S: 5 PROJECTSABHM150026 Cullman Fire …. Plumbing - Cullman Fire... · all horizontal gas, air,...
Transcript of S: 5 PROJECTSABHM150026 Cullman Fire …. Plumbing - Cullman Fire... · all horizontal gas, air,...
WALL MTD.; TEMPERED HW
REMARKS
WALL MTD.; FLUSH VALVE
FLOOR MTD.; FLUSH VALVE
WATER CLOSET - ADA COMPLIANT
PLUMBING FIXTURE CONNECTION SCHEDULE
P-9
P-8
P-10
LAVATORY - ADA COMPLIANT
FIXTURE
URINAL
P-6
P-1
MARK
1-1/4"
3"
1/2"
1"
4"
WASTE CW
1"
1/2"
-
HW
-
REMARKSMANUFACTURER - MODELMARK STORAGETYPE
WATER HEATER SCHEDULE
1/2" 2 COMP BOWL; S/S1/2"
P-11
SINK
1-1/2"
GENERAL NOTES
1" FLOOR MTD.; FLUSH VALVE
-
WATER CLOSET
P-24"
WALL MTD.; TEMPERED HW; MT. RIM 34" AFF
LAVATORY - STAND
P-7A
1-1/4" 1/2" 1/2"
1/2" ISLAND1/2"
P-13
SINK
P-14
1/2" 1/2"
P-15
WASHER 2"
P-16
-
ROUGH & CONNECT1/2"
P-3
DISHWASHER
-
P-4
1/2" SS I COMP ON LEGS, "A" DRAINBOARDS
P-12
LAUNDRY TUB
P-20
P-5
P-21
SINGLE WALL MTD.; MT. LOWER SPOUT 36" AFF - ADAWATER COOLER1-1/2" 1/2"
-
10 GAL.ELEC.
LOCHINVAR JRJ10KS208V; 1 PHASE; 4.5 KW
WH-1100 GAL.NAT. GAS
LOCHINVAR AWN-199-100-DF9
WH-S1
LOCATIONS OF UTILITIES SHOWN ON PLANS ARE APPROXIMATE, VERIFY
OF ALL EXISTING SERVICES PRIOR TO INSTALLING ANY NEW PIPE.
CONTRACTOR SHALL VERIFY EXACT LOCATION, SIZE AND ELEVATION
WHICH SHOWN UNLESS OTHERWISE NOTED.
CEILING ON PLAN WHICH SHOWN UNLESS ONLESS OTHERWISE NOTED.
WHEREVER DISSIMILAR METALS ARE CONNECTED ON WATER LINES, A
ALL HORIZONTAL SANITARY PIPING IS RUN BELOW FLOOR ON PLAN
ALL HORIZONTAL GAS, AIR, WATER AND VENT PIPING SHALL BE RUN ABOVE
IN 18"x18"x6" THICK CONCRETE PAD. (J.R. SMITH 4258 OR EQUAL.)
ALL OUTSIDE CLEANOUTS SHALL BE BROUGHT TO GRADE AND EMBEDDED
MECHANICAL, AND ELECTRICAL FEATURES OF BUILDING.
COORDINATE ALL PIPE ROUTING TO AVOID CONFLICTS WITH STRUSTURAL,
ENDS SO THAT NO JOINTS OCCUR BELOW FLOOR.
ALL WATER PIPING BELOW SLAB ON GRADE SHALL BE BENT UP AT
FINISH GRADE OR FINISH FLOOR UNLESS OTHERWISE NOTED.
ALL WALL HYDRANTS AND HOSE BIBBS SHALL BE MOUNTED 24" ABOVE
ALL WATER PIPING INSTALLED IN EXTERIOR WALLS SHALL BE LOCATED
ON THE INTERIOR SIDE OF THE EXTERIOR WALL INSULATION.
WITH LOCAL UTILITY PRIOR TO BIDDING.
NO VENT THRU ROOF IS TO BE LOCATED WITHIN 10 FEET OF
ANY BUILDING AIR INTAKES, PER CODE. COORDINATE WITH MECHANICAL
AND GENERAL CONTRACTORS.
DIELECTRIC UNION SHALL BE USED.
SHALL BE INSTALLED BELOW CEILING INSULATION.
DOMESTIC WATER PIPING LOCATED ABOVE THE CEILING, 12.
10.
11.
9.
8.
7.
5.
6.
3.
4.
2.
1.
TRAPS, PRIMERS, INSTALLED IN ACCORDANCE WITH CODE AND LOCAL AUTHORITY.
ALL FIXTURES DIRECTLY CONNECTING TO SANITARY SEWER SHALL HAVE 13.
SIZE IN ACCORDANCE WITH MANUFACTURER'S REQUIREMENTS.
PROVIDE SHOCK ARRESTORS AT ALL PLUMBING DROPS.14.
RECIRC PUMP/HP/EL- BLDG
-
RCP-B, 2/5HP
NAT. GASLOCHINVAR AWN-199-100-DF9
RCP MODEL NUMBER (ARMSTRONG) MOUNTING
FLOOR
FLOOR
SHELF
-
E-24B
199CFH, 2 HTRS, 2 STORAGE
-
APPROVED EQUAL. PROVIDE START/STOP CONTACT FOR CONNECTION TO BMCS.
NOTE: PROVIDE B&G MODEL TC-1 AUTOMATIC TIMER AND AQ-3/4 AQUASTAT COMBINATION OR
P-22
P-23
SINGLE SKID
2 HTRS
WITH 2TANKS
NOTE
COMMERCIAL: WITH SA; QUICK CONNECTS
ALL WETTED MATERIAL TO MEET FEDERAL LEAD FREE GUIDELINES.
THERMOSTATIC MIXER
80
INPUT
CFH
GAS EQUIPMENT SCHEDULE
SYMBOL
GFH-1 65
GFH-2
GFH-3
GFF-111
GFF-203
100 GAL.
P-7 SINGLE WALL MTD.; MTWATER COOLER - ADA COMPLIANT 1-1/2" 1/2"
-
1/2" FLOOR STANDING
-
ICEMAKER FS
1/2" SINGLE BOWL; S/S1/2"SINK BREAKROOM 1-1/2"
WALL MTD.; FLUSH VALVE, ADAURINAL - ADA COMPLIANT3" 1"
-
1/2" 1/2"SHOWER 3"
BASIN WITH SHOWER CONTROLS
1/2" 1/2"SHOWER 3"
BASIN WITH SHOWER CONTROLS
1/2" 1/2"SHOWER - ADA 3"
BASIN WITH SHOWER CONTROLS - ADA
1/2" INTEGRAL SINGLE BOWL; INTERCEPTOR , FAUCET1/2"SINK 1-1/2"
P-24
1/2"ROUGH & CONNECT, PROVIDE FILTER-
ICE MAKER -
DRYERGAS 75CFH, QUICK CONNECTS
---
1/2" 1/2"WASH MACH BOX 2"RESIDENTIAL
1-1/2"
1/2"
1-1/2"
60
80
100
65
65
40
INLET
PRESS
OUTLET
PRESS
7"WC
REMARKS
REGULATOR
2PSI ROUGH AND CONNECT
7"WC2PSI ROUGH AND CONNECT
7"WC2PSI ROUGH AND CONNECT
7"WC2PSI ROUGH AND CONNECT
7"WC2PSI ROUGH AND CONNECT
7"WC2PSI ROUGH AND CONNECT
7"WC2PSI ROUGH AND CONNECT
7"WC2PSI ROUGH AND CONNECT
7"WC2PSI ROUGH AND CONNECT
7"WC2PSI ROUGH AND CONNECT
1. PIPE LESS THAN 2 1/2" IN EQUIPMENT ROOMS MUST
BE TRANSVERSLEY BRACED ON A MAXIMUM OF 15'
CENTERS.
2. CONTRACTOR SHALL PROVIDE SIESMIC BRACING FOR CATEGORY D
FOR MECHANICAL PIPING, INCLUDING PLUMBING AND FIRE PROTECTION.
3. CONTRACTOR SHALL SUBMIT DRAWING FROM SEISMIC
RESTRAINT MANUFACTURER DETAILING HANGER TYPES
AND LOCATIONS. DRAWING SHALL BE SEALED AND INSPECTED BY A
PROFESSIONAL ENGINEER EMPLOYED BY THE SEISMIC
RESTRAINT MANUFACTURER.
