Details of Contracts awarded with respect to RVNL/PIU/Bilaspur as on 28.02.2011.
Tender
Number
Date of
Opening
Description of Item/Work Contract No
& date of
award
Contractor’s
Name
Quantity
(for supply
contract)
Estimated
Cost (for
Engg./Elect.
/ S&T/
Mech.)
Rate (for supply
contract)
Tendered Cost
(for Engg./Elect./
S&T/ Mech.)
Value of
Contract
Scheduled
Completion
date
RVNL/Raipur
/SA -KH-
KHD- ANP/5
Dt. 6/10/07
29.11.07 Construction of Road bed, Major & Minor
Bridges and Track linking (excluding supply of
Rails and Sleepers, Thick Web Switches and
special Sleepers) S&T and OHE & General
Electrical Work in connection with Doubling
between Salka Road- Khongsara (25.8 Km)
and Khodri-Anuppur (61.6 Km) on Bilaspur
Division of South East Central Railway in
Chhattisgarh and MP State, India.
RVNL/Raipur/
SA -KH-KHD-
ANP/ 5
Dt. 15/04/08
M/s DS
Constructions
Ltd, Best &
Crompton
Engineers Ltd.
(JV), C-66,
South
Extension-11,
New Delhi –
110049.
170.12 Cr. 177.498 Cr 177.498 Cr 30.05.2010
Extended up
to
30.06.2011
2008/RVNL/
Bilaspur/DRZ
-RGH
Dt.30.06.08
12.08.08 Conducting Final Location Survey, marking
centre line for Final Alignment on ground,
Design detailed Engineering, preparation of
Drawings and approval from RVNL/Railway for
doubling of Dallirajhara-Rowghat New Rail
link (95.00 Km) on Raipur Division of
S.E.C.Railway.
CPM/RVNL/BS
P/DRZ-
RGH/FLS/01
Dt.23.09.08
M/s Balaji Rail
Road Systems
Ltd, Plot No. 3,
Sitaram Nagar,
Staff Road,
Near Diamond
Point,
Secunderabad
500009
0.9022 Cr. 0.9497Cr 0.9497Cr 15.02.2009
extended up
to 30.04.2011 RVNL
2009/RVNL/
Bilaspur/DRZ
-ROW/02
Dt.12.03.09
16.06.09 Construction of Road bed, supply of ballast,
major & minor bridges, Residential and
service buildings & general electrical work etc.
, for Dallirajhara-Keoti section( 42 Kms) in
connection with a new rail link between
Dallirajhara and Rowghat in Raipur Division of
S.E.C.Railway in the state of Chhattisgarh
( India).
CPM/RVNL/BSP
/DRZ-
Keoti/SMS/736
Dt.20.10.09
M/s SMS
Infrastructure
Limited- 267
Ganesh
Phadnavis
Bhavan, Near
Triangular
Park,
Dharampeth,
Nagpur
440010
115.629 Cr 97.815 Cr. 97.81Cr. 09.06.2012
(30 months
including
Defect
Liability
Period of 6
Months)
RVNL/Raipur
/SA-KH-KHD-
ANP/ PMC-2
dtd.19.11.07
21.12.07 Project Management Consultancy (PMC) for
Construction of Roadbed, Major and Minor
Bridges, Track Linking (excluding supply of
rails, sleepers, thick web switches & special
sleepers), S&T, and OHE and General
Electrical work in connection with doubling
between Salka Road- Khongsara ( 25.8 Km)
and Khodri- Anuppur (61.6 Km) on Bilaspur
Division of South East Central Railway in
Chhattisgarh & M.P. State ( India).
RVNL/Raipur/
SA-KH-KHD-
ANP/ PMC-2
dtd.29.04.08
M/s S.N.Bhobe
& Associates
Pvt.
Ltd,Banking
Complex No. II
Unit
No.10,Plot No.
9 & 10, Sector-
19A,Vashi,
Navi Mumbai-
400 705
NIL 3.34 Cr. 3.34 Cr. 23.12.2010
(30 months
including
Defect
Liability
Period of 6
Months)
Extended up
to
Dt.30.06.11.
RVNL/Bilasp
ur/DRZ-
ROW/PMC-
2/ dt. 21-09-
09
01.12.09 Project Management Consultancy (PMC)
tender for “construction of roadbed, supply of
ballast, p-way, major & minor bridges,
residential and service buildings, signal and
telecom & electrical work etc., for dallirajhara
– rowghat new rail link project in raipur
division of south east central railway in the
state of chhattisgarh, india”
CPM/RVNL/BSP
/DRZ-
ROW/PMC(Ten
der)/1529
Dt.28.07.10
M/S Lion
Engineering
Consultant &
M/S
Consulting
Engineers
Group Ltd (JV),
Home No.14,
Deepak
Society,
Chhunna
NIL 3.0285 Cr 3.0285 Cr 13.09.2013
(36 months
including
Defect
Liability
Period of 6
Months)
RVNL
DGM/P-I/RVNL/BSP
Bhatti, Kolar
Road, Bhopal
(MP)
2006/RVNL/
Raipur/Anup
pur-
Bilaspur/3
Dt.22.11.06
04.01.07 Conducting Detailed Designing Engineering (
Civil, P.Way and Electrical Engineering), Yard
Drawings, Preparation of LOP Assistance in
land acquisition and forest clearances,
Detailed Construction Estimate and BOQ for
Doubling between Khodri-Anuppur (61.6Km)
and Salka Road-Khongsara (25.8KM) on
Bilaspur Division of South East Central
Railway.
CPM/RVNL/
Raipur/ Salka
Road-Annupur
Dt.16.01.07
M/S Monarch
Surveyors &
Contractor
Pvt. Ltd. Of 67,
Rujeta Appt.
Panmala,
Pune-30.
Rs.
57,30,000/-
Rs. 52,14,300/- Rs.
52,14,300/-
16.05.2007
Extended up
to 30.09.10
grant of
extension
under
process upto
31.03.11
2006/RVNL/
Mumbai/
Bilaspur
Yard/ Fly
Over/04
Dt.23.11.06
04.01.07 Conducting Confirmatory Final Location
Survey (FLS) of Fly Over at Bilaspur yard and
making the centre line of final alignment on
the ground for BG double line conforming to
the standards of a Group A on FLYOVER and
at its approaches in connection with doubling
of Bilaspur-Anuppur section along with
Detailed Designing of (Civil, P.Way, and
Electrical Engineering) aspects, preparation of
Bill of Quantities including land acquisition on
SEC Railway.
CPM/RVNL/
Raipur/Salka
road-Anuppur
Dt.16.01.07
M/S Monarch
Surveyors &
Contractor
Pvt. Ltd. Of 67,
Rujeta Appt.
Panmala,
Pune-30.
Rs.
19,48,400/-
Rs. 18,12,012/- Rs.
18,12,012/-
30.03.07
Extended up
to 30.09.10
grant of
extension
under
process upto
31.03.11 RVNL
Sl.No. TENDER NO. Date of Opening
Description of Item/Work Contract No. & date of Award
Contractors Name
Trender Cost
Value of contract
Completion date
1 RVNL/KOL/NOA‐BARA‐DKAS/METRO Dt. 30.11.10
Tech. Bid ‐03.01.2011 Price Bid 27.01.2011
Execution of Design & construction of PSC viaduct, Embankment and Stations including E&M works in connection with extension of Metro Railway Line Naopara (excluding) ‐ Baranagar‐ Daksineswar of Kolkata Metro.
No.RVNL/NOA‐BARA‐DAKS/METRO/TENDER(R)/1 dt.04.02.2011
M/s. CCCL‐SAM India(JV)
223Cr. 199.88Cr. 30 months from the date of issue of LOA
2 RVNL/KOL/JOKA‐BEHALA‐MOMINPUR/VIADUCT/METRO Dt. 27.09.10
Tech. Bid ‐12.11.2010 Price Bid 18.12.10
Package - I : "Construction of viaduct including related works for 4.748 km length excluding station areas from CH (-)1250 to CH 4128.00 between Joka to Behala Chowrasta including depot approach at Joka, in Joka-BBD BAG corridor of Kolkata Metro Railway Line."
RVNL/KOL/METRO/JOKA‐BBD BAG/TENDER/2/BEC File Vol.1/PACKAGE‐I Dt.28.12.2010
M/s. Simplex Infrastructers Ltd.
206.30 Cr. 181.14 Cr. 30 months from the date of issue of LOA
3 RVNL/KOL/JOKA‐BEHALA‐MOMINPUR/VIADUCT/METRO Dt. 27.09.10
Tech. Bid ‐12.11.2010 Price Bid 18.12.10
Package - II : "Construction of viaduct including related works for 4.762 km length excluding station areas from CH 4128.00 to CH 9700.00 between Behala Chowrasta to Mominpur in Joka-BBD BAG corridor of Kolkata Metro Railway Line."
RVNL/KOL/METRO/JOKA‐BBD BAG/TENDER/2/BEC File Vol.1/PACKAGE‐II Dt.28.12.2010
M/s. Simplex Infrastructers Ltd.
206.50 Cr. 184.72 Cr. 30 months from the date of issue of LOA
DETAILS OF CONTRACTS AWARDED UPTO FEB. 2011 BY PIU KOLKATA
RVNL
S.No Tender No. Date of
Opening
Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract)
Estimated Cost (for
Engg./Elect./S&T/Mech.)
Rate (for supply contract)
Tendered Cost (for
Engg./Elect./S&T/Mech.)
Scheduled Completion
Date
1 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges,
Track Linking (excluding supply of rails, thick web
switches & sleepers), S&T and OHE & General Electrical
work in connection with 3rd
line between Habibganj &
Bina (144.76 Km) on Bhopal Division of West Central
Railway in the state of Madhya Pradesh (India) - Package
No. 1 between Bina (Incl) to Ganj Basoda (Incl) chainage
975.16 to 928.500 (Km 46.66).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-1 dated
31.08.2009 (Contract
agreement yet to be
done)
M/s. Larsen & Toubro Ltd,ECC
Division,Post Box No. 979,Mount
Poonamalle Road,Manakakkam,
Chennai-600089.--
Rs 141.88 Cr March, 2012
2 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges,
Track Linking (excluding supply of rails, thick web
switches & sleepers), S&T and OHE & General Electrical
work in connection with 3rd
line between Habibganj &
Bina (144.76 Km) on Bhopal Division of West Central
Railway in the state of Madhya Pradesh (India) - Package
No. 2 between GanjBasoda (Excl) to Sanchi (Incl)
chainage 928.500 to 879.750 (Km 48.75).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-2 dated
31.08.2009 (Contract
agreement yet to be
done)
M/s. Larsen & Toubro Ltd,ECC
Division,Post Box No. 979,Mount
Poonamalle Road,Manakakkam,
Chennai-600089.
--
Rs. 150.05 Cr March, 2012
3 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges,
Track Linking (excluding supply of rails, thick web
switches & sleepers), S&T and OHE & General Electrical
work in connection with 3rd
line between Habibganj &
Bina (144.76 Km) on Bhopal Division of West Central
Railway in the state of Madhya Pradesh (India) - Package
No. 3 between Sanchi (Excl) to Habibganj (Incl) chainage
879.750 to 830.850 (Km 48.9).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-3 dated
31.08.2009 (Contract
agreement yet to be
done)
M/s. NCCL-ECIECCL-ARPL (JV),
C/o M/S Nagarjuna Construction
Company Limited,4th Floor, Uma
Enclave, Road No. 9,
HYDERABAD-500034. --
Rs 135.65 Cr March, 2012
4 RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/Switches; Lot
No. 31030801
27.06.2008 Manufacture and supply of P.way items for BG (1673mm)
for patch doubling of Guntakul-Raichur Section under
CPM/RVNL/SC
RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/Switches dated
30.03.2009
M/s VAE VKN Industries Pvt.
Ltd., 24/5 Sriram Road, Civil
Lines, Delhi-110054.
Manufacture and Supply: Rs
1.25 Cr for 60 kg 1 in 12 Switches
and Rs 16.97 Lakh for 60 kg 1 in 8
1/2 Switches & Rs 4.24 Lakh for
52 kg 1 in 8 1/2 Switches.
Transportation: Rs 26.50 Lac for
60 kg 1 in 12 Switches and Rs
4.50 Lac for 52 kg 1 in 8 1/2
Switches & Rs 1.12 Lakh for 60 kg
1 in 8 1/2 Switches.
Rs 1.77 Cr 30.11.2010
(extended)
5 RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/CMS Xing; Lot
No. 31030802
27.06.2008 Manufacture and supply of P.way items for BG (1673mm)
for patch doubling of Guntakul-Raichur Section under
CPM/RVNL/SC
RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/CMS Xing dated
30.03.2009
M/s VAE VKN Industries Pvt.
Ltd., 24/5 Sriram Road, Civil
Lines, Delhi-110054.
Manufacture and Supply: Rs
2.47 Cr for 60 kg 1 in 12 CMS
Crossing and Rs 0.5 Cr for 60 kg 1
in 8 1/2 CMS Crossing.
Transportation: Rs 3.18 Lac for
60 kg 1 in 12 CMS Crossing and
Rs 0.6 Lac for 60 kg 1 in 8 1/2
CMS Crossing.
Rs 3.02 Cr 30.08.2010
(extended)
6 RVNL/Mumbai/Bina-
BPL/ 2006 dated
30.08.2006
30.08.2006 Conducting Final Location Survey (FLS) marking the
center line of the final alignment on the ground and
Detailed Design Engg (DDE) for BG third line between
Bina-Bhopal (138.423 Km) in WC Rly.
RVNL/Mumb/RPS/FLS(Bi
na- BPL)/ 2006 dated
11.12.2006
M/s Monarch Services &
Contractors, Sinhagad Road,
Pune-411030
--- Rs 1.23 Cr 31.03.2011
(extended)
Details of Contracts Placed upto the month of Feb' 2011 under GM/P-III
RVNL
7 RVNL/BPL/S&T/HBJ-
BPL-BIN/2
09.06.2009 Supply, installing, modification, testing &commissing of
electronic interlocking system alongwith modification, in
relay based indoor signaling arrangement at PI/RRI/LC
gates, IBH etc. alongwith yard remodeling in connection
with the work of 3rd line between Habibganj & Bina
(144.76 Km) on Bhopal Division of West Central Railway
in the state of Madhya Pradesh (India)
No: RVNL/BPL/S&T/HBJ-
BPL-BIN/2 dated
23.10.2009
M/s Bharat Rail Automations (P)
Ltd. B-107, Mandpeshwar
Industrial Estate, SVP ROAD,
Borivali (W), Mumbai-400092
Signaling & Telecommuction - Rs
23,32,40,706/-
Rs 23.32 Cr 22.10.2011
8 RVNL/P-III/PSC Turnout
Sleeper Set/Guntakul-
Raichur/2009; Lot No.
5030901
04.09.2009. Manufacture and supply of P.way items for BG (1673mm)
for for patch doubling of Guntakul-Raichur Section under
CPM/RVNL/SC
RVNL/P-III/PSC Turnout
Sleeper Set/Guntakul-
Raichur/2009; Lot No.
5030901 dated
13.11.2009.
M/s Patil Rail Infrastructure Pvt
Ltd., The Grand, 3rd & 4th Floor
6-3-1090/B-4 Raj Bhawan Road,
Somaji guda, Hyderabad-500082.
Manufacture and Supply: Rs
3.22 Cr. for PSC Turnout Sleeper
Set for 1 in 12, 60 kg and Rs
52.63 Lakh for PSC Turnout
Sleeper Set 1 in 8 1/2 for 60 kg .
Transportation: Rs 32.86 Lac for
PSC Turnout Sleeper Set for 60 kg
1 in 12 and Rs 6 Lakh for PSC
Turnout Sleeper Set 1 in 8 1/2 for
60 kg.
Rs 4.14 Cr 30.11.2010.
9 RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120803
04.09.2009. Manufacture and supply of P.way items for BG (1673mm)
for Salka Road- Anuppur Section under
CPM/RVNL/Bilaspur.
RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120803 dated
17.11.2009
M/s Rayalaseema Concrete
Sleepers Pvt Ltd., The Grand,
3rd & 4th Floor 6-3-1090/B-4 Raj
Bhawan Road, Somaji guda,
Hyderabad-500082.
Manufacture and Supply: Rs
3.34 Cr. for PSC Turnout Sleeper
Set for 1 in 12, and Rs 25.26 Lac
for PSC T/out Sleeper Set 1 in 8
1/2 60 kg & Rs 10.9 lac for PSC
Turnout Sleeper Set for Derailing
Switch 60 Kg, Transportation:
Rs 20.90 Lac for PSC Turnout
Sleeper Set for 60 kg 1 in 12 and
Rs 1.68 Lakh for PSC Turnout
Sleeper Set 1 in 8 1/2 for 60 kg &
Rs 0.84 lac for PSC Turnout
Sleeper Set for Derailing Switch
60 Kg.
Rs 3.92 Cr 31.12.2010.
10 RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120801
04.09.2009. Manufacture and supply of P.way items for BG
(1673mm)for Salka Road- Anuppur Section under
CPM/RVNL/Bilaspur.
RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No.11120801 dated
18.11.2009
M/s Hindustan Engg. & Industries
Ltd., Mody Building, 27, Sir RN
Mukherji Marg, Kolkata-700001.
Manufacture and Supply: Rs
5.70 Lac for 1 in 8 1/2 52Kg
Curved Switches and Rs 5.10 Lac
for 1 in 81/2 Derailing Switches
52Kg. Transportation: Rs 1.31
Lac for 1 in 8 1/2 52Kg Curved
Switches and Rs 1.08 Lac for 1 in
8 1/2 Derailing Switches
Rs 13.19 Lac 10.09.2010
(extended)
11 RVNL/BPL/Elect/HBJ-
BIN/TSS
23.07.2009 Design, Supply, Erection, Testing & commissioning of
132/25 KV Traction Sub-station, Feeding Post, Fixed
Capacitor, bank System & other associated works at
BARETH & SANCHI, TRACTION SUB STATIONS,
Augmentation & replacement of traction transformers AT
BINA TSS, by providing 3rd bay & modification in existing
Feeding Posts at Sukhisewania, Gulabganj in connection
with Electrification of 3rd line on BINA- BHOPAL section
of BHOPAL DIVISION of WCR.
RVNL/BPL/Elect/HBJ-
BIN/TSS
dated18/19.01.2010
M/s S. L. Enterprises 41-A,
Phase-II, Mayapuri Industrial
State, Delhi-110064
Electrical Items-Rs 3.89 Cr for
CORE SOR Items, Rs 11.36 Cr for
Traction Transformer, Rs 0.12 Cr
for Maintenance spares,Rs 0.09
Cr for Maintenance Tools, Rs 0.35
Cr for Site Facilities & Rs 2.65 Cr
for Misc. Items,etc.
Rs 18.47 Cr 18.01.2012
12 RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120802
04.09.2009. Manufacture and supply of P.way items for BG
(1673mm)for Salka Road- Anuppur Section under
CPM/RVNL/Bilaspur.
RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No.11120802 dated
18.11.2009
M/s Hindustan Engg. & Industries
Ltd., Mody Building, 27, Sir RN
Mukherji Marg, Kolkata-700001.
Manufacture and Supply: Rs
2.33 Cr for 60 Kg CMS Crossing 1
in 12, and Rs 17.75 Lac for 52 Kg
CMS Crossing 1 in 81/2
Transportation: Rs 2.53 Lac for
60 Kg CMS Crossing 1 in 12, and
Rs 0.24 Lac for 52 Kg CMS
Crossing 1 in 81/2.
Rs 2.53 Cr 31.10.2010
(extended)
RVNL
13 RVNL/New Delhi/B-B-
H/PMC/Pt-II
15.10.2009 Project Management Consultancy forConstruction of
Road Bed, Major and Minor Bridges, Track Linking
(excluding supply of rails, thick web switches & sleepers),
S&T and OHE & General Electrical work in connection
with 3rd line between Habibganj & Bina (144.76 Km) on
Bhopal Division of West Central Railway in the state of
Madhya Pradesh (India)
Notification of Award No
RVNL/New Delhi/B-B-
H/PMC/Pt-II dated
23.03.2010
M/s Aarvee Associates
Architects, Engineers &
Consultants Pvt Ltd, Ravula
Residancy, Srinagar Colony,
Hyderabad-82.
Renumerations for -Rs 6.57 Cr
for staff & Provision &
maintenance of Office for- Rs
2.70 Lacs.
Rs 6.60 Cr 22.10.2012
14 No. RVNL/P-
III/TWS/2009/Pt I
25.02.2010 Manufacture and Supply of Curved Switches with ZU-
1–60/60E1A1 Thick Web Tongue Rail and UIC 60 (880
Grade) Stock Rail conforming to Indian Railway
Specifications IRS-T-10-2000 for various rail road
projects in different regions of India.
Notification of Award No
No. RVNL/P-
III/TWS/2009/Pt I
Dated 26.05.2010
M/s VAE VKN RTT (JV),
Century Towers,
5th Floor,
45 Shakespeare Sarani,
Kolkata. - 700 017
Manufacture and Supply: Rs
17.79 Cr for 60 kg 1 in 12 TWS
Transportation: Rs 36.84 Lac for
60 kg 1 in 12 TWS.
Rs 18.16 Cr 25.05.2011
RVNL
Tender Number Date of
Opening
Description of Item/Work Contract No.
& date of
award
Contractor's Name Quantity (for supply
contract)
Estimated Cost (for
Engg./Elect./
S&T/Mech.)
Rate (for supply
contract)
Tenderered Cost
(for Engg./Elect./
S&T/Mech.)
Value of
Contract
Scheduled
completion
date
2005/RVNL/P/CC/PB
dtd. 22.07.05
29.07.05 Design & Proof checking of Additional
Openings in ROBs at Kosi Kalan and
Bhuteshwar
03.08.05 M/s Unique Engineers 3.6 Lacs 3.33 Lacs 3.33 Lacs 23.08.05
2005/RVNL/CC/P/DEE
/Palwal-Bhuteshwar
dt.12.08.05
29.08.05 Detailed Design Engineering for Palwal -
Bhuteshwar 3rd Line of NCR
12.09.05 M/s Scott Wilson
Kirkpatrick India Pvt. Ltd.
53.01 Lacs 47.00 Lacs 47.00 Lacs 11.03.06
2005/RVNL/CC/P/2005
/Jn.-Tkd dt.16.09.05
29.09.05 Detailed Design Engineering for Jn. Cabin -
Palwal 4th Line (34 Km.) of NR
07.10.05 M/s Dalal Mott Macdonald 16.94 Lacs 19.61 Lacs 19.61 Lacs 06.01.2006
2005/RVNL/CC/P/PCD
E/Palwal-Bhuteshwar
6.03.06 Proof Check of Detailed Design Engineering in
connection with Palwal-Bhuteshwar
28.03.06 M/s Dalal Mott Macdonald - 8.20 lakh. 8.20 Lacs 28.03.2006
2005/RVNL/P/CC/Civil
Works
27.12.05 All Civil Engineering and connected General
Electrical Works for Construction of Road bed
facilities, Buildings, Box-pushing in existing 2
ROBs including Misc. works for Palwal-
Bhuteshwar 3rd Line (81 Kms) on North
Central Railway
8.5.2006 M/s Era Consutrction
India Ltd.
62.05 Cr. 62.05 Cr. 62.05 Cr. 30.06.11
2005/RVNL/P/CC/PMC
(PB) dated 11.09.06
23.06.06 PMC of construction of palwal-Bhuteshwar 3rd
Line Doyubling (81 kms) in the State of
Haryana and Uttar Pradesh (India) including
Road bed facilities, Bridge works, Box
Pushing, Flash Butt Welding, P.Way,
miscellaneous Civil works, Electrical works
including OHE and Signalling and Interlocking
works on North Central Railway
27.09.06 M/s Scott Wilson
kirkpatric India Pvt. Ltd.
