/27 Yes22113 11 Imperial 8 R31.2 R31.2 Roadside Planning 2026/2713842 11 Imperial 8 R32.400 R46.100 Roadside Post-Planning 2021/22 $3,61122094 11 Imperial 8 R46.05 R48.78 Bridge Planning 2027/28 Yes20251 11 Imperial 8 R96.800 Bridge Post-Planning 2020/21 $5,931 Yes19308 11 Imperial 8 Various Various Bridge Post-Planning 2021/22 $15,000 Yes22162 11 Imperial 78 50.2 61.8 Pavement Planning 2027/28 Yes21647 11 Imperial 78 72.1 73.8 Drainage Post-Planning 2019/20 $2,793 Yes21789 11 Imperial 86 5.1 8.8 Relinquishment Planning 2025/2620220 11 Imperial 86 R0.0 5.1 Relinquishment Planning 2025/2622522 11 Imperial 86 R23.000 Major Damage - Emergency Opening Post-Planning 2019/20 $2,70020295 11 Imperial 98 30.8 39.7 Pavement Planning 2027/28 Yes17936 11 Imperial 98 32.1 32.5 Mobility - ADA Post-Planning 2019/20 $3,62121310 11 Imperial 98 39.6 45.2 Pavement Post-Planning 2019/20 $9,553 Yes22314 11 Imperial 111 0.2 1.2 Relinquishment Planning 2024/2522310 11 Imperial 111 45.2 Major Damage - Emergency Opening Post-Planning 2019/20 $14,42019299 11 Imperial 111 R3.200 45.4 Safety - Collision Reduction Post-Planning 2023/24 $15,90117379 11 Imperial Various Various Various Safety - Collision Reduction Post-Planning 2019/20 $3,12016038 11 San Diego 5 0.4 72.4 Safety Post-Planning 2019/20 $3,36721779 11 San Diego 5 22.26 22.26 Bridge Planning 2025/26 Yes22105 11 San Diego 5 39.34 64.8 Drainage Planning 2028/29 Yes17856 11 San Diego 5 R0.300 R15.200 Mobility - TMS Post-Planning 2020/21 $27,207 Yes19165 11 San Diego 5 R0.300 R36.000 Pavement Post-Planning 2022/23 $100,578 Yes21648 11 San Diego 5 R0.300 R5.000 Roadside Post-Planning 2020/21 $15,99921788 11 San Diego 5 R10.72 R30.64 Bridge Planning 2024/25 Yes16868 11 San Diego 5 R13.500 R14.400 Safety Improvements Post-Planning 2019/20 $3,68517546 11 San Diego 5 R30.000 R34.300 Safety - Collision Reduction Post-Planning 2020/21 $6,31722521 11 San Diego 5 R31.800 Major Damage - Emergency Opening Post-Planning 2019/20 $2,00016960 11 San Diego 5 R31.800 R32.200 Sustainability Post-Planning 2020/21 $3,3409340 11 San Diego 5 R34.900 R35.100 Sustainability Post-Planning 2019/20 $3,344

19301 11 San Diego 5 R42.200 R47.100 Mobility - Operational Improvements Post-Planning 2022/23 $23,25818917 11 San Diego 5 R47.000 R48.000 Mobility - Operational Improvements Post-Planning 2021/22 $8,026