4. RIGID BRACING ONLY AS SPECIFIED IN SPECIFICATION SECTION 15090 WILL
BE ALLOWED. SEISMIC ROPE SYSTEMS WILL NOT BE ALLOWED.
5. INSTALL BRACING PER MANUFACTURERS INSTRUCTIONS.
SEISMIC NOTES
WH-2
PLUMBING LEGEND
PIPE TURNING DOWN
PIPE TURNING UP
DOMESTIC HOT WATER RETURN - 120° F
UNION
TEE UP
TEE DOWN
EMERGENCY ROOF DRAIN
GAS LINE
VENT
DOMESTIC COLD WATER
DOMESTIC HOT WATER SUPPLY - 120° F
HOSE BIBB
WATER HAMMER ARRESTOR
HOT WATER SUPPLY - 140° F
SOIL, WASTE OR SANITARY SEWER
CLEANOUT - WALL TYPE
FLOOR DRAIN
BALL VALVE
BALANCE VALVE
ROOF DRAIN
P-TRAP
SHOWER DRAIN
CLEANOUT - PLUG TYPE
CLEANOUT - EXTERIOR
CAP ON END OF PIPE
BALL VALVE
CHECK VALVE
PLUMBING FIXTURE NUMBER
RISER NUMBER
GAS VALVE
PRESSURE REDUCING VALVE
TYPICAL
VENT STACK
BELOW FINISHED FLOOR
ABOVE
WASTE STACK
VENT THROUGH ROOF
HOT WATER RETURN
HOT WATER
GALLONS PER MINUTE
ABOVE FINISHED FLOOR
BACKFLOW PREVENTER
GALLONS PER HOUR
AFF
BFP
BFF
GPH
GPM
HW
HWR
TYP
VS
VTR
WS
ABV
WALL HYDRANT
120
140
ERD
HB
PLUMBING SPECIALTIES LEGEND
ACCESS PANELAP
FIXT.
DESCRIPTION
WALL HYDRANT FREEZE PROOFWH
INTERIOR HOSE BIBBHB
FLOOR DRAINFD
TRAP PRIMERTP
NO.
REMARKS
INSTALL DEEP SEAL TRAP
SQUARE GRATE
INSTALL DEEP DEAL TRAP SEDIMENT WITH TRAP INSERT
RECESSED MOUNTED
SURFACE MOUNTED
PROSEAL ACCEPTABLE EQUAL
FLUSH TO WALL
CONDENSATE BOXCB
PROVIDE OX BOX WITH TRAP PRIMER
AND CONDENSATE FUNNEL
ROOF DRAINRD
PROVIDE WITH CASTE IRON BODY, INSULATE, WITH DECK CLAMP
EMERGENCY ROOF DRAINERD
WHA
WH
P-#
FCO
WCO
RD
#
SPECIFICATIONS
JR SMITH 2005- P050 FLOOR DRAIN, COATED, CAST IRON BODY
WITH BOTTOM OUTLET,TRAP PRIMER INSERT, MEMBRANE
CLAMP, ADJUSTABLE COLLAR, WITH SQUARE POLISHED
NICKLE-BRONZE GRATE.
JR SMITH 5609-QT NON-FREEZE NICKLE-BRONZE PLATED,
QUARTER TURN S.S. BOX WITH HINGED LOCKING DOOR.
WOODFORD B26-CH, FLUSH MOUNTED WALL BOX, 3/4" HOSE
THREADS AND VAC. BREAKER BACKFLOW PREVENTER, WHEEL
HANDLE.
J.R. SMITH QUAD CLOSE
ACORN 8292 ACCESS DOOR, TYPE 304 S.S., 10-1/2" X 8-1/4"
OVERALL WITH CYLINDER LOCK AND KEYS.
SIOUX CHIEF OX BOX WITH FUNNEL FOR CONDENSATE.
LOUVERED FRONT.
JR SMITH 1011-AL WITH 3" DAM. UNDERDECK CLAMP,
STAINLESS STEEL GRAVEL GUARD. INSULATE BODY AND
PIPING.
JR SMITH 1011-AL WITH SUMP RECEIVER. UNDER DECK
CLAMP, STAINLESS STEEL GRAVEL GUARD. INSULATE BODY,
AND PIPING TO BELOW GRADE.
EMERGENCY ROOF DRAIN
ERD
G
GAS EQUIPMENT CONNECT
MEDIUM DUTY FLOOR DRAINMFD
BUCKET SQUARE GRATE
JR SMITH 2230 MECHANICAL FLOOR DRAIN COATED CAST IRON
BODY WITH BOTTOM OUTLET BUCKET 1/2" TRAP PRIMER,
MEMBRANE CLAMP, ADJUSTABLE COLLAR, WITH SQUARE
POLISHED NICKLE-BRONZE GRATE.
P-17
P-18
P-19
1/2" 1/2"WASHER 2"P-25COMMERCIAL: WITH SA; QUICK CONNECTS
P-26
DRYERGAS 75CFH, QUICK CONNECTS
---
GFF-101
GFF-106
GFF-2W
GFF-2E
GFF-241
80
110
A
AIR
AAIR OUTLET/ DROP
1/2" 1/2"JANITOR'S RECEPTOR 1-1/2"-
GFH-4 65 7"WC2PSI ROUGH AND CONNECT
GFH-5 65 7"WC2PSI ROUGH AND CONNECT
GFH-6
65 7"WC2PSI ROUGH AND CONNECT
SINK DECON
HOSE REEL (AIR)
AIR
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
3/4"
-- - -
1/2" 1/2"1-1/2"
SS DOUBLE BOWL, LESS DIVIDER
GFH-7
65 7"WC2PSI ROUGH AND CONNECT
GFH-8
65 7"WC2PSI ROUGH AND CONNECT
OW
OIL WASTE
GFF-110
100 7"WC2PSI ROUGH AND CONNECT
7"WC2PSI ROUGH AND CONNECT
GFF-206
80
TMV-B
G
FD
SD
TRENCH DRAINTD
SD
SHOWER DRAIN
INSTALL DEEP SEAL TRAP
SQUARE GRATE
JR SMITH 2005- P050 FLOOR DRAIN, COATED, CAST IRON BODY
WITH BOTTOM OUTLET, MEMBRANE CLAMP, ADJUSTABLE
COLLAR, WITH SQUARE POLISHED NICKLE-BRONZE GRATE.
LAVATORYP-27
COUNTER MOUNTED1-1/4" 1/2" 1/2"
-
SEE SPECIFICATIONS
G
MC
NE
TW
OR
K.C
OM
27
01 1st A
ve
nu
e S
, S
uite
10
0 | B
irm
in
gh
am
, A
L 3
52
33
20
5.8
79
.4
46
2 |
Te
l
dra
wn
b
y:
IS
SU
E D
AT
E
ch
ec
ke
d b
y:
sh
ee
to
f
GO
OD
WY
NM
IL
LS
CA
WO
OD
A
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
4/2
8/2
016
10
:18
:0
0 A
M
Wa
ld
orp
S
t. C
ullm
an
, A
L
JT
R/J
LC
CL
J
CU
LL
MA
N F
IR
E &
R
ES
CU
E S
TA
TIO
N N
o. 3
GM
C #
A
BH
M15
00
26
08
/3
1/16
Bid
S
et
BIRMINGHAM
TUSCALOOSA
JACKSON
NASHVILLE
www.edmondsengineering.com
Project Number :
(205) 988-2069
(205) 752-9915
(601) 362-6478
(615) 265-8071
BHM16018
BA
A
L
A
A
M
N
S
EE
C
I
D
L
N
E
E
R
I
G
N
E
PROFESSIONAL
No. 24747
W
A
D
E
S
W
A
R
T
TE
08-31-16
PL
UM
BIN
G -
SC
HE
DU
LE
S,
LE
GE
ND
S, &
N
OT
ES
P0
.0
1
FIN. GRADE
4" PVC
FIN. FLOOR
SEAL OPENING
SEAL OPENING
NO SCALE
VACUUM RELIEF VALVE
DIELECTRIC UNION (TYPICAL)
PROVIDE NEW 1 1/2"x1 1/2"x3/4"
24"x24"x3/4" THICK PLYWOOD1" TO HD
ANGLE FRAME & SUPPORT
WATER HEATER
PROVIDE NEW
SAFETY PANPROVIDE NEW
HOSE BIBB
ASME P&T RELIEF VALVE
AMTROL MODEL ST-5EXPANSION TANK
CHECK VALVE
CW SUPPLY
HW RETURN
SUPPLYHW
CIRC. PUMP
AQUASTAT
THERMOMETER
TIMER
NO SCALE
INTUMESCENT FIRESTOP SEALANT.