4.32 Cr. 4.28 Cr. 4.28 Cr. 13.12.11
RVNL/NDLS/ALJN-
GZB/2005/01 dated
14.10.05.
23.12.2005 Construction of Roadbed, Bridges, Facilities,
Installation of Track (excluding Supply of Rails, Thick
Web Switches & Weldable CMS Crossings) &
Electrical (Railway Electrification & General
Electrification) in connection with Provision of 3rd line
on Aligarh - Ghaziabad Section (106 Kms.) in the State
of Uttar Pradesh (India).
08.06.06 M/s IRCON - GANNON -
Dunkerly - JV
188.00 Crore 223.94 Cr. 223.45 Cr. 31.06.11
Details of Contracts Awarded upto Feb 2011 in connection with Palwal-Bhuteshawar and Aligarh-Ghaziabad 3rd line.
AGMP-II Feb-11.xls Contract Awarded upto March 09
RVNL
Tender Number Date of
Opening
Description of Item/Work Contract No.
& date of
award
Contractor's Name Quantity (for supply
contract)
Estimated Cost (for
Engg./Elect./
S&T/Mech.)
Rate (for supply
contract)
Tenderered Cost
(for Engg./Elect./
S&T/Mech.)
Value of
Contract
Scheduled
completion
date
RVNL/NDLS/ALJN-
GZB/2005/02 dated
16.11.05.
28.12.05 PMC for the Construction of Roadbed, Bridges,
Facilities, Installation of Track (Excluding Supply of
Rails, Thick Web switches and weldable CMS
crossings( & Electrical (Railway Electrification and
General Electrification) in connection with provision of
3rd Line on Aligarh - Ghaziabad Section (106 Kms) in
the state of Uttar Pradesh)
10.07.06 LASA-Wilbur Smith
Associates-JV4.46 Cr. 4.97 Cr. 4.90 crores 31.12.11
2005/RVNL/P/CC/P.Way(P
B) dated 20.3.2007.24.03.06 Construction of all P.Way Works including supply of
Ballast and P.Way Materials (Excluding Rails and PSC
sleepers), Signalling and OHE for Palwal-Bhuteshwar
3rd Line (81 kms.) on NC Railway.
20.03.07 M/s Kalindee- Cobra JV. 88.59 Cr. 118.7 Cr. 118.7 Cr. 31.12.11
AGM/P1/RVNL/A:KM-
GZB/Weld Tester/2010
dated 08.03.2010.
03.03.2010 Supply of Digital Ultrasonic Equipment for
Welded Rail Joints.
08.03.2010
(AGM/P1/RV
NL/ALJN-
GZB/Weld
Tester/2010
dt. 8.3.10.
M/s Electronics &
Engineering Co. (I) Pvt.
Ltd.
2 No. (Rs. 2,35,000/-
each + [email protected]%,
ST @ 12.5%).
Rs.5,78,052/- Rs.5,78,052/- 08.06.10
AGMP-II Feb-11.xls Contract Awarded upto March 09
RVNL
Detail of Contract awarded upto February, 2011
Project Planning & Development Department
Sr. No.
Tender No. Date of opening (Tender)
Description of work/study
Contract No. & date (LOA)
Contractor’s Name
Estimated cost of work (Rs.)
Tendered cost (Rs.)
Scheduled completion date
Physical Progress
1 RVNL/PP&D/Bankability/Buramara-Chakulia/10
25/03/10
Bankability study of Buramara-Chakulia New Line with upgradation of Rupsa-Buramara BG Line on SER.
RVNL/PP&D/Bankability/Buramara-Chakulia/10 30/04/2010
M/S Feedback Ventures Pvt. Ltd.
15,0
0,0
00/-
13,1
8,0
85/-
3 months from the date of submission of Bank Guarantee (14/05/2010) 15/08/2010 (extended)
Final Report submitted on 21.01.11 and under examination by RVNL Finance.
2 RVNL/PP&D/Bankability/Nallapadu-Guntakal/RE/10
09/04/10
Bankability study of electrification of Nallapadu-Guntakal section
RVNL/PP&D/Babkability/Nallapadu-Guntakal/RE/10 11/06/2010
M/s PricewaterhouseCoopers Pvt. Ltd
15,0
0,0
00/-
9,9
1,5
14/-
3 months from the date of submission of Bank Guarantee (25/06/2010) 25/09/2010 (extended)
Final Report submitted on 27.09.10 and under examination by RVNL Finance.
3. PP&D/RFP/BOT/CONSULT/2009/Pt. II
21.08.10
Project Consultancy services for development of PPP model in Railway projects.
PP&D/RFP/BOT/CONSULT/2009/Pt. II dated: 25.03.2010
M/s. RITES Ltd.
30,9
3,2
93/-
15,0
0,0
00/-
26 weeks from the date of acceptance of LOA(25/03/2010) 25/09/2010 (extended)
Final Report submitted 07.02.11 and under modification by RITES.
4. PP&D/RVNL/ HX-SBC/2010
23.08.10
Bankability study for Cuddapah-Bangalore New Line project.
PP&D/RVNL/ HX-SBC/2010 24/09/2010
M/s PricewaterhouseCoopers Pvt. Ltd.
12,8
9,3
40/-
14,5
0,1
00/-
8 weeks from the date of acceptance of CV(06/10/2010) 2/12/2010
Final Report submitted on 09.02.11 and under modification by PWC.
RVNL
5. PP&D/RVNL/ KUR-BOLANGIR/2010
21.09.10
Bankability study for Khurda Road-Bolangir New Line project.
PP&D/RVNL/ KUR-BOLANGIR/2010 04/10/2010
M/S Deloitte Touche Tohmatsu India Pvt. Ltd. 1
5,0
0,0
00/-
9,6
5,1
25/-
10 weeks from the date of acceptance of CV(15/10/2010) 25/01/2011)
Final Report sent to Railway Board on 02.02.11 for examination
6. PP&D/RVNL/DHD-INDB/Bank/2010
N.A.
Bankability study for Dahod-Indore New Line project in Western Railway.
PP&D/RVNL/DHD-INDB/Bank/2010 dated 24.12.2010
Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/21, Goyal Inter City, Block-C, Drive in Road, Thaltej, Ahemedabad-54
----
---
1,9
5,0
00/-
6 weeks from LAO (24.12.10) for Traffic Study. Being only Traffic Study Out sourced.
Study being done in house. Only Traffic Study Out sourced. Traffic Study report submitted on 21.02.11 and under examination.
7. PP&D/FT/HUK/2010
21.01.11
Feasibility Study for Development of Freight Terminal at Holambi Kalan on Northern Railway.
PP&D/FT/HUK/2010 dated 08.02.2011
M/S Deloitte Touche Tohmatsu India Pvt. Ltd. 5
,00,0
00/-
8,7
6,8
85/-
16 weeks from the date of acceptance of CV(18/02/2011) 10/06/2011)
Study in progress.
8. PP&D/RVNL/MCLA-NLDA/Bank/2010
N.A.
Bankability study for Macherla-NalgondaNew Line project in South Central Railway.
PP&D/RVNL / MCLA – NLDA / BANKA / 2010 dated 21.02.11
Traffic Study to Sh.Sanjeeva SHivesh, CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, C-block, Sec.-43, Gurgaon.
----
--
1,7
5,0
00/-
4 weeks for from LOA (21.02.11) for Traffic Study. Being only Traffic Study Out sourced.
Study being done in house. Only Traffic Study Out sourced.
9. PP&D/RVNL/ADI-UDZ/Bank/2010
N.A.
Bankability study for Ahmedabad-Udaipur Gauge Conversion project in Western Railway.
N.A. N.A. Study done in house. --
----
--
----
N.A.
Study done in house and Completed, Report sent to Rly. Board on 31.12.2010.
RVNL
Detail of Contract awarded upto March, 2011
Project Planning & Development Department
S. No
Tender No. Date of opening (Tender)
Description of work/study
Contract No. & date (LOA)
Contractor’s Name
Estimated cost of work (Rs.)
Tendered cost (Rs.)
Scheduled completion date
Physical Progress ( upto 31.03.11)
1 RVNL/PP&D/Bankability/Buramara-Chakulia/10
25/03/10
Bankability study of Buramara-Chakulia New Line with upgradation of Rupsa-Buramara BG Line on SER.
RVNL/PP&D/Bankability/Buramara-Chakulia/10 30/04/2010
M/S Feedback Ventures Pvt. Ltd.
15
,00
,00
0/-
13
,18
,08
5/-
3 months from the date of submission of Bank Guarantee (14/05/2010) 15/08/2010 (extended)
Final Report submitted on 21.01.11 and under examination by RVNL Finance.
2 RVNL/PP&D/Bankability/Nallapadu-Guntakal/RE/10
09/04/10
Bankability study of electrification of Nallapadu-Guntakal section
RVNL/PP&D/Babkability/Nallapadu-Guntakal/RE/10 11/06/2010
M/s PricewaterhouseCoopers Pvt. Ltd
15
,00
,00
0/-
9,9
1,5
14
/-
3 months from the date of
submission of Bank Guarantee
(25/06/2010)
25/09/2010 (extended)
Final Report submitted on 27.09.10 and under submission to RVNL BOD for approval.
3. PP&D/RFP/BOT/CONSULT/2009/Pt. II
21.08.10
Project Consultancy services for development of PPP model in Railway projects.
PP&D/RFP/BOT/CONSULT/2009/Pt. II dated: 25.03.2010
M/s. RITES Ltd.
30
,93
,29
3/-
15
,00
,00
0/-
26 weeks from the date of acceptance of LOA(25/03/2010) 25/09/2010 (extended)
Final Report submitted 07.02.11 and under modification by RITES.
4. PP&D/RVNL/ HX-SBC/2010
23.08.10
Bankability study for Cuddapah-Bangalore New Line project.
PP&D/RVNL/ HX-SBC/2010 24/09/2010
M/s PricewaterhouseCoopers Pvt. Ltd.
12
,89
,34
0/-
14
,50
,10
0/-
8 weeks from the date of acceptance of CV(06/10/2010) 2/12/2010
Final Report submittedon 09.02.11 and under modification by PWC.
5. PP&D/RVNL/ KUR-BOLANGIR/2010
21.09.10
Bankability study for Khurda Road-Bolangir New Line project.
PP&D/RVNL/ KUR-BOLANGIR/2010 04/10/2010
M/S Deloitte Touche Tohmatsu India Pvt. Ltd. 1
5,0
0,0
00
/-
9,6
5,1
25
/- 10 weeks from
the date of acceptance of CV(15/10/2010) 25/01/2011
Final Report sent to Railway Board on 02.02.11 for examination & acceptance.
RVNL
6. PP&D/RVNL/DHD-INDB/Bank/2010
N.A. Study being done in house.
Bankability study for Dahod-Indore New Line project in Western Railway.
PP&D/RVNL/DHD-INDB/Bank/2010 dated 24.12.2010
Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/21, Goyal Inter City, Block-C, Drive in Road, Thaltej, Ahemedabad-54
----
---
1,9
5,0
00
/- 6 weeks from LAO
(24.12.10) for Traffic Study which is out sourced.
Study being done in house. Only Traffic Study Out sourced.
Traffic Study report submitted on 21.02.11 and under examination.
7. PP&D/FT/HUK/2010 21.01.11
Feasibility Study for Development of Freight Terminal at Holambi Kalan on Northern Railway.
PP&D/FT/HUK/2010 dated 08.02.2011
M/S Deloitte Touche Tohmatsu India Pvt. Ltd.
5,0
0,0
00
/-
8,7
6,8
85
/- 16 weeks from
the date of acceptance of CV(18/02/2011) 10/06/2011
Study in progress.
8. PP&D/RVNL/MCLA-NLDA/Bank/2010
N.A. Study being done in-house.
Bankability study for Macherla-NalgondaNew Line project in South Central Railway.
PP&D/RVNL / MCLA – NLDA / BANKA / 2010 dated 21.02.11
Traffic Study to Sh.Sanjeeva SHivesh ( ex IRAS), CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, C-block, Sec.-43, Gurgaon.
----
--
1,7
5,0
00
/-
4 weeks from LOA (21.02.11) for Traffic Study which is out sourced. 20.03.2011
Study being done in-house. Only Traffic Study Out sourced.
9. PP&D/RVNL/ADI-UDZ/Bank/2010
N.A. Study done in house.
Bankability study for Ahmedabad-Udaipur Gauge Conversion project in Western Railway.
N.A. N.A. Study done in house.
----
--
----
--
N.A.
Study done in house and Completed, Report sent to Rly. Board on 31.12.2010.
10. No. PP&D/RVNL/BJP-
SDB/BANK/2010 20/12/2010
Bankability study of
Bijapur -
Shahabad New line
in South Western
Railway
No.
PP&D/RVNL/BJP-
SDB/BANK/2010
Dated: 08/03/2011
M/s Deloitte
Touche
Tohmatsu India
Pvt. Ltd.
15
,00
,00
0.0
0
12
,28
,17
9.4
7
(3 months from LOA dated 08.03.2011) 06/06/2011
Study in progress.
RVNL
S.No Tender No. Date of
Opening
Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract)
Estimated Cost (for
Engg./Elect./S&T/Mech.)
Rate (for supply
contract)
Tendered Cost
(for
Engg./Elect./S&
Scheduled
Completion
Date
1 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges, Track
Linking (excluding supply of rails, thick web switches &
sleepers), S&T and OHE & General Electrical work in
connection with 3rd
line between Habibganj & Bina (144.76
Km) on Bhopal Division of West Central Railway in the state
of Madhya Pradesh (India) - Package No. 1 between Bina
(Incl) to Ganj Basoda (Incl) chainage 975.16 to 928.500 (Km
46.66).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-1 dated
31.08.2009 (Contract
agreement yet to be done)
M/s. Larsen & Toubro Ltd,ECC
Division,Post Box No. 979,Mount
Poonamalle Road,Manakakkam,
Chennai-600089.--
Rs 141.88 Cr March, 2012
2 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges, Track
Linking (excluding supply of rails, thick web switches &
sleepers), S&T and OHE & General Electrical work in
connection with 3rd
line between Habibganj & Bina (144.76
Km) on Bhopal Division of West Central Railway in the state
of Madhya Pradesh (India) - Package No. 2 between
GanjBasoda (Excl) to Sanchi (Incl) chainage 928.500 to
879.750 (Km 48.75).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-2 dated
31.08.2009 (Contract
agreement yet to be done)
M/s. Larsen & Toubro Ltd,ECC
Division,Post Box No. 979,Mount
Poonamalle Road,Manakakkam,
Chennai-600089.--
Rs. 150.05 Cr March, 2012
3 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges, Track
Linking (excluding supply of rails, thick web switches &
sleepers), S&T and OHE & General Electrical work in
connection with 3rd
line between Habibganj & Bina (144.76
Km) on Bhopal Division of West Central Railway in the state
of Madhya Pradesh (India) - Package No. 3 between Sanchi
(Excl) to Habibganj (Incl) chainage 879.750 to 830.850 (Km
48.9).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-3 dated
31.08.2009 (Contract
agreement yet to be done)
M/s. NCCL-ECIECCL-ARPL (JV),
C/o M/S Nagarjuna Construction
Company Limited,4th Floor, Uma
Enclave, Road No. 9,
HYDERABAD-500034. --
Rs 135.65 Cr March, 2012
4 RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/Switches; Lot No.
31030801
27.06.2008 Manufacture and supply of P.way items for BG (1673mm)
for patch doubling of Guntakul-Raichur Section under
CPM/RVNL/SC
RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/Switches dated
30.03.2009
M/s VAE VKN Industries Pvt. Ltd.,
24/5 Sriram Road, Civil Lines,
Delhi-110054.
Manufacture and Supply: Rs 1.25 Cr
for 60 kg 1 in 12 Switches and Rs
16.97 Lakh for 60 kg 1 in 8 1/2
Switches & Rs 4.24 Lakh for 52 kg 1
in 8 1/2 Switches. Transportation:
Rs 26.50 Lac for 60 kg 1 in 12
Switches and Rs 4.50 Lac for 52 kg 1
in 8 1/2 Switches & Rs 1.12 Lakh for
60 kg 1 in 8 1/2 Switches.
Rs 1.77 Cr 30.11.2010
(extended)
5 RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/CMS Xing; Lot
No. 31030802
27.06.2008 Manufacture and supply of P.way items for BG (1673mm)
for patch doubling of Guntakul-Raichur Section under
CPM/RVNL/SC
RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/CMS Xing dated
30.03.2009
M/s VAE VKN Industries Pvt. Ltd.,
24/5 Sriram Road, Civil Lines,
Delhi-110054.
Manufacture and Supply: Rs 2.47 Cr
for 60 kg 1 in 12 CMS Crossing and
Rs 0.5 Cr for 60 kg 1 in 8 1/2 CMS
Crossing. Transportation: Rs 3.18
Lac for 60 kg 1 in 12 CMS Crossing
and Rs 0.6 Lac for 60 kg 1 in 8 1/2
CMS Crossing.
Rs 3.02 Cr 30.08.2010
(extended)
6 RVNL/Mumbai/Bina-
BPL/ 2006 dated
30.08.2006
30.08.2006 Conducting Final Location Survey (FLS) marking the center
line of the final alignment on the ground and Detailed Design
Engg (DDE) for BG third line between Bina-Bhopal (138.423
Km) in WC Rly.
RVNL/Mumb/RPS/FLS(Bi
na- BPL)/ 2006 dated
11.12.2006
M/s Monarch Services &
Contractors, Sinhagad Road,
Pune-411030
--- Rs 1.23 Cr 31.03.2011
(extended)
Details of Contracts Placed upto the month of March' 2011 under GM/P-III
RVNL
7 RVNL/BPL/S&T/HBJ-BPL-
BIN/2
09.06.2009 Supply, installing, modification, testing &commissing of
electronic interlocking system alongwith modification, in
relay based indoor signaling arrangement at PI/RRI/LC
gates, IBH etc. alongwith yard remodeling in connection with
the work of 3rd line between Habibganj & Bina (144.76 Km)
on Bhopal Division of West Central Railway in the state of
Madhya Pradesh (India)
No: RVNL/BPL/S&T/HBJ-
BPL-BIN/2 dated
23.10.2009
M/s Bharat Rail Automations (P)
Ltd. B-107, Mandpeshwar
Industrial Estate, SVP ROAD,
Borivali (W), Mumbai-400092
Signaling & Telecommuction - Rs
23,32,40,706/-
Rs 23.32 Cr 22.10.2011
8 RVNL/P-III/PSC Turnout
Sleeper Set/Guntakul-
Raichur/2009; Lot No.
5030901
04.09.2009. Manufacture and supply of P.way items for BG (1673mm)
for for patch doubling of Guntakul-Raichur Section under
CPM/RVNL/SC
RVNL/P-III/PSC Turnout
Sleeper Set/Guntakul-
Raichur/2009; Lot No.
5030901 dated
13.11.2009.
M/s Patil Rail Infrastructure Pvt
Ltd., The Grand, 3rd & 4th Floor 6-
3-1090/B-4 Raj Bhawan Road,
Somaji guda, Hyderabad-500082.
Manufacture and Supply: Rs 3.22
Cr. for PSC Turnout Sleeper Set for 1
in 12, 60 kg and Rs 52.63 Lakh for
PSC Turnout Sleeper Set 1 in 8 1/2
for 60 kg . Transportation: Rs 32.86
Lac for PSC Turnout Sleeper Set for
60 kg 1 in 12 and Rs 6 Lakh for PSC
Turnout Sleeper Set 1 in 8 1/2 for 60
kg.
Rs 4.14 Cr 30.11.2010.
9 RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120803
04.09.2009. Manufacture and supply of P.way items for BG (1673mm)
for Salka Road- Anuppur Section under
CPM/RVNL/Bilaspur.
RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120803 dated
17.11.2009
M/s Rayalaseema Concrete
Sleepers Pvt Ltd., The Grand, 3rd
& 4th Floor 6-3-1090/B-4 Raj
Bhawan Road, Somaji guda,
Hyderabad-500082.
Manufacture and Supply: Rs 3.34
Cr. for PSC Turnout Sleeper Set for 1
in 12, and Rs 25.26 Lac for PSC T/out
Sleeper Set 1 in 8 1/2 60 kg & Rs
10.9 lac for PSC Turnout Sleeper Set
for Derailing Switch 60 Kg,
Transportation: Rs 20.90 Lac for
PSC Turnout Sleeper Set for 60 kg 1
in 12 and Rs 1.68 Lakh for PSC
Turnout Sleeper Set 1 in 8 1/2 for 60
kg & Rs 0.84 lac for PSC Turnout
Sleeper Set for Derailing Switch 60
Kg.
Rs 3.92 Cr 28.02.2011.
10 RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120801
04.09.2009. Manufacture and supply of P.way items for BG (1673mm)for
Salka Road- Anuppur Section under CPM/RVNL/Bilaspur.
RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No.11120801 dated
18.11.2009
M/s Hindustan Engg. & Industries
Ltd., Mody Building, 27, Sir RN
Mukherji Marg, Kolkata-700001.
Manufacture and Supply: Rs 5.70
Lac for 1 in 8 1/2 52Kg Curved
Switches and Rs 5.10 Lac for 1 in
81/2 Derailing Switches 52Kg.
Transportation: Rs 1.31 Lac for 1 in
8 1/2 52Kg Curved Switches and Rs
1.08 Lac for 1 in 8 1/2 Derailing
Switches
Rs 13.19 Lac 10.09.2010
(extended)
11 RVNL/BPL/Elect/HBJ-
BIN/TSS
23.07.2009 Design, Supply, Erection, Testing & commissioning of
132/25 KV Traction Sub-station, Feeding Post, Fixed
Capacitor, bank System & other associated works at
BARETH & SANCHI, TRACTION SUB STATIONS,
Augmentation & replacement of traction transformers AT
BINA TSS, by providing 3rd bay & modification in existing
Feeding Posts at Sukhisewania, Gulabganj in connection
with Electrification of 3rd line on BINA- BHOPAL section of
BHOPAL DIVISION of WCR.
RVNL/BPL/Elect/HBJ-
BIN/TSS
dated18/19.01.2010
M/s S. L. Enterprises 41-A, Phase-
II, Mayapuri Industrial State, Delhi-
110064
Electrical Items-Rs 3.89 Cr for
CORE SOR Items, Rs 11.36 Cr for
Traction Transformer, Rs 0.12 Cr for
Maintenance spares,Rs 0.09 Cr for
Maintenance Tools, Rs 0.35 Cr for
Site Facilities & Rs 2.65 Cr for Misc.
Items,etc.
Rs 18.47 Cr 18.01.2012
RVNL
12 RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120802
04.09.2009. Manufacture and supply of P.way items for BG (1673mm)for
Salka Road- Anuppur Section under CPM/RVNL/Bilaspur.
RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No.11120802 dated
18.11.2009
M/s Hindustan Engg. & Industries
Ltd., Mody Building, 27, Sir RN
Mukherji Marg, Kolkata-700001.
Manufacture and Supply: Rs 2.33 Cr
for 60 Kg CMS Crossing 1 in 12, and
Rs 17.75 Lac for 52 Kg CMS Crossing
1 in 81/2 Transportation: Rs 2.53
Lac for 60 Kg CMS Crossing 1 in 12,
and Rs 0.24 Lac for 52 Kg CMS
Crossing 1 in 81/2.
Rs 2.53 Cr 31.10.2010
(extended)
13 RVNL/New Delhi/B-B-
H/PMC/Pt-II
15.10.2009 Project Management Consultancy forConstruction of Road
Bed, Major and Minor Bridges, Track Linking (excluding
supply of rails, thick web switches & sleepers), S&T and
OHE & General Electrical work in connection with 3rd line
between Habibganj & Bina (144.76 Km) on Bhopal Division
of West Central Railway in the state of Madhya Pradesh
(India)
Notification of Award No
RVNL/New Delhi/B-B-
H/PMC/Pt-II dated
23.03.2010
M/s Aarvee Associates
Architects, Engineers &
Consultants Pvt Ltd, Ravula
Residancy, Srinagar Colony,
Hyderabad-82.