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 50

Page 54: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

21783 11 San Diego 5 R49.28 R52.32 Mobility - ADA Planning 2024/2518422 11 San Diego 5 R55.600 R70.000 Safety - Collision Reduction Post-Planning 2020/21 $8,49320228 11 San Diego 5 R67.2 R67.2 Mobility - WIM Scales & CVEFs Planning 2024/2521816 11 San Diego 5 Various Various Mobility - Operational Improvements Planning 2026/2722149 11 San Diego 8 0.7 2.7 Pavement Planning 2028/29 Yes16945 11 San Diego 8 2.2 Bridge Post-Planning 2020/21 $4,665 Yes13767 11 San Diego 8 3 8.5 Mobility - ADA Post-Planning 2021/22 $3,15121435 11 San Diego 8 5.6 5.6 Safety Improvements Planning 2020/2116903 11 San Diego 8 5.9 11.5 Roadside Post-Planning 2019/20 $6,82320169 11 San Diego 8 9.6 R20 Mobility - ADA Planning 2028/2921059 11 San Diego 8 12.9 16.5 Bridge Post-Planning 2021/22 $30,449 Yes21828 11 San Diego 8 13.4 R20.400 Roadside Post-Planning 2020/21 $8,12422093 11 San Diego 8 22.3 37.35 Drainage Planning 2027/28 Yes22092 11 San Diego 8 39.66 75.86 Drainage Planning 2027/28 Yes16020 11 San Diego 8 L0.700 R23.000 Drainage Post-Planning 2019/20 $13,230 Yes22095 11 San Diego 8 R0.4 R21.7 Drainage Planning 2028/29 Yes20297 11 San Diego 8 R0.4 R39.0 Mobility - TMS Planning 2025/26 Yes22120 11 San Diego 8 R21.6 R25.9 Pavement Planning 2027/28 Yes16848 11 San Diego 8 R23.000 R61.300 Drainage Post-Planning 2020/21 $13,393 Yes22466 11 San Diego 8 R23.600 Major Damage - Emergency Opening Post-Planning 2019/20 $3,50021351 11 San Diego 8 R25.100 R40.100 Drainage Post-Planning 2019/20 $7,957 Yes17021 11 San Diego 8 R31.800 R41.700 Pavement Post-Planning 2021/22 $53,459 Yes20241 11 San Diego 8 R67.58 R67.58 Facilities Planning 2025/2616760 11 San Diego 8 Various Various Safety - Collision Reduction Post-Planning 2020/21 $6,71820305 11 San Diego 15 0 30 Mobility - ADA Planning 2026/2722086 11 San Diego 15 0.37 0.87 Sustainability Planning 2027/2818973 11 San Diego 15 0.4 R10.600 Drainage Post-Planning 2022/23 $34,456 Yes22090 11 San Diego 15 0.45 9.21 Drainage Planning 2026/27 Yes20253 11 San Diego 15 2.6 52.1 Pavement Planning 2026/27 Yes20473 11 San Diego 15 M17.94 R31.48 Pavement Planning 2028/29 Yes21784 11 San Diego 15 M18.1 M23.7 Mobility - ADA Planning 2025/2620229 11 San Diego 15 R31.300 R37.100 Pavement Post-Planning 2020/21 $74,860 Yes13733 11 San Diego 52 0.4 5.7 Roadside Post-Planning 2020/21 $6,66815786 11 San Diego 52 0.4 14.8 Safety - Collision Reduction Post-Planning 2019/20 $6,38022102 11 San Diego 52 0.87 15.82 Drainage Planning 2028/29 Yes19302 11 San Diego 52 5.1 8.7 Pavement Post-Planning 2021/22 $44,970 Yes16889 11 San Diego 54 0 6.4 Pavement Post-Planning 2021/22 $27,132 Yes20924 11 San Diego 54 T10.99 T14.21 Relinquishment Planning 2024/2520287 11 San Diego 54 T10.993 T14.2 Pavement Planning 2026/27 Yes21329 11 San Diego 56 0 2.9 Sustainability Planning 2024/2520292 11 San Diego 56 0 2.9 Pavement Planning 2025/26 Yes14077 11 San Diego 56 0.3 9.7 Roadside Post-Planning 2021/22 $3,34922106 11 San Diego 56 3.24 8.56 Drainage Planning 2028/29 Yes22101 11 San Diego 67 2.04 17.9 Drainage Planning 2028/29 Yes19306 11 San Diego 67 R4.100 15.9 Drainage Post-Planning 2023/24 $13,344 Yes21311 11 San Diego 67 R6.000 24.4 Pavement Post-Planning 2020/21 $35,909 Yes20774 11 San Diego 75 8.9 10 Relinquishment Post-Planning 2019/20 $5,10020171 11 San Diego 75 11.2 R20.2 Relinquishment Planning 2024/259235 11 San Diego 75 R20.500 R22.000 Bridge Post-Planning 2030/31 $599,993 Yes