STRUCTURAL STEEL SQUARE TUBING
SHELTER EXTERIOR
SHELTER INTERIOR
SIZED TO ACCOMMENDATE PIPING.STEEL PLATE SAME WIDTH ASTUBING. WELD TO TUBING.
WELD SEAM AFTERPIPING IS INSTALLED.
(MIN. 1/4" THICK) (MIN. 1/4" THICK)
PROVIDE TRAPEZE SUPPORT ATEND OF TUBING. USE UNISTRUTAND 1/2" THREADED RODS.
6" WIDE X 1/4" THICK PLATE(EACH SIDE OF TUBING)
NOTE:1. PROVIDE ALL WELDED CONSTRUCTION.
1/2" ANCHOR BOLTS(EACH SIDE OF TUBING) PIPING WITH INSULATION.
CONTINUOUS WELD, TOPAND BOTTOM TO TUBING.
INTUMESCENT FIRESTOP SEALANT.
A
A
A
6'7"
HR-1 HOSE REEL
PROVIDE QUICK DISCONNECT
COORDINATE SIZE AND LOCATIO
N
WITH OWNER
1"
NO SCALE
A
A
A
NO SCALE
PROVIDE QUICK DISCONNECT
COORDINATE WITH
OWNER
3/4"
PROVIDE 3/4" BRASS
BALL VLAVE GRAINGER
# 6GD14 TYP. BLO
W
DOWN VALVE
NO SCALE
CONCRETE THRUST BLOCKCARRY BOTTOM TOUNDISTURBED EARTH
MECHANICAL JOINT
EL. OR TEE
NOTE:USE THIS METHOD OFBLOCKING OUTSIDEOF BUILDING
WATER MAIN ORSPRINKLER MAIN
WATER MAIN ORSPRINKLER MAIN
BRACKET
3/4" TREATED PLYWOOD
BALL VALVE
1/2"CW
WATER FILTER
1/2" FILTERED CW
NC
NO SCALE
ABOVE ICE MAKER ON WALL
1/2" FILTERED CW
PROVIDE STRUCTURAL
SUPPORT TO STRUCTU
RESLOPE AIRLINE TO
LOW POINT
DRAIN DOWNS
SLOPE AIRLINE TO
LOW POINT
DRAIN DOWNS
NO SCALEMOUNT AS HIGH AS POSSIBLE ABOVE FLOOR
GG
STORAGE TANK
STORAGE TANK
GAS WATERHEATER
GAS WATERHEATER
FURNISH 120/1/60 (15AMP)DEDICATED GFI PLUG AND SWITCHLABEL SWITCH WITH EQUIPMENT TAGCOORDINATE WITH ELECTRICAL. INSTALLPER NFPA 70, NEC CLASS 1 WIRING.(TYP. EACH HEATER)
THERMOSTATIC MIXING VALVESEE WATER HEATER SCHEDULE TMV-B
PROVIDE LOW VOLTAGE WIRING TOBUILDING MANAGEMENT SYSTEM.MONITOR FAILURES. (TYP. EACHHEATER)
ALARM BELLEACH UNIT
LOWVOLTAGEWIRING(TYP.)
NEUTRALIZATION KIT(TYP. EACH HEATER)
HOUSEKEEPING PAD
FINISH FLOOR
SEE HVAC VENTINGAND COMB. AIR.(TYPICAL EACH HEATER)
CONCENTRIC VENT KITINSTALL PER MNF REQUIREMENTS(TYP. EACH HEATER)
PIPE RELIEF TO DRAIN(TYPICAL EACH UNIT)
ASME P&T RELIEF VALVE(TYP.) EACH UNIT
PIPE RELIEF TO DRAIN(TYP. EACH HEATER)
FLOW SWITCH AND RELIEF VALVE(TYP. EACH HEATER)
BUILDING CIRC. PUMP RCP-BSEE SCHEDULE WATER HEATER SCHEDULE
(TYP. EACH HEATER)WATER HEATER CIRC. PUMP (FURNISHED BY MANUFACTURER)1/12 HP, 115/1/60
GAS PRESSURE REGULATORINLET PRESSURE: 2 PSIOUTLET PRESSURE: 14"WCFLOW: 199 CFH
UNION AND BALL VALVE(TYP)
CHECK VALVE
DIRT LEG
DIAL THERMOMETER
THERMOMETERTHERMOMETER
VACUUM BREAKER
EXPANSIONTANK
140
SEE TYPICAL GASCONNECTION DETAIL
140 140140
140
140
140
140
140
140
140
140140
140
140
140
140140140
140
MODEL
NUMBER OF UNITS
2
200 1 1/2"
REQUIRED PIPE SIZES IN NPT
SEE CHART FOR MANIFOLD PIPE SIZINGSIZE PIPING PER MANUFACTURER'S INSTRUCTIONS
2" CW SUPPLY
NO SCALE
UNIT AND STORAGE TANKTO BE A SKID MOUNTEDASSEMBLY WITH SINGLEPOINT CONNECTION.
SEE SCHEDULE FOR RECIRC PUMP SCHEDULE(TYPICAL)
SEE SCHEDULE FOR REVERSE MANIFOLD PIPESIZING. MANIFOLD TO BE REVERSE PIPED AS REQUIREDBY MANUFACTURER.
2" 120°HW TO BUILDING
S2 S1WH2 WH1
3/4"3/4"
G
MC
NE
TW
OR
K.C
OM
27
01 1st A
ve
nu
e S
, S
uite
10
0 | B
irm
in
gh
am
, A
L 3
52
33
20
5.8
79
.4
46
2 |
Te
l
dra
wn
b
y:
IS
SU
E D
AT
E
ch
ec
ke
d b
y:
sh
ee
to
f
GO
OD
WY
NM
IL
LS
CA
WO
OD
A
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
4/2
8/2
016
10
:18
:0
0 A
M
Wa
ld
orp
S
t. C
ullm
an
, A
L
JT
R/J
LC
CL
J
CU
LL
MA
N F
IR
E &
R
ES
CU
E S
TA
TIO
N N
o. 3
GM
C #
A
BH
M15
00
26
08
/3
1/16
Bid
S
et
BIRMINGHAM
TUSCALOOSA
JACKSON
NASHVILLE
www.edmondsengineering.com
Project Number :
(205) 988-2069
(205) 752-9915
(601) 362-6478
(615) 265-8071
BHM16018
BA
A
L
A
A
M
N
S
EE
C
I
D
L
N
E
E
R
I
G
N
E
PROFESSIONAL
No. 24747
W
A
D
E
S
W
A
R
T
TE
08-31-16
PL
UM
BIN
G - D
ET
AIL
S
P0
.0
2
G
GENSET3500CFH
GAS GENERATOR CONNECTION:GAS COCK, STRAINERGAS PRESSURE REGULATOR 1- (7PSI-13"WC)PIPE ONE PIPE SIZE LARGER TO GENERATOR.REDUCE AT CONNECTION TO GENERATOR.
DIRT LEG
GAS METER:GENERATOR LOAD : 1850 AT 2PSILONGEST DISTANCE : 10FT
BUILDING LOAD: 4030CFHFUTURE BUILDING LOAD: 700CFHTOTAL LOAD: 4730CFH
CONTRACTOR TO COORDINATE WITH LOCALUTILITY TO PROVIDE GAS SERVICE ANDMETER SET. INCLUDE ALL FEES AND PERMITS
FLEXIBLE FUEL LINE
MANIFOLD SERVICEVALVE
G
4"
DETAIL OF GAS METER AT GENERATOR
NO SCALE
RUBBER ROOF SEALANT
GA
S EQ
UIP
MEN
T
SEDIMENT TRAP(DIRT LEG)
UNION(TYP.)
