Rt k Quick Guide

download Rt k Quick Guide

of 167

Transcript of Rt k Quick Guide

  • 7/28/2019 Rt k Quick Guide

    1/167

    GPS System 500

    GPS System 500RTK Quick GuideVersion 4.0June 2002

  • 7/28/2019 Rt k Quick Guide

    2/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 2

    1.0 System 500 RTK Quick Guide

    In this Chapter The following sections describe the layout of this quick guide and the directorystructure on the PCMCIA card used in a System 500 GPS receiver.

    Section Topic

    1.1 Quick Guide Overview

    1.1.1 Terminal Access

    1.2 PCMCIA Card Directory Structure

    1.3 Creating a Job

    1.4 Selecting a Job

    1.5 Selecting a Configuration Set

    1.1 Quick Guide Overview

    About thisQuick Guide

    This manual is designed as a supplement to the System 500 manuals available onthe SKI-Pro CD. The intent of this quick guide is to provide a step-by-step guidethrough the more common procedures used in RTK (Real Time Kinematic) GPSsurveying.

    This quick guide

    assumes that the user is familiar with general GPS surveying procedures and realtime applications and

    uses the term sensor interchangeably with System 500 GPS receiver.

    Quick GuideOverview

    This RTK Quick Guide contains the following chapters.

    Chapter Topic

    1.0 System 500 RTK Quick Guide

    2.0 The Real Time Reference

    3.0 The Real Time Rover

    4.0 Real Time Stake Out

    5.0 Coordinate Systems with Map Projections

    6.0 Local Coordinate Systems

    7.0 The Point Management Utility

    8.0 The Config Button

    9.0 Configurations

    10.0 PDL Radio Modem Configuration11.0 Transfer

    FirmwareVersion 4.0

    This quick guide has been written for System 500 Firmware Version 4.0. If you areusing a different firmware version, you may notice slight differences in the menucommands.

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    3/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 3

    1.1 Quick Guide Overview,Continued

    User Manuals A number of user manuals are available on the SKI-Pro CD. These manuals areprovided in Adobe Acrobat format along with the Adobe Acrobat reader. The usermanuals contain a wealth of information on System 500, including systemspecifications and operation procedures for real time as well as post-processedstatic, rapid static, and kinematic surveys.

    More detailed information on real time surveying can be found in the following Leicamanuals:

    GPS Equipment User Manual provides a general system overview, containsinformation on technical specifications, and care and usage of the equipment.

    Getting Started with Real-Time Surveys contains instructions on equipmentsetup and procedures specific to real time surveying.

    Technical Reference Manual this comprehensive manual provides detailedinformation on nearly all aspects of System 500 including many of theprocedures mentioned in this quick guide.

  • 7/28/2019 Rt k Quick Guide

    4/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 4

    1.1.1 Terminal Access

    Access Below you will find methods for accessing menu choices. These conventions areheld throughout all operations on the terminal.

    Item Display

    Accessing a Menu Option

    From the Main\ menu screen, there are two ways to accessa menu option.

    1. Use the up/down arrows buttons to select themenu option and then press the F1 (CONT)button.

    2. Press the number corresponding to the menu item.For instance, press the number 1 on the terminal keypadto access the Survey screen.

    Down arrow beside a field

    When you see a down arrow by a field, this means thatthere are more choices available in a list box for thatparticular field.

    You may use the left/right arrow buttons to toggle throughthe list box to find the choice you are looking for.

    Or

    To open the list box, press the ENTER button.

    In the list box:

    When you see a bar on the right-hand side of the list box,this means that there are more selections available.

    Use the down arrow button to view more choices.

    The black rectangle inside the bar indicates where yourcurser is with respect to the entire list of choices.

  • 7/28/2019 Rt k Quick Guide

    5/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 5

    1.2 PCMCIA Card Directory Structure

    What GoesWhere?

    The PCMCIA (Personal Computer Memory Card International Association) carddirectory structure for Leica System 500 GPS receivers is explained below.

    All items marked as (System RAM)must ultimately be transferred to the receiverssystem RAM. These items may be copied to the PCMCIA card using the SensorTransfer function in SKI-Pro and then transferred to system RAM on the sensor.