Renumerations for -Rs 6.57 Cr for
staff & Provision & maintenance of
Office for- Rs 2.70 Lacs.
Rs 6.60 Cr 22.10.2012
14 No. RVNL/P-
III/TWS/2009/Pt I
25.02.2010 Manufacture and Supply of Curved Switches with ZU-
1–60/60E1A1 Thick Web Tongue Rail and UIC 60 (880
Grade) Stock Rail conforming to Indian Railway
Specifications IRS-T-10-2000 for various rail road projects in
different regions of India.
Notification of Award No
No. RVNL/P-
III/TWS/2009/Pt I
Dated 26.05.2010
M/s VAE VKN RTT (JV),
Century Towers,
5th Floor,
45 Shakespeare Sarani,
Kolkata. - 700 017
Manufacture and Supply: Rs 17.79
Cr for 60 kg 1 in 12 TWS
Transportation: Rs 36.84 Lac for 60
kg 1 in 12 TWS.
Rs 18.16 Cr 25.05.2011
RVNL
S.No Tender No. Date of
Opening
Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract)
Estimated Cost (for
Engg./Elect./S&T/Mech.)
Rate (for supply contract)
Tendered Cost (for
Engg./Elect./S&T/Mech.)
Scheduled Completion
Date
1 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges,
Track Linking (excluding supply of rails, thick web
switches & sleepers), S&T and OHE & General Electrical
work in connection with 3rd
line between Habibganj &
Bina (144.76 Km) on Bhopal Division of West Central
Railway in the state of Madhya Pradesh (India) - Package
No. 1 between Bina (Incl) to Ganj Basoda (Incl) chainage
975.16 to 928.500 (Km 46.66).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-1 dated
31.08.2009 (Contract
agreement yet to be
done)
M/s. Larsen & Toubro Ltd,ECC
Division,Post Box No. 979,Mount
Poonamalle Road,Manakakkam,
Chennai-600089.--
Rs 141.88 Cr March, 2012
2 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges,
Track Linking (excluding supply of rails, thick web
switches & sleepers), S&T and OHE & General Electrical
work in connection with 3rd
line between Habibganj &
Bina (144.76 Km) on Bhopal Division of West Central
Railway in the state of Madhya Pradesh (India) - Package
No. 2 between GanjBasoda (Excl) to Sanchi (Incl)
chainage 928.500 to 879.750 (Km 48.75).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-2 dated
31.08.2009 (Contract
agreement yet to be
done)
M/s. Larsen & Toubro Ltd,ECC
Division,Post Box No. 979,Mount
Poonamalle Road,Manakakkam,
Chennai-600089.
--
Rs. 150.05 Cr March, 2012
3 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges,
Track Linking (excluding supply of rails, thick web
switches & sleepers), S&T and OHE & General Electrical
work in connection with 3rd
line between Habibganj &
Bina (144.76 Km) on Bhopal Division of West Central
Railway in the state of Madhya Pradesh (India) - Package
No. 3 between Sanchi (Excl) to Habibganj (Incl) chainage
879.750 to 830.850 (Km 48.9).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-3 dated
31.08.2009 (Contract
agreement yet to be
done)
M/s. NCCL-ECIECCL-ARPL (JV),
C/o M/S Nagarjuna Construction
Company Limited,4th Floor, Uma
Enclave, Road No. 9,
HYDERABAD-500034. --
Rs 135.65 Cr March, 2012
4 RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/Switches; Lot
No. 31030801
27.06.2008 Manufacture and supply of P.way items for BG (1673mm)
for patch doubling of Guntakul-Raichur Section under
CPM/RVNL/SC
RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/Switches dated
30.03.2009
M/s VAE VKN Industries Pvt.
Ltd., 24/5 Sriram Road, Civil
Lines, Delhi-110054.
Manufacture and Supply: Rs
1.25 Cr for 60 kg 1 in 12 Switches
and Rs 16.97 Lakh for 60 kg 1 in 8
1/2 Switches & Rs 4.24 Lakh for
52 kg 1 in 8 1/2 Switches.
Transportation: Rs 26.50 Lac for
60 kg 1 in 12 Switches and Rs
4.50 Lac for 52 kg 1 in 8 1/2
Switches & Rs 1.12 Lakh for 60 kg
1 in 8 1/2 Switches.
Rs 1.77 Cr 30.11.2010
(extended)
5 RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/CMS Xing; Lot
No. 31030802
27.06.2008 Manufacture and supply of P.way items for BG (1673mm)
for patch doubling of Guntakul-Raichur Section under
CPM/RVNL/SC
RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/CMS Xing dated
30.03.2009
M/s VAE VKN Industries Pvt.
Ltd., 24/5 Sriram Road, Civil
Lines, Delhi-110054.
Manufacture and Supply: Rs
2.47 Cr for 60 kg 1 in 12 CMS
Crossing and Rs 0.5 Cr for 60 kg 1
in 8 1/2 CMS Crossing.
Transportation: Rs 3.18 Lac for
60 kg 1 in 12 CMS Crossing and
Rs 0.6 Lac for 60 kg 1 in 8 1/2
CMS Crossing.
Rs 3.02 Cr 30.08.2010
(extended)
6 RVNL/Mumbai/Bina-
BPL/ 2006 dated
30.08.2006
30.08.2006 Conducting Final Location Survey (FLS) marking the
center line of the final alignment on the ground and
Detailed Design Engg (DDE) for BG third line between
Bina-Bhopal (138.423 Km) in WC Rly.
RVNL/Mumb/RPS/FLS(Bi
na- BPL)/ 2006 dated
11.12.2006
M/s Monarch Services &
Contractors, Sinhagad Road,
Pune-411030
--- Rs 1.23 Cr 31.03.2011
(extended)
Details of Contracts Placed upto the month of April' 2011 under GM/P-III
RVNL
7 RVNL/BPL/S&T/HBJ-
BPL-BIN/2
09.06.2009 Supply, installing, modification, testing &commissing of
electronic interlocking system alongwith modification, in
relay based indoor signaling arrangement at PI/RRI/LC
gates, IBH etc. alongwith yard remodeling in connection
with the work of 3rd line between Habibganj & Bina
(144.76 Km) on Bhopal Division of West Central Railway
in the state of Madhya Pradesh (India)
No: RVNL/BPL/S&T/HBJ-
BPL-BIN/2 dated
23.10.2009
M/s Bharat Rail Automations (P)
Ltd. B-107, Mandpeshwar
Industrial Estate, SVP ROAD,
Borivali (W), Mumbai-400092
Signaling & Telecommuction - Rs
23,32,40,706/-
Rs 23.32 Cr 22.10.2011
8 RVNL/P-III/PSC Turnout
Sleeper Set/Guntakul-
Raichur/2009; Lot No.
5030901
04.09.2009. Manufacture and supply of P.way items for BG (1673mm)
for for patch doubling of Guntakul-Raichur Section under
CPM/RVNL/SC
RVNL/P-III/PSC Turnout
Sleeper Set/Guntakul-
Raichur/2009; Lot No.
5030901 dated
13.11.2009.
M/s Patil Rail Infrastructure Pvt
Ltd., The Grand, 3rd & 4th Floor
6-3-1090/B-4 Raj Bhawan Road,
Somaji guda, Hyderabad-500082.
Manufacture and Supply: Rs
3.22 Cr. for PSC Turnout Sleeper
Set for 1 in 12, 60 kg and Rs
52.63 Lakh for PSC Turnout
Sleeper Set 1 in 8 1/2 for 60 kg .
Transportation: Rs 32.86 Lac for
PSC Turnout Sleeper Set for 60 kg
1 in 12 and Rs 6 Lakh for PSC
Turnout Sleeper Set 1 in 8 1/2 for
60 kg.
Rs 4.14 Cr 30.11.2010.
9 RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120803
04.09.2009. Manufacture and supply of P.way items for BG (1673mm)
for Salka Road- Anuppur Section under
CPM/RVNL/Bilaspur.
RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120803 dated
17.11.2009
M/s Rayalaseema Concrete
Sleepers Pvt Ltd., The Grand,
3rd & 4th Floor 6-3-1090/B-4 Raj
Bhawan Road, Somaji guda,
Hyderabad-500082.
Manufacture and Supply: Rs
3.34 Cr. for PSC Turnout Sleeper
Set for 1 in 12, and Rs 25.26 Lac
for PSC T/out Sleeper Set 1 in 8
1/2 60 kg & Rs 10.9 lac for PSC
Turnout Sleeper Set for Derailing
Switch 60 Kg, Transportation:
Rs 20.90 Lac for PSC Turnout
Sleeper Set for 60 kg 1 in 12 and
Rs 1.68 Lakh for PSC Turnout
Sleeper Set 1 in 8 1/2 for 60 kg &
Rs 0.84 lac for PSC Turnout
Sleeper Set for Derailing Switch
60 Kg.
Rs 3.92 Cr 28.02.2011.
10 RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120801
04.09.2009. Manufacture and supply of P.way items for BG
(1673mm)for Salka Road- Anuppur Section under
CPM/RVNL/Bilaspur.
RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No.11120801 dated
18.11.2009
M/s Hindustan Engg. & Industries
Ltd., Mody Building, 27, Sir RN
Mukherji Marg, Kolkata-700001.
Manufacture and Supply: Rs
5.70 Lac for 1 in 8 1/2 52Kg
Curved Switches and Rs 5.10 Lac
for 1 in 81/2 Derailing Switches
52Kg. Transportation: Rs 1.31
Lac for 1 in 8 1/2 52Kg Curved
Switches and Rs 1.08 Lac for 1 in
8 1/2 Derailing Switches
Rs 13.19 Lac 10.09.2010
(extended)
11 RVNL/BPL/Elect/HBJ-
BIN/TSS
23.07.2009 Design, Supply, Erection, Testing & commissioning of
132/25 KV Traction Sub-station, Feeding Post, Fixed
Capacitor, bank System & other associated works at
BARETH & SANCHI, TRACTION SUB STATIONS,
Augmentation & replacement of traction transformers AT
BINA TSS, by providing 3rd bay & modification in existing
Feeding Posts at Sukhisewania, Gulabganj in connection
with Electrification of 3rd line on BINA- BHOPAL section
of BHOPAL DIVISION of WCR.
RVNL/BPL/Elect/HBJ-
BIN/TSS
dated18/19.01.2010
M/s S. L. Enterprises 41-A,
Phase-II, Mayapuri Industrial
State, Delhi-110064
Electrical Items-Rs 3.89 Cr for
CORE SOR Items, Rs 11.36 Cr for
Traction Transformer, Rs 0.12 Cr
for Maintenance spares,Rs 0.09
Cr for Maintenance Tools, Rs 0.35
Cr for Site Facilities & Rs 2.65 Cr
for Misc. Items,etc.
Rs 18.47 Cr 18.01.2012
12 RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120802
04.09.2009. Manufacture and supply of P.way items for BG
(1673mm)for Salka Road- Anuppur Section under
CPM/RVNL/Bilaspur.
RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No.11120802 dated
18.11.2009
M/s Hindustan Engg. & Industries
Ltd., Mody Building, 27, Sir RN
Mukherji Marg, Kolkata-700001.
Manufacture and Supply: Rs
2.33 Cr for 60 Kg CMS Crossing 1
in 12, and Rs 17.75 Lac for 52 Kg
CMS Crossing 1 in 81/2
Transportation: Rs 2.53 Lac for
60 Kg CMS Crossing 1 in 12, and
Rs 0.24 Lac for 52 Kg CMS
Crossing 1 in 81/2.
Rs 2.53 Cr 31.10.2010
(extended)
RVNL
13 RVNL/New Delhi/B-B-
H/PMC/Pt-II
15.10.2009 Project Management Consultancy forConstruction of
Road Bed, Major and Minor Bridges, Track Linking
(excluding supply of rails, thick web switches & sleepers),
S&T and OHE & General Electrical work in connection
with 3rd line between Habibganj & Bina (144.76 Km) on
Bhopal Division of West Central Railway in the state of
Madhya Pradesh (India)
Notification of Award No
RVNL/New Delhi/B-B-
H/PMC/Pt-II dated
23.03.2010
M/s Aarvee Associates
Architects, Engineers &
Consultants Pvt Ltd, Ravula
Residancy, Srinagar Colony,
Hyderabad-82.
Renumerations for -Rs 6.57 Cr
for staff & Provision &
maintenance of Office for- Rs
2.70 Lacs.
Rs 6.60 Cr 22.10.2012
14 No. RVNL/P-
III/TWS/2009/Pt I
25.02.2010 Manufacture and Supply of Curved Switches with ZU-
1–60/60E1A1 Thick Web Tongue Rail and UIC 60 (880
Grade) Stock Rail conforming to Indian Railway
Specifications IRS-T-10-2000 for various rail road
projects in different regions of India.
Notification of Award No
No. RVNL/P-
III/TWS/2009/Pt I
Dated 26.05.2010
M/s VAE VKN RTT (JV),
Century Towers,
5th Floor,
45 Shakespeare Sarani,
Kolkata. - 700 017
Manufacture and Supply: Rs
17.79 Cr for 60 kg 1 in 12 TWS
Transportation: Rs 36.84 Lac for
60 kg 1 in 12 TWS.
Rs 18.16 Cr 25.05.2011
RVNL
Detail of Contract awarded upto April, 2011
Project Planning & Development Department
Sr. No.
Tender No. Date of opening (Tender)
Description of work/study
Contract No. & date (LOA)
Contractor’s Name
Estimated cost of
work (Rs.)
Tendered cost (Rs.)
Scheduled completion date
Physical Progress
( upto 30.04.11)
1 RVNL/PP&D/Bankability/Buramara-Chakulia/10
25/03/10 Bankability study of Buramara-Chakulia New Line with upgradation of Rupsa-Buramara BG Line on SER.
RVNL/PP&D/Bankability/Buramara-Chakulia/10 30/04/2010
M/S Feedback Ventures Pvt. Ltd.
15,0
0,0
00/-
1
3,1
8,0
85/-
3 months from the date of submission of Bank Guarantee (14/05/2010) 15/08/2010 (extended)
Final Report submitted on 21.01.11 and under examination by RVNL Finance.
2 RVNL/PP&D/Bankability/Nallapadu-Guntakal/RE/10
09/04/10 Bankability study of electrification of Nallapadu-Guntakal section
RVNL/PP&D/Babkability/Nallapadu-Guntakal/RE/10 11/06/2010
M/s PricewaterhouseCoopers Pvt. Ltd
15,0
0,0
00/-
9,9
1,5
14/-
3 months from the date of submission of Bank Guarantee (25/06/2010) 25/09/2010 (extended)
Final Report submitted on 27.09.10 and under submission to RVNL BOD for approval.
3. PP&D/RFP/BOT/CONSULT/2009/Pt. II
21.08.10 Project Consultancy services for development of PPP model in Railway projects.
PP&D/RFP/BOT/CONSULT/2009/Pt. II dated: 25.03.2010
M/s. RITES Ltd.
30,9
3,2
93/-
15,0
0,0
00/-
26 weeks from the date of acceptance of LOA(25/03/2010) 25/09/2010 (extended)
Draft Final Report submitted 07.02.11 and under modification by RITES.
4. PP&D/RVNL/ HX-SBC/2010
23.08.10 Bankability study for Cuddapah-Bangalore New Line project.
PP&D/RVNL/ HX-SBC/2010 24/09/2010
M/s PricewaterhouseCoopers Pvt. Ltd.
12,8
9,3
40/-
1
4,5
0,1
00/-
8 weeks from the date of acceptance of CV(06/10/2010) 2/12/2010
Draft Final Report submitted on 09.02.11 and under modification by PWC.
RVNL
5. PP&D/RVNL/ KUR-BOLANGIR/2010
21.09.10 Bankability study for Khurda Road-Bolangir New Line project.
PP&D/RVNL/ KUR-BOLANGIR/2010 04/10/2010
M/S Deloitte Touche Tohmatsu India Pvt. Ltd.
15,0
0,0
00/-
9,6
5,1
25/-
10 weeks from the date of acceptance of CV(15/10/2010) 25/01/2011)
Final Report sent to Railway Board on 02.02.11 for examination & acceptance.
6. PP&D/RVNL/DHD-INDB/Bank/2010
N.A. Study being done in house.
Bankability study for Dahod-Indore New Line project in Western Railway.
PP&D/RVNL/DHD-INDB/Bank/2010 dated 24.12.2010
Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/21, Goyal Inter City, Block-C, Drive in Road, Thaltej, Ahemedabad-54 --
----
-
1,9
5,0
00/-
6 weeks from LAO (24.12.10) for Traffic Study which is out sourced.
Study being done in house. Only Traffic Study Out sourced. Traffic Study draft report submitted on 21.02.11 and under examination. Final traffic report under preparation.
7. PP&D/FT/HUK/2010
21.01.11 Feasibility Study for Development of Freight Terminal at Holambi Kalan on Northern Railway.
PP&D/FT/HUK/2010 dated 08.02.2011
M/S Deloitte Touche Tohmatsu India Pvt. Ltd.
5,0
0,0
00/-
8,7
6,8
85/-
16 weeks from the date of acceptance of CV(18/02/2011) 10/06/2011)
Study in progress.
8. PP&D/RVNL/MCLA-NLDA/Bank/2010
N.A. Study being done in house.
Bankability study for Macherla-NalgondaNew Line project in South Central Railway.
PP&D/RVNL / MCLA – NLDA / BANKA / 2010 dated 21.02.11
Traffic Study to Sh.Sanjeeva SHivesh ( ex IRAS), CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, C-block, Sec.-43, Gurgaon.
----
--
1,7
5,0
00/-
4 weeks from LOA (21.02.11) for Traffic Study which is out sourced. 20.03.2011
Study being done in house. Only Traffic Study Out sourced. Modified draft traffic report submitted on 03.05.11 and under examination.
RVNL
9. PP&D/RVNL/ADI-UDZ/Bank/2010
N.A. Study done in house.
Bankability study for Ahmedabad-Udaipur Gauge Conversion project in Western Railway.
N.A. N.A. Study done in house.
----
--
--
----
N.A. Study done in house and Completed, Report sent to Rly. Board on 31.12.2010.
10. No. PP&D/RVNL/BJP-SDB/BANK/2010
20/12/2010 Bankability study of Bijapur - Shahabad New line
in South Western Railway
No. PP&D/RVNL/BJP-SDB/BANK/2010
Dated: 08/03/2011
M/s Deloitte Touche
Tohmatsu India
Pvt. Ltd.
15,0
0,0
00.0
0
12,2
8,1
79.4
7
(3 months from LOA dated 08.03.2011) 06/06/2011
Study in progress.
11. No. PP&D/RVNL/DW
R-BGM/BANK/ 2010
27/12/2010 Bankability study of Dharwad –
Belgaum New line in South Western Railway
No. PP&D/RVNL/DWR
-BGM/BANK/Tender/2010 Dated: 04/04/2011
M/s ARKITECHNO
Consultants (India) Pvt. Ltd
14,8
9,0
00.0
0
9,7
1,1
68.0
0
(3 months from LOA)
03/07/2011
Study in progress.
12. No. PP&D/RVNL/
RDG-TK / BANK/2010
04/1/2011 Bankability study of
Rayadurg-Tumkur New line in South Western Railway
No. PP&D/RVNL/
RDG-TK /BANK/2010 Dated: 19/04/2011
M/s Deloitte
Touche Tohmatsu India Pvt. Ltd.
14,8
9,0
00.0
0
12,2
8,1
79.4
7
(3 months from LOA) 18.07.2011
Study in progress.
RVNL
S.No Tender No. Date of
Opening
Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract)
Estimated Cost (for
Engg./Elect./S&T/Mech.)
Rate (for supply contract)
Tendered Cost (for
Engg./Elect./S&T/Mech.)
Scheduled Completion
Date
1 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges,
Track Linking (excluding supply of rails, thick web
switches & sleepers), S&T and OHE & General Electrical
work in connection with 3rd
line between Habibganj &
Bina (144.76 Km) on Bhopal Division of West Central
Railway in the state of Madhya Pradesh (India) - Package
No. 1 between Bina (Incl) to Ganj Basoda (Incl) chainage
975.16 to 928.500 (Km 46.66).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-1 dated
31.08.2009 (Contract
agreement yet to be
done)
M/s. Larsen & Toubro Ltd,ECC
Division,Post Box No. 979,Mount
Poonamalle Road,Manakakkam,
Chennai-600089.--
Rs 141.88 Cr March, 2012
2 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges,
Track Linking (excluding supply of rails, thick web
switches & sleepers), S&T and OHE & General Electrical
work in connection with 3rd
line between Habibganj &
Bina (144.76 Km) on Bhopal Division of West Central
Railway in the state of Madhya Pradesh (India) - Package
No. 2 between GanjBasoda (Excl) to Sanchi (Incl)
chainage 928.500 to 879.750 (Km 48.75).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-2 dated
31.08.2009 (Contract
agreement yet to be
done)
M/s. Larsen & Toubro Ltd,ECC
Division,Post Box No. 979,Mount
Poonamalle Road,Manakakkam,
Chennai-600089.
--
Rs. 150.05 Cr March, 2012
3 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges,
Track Linking (excluding supply of rails, thick web
switches & sleepers), S&T and OHE & General Electrical
work in connection with 3rd
line between Habibganj &
Bina (144.76 Km) on Bhopal Division of West Central
Railway in the state of Madhya Pradesh (India) - Package
No. 3 between Sanchi (Excl) to Habibganj (Incl) chainage
879.750 to 830.850 (Km 48.9).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-3 dated
31.08.2009 (Contract
agreement yet to be
done)
M/s. NCCL-ECIECCL-ARPL (JV),
C/o M/S Nagarjuna Construction
Company Limited,4th Floor, Uma
Enclave, Road No. 9,
HYDERABAD-500034. --
Rs 135.65 Cr March, 2012
4 RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/Switches; Lot
No. 31030801
27.06.2008 Manufacture and supply of P.way items for BG (1673mm)
for patch doubling of Guntakul-Raichur Section under
CPM/RVNL/SC
RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/Switches dated
30.03.2009
M/s VAE VKN Industries Pvt.
Ltd., 24/5 Sriram Road, Civil
Lines, Delhi-110054.
Manufacture and Supply: Rs 1.25
Cr for 60 kg 1 in 12 Switches and
Rs 16.97 Lakh for 60 kg 1 in 8 1/2
Switches & Rs 4.24 Lakh for 52 kg 1
in 8 1/2 Switches. Transportation:
Rs 26.50 Lac for 60 kg 1 in 12
Switches and Rs 4.50 Lac for 52 kg
1 in 8 1/2 Switches & Rs 1.12 Lakh
for 60 kg 1 in 8 1/2 Switches.
Rs 1.77 Cr 30.11.2010
(extended)
5 RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/CMS Xing; Lot
No. 31030802
27.06.2008 Manufacture and supply of P.way items for BG (1673mm)
for patch doubling of Guntakul-Raichur Section under
CPM/RVNL/SC
RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/CMS Xing dated
30.03.2009
M/s VAE VKN Industries Pvt.
Ltd., 24/5 Sriram Road, Civil
Lines, Delhi-110054.
Manufacture and Supply: Rs 2.47
Cr for 60 kg 1 in 12 CMS Crossing
and Rs 0.5 Cr for 60 kg 1 in 8 1/2
CMS Crossing. Transportation:
Rs 3.18 Lac for 60 kg 1 in 12 CMS
Crossing and Rs 0.6 Lac for 60 kg 1
in 8 1/2 CMS Crossing.
Rs 3.02 Cr 30.08.2010
(extended)
6 RVNL/Mumbai/Bina-
BPL/ 2006 dated
30.08.2006
30.08.2006 Conducting Final Location Survey (FLS) marking the
center line of the final alignment on the ground and
Detailed Design Engg (DDE) for BG third line between
Bina-Bhopal (138.423 Km) in WC Rly.