GAS PRESS REGINLET PRESS: 2PSIOUTLET PRESS: 7"WC
MANUAL GAS SHUTOFFVALVE UPSTREAM OF REG
GAS CONNECTION
NO SCALE
TO BUILDING
4"
PER MNF
1 1/2"
DETAIL of OIL/WATER SEPARATOR
NO SCALE
OUTLET
CLEANOUT
VENTVENT
INLET
CLEANOUT
VENT
STORAGE COMPARTMENT
VENTVENT
12V TO CONTROL PANEL
VENT
VENT
FINISH FLOOR
110V
12V TO HIGH LEVEL SENSOR
ALARM/CONTROL PANEL
RESET BUTTON
HIGH LEVEL ALARM LIGHT
PROVIDE EXTENTION(S)
AS ERQUIRED TO HAVE TOP
FLUSH WITH FINISH FLOOR
G
CLEVIS HANGER
INSULATION
PIPE
18 GA SHEETMETAL SADDLE18" LONG FOR PIPES 2" & SMALLER.2 1/2" AND LARGER USE ELLEN FIG. 251
JEFFCOAT
PLUGCLEANOUT
WALL OR PARTITION
ROUND CHROMECOVER PLATE
SOIL OR WASTE PIPE
(18"x18"x6" THICK)CONCRETE PAD
FINISH GRADE
OF PIPE AND IS FREE TO MOVE CLEANOUT BOX IS INDEPENDENT
UNDERGROUND DRAINAGE PIPING
WITH SETTLEMENT OF GRADE.
CAST IRON PIPE
J.R. SMITH 4258 OR EQUAL
TW TO LAVATORY
HW SUPPLY
THERMOSTATIC MIXING VALVE
CW SUPPLY
DRAIN
H C
NOTE:
CONTRACTOR IS RESPONSIBLEFOR INSTALLING FIXTURES
AT HEIGHTS REFERENCED UNDER
ARCHITECTURAL DRAWINGS
PLUMBING SUPPORT SHALL BEOF SAME MANUFACTURER
DRYER
AIR COMPRESSOR
TO BAY
SLOPE
AIR COMPRESSOR: INGERSOL RAND 2475N7.5-230.3-FP TANK MOUNTED
7.5HP TWO STAGE COMPRESSOR ON 80
GALLON TANK STARTER.
AIR DRYER: iNGERSOL RAND D42IN,ELECTRIC DRAIN,
POWER ON LIGHT, AIR
OUTLET PRESSURE, DIGITAL DISPLAY
AND DIFF. PRESS. GAUGE.
CONTRACTOR TO ASSEMBLE AIR
COMPRESSOR, DRYER AS
TO BE PIPED IN THE FIELD. PROVIDE
ALL INTERCONNECTING ELECTRICAL,
PLUMBING AND MECHANICAL.
TO MFD
TO MFD
1/2" MINIMUM
UNIONS FORQUICK REMOVAL
PRESSURE GAUGETYPICAL
AUTOMATICCONDENSATE TRAP
COMPRESSOR ISOLATIONPADS. TYPICAL
1/2" MIN.
BALL VALVETYPICAL
FLEXIBLE CONN.TYPICAL
4" HOUSEKEEPING PAD
RELIEF VALVE
CONTROL PANEL W/ STARTER. SEEMANUFACTURER FOR REQUIREMENTSCOORDINATE W/ ELECTRICAL
A
1 1/2"
0-200 PSI
UNDER CIVILDOMESTIC WATER SERVICE INSTALLED
CONN TO EXIST SITE WATER SERVICE INSTALLED
STRAINER W/BLOW DN VALVEW/HOSE END CONNECTION
BALL VALVE
HB
THRUST BLOCK. MINIMUM1 CU YD CONCRETE. TYPICAL ALL DIRECTION CHANGES
EXACT LOCATION PRIOR TO BEGINNING WORK.
3/4"
0-150 PSI
PRESSURE GAGE
FLOOR
UNDER CIVIL. VERIFY IN FIELD
PRESSURE GAGE3" DIAMETER
4"
4"
4"
3/4"
NATIONAL STANDARDFIRE CONNECTION
HOSE BIBB
1 1/2"
42"AFF (VERIFY WITH FC)
1 1/2"
1 1/2"
BUILDING SUPPLY
NF LINE AT BAY FORSPRAY DOWN AND TRUCK FILL
1 1/2"
1 1/2"
AA
G
MC
NE
TW
OR
K.C
OM
27
01 1st A
ve
nu
e S
, S
uite
10
0 | B
irm
in
gh
am
, A
L 3
52
33
20
5.8
79
.4
46
2 |
Te
l
dra
wn
b
y:
IS
SU
E D
AT
E
ch
ec
ke
d b
y:
sh
ee
to
f
GO
OD
WY
NM
IL
LS
CA
WO
OD
A
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
4/2
8/2
016
10
:18
:0
0 A
M
Wa
ld
orp
S
t. C
ullm
an
, A
L
JT
R/J
LC
CL
J
CU
LL
MA
N F
IR
E &
R
ES
CU
E S
TA
TIO
N N
o. 3
GM
C #
A
BH
M15
00
26
08
/3
1/16
Bid
S
et
BIRMINGHAM
TUSCALOOSA
JACKSON
NASHVILLE
www.edmondsengineering.com
Project Number :
(205) 988-2069
(205) 752-9915
(601) 362-6478
(615) 265-8071
BHM16018
BA
A
L
A
A
M
N
S
EE
C
I
D
L
N
E
E
R
I
G
N
E
PROFESSIONAL
No. 24747
W
A
D
E
S
W
A
R
T
TE
08-31-16
PL
UM
BIN
G - D
ET
AIL
S
P0
.0
3
C
O
C
O
C
O
C
O
C
O
C
O
P
-
5
P
-
6
F
D
F
D
S
D
S
D
F
D
R1
P
-
1
P
-
2
P
-
4
P
-
5
P
-
2
F
D
S
D
3
"
3
"
C
O
4
"
4
"
4
"
3
"
3
"
3
"
3
"
3
"
3
"
3
"
C
O
3
"
2
"
3
"
3
"
4
"
V
S
T
R
4
"
2
"
3
"
2
"
2
"
2
"
3
"
3
"
2
"
2
"
2
"
2
"
3
"
2
"
2
"
2
"
4
"
4
"
C
O
C
O
P
-
2
P
-
1
1
P
-
4
C
O
C
O
P
-
6
P
-
5
F
D
C
O
C
O
P
-
7
A
P
-
7
R2
4
"
4
" 4
"
4
"
4
"
4
"
4
"
4
"
4
"
4
"
2
"
2
"
2
"
2
"
2
"
2
"
P
-
1
73"
2
"
2
"
2
"
2
"
2
"
2
"
2
"
2
"
4
"
3
"
C
O
4
"
C
O
P
-
2
P
-
5
4
"
4
"
4
"
4
"
4
"
R3
2
"
2
"
2
"
R4
C
O
C
O
P
-
5
P
-
6
P
-
1
M
F
D
M
F
D
C
O
4
"
4
"
3
"
3
"
4
"
2
"
2
"
3
"
P
-
2
4
"
4
"
4
"
4
"
3
"
4
"
P
-
5
C
O
P
-
2
F
D
C
O
P
-
2
C
O
C
O
P
-
5
C
O
C
O
P
-
7
A
P
-
7
A
4
"
R5
4
"
F
D
4
"
S
S
U
P
3
"
V
S
U
P
3
"
2
"
4
"
3
"
2
"
2
"
4
"
2
"
4
"
3
"
3
"
3
"
W
S
U
P
3
"
4
"
4
"
2
"
2
"
2
"
2
"
2
"
2
"
2
"
3
"
4
"
4
"
4
"
2
"
4
"
C
O
M
F
D
P
-
1
2
P
-
8
4
"
C
O
C
O
2
"
V
S
U
P
2
"
3
"
2
"
3
"
2
"
R6
3
"
2
"
2
"
B
E
L
O
W
G
R
A
D
E
3
"
2
"
2
"
R7
P
-
1
7
M
F
D
C
O
2
"
2
"
3
"
3
"
3
"
R8
4
"
4
"
4
"
C
B
4
"
4
"
4
"
4
"
4
"
4
"
W
C
O
4
"
4
"
4
"
O
W
O
W
O
W
C
B
C
B
C
B
C
B
C