    CODE Code Lists - (System RAM)

    CONVERT Format files from Format Manager (System RAM)

    DATA ASCII files & Stk_Line.txt (line definition file) (PC Card)

    GPS Almanac files (System RAM)

    GEOID Geoid Model Field Files - (SystemRAM)

    DTM DTM Stake-Out files (PC Card)

    GEODBAll Job files (PC Card)

    Coordinate Systems - (System RAM)

    GPS

    CONF Configuration Sets (System RAM)

    PROG Firmware Upgrade files (System RAM)

    GSI GSI Files {Coordinate output using format files} (PC Card)

    IDEX IDEX Files (PC Card)

    LOG Log Files from Application Programs {COGO or Stake-Out} (PCCard)

  • 7/28/2019 Rt k Quick Guide

    6/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 6

    1.3 Creating a Job

    Jobs Jobs exist in order for you to be able to structure and organize your work. Theydefine a common location within the System 500 file system for points.

    All points that are recorded will be stored within a particular job. Jobs normallyreside on the PCMCIA card unless you have purchased internal memory (notinternal RAM) for your GPS receiver.

    A copy of the Coordinate System that was used with the last active job will also bestored (See Chapter 5.0 Coordinate Systems and Map Projections).

    Step Action Display

    1 In the MAIN\ menu screen:

    Use the up/down arrows to select menu option 5

    Job.

    Press the F1 (CONT) button.

    This takes you to the JOB\ PC-Card screen.

    2 In the JOB\ PC-Card screen:

    A list of the currently available jobs is displayedwith the date they were created.

    Press the F2 (NEW) button.

    This takes you to the JOB\ New Job screen.

    3 In the JOB\ New Job screen:

    The job name may contain up to 16 characters andmay include spaces.

    Enter a name for the job.

    Press the ENTER button when finished.

    Note: You may enter in a description for the job in

    the Description field and who created the job inthe Creator field but both of these are optionaland not required.

    Press the F1 (CONT) button when finished.

    This returns you to the JOB\ PC-Card screen.

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    7/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 7

    1.3 Creating a Job, Continued

    Step Action Display

    4 In the JOB\ PC-Card screen:

    The newly created job appears in the job list.

    In this example the job Topo was created.

    Press the F1 (CONT) button.

    This returns you to the MAIN\ screen.

  • 7/28/2019 Rt k Quick Guide

    8/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 8

    1.4 Selecting a Job

    Introduction There are two ways to select a job.1. Via the Survey screen.2. Via the Job screen.

    This section describes both ways.

    1. Via theSurvey Screen

    In this example we will select a job via the Survey screen. This is the most commonway to select a job.

    Note: In the example below, the current job selection is Norcross and we willchange it to RTK.

    Step Action Display

    1 In the MAIN\ menu screen:

    Select menu item 1 Survey.

    Press the F1 (CONT) button.

    This takes you to the SURVEY\ Begin screen.

    2 In the SURVEY\ Begin screen:

    Use the up/down arrow buttons to select theJob field.

    Press the ENTER button.

    This takes you to the JOB: PC-Card: list boxscreen.

    3 In to the JOB: PC-Card: list box screen:

    Here is the list of all the jobs currently stored onthe PC-Card.

    Use the up/down arrows to select a job. (In thisexample it is RTK.

    Press the F1 (CONT) button.

    This returns you to the SURVEY\ Begin screen.

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    9/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 9

    1.4 Selecting a Job, Continued

    Step Action Display

    4 In the SURVEY\ Begin screen:

    We now see the newly selected job in the Jobfield and we can continue with the survey.

    2. Via the JobScreen

    In this example we will select a job using the Job screen.

    Note: In the example below we will change the current job to Topo.

    Step Action Display

    1 In the MAIN\ menu screen:

    Select menu item 5 Job.

    Press the F1 (CONT) button.

    This takes you to the JOB\ PC-Card list box

    screen.

    2 In the JOB\ PC-Card list box screen.

    Use the up/down arrow buttons to select Topo.

    Press the F1 (CONT) button.

    This returns you to the MAIN\ menu screen.

