Rupeni Mua Consulting Engineers Ltd. - 065... · 2016. 4. 7. · Bolt connections1 Good watrer...

10
Rupeni Mua Consulting Engineers Ltd. PO Box 11420,Nadi Airport, Nadi, Fiji Islands, Phone/Facsimile: (679) 6660687,Mobile Phone: (679) 9996769 Email: [email protected] CYCLONE WINSTON PRELIMINARY ASSESSMENT SCHOOLS, HEALTH FACILITIES & PUBLIC BUILDINGS for FIJI INSTITUTION OF ENGINEERS & DEPARTMENT OF NATIONAL PLANNING (MINISTRY OF FINANCE) NAME OF FACILITY: Lautoka Ahmadiyya Primary School TYPE: Primary School LOCATION: Golf Link Crescent, Lautoka DATE OF ASSESSMENT: 28 March 2016 DATE OF REPORT: 04 April 2016 RMCE REPORT NO: TCW/09 GOVERNMENT FACILITY NO: 065 DISCLAIMER: This report has been prepared for the benefit of the Fiji Institution of Engineers and the Ministry of Finance to establish the extent of damages based on a Preliminary Assessment. In no circumstances is the report to be used for scoping or establishment of detailed costs for damages. No responsibility shall be taken for incorrect or incomplete information due to the short time taken to carry out the initial assessment as part of voluntary pro bono service offered by RMCE. Detailed assessment should be carried out for detailed scoping and costing of repair, reinstatement or even for any upgrading work.

Transcript of Rupeni Mua Consulting Engineers Ltd. - 065... · 2016. 4. 7. · Bolt connections1 Good watrer...

Page 1: Rupeni Mua Consulting Engineers Ltd. - 065... · 2016. 4. 7. · Bolt connections1 Good watrer damage 3 2 Average 3 Poor Purlins 75 x 50 @ 800crs strapped to truss rafters 1 Good

Rupeni Mua Consulting Engineers Ltd. PO Box 11420,Nadi Airport, Nadi, Fiji Islands, Phone/Facsimile: (679) 6660687,Mobile Phone: (679) 9996769

Email: [email protected]

CYCLONE WINSTON PRELIMINARY ASSESSMENT SCHOOLS, HEALTH FACILITIES & PUBLIC BUILDINGS

for

FIJI INSTITUTION OF ENGINEERS & DEPARTMENT OF NATIONAL PLANNING (MINISTRY OF FINANCE)

NAME OF FACILITY: Lautoka Ahmadiyya Primary School

TYPE: Primary School

LOCATION: Golf Link Crescent, Lautoka

DATE OF ASSESSMENT: 28 March 2016

DATE OF REPORT: 04 April 2016

RMCE REPORT NO: TCW/09

GOVERNMENT FACILITY NO: 065

DISCLAIMER: This report has been prepared for the benefit of the Fiji Institution of Engineers and the Ministry of Finance to

establish the extent of damages based on a Preliminary Assessment. In no circumstances is the report to be used for scoping or

establishment of detailed costs for damages. No responsibility shall be taken for incorrect or incomplete information due to the short

time taken to carry out the initial assessment as part of voluntary pro bono service offered by RMCE. Detailed assessment should be

carried out for detailed scoping and costing of repair, reinstatement or even for any upgrading work.

Page 2: Rupeni Mua Consulting Engineers Ltd. - 065... · 2016. 4. 7. · Bolt connections1 Good watrer damage 3 2 Average 3 Poor Purlins 75 x 50 @ 800crs strapped to truss rafters 1 Good

RAPID ASSESSMENT TEMPLATE: CYCLONE WINSTON DAMAGED BUILDINGSSCHOOLS, PUBLIC BUILDINGS & HEALTH FACILITIES

INSPECTOR: Rupeni

FIRM/COMPANY: RMCE Extent of Damage Rating Description

1 Minor/Cosmetic/Water

GENERAL INFORMATION 2 Some Damage

Building Name: Lautoka Ahmadiyya Primery School 3 Extensive but Repairable

Type: 4 Irreparable

Location: Golf Link Cresent, Lautoka

No. of Buildings: 8 Types of Buildings

Ariel Plan Available: YES / NO School Block

Staff Quarters

REPORT Toilet Block

Page No. : Utility Building (FEA, Services, etc)

Building No. : Library Divisional Hospital

Building Approx Age: ? Sub-Divisional Hospital

No. of Storeys: 2 Health Centre

Nursing Station

Public Building or Facility

EVALUATION

Type of Construction Description Damage

Extent of

Damage

Rating

Photo No.