B
C
B
C
B
4
"
4
"
C
O
4
"
4
"
2
"
V
E
N
T
U
P
2
"
V
E
N
T
B
E
L
O
W
G
R
A
D
E
F
D
C
O
C
O
P
-
1
8
2
"
2
"
W
S
U
P
4
"
4
"
4
"
3
"
R9
R10
C
B
C
B
4
"
4
"
V
S
U
P
2
"
O
W
O
W
O
W
O
W
4
"
4
"
C
O
4
"
M
F
D
S
D
P
-
2
F
D
P
-
5
C
O
4
"
V
S
T
R
4
"
S
S
D
N
4
"
4
"
4
"
3
"
3
"
3
"
C
O
2
"
2
"
2
"
R11
R12
S
D
S
D
F
D
F
D
P
-
2
P
-
2
F
D
P
-
2
5
C
O
C
O
C
O
C
O
C
O
P
-
1
7
3
"
3
"
3
"
2
"
2
"
2
"
3
"
4
"
3
"
2
"
4
"
V
S
T
R
3
"
3
"
3
"
3
"
3
"
2
"
3
"
3
"
2
"
2
"
2
"
2
"
3
"
2
"
3
"
3
"
4
"
S
S
D
N
C
O
C
O
3
"
3
"
2
"
3
"
3
"
R13
M
F
D
3
"
2
"
C
O
3
"
2
"
R14
4
"
4
"
M
F
D
M
F
D
M
F
D
4
"
3
"
3
"
3
"
C
O
G
MC
NE
TW
OR
K.C
OM
27
01 1st A
ve
nu
e S
, S
uite
10
0 | B
irm
in
gh
am
, A
L 3
52
33
20
5.8
79
.4
46
2 |
Te
l
dra
wn
b
y:
IS
SU
E D
AT
E
ch
ec
ke
d b
y:
sh
ee
to
f
GO
OD
WY
NM
IL
LS
CA
WO
OD
A
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
4/2
8/2
016
10
:18
:0
0 A
M
Wa
ld
orp
S
t. C
ullm
an
, A
L
JT
R/J
LC
CL
J
CU
LL
MA
N F
IR
E &
R
ES
CU
E S
TA
TIO
N N
o. 3
GM
C #
A
BH
M15
00
26
08
/3
1/16
Bid
S
et
BIRMINGHAM
TUSCALOOSA
JACKSON
NASHVILLE
www.edmondsengineering.com
Project Number :
(205) 988-2069
(205) 752-9915
(601) 362-6478
(615) 265-8071
BHM16018
BA
A
L
A
A
M
N
S
EE
C
I
D
L
N
E
E
R
I
G
N
E
PROFESSIONAL
No. 24747
W
A
D
E
S
W
A
R
T
TE
08-31-16
PL
UM
BIN
G - R
IS
ER
S
P0
.0
4
223
APPARATUS
BAYS210
ADMIN ENTRY
LOBBY100
OFFICE
MANAGER101
CORRIDOR100A
CONFERENCE
ROOM104
FIRE CHIEF102
FIRE MARSHAL106
INSPECTOR108
EMS OFFICER110
MEDICAL
SUPPLY
STORAGE112
POLICE
SUBSTATION114 TRAINING
EQUIPMENT
STOR112A
BREAK ROOM111
MENS
RESTROOM109
TRAINING
OFFICER107
TRAINING
ROOM116
MECH116C
WC116B
ADA WC116A
ELEC116D
FIRST AID116E
STOR116F
TECH116G
DECON211
838 SF
MAINTENANCE
BAY215
MAINTENANCE
STOR ROOM214
ELEC213
STAIR3
WC209AMECH
209C
WC205
WORKSTATIONS204
STOR209B
STATION
HOUSE LOBBY201
STATION CAPT
OFFICE202
TOWERSTAIR 1
DAY ROOM203
FILE STOR101A
MENS
RESTROOM105A
MEN'S
LOCKERS105
MECH115
ELEC113
WOMEN'S
LOCKERS103
COVEREDPATIO
CORRIDOR100C
237 SF
CORRIDOR100B
POLICE WC114A
MECH206A
STOR206B
MECH/STOR200A
GEAR ROOM208
VEST207
CORRIDOR200
STATION
HOUSESTAIR 2
JAN111A
F G HD
2
3
4
E
KITCHEN206
1
CBA
TANK STOR212
MECH213A
1/4" / 1'-0"
P-5 P-2
P-6
P-1WH-S1 ONSHELF
P-11
P-2P-4P-6P-5
P-7
P-7A
P-17
P-5
P-2
P-13
P-6P-5
P-2 P-1
P-4
P-2
P-5
P-15
P-8
P-12P-24
P-25
P-6
P-5
P-2
P-7P-7A
P-2
P-5
WH-1 WH-2
FD
FD
FD
FD
MFD
FD
FDFD
FD
OW
TRENCH
TRENCH
OW
4"ø
CO
CATCHBASIN (TYP)
4"VSTR
4"ø 4"ø
CATCHBASIN
TRENCH
TD
OW
CATCHBASIN
TRENCH
TD
4"ø
4"ø4"ø
4"ø4"ø4"ø
4"ø
4"ø
4"ø
3" VS UP
4"ø
4"ø 4"ø
CO
3" WS
MFD
PROVIDEISLANDVENTING
ST-2
ST-1
4"ø
4"ø
CO
3"ø
4"ø
4"ø
4"ø
3" WS &2" VS3"ø 3"ø
3"ø
4"ø
4"ø
3"ø
2" WS& VS
3"ø
MFD
4"ø
4"CO
MFD
MFD
3"ø
3"ø
R4
R3
R2
R1
R5
R6
R7
R8
R9
R10
MFD
4"ø
WH-2
WH-1
3" WS UP
MFD
MFD
3"ø
2"ø2"ø
2"ø 3"ø
4"ø
4" VSTR
4"ø
4"ø
2"ø
2"ø
3" VSTR
3" VSTR
2"ø
3"ø
3"ø
2" BELOWGRADE
3" VS2" VS
2"ø2"ø
MFD
CO
COORDINATE WITHCIVIL TO PROVIDE 4"SANITARY WASTE
4"VS
2" VENTUP
2" VENT BELOWGRADE
CO
CO4"ø
4"ø
3" WS/2" VS
3" WS,2" VS
2"ø
4"ø
P-17
2"ø 3"ø
4"ø
3" WS
2" WS UP
CO
OW
OW
OW
OW
CO
2"ø
2"ø
R14
P-18
COORDINATE WITH CIVIL TOPROVIDE 4" SANITARYINVERT -51.55 BFF
3"ø
4" SS UP
WCO
4"ø
4"ø
4"ø
4"ø
2"ø
3" WS,2" VS
3"ø
2" VS UP
MFD
4" VS UP
OIL INTERCEPTORSEE DETAIL
HIGH LEVELALARM
PROVIDE CONDUIT FORALARM WIRING
4"ø
4"ø4"ø
4" WS
S
COORDINATE WITHCIVIL TO PROVIDE6" STORM AT 18"BELOW FF
P-14
4"
CBCBCBCB
CB
CB CB CB
INVERT -36.5 BFFINVERT-42.75 BFF
IN JOISTSPACE
4"ø
4"ø
3"ø3"ø
3"ø
6" RL UP
6" STORM
4"ø
4" WS, 2" VS
4" WS, 2" VS
4"ø2"ø
3"ø 3"ø
SD
SD
SD
3"ø
2
P1.01
HOSE
DRYING
BASIN
TOWERSTAIR 1
FEC
CO
MFD
3"ø
3" WS, 2" VSUP IN WALL
4"ø
Project Number :
BIRMINGHAM
TUSCALOOSA
JACKSON
NASHVILLE
www.edmondsengineering.com
(205) 988-2069
(205) 752-9915
(601) 362-6478
(615) 265-8071
EDMONDSTrusted Engineering Solutions
270
1 1s
t A
ven
ue
S, S
uit
e 1
00
|
B
irm
ing
ham
, AL
35
233
205
.879
.44
62
|
Te
l G
MC
NE
TW
OR
K.C
OM
dra
wn
by:
ISS
UE
D
AT
E
che
cke
d b
y:sh
ee
to
f
GO
OD
WY
NM
IL
LS
CA
WO
OD
A
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
BHM160188/3
1/20
16 8
:35
:59
PM
Wa
ldo
rp S
t. C
ullm
an
, AL
PL
UM
BIN
G -
LE
VE
L1
-
NO
N-P
RE
SS
UR
E P
IPIN
G
PL
AN
P1.