    3 In the MAIN\ menu screen:

    Use the up/down arrow buttons to select 1Survey.

    Press the F1 (CONT) button.

    This takes you to the SURVEY\ Begin screen.

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    10/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 10

    1.4 Selecting a Job, Continued

    Step Action Display

    4 In the SURVEY\ Begin screen:

    We can see the newly selected job is now thecurrent job and we can continue the survey.

  • 7/28/2019 Rt k Quick Guide

    11/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 11

    1.5 Selecting a Configuration Set

    Introduction A configuration set is a set of parameters that defines a mode of operation. Theconfiguration set in use by the GPS receiver/sensor will control the behavior of thesystem. (See Chapter 9.0 Configurations).

    The sensor will not operate without a configuration set selected.

    The procedure for selecting a configuration set is the same for all System 500 GPSsurveys.

    Note: In the example below, we will select an RTK rover configuration set.

    Step Action Display

    1 In the MAIN\ menu screen:

    Select menu item 1 Survey.

    Press the F1 (CONT) button.

    This takes you to the SURVEY\ Begin screen.

    2 In the SURVEY\ Begin screen:

    In this example, the rapid static configurationRPDSTAT is selected. We want to change thisto the RTK rover configuration.

    There are two ways of changing the configurationset.

    1. Highlight the Config Set field and usethe left/right arrow buttons to togglethrough the list of configuration sets untilwe find the correct set or

    2. Highlight the Config Set field and pressthe ENTER button to bring up a list box ofconfiguration sets.

    In this example we will review the list ofconfigurations sets.

    Select the Config Set field.

    Press the ENTER button.

    This takes you to the CONFIG SET: list box screen.

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    12/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 12

    1.5 Selecting a Configuration Set, Continued

    Step Action Display

    3 In the CONFIG SET: list box screen:

    Use the up/down arrow buttons to highlight thedesired configuration set. Remember in thisexample we are looking for the real time roverconfiguration and in this example it is calledRTROVER.

    Press the F1 (CONT) button.

    Note: In this display on the right there are manyuser-defined configuration sets that you may nothave in your list. Do not worry. These werecreated on a demo receiver and normally do notcome with the receiver. To learn more about

    creating configuration sets, see Chapter 9.0Configurations.

    This takes us back to the SURVEY\ Begin screen.

    4 In the SURVEY\ Begin screen:

    We now see the RTK rover configuration set calledRTROVER in the Config Set field.

    We are ready to continue our survey.

  • 7/28/2019 Rt k Quick Guide

    13/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 13

    2.0 The Real Time Reference

    Introduction The RTK reference (also known as the RTK base station) can be placed on anexisting control point with known coordinates or on a station where approximatereference station coordinates are known. This chapter will give directions for bothmethods.

    Setup onExistingControl

    If setting up on an existing control point, the coordinate values for this station mustbe available prior to starting the reference station occupation. The referencestations coordinate values may be manually entered using Point Management asdescribed in Section 7.2of this quick guide, called from a job that was created inSKI-Pro and transferred to the PCMCIA card, or called from an ASCII file.

    The default coordinate format for the reference station is WGS84 geodetic (Latitude,Longitude, & Ellipsoid Height). However, grid coordinate values may be used if theproper coordinate system is available on the reference station sensor and attachedto the job.

    This can be either the appropriate State Plane zone, a 1-Step or 2-Steptransformation to an existing local grid, or a user-defined projection such as a localTransverse Mercator, for example (see Chapters 5 and 6 to learn more aboutcoordinate systems).

    Setup UsingApproximateCoordinates

    Important Note:

    The HERE function is used to select an approximate (autonomous) WGS84 startingcoordinate for the reference station. This is accomplished using only one epoch ofthe code message received from the GPS satellites.

    Alternatively, a Single Point Position (SPP) may be performed to get a slightly

    more accurate starting position. This procedure averages the code positions overtime. Since Selective Availability (SA) has been turned off, it is no longer necessaryto do a Single Point Position although that option is still available if you wish to use it.Single Point Positions will not be covered in this quick guide.