Floor concrete 1 Good some water damage 1

2 Average

3 Poor

Foundations not visible 1 Good na

2 Average

3 Poor

Walls concrete masonry in concrete column and beam frame 1 Good nil

2 Average

3 Poor

Rafters/Truss 150 x 50 top chord, 200 x 50 bottom chord with 100 x 50 webs with 12dia. Bolt connections1 Good watrer damage 3

2 Average

3 Poor

Purlins 75 x 50 @ 800crs strapped to truss rafters 1 Good minimal damage 3

2 Average

3 Poor

Roof CI roof cladding with screw fixing 1 Good cladding fixing failure where the screws were broken off rather than pull-out failureextensive damage

2 Average 4

3 Poor

Electrical standard wiring and fixtures 1 Good water damage 2

2 Average

3 Poor

Hydraulics none. 1 Good na

2 Average

3 Poor

Windows/Doors glass louvres in nstandard carriers over windows 1 Good some damage sustained 2

fixed glass panel in timber doors 2 Average

3 Poor

Shutters 50 x 50 mesh 1 Good some damage.

2 Average 1

3 Poor

Ceilings maissonite ceiling boards 1 Good water damage 4

2 Average

3 Poor

Terraces/Verandah 150 x 50 strapped to 200 x 75 timber beams bolted to 75dia GI posts spaced at 4m crs1 Good nil

2 Average

3 Poor

Tiles/Floor Covering mossaic tiles 1 Good nil

2 Average

3 Poor

Gutters none provided 1 Good na

2 Average

3 Poor

Downpipes na 1 Good na

2 Average

3 Poor

Fascia Boards timber 1 Good significant damage 3

2 Average

3 Poor

Furniture/Desks etc. removed 1 Good na

2 Average

3 Poor

Possible Intermediate Solution temporary relocate library

Possible Long Term Solution re-engineer with proper terrain factors to reflect high degree of exposure of site

proper construction practices and supervision required due to poor quality or sub-standard cladding screws suspected

Damage Assessment ($) 8,500

Basis of Calculation Quantec

FEES ESTIMATE:

Design/Documentation:

Tender/Approval:

Inspection/End Construction:

Build Quality

Page 3: Rupeni Mua Consulting Engineers Ltd. - 065... · 2016. 4. 7. · Bolt connections1 Good watrer damage 3 2 Average 3 Poor Purlins 75 x 50 @ 800crs strapped to truss rafters 1 Good

RAPID ASSESSMENT TEMPLATE: CYCLONE WINSTON DAMAGED BUILDINGSSCHOOLS, PUBLIC BUILDINGS & HEALTH FACILITIES

INSPECTOR: Rupeni

FIRM/COMPANY: RMCE Extent of Damage Rating Description

1 Minor/Cosmetic/Water

GENERAL INFORMATION 2 Some Damage

Building Name: Lautoka Ahmadiyya Primary School 3 Extensive but Repairable

Type: 4 Irreparable

Location: Golf Link Cresent, Lautoka

No. of Buildings Surveyed: 5 Types of Buildings

Ariel Plan Available: YES / NO School Block

Staff Quarters

REPORT Toilet Block

Page No. : Utility Building (FEA, Services, etc)

Building No. : Block A (Room 7) Divisional Hospital

Building Approx Age: ? Sub-Divisional Hospital

No. of Storeys: 1 Health Centre

Nursing Station

Public Building or Facility

EVALUATION

Type of Construction Description Damage

Extent of

Damage

Rating

Photo No.

Floor concrete 1 Good nil minor

2 Average

3 Poor

Foundations not visible 1 Good na na

2 Average

3 Poor

Walls masonry 1 Good some cracks 1

2 Average

3 Poor

Truss 150 x 50 top chord, 100 x 50 bott chord, 75 x 50 webs with gang nail plate connectors1 Good Roof tie down failure at gable ends 4

2 Average

3 Poor

Purlins 75 x 50 flat @ 750 crs 1 Good damages due to roof tie down failure 4

2 Average

3 Poor

Roof Gable roof with CI cladding fixed with roofing nails and some cyclone screws to underlying purlins1 Good damage at gable end area 4

40 x 40 angle iron over cladding at eaves with 12mm anchor rods welded to steel plates @ 2m crs dyna bolted to concrete wall 2 Average

3 Poor

Electrical standard classroom wiring 1 Good some damage 2

2 Average

3 Poor

Hydraulics 1 Good

2 Average

3 Poor

Windows/Doors glass louvre blades in aluminium carriers fixed onto window timber frames 1 Good 2

2 Average

3 Poor

Shutters 50 x 50 mesh 1 Good minor 1

2 Average

3 Poor

Ceilings maissonete boards 1 Good physical and water damage 3&4

2 Average

3 Poor

Terraces/Verandah 150 x 50 rafters @ 900 crs strapped onto 2/200 x 50 beams bolted to U- brackets welded to 75 dia. GI posts spaced @ 2.5m 1 Good loose 1