RVNL/Mumb/RPS/FLS(Bi
na- BPL)/ 2006 dated
11.12.2006
M/s Monarch Services &
Contractors, Sinhagad Road,
Pune-411030
--- Rs 1.23 Cr 31.03.2011
(extended)
Details of Contracts Placed upto the month of May' 2011 under GM/P-III
RVNL
7 RVNL/BPL/S&T/HBJ-
BPL-BIN/2
09.06.2009 Supply, installing, modification, testing &commissing of
electronic interlocking system alongwith modification, in
relay based indoor signaling arrangement at PI/RRI/LC
gates, IBH etc. alongwith yard remodeling in connection
with the work of 3rd line between Habibganj & Bina
(144.76 Km) on Bhopal Division of West Central Railway
in the state of Madhya Pradesh (India)
No: RVNL/BPL/S&T/HBJ-
BPL-BIN/2 dated
23.10.2009
M/s Bharat Rail Automations (P)
Ltd. B-107, Mandpeshwar
Industrial Estate, SVP ROAD,
Borivali (W), Mumbai-400092
Signaling & Telecommuction - Rs
23,32,40,706/-
Rs 23.32 Cr 22.10.2011
8 RVNL/P-III/PSC Turnout
Sleeper Set/Guntakul-
Raichur/2009; Lot No.
5030901
04.09.2009. Manufacture and supply of P.way items for BG (1673mm)
for for patch doubling of Guntakul-Raichur Section under
CPM/RVNL/SC
RVNL/P-III/PSC Turnout
Sleeper Set/Guntakul-
Raichur/2009; Lot No.
5030901 dated
13.11.2009.
M/s Patil Rail Infrastructure Pvt
Ltd., The Grand, 3rd & 4th Floor
6-3-1090/B-4 Raj Bhawan Road,
Somaji guda, Hyderabad-500082.
Manufacture and Supply: Rs 3.22
Cr. for PSC Turnout Sleeper Set for
1 in 12, 60 kg and Rs 52.63 Lakh
for PSC Turnout Sleeper Set 1 in 8
1/2 for 60 kg . Transportation: Rs
32.86 Lac for PSC Turnout Sleeper
Set for 60 kg 1 in 12 and Rs 6 Lakh
for PSC Turnout Sleeper Set 1 in 8
1/2 for 60 kg.
Rs 4.14 Cr 30.11.2010.
9 RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120803
04.09.2009. Manufacture and supply of P.way items for BG (1673mm)
for Salka Road- Anuppur Section under
CPM/RVNL/Bilaspur.
RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120803 dated
17.11.2009
M/s Rayalaseema Concrete
Sleepers Pvt Ltd., The Grand,
3rd & 4th Floor 6-3-1090/B-4 Raj
Bhawan Road, Somaji guda,
Hyderabad-500082.
Manufacture and Supply: Rs 3.34
Cr. for PSC Turnout Sleeper Set for
1 in 12, and Rs 25.26 Lac for PSC
T/out Sleeper Set 1 in 8 1/2 60 kg
& Rs 10.9 lac for PSC Turnout
Sleeper Set for Derailing Switch 60
Kg, Transportation: Rs 20.90 Lac
for PSC Turnout Sleeper Set for 60
kg 1 in 12 and Rs 1.68 Lakh for
PSC Turnout Sleeper Set 1 in 8 1/2
for 60 kg & Rs 0.84 lac for PSC
Turnout Sleeper Set for Derailing
Switch 60 Kg.
Rs 3.92 Cr 28.02.2011.
10 RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120801
04.09.2009. Manufacture and supply of P.way items for BG
(1673mm)for Salka Road- Anuppur Section under
CPM/RVNL/Bilaspur.
RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No.11120801 dated
18.11.2009
M/s Hindustan Engg. & Industries
Ltd., Mody Building, 27, Sir RN
Mukherji Marg, Kolkata-700001.
Manufacture and Supply: Rs 5.70
Lac for 1 in 8 1/2 52Kg Curved
Switches and Rs 5.10 Lac for 1 in
81/2 Derailing Switches 52Kg.
Transportation: Rs 1.31 Lac for 1
in 8 1/2 52Kg Curved Switches and
Rs 1.08 Lac for 1 in 8 1/2 Derailing
Switches
Rs 13.19 Lac 10.09.2010
(extended)
11 RVNL/BPL/Elect/HBJ-
BIN/TSS
23.07.2009 Design, Supply, Erection, Testing & commissioning of
132/25 KV Traction Sub-station, Feeding Post, Fixed
Capacitor, bank System & other associated works at
BARETH & SANCHI, TRACTION SUB STATIONS,
Augmentation & replacement of traction transformers AT
BINA TSS, by providing 3rd bay & modification in existing
Feeding Posts at Sukhisewania, Gulabganj in connection
with Electrification of 3rd line on BINA- BHOPAL section
of BHOPAL DIVISION of WCR.
RVNL/BPL/Elect/HBJ-
BIN/TSS
dated18/19.01.2010
M/s S. L. Enterprises 41-A,
Phase-II, Mayapuri Industrial
State, Delhi-110064
Electrical Items-Rs 3.89 Cr for
CORE SOR Items, Rs 11.36 Cr for
Traction Transformer, Rs 0.12 Cr for
Maintenance spares,Rs 0.09 Cr for
Maintenance Tools, Rs 0.35 Cr for
Site Facilities & Rs 2.65 Cr for Misc.
Items,etc.
Rs 18.47 Cr 18.01.2012
12 RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120802
04.09.2009. Manufacture and supply of P.way items for BG
(1673mm)for Salka Road- Anuppur Section under
CPM/RVNL/Bilaspur.
RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No.11120802 dated
18.11.2009
M/s Hindustan Engg. & Industries
Ltd., Mody Building, 27, Sir RN
Mukherji Marg, Kolkata-700001.
Manufacture and Supply: Rs 2.33
Cr for 60 Kg CMS Crossing 1 in 12,
and Rs 17.75 Lac for 52 Kg CMS
Crossing 1 in 81/2
Transportation: Rs 2.53 Lac for 60
Kg CMS Crossing 1 in 12, and Rs
0.24 Lac for 52 Kg CMS Crossing 1
in 81/2.
Rs 2.53 Cr 31.10.2010
(extended)
RVNL
13 RVNL/New Delhi/B-B-
H/PMC/Pt-II
15.10.2009 Project Management Consultancy forConstruction of
Road Bed, Major and Minor Bridges, Track Linking
(excluding supply of rails, thick web switches & sleepers),
S&T and OHE & General Electrical work in connection
with 3rd line between Habibganj & Bina (144.76 Km) on
Bhopal Division of West Central Railway in the state of
Madhya Pradesh (India)
Notification of Award No
RVNL/New Delhi/B-B-
H/PMC/Pt-II dated
23.03.2010
M/s Aarvee Associates
Architects, Engineers &
Consultants Pvt Ltd, Ravula
Residancy, Srinagar Colony,
Hyderabad-82.
Renumerations for -Rs 6.57 Cr for
staff & Provision & maintenance of
Office for- Rs 2.70 Lacs.
Rs 6.60 Cr 22.10.2012
14 No. RVNL/P-
III/TWS/2009/Pt I
25.02.2010 Manufacture and Supply of Curved Switches with ZU-
1–60/60E1A1 Thick Web Tongue Rail and UIC 60 (880
Grade) Stock Rail conforming to Indian Railway
Specifications IRS-T-10-2000 for various rail road
projects in different regions of India.
Notification of Award No
No. RVNL/P-
III/TWS/2009/Pt I
Dated 26.05.2010
M/s VAE VKN RTT (JV),
Century Towers,
5th Floor,
45 Shakespeare Sarani,
Kolkata. - 700 017
Manufacture and Supply: Rs 17.79
Cr for 60 kg 1 in 12 TWS
Transportation: Rs 36.84 Lac for
60 kg 1 in 12 TWS.
Rs 18.16 Cr 25.05.2011
(Extended upto
15.09.2011)
RVNL
Detail of Contract awarded upto May, 2011
Project Planning & Development Department
Sr. No.
Tender No. Date of opening (Tender)
Description of work/study
Contract No. & date (LOA)
Contractor’s Name
Estimated cost of
work (Rs.)
Tendered cost (Rs.)
Scheduled completion date
Physical Progress (upto 31.05.11)
1 RVNL/PP&D/Bankability/Buramara-Chakulia/10
25/03/10
Bankability study of Buramara-Chakulia New Line with upgradation of Rupsa-Buramara BG Line on SER.
RVNL/PP&D/Bankability/Buramara-Chakulia/10 30/04/2010
M/S Feedback Ventures Pvt. Ltd.
15,0
0,0
00/-
13,1
8,0
85/-
3 months from the date of submission of Bank Guarantee (14/05/2010) 15/08/2010 (extended)
Final Report submitted on 21.01.11 and under examination by RVNL Finance.
2
RVNL/PP&D/Bankability/Nallapadu-Guntakal/RE/10
09/04/10
Bankability study of electrification of Nallapadu-Guntakal section
RVNL/PP&D/Babkability/Nallapadu-Guntakal/RE/10 11/06/2010
M/s PricewaterhouseCoopers Pvt. Ltd
15,0
0,0
00/-
9
,91,5
14/-
3 months from the date of submission of Bank Guarantee (25/06/2010) 25/09/2010 (extended)
Final Report submitted on 27.09.10 and has been sent on 18.05.11 for putting op to RVNL BOD for approval.
3. PP&D/RFP/BOT/CONSULT/2009/Pt. II
21.08.10
Project Consultancy services for development of PPP model in Railway projects.
PP&D/RFP/BOT/CONSULT/2009/Pt. II dated: 25.03.2010
M/s. RITES Ltd.
30,9
3,2
93/-
15,0
0,0
00/-
26 weeks from the date of acceptance of LOA(25/03/2010) 25/09/2010 (extended)
Final Report submitted on 18.05.10 and has been sent on 24.05.11 for putting op to RVNL BOD for approval.
4. PP&D/RVNL/ HX-SBC/2010
23.08.10
Bankability study for Cuddapah-Bangalore New Line project.
PP&D/RVNL/ HX-SBC/2010 24/09/2010
M/s PricewaterhouseCoopers Pvt. Ltd.
12,8
9,3
40/-
14,5
0,1
00/-
8 weeks from the date of acceptance of CV(06/10/2010) 2/12/2010
Revised Draft Final Report submitted on 30.05.11 and under examination by RVNL
RVNL
5.
PP&D/RVNL/ KUR-BOLANGIR/2010
21.09.10
Bankability study for Khurda Road-Bolangir New Line project.
PP&D/RVNL/ KUR-BOLANGIR/2010 04/10/2010
M/S Deloitte Touche Tohmatsu India Pvt. Ltd.
15,0
0,0
00/-
9,6
5,1
25/-
10 weeks from the date of acceptance of CV(15/10/2010) 25/01/2011)
Final Report sent to Railway Board on 02.02.11 for examination & acceptance.
6.
PP&D/RVNL/DHD-INDB/Bank/2010
N.A. Study being done in house.
Bankability study for Dahod-Indore New Line project in Western Railway.
PP&D/RVNL/DHD-INDB/Bank/2010 dated 24.12.2010
Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/21, Goyal Inter City, Block-C, Drive in Road, Thaltej, Ahemedabad-54 ----
---
1,9
5,0
00/-
6 weeks from LAO (24.12.10) for Traffic Study which is out sourced.
Study being done in house. Only Traffic Study Out sourced. Traffic Study draft report submitted on 21.02.11 and under examination. Final traffic report under preparation.
7. PP&D/FT/HUK/2010
21.01.11
Feasibility Study for Development of Freight Terminal at Holambi Kalan on Northern Railway.
PP&D/FT/HUK/2010 dated 08.02.2011
M/S Deloitte Touche Tohmatsu India Pvt. Ltd.
5,0
0,0
00/-
8,7
6,8
85/-
16 weeks from the date of acceptance of CV(18/02/2011) 10/06/2011)
Study in progress.
8.
PP&D/RVNL/MCLA-NLDA/Bank/2010
N.A. Study being done in house.
Bankability study for Macherla-NalgondaNew Line project in South Central Railway.
PP&D/RVNL / MCLA – NLDA / BANKA / 2010 dated 21.02.11
Traffic Study to Sh.Sanjeeva SHivesh ( ex IRAS), CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, C-block, Sec.-43, Gurgaon. --
----
1,7
5,0
00/-
4 weeks from LOA (21.02.11) for Traffic Study which is out sourced. 20.03.2011
Study being done in house. Only Traffic Study Out sourced. Revised draft traffic report submitted on 30.05.11 and under examination.
9. PP&D/RVNL/ADI-UDZ/Bank/2010
N.A. Study done in house.
Bankability study for Ahmedabad-Udaipur Gauge Conversion project in Western Railway.
N.A. N.A. Study done in house.
----
--
----
--
N.A.
Study done in house and Completed, Report sent to Rly. Board on 31.12.2010.
RVNL
10.
No. PP&D/RVNL/BJ
P-SDB/BANK/2010
20/12/2010
Bankability study of Bijapur -
Shahabad New line in South Western Railway
No. PP&D/RVNL/BJP-
SDB/BANK/2010 Dated: 08/03/2011
M/s Deloitte Touche Tohmatsu India Pvt. Ltd.
15,0
0,0
00.0
0
12,2
8,1
79.4
7
(3 months from LOA dated 08.03.2011) 06/06/2011
Study in progress.
11.
No.
PP&D/RVNL/DWR-BGM/BANK/ 2010
27/12/2010
Bankability study
of Dharwad – Belgaum New line in South Western Railway
No. PP&D/RVNL/DWR
-BGM/BANK/Tender/2010 Dated: 04/04/2011
M/s ARKITECHNO Consultants (India) Pvt. Ltd
14,8
9,0
00.0
0
9,7
1,1
68.0
0
(3 months from LOA) 03/07/2011
Study in progress.
12.
No. PP&D/RVNL/ RDG-TK / BANK/2010
04/1/2011
Bankability study of Rayadurg-Tumkur New line in South Western Railway
No. PP&D/RVNL/ RDG-TK /BANK/2010 Dated: 19/04/2011
M/s Deloitte Touche Tohmatsu India Pvt. Ltd.
14,8
9,0
00.0
0
12,2
8,1
79.4
7
(3 months from LOA) 18.07.2011
Study in progress.
RVNL
S.No Tender No. Date of
Opening
Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract)
Estimated Cost (for
Engg./Elect./S&T/Mech.)
Rate (for supply contract)
Tendered Cost (for
Engg./Elect./S&T/Mech.)
Scheduled Completion
Date
1 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges,
Track Linking (excluding supply of rails, thick web
switches & sleepers), S&T and OHE & General Electrical
work in connection with 3rd
line between Habibganj &
Bina (144.76 Km) on Bhopal Division of West Central
Railway in the state of Madhya Pradesh (India) - Package
No. 1 between Bina (Incl) to Ganj Basoda (Incl) chainage
975.16 to 928.500 (Km 46.66).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-1 dated
31.08.2009 (Contract
agreement yet to be
done)
M/s. Larsen & Toubro Ltd,ECC
Division,Post Box No. 979,Mount
Poonamalle Road,Manakakkam,
Chennai-600089.--
Rs 141.88 Cr March, 2012
2 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges,
Track Linking (excluding supply of rails, thick web
switches & sleepers), S&T and OHE & General Electrical
work in connection with 3rd
line between Habibganj &
Bina (144.76 Km) on Bhopal Division of West Central
Railway in the state of Madhya Pradesh (India) - Package
No. 2 between GanjBasoda (Excl) to Sanchi (Incl)
chainage 928.500 to 879.750 (Km 48.75).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-2 dated
31.08.2009 (Contract
agreement yet to be
done)
M/s. Larsen & Toubro Ltd,ECC
Division,Post Box No. 979,Mount
Poonamalle Road,Manakakkam,
Chennai-600089.
--
Rs. 150.05 Cr March, 2012
3 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges,
Track Linking (excluding supply of rails, thick web
switches & sleepers), S&T and OHE & General Electrical
work in connection with 3rd
line between Habibganj &
Bina (144.76 Km) on Bhopal Division of West Central
Railway in the state of Madhya Pradesh (India) - Package
No. 3 between Sanchi (Excl) to Habibganj (Incl) chainage
879.750 to 830.850 (Km 48.9).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-3 dated
31.08.2009 (Contract
agreement yet to be
done)
M/s. NCCL-ECIECCL-ARPL (JV),
C/o M/S Nagarjuna Construction
Company Limited,4th Floor, Uma
Enclave, Road No. 9,
HYDERABAD-500034. --
Rs 135.65 Cr March, 2012
4 RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/Switches; Lot
No. 31030801
27.06.2008 Manufacture and supply of P.way items for BG (1673mm)
for patch doubling of Guntakul-Raichur Section under
CPM/RVNL/SC
RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/Switches dated
30.03.2009
M/s VAE VKN Industries Pvt.
Ltd., 24/5 Sriram Road, Civil
Lines, Delhi-110054.
Manufacture and Supply: Rs
1.25 Cr for 60 kg 1 in 12 Switches
and Rs 16.97 Lakh for 60 kg 1 in 8
1/2 Switches & Rs 4.24 Lakh for
52 kg 1 in 8 1/2 Switches.
Transportation: Rs 26.50 Lac for
60 kg 1 in 12 Switches and Rs
4.50 Lac for 52 kg 1 in 8 1/2
Switches & Rs 1.12 Lakh for 60 kg
1 in 8 1/2 Switches.
Rs 1.77 Cr 30.11.2010
(extended)
5 RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/CMS Xing; Lot
No. 31030802
27.06.2008 Manufacture and supply of P.way items for BG (1673mm)
for patch doubling of Guntakul-Raichur Section under
CPM/RVNL/SC
RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/CMS Xing dated
30.03.2009
M/s VAE VKN Industries Pvt.
Ltd., 24/5 Sriram Road, Civil
Lines, Delhi-110054.
Manufacture and Supply: Rs
2.47 Cr for 60 kg 1 in 12 CMS
Crossing and Rs 0.5 Cr for 60 kg 1
in 8 1/2 CMS Crossing.
Transportation: Rs 3.18 Lac for
60 kg 1 in 12 CMS Crossing and
Rs 0.6 Lac for 60 kg 1 in 8 1/2
CMS Crossing.
Rs 3.02 Cr 30.08.2010
(extended)
6 RVNL/Mumbai/Bina-
BPL/ 2006 dated
30.08.2006
30.08.2006 Conducting Final Location Survey (FLS) marking the
center line of the final alignment on the ground and
Detailed Design Engg (DDE) for BG third line between
Bina-Bhopal (138.423 Km) in WC Rly.
RVNL/Mumb/RPS/FLS(Bi
na- BPL)/ 2006 dated
11.12.2006
M/s Monarch Services &
Contractors, Sinhagad Road,
Pune-411030
--- Rs 1.23 Cr 31.03.2011
(extended)
Details of Contracts Placed upto the month of June' 2011 under GM/P-III
RVNL
7 RVNL/BPL/S&T/HBJ-
BPL-BIN/2
09.06.2009 Supply, installing, modification, testing &commissing of
electronic interlocking system alongwith modification, in
relay based indoor signaling arrangement at PI/RRI/LC
gates, IBH etc. alongwith yard remodeling in connection
with the work of 3rd line between Habibganj & Bina
(144.76 Km) on Bhopal Division of West Central Railway
in the state of Madhya Pradesh (India)
No: RVNL/BPL/S&T/HBJ-
BPL-BIN/2 dated
23.10.2009
M/s Bharat Rail Automations (P)
Ltd. B-107, Mandpeshwar
Industrial Estate, SVP ROAD,
Borivali (W), Mumbai-400092
Signaling & Telecommuction - Rs
23,32,40,706/-
Rs 23.32 Cr 22.10.2011
8 RVNL/P-III/PSC Turnout
Sleeper Set/Guntakul-
Raichur/2009; Lot No.
5030901
04.09.2009. Manufacture and supply of P.way items for BG (1673mm)
for for patch doubling of Guntakul-Raichur Section under
CPM/RVNL/SC
RVNL/P-III/PSC Turnout
Sleeper Set/Guntakul-
Raichur/2009; Lot No.
5030901 dated
13.11.2009.
M/s Patil Rail Infrastructure Pvt
Ltd., The Grand, 3rd & 4th Floor
6-3-1090/B-4 Raj Bhawan Road,
Somaji guda, Hyderabad-500082.
Manufacture and Supply: Rs
3.22 Cr. for PSC Turnout Sleeper
Set for 1 in 12, 60 kg and Rs
52.63 Lakh for PSC Turnout
Sleeper Set 1 in 8 1/2 for 60 kg .
Transportation: Rs 32.86 Lac for
PSC Turnout Sleeper Set for 60 kg
1 in 12 and Rs 6 Lakh for PSC
Turnout Sleeper Set 1 in 8 1/2 for
60 kg.
Rs 4.14 Cr 30.11.2010.
9 RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120803
04.09.2009. Manufacture and supply of P.way items for BG (1673mm)
for Salka Road- Anuppur Section under
CPM/RVNL/Bilaspur.
RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120803 dated
17.11.2009
M/s Rayalaseema Concrete
Sleepers Pvt Ltd., The Grand,
3rd & 4th Floor 6-3-1090/B-4 Raj
Bhawan Road, Somaji guda,
Hyderabad-500082.
Manufacture and Supply: Rs
3.34 Cr. for PSC Turnout Sleeper
Set for 1 in 12, and Rs 25.26 Lac
for PSC T/out Sleeper Set 1 in 8
1/2 60 kg & Rs 10.9 lac for PSC
Turnout Sleeper Set for Derailing
Switch 60 Kg, Transportation:
Rs 20.90 Lac for PSC Turnout
Sleeper Set for 60 kg 1 in 12 and
Rs 1.68 Lakh for PSC Turnout
Sleeper Set 1 in 8 1/2 for 60 kg &
Rs 0.84 lac for PSC Turnout
Sleeper Set for Derailing Switch
60 Kg.
Rs 3.92 Cr 28.02.2011.
10 RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120801
04.09.2009. Manufacture and supply of P.way items for BG
(1673mm)for Salka Road- Anuppur Section under
CPM/RVNL/Bilaspur.
RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No.11120801 dated
18.11.2009
M/s Hindustan Engg. & Industries
Ltd., Mody Building, 27, Sir RN
Mukherji Marg, Kolkata-700001.
Manufacture and Supply: Rs
5.70 Lac for 1 in 8 1/2 52Kg
Curved Switches and Rs 5.10 Lac
for 1 in 81/2 Derailing Switches
52Kg. Transportation: Rs 1.31
Lac for 1 in 8 1/2 52Kg Curved
Switches and Rs 1.08 Lac for 1 in
8 1/2 Derailing Switches
Rs 13.19 Lac 10.09.2010
(extended)
11 RVNL/BPL/Elect/HBJ-
BIN/TSS
23.07.2009 Design, Supply, Erection, Testing & commissioning of
132/25 KV Traction Sub-station, Feeding Post, Fixed
Capacitor, bank System & other associated works at
BARETH & SANCHI, TRACTION SUB STATIONS,
Augmentation & replacement of traction transformers AT
BINA TSS, by providing 3rd bay & modification in existing
Feeding Posts at Sukhisewania, Gulabganj in connection
with Electrification of 3rd line on BINA- BHOPAL section
of BHOPAL DIVISION of WCR.
RVNL/BPL/Elect/HBJ-
BIN/TSS
dated18/19.01.2010
M/s S. L. Enterprises 41-A,
Phase-II, Mayapuri Industrial
State, Delhi-110064
Electrical Items-Rs 3.89 Cr for
CORE SOR Items, Rs 11.36 Cr for
Traction Transformer, Rs 0.12 Cr
for Maintenance spares,Rs 0.09
Cr for Maintenance Tools, Rs 0.35
Cr for Site Facilities & Rs 2.65 Cr
for Misc. Items,etc.