    Whether reference station coordinates are determined using the SPP or HEREfunctions, these coordinates (WGS84 Latitude, Longitude, & Ellipsoid Height) areapproximate.

    This procedure must only be performed once per project, since any localtransformation parameters are based on this approximate WGS84 position. From

    this point on, the reference station must always be setup either on this originalstation, or some other station in the project that has been surveyed in relation to thisreference position.

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    14/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 14

    2.0 The Real Time Reference, Continued

    In this Chapter The following sections of this chapter explain the procedures for starting and endingthe reference station survey, as well as selecting the reference station coordinates.

    Section Topic2.1 Starting the Real Time Reference Station Survey

    2.1.1 Selecting an Existing Control Station

    2.1.2 Using the HERE Function

    2.1.3 Using the LAST Button

    2.2 Ending the Real Time Reference Station Survey

    RTK ReferenceRadio

    See Chapter 10.0 PDL Radio Modem Configuration on configuring your PDL radio.

  • 7/28/2019 Rt k Quick Guide

    15/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 15

    2.1 Starting the Real Time Reference Station Survey

    Introduction To start a real time reference station survey, you must have:

    a Configuration Set (See Chapter 9.0 Configurations), a job to store your data (See Chapter 1, Section 1.3 Creating a Job), and

    a coordinate system if you wish to work in any other coordinate system other thanWGS84 (See Chapter 5.0 Coordinate Systems with Map Projections and Chapter6.0 Local Coordinate Systems).

    Step Action Display

    1 From the Main\ menu screen:

    Select menu item 1 Survey.

    Press the F1 (CONT) button.

    This takes you to the SURVEY\ Begin screen.

    2 In the SURVEY\ Begin screen, select the followingparameters:

    The Real Time Reference configuration set

    The job, and

    The correct antenna type.

    Note: Use the F6 (CSYS) button to access a list of

    coordinate systems. Here you can choose thecoordinate system for the job.

    Once all parameters are correct,

    Press the F1 (CONT) button.

    This takes you to the SURVEY\ screen.

    Important Note: The user must now choose one of the following procedures for selecting thereference station coordinates.

    2.1.1 Selecting an Existing Control Station

    2.1.2 Using the HERE Function

    2.1.3 Using the LAST Button

  • 7/28/2019 Rt k Quick Guide

    16/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 16

    2.1.1 Selecting an Existing Control Station

    EnteringKnownCoordinates

    The coordinate values for the reference station must be available in the job prior tostarting the reference station survey. If the coordinates do not already exist in the

    job, the values may be manually entered, using Point Management, as described in

    Section 7.2of this manual or you can use the procedures described in Sections 2.1.2and 2.1.3.

    The default format for the reference station coordinates is WGS84 geodetic(Latitude, Longitude, & Ellipsoid Height).

    If grid coordinate values are to be used, the proper coordinate system must beavailable on the reference sensor. This can be either the appropriate State Planeprojection, a 1-Step or 2-Step transformation to an existing local grid, or a user-defined projection such as a local Transverse Mercator projection, for example.

    Step Action Display

    1 In the SURVEY\ screen:

    Select the Point Id field and press the ENTERbutton to open a list box containing all theexisting points in the job or use the left/rightarrow buttons to toggle through the list of points.Choose the reference stations Point Id from thislist.

    Select the Ant Height field.

    Enter the measured antenna height. Whenusing the Leica height hook, this is themeasurement to the white mark on the heighthook.

    Press the F1 (CONT) button to start the survey.

    This takes you to the Survey\ screen.

    2 Once the survey is started:

    Pay attention to the satellite tracking status andradio port status.

    At least 5 satellites (L1 & L2) are required for RTKinitialization and the arrow symbol should now beflashing upwards.

  • 7/28/2019 Rt k Quick Guide

    17/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 17

    2.1.2 Using the HERE Function

    HERE Function The HERE function is used to derive an approximate (autonomous) position for thereference station. Coordinates are WGS84 (Latitude, Longitude, & Ellipsoid Height).

    Step Action Display

    1 In the SURVEY\ screen:

    Enter the measured antenna height in the AntHeight field.

    Press the F4 (HERE) button to execute theHERE function.

    This takes you to the MANAGE\ New Point screen.