2 Average

3 Poor

Tiles/Floor Covering massaic tiles 1 Good 1

2 Average

3 Poor

Gutters box gutters 1 Good extensive damage along length of building

2 Average 2

3 Poor

Downpipes pvc pipes fixed to fascia and walls or posts 1 Good some minor damage 1

2 Average

3 Poor

Fascia Boards timber 1 Good 3

2 Average

3 Poor

Furniture/Desks etc. removed 1 Good

2 Average

3 Poor

Possible Intermediate Solution Temporary roo system to allow use of classroom if needed

Possible Long Term Solution Proper engineering assessment and design with the view to upgrading to current cyclone standards

Damage Assessment ($) $30,000

Basis of Calculation Quantech

FEES ESTIMATE:

Design/Documentation:

Tender/Approval:

Inspection/End Construction:

Build Quality

Page 4: Rupeni Mua Consulting Engineers Ltd. - 065... · 2016. 4. 7. · Bolt connections1 Good watrer damage 3 2 Average 3 Poor Purlins 75 x 50 @ 800crs strapped to truss rafters 1 Good

RAPID ASSESSMENT TEMPLATE: CYCLONE WINSTON DAMAGED BUILDINGSSCHOOLS, PUBLIC BUILDINGS & HEALTH FACILITIES

INSPECTOR: Rupeni

FIRM/COMPANY: RMCE Extent of Damage Rating Description

1 Minor/Cosmetic/Water

GENERAL INFORMATION 2 Some Damage

Building Name: Lautoka Ahmadiyya Primary School 3 Extensive but Repairable

Type: 4 Irreparable

Location: Golf Link Cresent

No. of Buildings: 8 Types of Buildings

Ariel Plan Available: YES / NO School Block

Staff Quarters

REPORT Toilet Block

Page No. : Utility Building (FEA, Services, etc)

Building No. : Staff Quarters Divisional Hospital

Building Approx Age: ? Sub-Divisional Hospital

No. of Storeys: 1 Health Centre

Nursing Station

Public Building or Facility

EVALUATION

Type of Construction Description Damage

Extent of

Damage

Rating

Photo No.

Floor concrete 1 Good nil

2 Average

3 Poor

Foundations not visible 1 Good na

2 Average

3 Poor

Walls blockwalls 1 Good nil

2 Average 3

3 Poor

Rafters/Truss 200 x 50 chords 1 Good require upgrading to connectors 3

2 Average

3 Poor

Purlins 75 x 50 timber purlins @ 800crs 1 Good not evident 3

2 Average

3 Poor

Roof CI cladding with roofing nail fixing 1 Good Fixings are loose in most areas 3

2 Average

3 Poor

Electrical standard 1 Good na

2 Average

3 Poor

Hydraulics plumbing to toilet extension 1 Good nil

2 Average

3 Poor

Windows/Doors glass louvres in standard frames over windows 1 Good some broken blades 2

2 Average

3 Poor

Shutters 50 x 50 mesh 1 Good nil

2 Average

3 Poor

Ceilings maissonete boards 1 Good water damage 2

2 Average

3 Poor

Terraces/Verandah extended roof frame supported on 75dia pipe posts 1 Good not evident

2 Average

3 Poor

Tiles/Floor Covering ceremic tiles 1 Good nil

2 Average

3 Poor

Gutters PVC gutters 1 Good loose connections

2 Average 1

3 Poor

Downpipes PVC strapped to pipe posts 1 Good loose straps

2 Average 1

3 Poor

Fascia Boards timber. 1 Good some minor damage 1

2 Average

3 Poor

Furniture/Desks etc. small kindergarten furniture 1 Good not evident

2 Average

3 Poor

Possible Intermediate Solution repair works ongoing and close to completion

Possible Long Term Solution proper engineering assessment with the view to upgrading to current wind standards

Damage Assessment ($)

Basis of Calculation

FEES ESTIMATE:

Design/Documentation:

Tender/Approval:

Inspection/End Construction:

Build Quality

Page 5: Rupeni Mua Consulting Engineers Ltd. - 065... · 2016. 4. 7. · Bolt connections1 Good watrer damage 3 2 Average 3 Poor Purlins 75 x 50 @ 800crs strapped to truss rafters 1 Good

RAPID ASSESSMENT TEMPLATE: CYCLONE WINSTON DAMAGED BUILDINGSSCHOOLS, PUBLIC BUILDINGS & HEALTH FACILITIES

INSPECTOR: Rupeni

FIRM/COMPANY: RMCE Extent of Damage Rating Description

1 Minor/Cosmetic/Water

GENERAL INFORMATION 2 Some Damage

Building Name: Lautoka Ahmadiyya Primary School 3 Extensive but Repairable

Type: 4 Irreparable

Location: Golf Link Cresent

No. of Buildings: 8 Types of Buildings

Ariel Plan Available: YES / NO School Block

Staff Quarters

REPORT Toilet Block

Page No. : Utility Building (FEA, Services, etc)

Building No. : Kindergaten Block Divisional Hospital

Building Approx Age: ? Sub-Divisional Hospital

No. of Storeys: 1 Health Centre

Nursing Station

Public Building or Facility

EVALUATION

Type of Construction Description Damage

Extent of

Damage

Rating

Photo No.