Rs 18.47 Cr 18.01.2012
12 RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120802
04.09.2009. Manufacture and supply of P.way items for BG
(1673mm)for Salka Road- Anuppur Section under
CPM/RVNL/Bilaspur.
RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No.11120802 dated
18.11.2009
M/s Hindustan Engg. & Industries
Ltd., Mody Building, 27, Sir RN
Mukherji Marg, Kolkata-700001.
Manufacture and Supply: Rs
2.33 Cr for 60 Kg CMS Crossing 1
in 12, and Rs 17.75 Lac for 52 Kg
CMS Crossing 1 in 81/2
Transportation: Rs 2.53 Lac for
60 Kg CMS Crossing 1 in 12, and
Rs 0.24 Lac for 52 Kg CMS
Crossing 1 in 81/2.
Rs 2.53 Cr 31.10.2010
(extended)
RVNL
13 RVNL/New Delhi/B-B-
H/PMC/Pt-II
15.10.2009 Project Management Consultancy forConstruction of
Road Bed, Major and Minor Bridges, Track Linking
(excluding supply of rails, thick web switches & sleepers),
S&T and OHE & General Electrical work in connection
with 3rd line between Habibganj & Bina (144.76 Km) on
Bhopal Division of West Central Railway in the state of
Madhya Pradesh (India)
Notification of Award No
RVNL/New Delhi/B-B-
H/PMC/Pt-II dated
23.03.2010
M/s Aarvee Associates
Architects, Engineers &
Consultants Pvt Ltd, Ravula
Residancy, Srinagar Colony,
Hyderabad-82.
Renumerations for -Rs 6.57 Cr
for staff & Provision &
maintenance of Office for- Rs
2.70 Lacs.
Rs 6.60 Cr 22.10.2012
14 No. RVNL/P-
III/TWS/2009/Pt I
25.02.2010 Manufacture and Supply of Curved Switches with ZU-
1–60/60E1A1 Thick Web Tongue Rail and UIC 60 (880
Grade) Stock Rail conforming to Indian Railway
Specifications IRS-T-10-2000 for various rail road
projects in different regions of India.
Notification of Award No
No. RVNL/P-
III/TWS/2009/Pt I
Dated 26.05.2010
M/s VAE VKN RTT (JV),
Century Towers,
5th Floor,
45 Shakespeare Sarani,
Kolkata. - 700 017
Manufacture and Supply: Rs
17.79 Cr for 60 kg 1 in 12 TWS
Transportation: Rs 36.84 Lac for
60 kg 1 in 12 TWS.
Rs 18.16 Cr 25.05.2011
(Extended upto
15.09.2011)
RVNL
DETAILS OF CONTRACT PLACED DURING THE MONTH OF JULY, 2011.
Tender No. Date of opening.
Description of Item/work
Contract No.
and date.
Contractor’s Name.
Quantity (for supply contract) Estimated Cost)for Engg.,
S&T/Mech.
Rate (for supply contract) Tendered Cost. (for
Engg./Elect/ S&T/
Mech)
Value of contract. Schedule completion.
IFB No. 2010/ RVNL/ Bilaspur/ DRZ-ROW/04 dated
01.11.2010
28.01.2011 “Construction of Roadbed, Supply of Ballast, Major & Minor
Bridges, Residential and Service Buildings & General Electrical Work
etc. for Keoti - Rowghat Section (53 Km) in Connection with a New
Rail Link between Dallirajhara and Rowghat in Raipur Division of
South East Central Railway in the State of Chhattisgarh, India.”
LOA No. CPM/RVNL/ BSP/Keoti-ROW/JMC/ 357 dated 18.07.2011.
M/s. JMC Projects (India) Ltd.,
Engineers & Contractors, Ahmedabad.
Estimated cost: Rs.131.80 crore
Tender cost: Rs.131.76 Cr.
Rs.1317656338.20/- 30 months + 6 months defect liability period.
DGM/P-II/RVNL/BSP.
RVNL
S.No Tender No. Date of
Opening
Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract)
Estimated Cost (for
Engg./Elect./S&T/Mech.)
Rate (for supply contract)
Tendered Cost (for
Engg./Elect./S&T/Mech.)
Scheduled Completion
Date
1 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges,
Track Linking (excluding supply of rails, thick web
switches & sleepers), S&T and OHE & General
Electrical work in connection with 3rd
line between
Habibganj & Bina (144.76 Km) on Bhopal Division of
West Central Railway in the state of Madhya Pradesh
(India) - Package No. 1 between Bina (Incl) to Ganj
Basoda (Incl) chainage 975.16 to 928.500 (Km 46.66).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-1 dated
31.08.2009 (Contract
agreement yet to be
done)
M/s. Larsen & Toubro Ltd,ECC
Division,Post Box No.
979,Mount Poonamalle
Road,Manakakkam, Chennai-
600089. --
Rs 141.88 Cr March, 2012
2 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges,
Track Linking (excluding supply of rails, thick web
switches & sleepers), S&T and OHE & General
Electrical work in connection with 3rd
line between
Habibganj & Bina (144.76 Km) on Bhopal Division of
West Central Railway in the state of Madhya Pradesh
(India) - Package No. 2 between GanjBasoda (Excl) to
Sanchi (Incl) chainage 928.500 to 879.750 (Km 48.75).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-2 dated
31.08.2009 (Contract
agreement yet to be
done)
M/s. Larsen & Toubro Ltd,ECC
Division,Post Box No.
979,Mount Poonamalle
Road,Manakakkam, Chennai-
600089. --
Rs. 150.05 Cr March, 2012
3 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges,
Track Linking (excluding supply of rails, thick web
switches & sleepers), S&T and OHE & General
Electrical work in connection with 3rd
line between
Habibganj & Bina (144.76 Km) on Bhopal Division of
West Central Railway in the state of Madhya Pradesh
(India) - Package No. 3 between Sanchi (Excl) to
Habibganj (Incl) chainage 879.750 to 830.850 (Km
48.9).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-3 dated
31.08.2009 (Contract
agreement yet to be
done)
M/s. NCCL-ECIECCL-ARPL
(JV), C/o M/S Nagarjuna
Construction Company
Limited,4th Floor, Uma Enclave,
Road No. 9, HYDERABAD-
500034.--
Rs 135.65 Cr March, 2012
4 RVNL/P-III/P.way
items/Guntakul-
Raichur/1 of
2009/Switches; Lot No.
31030801
27.06.2008 Manufacture and supply of P.way items for BG
(1673mm) for patch doubling of Guntakul-Raichur
Section under CPM/RVNL/SC
RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/Switches dated
30.03.2009
M/s VAE VKN Industries Pvt.
Ltd., 24/5 Sriram Road, Civil
Lines, Delhi-110054.
Manufacture and Supply: Rs
1.25 Cr for 60 kg 1 in 12 Switches
and Rs 16.97 Lakh for 60 kg 1 in
8 1/2 Switches & Rs 4.24 Lakh
for 52 kg 1 in 8 1/2 Switches.
Transportation: Rs 26.50 Lac
for 60 kg 1 in 12 Switches and Rs
4.50 Lac for 52 kg 1 in 8 1/2
Switches & Rs 1.12 Lakh for 60
kg 1 in 8 1/2 Switches.
Rs 1.77 Cr 30.11.2010
(extended)
5 RVNL/P-III/P.way
items/Guntakul-
Raichur/1 of 2009/CMS
Xing; Lot No. 31030802
27.06.2008 Manufacture and supply of P.way items for BG
(1673mm) for patch doubling of Guntakul-Raichur
Section under CPM/RVNL/SC
RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/CMS Xing dated
30.03.2009
M/s VAE VKN Industries Pvt.
Ltd., 24/5 Sriram Road, Civil
Lines, Delhi-110054.
Manufacture and Supply: Rs
2.47 Cr for 60 kg 1 in 12 CMS
Crossing and Rs 0.5 Cr for 60 kg
1 in 8 1/2 CMS Crossing.
Transportation: Rs 3.18 Lac for
60 kg 1 in 12 CMS Crossing and
Rs 0.6 Lac for 60 kg 1 in 8 1/2
CMS Crossing.
Rs 3.02 Cr 30.08.2010
(extended)
6 RVNL/Mumbai/Bina-
BPL/ 2006 dated
30.08.2006
30.08.2006 Conducting Final Location Survey (FLS) marking the
center line of the final alignment on the ground and
Detailed Design Engg (DDE) for BG third line between
Bina-Bhopal (138.423 Km) in WC Rly.
RVNL/Mumb/RPS/FLS(Bi
na- BPL)/ 2006 dated
11.12.2006
M/s Monarch Services &
Contractors, Sinhagad Road,
Pune-411030
--- Rs 1.23 Cr 31.03.2011
(extended)
Details of Contracts Placed upto the month of July' 2011 under GM/P-III
RVNL
7 RVNL/BPL/S&T/HBJ-
BPL-BIN/2
09.06.2009 Supply, installing, modification, testing &commissing of
electronic interlocking system alongwith modification, in
relay based indoor signaling arrangement at PI/RRI/LC
gates, IBH etc. alongwith yard remodeling in connection
with the work of 3rd line between Habibganj & Bina
(144.76 Km) on Bhopal Division of West Central
Railway in the state of Madhya Pradesh (India)
No: RVNL/BPL/S&T/HBJ-
BPL-BIN/2 dated
23.10.2009
M/s Bharat Rail Automations (P)
Ltd. B-107, Mandpeshwar
Industrial Estate, SVP ROAD,
Borivali (W), Mumbai-400092
Signaling & Telecommuction - Rs
23,32,40,706/-
Rs 23.32 Cr 22.10.2011
8 RVNL/P-III/PSC Turnout
Sleeper Set/Guntakul-
Raichur/2009; Lot No.
5030901
04.09.2009
.
Manufacture and supply of P.way items for BG
(1673mm) for for patch doubling of Guntakul-Raichur
Section under CPM/RVNL/SC
RVNL/P-III/PSC Turnout
Sleeper Set/Guntakul-
Raichur/2009; Lot No.
5030901 dated
13.11.2009.
M/s Patil Rail Infrastructure Pvt
Ltd., The Grand, 3rd & 4th Floor
6-3-1090/B-4 Raj Bhawan Road,
Somaji guda, Hyderabad-
500082.
Manufacture and Supply: Rs
3.22 Cr. for PSC Turnout Sleeper
Set for 1 in 12, 60 kg and Rs
52.63 Lakh for PSC Turnout
Sleeper Set 1 in 8 1/2 for 60 kg .
Transportation: Rs 32.86 Lac
for PSC Turnout Sleeper Set for
60 kg 1 in 12 and Rs 6 Lakh for
PSC Turnout Sleeper Set 1 in 8
1/2 for 60 kg.
Rs 4.14 Cr 30.11.2010.
9 RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120803
04.09.2009
.
Manufacture and supply of P.way items for BG
(1673mm) for Salka Road- Anuppur Section under
CPM/RVNL/Bilaspur.
RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120803 dated
17.11.2009
M/s Rayalaseema Concrete
Sleepers Pvt Ltd., The Grand,
3rd & 4th Floor 6-3-1090/B-4
Raj Bhawan Road, Somaji guda,
Hyderabad-500082.
Manufacture and Supply: Rs
3.34 Cr. for PSC Turnout Sleeper
Set for 1 in 12, and Rs 25.26 Lac
for PSC T/out Sleeper Set 1 in 8
1/2 60 kg & Rs 10.9 lac for PSC
Turnout Sleeper Set for Derailing
Switch 60 Kg, Transportation:
Rs 20.90 Lac for PSC Turnout
Sleeper Set for 60 kg 1 in 12 and
Rs 1.68 Lakh for PSC Turnout
Sleeper Set 1 in 8 1/2 for 60 kg &
Rs 0.84 lac for PSC Turnout
Sleeper Set for Derailing Switch
60 Kg.
Rs 3.92 Cr 28.02.2011.
10 RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120801
04.09.2009
.
Manufacture and supply of P.way items for BG
(1673mm)for Salka Road- Anuppur Section under
CPM/RVNL/Bilaspur.
RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No.11120801 dated
18.11.2009
M/s Hindustan Engg. &
Industries Ltd., Mody Building,
27, Sir RN Mukherji Marg,
Kolkata-700001.
Manufacture and Supply: Rs
5.70 Lac for 1 in 8 1/2 52Kg
Curved Switches and Rs 5.10 Lac
for 1 in 81/2 Derailing Switches
52Kg. Transportation: Rs 1.31
Lac for 1 in 8 1/2 52Kg Curved
Switches and Rs 1.08 Lac for 1 in
8 1/2 Derailing Switches
Rs 13.19 Lac 10.09.2010
(extended)
11 RVNL/BPL/Elect/HBJ-
BIN/TSS
23.07.2009 Design, Supply, Erection, Testing & commissioning of
132/25 KV Traction Sub-station, Feeding Post, Fixed
Capacitor, bank System & other associated works at
BARETH & SANCHI, TRACTION SUB STATIONS,
Augmentation & replacement of traction transformers
AT BINA TSS, by providing 3rd bay & modification in
existing Feeding Posts at Sukhisewania, Gulabganj in
connection with Electrification of 3rd line on BINA-
BHOPAL section of BHOPAL DIVISION of WCR.
RVNL/BPL/Elect/HBJ-
BIN/TSS
dated18/19.01.2010
M/s S. L. Enterprises 41-A,
Phase-II, Mayapuri Industrial
State, Delhi-110064
Electrical Items-Rs 3.89 Cr for
CORE SOR Items, Rs 11.36 Cr
for Traction Transformer, Rs 0.12
Cr for Maintenance spares,Rs
0.09 Cr for Maintenance Tools,
Rs 0.35 Cr for Site Facilities & Rs
2.65 Cr for Misc. Items,etc.
Rs 18.47 Cr 18.01.2012
12 RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120802
04.09.2009
.
Manufacture and supply of P.way items for BG
(1673mm)for Salka Road- Anuppur Section under
CPM/RVNL/Bilaspur.
RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No.11120802 dated
18.11.2009
M/s Hindustan Engg. &
Industries Ltd., Mody Building,
27, Sir RN Mukherji Marg,
Kolkata-700001.
Manufacture and Supply: Rs
2.33 Cr for 60 Kg CMS Crossing
1 in 12, and Rs 17.75 Lac for 52
Kg CMS Crossing 1 in 81/2
Transportation: Rs 2.53 Lac for
60 Kg CMS Crossing 1 in 12, and
Rs 0.24 Lac for 52 Kg CMS
Crossing 1 in 81/2.
Rs 2.53 Cr 31.10.2010
(extended)
RVNL
13 RVNL/New Delhi/B-B-
H/PMC/Pt-II
15.10.2009 Project Management Consultancy forConstruction of
Road Bed, Major and Minor Bridges, Track Linking
(excluding supply of rails, thick web switches &
sleepers), S&T and OHE & General Electrical work in
connection with 3rd line between Habibganj & Bina
(144.76 Km) on Bhopal Division of West Central
Railway in the state of Madhya Pradesh (India)
Notification of Award No
RVNL/New Delhi/B-B-
H/PMC/Pt-II dated
23.03.2010
M/s Aarvee Associates
Architects, Engineers &
Consultants Pvt Ltd, Ravula
Residancy, Srinagar Colony,
Hyderabad-82.
Renumerations for -Rs 6.57 Cr
for staff & Provision &
maintenance of Office for- Rs
2.70 Lacs.
Rs 6.60 Cr 22.10.2012
14 No. RVNL/P-
III/TWS/2009/Pt I
25.02.2010 Manufacture and Supply of Curved Switches with ZU-
1–60/60E1A1 Thick Web Tongue Rail and UIC 60 (880
Grade) Stock Rail conforming to Indian Railway
Specifications IRS-T-10-2000 for various rail road
projects in different regions of India.
Notification of Award No
No. RVNL/P-
III/TWS/2009/Pt I
Dated 26.05.2010
M/s VAE VKN RTT (JV),
Century Towers,
5th Floor,
45 Shakespeare Sarani,
Kolkata. - 700 017
Manufacture and Supply: Rs
17.79 Cr for 60 kg 1 in 12 TWS
Transportation: Rs 36.84 Lac
for 60 kg 1 in 12 TWS.
Rs 18.16 Cr 25.05.2011
(Extended upto
15.09.2011)
RVNL
Detail of Contract awarded upto July, 2011
Project Planning & Development Department
Sr. No.
Tender No. Date of opening (Tender)
Description of work/study
Contract No. & date (LOA)
Contractor’s Name
Estimated cost of
work (Rs.)
Tendered cost (Rs.)
Scheduled completion date
Physical Progress
( upto 31.07.11)
1 RVNL/PP&D/Bankability/Buramara -Chakulia/10
25/03/10 Bankability study of Buramara-Chakulia New Line with upgradation of Rupsa-Buramara BG Line on SER.
RVNL/PP&D/Bankability/Buramara-Chakulia/10 30/04/2010
M/S Feedback Ventures Pvt. Ltd.
15,0
0,0
00/-
1
3,1
8,0
85/-
3 months from the date of submission of Bank Guarantee (14/05/2010) 15/08/2010 (extended)
Final Report is being placed before RVNL BOD for approval.
2 RVNL/PP&D/Bankability/Nallapadu -Guntakal/RE/10
09/04/10 Bankability study of electrification of Nallapadu-Guntakal section
RVNL/PP&D/Babkability/Nallapadu-Guntakal/RE/10 11/06/2010
M/s PricewaterhouseCoopers Pvt. Ltd
15,0
0,0
00/-
9,9
1,5
14/-
3 months from the date of submission of Bank Guarantee (25/06/2010) 25/09/2010 (extended)
Final Report approved by RVNL BOD and is under submission to Railway Board for acceptance.
3. PP&D/RFP/BOT/CONSULT/2009/Pt. II
21.08.10 Project Consultancy services for development of PPP model in Railway projects.
PP&D/RFP/BOT/CONSULT/2009/Pt. II dated: 25.03.2010
M/s. RITES Ltd.
30,9
3,2
93/-
15,0
0,0
00/-
26 weeks from the date of acceptance of LOA(25/03/2010) 25/09/2010 (extended)
Final Report has been approved by RVNL BOD for onward transmission to Railway board for acceptance.
4. PP&D/RVNL/ HX-SBC/2010
23.08.10 Bankability study for Cuddapah-Bangalore New Line project.
PP&D/RVNL/ HX-SBC/2010 24/09/2010
M/s PricewaterhouseCoopers Pvt. Ltd.
12,8
9,3
40/-
1
4,5
0,1
00/-
8 weeks from the date of acceptance of CV(06/10/2010) 2/12/2010
Final Report submitted on 26.07.11 and under examination by RVNL.
RVNL
5. PP&D/RVNL/ KUR-BOLANGIR/2010
21.09.10 Bankability study for Khurda Road-Bolangir New Line project.
PP&D/RVNL/ KUR-BOLANGIR/2010 04/10/2010
M/S Deloitte Touche Tohmatsu India Pvt. Ltd.
15,0
0,0
00/-
9,6
5,1
25/-
10 weeks from the date of acceptance of CV(15/10/2010) 25/01/2011)
Final Report sent to Railway Board on 02.02.11 for acceptance.
6. PP&D/RVNL/DHD-INDB/Bank/2010
N.A. Study done in house.
Bankability study for Dahod-Indore New Line project in Western Railway.
PP&D/RVNL/DHD-INDB/Bank/2010 dated 24.12.2010
Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/21, Goyal Inter City, Block-C, Drive in Road, Thaltej, Ahemedabad-54
----
---
1,9
5,0
00/-
6 weeks from LAO (24.12.10) for Traffic Study which is out sourced.
Study done in house. Only Traffic Study Out sourced. Final report submitted on 20.06.2011 and under examination.
7. PP&D/FT/HUK/2010 21.01.11 Feasibility Study for Development of Freight Terminal at Holambi Kalan on Northern Railway.
PP&D/FT/HUK/2010 dated 08.02.2011
M/S Deloitte Touche Tohmatsu India Pvt. Ltd.
5,0
0,0
00/-
8,7
6,8
85/-
16 weeks from the date of acceptance of CV(18/02/2011) 10/06/2011)
Draft Final report submitted on 15.07.2011 and under examination.
8. PP&D/RVNL/MCLA- NLDA/Bank/2010
N.A. Study done in house.
Bankability study for Macherla-NalgondaNew Line project in South Central Railway.
PP&D/RVNL / MCLA – NLDA / BANKA / 2010 dated 21.02.11
Traffic Study to Sh.Sanjeeva SHivesh ( ex IRAS), CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, C-block, Sec.-43, Gurgaon.
----
--
1,7
5,0
00/-
4 weeks from LOA (21.02.11) for Traffic Study which is out sourced. 20.03.2011
Study done in house. Only Traffic Study Out sourced. Final report submitted on 02.06.2011 and under examination.
9. PP&D/RVNL/ADI -UDZ/Bank/2010
N.A. Study done in house.
Bankability study for Ahmedabad -Udaipur Gauge Conversion project in Western Railway.
N.A. N.A. Study done in house.
----
--
--
----
N.A. Study done in house and Completed, Report sent to Rly. Board on 31.12.2010.
RVNL
10. No. PP&D/RVNL/BJP -SDB/BANK/2010
20/12/10 Bankability study of Bijapur - Shahabad New line in South Western
Railway
No. PP&D/RVNL/BJP-SDB/BANK/2010 Dated: 08/03/2011
M/s Deloitte Touche
Tohmatsu India Pvt. Ltd.
15,0
0,0
00.0
0
12,2
8,1
79.4
7
(3 months from LOA dated 08.03.2011) 06/06/2011
Draft final report submitted on 10.06.2011 and under examination by RVNL.
11. No. PP&D/RVNL/DWR -BGM/BANK/ 2010
27/12/10 Bankability study of Dharwad – Belgaum New line
in South Western Railway
No. PP&D/RVNL/DWR-
BGM/BANK/Tender/2010 Dated: 04/04/2011
M/s ARKITECHNO Consultants (India)
Pvt. Ltd
14,8
9,0
00.0
0
9,7
1,1
68.0
0
(3 months from LOA)
03/07/2011
Study in progress. Interim report submitted on 23.06.2011
12. No. PP&D/RVNL/ RDG-TK / BANK/2010
04/01/11 Bankability study of Rayadurg-Tumkur
New line in South Western Railway
No. PP&D/RVNL/ RDG-TK
/BANK/2010 Dated: 19/04/2011
M/s Deloitte Touche Tohmatsu
India Pvt. Ltd.
14,8
9,0
00.0
0
12,2
8,1
79.4
7
(3 months from LOA) 18.07.2011
Study in progress. Interim report submitted on 20.06.2011
13. No. 2006/Website/
rvnl.org//Pt.II
N.A. Extension of Web
Space hosting with 100 E-Mail boxes and Maintenance of web Portal of RVNL on nomination basis.
No. 2006/Website/
rvnl.org//Pt.II Dated: 12/05/2011
National Co-
operative Consumers’ Federation of India Ltd. …
…..
2,5
3,0
00.0
0
11/04/2011 to 10/04/2012
N.A.
RVNL
Detail of Contract awarded upto August, 2011
Project Planning & Development Department
Sr. No.
Tender No. Date of opening (Tender)
Description of work/study
Contract No. & date (LOA)
Contractor’s Name
Estimated cost of
work (Rs.)
Tendered cost (Rs.)
Scheduled completion date
Physical Progress
( upto 31.08.11)
1 RVNL/PP&D/Bankability/Buramara -Chakulia/10
25/03/10 Bankability study of Buramara-Chakulia New Line with upgradation of Rupsa-Buramara BG Line on SER.
RVNL/PP&D/Bankability/Buramara-Chakulia/10 30/04/2010
M/S Feedback Ventures Pvt. Ltd.
15,0
0,0
00/-
1
3,1
8,0
85/-
3 months from the date of submission of Bank Guarantee (14/05/2010) 15/08/2010 (extended)
Final Report sent to Railway Board on 16.08.11 for acceptance.