    2 In the MANAGE\ New Point screen:

    Select the Point Id field and enter a new pointID.

    Press the F1 (STORE) button to store the newreference point.

    This takes you to the SURVEY\ screen.

    3 In the SURVEY\ screen:

    Press the F1 (CONT) button to start thereference station survey.

    This takes you to the Survey\ screen.

    4 Once the survey is started:

    Pay attention to the satellite tracking status andradio port status.

    At least 5 satellites (L1 & L2) are required for RTKinitialization and the arrow symbol should now beflashing upwards.

  • 7/28/2019 Rt k Quick Guide

    18/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 18

    2.1.3 Using the LAST Button

    LAST Button The LAST button is used to retrieve the last used reference station coordinates.This information is stored in the system RAM. This is useful if the current job hasbeen deleted from the reference station sensor; you can use this command toretrieve those deleted coordinates.

    Step Action Display

    1 In the SURVEY\ screen:

    Press the F3 (LAST) button to retrieve the lastused reference station coordinates.

    This retrieves the last used coordinates fromsystem memory and takes you to the Survey\

    screen.

    Note: Be careful to check that these are thecorrect reference station coordinates.

    2 In the SURVEY\ screen:

    Enter the measured antenna height.

    Press the F1 (CONT) button to start thereference station survey.

    3 Once the survey is started:

    Pay attention to the satellite tracking status andradio port status.

    At least 5 satellites (L1 & L2) are required for RTKinitialization and the arrow symbol should now beflashing upwards.

  • 7/28/2019 Rt k Quick Guide

    19/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 19

    2.2 Ending the Real Time Reference Station Survey

    Stopping theSurvey

    Prior to ending the reference station survey, the antenna height should be measuredand verified against the value entered in the sensor. The tribrach should also bechecked to make sure the antenna is still over the point and level.

    Step Action Display

    1 In the SURVEY\ screen:

    Press the F1 (STOP) button.

    This will end the survey, and return you to theMAIN\ menu screen.

    2 In the MAIN\ menu screen:

    The sensor can now be turned off. To turn off thesensor:

    Press the ON button.

    Note: The sensor can only be turned off from theMAIN\ menu screen.

  • 7/28/2019 Rt k Quick Guide

    20/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 20

    3.0 The Real Time Rover

    Introduction The real time rover configuration can be used for a number of surveying applications,including:

    boundary surveys,

    volume surveys,

    topographic surveys,

    staking lines or grids,

    staking out points on construction sites,

    vehicle mounted kinematic surveys for road profiling, or rough topo,

    etc.

    BaselineLength

    Real time surveys can be performed over relatively large distances, up toapproximately 30 kilometers (20 miles), depending on the communication link.

    A practical limit for radio communication is approximately 10 kilometersdepending on topography and obstructions between reference and rover radios.

    Using cell phones as the data link and Leicas System 500 GPS receivers, RTKranges of 30+ kilometers are easily achieved.

    In this Chapter The following sections of this chapter explain the procedures for starting and endingthe rover survey as well as performing the real time survey operations.

    Section Topic

    3.1 Starting the Real Time Rover Survey3.1.1 Receiving Radio Communication

    3.2 Occupy Points Manual Stop and Store

    3.3 Occupy Points Automatic Stop and Store

    3.4 The Automated Point Id Template

    3.5 Using a Code List

    3.5.1 Adding Attributes to Codes

    3.6 Adding Point Annotations (Notes)

    3.7 Surveying Hidden Points (Offsets)

    3.7.1 Hidden Point b Bearin and Distance

    3.8 Auto Recorded Positions

    3.9 Ending the Real Time Rover Survey

  • 7/28/2019 Rt k Quick Guide

    21/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 21

    3.1 Starting the Real Time Rover Survey

    Introduction To begin a real time rover survey, you must have:

    a configuration set (See Chapter 9.0 Configurations and Chapter 1, Section 1.4Selecting a Configuration Set),

    a job to store your data (See Chapter 1, Section 1.3 Creating a Job and Section1.4 Selecting a Job), and

    a coordinate system if you wish to work in any coordinate system other thanWGS84 (See Chapter 5.0 Coordinate Systems with Map Projections and Chapter6.0 Local Coordinate Systems).