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 51

Page 55: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

16862 11 San Diego 76 29.3 29.6 Sustainability Post-Planning 2026/27 $24,86220221 11 San Diego 76 R0.0 R8.1 Pavement Planning 2024/25 Yes19304 11 San Diego 76 R17.500 52.2 Drainage Post-Planning 2023/24 $21,259 Yes19298 11 San Diego 78 0 N17.700 Pavement Post-Planning 2022/23 $137,701 Yes16717 11 San Diego 78 0 R16.500 Drainage Post-Planning 2021/22 $14,181 Yes20306 11 San Diego 78 7.7 9 Mobility - Operational Improvements Planning 2025/2622098 11 San Diego 78 19.75 91.7 Drainage Planning 2028/29 Yes20475 11 San Diego 78 33.7 37.2 Pavement Planning 2024/25 Yes21780 11 San Diego 78 37.2 60 Pavement Planning 2024/25 Yes13581 11 San Diego 78 38.9 46.8 Drainage Post-Planning 2019/20 $5,821 Yes15952 11 San Diego 78 N17.600 R21.400 Pavement Post-Planning 2019/20 $29,648 Yes22302 11 San Diego 78 R21.3 33.8 Pavement Planning 2026/27 Yes22097 11 San Diego 79 0.99 10.96 Drainage Planning 2027/28 Yes20294 11 San Diego 79 11.2 44.7 Pavement Planning 2024/25 Yes19307 11 San Diego 79 20.3 53 Drainage Post-Planning 2023/24 $11,777 Yes20232 11 San Diego 79 L0.0 9.3 Pavement Planning 2027/28 Yes19300 11 San Diego 94 1.4 16 Drainage Post-Planning 2023/24 $78,101 Yes16257 11 San Diego 94 2.6 R11.100 Mobility - ADA Post-Planning 2020/21 $4,93513845 11 San Diego 94 4.4 7.3 Roadside Post-Planning 2020/21 $4,85619303 11 San Diego 94 15.3 65.3 Drainage Post-Planning 2023/24 $33,365 Yes16401 11 San Diego 94 R10.400 14.9 Pavement Post-Planning 2019/20 $16,115 Yes13419 11 San Diego 125 9.6 13.2 Roadside Post-Planning 2020/21 $8,02918983 11 San Diego 125 10 13 Pavement Post-Planning 2021/22 $72,449 Yes17031 11 San Diego 125 12.9 22.3 Pavement Post-Planning 2021/22 $42,277 Yes18718 11 San Diego 163 1.6 2.8 Bridge Post-Planning 2024/25 $20,723 Yes21376 11 San Diego 163 4.4 R10.800 Mobility - TMS Post-Planning 2022/23 $10,808 Yes19044 11 San Diego 805 0.1 14.6 Pavement Post-Planning 2023/24 $193,239 Yes17767 11 San Diego 805 0.6 3.3 Roadside Post-Planning 2020/21 $9,67017768 11 San Diego 805 3.4 5.1 Roadside Post-Planning 2020/21 $6,01313766 11 San Diego 805 3.5 13.9 Mobility - ADA Post-Planning 2021/22 $11,54719142 11 San Diego 805 14.6 23.7 Mobility - TMS Post-Planning 2022/23 $77,978 Yes13082 11 San Diego 805 20.7 23.5 Roadside Post-Planning 2020/21 $9,14219151 11 San Diego 805 23.7 28.5 Drainage Post-Planning 2023/24 $47,068 Yes22534 11 San Diego 805 25 Major Damage - Emergency Opening Post-Planning 2019/20 $1,80022119 11 San Diego 905 2.84 11.73 Pavement Planning 2028/29 Yes13430 11 San Diego Various Various Various Mobility - TMS Post-Planning 2019/20 $7,787 Yes13486 11 San Diego Various Various Various Mobility - ADA Post-Planning 2019/20 $8,36917378 11 San Diego Various Various Various Safety - Collision Reduction Post-Planning 2019/20 $6,25918137 11 San Diego Various Various Various Mobility - TMS Post-Planning 2019/20 $16,870 Yes22465 11 San Diego Various Various Various Major Damage - Emergency Opening Post-Planning 2019/20 $5,80011310 12 Orange 1 4.9 5.5 Pavement Post-Planning 2019/20 $12,076 Yes13768 12 Orange 1 5.5 7.9 Mobility - ADA Post-Planning 2020/21 $17,84421158 12 Orange 1 5.5 7.9 Pavement Post-Planning 2020/21 $3,985 Yes13601 12 Orange 1 7.9 10.5 Mobility - ADA Post-Planning 2019/20 $19,20521159 12 Orange 1 7.9 10.5 Pavement Post-Planning 2019/20 $4,305 Yes20767 12 Orange 1 8.4 33.719 Drainage Planning 2026/27 Yes20914 12 Orange 1 8.5 Safety Improvements Post-Planning 2022/23 $2,18313030 12 Orange 1 9.4 Bridge Post-Planning 2019/20 $6,681 Yes16712 12 Orange 1 12.2 13.3 Sustainability Post-Planning 2020/21 $3,227