2 RVNL/PP&D/Bankability/Nallapadu -Guntakal/RE/10
09/04/10 Bankability study of electrification of Nallapadu-Guntakal section
RVNL/PP&D/Babkability/Nallapadu-Guntakal/RE/10 11/06/2010
M/s PricewaterhouseCoopers Pvt. Ltd
15,0
0,0
00/-
9,9
1,5
14/-
3 months from the date of submission of Bank Guarantee (25/06/2010) 25/09/2010 (extended)
Final Report sent to Railway Board on 04.08.11 for acceptance.
3. PP&D/RFP/BOT/CONSULT/2009/Pt. II
21.08.10 Project Consultancy services for development of PPP model in Railway projects.
PP&D/RFP/BOT/CONSULT/2009/Pt. II dated: 25.03.2010
M/s. RITES Ltd.
30,9
3,2
93/-
15,0
0,0
00/-
26 weeks from the date of acceptance of LOA(25/03/2010) 25/09/2010 (extended)
Final Report has been approved by RVNL BOD for onward transmission to Railway board for acceptance.
4. PP&D/RVNL/ HX-SBC/2010
23.08.10 Bankability study for Cuddapah-Bangalore New Line project.
PP&D/RVNL/ HX-SBC/2010 24/09/2010
M/s PricewaterhouseCoopers Pvt. Ltd.
12,8
9,3
40/-
1
4,5
0,1
00/-
8 weeks from the date of acceptance of CV(06/10/2010) 2/12/2010
Final Report submitted on 26.07.11 and under examination by RVNL.
RVNL
5. PP&D/RVNL/ KUR-BOLANGIR/2010
21.09.10 Bankability study for Khurda Road-Bolangir New Line project.
PP&D/RVNL/ KUR-BOLANGIR/2010 04/10/2010
M/S Deloitte Touche Tohmatsu India Pvt. Ltd.
15,0
0,0
00/-
9,6
5,1
25/-
10 weeks from the date of acceptance of CV(15/10/2010) 25/01/2011)
Final Report sent to Railway Board on 02.02.11 for acceptance.
6. PP&D/RVNL/DHD-INDB/Bank/2010
N.A. Study done in house.
Bankability study for Dahod-Indore New Line project in Western Railway.
PP&D/RVNL/DHD-INDB/Bank/2010 dated 24.12.2010
Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/21, Goyal Inter City, Block-C, Drive in Road, Thaltej, Ahemedabad-54
----
---
1,9
5,0
00/-
6 weeks from LAO (24.12.10) for Traffic Study which is out sourced.
Study done in house. Only Traffic Study Out sourced. Final report submitted on 20.06.2011 and under examination.
7. PP&D/FT/HUK/2010 21.01.11 Feasibility Study for Development of Freight Terminal at Holambi Kalan on Northern Railway.
PP&D/FT/HUK/2010 dated 08.02.2011
M/S Deloitte Touche Tohmatsu India Pvt. Ltd.
5,0
0,0
00/-
8,7
6,8
85/-
16 weeks from the date of acceptance of CV(18/02/2011) 10/06/2011)
Draft Final report submitted on 15.07.2011 and under examination.
8. PP&D/RVNL/MCLA- NLDA/Bank/2010
N.A. Study done in house.
Bankability study for Macherla-NalgondaNew Line project in South Central Railway.
PP&D/RVNL / MCLA – NLDA / BANKA / 2010 dated 21.02.11
Traffic Study to Sh.Sanjeeva SHivesh ( ex IRAS), CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, C-block, Sec.-43, Gurgaon.
----
--
1,7
5,0
00/-
4 weeks from LOA (21.02.11) for Traffic Study which is out sourced. 20.03.2011
Study done in house. Only Traffic Study Out sourced. Revised Final report submitted on 09.08.2011 and under examination.
9. PP&D/RVNL/ADI -UDZ/Bank/2010
N.A. Study done in house.
Bankability study for Ahmedabad -Udaipur Gauge Conversion project in Western Railway.
N.A. N.A. Study done in house.
----
--
--
----
N.A. Study done in house and Completed, Report sent to Rly. Board on 31.12.2010.
RVNL
10. No. PP&D/RVNL/BJP -SDB/BANK/2010
20/12/10 Bankability study of Bijapur - Shahabad New line in South Western
Railway
No. PP&D/RVNL/BJP-SDB/BANK/2010 Dated: 08/03/2011
M/s Deloitte Touche
Tohmatsu India Pvt. Ltd.
15,0
0,0
00.0
0
12,2
8,1
79.4
7
(3 months from LOA dated 08.03.2011) 06/06/2011
Draft Final report submitted on 11.08.2011 and under examination by RVNL.
11. No. PP&D/RVNL/DWR -BGM/BANK/ 2010
27/12/10 Bankability study of Dharwad – Belgaum New line
in South Western Railway
No. PP&D/RVNL/DWR-
BGM/BANK/Tender/2010 Dated: 04/04/2011
M/s ARKITECHNO Consultants (India)
Pvt. Ltd
14,8
9,0
00.0
0
9,7
1,1
68.0
0
(3 months from LOA dated
04.04.2011)
03/07/2011
Draft Final report submitted on 29.08.2011 and under examination by RVNL.
12. No. PP&D/RVNL/ RDG-TK / BANK/2010
04/01/11 Bankability study of Rayadurg-Tumkur
New line in South Western Railway
No. PP&D/RVNL/ RDG-TK
/BANK/2010 Dated: 19/04/2011
M/s Deloitte Touche Tohmatsu
India Pvt. Ltd.
14,8
9,0
00.0
0
12,2
8,1
79.4
7
(3 months from LOA dated 19.04.2011) 18.07.2011
Draft Final report submitted on 11.08.2011 and under examination by RVNL.
RVNL
S.No Tender No. Date of
Opening
Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract)
Estimated Cost (for
Engg./Elect./S&T/Mech.)
Rate (for supply contract)
Tendered Cost (for
Engg./Elect./S&T/Mech.)
Scheduled Completion
Date
1 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges,
Track Linking (excluding supply of rails, thick web
switches & sleepers), S&T and OHE & General
Electrical work in connection with 3rd
line between
Habibganj & Bina (144.76 Km) on Bhopal Division of
West Central Railway in the state of Madhya Pradesh
(India) - Package No. 1 between Bina (Incl) to Ganj
Basoda (Incl) chainage 975.16 to 928.500 (Km 46.66).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-1 dated
31.08.2009 (Contract
agreement yet to be
done)
M/s. Larsen & Toubro Ltd,ECC
Division,Post Box No.
979,Mount Poonamalle
Road,Manakakkam, Chennai-
600089. --
Rs 141.88 Cr March, 2012
2 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges,
Track Linking (excluding supply of rails, thick web
switches & sleepers), S&T and OHE & General
Electrical work in connection with 3rd
line between
Habibganj & Bina (144.76 Km) on Bhopal Division of
West Central Railway in the state of Madhya Pradesh
(India) - Package No. 2 between GanjBasoda (Excl) to
Sanchi (Incl) chainage 928.500 to 879.750 (Km 48.75).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-2 dated
31.08.2009 (Contract
agreement yet to be
done)
M/s. Larsen & Toubro Ltd,ECC
Division,Post Box No.
979,Mount Poonamalle
Road,Manakakkam, Chennai-
600089. --
Rs. 150.05 Cr March, 2012
3 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges,
Track Linking (excluding supply of rails, thick web
switches & sleepers), S&T and OHE & General
Electrical work in connection with 3rd
line between
Habibganj & Bina (144.76 Km) on Bhopal Division of
West Central Railway in the state of Madhya Pradesh
(India) - Package No. 3 between Sanchi (Excl) to
Habibganj (Incl) chainage 879.750 to 830.850 (Km
48.9).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-3 dated
31.08.2009 (Contract
agreement yet to be
done)
M/s. NCCL-ECIECCL-ARPL
(JV), C/o M/S Nagarjuna
Construction Company
Limited,4th Floor, Uma Enclave,
Road No. 9, HYDERABAD-
500034.--
Rs 135.65 Cr March, 2012
4 RVNL/P-III/P.way
items/Guntakul-
Raichur/1 of
2009/Switches; Lot No.
31030801
27.06.2008 Manufacture and supply of P.way items for BG
(1673mm) for patch doubling of Guntakul-Raichur
Section under CPM/RVNL/SC
RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/Switches dated
30.03.2009
M/s VAE VKN Industries Pvt.
Ltd., 24/5 Sriram Road, Civil
Lines, Delhi-110054.
Manufacture and Supply: Rs
1.25 Cr for 60 kg 1 in 12 Switches
and Rs 16.97 Lakh for 60 kg 1 in
8 1/2 Switches & Rs 4.24 Lakh
for 52 kg 1 in 8 1/2 Switches.
Transportation: Rs 26.50 Lac
for 60 kg 1 in 12 Switches and Rs
4.50 Lac for 52 kg 1 in 8 1/2
Switches & Rs 1.12 Lakh for 60
kg 1 in 8 1/2 Switches.
Rs 1.77 Cr 30.11.2010
(extended)
5 RVNL/P-III/P.way
items/Guntakul-
Raichur/1 of 2009/CMS
Xing; Lot No. 31030802
27.06.2008 Manufacture and supply of P.way items for BG
(1673mm) for patch doubling of Guntakul-Raichur
Section under CPM/RVNL/SC
RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/CMS Xing dated
30.03.2009
M/s VAE VKN Industries Pvt.
Ltd., 24/5 Sriram Road, Civil
Lines, Delhi-110054.
Manufacture and Supply: Rs
2.47 Cr for 60 kg 1 in 12 CMS
Crossing and Rs 0.5 Cr for 60 kg
1 in 8 1/2 CMS Crossing.
Transportation: Rs 3.18 Lac for
60 kg 1 in 12 CMS Crossing and
Rs 0.6 Lac for 60 kg 1 in 8 1/2
CMS Crossing.
Rs 3.02 Cr 30.08.2010
(extended)
6 RVNL/Mumbai/Bina-
BPL/ 2006 dated
30.08.2006
30.08.2006 Conducting Final Location Survey (FLS) marking the
center line of the final alignment on the ground and
Detailed Design Engg (DDE) for BG third line between
Bina-Bhopal (138.423 Km) in WC Rly.
RVNL/Mumb/RPS/FLS(Bi
na- BPL)/ 2006 dated
11.12.2006
M/s Monarch Services &
Contractors, Sinhagad Road,
Pune-411030
--- Rs 1.23 Cr 31.03.2011
(extended)
Details of Contracts Placed upto the month of Sept' 2011 under GM/P-III
RVNL
7 RVNL/BPL/S&T/HBJ-
BPL-BIN/2
09.06.2009 Supply, installing, modification, testing &commissing of
electronic interlocking system alongwith modification, in
relay based indoor signaling arrangement at PI/RRI/LC
gates, IBH etc. alongwith yard remodeling in connection
with the work of 3rd line between Habibganj & Bina
(144.76 Km) on Bhopal Division of West Central
Railway in the state of Madhya Pradesh (India)
No: RVNL/BPL/S&T/HBJ-
BPL-BIN/2 dated
23.10.2009
M/s Bharat Rail Automations (P)
Ltd. B-107, Mandpeshwar
Industrial Estate, SVP ROAD,
Borivali (W), Mumbai-400092
Signaling & Telecommuction - Rs
23,32,40,706/-
Rs 23.32 Cr 22.10.2011
8 RVNL/P-III/PSC Turnout
Sleeper Set/Guntakul-
Raichur/2009; Lot No.
5030901
04.09.2009
.
Manufacture and supply of P.way items for BG
(1673mm) for for patch doubling of Guntakul-Raichur
Section under CPM/RVNL/SC
RVNL/P-III/PSC Turnout
Sleeper Set/Guntakul-
Raichur/2009; Lot No.
5030901 dated
13.11.2009.
M/s Patil Rail Infrastructure Pvt
Ltd., The Grand, 3rd & 4th Floor
6-3-1090/B-4 Raj Bhawan Road,
Somaji guda, Hyderabad-
500082.
Manufacture and Supply: Rs
3.22 Cr. for PSC Turnout Sleeper
Set for 1 in 12, 60 kg and Rs
52.63 Lakh for PSC Turnout
Sleeper Set 1 in 8 1/2 for 60 kg .
Transportation: Rs 32.86 Lac
for PSC Turnout Sleeper Set for
60 kg 1 in 12 and Rs 6 Lakh for
PSC Turnout Sleeper Set 1 in 8
1/2 for 60 kg.
Rs 4.14 Cr 30.11.2010.
9 RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120803
04.09.2009
.
Manufacture and supply of P.way items for BG
(1673mm) for Salka Road- Anuppur Section under
CPM/RVNL/Bilaspur.
RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120803 dated
17.11.2009
M/s Rayalaseema Concrete
Sleepers Pvt Ltd., The Grand,
3rd & 4th Floor 6-3-1090/B-4
Raj Bhawan Road, Somaji guda,
Hyderabad-500082.
Manufacture and Supply: Rs
3.34 Cr. for PSC Turnout Sleeper
Set for 1 in 12, and Rs 25.26 Lac
for PSC T/out Sleeper Set 1 in 8
1/2 60 kg & Rs 10.9 lac for PSC
Turnout Sleeper Set for Derailing
Switch 60 Kg, Transportation:
Rs 20.90 Lac for PSC Turnout
Sleeper Set for 60 kg 1 in 12 and
Rs 1.68 Lakh for PSC Turnout
Sleeper Set 1 in 8 1/2 for 60 kg &
Rs 0.84 lac for PSC Turnout
Sleeper Set for Derailing Switch
60 Kg.
Rs 3.92 Cr 28.02.2011.
10 RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120801
04.09.2009
.
Manufacture and supply of P.way items for BG
(1673mm)for Salka Road- Anuppur Section under
CPM/RVNL/Bilaspur.
RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No.11120801 dated
18.11.2009
M/s Hindustan Engg. &
Industries Ltd., Mody Building,
27, Sir RN Mukherji Marg,
Kolkata-700001.
Manufacture and Supply: Rs
5.70 Lac for 1 in 8 1/2 52Kg
Curved Switches and Rs 5.10 Lac
for 1 in 81/2 Derailing Switches
52Kg. Transportation: Rs 1.31
Lac for 1 in 8 1/2 52Kg Curved
Switches and Rs 1.08 Lac for 1 in
8 1/2 Derailing Switches
Rs 13.19 Lac 10.09.2010
(extended)
11 RVNL/BPL/Elect/HBJ-
BIN/TSS
23.07.2009 Design, Supply, Erection, Testing & commissioning of
132/25 KV Traction Sub-station, Feeding Post, Fixed
Capacitor, bank System & other associated works at
BARETH & SANCHI, TRACTION SUB STATIONS,
Augmentation & replacement of traction transformers
AT BINA TSS, by providing 3rd bay & modification in
existing Feeding Posts at Sukhisewania, Gulabganj in
connection with Electrification of 3rd line on BINA-
BHOPAL section of BHOPAL DIVISION of WCR.
RVNL/BPL/Elect/HBJ-
BIN/TSS
dated18/19.01.2010
M/s S. L. Enterprises 41-A,
Phase-II, Mayapuri Industrial
State, Delhi-110064
Electrical Items-Rs 3.89 Cr for
CORE SOR Items, Rs 11.36 Cr
for Traction Transformer, Rs 0.12
Cr for Maintenance spares,Rs
0.09 Cr for Maintenance Tools,
Rs 0.35 Cr for Site Facilities & Rs
2.65 Cr for Misc. Items,etc.
Rs 18.47 Cr 18.01.2012
12 RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120802
04.09.2009
.
Manufacture and supply of P.way items for BG
(1673mm)for Salka Road- Anuppur Section under
CPM/RVNL/Bilaspur.
RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No.11120802 dated
18.11.2009
M/s Hindustan Engg. &
Industries Ltd., Mody Building,
27, Sir RN Mukherji Marg,
Kolkata-700001.
Manufacture and Supply: Rs
2.33 Cr for 60 Kg CMS Crossing
1 in 12, and Rs 17.75 Lac for 52
Kg CMS Crossing 1 in 81/2
Transportation: Rs 2.53 Lac for
60 Kg CMS Crossing 1 in 12, and
Rs 0.24 Lac for 52 Kg CMS
Crossing 1 in 81/2.
Rs 2.53 Cr 31.10.2010
(extended)
RVNL
13 RVNL/New Delhi/B-B-
H/PMC/Pt-II
15.10.2009 Project Management Consultancy forConstruction of
Road Bed, Major and Minor Bridges, Track Linking
(excluding supply of rails, thick web switches &
sleepers), S&T and OHE & General Electrical work in
connection with 3rd line between Habibganj & Bina
(144.76 Km) on Bhopal Division of West Central
Railway in the state of Madhya Pradesh (India)
Notification of Award No
RVNL/New Delhi/B-B-
H/PMC/Pt-II dated
23.03.2010
M/s Aarvee Associates
Architects, Engineers &
Consultants Pvt Ltd, Ravula
Residancy, Srinagar Colony,
Hyderabad-82.
Renumerations for -Rs 6.57 Cr
for staff & Provision &
maintenance of Office for- Rs
2.70 Lacs.
Rs 6.60 Cr 22.10.2012
14 No. RVNL/P-
III/TWS/2009/Pt I
25.02.2010 Manufacture and Supply of Curved Switches with ZU-
1–60/60E1A1 Thick Web Tongue Rail and UIC 60 (880
Grade) Stock Rail conforming to Indian Railway
Specifications IRS-T-10-2000 for various rail road
projects in different regions of India.
Notification of Award No
No. RVNL/P-
III/TWS/2009/Pt I
Dated 26.05.2010
M/s VAE VKN RTT (JV),
Century Towers,
5th Floor,
45 Shakespeare Sarani,
Kolkata. - 700 017
Manufacture and Supply: Rs
17.79 Cr for 60 kg 1 in 12 TWS
Transportation: Rs 36.84 Lac
for 60 kg 1 in 12 TWS.
Rs 18.16 Cr 25.05.2011
(Extended upto
31.12.2011)
RVNL
Detail of Contract awarded upto October, 2011
Project Planning & Development Department
Sr. No.
Tender No. Date of opening (Tender)
Description of work/study
Contract No. & date (LOA)
Contractor’s Name
Estimated cost of
work (Rs.)
Tendered cost (Rs.)
Scheduled completion date
Physical Progress
( upto 31.10.11)
1 RVNL/PP&D/Bankability/Buramara -Chakulia/10
25/03/10 Bankability study of Buramara-Chakulia New Line with upgradation of Rupsa-Buramara BG Line on SER.
RVNL/PP&D/Bankability/Buramara-Chakulia/10 30/04/2010
M/S Feedback Ventures Pvt. Ltd.
15,0
0,0
00/-
1
3,1
8,0
85/-
3 months from the date of submission of Bank Guarantee (14/05/2010) 15/08/2010 (extended)
Final Report sent to Railway Board on 16.08.11 for acceptance.
2 RVNL/PP&D/Bankability/Nallapadu -Guntakal/RE/10
09/04/10 Bankability study of electrification of Nallapadu-Guntakal section
RVNL/PP&D/Babkability/Nallapadu-Guntakal/RE/10 11/06/2010
M/s PricewaterhouseCoopers Pvt. Ltd
15,0
0,0
00/-
9,9
1,5
14/-
3 months from the date of submission of Bank Guarantee (25/06/2010) 25/09/2010 (extended)
Final Report sent to Railway Board on 04.08.11 for acceptance.
3. PP&D/RFP/BOT/CONSULT/2009/Pt. II
21.08.10 Project Consultancy services for development of PPP model in Railway projects.
PP&D/RFP/BOT/CONSULT/2009/Pt. II dated: 25.03.2010
M/s. RITES Ltd.
30,9
3,2
93/-
15,0
0,0
00/-
26 weeks from the date of acceptance of LOA(25/03/2010) 25/09/2010 (extended)
Final Report sent to Railway Board on 21.09.11 for acceptance.
4. PP&D/RVNL/ HX-SBC/2010
23.08.10 Bankability study for Cuddapah-Bangalore New Line project.
PP&D/RVNL/ HX-SBC/2010 24/09/2010
M/s PricewaterhouseCoopers Pvt. Ltd.
12,8
9,3
40/-
1
4,5
0,1
00/-
8 weeks from the date of acceptance of CV(06/10/2010) 2/12/2010
Revised Final Report submitted on 03.10.11 and under examination by RVNL Finance.
RVNL
5. PP&D/RVNL/ KUR-BOLANGIR/2010
21.09.10 Bankability study for Khurda Road-Bolangir New Line project.
PP&D/RVNL/ KUR-BOLANGIR/2010 04/10/2010
M/S Deloitte Touche Tohmatsu India Pvt. Ltd.
15,0
0,0
00/-
9,6
5,1
25/-
10 weeks from the date of acceptance of CV(15/10/2010) 25/01/2011)
Final Report sent to Railway Board on 02.02.11 for acceptance.
6. PP&D/RVNL/DHD-INDB/Bank/2010
N.A. Study done in house.
Bankability study for Dahod-Indore New Line project in Western Railway.
PP&D/RVNL/DHD-INDB/Bank/2010 dated 24.12.2010
Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/21, Goyal Inter City, Block-C, Drive in Road, Thaltej, Ahemedabad-54
----
---
1,9
5,0
00/-
6 weeks from LAO (24.12.10) for Traffic Study which is out sourced.
Study done in house. Only Traffic Study Out sourced. Final report submitted on 20.06.2011 and under examination.
7. PP&D/FT/HUK/2010 21.01.11 Feasibility Study for Development of Freight Terminal at Holambi Kalan on Northern Railway.
PP&D/FT/HUK/2010 dated 08.02.2011
M/S Deloitte Touche Tohmatsu India Pvt. Ltd.
5,0
0,0
00/-
8,7
6,8
85/-
16 weeks from the date of acceptance of CV(18/02/2011) 10/06/2011)
Draft Final report submitted on 15.07.2011 and under examination.
8. PP&D/RVNL/MCLA- NLDA/Bank/2010
N.A. Study done in house.
Bankability study for Macherla-Nalgonda New Line project in South Central Railway.
PP&D/RVNL / MCLA – NLDA / BANKA / 2010 dated 21.02.11
Traffic Study to Sh.Sanjeeva SHivesh ( ex IRAS), CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, C-block, Sec.-43, Gurgaon.
----
--
1,7
5,0
00/-
4 weeks from LOA (21.02.11) for Traffic Study which is out sourced. 20.03.2011
Study done in house. Only Traffic Study Out sourced. Revised Final report submitted on 09.08.2011 and under examination.
9. PP&D/RVNL/ADI -UDZ/Bank/2010
N.A. Study done in house.
Bankability study for Ahmedabad -Udaipur Gauge Conversion project in Western Railway.
N.A. N.A. Study done in house.
----
--
--
----
N.A. Study done in house and Completed, Report sent to Rly. Board on 31.12.2010.
RVNL
10. No. PP&D/RVNL/BJP -SDB/BANK/2010
20/12/10 Bankability study of Bijapur - Shahabad New line in South Western
Railway
No. PP&D/RVNL/BJP-SDB/BANK/2010 Dated: 08/03/2011
M/s Deloitte Touche
Tohmatsu India Pvt. Ltd.
15,0
0,0
00.0
0
12,2
8,1
79.4
7
(3 months from LOA dated 08.03.2011) 06/06/2011
Revised Final report submitted on 07.10.2011 and under examination by RVNL Finance.
11. No. PP&D/RVNL/DWR -BGM/BANK/ 2010
27/12/10 Bankability study of Dharwad – Belgaum New line
in South Western Railway
No. PP&D/RVNL/DWR-
BGM/BANK/Tender/2010 Dated: 04/04/2011
M/s ARKITECHNO Consultants (India)
Pvt. Ltd
14,8
9,0
00.0
0
9,7
1,1
68.0
0
(3 months from LOA dated
04.04.2011)
03/07/2011
Revised Final report submitted on 05.10.2011 and under examination by RVNL Finance.