    Step Action Display

    1 From the Main menu screen:

    Select menu option 1 Survey.

    Press the F1 (CONT) button.

    This takes you to the SURVEY\ Begin screen.

    2 In the SURVEY\ Begin screen:

    Select the following parameters:

    The Real Time Rover configuration set, The job, and

    The antenna type.

    Note: Use the F6 (CSYS) button to access a listbox of all the coordinate systems in the systemRAM.

    Choose the coordinate system for the job.

    Press the F1 (CONT) button.

    This takes you to the SURVEY\ screen.

  • 7/28/2019 Rt k Quick Guide

    22/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 22

    3.1.1 Receiving Radio Communication

    Introduction Receiving appropriate RTK transmissions from the correct reference stations radiois imperative for an RTK survey to be completed with the highest accuracy.

    When starting an RTK rover survey, the first thing we need to verify is that we arereceiving proper transmissions from our reference receivers radio. (See Chapter 2The Real Time Reference and Chapter 10 PDL Radio Modem Configuration.)

    Step Action Display

    1 From the Main\ menu screen:

    To see if we are receiving from our referencereceiver after we have completed the steps inSection 3.1.1:

    Check for the pulsing down arrow. Thisindicates that we are receiving correct RTKtransmissions. The arrow will steadily pulse.

    Look for the fixed icon . This shows thatthe phase ambiguities have solved.

    TroubleShooting

    When the rover receiver does not solve phase ambiguities you must investigate why.

    The table below lists an RTK problem and a possible reason for the problem.

    Problem Potential Reason

    No down arrow. If you do not have a down arrow then you do not have a real time roverconfiguration set selected and you must switch configuration sets. SeeChapter 1, Section 1.4 and Chapter 9.

    Down arrow is not pulsing. This means the receiver is not receiving or understanding thetransmissions from the reference receivers radio. There are manyreasons why this may occur.

    The major points to investigate are:

    Reference radio is not transmitting.

    Rover and Reference radios are not on the same channel. Either the reference or rovers radio is on the wrong port.

    The receivers port has been assigned to be using an incorrect radiotype.

    Battery level on either the reference or rover is not adequate.

    See Chapter 10 PDL Radio Modem Configuration

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    23/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 23

    3.1.1 Receiving Radio Communication, Continued

    Scan Function To verify if you are receiving RTK transmissions from another source other than youreference, use the Scan function.

    The Scan function is new to firmware version 4.0.

    Step Action Display

    1 For more information on the Scan function, seeChapter 10, Section 10.2.1 Changing the RadioChannel on the Rover.

    This display was intentionally left blank.

  • 7/28/2019 Rt k Quick Guide

    24/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 24

    3.2 Occupy Points - Manual Stop and Store

    Manual PointOccupation

    Individual points may be surveyed using manual occupation settings. This is wherethe operator decides how long to occupy a point. This is a three-step process wherethe operator will instruct the instrument to start, stop, and store the point coordinates.See Section 8.2for further details on configuring occupation settings.

    Step Action Display

    1 In the SURVEY\ screen:

    Enter the Point Id (Identification) and check thefollowing:

    Antenna Height

    Coordinate Quality (CQ), and

    Initialization Status icon: .

    Press the F1 (OCUPY) button to survey thepoint.

    2 The sensor will record the real time measurementsuntil the operator chooses to stop the occupation.

    Ensure that:

    Coordinate quality is within tolerance.

    Initialization status is OK.

    Press the F1 (STOP) button to stop theoccupation.

    3 The operator must now store the surveyed point asfollows:

    Press the F1 (STORE) button.

    This takes you back to the SURVEY\ screen.

    4 From the SURVEY\ screen:

    You are ready to survey another point.

  • 7/28/2019 Rt k Quick Guide

    25/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 25

    3.3 Occupy Points - Automatic Stop and Store

    AutomatedOccupationSettings

    Points may be occupied using automated parameters. This is where the sensoruses predefined settings to stop the occupation and store the point coordinates. SeeSection 8.2for details on configuring occupation settings.

