Run 10 plan based on 25 Nov Revised Planand s=200 extended by 1 week
• Dec. 1, Begin cool down to 4.5K • Dec. 4, Cooldown to 4.5K complete in both rings!• Dec. 5, beam setup in RHIC begins.• Dec 16, 20 hr unplanned Maintenance day• Dec 20 (AM)-21(PM), blizzard 09 shut us down• Dec. 27, RHIC Setup complete, begin Ramp Up for Physics (was 14 Dec, late)• Dec 31 (midnight-store 11340), Machine, Physics declared (store 11340) s=200 GeV/n Au-Au• Jan 2 (midnight) STAR in Physics Mode• Jan 8 (0600) PHENIX in Physics Mode• Jan 12, Rebucketing not yet routine, stochastic cooling still to come.• Jan 22, changed beta* from 0.6 to 0.7 meters, rebucketing ~established, yellow transverse stochastic cooling on• Mar. 18 (0556), End 10 week s = 200 GeV/n Run, begin s = 62.4 GeV/n setup• Mar. 20 19, Begin 4 week s = 62.4 GeV/n run
– Machine physics 19 March for stores ≥11954– PHENIX Physics 19 Mar for stores ≥11955– STAR Physics 22 March for stores ≥11976
• Apr. 17 8, End 4 week s = 62.4 GeV/n Run, begin s = 39 GeV/n setup• Apr. 19 9, Begin 1.5 week s = 39 GeV/n run• Apr. 30 20(?), End 1.5 week s = 39 GeV/n Run, finish n= 0.67 studies sometime before polarity switches begin (i.e. this is a
placeholder)• May 1, complete n= 0.67 studies for pp and s = 7.7 GeV/n setup (12 hr pol. switches)• May. 3, Begin 4 week s = 7.7 GeV/n run• May 23 – 28 IPAC (Kyoto)• May 22 Jun 3, Satogata is away• May 31, End 4 week s = 7.7 GeV/n Run, begin s = 11.5 GeV/n setup (4-6 hr polarity switch, if necessary)• Jun 2, begin s = 11.5 GeV/n for STAR• Jun 16, end 2 week s = 11.5 GeV/n run, begin s = 5 GeV/n setup (4-6 hr polarity switch, if necessary)• Jun 18, begin s = 5 GeV development• Jun 21, end 3 days at s = 5 GeV/n • Jun 22 , Begin Cryo Warm-up• Jun 23, Warm-up complete, Run 10 ends – 29.2 CRYO WEEKS
![Page 2: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/2.jpg)
Run 10 plan based on 25 Nov Revised Planand s=200 extended by 1 week
• Mar. 20 19, Begin 4 week s = 62.4 GeV/n run– Machine physics 19 March for stores ≥11954– PHENIX Physics 19 Mar for stores ≥11955– STAR Physics 22 March for stores ≥11976
• Apr. 17 8, End 4 2.9 week s = 62.4 GeV/n Run, begin s = 39 GeV/n setup• Apr. 19 9, Begin 1.5 week s = 39 GeV/n run• Apr. 30 20(?), End 1.5 week s = 39 GeV/n Run, finish n= 0.67 studies for pp sometime
before polarity switches begin (i.e. this is a placeholder)Below schedule TBD• May 1, Begin s = 7.7 GeV/n setup (12 hr pol. switches)• May. 3, Begin 4 week s = 7.7 GeV/n run• May 23 – 28 IPAC (Kyoto)• May 22 Jun 3, Satogata is away• May 31, End 4 week s = 7.7 GeV/n Run, begin s = 11.5 GeV/n setup (4-6 hr polarity
switch, if necessary)• Jun 2, begin s = 11.5 GeV/n for STAR• Jun 16, end 2 week s = 11.5 GeV/n run, begin s = 5 GeV/n setup (4-6 hr polarity
switch, if necessary)• Jun 18, begin s = 5 GeV development• Jun 21, end 3 days at s = 5 GeV/n • Jun 22 , Begin Cryo Warm-up• Jun 23, Warm-up complete, Run 10 ends – 29.2 CRYO WEEKS• Last Week of June – Commission EBIS with He beam to NSRL
![Page 3: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/3.jpg)
Run 10 Au-Au Goals3/30/10
• STAR– s = 62 GeV/n
• Luminosity Sampled/Delivered = ?/90 mb-1
• 100M Min-bias events
• PHENIX– s = 62 GeV/n
• Luminosity Recorded/Delivered = 64/193 mb-1
• 400M Min-bias events
![Page 4: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/4.jpg)
PHENIX Goal (400M min-bias events)
STAR Goal (100M min-bias events)19 Mar
8 Apr
![Page 5: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/5.jpg)
Through 0900 hrs, 6 April
