S DR L Engineering Status Q4 201 4 DCP Midstream...
Transcript of S DR L Engineering Status Q4 201 4 DCP Midstream...
S +TMainp$
li
+
+E
Subject: DR
+DCP MidTx/LA. The DRL Mancill, SMIEE, Passistance of Wnclude: (2) Eaglproject: $8M, (3$5M, a new cont
iquid handling p
+DCP ‐ NG
+Noble EnEast Medit
• DRL membeDelivery ManMachinery, CSafety AssessStructure PRMdeepwater d
• Geote• DetaileModul• HSE / Qongoin• Hull &with BW• Moori• Major
RL Enginee
stream ‐ team of Jason PCIC, IAS, Jamesilliam Donovan eford inlet liqu) NGL meter statrol room projec
roject, a 300MM
GL Project
ergy ‐ Levterranean
rs include Chris nager, with VinceColby Hafner andsment and Don MP ‐ for this giaevelopment offs
chnical survey ised design undere Engineering CoQA audits of inteng. Marine SystemWO. ng analysis and Equipment RFP
ering Statu
DRL has becom
Jarrell, P.E., ands Bond, and Alla(Engineering Mid handling proations: $12M, (2ct: $5M, and sev
MSCFD compress
The majority of
viathan FPS
Lyttle as Hull e Page – Lead d Dana Garber oReed for the Fixnt 2000 Mmscfdshore Israel.
s underway at sirway with Topsidontractor Aker, egration yards a
s engg progress
design finalized's under review.
us ‐ Q4 201
me DCP Midstre
d colleague Proan Clement (AssManager), Claytoojects: $30M, a 2) large propaneveral smaller but
sor station, and
f the work has be
has just commstation now, mile pipeline group has mengineering, pipeline contprocurement
The other mafacility in Miccompliance wthat he is lead
SO,
on xed d
te. de Oslo. are
ing
.
.
14
eam’s “go – to
oject Managers istant PM) are con Pertell (Projtruck unloadinge terminal projet critical project
several other O&
een on NGL met
missioned the Bwhich is set to as well represemanaged to dconstruction, atrol valve instato dealing with
jor area that Dachigan. He is in
with DOT regulatding or consultin
o” partner for 3
David Papst, Dacurrently manag. Controls) & Eg terminal: $14ects in Marysvills. 2015 project
&M and Busines
ter stations in W
Bearkat station icommission in
ents the largest ate ($8M). Alland commissionllation. He hanRight of Way.
avid has been invnvolved in a lations by next sumng on.
3rd party Projec
avid Byrnes, P.Eging (16) projectEd Vettel (Proj. 4M, (2) DCS upgle, MI: $12M, ans include: an inl
ss Development
West Texas and L
in October and January. The Bistand‐alone prolan Clement isning of 7 differndles everything
volved with is DCrge undertakingmmer as well as
ct Management
E., Patrick Ewartts totaling $88MControls). Magrades projects n Amine Contacet knock out pla
t Projects.
Louisiana. David
is working on tig Lake project ioject that the Hs actively supprent meter statg from drawing
CP’s Marysville Ng to bring the s a handful of ot
services in
t, P.E., Mike MM with the jor projects and a MCC ctor project: ant, another
Byrnes, P.E.,
the Big Lake involves a 4 ouston NGL porting the tions and a g review to
NGL storage facility into her projects
CO DtTsSMo
+Dt
+Dd
D+wfwoaidscdatrwtmver
Cardon Onshore &
Dave has been thhis Onshore anThe project incslugcatcher in tSeveral WHP plaMexico and the gof Houston and O
+Hess – HaDRL Team includo complete civil
+Husky EnDRL (Nigel Hill development fol
DRL Malay+Murphy Oiwe were engageurther develop water Kikeh Spaoffshore Sabah. analyses on attrdentified in study. The conditions togetdeep water subsa space constraiechnical challeecovery initiativwide range of hese problemmodeling studiesvendor co‐ordinaexpansion conceecommenced in
Gas Fie& Offshore
he Repsol E&C Mnd Offshore Gacludes the fouthe World at 2tforms are in fagas plant modulOK.
awkeye Gades Ken Butler (Ps before the win
nergy – Maand Dave) are lowing the awar
ysia ‐ KL Opil IOR ‐ Duringed by Murphy Ostudy work forr and FPSO devDRL performed ractive options our 2013 maturing s
her with the limsea trees and drined spar pose enges to increves. DRL has pefunctions to h
ms including; s, flow assurancation and poweept comparisonsn Q4.
eld –
Manager for s Facilities.
urth largest 23,000 bbl. brication in le came out
as TreatingPM), Greg Chittunter comes in at
adura Sourto recommencrd of the Lease C
perations g 1H 2014
Oil in KL to the deep velopment a series of previously screening subsurface itations of ry trees on significant eased oil rformed a help solve
process e analysis, er system s. Studies
g & Comprum (Packages Le‐50 deg F and p
r Gas FPSOce PMT supportContract to Bum
Ikram
ession Plaead), Robert Whpermafrost.