    If the sensor is configured to use Accuracy, the occupation will stop when thecoordinate quality (CQ) is within the specified accuracy parameters. The pointcoordinates will be stored automatically.

    If the sensor is configured to use Positions, the sensor will average the specifiednumber of measurements, stop the occupation, and then store the point coordinates.

    Step Action Display

    1 In the SURVEY\ screen:

    Enter the Point Id (Identification) and check thefollowing:

    Antenna Height

    Coordinate Quality (CQ), and

    Initialization Status icon: .

    Press the F1 (OCUPY) button to survey thepoint.

    2 The Sensor will automatically stop the occupationaccording to the settings in the configuration.

    The point coordinates will be automatically storedand the receiver is ready to measure the nextpoint.

    To survey another point, repeat Step 1 above.

  • 7/28/2019 Rt k Quick Guide

    26/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 26

    3.4 The Automated Point Id Template

    AutomaticIncrement ofPoint Id

    The sensor can be set to automatically increment point numbers based on the pointId (Identification) that you enter. This is useful when surveying a series of points withincrementing point numbers. See Section 8.4 for instructions on configuring point Idtemplates.

    Step Action Display

    1 In the SURVEY\ screen:

    Enter a Point Id.

    The Sensor will automatically create a new point Idseries based on that point number. The point Idwill automatically increment with each point

    surveyed.

    Press the F1 (OCUPY) button to survey the point.

    2 Once the point coordinates are stored, the displayreturns to the SURVEY\ screen.

    You will notice that the point number hasincremented automatically.

    3 In the SURVEY\ screen:

    Enter another point number to start a newpoint Id template.

    The Sensor will automatically create a new seriesbased on that point number.

    Press the F1 (OCUPY) button to survey thepoint.

    4 Once the point coordinates are stored, you willnotice that the point number has incremented

    automatically using the new point series.

    You are ready to survey another point.

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    27/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 27

    3.4 The Automated Point ID Template, Continued

    Individual Point

    Ids

    It is possible to step outside of the point Id sequence (to survey an individual point)

    without creating a new series of points.

    Step Action Display

    5 In the SURVEY\ screen:

    Press the SHIFT button.

    This will bring up a new set of function-buttonoptions as shown below.

    6 In the SURVEY\ screen:

    Press the F5 (INDIV) button to switch toindividual point occupation.

    Notice the Point Id field has changed to Indiv.PtId as in the screen below.

    7 In the SURVEY\ screen:

    Enter the new point Id.

    This can be any point Id or number outside theprevious series.

    Press the F1 (OCUPY) button to survey thepoint.

    8 Once the point coordinates are stored, the displayreturns to the SURVEY\ screen.

    You will notice that the point number has defaultedback to the previous series.

  • 7/28/2019 Rt k Quick Guide

    28/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 28

    3.5 Using a Code List

    Codes This example assumes there is a Thematical code list attached to the job. Thethematical code list consists of a code and a code description. A thematical code isa code that is stored together (attached) with the point. Alternatively, a Free code is

    a code that when stored, is attached to the time when the code was recorded.

    To learn how to attach a code list to a job, see Section 8.6in this guide.

    Detailed information on codes and code lists can be found in the TechnicalReference Manual included on the SKI-Pro CD.

    Step Action Display

    1 In the SURVEY\ screen:

    Select a Point ID.

    Highlightthe Point Code field.

    Press the ENTER button to display a list boxof codes.

    This takes you to the Point Code: list box.

    2 In the Point Code: list box:

    Use the up/down arrows to select a code or

    enter the first letter of the code and the searchfunction will automatically go to the first codestarting with that letter.

    Press the F1 (CONT) button.

    This takes you back to the SURVEY\ screen.

    3 In the SURVEY\ screen:

    Press the F1 (OCUPY) button to measure thepoint and store the code.

  • 7/28/2019 Rt k Quick Guide

    29/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 29

    3.5.1 Adding Attributes to Codes

    Attributes Some codes have attributes attached. An attribute is an additional block ofinformation that provides greater detail about the code. In the code list, these aremarked with an *.

    Step Action Display

    1 In the SURVEY\ screen:

    Select the Point Code field.