12. No. PP&D/RVNL/ RDG-TK / BANK/2010
04/01/11 Bankability study of Rayadurg-Tumkur
New line in South Western Railway
No. PP&D/RVNL/ RDG-TK
/BANK/2010 Dated: 19/04/2011
M/s Deloitte Touche Tohmatsu
India Pvt. Ltd.
14,8
9,0
00.0
0
12,2
8,1
79.4
7
(3 months from LOA dated 19.04.2011) 18.07.2011
Revised Final report submitted on 07.10.2011 and under examination by RVNL Finance.
RVNL
S.No Tender No. Date of
Opening
Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract)
Estimated Cost (for
Engg./Elect./S&T/Mech.)
Rate (for supply contract)
Tendered Cost (for
Engg./Elect./S&T/Mech.)
Scheduled Completion
Date
1 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges, Track
Linking (excluding supply of rails, thick web switches &
sleepers), S&T and OHE & General Electrical work in
connection with 3rd
line between Habibganj & Bina (144.76
Km) on Bhopal Division of West Central Railway in the
state of Madhya Pradesh (India) - Package No. 1 between
Bina (Incl) to Ganj Basoda (Incl) chainage 975.16 to
928.500 (Km 46.66).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-1 dated
31.08.2009 (Contract
agreement yet to be done)
M/s. Larsen & Toubro Ltd,ECC
Division,Post Box No. 979,Mount
Poonamalle Road,Manakakkam,
Chennai-600089.--
Rs 141.88 Cr March, 2012
2 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges, Track
Linking (excluding supply of rails, thick web switches &
sleepers), S&T and OHE & General Electrical work in
connection with 3rd
line between Habibganj & Bina (144.76
Km) on Bhopal Division of West Central Railway in the
state of Madhya Pradesh (India) - Package No. 2 between
GanjBasoda (Excl) to Sanchi (Incl) chainage 928.500 to
879.750 (Km 48.75).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-2 dated
31.08.2009 (Contract
agreement yet to be done)
M/s. Larsen & Toubro Ltd,ECC
Division,Post Box No. 979,Mount
Poonamalle Road,Manakakkam,
Chennai-600089.
--
Rs. 150.05 Cr March, 2012
3 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges, Track
Linking (excluding supply of rails, thick web switches &
sleepers), S&T and OHE & General Electrical work in
connection with 3rd
line between Habibganj & Bina (144.76
Km) on Bhopal Division of West Central Railway in the
state of Madhya Pradesh (India) - Package No. 3 between
Sanchi (Excl) to Habibganj (Incl) chainage 879.750 to
830.850 (Km 48.9).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-3 dated
31.08.2009 (Contract
agreement yet to be done)
M/s. NCCL-ECIECCL-ARPL
(JV), C/o M/S Nagarjuna
Construction Company
Limited,4th Floor, Uma Enclave,
Road No. 9, HYDERABAD-
500034.
--
Rs 135.65 Cr March, 2012
4 RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/Switches; Lot No.
31030801
27.06.2008 Manufacture and supply of P.way items for BG (1673mm)
for patch doubling of Guntakul-Raichur Section under
CPM/RVNL/SC
RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/Switches dated
30.03.2009
M/s VAE VKN Industries Pvt. Ltd.,
24/5 Sriram Road, Civil Lines,
Delhi-110054.
Manufacture and Supply: Rs
1.25 Cr for 60 kg 1 in 12 Switches
and Rs 16.97 Lakh for 60 kg 1 in 8
1/2 Switches & Rs 4.24 Lakh for 52
kg 1 in 8 1/2 Switches.
Transportation: Rs 26.50 Lac for
60 kg 1 in 12 Switches and Rs 4.50
Lac for 52 kg 1 in 8 1/2 Switches &
Rs 1.12 Lakh for 60 kg 1 in 8 1/2
Switches.
Rs 1.77 Cr 25.12.2010
(extended)
5 RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/CMS Xing; Lot
No. 31030802
27.06.2008 Manufacture and supply of P.way items for BG (1673mm)
for patch doubling of Guntakul-Raichur Section under
CPM/RVNL/SC
RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/CMS Xing dated
30.03.2009
M/s VAE VKN Industries Pvt. Ltd.,
24/5 Sriram Road, Civil Lines,
Delhi-110054.
Manufacture and Supply: Rs
2.47 Cr for 60 kg 1 in 12 CMS
Crossing and Rs 0.5 Cr for 60 kg 1
in 8 1/2 CMS Crossing.
Transportation: Rs 3.18 Lac for
60 kg 1 in 12 CMS Crossing and
Rs 0.6 Lac for 60 kg 1 in 8 1/2
CMS Crossing.
Rs 3.02 Cr 30.08.2010
(extended)
6 RVNL/Mumbai/Bina-
BPL/ 2006 dated
30.08.2006
30.08.2006 Conducting Final Location Survey (FLS) marking the
center line of the final alignment on the ground and
Detailed Design Engg (DDE) for BG third line between
Bina-Bhopal (138.423 Km) in WC Rly.
RVNL/Mumb/RPS/FLS(Bi
na- BPL)/ 2006 dated
11.12.2006
M/s Monarch Services &
Contractors, Sinhagad Road,
Pune-411030
--- Rs 1.23 Cr 31.03.2011
(extended)
Details of Contracts Placed upto the month of Oct' 2011 under GM/P-III
RVNL
7 RVNL/BPL/S&T/HBJ-
BPL-BIN/2
09.06.2009 Supply, installing, modification, testing &commissing of
electronic interlocking system alongwith modification, in
relay based indoor signaling arrangement at PI/RRI/LC
gates, IBH etc. alongwith yard remodeling in connection
with the work of 3rd line between Habibganj & Bina
(144.76 Km) on Bhopal Division of West Central Railway
in the state of Madhya Pradesh (India)
No: RVNL/BPL/S&T/HBJ-
BPL-BIN/2 dated
23.10.2009
M/s Bharat Rail Automations (P)
Ltd. B-107, Mandpeshwar
Industrial Estate, SVP ROAD,
Borivali (W), Mumbai-400092
Signaling & Telecommuction - Rs
23,32,40,706/-
Rs 23.32 Cr 22.10.2011
8 RVNL/P-III/PSC Turnout
Sleeper Set/Guntakul-
Raichur/2009; Lot No.
5030901
04.09.2009. Manufacture and supply of P.way items for BG (1673mm)
for for patch doubling of Guntakul-Raichur Section under
CPM/RVNL/SC
RVNL/P-III/PSC Turnout
Sleeper Set/Guntakul-
Raichur/2009; Lot No.
5030901 dated
13.11.2009.
M/s Patil Rail Infrastructure Pvt
Ltd., The Grand, 3rd & 4th Floor 6-
3-1090/B-4 Raj Bhawan Road,
Somaji guda, Hyderabad-500082.
Manufacture and Supply: Rs
3.22 Cr. for PSC Turnout Sleeper
Set for 1 in 12, 60 kg and Rs
52.63 Lakh for PSC Turnout
Sleeper Set 1 in 8 1/2 for 60 kg .
Transportation: Rs 32.86 Lac for
PSC Turnout Sleeper Set for 60 kg
1 in 12 and Rs 6 Lakh for PSC
Turnout Sleeper Set 1 in 8 1/2 for
60 kg.
Rs 4.14 Cr 30.11.2010.
9 RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120803
04.09.2009. Manufacture and supply of P.way items for BG (1673mm)
for Salka Road- Anuppur Section under
CPM/RVNL/Bilaspur.
RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120803 dated
17.11.2009
M/s Rayalaseema Concrete
Sleepers Pvt Ltd., The Grand, 3rd
& 4th Floor 6-3-1090/B-4 Raj
Bhawan Road, Somaji guda,
Hyderabad-500082.
Manufacture and Supply: Rs
3.34 Cr. for PSC Turnout Sleeper
Set for 1 in 12, and Rs 25.26 Lac
for PSC T/out Sleeper Set 1 in 8
1/2 60 kg & Rs 10.9 lac for PSC
Turnout Sleeper Set for Derailing
Switch 60 Kg, Transportation: Rs
20.90 Lac for PSC Turnout Sleeper
Set for 60 kg 1 in 12 and Rs 1.68
Lakh for PSC Turnout Sleeper Set
1 in 8 1/2 for 60 kg & Rs 0.84 lac
for PSC Turnout Sleeper Set for
Derailing Switch 60 Kg.
Rs 3.92 Cr 28.02.2011.
10 RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120801
04.09.2009. Manufacture and supply of P.way items for BG
(1673mm)for Salka Road- Anuppur Section under
CPM/RVNL/Bilaspur.
RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No.11120801 dated
18.11.2009
M/s Hindustan Engg. & Industries
Ltd., Mody Building, 27, Sir RN
Mukherji Marg, Kolkata-700001.
Manufacture and Supply: Rs
5.70 Lac for 1 in 8 1/2 52Kg
Curved Switches and Rs 5.10 Lac
for 1 in 81/2 Derailing Switches
52Kg. Transportation: Rs 1.31
Lac for 1 in 8 1/2 52Kg Curved
Switches and Rs 1.08 Lac for 1 in
8 1/2 Derailing Switches
Rs 13.19 Lac 10.09.2010
(extended)
11 RVNL/BPL/Elect/HBJ-
BIN/TSS
23.07.2009 Design, Supply, Erection, Testing & commissioning of
132/25 KV Traction Sub-station, Feeding Post, Fixed
Capacitor, bank System & other associated works at
BARETH & SANCHI, TRACTION SUB STATIONS,
Augmentation & replacement of traction transformers AT
BINA TSS, by providing 3rd bay & modification in existing
Feeding Posts at Sukhisewania, Gulabganj in connection
with Electrification of 3rd line on BINA- BHOPAL section of
BHOPAL DIVISION of WCR.
RVNL/BPL/Elect/HBJ-
BIN/TSS
dated18/19.01.2010
M/s S. L. Enterprises 41-A,
Phase-II, Mayapuri Industrial
State, Delhi-110064
Electrical Items-Rs 3.89 Cr for
CORE SOR Items, Rs 11.36 Cr for
Traction Transformer, Rs 0.12 Cr
for Maintenance spares,Rs 0.09
Cr for Maintenance Tools, Rs 0.35
Cr for Site Facilities & Rs 2.65 Cr
for Misc. Items,etc.
Rs 18.47 Cr 18.01.2012
RVNL
12 RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120802
04.09.2009. Manufacture and supply of P.way items for BG
(1673mm)for Salka Road- Anuppur Section under
CPM/RVNL/Bilaspur.
RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No.11120802 dated
18.11.2009
M/s Hindustan Engg. & Industries
Ltd., Mody Building, 27, Sir RN
Mukherji Marg, Kolkata-700001.
Manufacture and Supply: Rs
2.33 Cr for 60 Kg CMS Crossing 1
in 12, and Rs 17.75 Lac for 52 Kg
CMS Crossing 1 in 81/2
Transportation: Rs 2.53 Lac for
60 Kg CMS Crossing 1 in 12, and
Rs 0.24 Lac for 52 Kg CMS
Crossing 1 in 81/2.
Rs 2.53 Cr 31.10.2010
(extended)
13 RVNL/New Delhi/B-B-
H/PMC/Pt-II
15.10.2009 Project Management Consultancy forConstruction of Road
Bed, Major and Minor Bridges, Track Linking (excluding
supply of rails, thick web switches & sleepers), S&T and
OHE & General Electrical work in connection with 3rd line
between Habibganj & Bina (144.76 Km) on Bhopal Division
of West Central Railway in the state of Madhya Pradesh
(India)
Notification of Award No
RVNL/New Delhi/B-B-
H/PMC/Pt-II dated
23.03.2010
M/s Aarvee Associates
Architects, Engineers &
Consultants Pvt Ltd, Ravula
Residancy, Srinagar Colony,
Hyderabad-82.
Renumerations for -Rs 6.57 Cr
for staff & Provision &
maintenance of Office for- Rs
2.70 Lacs.
Rs 6.60 Cr 22.10.2012
14 No. RVNL/P-
III/TWS/2009/Pt I
25.02.2010 Manufacture and Supply of Curved Switches with ZU-
1–60/60E1A1 Thick Web Tongue Rail and UIC 60 (880
Grade) Stock Rail conforming to Indian Railway
Specifications IRS-T-10-2000 for various rail road
projects in different regions of India.
Notification of Award No
No. RVNL/P-
III/TWS/2009/Pt I
Dated 26.05.2010
M/s VAE VKN RTT (JV),
Century Towers,
5th Floor,
45 Shakespeare Sarani,
Kolkata. - 700 017
Manufacture and Supply: Rs
17.79 Cr for 60 kg 1 in 12 TWS
Transportation: Rs 36.84 Lac for
60 kg 1 in 12 TWS.
Rs 18.16 Cr 25.05.2011
(Extended upto
31.12.2011)
RVNL
Detail of Contract awarded upto November, 2011
Project Planning & Development Department
Sr. No.
Tender No. Date of opening (Tender)
Description of work/study
Contract No. & date (LOA)
Contractor’s Name
Estimated cost of
work (Rs.)
Tendered cost (Rs.)
Scheduled completion date
Physical Progress
( upto 30.11.11)
1 RVNL/PP&D/Bankability/Buramara -Chakulia/10
25/03/10 Bankability study of Buramara-Chakulia New Line with upgradation of Rupsa-Buramara BG Line on SER.
RVNL/PP&D/Bankability/Buramara-Chakulia/10 30/04/2010
M/S Feedback Ventures Pvt. Ltd.
15,0
0,0
00/-
1
3,1
8,0
85/-
3 months from the date of submission of Bank Guarantee (14/05/2010) 15/08/2010 (extended)
Final Report sent to Railway Board on 16.08.11 for acceptance.
2 RVNL/PP&D/Bankability/Nallapadu -Guntakal/RE/10
09/04/10 Bankability study of electrification of Nallapadu-Guntakal section
RVNL/PP&D/Babkability/Nallapadu-Guntakal/RE/10 11/06/2010
M/s PricewaterhouseCoopers Pvt. Ltd
15,0
0,0
00/-
9,9
1,5
14/-
3 months from the date of submission of Bank Guarantee (25/06/2010) 25/09/2010 (extended)
Final Report sent to Railway Board on 04.08.11 for acceptance.
3. PP&D/RFP/BOT/CONSULT/2009/Pt. II
21.08.10 Project Consultancy services for development of PPP model in Railway projects.
PP&D/RFP/BOT/CONSULT/2009/Pt. II dated: 25.03.2010
M/s. RITES Ltd.
30,9
3,2
93/-
15,0
0,0
00/-
26 weeks from the date of acceptance of LOA(25/03/2010) 25/09/2010 (extended)
Final Report sent to Railway Board on 21.09.11 for acceptance.
4. PP&D/RVNL/ HX-SBC/2010
23.08.10 Bankability study for Cuddapah-Bangalore New Line project.
PP&D/RVNL/ HX-SBC/2010 24/09/2010
M/s PricewaterhouseCoopers Pvt. Ltd.
12,8
9,3
40/-
1
4,5
0,1
00/-
8 weeks from the date of acceptance of CV(06/10/2010) 2/12/2010
Revised Final Report submitted on 03.10.11 and under examination by RVNL Finance.
RVNL
5. PP&D/RVNL/ KUR-BOLANGIR/2010
21.09.10 Bankability study for Khurda Road-Bolangir New Line project.
PP&D/RVNL/ KUR-BOLANGIR/2010 04/10/2010
M/S Deloitte Touche Tohmatsu India Pvt. Ltd.
15,0
0,0
00/-
9,6
5,1
25/-
10 weeks from the date of acceptance of CV(15/10/2010) 25/01/2011)
Final Report sent to Railway Board on 02.02.11 for acceptance.
6. PP&D/RVNL/DHD-INDB/Bank/2010
N.A. Study done in house.
Bankability study for Dahod-Indore New Line project in Western Railway.
PP&D/RVNL/DHD-INDB/Bank/2010 dated 24.12.2010
Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/21, Goyal Inter City, Block-C, Drive in Road, Thaltej, Ahemedabad-54
----
---
1,9
5,0
00/-
6 weeks from LAO (24.12.10) for Traffic Study which is out sourced.
Study done in house. Only Traffic Study Out sourced. Final report submitted on 20.06.2011 and under examination.
7. PP&D/FT/HUK/2010 21.01.11 Feasibility Study for Development of Freight Terminal at Holambi Kalan on Northern Railway.
PP&D/FT/HUK/2010 dated 08.02.2011
M/S Deloitte Touche Tohmatsu India Pvt. Ltd.
5,0
0,0
00/-
8,7
6,8
85/-
16 weeks from the date of acceptance of CV(18/02/2011) 10/06/2011)
Draft Final report submitted on 15.07.2011 and under examination.
8. PP&D/RVNL/MCLA- NLDA/Bank/2010
N.A. Study done in house.
Bankability study for Macherla-Nalgonda New Line project in South Central Railway.
PP&D/RVNL / MCLA – NLDA / BANKA / 2010 dated 21.02.11
Traffic Study to Sh.Sanjeeva SHivesh ( ex IRAS), CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, C-block, Sec.-43, Gurgaon.
----
--
1,7
5,0
00/-
4 weeks from LOA (21.02.11) for Traffic Study which is out sourced. 20.03.2011
Study done in house. Only Traffic Study Out sourced. Revised Final report submitted on 09.08.2011 and under examination.
9. PP&D/RVNL/ADI -UDZ/Bank/2010
N.A. Study done in house.
Bankability study for Ahmedabad -Udaipur Gauge Conversion project in Western Railway.
N.A. N.A. Study done in house.
----
--
--
----
N.A. Study done in house and Completed, Report sent to Rly. Board on 31.12.2010.
RVNL
10. No. PP&D/RVNL/BJP -SDB/BANK/2010
20/12/10 Bankability study of Bijapur - Shahabad New line in South Western
Railway
No. PP&D/RVNL/BJP-SDB/BANK/2010 Dated: 08/03/2011
M/s Deloitte Touche
Tohmatsu India Pvt. Ltd.
15,0
0,0
00.0
0
12,2
8,1
79.4
7
(3 months from LOA dated 08.03.2011) 06/06/2011
Revised Final report submitted on 07.10.2011 and under examination by RVNL Finance.
11. No. PP&D/RVNL/DWR -BGM/BANK/ 2010
27/12/10 Bankability study of Dharwad – Belgaum New line
in South Western Railway
No. PP&D/RVNL/DWR-
BGM/BANK/Tender/2010 Dated: 04/04/2011
M/s ARKITECHNO Consultants (India)
Pvt. Ltd
14,8
9,0
00.0
0
9,7
1,1
68.0
0
(3 months from LOA dated
04.04.2011)
03/07/2011
Revised Final report submitted on 05.10.2011 and under examination by RVNL Finance.
12. No. PP&D/RVNL/ RDG-TK / BANK/2010
04/01/11 Bankability study of Rayadurg-Tumkur
New line in South Western Railway
No. PP&D/RVNL/ RDG-TK
/BANK/2010 Dated: 19/04/2011
M/s Deloitte Touche Tohmatsu
India Pvt. Ltd.
14,8
9,0
00.0
0
12,2
8,1
79.4
7
(3 months from LOA dated 19.04.2011) 18.07.2011
Revised Final report submitted on 07.10.2011 and under examination by RVNL Finance.
RVNL
S.No Tender No. Date of
Opening
Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract)
Estimated Cost (for
Engg./Elect./S&T/Mech.)
Rate (for supply contract)
Tendered Cost (for
Engg./Elect./S&T/Mech.)
Scheduled Completion
Date
1 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges,
Track Linking (excluding supply of rails, thick web
switches & sleepers), S&T and OHE & General
Electrical work in connection with 3rd
line between
Habibganj & Bina (144.76 Km) on Bhopal Division of
West Central Railway in the state of Madhya Pradesh
(India) - Package No. 1 between Bina (Incl) to Ganj
Basoda (Incl) chainage 975.16 to 928.500 (Km 46.66).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-1 dated
31.08.2009 (Contract
agreement yet to be
done)
M/s. Larsen & Toubro Ltd,ECC
Division,Post Box No.
979,Mount Poonamalle
Road,Manakakkam, Chennai-
600089. --
Rs 141.88 Cr March, 2012
2 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges,
Track Linking (excluding supply of rails, thick web
switches & sleepers), S&T and OHE & General
Electrical work in connection with 3rd
line between
Habibganj & Bina (144.76 Km) on Bhopal Division of
West Central Railway in the state of Madhya Pradesh
(India) - Package No. 2 between GanjBasoda (Excl) to
Sanchi (Incl) chainage 928.500 to 879.750 (Km 48.75).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-2 dated
31.08.2009 (Contract
agreement yet to be
done)
M/s. Larsen & Toubro Ltd,ECC
Division,Post Box No.
979,Mount Poonamalle
Road,Manakakkam, Chennai-
600089. --
Rs. 150.05 Cr March, 2012
3 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges,
Track Linking (excluding supply of rails, thick web
switches & sleepers), S&T and OHE & General
Electrical work in connection with 3rd
line between
Habibganj & Bina (144.76 Km) on Bhopal Division of
West Central Railway in the state of Madhya Pradesh
(India) - Package No. 3 between Sanchi (Excl) to
Habibganj (Incl) chainage 879.750 to 830.850 (Km
48.9).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-3 dated
31.08.2009 (Contract
agreement yet to be
done)
M/s. NCCL-ECIECCL-ARPL
(JV), C/o M/S Nagarjuna
Construction Company
Limited,4th Floor, Uma Enclave,
Road No. 9, HYDERABAD-
500034.--
Rs 135.65 Cr March, 2012
4 RVNL/P-III/P.way
items/Guntakul-
Raichur/1 of
2009/Switches; Lot No.
31030801
27.06.2008 Manufacture and supply of P.way items for BG
(1673mm) for patch doubling of Guntakul-Raichur
Section under CPM/RVNL/SC
RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/Switches dated
30.03.2009
M/s VAE VKN Industries Pvt.
Ltd., 24/5 Sriram Road, Civil
Lines, Delhi-110054.
Manufacture and Supply: Rs
1.25 Cr for 60 kg 1 in 12 Switches
and Rs 16.97 Lakh for 60 kg 1 in
8 1/2 Switches & Rs 4.24 Lakh
for 52 kg 1 in 8 1/2 Switches.
Transportation: Rs 26.50 Lac
for 60 kg 1 in 12 Switches and Rs
4.50 Lac for 52 kg 1 in 8 1/2
Switches & Rs 1.12 Lakh for 60
kg 1 in 8 1/2 Switches.
Rs 1.77 Cr 25.12.2010 (extended)
5 RVNL/P-III/P.way
items/Guntakul-
Raichur/1 of 2009/CMS
Xing; Lot No. 31030802
27.06.2008 Manufacture and supply of P.way items for BG
(1673mm) for patch doubling of Guntakul-Raichur
Section under CPM/RVNL/SC
RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/CMS Xing dated
30.03.2009
M/s VAE VKN Industries Pvt.
Ltd., 24/5 Sriram Road, Civil
Lines, Delhi-110054.
Manufacture and Supply: Rs
2.47 Cr for 60 kg 1 in 12 CMS
Crossing and Rs 0.5 Cr for 60 kg
1 in 8 1/2 CMS Crossing.
Transportation: Rs 3.18 Lac for
60 kg 1 in 12 CMS Crossing and
Rs 0.6 Lac for 60 kg 1 in 8 1/2
CMS Crossing.
Rs 3.02 Cr 30.08.2010 (extended)
6 RVNL/Mumbai/Bina-
BPL/ 2006 dated
30.08.2006
30.08.2006 Conducting Final Location Survey (FLS) marking the
center line of the final alignment on the ground and
Detailed Design Engg (DDE) for BG third line between
Bina-Bhopal (138.423 Km) in WC Rly.