Floor concrete 1 Good nil

2 Average

3 Poor

Foundations not visible 1 Good na

2 Average

3 Poor

Walls timber frame with plyboard lining 1 Good extensive damage at the gable end and toilet extension

CI cladding to toilet extension 2 Average 3

3 Poor

Rafters/Truss not accessible but reported similar to staff quarters 1 Good na

2 Average

3 Poor

Purlins 75 x 50 timber purlins @ 800crs 1 Good tie down failure 3

2 Average

3 Poor

Roof CI cladding with roofing nail fixing 1 Good Fixings are loose in most areas 3

2 Average

3 Poor

Electrical standard 1 Good na

2 Average

3 Poor

Hydraulics plumbing to toilet extension 1 Good nil

2 Average

3 Poor

Windows/Doors glass louvres in standard frames over windows 1 Good some broken blades 2

2 Average

3 Poor

Shutters 50 x 50 mesh 1 Good nil

2 Average

3 Poor

Ceilings maissonete boards 1 Good water damage 2

2 Average

3 Poor

Terraces/Verandah 100 x 50 timber rafters @ 2.5m crs strapped to wall plate and 2/100x50 terrace beam bolted to 100 x 100 timber post bolted to steel bracket embedded in concrete floor1 Good not evident

2 Average

3 Poor

Tiles/Floor Covering ceremic tiles 1 Good nil

2 Average

3 Poor

Gutters PVC gutters 1 Good loose along the fromntage and blown off along the rear of the building

2 Average 1

3 Poor

Downpipes PVC downpipes strapped to timber posts 1 Good loose straps

2 Average 1

3 Poor

Fascia Boards timber. 1 Good some minor damage 1

2 Average

3 Poor

Furniture/Desks etc. small kindergarten furniture 1 Good not evident

2 Average

3 Poor

Possible Intermediate Solution repair loose fittings and fixtures

Possible Long Term Solution proper engineering assessment with the view to upgrading to current wind standards

Damage Assessment ($) $5,000

Basis of Calculation Quantec

FEES ESTIMATE:

Design/Documentation:

Tender/Approval:

Inspection/End Construction:

Build Quality

Page 6: Rupeni Mua Consulting Engineers Ltd. - 065... · 2016. 4. 7. · Bolt connections1 Good watrer damage 3 2 Average 3 Poor Purlins 75 x 50 @ 800crs strapped to truss rafters 1 Good

LAUTOKA AHMADIYYA PRIMARY SCHOOL

Buildings Layout Plan

Page 7: Rupeni Mua Consulting Engineers Ltd. - 065... · 2016. 4. 7. · Bolt connections1 Good watrer damage 3 2 Average 3 Poor Purlins 75 x 50 @ 800crs strapped to truss rafters 1 Good

Labrary & Room 7 (Block A):

Classroom Block A (Left) and Library Block (Right)

Room 7 on Block A (roof cladding and tie-down failure)

Room 7 cladding tie-down (angle iron bolted to concrete wall) failure

Page 8: Rupeni Mua Consulting Engineers Ltd. - 065... · 2016. 4. 7. · Bolt connections1 Good watrer damage 3 2 Average 3 Poor Purlins 75 x 50 @ 800crs strapped to truss rafters 1 Good

CLADDING & Purlin failure at main roof and terrace area

Kindergarten Block:

Roof failure on toilet extension side (Right)

Purlin tie-down and cladding failure on gable end

(sub standard construction methods)

Page 9: Rupeni Mua Consulting Engineers Ltd. - 065... · 2016. 4. 7. · Bolt connections1 Good watrer damage 3 2 Average 3 Poor Purlins 75 x 50 @ 800crs strapped to truss rafters 1 Good

Gutter failure along rear of building

Staff Quarters:

Staff quarters partially repaired

Inadequate gable end rafter fixing and ridge beam discontinued causing roof failure

Water damage to ceiling board

Page 10: Rupeni Mua Consulting Engineers Ltd. - 065... · 2016. 4. 7. · Bolt connections1 Good watrer damage 3 2 Average 3 Poor Purlins 75 x 50 @ 800crs strapped to truss rafters 1 Good

Poor construction practices on gable end blockwall and tie-down systems contributing to failure