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 52

Page 56: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

16817 12 Orange 1 13 33.6 Mobility - TMS Post-Planning 2020/21 $24,641 Yes20955 12 Orange 1 17.4 21.5 Pavement Post-Planning 2021/22 $19,930 Yes21682 12 Orange 1 18.59 33.45 Safety Improvements Planning 2023/2419237 12 Orange 1 20.4 23.7 Safety Improvements Post-Planning 2021/22 $2,98117818 12 Orange 1 27 29.9 Safety Improvements Post-Planning 2019/20 $2,76016716 12 Orange 1 29.9 33.7 Pavement Post-Planning 2020/21 $20,562 Yes20765 12 Orange 1 R0.100 R0.900 Roadside Post-Planning 2022/23 $8,00020918 12 Orange 5 0 1.6 Pavement Post-Planning 2021/22 $34,051 Yes20632 12 Orange 5 0 10 Pavement Planning 2025/26 Yes16025 12 Orange 5 3.3 Drainage Post-Planning 2019/20 $10,637 Yes19831 12 Orange 5 3.393 6.779 Safety Improvements Planning 2022/2321826 12 Orange 5 9.6 10.3 Safety Improvements Planning 2023/2422135 12 Orange 5 10 21.3 Pavement Planning 2024/25 Yes13589 12 Orange 5 10.3 10.4 Sustainability Post-Planning 2019/20 $3,41520792 12 Orange 5 21.3 30.3 Pavement Planning 2024/25 Yes19238 12 Orange 5 30.3 31.4 Safety Improvements Post-Planning 2021/22 $11,28521950 12 Orange 5 30.3 44.382 Pavement Planning 2025/26 Yes21393 12 Orange 5 33.7 35.4 Safety Improvements Planning 2022/239306 12 Orange 5 34.5 36.8 Roadside Post-Planning 2020/21 $3,000

19400 12 Orange 5 34.5 37.4 Safety Improvements Post-Planning 2019/20 $9,87221045 12 Orange 5 36.1 Safety Improvements Post-Planning 2021/22 $4,8199307 12 Orange 5 36.8 38.5 Roadside Post-Planning 2020/21 $3,0009308 12 Orange 5 38.5 41.6 Roadside Post-Planning 2021/22 $3,0009309 12 Orange 5 41.9 43.1 Roadside Post-Planning 2021/22 $3,000