RVNL/Mumb/RPS/FLS(Bi
na- BPL)/ 2006 dated
11.12.2006
M/s Monarch Services &
Contractors, Sinhagad Road,
Pune-411030
--- Rs 1.23 Cr 31.03.2011 (extended)
Details of Contracts Placed upto the month of Nov' 2011 under GM/P-III
RVNL
7 RVNL/BPL/S&T/HBJ-
BPL-BIN/2
09.06.2009 Supply, installing, modification, testing &commissing of
electronic interlocking system alongwith modification, in
relay based indoor signaling arrangement at PI/RRI/LC
gates, IBH etc. alongwith yard remodeling in connection
with the work of 3rd line between Habibganj & Bina
(144.76 Km) on Bhopal Division of West Central
Railway in the state of Madhya Pradesh (India)
No: RVNL/BPL/S&T/HBJ-
BPL-BIN/2 dated
23.10.2009
M/s Bharat Rail Automations (P)
Ltd. B-107, Mandpeshwar
Industrial Estate, SVP ROAD,
Borivali (W), Mumbai-400092
Signaling & Telecommuction - Rs
23,32,40,706/-
Rs 23.32 Cr 22.10.2011
8 RVNL/P-III/PSC Turnout
Sleeper Set/Guntakul-
Raichur/2009; Lot No.
5030901
04.09.2009
.
Manufacture and supply of P.way items for BG
(1673mm) for for patch doubling of Guntakul-Raichur
Section under CPM/RVNL/SC
RVNL/P-III/PSC Turnout
Sleeper Set/Guntakul-
Raichur/2009; Lot No.
5030901 dated
13.11.2009.
M/s Patil Rail Infrastructure Pvt
Ltd., The Grand, 3rd & 4th Floor
6-3-1090/B-4 Raj Bhawan Road,
Somaji guda, Hyderabad-
500082.
Manufacture and Supply: Rs
3.22 Cr. for PSC Turnout Sleeper
Set for 1 in 12, 60 kg and Rs
52.63 Lakh for PSC Turnout
Sleeper Set 1 in 8 1/2 for 60 kg .
Transportation: Rs 32.86 Lac
for PSC Turnout Sleeper Set for
60 kg 1 in 12 and Rs 6 Lakh for
PSC Turnout Sleeper Set 1 in 8
1/2 for 60 kg.
Rs 4.14 Cr 30.11.2010.
9 RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120803
04.09.2009
.
Manufacture and supply of P.way items for BG
(1673mm) for Salka Road- Anuppur Section under
CPM/RVNL/Bilaspur.
RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120803 dated
17.11.2009
M/s Rayalaseema Concrete
Sleepers Pvt Ltd., The Grand,
3rd & 4th Floor 6-3-1090/B-4
Raj Bhawan Road, Somaji guda,
Hyderabad-500082.
Manufacture and Supply: Rs
3.34 Cr. for PSC Turnout Sleeper
Set for 1 in 12, and Rs 25.26 Lac
for PSC T/out Sleeper Set 1 in 8
1/2 60 kg & Rs 10.9 lac for PSC
Turnout Sleeper Set for Derailing
Switch 60 Kg, Transportation:
Rs 20.90 Lac for PSC Turnout
Sleeper Set for 60 kg 1 in 12 and
Rs 1.68 Lakh for PSC Turnout
Sleeper Set 1 in 8 1/2 for 60 kg &
Rs 0.84 lac for PSC Turnout
Sleeper Set for Derailing Switch
60 Kg.
Rs 3.92 Cr 28.02.2011.
10 RVNL/BPL/Elect/HBJ-
BIN/TSS
23.07.2009 Design, Supply, Erection, Testing & commissioning of
132/25 KV Traction Sub-station, Feeding Post, Fixed
Capacitor, bank System & other associated works at
BARETH & SANCHI, TRACTION SUB STATIONS,
Augmentation & replacement of traction transformers
AT BINA TSS, by providing 3rd bay & modification in
existing Feeding Posts at Sukhisewania, Gulabganj in
connection with Electrification of 3rd line on BINA-
BHOPAL section of BHOPAL DIVISION of WCR.
RVNL/BPL/Elect/HBJ-
BIN/TSS
dated18/19.01.2010
M/s S. L. Enterprises 41-A,
Phase-II, Mayapuri Industrial
State, Delhi-110064
Electrical Items-Rs 3.89 Cr for
CORE SOR Items, Rs 11.36 Cr
for Traction Transformer, Rs 0.12
Cr for Maintenance spares,Rs
0.09 Cr for Maintenance Tools,
Rs 0.35 Cr for Site Facilities & Rs
2.65 Cr for Misc. Items,etc.
Rs 18.47 Cr 18.01.2012
11 RVNL/New Delhi/B-B-
H/PMC/Pt-II
15.10.2009 Project Management Consultancy forConstruction of
Road Bed, Major and Minor Bridges, Track Linking
(excluding supply of rails, thick web switches &
sleepers), S&T and OHE & General Electrical work in
connection with 3rd line between Habibganj & Bina
(144.76 Km) on Bhopal Division of West Central
Railway in the state of Madhya Pradesh (India)
Notification of Award No
RVNL/New Delhi/B-B-
H/PMC/Pt-II dated
23.03.2010
M/s Aarvee Associates
Architects, Engineers &
Consultants Pvt Ltd, Ravula
Residancy, Srinagar Colony,
Hyderabad-82.
Renumerations for -Rs 6.57 Cr
for staff & Provision &
maintenance of Office for- Rs
2.70 Lacs.
Rs 6.60 Cr 22.10.2012
12 No. RVNL/P-
III/TWS/2009/Pt I
25.02.2010 Manufacture and Supply of Curved Switches with ZU-
1–60/60E1A1 Thick Web Tongue Rail and UIC 60 (880
Grade) Stock Rail conforming to Indian Railway
Specifications IRS-T-10-2000 for various rail road
projects in different regions of India.
Notification of Award No
No. RVNL/P-
III/TWS/2009/Pt I
dated 26.05.2010
M/s VAE VKN RTT (JV),
Century Towers,
5th Floor,
45 Shakespeare Sarani,
Kolkata. - 700 017
Manufacture and Supply: Rs
17.79 Cr for 60 kg 1 in 12 TWS
Transportation: Rs 36.84 Lac
for 60 kg 1 in 12 TWS.
Rs 18.16 Cr 25.05.2011
(Extended upto
31.12.2011)
RVNL
S.No Tender No. Date of
Opening
Description of Item/Work Contract No. & Date Contractor's Name Quantity (for supply contract)
Estimated Cost (for
Engg./Elect./S&T/Mech.)
Rate (for supply contract)
Tendered Cost (for
Engg./Elect./S&T/Mech.)
Scheduled Completion
Date
1 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges,
Track Linking (excluding supply of rails, thick web
switches & sleepers), S&T and OHE & General
Electrical work in connection with 3rd
line between
Habibganj & Bina (144.76 Km) on Bhopal Division of
West Central Railway in the state of Madhya Pradesh
(India) - Package No. 1 between Bina (Incl) to Ganj
Basoda (Incl) chainage 975.16 to 928.500 (Km 46.66).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-1 dated
31.08.2009 (Contract
agreement yet to be
done)
M/s. Larsen & Toubro Ltd,ECC
Division,Post Box No.
979,Mount Poonamalle
Road,Manakakkam, Chennai-
600089. --
Rs 141.88 Cr March, 2012
2 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges,
Track Linking (excluding supply of rails, thick web
switches & sleepers), S&T and OHE & General
Electrical work in connection with 3rd
line between
Habibganj & Bina (144.76 Km) on Bhopal Division of
West Central Railway in the state of Madhya Pradesh
(India) - Package No. 2 between GanjBasoda (Excl) to
Sanchi (Incl) chainage 928.500 to 879.750 (Km 48.75).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-2 dated
31.08.2009 (Contract
agreement yet to be
done)
M/s. Larsen & Toubro Ltd,ECC
Division,Post Box No.
979,Mount Poonamalle
Road,Manakakkam, Chennai-
600089. --
Rs. 150.05 Cr March, 2012
3 RVNL/P-III/BIN-
BPL/Composite Works
Tender
31.01.2009 Construction of Road Bed, Major and Minor Bridges,
Track Linking (excluding supply of rails, thick web
switches & sleepers), S&T and OHE & General
Electrical work in connection with 3rd
line between
Habibganj & Bina (144.76 Km) on Bhopal Division of
West Central Railway in the state of Madhya Pradesh
(India) - Package No. 3 between Sanchi (Excl) to
Habibganj (Incl) chainage 879.750 to 830.850 (Km
48.9).
Notification of Award No.
RVNL/P-III/BIN-
BPL/Composite Works
Tender/Package-3 dated
31.08.2009 (Contract
agreement yet to be
done)
M/s. NCCL-ECIECCL-ARPL
(JV), C/o M/S Nagarjuna
Construction Company
Limited,4th Floor, Uma Enclave,
Road No. 9, HYDERABAD-
500034.--
Rs 135.65 Cr March, 2012
4 RVNL/P-III/P.way
items/Guntakul-
Raichur/1 of
2009/Switches; Lot No.
31030801
27.06.2008 Manufacture and supply of P.way items for BG
(1673mm) for patch doubling of Guntakul-Raichur
Section under CPM/RVNL/SC
RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/Switches dated
30.03.2009
M/s VAE VKN Industries Pvt.
Ltd., 24/5 Sriram Road, Civil
Lines, Delhi-110054.
Manufacture and Supply: Rs
1.25 Cr for 60 kg 1 in 12 Switches
and Rs 16.97 Lakh for 60 kg 1 in
8 1/2 Switches & Rs 4.24 Lakh
for 52 kg 1 in 8 1/2 Switches.
Transportation: Rs 26.50 Lac
for 60 kg 1 in 12 Switches and Rs
4.50 Lac for 52 kg 1 in 8 1/2
Switches & Rs 1.12 Lakh for 60
kg 1 in 8 1/2 Switches.
Rs 1.77 Cr 25.12.2010
(extended)
5 RVNL/P-III/P.way
items/Guntakul-
Raichur/1 of 2009/CMS
Xing; Lot No. 31030802
27.06.2008 Manufacture and supply of P.way items for BG
(1673mm) for patch doubling of Guntakul-Raichur
Section under CPM/RVNL/SC
RVNL/P-III/P.way
items/Guntakul-Raichur/1
of 2009/CMS Xing dated
30.03.2009
M/s VAE VKN Industries Pvt.
Ltd., 24/5 Sriram Road, Civil
Lines, Delhi-110054.
Manufacture and Supply: Rs
2.47 Cr for 60 kg 1 in 12 CMS
Crossing and Rs 0.5 Cr for 60 kg
1 in 8 1/2 CMS Crossing.
Transportation: Rs 3.18 Lac for
60 kg 1 in 12 CMS Crossing and
Rs 0.6 Lac for 60 kg 1 in 8 1/2
CMS Crossing.
Rs 3.02 Cr 30.08.2010
(extended)
6 RVNL/Mumbai/Bina-
BPL/ 2006 dated
30.08.2006
30.08.2006 Conducting Final Location Survey (FLS) marking the
center line of the final alignment on the ground and
Detailed Design Engg (DDE) for BG third line between
Bina-Bhopal (138.423 Km) in WC Rly.
RVNL/Mumb/RPS/FLS(Bi
na- BPL)/ 2006 dated
11.12.2006
M/s Monarch Services &
Contractors, Sinhagad Road,
Pune-411030
--- Rs 1.23 Cr 31.03.2012
(extended)
Details of Contracts Placed upto the month of Dec' 2011 under GM/P-III
RVNL
7 RVNL/BPL/S&T/HBJ-
BPL-BIN/2
09.06.2009 Supply, installing, modification, testing &commissing of
electronic interlocking system alongwith modification, in
relay based indoor signaling arrangement at PI/RRI/LC
gates, IBH etc. alongwith yard remodeling in connection
with the work of 3rd line between Habibganj & Bina
(144.76 Km) on Bhopal Division of West Central
Railway in the state of Madhya Pradesh (India)
No: RVNL/BPL/S&T/HBJ-
BPL-BIN/2 dated
23.10.2009
M/s Bharat Rail Automations (P)
Ltd. B-107, Mandpeshwar
Industrial Estate, SVP ROAD,
Borivali (W), Mumbai-400092
Signaling & Telecommuction - Rs
23,32,40,706/-
Rs 23.32 Cr 22.10.2011
8 RVNL/P-III/PSC Turnout
Sleeper Set/Guntakul-
Raichur/2009; Lot No.
5030901
04.09.2009
.
Manufacture and supply of P.way items for BG
(1673mm) for for patch doubling of Guntakul-Raichur
Section under CPM/RVNL/SC
RVNL/P-III/PSC Turnout
Sleeper Set/Guntakul-
Raichur/2009; Lot No.
5030901 dated
13.11.2009.
M/s Patil Rail Infrastructure Pvt
Ltd., The Grand, 3rd & 4th Floor
6-3-1090/B-4 Raj Bhawan Road,
Somaji guda, Hyderabad-
500082.
Manufacture and Supply: Rs
3.22 Cr. for PSC Turnout Sleeper
Set for 1 in 12, 60 kg and Rs
52.63 Lakh for PSC Turnout
Sleeper Set 1 in 8 1/2 for 60 kg .
Transportation: Rs 32.86 Lac
for PSC Turnout Sleeper Set for
60 kg 1 in 12 and Rs 6 Lakh for
PSC Turnout Sleeper Set 1 in 8
1/2 for 60 kg.
Rs 4.14 Cr 30.11.2010.
9 RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120803
04.09.2009
.
Manufacture and supply of P.way items for BG
(1673mm) for Salka Road- Anuppur Section under
CPM/RVNL/Bilaspur.
RVNL/P-III/P.way
items/Salka Road-
Anuppur/2 of 2009; Lot
No. 11120803 dated
17.11.2009
M/s Rayalaseema Concrete
Sleepers Pvt Ltd., The Grand,
3rd & 4th Floor 6-3-1090/B-4
Raj Bhawan Road, Somaji guda,
Hyderabad-500082.
Manufacture and Supply: Rs
3.34 Cr. for PSC Turnout Sleeper
Set for 1 in 12, and Rs 25.26 Lac
for PSC T/out Sleeper Set 1 in 8
1/2 60 kg & Rs 10.9 lac for PSC
Turnout Sleeper Set for Derailing
Switch 60 Kg, Transportation:
Rs 20.90 Lac for PSC Turnout
Sleeper Set for 60 kg 1 in 12 and
Rs 1.68 Lakh for PSC Turnout
Sleeper Set 1 in 8 1/2 for 60 kg &
Rs 0.84 lac for PSC Turnout
Sleeper Set for Derailing Switch
60 Kg.
Rs 3.92 Cr 28.02.2011.
10 RVNL/BPL/Elect/HBJ-
BIN/TSS
23.07.2009 Design, Supply, Erection, Testing & commissioning of
132/25 KV Traction Sub-station, Feeding Post, Fixed
Capacitor, bank System & other associated works at
BARETH & SANCHI, TRACTION SUB STATIONS,
Augmentation & replacement of traction transformers
AT BINA TSS, by providing 3rd bay & modification in
existing Feeding Posts at Sukhisewania, Gulabganj in
connection with Electrification of 3rd line on BINA-
BHOPAL section of BHOPAL DIVISION of WCR.
RVNL/BPL/Elect/HBJ-
BIN/TSS
dated18/19.01.2010
M/s S. L. Enterprises 41-A,
Phase-II, Mayapuri Industrial
State, Delhi-110064
Electrical Items-Rs 3.89 Cr for
CORE SOR Items, Rs 11.36 Cr
for Traction Transformer, Rs 0.12
Cr for Maintenance spares,Rs
0.09 Cr for Maintenance Tools,
Rs 0.35 Cr for Site Facilities & Rs
2.65 Cr for Misc. Items,etc.
Rs 18.47 Cr 18.01.2012
11 RVNL/New Delhi/B-B-
H/PMC/Pt-II
15.10.2009 Project Management Consultancy forConstruction of
Road Bed, Major and Minor Bridges, Track Linking
(excluding supply of rails, thick web switches &
sleepers), S&T and OHE & General Electrical work in
connection with 3rd line between Habibganj & Bina
(144.76 Km) on Bhopal Division of West Central
Railway in the state of Madhya Pradesh (India)
Notification of Award No
RVNL/New Delhi/B-B-
H/PMC/Pt-II dated
23.03.2010
M/s Aarvee Associates
Architects, Engineers &
Consultants Pvt Ltd, Ravula
Residancy, Srinagar Colony,
Hyderabad-82.
Renumerations for -Rs 6.57 Cr
for staff & Provision &
maintenance of Office for- Rs
2.70 Lacs.
Rs 6.60 Cr 22.10.2012
12 No. RVNL/P-
III/TWS/2009/Pt I
25.02.2010 Manufacture and Supply of Curved Switches with ZU-
1–60/60E1A1 Thick Web Tongue Rail and UIC 60 (880
Grade) Stock Rail conforming to Indian Railway
Specifications IRS-T-10-2000 for various rail road
projects in different regions of India.
Notification of Award No
No. RVNL/P-
III/TWS/2009/Pt I
Dated 26.05.2010
M/s VAE VKN RTT (JV),
Century Towers,
5th Floor,
45 Shakespeare Sarani,
Kolkata. - 700 017
Manufacture and Supply: Rs
17.79 Cr for 60 kg 1 in 12 TWS
Transportation: Rs 36.84 Lac
for 60 kg 1 in 12 TWS.
Rs 18.16 Cr 25.05.2011
(Extended upto
31.01.2012)
RVNL
Detail of Contract awarded upto December, 2011
Project Planning & Development Department
Sr. No.
Tender No. Date of opening (Tender)
Description of work/study
Contract No. & date (LOA)
Contractor’s Name
Estimated cost of
work (Rs.)
Tendered cost (Rs.)
Scheduled completion date
Physical Progress
( upto 31.12.11)
1 RVNL/PP&D/Bankability/Buramara -Chakulia/10
25/03/10 Bankability study of Buramara-Chakulia New Line with upgradation of Rupsa-Buramara BG Line on SER.
RVNL/PP&D/Bankability/Buramara-Chakulia/10 30/04/2010
M/S Feedback Ventures Pvt. Ltd.
15,0
0,0
00/-
1
3,1
8,0
85/-
3 months from the date of submission of Bank Guarantee (14/05/2010) 15/08/2010 (extended)
Final Report sent to Railway Board on 16.08.11 for acceptance.
2 RVNL/PP&D/Bankability/Nallapadu -Guntakal/RE/10
09/04/10 Bankability study of electrification of Nallapadu-Guntakal section
RVNL/PP&D/Babkability/Nallapadu-Guntakal/RE/10 11/06/2010
M/s PricewaterhouseCoopers Pvt. Ltd
15,0
0,0
00/-
9,9
1,5
14/-
3 months from the date of submission of Bank Guarantee (25/06/2010) 25/09/2010 (extended)
Final Report sent to Railway Board on 04.08.11 for acceptance.
3. PP&D/RFP/BOT/CONSULT/2009/Pt. II
21.08.10 Project Consultancy services for development of PPP model in Railway projects.
PP&D/RFP/BOT/CONSULT/2009/Pt. II dated: 25.03.2010
M/s. RITES Ltd.
30,9
3,2
93/-
15,0
0,0
00/-
26 weeks from the date of acceptance of LOA(25/03/2010) 25/09/2010 (extended)
Final Report sent to Railway Board on 21.09.11 for acceptance.
4. PP&D/RVNL/ KUR-BOLANGIR/2010
21.09.10 Bankability study for Khurda Road-Bolangir New Line project.
PP&D/RVNL/ KUR-BOLANGIR/2010 04/10/2010
M/S Deloitte Touche Tohmatsu India Pvt. Ltd.
15,0
0,0
00/-
9,6
5,1
25/-
10 weeks from the date of acceptance of CV(15/10/2010) 25/01/2011)
Final Report sent to Railway Board on 02.02.11 for acceptance.
RVNL
5. PP&D/RVNL/ HX-SBC/2010
23.08.10 Bankability study for Cuddapah-Bangalore New Line project.
PP&D/RVNL/ HX-SBC/2010 24/09/2010
M/s PricewaterhouseCoopers Pvt. Ltd.
12,8
9,3
40/-
1
4,5
0,1
00/-
8 weeks from the date of acceptance of CV(06/10/2010) 2/12/2010
Final Report sent to Railway Board on 30.12.11 for acceptance.
6. PP&D/RVNL/DHD-INDB/Bank/2010
N.A. Study done in house.
Bankability study for Dahod-Indore New Line project in Western Railway.
PP&D/RVNL/DHD-INDB/Bank/2010 dated 24.12.2010
Traffic Study to Shri H.S.Duggal, Rtd.COM, Indian Railways,C/2/21, Goyal Inter City, Block-C, Drive in Road, Thaltej, Ahemedabad-54
----
---
1,9
5,0
00/-
6 weeks from LAO (24.12.10) for Traffic Study which is out sourced.
Study done in house. Only Traffic Study Out sourced. Final report under preparation & finalization by RVNL.
7. PP&D/FT/HUK/2010 21.01.11 Feasibility Study for Development of Freight Terminal at Holambi Kalan on Northern Railway.
PP&D/FT/HUK/2010 dated 08.02.2011
M/S Deloitte Touche Tohmatsu India Pvt. Ltd.
5,0
0,0
00/-
8,7
6,8
85/-
16 weeks from the date of acceptance of CV(18/02/2011) 10/06/2011)
Draft Final report submitted on 15.07.2011 and under examination.
8. PP&D/RVNL/MCLA- NLDA/Bank/2010
N.A. Study done in house.
Bankability study for Macherla-Nalgonda New Line project in South Central Railway.
PP&D/RVNL / MCLA – NLDA / BANKA / 2010 dated 21.02.11
Traffic Study to Sh.Sanjeeva SHivesh ( ex IRAS), CEO, Smart Wave Consulting Pvt. Ltd., 410/CA, Shushant Lok, C-block, Sec.-43, Gurgaon.
----
--
1,7
5,0
00/-
4 weeks from LOA (21.02.11) for Traffic Study which is out sourced. 20.03.2011
Study done in house. Only Traffic Study Out sourced. Revised Final report submitted on 09.08.2011 and under examination by RVNL Finance.
9. PP&D/RVNL/ADI -UDZ/Bank/2010
N.A. Study done in house.
Bankability study for Ahmedabad -Udaipur Gauge Conversion project in Western Railway.
N.A. N.A. Study done in house.
----
--
--
----
N.A. Study done in house and Completed, Report sent to Rly. Board on 31.12.2010.
RVNL
10. No. PP&D/RVNL/BJP -SDB/BANK/2010
20/12/10 Bankability study of Bijapur - Shahabad New line in South Western
Railway
No. PP&D/RVNL/BJP-SDB/BANK/2010 Dated: 08/03/2011
M/s Deloitte Touche
Tohmatsu India Pvt. Ltd.
15,0
0,0
00.0
0
12,2
8,1
79.4
7
(3 months from LOA dated 08.03.2011) 06/06/2011
Final Report sent to Railway Board on 30.12.11 for acceptance.
11. No. PP&D/RVNL/DWR -BGM/BANK/ 2010
27/12/10 Bankability study of Dharwad – Belgaum New line
in South Western Railway
No. PP&D/RVNL/DWR-
BGM/BANK/Tender/2010 Dated: 04/04/2011
M/s ARKITECHNO Consultants (India)
Pvt. Ltd
14,8
9,0
00.0
0
9,7
1,1
68.0
0
(3 months from LOA dated
04.04.2011)
03/07/2011
Final Report sent to Railway Board on 30.12.11 for acceptance.
12. No. PP&D/RVNL/ RDG-TK / BANK/2010
04/01/11 Bankability study of Rayadurg-Tumkur
New line in South Western Railway
No. PP&D/RVNL/ RDG-TK
/BANK/2010 Dated: 19/04/2011
M/s Deloitte Touche Tohmatsu
India Pvt. Ltd.
14,8
9,0
00.0
0
12,2
8,1
79.4
7
(3 months from LOA dated 19.04.2011) 18.07.2011
Final Report sent to Railway Board on 30.12.11 for acceptance.
RVNL