![Page 6: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/6.jpg)
68.0
118.1
64.3
112.0
76.0
123.7
0
24
48
72
96
120
144
0
20
40
60
80
100
120
03/18 to 3/24
3/25 to 3/31
04/01 to 04/07
04/08 to 04/14
hour
s pe
r wee
k at
sto
re
Run 10 (AuAu) -- Integrated Luminosity by week
inte
grat
ed lu
mni
osity
[m
b^-1
]
period
Phenix STAR (lumi) hours at store
thru fill 12085ending 09:00 April 6
![Page 7: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/7.jpg)
1.3 x 109/bunch
31 x 31 GeV/n Au, 30 March to Present
![Page 8: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/8.jpg)
31 x 31 GeV/n Au, 30 March to Present
![Page 9: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/9.jpg)
![Page 10: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/10.jpg)
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
40.0%
45.0%
50.0%
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
0.8 0.9 1 1.1 1.2 1.3 1.4 1.5
% o
f bea
m lo
st r
amp
plus
reb
ucke
ting
RHIC
Bea
m p
er b
unch
aft
er R
ebuc
ketin
g x
1E9
RHIC accramp Intensity per bunch x1E9
Run 10, 62 GeV AuAu
beginning ramp vs beginning store
% lost ramp and rebucketing
![Page 11: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/11.jpg)
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
40.0%
45.0%
50.0%
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
0.8 0.9 1 1.1 1.2 1.3 1.4 1.5
% o
f bea
m lo
st r
amp
plus
reb
ucke
ting
RHIC
Bea
m p
er b
unch
aft
er R
ebuc
ketin
g x
1E9
RHIC accramp Intensity per bunch x1E9
Run 10, s = 200 GeV AuAu
beginning ramp vs beginning store
% lost ramp and rebucketing
![Page 12: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/12.jpg)
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
40.0%
45.0%
50.0%
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
0.8 0.9 1 1.1 1.2 1.3 1.4 1.5
% o
f bea
m lo
st r
ebuc
ketin
g
RHIC
Bea
m p
er b
unch
aft
er R
ebuc
ketin
g x
1E9
RHIC accramp Intensity per bunch x1E9
Run 10, 62 GeV AuAubeginning ramp vs beginning store
% lost in rebucketing
![Page 13: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/13.jpg)
0.0%
5.0%
10.0%
15.0%
20.0%
25.0%
30.0%
35.0%
40.0%
45.0%
50.0%
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
0.8 0.9 1 1.1 1.2 1.3 1.4 1.5
% o
f bea
m lo
st r
ebuc
ketin
g
RHIC
Bea
m p
er b
unch
aft
er R
ebuc
ketin
g x
1E9
RHIC accramp Intensity per bunch x1E9
Run 10, s = 200 GeV AuAubeginning ramp vs beginning store
% lost in rebucketing
![Page 14: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/14.jpg)
y = 3.0x2 + 0.0x - 0.0
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
0.8 0.9 1 1.1 1.2 1.3 1.4 1.5
Initi
al L
umi
RHIC
Bea
m p
er b
unch
acc
ram
p x
1E9
RHIC initial store Intensity per bunch x1E9
Run 10, 62 GeV AuAubeginning ramp vs beginning storeScaling with bunch intensity squaredInitial Lumi [10e-26cm-2s-1]Poly. (Scaling with bunch intensity squared)
![Page 15: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/15.jpg)
y = 32.9x2 + 0.0x - 0.0
0
10
20
30
40
50
60
70
80
90
100
0.8
0.9
1
1.1
1.2
1.3
1.4
1.5
0.8 0.9 1 1.1 1.2 1.3 1.4 1.5
Initi
al L
umi
RHIC
Bea
m a
ccra
mp
inte
nsity
per
bun
ch x
1E9
RHIC initial store Intensity per bunch x1E9
Run 10, s = 200 GeV AuAubeginning ramp vs beginning storeInitial Lumi [10e-26cm-2s-1]Scaling with bunch intensity squared
![Page 16: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/16.jpg)
http://www.bnl.gov/cad/esfd
AGS-Booster-Tandem/Linac Startup
RHIC Cryo Cooldown to 45 deg K
RHIC Cryo Cooldown/Warm-up
RHIC Cryo Operation
RHIC Cryo off