01
JT
R/J
LC
CL
R
CU
LL
MA
N F
IRE
& R
ES
CU
E S
TA
TIO
N N
o. 3
GM
C #
A
BH
M15
00
26
08
/31/
20
16B
id S
et
SCALE: 1/8" = 1'-0"
PLUMBING - LEVEL 1 - NON-PRESSURE PIPING PLAN1
SCALE: 1/8" = 1'-0"
PLUMBING -ENLARGED LEVEL 1 - NON-PRESSURE PIPING PLAN2
DRAWING NOTES
(GENERAL) DRAWINGS ARE DIAGRAMATIC IN NATURE AND MAY NOT REPRESENT EXACTCONDITIONS REQUIRED FOR INSTALLATION OF PLUMBING SYSTEMS CONTRACTORSHALL COORDINATE ALL NEW WORK WITH ARCHITECTURAL PLANS AS WELL AS OTHERTRADES PRIOR TO FABRICATION OR INSTALLATION OF PLUMBING SYSTEMS OREQUIPMENT. FURNISH AND INSTALL ALL OFFSETS OR TRANSITIONS AS REQUIRED FORCOMPLETION OF WORK.
PLUMBING CONTRACTOR SHALL COORDINATE EXACT LOCATION OF PLUMBINGSYSTEM WITH ARCHITECTURAL PLANS, MECHANICAL SYSTEMS, FIRE PROTECTIONSYSTEMS ELECTRICAL SYSTEMS, CIVIL AND STRUCTURAL SYSTEMS.
PLUMBING SYSTEM CONTRACTOR SHALL FURNISH AND INSTALL COMPLETE.COORDINATE EXACT LOCATION OF ALL RATED OPENINGS WITH ARCHITECTURAL PLANS
1.
2.
3.
No. 24747
W
AD
ES W
AR
T
T E
B AAL
A A
MNSEECI D
L
N E E RIGNE
PROFESSIONAL
08-31-16
TRUE
NORTH
TRUE
NORTH
2
3
71 SF
STORAGE240
GYM241
STOR242
MECH243
P-7
P-7A
2" WS DN
4" VSTR
2"ø
MFD
4"ø4" WS
4"ø
R14
-
-
VEST221
ELEC221B
STOR222CL
227
MECH221A
STOR231
MECH230
ALCOVE 11220L
ALCOVE 12220M
ALCOVE 13220N
SLEEPING
LOFT220
ALCOVE 10220K
ALCOVE 9220J
BATHROOM226 MECH
225C
LAUNDRY225B
LOCKER ROOM225
BATHROOM225A
JAN225D
ALCOVE 16220R
POLE ROOM223
ALCOVE 15220Q
ALCOVE 14220P
ALCOVE 1220A
ALCOVE 2220B
ALCOVE 3220C
ALCOVE 4220D
ALCOVE 5220E
ALCOVE 6220F
ALCOVE 7220G
ALCOVE 8220H
F G HD
2
3
4
E
1
CBA
P-5
P-2
P-15
P-25 P-26
P-2
P-2
P-15
P-15
MFD
FD
FD
4" SS DN
FD
FD
4" VSTR
4" VENTDOWN
4" IN JOISTSPACE
4" WS
MFD
3" WS DN 2"ø
2" VSTR
2" VS DN
2"ø
2" WS DN
P-17
4" VSTR
4"ø
3" SS DN
4" VS UP
2"ø
IN JOIST SPACE
2"ø
R11
R13
R14
SD
SD
4"ø
3"ø SD
3"ø3"ø
P-5
P-5
4"ø4" VSTR
3"WS/VS
4"SS DN
3"
4"2"WS/VS
3"VS DN
R12
Project Number :
BIRMINGHAM
TUSCALOOSA
JACKSON
NASHVILLE
www.edmondsengineering.com
(205) 988-2069
(205) 752-9915
(601) 362-6478
(615) 265-8071
EDMONDSTrusted Engineering Solutions
270
1 1s
t A
ven
ue
S, S
uit
e 1
00
|
B
irm
ing
ham
, AL
35
233
205
.879
.44
62
|
Te
l G
MC
NE
TW
OR
K.C
OM
dra
wn
by:
ISS
UE
D
AT
E
che
cke
d b
y:sh
ee
to
f
GO
OD
WY
NM
IL
LS
CA
WO
OD
A
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
BHM160188/3
1/20
16 8
:36
:02
PM
Wa
ldo
rp S
t. C
ullm
an
, AL
PL
UM
BIN
G -
LE
VE
L 2
& 3
-
NO
N-P
RE
SS
UR
E P
IPIN
G
PL
AN
P1.
02
JT
R/J
LC
CL
R
CU
LL
MA
N F
IRE
& R
ES
CU
E S
TA
TIO
N N
o. 3
GM
C #
A
BH
M15
00
26
08
/31/
20
16B
id S
et
SCALE: 1/8" = 1'-0"
PLUMBING -LEVEL 3 GYM - NON-PRESSURE PIPING PLAN2
SCALE: 1/8" = 1'-0"
PLUMBING - LEVEL 2 - NON-PRESSURE PIPING PLAN1
DRAWING NOTES
(GENERAL) DRAWINGS ARE DIAGRAMATIC IN NATURE AND MAY NOT REPRESENT EXACTCONDITIONS REQUIRED FOR INSTALLATION OF PLUMBING SYSTEMS CONTRACTORSHALL COORDINATE ALL NEW WORK WITH ARCHITECTURAL PLANS AS WELL AS OTHERTRADES PRIOR TO FABRICATION OR INSTALLATION OF PLUMBING SYSTEMS OREQUIPMENT. FURNISH AND INSTALL ALL OFFSETS OR TRANSITIONS AS REQUIRED FORCOMPLETION OF WORK.
PLUMBING CONTRACTOR SHALL COORDINATE EXACT LOCATION OF PLUMBINGSYSTEM WITH ARCHITECTURAL PLANS, MECHANICAL SYSTEMS, FIRE PROTECTIONSYSTEMS ELECTRICAL SYSTEMS, CIVIL AND STRUCTURAL SYSTEMS.
PLUMBING SYSTEM CONTRACTOR SHALL FURNISH AND INSTALL COMPLETE.COORDINATE EXACT LOCATION OF ALL RATED OPENINGS WITH ARCHITECTURAL PLANS
1.
2.
3.
No. 24747
W
AD
ES W
AR
T
T E
B AAL
A A
MNSEECI D
L
N E E RIGNE
PROFESSIONAL
08-31-16
TRUE
NORTH
TRUE
NORTH
4" VSTR
4" VSTR
4" VSTR
4" VSTR
4" VSTR
2" VSTR
4" VS DOWN
SS
4" RD4" RD
4" RD
4" RD
4" RD4" RD
6" DNS
S
6"
4"
4"
4"
4"
6"
6" RL DN
Project Number :
BIRMINGHAM
TUSCALOOSA
JACKSON
NASHVILLE
www.edmondsengineering.com
(205) 988-2069
(205) 752-9915
(601) 362-6478
(615) 265-8071
EDMONDSTrusted Engineering Solutions
270
1 1s
t A
ven
ue
S, S
uit
e 1
00
|
B
irm
ing
ham
, AL
35
233
205
.879
.44
62
|
Te
l G
MC
NE
TW
OR
K.C
OM
dra
wn
by:
ISS
UE
D
AT
E
che
cke
d b
y:sh
ee
to
f
GO
OD
WY
NM
IL
LS
CA
WO
OD
A
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
BHM160188/3
1/20
16 8
:36
:05
PM
Wa
ldo
rp S
t. C
ullm
an
, AL
PL
UM
BIN
G -
LE
VE
L 3
-
RO
OF
PL
AN
P1.
03
JT
R/J
LC
CL
R
CU
LL
MA
N F
IRE
& R
ES
CU
E S
TA
TIO
N N
o. 3
GM
C #
A
BH
M15
00
26
08
/31/
20
16B
id S
et
SCALE: 1/8" = 1'-0"
PLUMBING - LEVEL 3 - ROOF PLAN1DRAWING NOTES
(GENERAL) DRAWINGS ARE DIAGRAMATIC IN NATURE AND MAY NOT REPRESENT EXACTCONDITIONS REQUIRED FOR INSTALLATION OF PLUMBING SYSTEMS CONTRACTORSHALL COORDINATE ALL NEW WORK WITH ARCHITECTURAL PLANS AS WELL AS OTHERTRADES PRIOR TO FABRICATION OR INSTALLATION OF PLUMBING SYSTEMS OREQUIPMENT. FURNISH AND INSTALL ALL OFFSETS OR TRANSITIONS AS REQUIRED FORCOMPLETION OF WORK.