22187 12 Orange 5 42.5 Major Damage - Emergency Opening Post-Planning 2019/20 $57322374 12 Orange 5 42.01L 42.01L Major Damage - Emergency Opening Planning 2019/2021746 12 Orange 5 R26.56 R26.56 Safety Improvements Planning 2021/2222184 12 Orange 5 R28.80 42.73 Safety Improvements Planning 2023/2421862 12 Orange 5 R29.1 44.38 Mobility - Operational Improvements Planning 2027/2820992 12 Orange 5 R29.200 Safety Improvements Post-Planning 2021/22 $2,20322220 12 Orange 5 R41.84 R41.84 Safety Improvements Planning 2023/2421858 12 Orange 5 Various Various Mobility - TMS Post-Planning 2019/20 $9,436 Yes21719 12 Orange 22 R0.75 R9.41 Safety Improvements Planning 2023/2418683 12 Orange 22 R1.200 Safety Improvements Post-Planning 2020/21 $1,83522262 12 Orange 22 R10.121 R10.121 Safety Improvements Planning 2023/2417816 12 Orange 22 R10.700 R12.700 Safety Improvements Post-Planning 2021/22 $11,14921718 12 Orange 22 R11.6 R12.5 Safety Improvements Planning 2023/2420786 12 Orange 22 R11.8 R13.164 Pavement Planning 2026/27 Yes20960 12 Orange 22 R5.500 Safety Improvements Post-Planning 2022/23 $1,94721637 12 Orange 22 R8.0 R12.8 Mobility - TMS Planning 2025/26 Yes17812 12 Orange 22 R9.400 R10.100 Safety Improvements Post-Planning 2019/20 $7,72320638 12 Orange 39 0 22.6 Pavement Planning 2027/28 Yes18682 12 Orange 39 9.7 Safety Improvements Post-Planning 2020/21 $2,23421068 12 Orange 39 11.6 12.9 Relinquishment Planning 2024/2521430 12 Orange 39 12.181 12.181 Safety Improvements Planning 2022/2313714 12 Orange 39 15.2 15.9 Drainage Post-Planning 2019/20 $4,569 Yes21815 12 Orange 39 20.88 20.88 Safety Improvements Planning 2022/2318833 12 Orange 55 0.2 R17.800 Pavement Post-Planning 2023/24 $95,061 Yes21044 12 Orange 55 0.6 Safety Improvements Post-Planning 2021/22 $2,455

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 53

Page 57: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

19412 12 Orange 55 2 R4.800 Safety Improvements Post-Planning 2019/20 $2,98017495 12 Orange 55 4.7 Bridge Post-Planning 2020/21 $20,838 Yes9310 12 Orange 55 13.2 R17.800 Roadside Post-Planning 2019/20 $3,100

20860 12 Orange 55 13.8 13.9 Safety Improvements Post-Planning 2021/22 $3,84020868 12 Orange 55 R5.500 R6.300 Pavement Post-Planning 2019/20 $4,030 Yes21334 12 Orange 55 R5.99 R17.824 Safety Improvements Planning 2022/2317393 12 Orange 55 R8.000 R9.200 Mobility - Operational Improvements Post-Planning 2019/20 $46,80022196 12 Orange 57 11 R22.600 Safety Improvements Post-Planning 2023/24 $14,99819819 12 Orange 57 11.2 14.4 Safety Improvements Planning 2021/2219827 12 Orange 57 11.238 14.421 Safety Improvements Planning 2021/2221898 12 Orange 57 15.3 Major Damage - Emergency Opening Post-Planning 2019/20 $61619233 12 Orange 57 15.6 Safety Improvements Post-Planning 2020/21 $1,30822260 12 Orange 57 15.93 15.93 Safety Improvements Planning 2023/2419822 12 Orange 57 16.131 22.247 Safety Improvements Planning 2021/2222141 12 Orange 57 16.4 22.37 Pavement Planning 2027/28 Yes16753 12 Orange 57 22 Sustainability Post-Planning 2021/22 $10,38418944 12 Orange 57 10.8R 22.37 Bridge Planning 2027/28 Yes9215 12 Orange 73 10 28 Safety - Collision Reduction Post-Planning 2019/20 $30,788