RHIC STAR & PHENIX Lattice Sextupole Polarity Swap
RHIC Research with s = 200 GeV /n AuAu IBS NO
RHIC Research with s = 62.4 GeV /n AuAu IBS NO
RHIC Research with s = 39 GeV /n AuAu IBS NO
Complete n ~ 0.67 for pp studies
RHIC Research with s = 7.7 GeV /n AuAu NO YES
STAR Research with s = 11.5 GeV /n AuAu NO NO(or Maybe)
Beam Studies at s = 5 GeV /n AuAu NO YES
IPAC
NSRL (NASA Radiobiology)
Shutdown (RHIC)
C-A Operations-FY10
Program Element Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep
FY 2010
9 Mar 10
setup with beams in both rings
Sep
concurrent with RHIC
ramp up luminosity
21 Sep
29.2 weeks
1 Dec
20 Nov
setup as required
10 weeks physics
6/23 End Date
11 weeks
NSRL Schedule TBD
25 cryo weeks
4weeks
1.5wks
4weeks
2wks
with s=200 extended 1 week (budget premitting)
~12 hour overhead to swap Q7's out of IBS lattice and reverse sextupole polarities
4-6 hour overhead to reverse sextupole polarities (if necessary)
Complete before polarity switches
![Page 17: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/17.jpg)
Future Topics• Toward Smaller beta* - new quad triplets – D. Trbojevic
![Page 18: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/18.jpg)
Archive
![Page 19: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/19.jpg)
BNL Energy Cost
$(20)
$-
$20
$40
$60
$80
$100
$120O
ct-0
0
Oct
-01
Oct
-02
Oct
-03
Oct
-04
Oct
-05
Oct
-06
Oct
-07
Oct
-08
Oct
-09
Oct
-10
$/M
Whr
Billed Cost/MWhrWithout Balanced BillingBalanced Billing ProjectionRHIC ONAGS SEB/FEBNSRL
Through Feb 2010
![Page 20: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/20.jpg)
First Store Monday, 29 March, Store 12026
![Page 21: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/21.jpg)
First Store Monday, 29 March, Store 12026
![Page 22: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/22.jpg)
First Store Monday, 29 March, Store 12026
![Page 23: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/23.jpg)
First Store Monday, 29 March, Store 12026
![Page 24: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/24.jpg)
First Store Monday, 29 March, Store 12026
![Page 25: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/25.jpg)
First Store Monday, 29 March, Store 12026W
CM
Lon
gitu
dal E
mitt
ance
![Page 26: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/26.jpg)
31 x 31 GeV/n Au horiz and vert emittances
Store 12026
![Page 27: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/27.jpg)
PHENIX Goal*
* With 20 cm sigma IR diamond
PHENIX Minimum Goal*
STAR Goal
![Page 28: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/28.jpg)
![Page 29: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/29.jpg)
560.8629.2665.2
483.2
302.9
541.2526.8
359.5
588.6
178.9
71.3
590.3610651.2
703.0
525.4
335.4
569.2547.5
358.8
599.7
179.4
72.4
92.694.7105.899.183.895.296.076.2107.243.080.30
100
200
300
400
500
600
700
800
12/31 to 1/07
1/08 to 1/14
1/15 to 1/21
1/22 to 1/28
1/29 to 2/04
2/05 to 2/11
2/12 to 2/18
2/19 to 2/25
2/26 to 3/04
3/05 to 3/11
3/12 to 3/18
period
inte
grat
ed lu
mni
osity
[ m
b-1]
0
24
48
72
96
120
Run 10 (AuAu) -- Integrated Luminosity by week
hour
s pe
r wee
k at
sto
re
Phenix STAR (lumi) hours at store
thru fill 11932ending 06:00 March 18
Average hours per week at store = 88.5
![Page 30: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/30.jpg)
Through Jan 2010
BNL Energy Cost
$(20)
$-
$20
$40
$60
$80
$100
$120O
ct-0
0
Oct
-01
Oct
-02
Oct
-03
Oct
-04
Oct
-05
Oct
-06
Oct
-07
Oct
-08
Oct
-09
Oct
-10
$/M
Whr