PLUMBING CONTRACTOR SHALL COORDINATE EXACT LOCATION OF PLUMBINGSYSTEM WITH ARCHITECTURAL PLANS, MECHANICAL SYSTEMS, FIRE PROTECTIONSYSTEMS ELECTRICAL SYSTEMS, CIVIL AND STRUCTURAL SYSTEMS.
PLUMBING SYSTEM CONTRACTOR SHALL FURNISH AND INSTALL COMPLETE.COORDINATE EXACT LOCATION OF ALL RATED OPENINGS WITH ARCHITECTURAL PLANS
1.
2.
3.
No. 24747
W
AD
ES W
AR
T
T E
B AAL
A A
MNSEECI D
L
N E E RIGNE
PROFESSIONAL
08-31-16
TRUE
NORTH
REF.REF.REF.
REF.
UP
UP
APPARATUS
BAYS210
ADMIN ENTRY
LOBBY100
OFFICE
MANAGER101
CORRIDOR100A
CONFERENCE
ROOM104
FIRE CHIEF102
FIRE MARSHAL106
INSPECTOR108
EMS OFFICER110
MEDICAL
SUPPLY
STORAGE112
POLICE
SUBSTATION114 TRAINING
EQUIPMENT
STOR112A
BREAK ROOM111
MENS
RESTROOM109
TRAINING
OFFICER107
TRAINING
ROOM116
MECH116C
WC116B
ADA WC116A
ELEC116D
FIRST AID116E
STOR116F
TECH116G
DECON211
838 SF
MAINTENANCE
BAY215
MAINTENANCE
STOR ROOM214
ELEC213
STAIR3
WC209AMECH
209C
WC205
WORKSTATIONS204
STOR209B
STATION
HOUSE LOBBY201
STATION CAPT
OFFICE202
TOWERSTAIR 1
DAY ROOM203
FILE STOR101A
MENS
RESTROOM105A
MEN'S
LOCKERS105
MECH115
ELEC113
WOMEN'S
LOCKERS103
COVEREDPATIO
CORRIDOR100C
237 SF
CORRIDOR100B
POLICE WC114A
MECH206A
STOR206B
MECH/STOR200A
GEAR ROOM208
VEST207
CORRIDOR200
STATION
HOUSESTAIR 2
JAN111A
F G HD
2
3
4
E
KITCHEN206
1
CBA
TANK STOR212
MECH213A
MECH
P-5
P-2
P-6
P-1
P-11
P-2P-4P-6P-5
P-7
P-7A
P-17
P-5
P-2
P-13
P-14
P-6P-5
P-2 P-1P-4
P-2
P-5P-15
P-8
P-12
P-24
P-25
P-6
P-5
P-2
P-7 P-7A
P-2
P-5
FD W/INSERT
FD W/INSERT
FD W/INSERT
FD W/INSERT
FD W/INSERT
FD W/INSERT
FD
COORDINATE WITH CIVIL
2" WATER ENTRYSEE DETAIL
HB
WH
WHTRUCK FILL
WHTRUCK FILL
WHTRUCK FILL
WHTRUCK FILL
COORDINATE WITH CIVILTO PROVIDE 4" DOMESTICWATER W/ TRACK FILL
UTILITY MAINSDOWN TO 1STFLOOR CEILING
A A A
G
G
G
IN JOIST SPACE
4" DOMESTICWATER ENTRYSITE DETAIL
A
2 2 2
2 2 2 2
1
1
11
A
A
WH-S1 SEEDETAIL
2"ø
AA
A
A
A A
A A
4"ø
1/2" CW,HW DN
1" CWDN
1" CWDN
1/2" CW,HW DN
3/4"ø
WH
3/4" CW DN
3/4"ø
1/2" CW,HW
3/4" CW,HW DN
1/2" CW,HW
3/4"ø
3/4"ø
1" CW1/2" HWDN
1"ø
1/2" CW,HW DN 1" CW DN
1/2" CW,HW DN
3/4"ø
1/2"ø
G GG
3
P201
1/2"ø1/2"ø1/2" CW, HW DN
3/4" HW DN
2" CW DN
ALL FD'S MFD'STO HAVE TRAPINSERTS. TYPICAL
1/2"ø1/2"ø1/2"ø1/2"ø
2" CW,1/2" HWDN
3/4"ø3/4"ø
ALL FD'S & MFD'S TO HAVEDRAIN INSERTS
GAS METER SET
GENERATOR
GAS GENERATORSEE DETAIL
PROVIDE GAS METERINLET PRESSURE: VERIFYOUTLET PRESSURE: 2 PSILONGEST RUN: 350FTFLOW: 2770
PROVIDE BULKFEEDAS DETAILED ON P003
1 1/2" TO BUILDING
G
G
G
G
G
1 1/2" GAS VAVLEAND REGULATOR
1 1/2"ø
1 1/2"ø
1 1/2"ø
G G
1"ø
3/4"ø
BELOWGRADE
1/2" CW,HW DN
1/2" CW,HW DN
MFD W/INSERT
1"ø
1"ø3/4"ø
G
AIR COMPRESSORSEE DETAIL
65 CFH 65 CFH65 CFH
GGG
GGG
FD W/INSERT
FD W/INSERT
MFD W/INSERT
2"ø
2"ø
1"ø1"ø
3/4"ø3/4"ø
1/2"ø1/2"ø
1 1/2"ø 2"ø
3/4"ø 2"ø
3/4"ø
1 1/2" CW, 3/4" HW
1" CW
1/2" CWIN WALL
1/2"ø1/2"ø
G
1/2"ø
G
3/4" CW UP
HB W/VALVETYPICAL
1 1/2"ø
1 1/2"ø
HIGH LIMITALARM
ALL AIR TO BE INSTALLEDTO BLOW OFF AT LOWPOINT DRAIN DOWNS
GFH-3GFH-2GFH-1
GFH-5 GFH-6 GFH-7 GFH-8
GFH-4
STARTER
65 CFH
65 CFH 65 CFH 65 CFH 65 CFH
3/4"ø3/4"ø
1" AIR DROPPOINT BLOWOFF
1"
1"
1"
2"
1"ø
2"ø1 1/2"ø
1"ø
1 1/2"ø
1"ø
1"ø
BALANCING VALVE
3/4" WATER
G
3/4" GAS
3/4"ø
FD W/INSERT
3/4"ø
1"ø
2"ø2"ø
1"ø
GFF-111
G
1/2"ø
3"ø4"ø
4"ø
IN ATTIC
G
G
3/4"ø
1"ø
2" CW, 1"HW DN
1 1/2"ø
BALANCINGVALVE
3/4" GAS TOMECH 242SEE P2.02/2
3/4"ø
1" CW, 3/4"HW UP
1/2"øGFF-20680 CFH
G
MECH115
ELEC113
ST-1
G
MFD
REVERSE MANIFOLDPACKAGE
WH-1G
G
3/4"ø
GG
GFF-203
GFF-110
GFF-106
GFF-101
1"ø
2"ø
2"ø
3/4"ø
G
G
1"ø
3/4"ø
1/2"ø
1/2"ø
1/2"ø
RCP-BTMV-B
G
G
1"ø
MFD
MFD
MFD
ST-2
1/2"
1"
1"ø
HOSE
DRYING
BASIN
TOWERSTAIR 1
FEC
MFD W/INSERT
Project Number :
BIRMINGHAM
TUSCALOOSA
JACKSON
NASHVILLE
www.edmondsengineering.com
(205) 988-2069
(205) 752-9915
(601) 362-6478
(615) 265-8071
EDMONDSTrusted Engineering Solutions
270
1 1s
t A
ven
ue
S, S
uit
e 1
00
|
B
irm
ing
ham
, AL
35
233
205
.879
.44
62
|
Te
l G
MC
NE
TW
OR
K.C
OM
dra
wn
by:
ISS
UE
D
AT
E
che
cke
d b
y:sh
ee
to
f
GO
OD
WY
NM
IL
LS
CA
WO
OD
A
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
BHM160188/3
1/2
016
8:3
6:1
3 P
M
Wa
ldo
rp S
t. C
ullm
an
, AL
PL
UM
BIN
G -
LE
VE
L 1
-
PR
ES
SU
RE
PIP
ING
PL
AN
P2.0
1J
TR
/JL
C
CL
R
CU
LL
MA
N F
IRE
& R
ES
CU
E S
TA
TIO
N N
o. 3
GM
C #
A
BH
M15
00
26
08
/31/
20
16B
id S
et
SCALE: 1/8" = 1'-0"