19918 12 Orange 73 10.3 R28.045R Pavement Planning 2028/29 Yes20716 12 Orange 73 12.9 R26.800 Bridge Post-Planning 2021/22 $5,894 Yes15698 12 Orange 73 23.7 24.1 Safety Improvements Post-Planning 2019/20 $11,39620619 12 Orange 74 0 16.5 Pavement Planning 2028/29 Yes22543 12 Orange 74 11.5 16.59 Safety Improvements Planning 2023/2417809 12 Orange 74 11.5 16.6 Safety Improvements Post-Planning 2019/20 $51,76620915 12 Orange 90 1 3.5 Safety Improvements Post-Planning 2021/22 $4,91116714 12 Orange 90 2.6 5.1 Pavement Post-Planning 2019/20 $12,333 Yes18214 12 Orange 90 4 Safety Improvements Post-Planning 2019/20 $2,01121465 12 Orange 90 6.576 6.576 Safety Improvements Planning 2021/2221466 12 Orange 90 R5.3 6.6 Safety Improvements Planning 2022/2322231 12 Orange 91 4.8 6.4 Pavement Post-Planning 2023/24 $24,769 Yes20916 12 Orange 91 5.4 5.8 Safety Improvements Planning 2021/2221853 12 Orange 91 6.4 Major Damage - Emergency Opening Post-Planning 2019/20 $56322232 12 Orange 91 6.4 R9.200 Pavement Post-Planning 2023/24 $45,437 Yes22230 12 Orange 91 R0.000 4.8 Pavement Post-Planning 2023/24 $50,093 Yes21431 12 Orange 91 R0.8 R1.8 Safety Improvements Planning 2022/2317817 12 Orange 91 R1.800 R3.400 Safety Improvements Post-Planning 2020/21 $5,51322234 12 Orange 91 R10.800 R18.900 Mobility - TMS Post-Planning 2023/24 $14,761 Yes22233 12 Orange 91 R9.200 R10.800 Mobility - TMS Post-Planning 2023/24 $7,024 Yes20527 12 Orange 133 0 M4.2 Pavement Planning 2028/29 Yes22515 12 Orange 133 0.65 0.92 Major Damage - Emergency Opening Planning 2019/2013881 12 Orange 133 3.1 3.6 Safety Improvements Post-Planning 2019/20 $13,79017830 12 Orange 133 3.1 R4.3 Drainage Post-Planning 2019/20 $8,353 Yes16143 12 Orange 133 8.5 M9.300 Mobility - Operational Improvements Post-Planning 2021/22 $26,80820714 12 Orange 133 R7.5 13.6 Bridge Planning 2028/29 Yes20639 12 Orange 142 R0.753 6.35 Pavement Planning 2026/27 Yes20713 12 Orange 241 14.5 25.7 Bridge Post-Planning 2022/23 $20,167 Yes22030 12 Orange 241 14.545 30 Pavement Planning 2026/27 Yes11367 12 Orange 241 24.5 39 Pavement Post-Planning 2020/21 $25,800 Yes21863 12 Orange 241 29 30.4 Major Damage - Emergency Opening Post-Planning 2019/20 $1,198

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 54

Page 58: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

SHOPP Ten-Year Project Book FY 2019/20 Quarter 4 July 2020

SHOPP ID District County Route Begin Mile End Mile ActivityPlanning or Post

planning? Advertised Year Project Cost ($K) SB-1 Priority

21778 12 Orange 241 33.61 38.66 Major Damage - Permanent Restoration Planning 2022/2319858 12 Orange 261 0 6.2 Roadside Planning 2026/2718946 12 Orange 405 0.2 11.4 Pavement Post-Planning 2022/23 $197,350 Yes17811 12 Orange 405 5.6 Safety Improvements Post-Planning 2019/20 $3,4049304 12 Orange 405 7.3 11.8 Roadside Post-Planning 2019/20 $2,900

20791 12 Orange 405 11.4 16.9 Pavement Planning 2024/25 Yes15699 12 Orange 405 11.4 20.3 Safety Improvements Planning 2019/2018839 12 Orange 405 16.9 24.2 Pavement Post-Planning 2023/24 $64,000 Yes20787 12 Orange 605 R0.0 R1.6 Pavement Planning 2028/29 Yes21333 12 Orange 605 R0.026 R1.643 Safety Improvements Planning 2022/2322263 12 Orange 605 R1.553 R1.553 Safety Improvements Planning 2023/2418443 12 Orange Various Various Various Mobility - TMS Post-Planning 2019/20 $10,414 Yes20299 12 Orange Various Various Various Mobility - TMS Post-Planning 2019/20 $28,480 Yes21857 12 Orange Various Various Various Mobility - TMS Post-Planning 2019/20 $17,908 Yes22236 12 Orange Various Various Various Major Damage - Emergency Opening Post-Planning 2019/20 $1,73620956 12 Orange Various Various Various Bridge Post-Planning 2021/22 $23,104 Yes21043 12 Orange Various Various Various Pavement Post-Planning 2021/22 $40,400 Yes

Note: This Ten-Year Project Book is subject to change.

Project Book Summary 55

Page 59: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

Intentionally left blank

Page 60: S H OPERATION P TEN-Y PROJECT BOOK...The Project Book was developed by the districts under the following requirements: • Each District’s project portfolio performance meets or

California Department of Transportation 1120 N Street Sacramento, CA 95814 www.dot.ca.gov