Billed Cost/MWhrWithout Balanced BillingBalanced Billing ProjectionRHIC ONAGS SEB/FEBNSRL
![Page 31: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/31.jpg)
Through 2/28/10
RHIC Operations FY06-10
0.00
5.00
10.00
15.00
20.00
25.00
30.00
35.00
-30 -10 10 30 50 70 90 110 130 150 170 190
Days since beginning of Run
MW
CAD P ower 06CAD P ower 07CAD P ower 08CAD P ower 09CAD P ower 10
![Page 32: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/32.jpg)
Ring Bunches/Cycles
Avg Bunch in RHIC (10^6 ions)
Avg Efficiency XCBM to RHIC XCBM to Uxf1 Uxf1 to Wxf Wxf to Arc Arc to RHIC
Blue 56/56 909 0.836 1.056 0.963 0.992 0.828
Yellow 56/56 990 0.971 1.085 0.962 0.959 0.970
28 Feb Physics Store 11824, 0.7 m b* with some cooling and with rebucketing, STAR 32.7 mb-1, 3.9 hr store
Ring Bunches/Cycles Avg Bunch in RHIC (10^6 ions)
Avg Efficiency XCBM to RHIC XCBM to Uxf1 Uxf1 to Wxf Wxf to Arc Arc to RHIC
Blue 111/28 1262 0.917 0.975 0.961 1.001 0.977
Yellow 111/28 1246 0.910 0.961 0.964 0.988 0.994
0.9050.9890.9611.0230.8791168111/29Yellow
0.9270.9990.9611.0240.9111196111/28Blue
Arc to RHIC Wxf to Arc Uxf1 to Wxf XCBM to Uxf1 Avg Efficiency XCBM to RHIC
Avg Bunch in RHIC (10^6 ions) Bunches/Cycles Ring
18 Jan Physics Store 11489, 0.6 m b* No cooling or rebucketing, STAR 22.6 mb-1, 3.9 hr store
Ring Bunches/Cycles Avg Bunch in RHIC (10^6 ions)
Avg Efficiency XCBM to RHIC XCBM to Uxf1 Uxf1 to Wxf Wxf to Arc Arc to RHIC
Blue 111/28 1354 0.927 0.990 0.965 1.003 0.968
Yellow 111/28 1377 0.931 0.990 0.964 0.989 0.987
2 Mar Physics Store 11834, 0.7 m b* with some cooling and with rebucketing, STAR 29.4 mb-1,3.9 hr store)
31 Dec 1st Physics Store 11340, 0.6 m b* No cooling or rebucketing, STAR 3.2 mb-1, 2.6 hr store
![Page 33: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/33.jpg)
Through 2/28/10
RHIC Cryo Operations FY06-10
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
-30 -10 10 30 50 70 90 110 130 150 170 190
Days since beginning of Run
MW
RHIC Cryo 06RHIC Cryo 07RHIC Cryo 08RHIC Cryo 09RHIC Cryo 10
![Page 34: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/34.jpg)
Through 2/28/10
BNL Energy Use FY 2009-10
0
5
10
15
20
25
30
35
40
45
501-
Jul-0
8
1-A
ug-0
8
1-S
ep-0
8
1-O
ct-0
8
1-N
ov-0
8
1-D
ec-0
8
1-Ja
n-09
1-Fe
b-09
1-M
ar-0
9
1-A
pr-0
9
1-M
ay-0
9
1-Ju
n-09
1-Ju
l-09
1-A
ug-0
9
1-S
ep-0
9
1-O
ct-0
9
1-N
ov-0
9
1-D
ec-0
9
1-Ja
n-10
1-Fe
b-10
1-M
ar-1
0
Date
Dai
ly A
vera
ge P
ower
(MW
)
RHIC Cryo RHIC otherAGS-Exp BoosterAGS-Mach TandemCAD Bldg less SMD NSRLSite Base BNL Peak-Av
Site total not recorded after 30 Nov
![Page 35: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/35.jpg)
Physics production or beam studies weekssNN (GeV) 25-cryoweek run 27-cryoweek run
200 10 1062.4 4 439 1.5 1.527 0 018 0 0
11.5 @ STAR 0 27.7 4 4
Beam studies @ 5 GeV and @ n 0.67
0.5 0.5
Revised Run 10 Plan, Nov 25, 2009
![Page 36: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/36.jpg)
Run 10 Au-Au Goals11/19/09
• STAR– s = 200 GeV/n
• Luminosity Sampled/Delivered = 2/4 nb-1
• 250M Central Events• 300M Min-bias events
• PHENIX– s = 200 GeV/n
• Luminosity Recorded/Delivered = 1.4/>6 nb-1
• Minimum Goal: – Luminosity Recorded/Delivered = 1.1/3.9 nb-1
![Page 37: Run 10 plan based on 25 Nov Revised Plan and s=200 extended by 1 week](https://reader036.fdocuments.in/reader036/viewer/2022081604/568156c7550346895dc45abe/html5/thumbnails/37.jpg)
Run 03 Run 04 Run 05 Run 06 Run 07 Run 08 Run 09 Run 100
1
2
3
4
5
6
7
8
9
Time from start of 4.5 deg cooldown to Physics
Run 10 Actual
Goal
Actual
Wee
ks to
Phy
sics