1‐‐‐‐‐‐‐DGS
O ‐ Indonest to Husky‐CNOi Armarda , Mala
m, Arief, Ian, Danial, R
nt, North eat (Piping) and
10 compressors24,000 HP Cat drivers 5 inlet gas comp2 Refrig comp ‐3 flash gas Station Capacity2,000 bbl FingerDew point controGen Sets 2 x 1.5 Site 20 acres
sia OOC of this aysia.
Ron, Ridz, Dave, Chris
Dakota d Barry Plummer
pressors aerial ‐ screw
y 50 Mmscf/d r design slug catol / propane refMW each
s, James and Jim (and
r (EE Design). Pr
tcher – 6 fingers frigeration
d Joey)
roject racing
160 ft long
+ndop
+ptcc
+tdin
+teEr
rin
in
+inrwCct
+
+TML Kinabanew productiondevelopment proptions. DRL alsproject. We are c
+ENQ Tj Barproject in Q1, DRo the PMT as fconductor suppoconductors and t
+Tender Deso the Malaysiandevelopment to ncluding layouts
+PCSB Bokoechnology that employed to devEngineering initieductions.
ecycling projectnstallation weig
nitiatives that do
+Lunch andnitiative which elevant technolwith the commeCost Estimation.curriculum over his area.
+Upcoming
alu CPP Fea and processinroposals have pso evaluated altcontracting 6 ad
ram Phase 1RL are now provfacilities lead. Torted platform topsides and wil
sign Basis an Oil and Gas sebe used as parts and weight est
r ‐ The Bokor Pis being develovelop concept diatives and ben
t with facilities ht limits for bot
o not impact fun
learn highhas been effeclogies has takenencement of a st Jim Scott will the next 12 mo
g Events ‐
asibility Screg facilities to aproved uneconoternative water ditional personn
1 & 2 PMT ‐viding PMT suppThe execution pslated for Mal be installed by
nd Undiscloctor to prepare of the Client's Pimates for CPP a
hase 3 Redevelo
ped by the Enhaesign and layounchmark the pr
both onshore h lift and floato
nctionality or thr
hlights ‐ KL'sctive at sharingn a leap forwartructured progralead the team tonths to develop
eening Studyan existing fieldomic, and DRL injection technonel into TML.
Following on fro
port to the Clientphase assignmenrch next year. y drill rig making
osed New toa Basis of DesigPSC tender propand WHP platfor
opment Project
anced Oil Recovts within specifioject. DRL achi
+Twinproductextractiseparatproject separataggregathen de
+In tCaspi
and offshore inver. Current FE
roughput.
s post 'lunch a
g knowledge in‐rd in sophisticatam on Benchmathrough a compp and hone DRL
DRL Frida@ Ed1284HouRSVP*Hot
y ‐ Talisman's K
d, plus the intrwas awarded ologies to ensur
om our support
t project team innt started in AuThe complete weight, geomet
o Market Clgn and provide Cposal. DRL quickrms. The propos
is an EOR projec
very Centre (EOied weight targeeved and impr
nza Pasca ‐ Ition, offshore ion from 105 mmte FSO's. DRL (leto revise the cote propane andation and reviewevelop the agree
the pipe foan: DRL are pn the Caspian SED design weigh
and learn'
‐house on tion in Q4 arking and prehensive L's skills in
Engineering Hay December 1ddie V’s Prime48 Queensburyston, TX 77024P by Decembetel accommod
Kinabalu Redeve
roduction of wa 10 week sture selection of o
to UK Enquest's
n the form of Teugust with loadWHP comprisi
try and T&I desig
ient ‐ In SepteCost and Scheduly turned arounsal is currently w
ct using Immisci
RC, joint venturets, preliminary roved upon top
In 2012, DRL pe
Papua New Gumscfd of feed ged by Ian Johnsooncept for incred butane produw and optimizeed concept to Pr
or year endpoised to perfo
Sea. The projecthts are pushing
Holiday Bash in19th, 6 pm e Seafood and y Lane, Suite 24 er 12th @ NikiLdations availab
elopment Projec
water injection fudy project to optimal water in
marginal field d
echnical Lead Ja out of the 180ing subsea temgn issues highly
ember we were a
ule estimates fod a design brief
with the regulato
ble Water Altern
re between Petrcost estimate a
psides weight ta
rformed a conc
uinea, comprisias plus LPG andon) is expectingeased LPG plantucts, include pre the LPG extrare‐FEED level.
d – Petronorm a Value En
t development these envelopes
n Houston
Steaks 200
Luetchford@drble upon reque
ct comprises the
facilities. Earlieevaluate three njection techno
development Tan
mes Doel, who 0 MT WHP topsmplate, stabilizasensitive.
approached by a
or a greenfield, oto define the d
or for evaluation
nating Gas Injec
ronas and Shell)and schedule, ideargets and iden
ept design for o
ng platform in condensate stog award soon of t throughput, prrovision for 3rdction technolog
nas Magtymngineering stud
faces challenges and require w
rl‐engineering.est.
e addition of
er proposed alternative logy for the
njong Baram
is seconded side for the tion frame,
a newcomer
offshore gas evelopment .
ction (IWAG)
). DRL were entify Value ntified VE $
offshore LPG
stalled LPG orage in two a follow‐up roduction of d party gas gy. DRL will
mguly in y for a gas
es from low eight saving
.com