Rucio Commissioning
ADC Operations
Rucio Commissioning Won’t go into the details of the commissioning • ToDo list and priorities didn’t change respect to 6 weeks
ago https://indico.cern.ch/event/276501/session/1/contribution/3/materia
l/slides/1.pdf https://indico.cern.ch/event/276501/session/17/contribution/58/mate
rial/slides/1.pdf
• But a lot of work has been done in the meanwhile!
28 October 2014ADC Ops 2
..
28 October 2014ADC Ops 3
..
28 October 2014ADC Ops 4
ProdSys2 task with input/output in Rucio
Full chain is ongoing• Not all task finished (evgen and simul OK)
not a real issue, more an error while defining the chain.
• Still assigned manually
Not spot up to now real issues related to Rucio
28 October 2014ADC Ops 5
Horizontal scalability Present situation:
• possible to scale horizontally with “fixed” configuration Judge: rucio-daemon-prod-01, singleprocess, multithread Conveyor: rucio-daemon-prod-02,06,07,08, multiprocess, multithread Hermes: rucio-daemon-prod-02, singleprocess, singlethread Undertaker: rucio-daemon-prod-03, singleprocess, multithread Kronos: rucio-daemon-prod-03, singleprocess, singlethread Automatix: rucio-daemon-prod-04, singleprocess, multithread Transmogrifier: rucio-daemon-prod-04, singleprocess, singlethread Necromancer: rucio-daemon-prod-04, singleprocess, singlethread Reaper: rucio-daemon-prod-05, multiprocess, multithread
• Trying to increase the available VMs now
“Automatic” scalability: • The database change for automatic configuration of scalability of daemons is in
production. The patch to support this is implemented, not in production yet.
28 October 2014ADC Ops 6
Rucio Tape management: stagein Blocker issues resolved• Retries with timestamp
• Bringonline parameters passed to FTS3
Sorting out now details of RSEs for tapes• One RSE for “staging area”
• Mostly internal, between judge and conveyor
28 October 2014ADC Ops 7
Rucio *now*
28 October 2014ADC Ops 8
ongoing Ongoing: spot inconsistencies, under fixing
done
donedone
tested
28 October 2014ADC Ops 9
Still to be done
Ongoing
done
To be validated
Recovery done, monitoring ongoingongoing
Still to be done
OngoingSee rucio-ui
Patched, not deployed
Rucio “others”
ongoing
DQ2 – Rucio migration
28 October 2014ADC Ops 10
Backup
Horizontal scalability from Vincent
28 October 2014ADC Ops 11
.. .• .
• .
.• .
• .
.
28 October 2014ADC Ops 12