PLUMBING - LEVEL 1 - PRESSURE PIPING PLAN1
1 COORDINATE LOCATION OF AIR HOSE REEL WITH FIRE EQUIPMENT.TERMINATE WITH 75FT OF 3/4" HOSE.
2 COORDINATE WITH OVER HEAD DOORS.
PRESSURE PIPING NOTES
SCALE: 1/4" = 1'-0"
PLUMBING - LEVEL 1 - PRESSURE ENLARGED PLAN3
SCALE: 1/8" = 1'-0"
PLUMBING - ENLARGED LEVEL 1 - PRESSURE PIPING PLAN2
DRAWING NOTES
(GENERAL) DRAWINGS ARE DIAGRAMATIC IN NATURE AND MAY NOT REPRESENT EXACTCONDITIONS REQUIRED FOR INSTALLATION OF PLUMBING SYSTEMS CONTRACTORSHALL COORDINATE ALL NEW WORK WITH ARCHITECTURAL PLANS AS WELL AS OTHERTRADES PRIOR TO FABRICATION OR INSTALLATION OF PLUMBING SYSTEMS OREQUIPMENT. FURNISH AND INSTALL ALL OFFSETS OR TRANSITIONS AS REQUIRED FORCOMPLETION OF WORK.
PLUMBING CONTRACTOR SHALL COORDINATE EXACT LOCATION OF PLUMBINGSYSTEM WITH ARCHITECTURAL PLANS, MECHANICAL SYSTEMS, FIRE PROTECTIONSYSTEMS ELECTRICAL SYSTEMS, CIVIL AND STRUCTURAL SYSTEMS.
PLUMBING SYSTEM CONTRACTOR SHALL COORDINATE FIRE SPRINKLER SYSTEM WITHDUCTWORK, ELECTRICAL, AND STRUCTURAL. SPACE ABOVE CEILING IS LIMITED ANDCAREFUL COORDINATION WITH OTHER TRADES IS REQUIRED.
PLUMBING SYSTEM CONTRACTOR SHALL FURNISH AND INSTALL COMPLETE.COORDINATE EXACT LOCATION OF ALL RATED OPENINGS WITH ARCHITECTURAL PLANS
1.
2.
3.
4.
No. 24747
W
AD
ES W
AR
T
T E
B AAL
A A
MNSEECI D
L
N E E RIGNE
PROFESSIONAL
08-31-16
TRUE
NORTH
TRUE
NORTH
TRUE
NORTH
2
3
71 SF
STORAGE240
GYM241
STOR242
MECH243
P-7
P-7A
1/2" CW DN
MFD W/INSERT
GFF-241
G
3/4"ø
--
VEST221
ELEC221B
STOR222CL
227
MECH221A
STOR231
MECH230
ALCOVE 11220L
ALCOVE 12220M
ALCOVE 13220N
SLEEPING
LOFT220
ALCOVE 10220K
ALCOVE 9220J
BATHROOM226 MECH
225C
LAUNDRY225B
LOCKER ROOM225
BATHROOM225A
JAN225D
ALCOVE 16220R
POLE ROOM223
ALCOVE 15220Q
ALCOVE 14220P
ALCOVE 1220A
ALCOVE 2220B
ALCOVE 3220C
ALCOVE 4220D
ALCOVE 5220E
ALCOVE 6220F
ALCOVE 7220G
ALCOVE 8220H
F G HD
2
3
4
E
1
CBA
P-27 P-2
P-15
P-23 P-26
P-2
P-2
P-15
P-15
P-27
P-27
MFD W/INSERT
FD
FD
FD
FD W/ INSERTTYPICAL
1/2" CW, HW DN
1/2" CW, HW DN
1/2" CW, HW DN
ACCESS PANEL1" CW, 3/4" HW DN
1/2" CW, HW DN
3/4" CW DN
ALL FD'S & MFD'S TO HAVEDRAIN INSERTS
MFD W/TRAPINSERT
1" CW INWALL
2" CW DN W/ VALVE
HB
3/4" CWDN WITHVALVE
HB
PIPING IN JOIST SPACESHOWN ON P2.01
MFD W/INSERT
1"ø
1/2" CW UP
1/2"ø
CW DN W/HOSE BIBB
GFF-2W
GG
G
G
GFF-2E
G G
1/2"ø
1/2" GAS DN TOGAS DRYER
80 CFH
100 CFH
3/4"ø
1/2"ø
Project Number :
BIRMINGHAM
TUSCALOOSA
JACKSON
NASHVILLE
www.edmondsengineering.com
(205) 988-2069
(205) 752-9915
(601) 362-6478
(615) 265-8071
EDMONDSTrusted Engineering Solutions
270
1 1s
t A
ven
ue
S, S
uit
e 1
00
|
B
irm
ing
ham
, AL
35
233
205
.879
.44
62
|
Te
l G
MC
NE
TW
OR
K.C
OM
dra
wn
by:
ISS
UE
D
AT
E
che
cke
d b
y:sh
ee
to
f
GO
OD
WY
NM
IL
LS
CA
WO
OD
A
B
C
D
E
F
G
H
J
K
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12
A
B
C
D
E
F
G
H
J
K
BHM160188/3
1/2
016
8:3
6:1
6 P
M
Wa
ldo
rp S
t. C
ullm
an
, AL
PL
UM
BIN
G -
LE
VE
L 2
& 3
-
PR
ES
SU
RE
PIP
ING
PL
AN
P2.0
2J
TR
/JL
C
CL
R
CU
LL
MA
N F
IRE
& R
ES
CU
E S
TA
TIO
N N
o. 3
GM
C #
A
BH
M15
00
26
08
/31/
20
16B
id S
et
SCALE: 1/8" = 1'-0"
PLUMBING - LEVEL 3 GYM - PRESSURE PIPING PLAN2
SCALE: 1/8" = 1'-0"
PLUMBING - LEVEL 2 - PRESSURE PIPING PLAN1
DRAWING NOTES
(GENERAL) DRAWINGS ARE DIAGRAMATIC IN NATURE AND MAY NOT REPRESENT EXACTCONDITIONS REQUIRED FOR INSTALLATION OF PLUMBING SYSTEMS CONTRACTORSHALL COORDINATE ALL NEW WORK WITH ARCHITECTURAL PLANS AS WELL AS OTHERTRADES PRIOR TO FABRICATION OR INSTALLATION OF PLUMBING SYSTEMS OREQUIPMENT. FURNISH AND INSTALL ALL OFFSETS OR TRANSITIONS AS REQUIRED FORCOMPLETION OF WORK.
PLUMBING CONTRACTOR SHALL COORDINATE EXACT LOCATION OF PLUMBINGSYSTEM WITH ARCHITECTURAL PLANS, MECHANICAL SYSTEMS, FIRE PROTECTIONSYSTEMS ELECTRICAL SYSTEMS, CIVIL AND STRUCTURAL SYSTEMS.
PLUMBING SYSTEM CONTRACTOR SHALL COORDINATE FIRE SPRINKLER SYSTEM WITHDUCTWORK, ELECTRICAL, AND STRUCTURAL. SPACE ABOVE CEILING IS LIMITED ANDCAREFUL COORDINATION WITH OTHER TRADES IS REQUIRED.
PLUMBING SYSTEM CONTRACTOR SHALL FURNISH AND INSTALL COMPLETE.COORDINATE EXACT LOCATION OF ALL RATED OPENINGS WITH ARCHITECTURAL PLANS
1.
2.
3.
4.
No. 24747
W
AD
ES W
AR
T
T E
B AAL
A A
MNSEECI D
L
N E E RIGNE
PROFESSIONAL
08-31-16
TRUE
NORTH
TRUE
NORTH