    Press the ENTER button.

    This will open up the Point Code list box containing

    all available codes.

    2 In the Point Code list box:

    Note: Codes with attributes are marked with *.

    Use the up/down arrow buttons to select acode.

    Press the F4 (ATRIB) button.

    This takes you to the MANAGE\ Attributes screen.

    3 In the MANAGE\ Attributes screen:

    Use the up/down arrows to highlight theType field.

    Press the ENTER button.

    This takes you to the attribute type list box.

    4 In the attribute type list box screen:

    If the attribute is not in the list, you can add onehere.

    Enter a new attribute for the code (I.e. type in a

    new attribute).

    In this example we are adding Fir.

    Press the F2 (ADD) button.

    This creates a new attribute and takes you back tothe MANAGE\ Attributes screen.

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    30/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 30

    3.5.1 Adding Attributes to Codes, Continued

    Step Action Display

    5 Continuing in the MANAGE\ Attributes screen:

    The new attribute is displayed in the Type field.

    Press the F1 (CONT) button.

    This takes you back to the SURVEY\ screen.

    6 In the SURVEY\ screen:

    Press the F1 (OCUPY) button to measure the

    point with the new attribute attached to the code.

  • 7/28/2019 Rt k Quick Guide

    31/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 31

    3.6 Adding Point Annotations (Notes)

    PointAnnotations

    A point annotation is additional text that may be entered in the field. A maximum offour lines of text may be attached to a point.

    Step Action Display

    1 In the SURVEY\ screen:

    Press the F5 (ADD) button to enter anannotation.

    This takes you to the SURVEY\ Add Menu.

    2 In the SURVEY\ Add Menu:

    Select menu option 1 Point Annotations.

    Press the F1 (CONT) button.

    This takes you to the SURVEY\ Point Annotationsscreen.

    3 In the SURVEY\ Point Annotations screen:

    Type the notes you wish to add.

    The F3 (LAST) button brings up the lastcomplete set of annotations.

    The F5 (LAST4) button brings up the lastannotation for the line that is highlighted.

    Press the F1 (CONT) button to store theannotation.

    This takes you back to the SURVEY\ screen.

    4 In the SURVEY\ screen:

    Press the F1 (OCUPY) button to survey the

    point as described in earlier sections of thisguide.

  • 7/28/2019 Rt k Quick Guide

    32/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 32

    3.7 Surveying Hidden Points (Offsets)

    Hidden Points Hidden points are points that cannot be directly occupied with the real time rover.These offsets can be computed using several options:

    Bearing and Distance offset computed from one point (A). This starting pointcan be known or surveyed as an auxiliary point. The bearing can be definedusing a second (auxiliary) point (B).

    Double Bearing offset computed from two points (A) & (B). The startingpoints can be known or surveyed as auxiliary points. The bearings can bedefined using extra auxiliary points (C) & (D).

    Double Distance offset computed from two points (A) & (B). The hidden pointmust be defined as left (-) or right (+) of the line from (A) to (B).

    Chainage and Offset offset computed using a distance along the line (A-B),and a perpendicular offset from the line (A) to (B). The chainage is measuredfrom point (A). The offset is entered as left (-) or right (+) of the line from (A) to(B).

    About thisExample

    This section lists instructions for the Bearing and Distance offset computation only.This method demonstrates all of the tools necessary to perform the other operations.

    Step Action Display

    1 In the SURVEY\ screen:

    Press the F5 (ADD) button.

    This takes you to the SURVEY\ Add Menu screen.

    2 In the SURVEY\ Add Menu screen:

    Select menu option 3 Hidden Point.

    Press the F1 (CONT) button.

    This takes you to the SURVEY\ Hidden Pointscreen.

  • 7/28/2019 Rt k Quick Guide

    33/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 33

    3.7.1 Hidden Point by Bearing and Distance

    Starting Point The offset must be computed from a starting point. This starting point can be anexisting point in the job database or an auxiliary point that you choose to survey.

    Step Action Display

    1 In the SURVEY\ Hidden Point screen:

    Select menu option 1 Bearing and Distance.

    Press the F1 (CONT) button.

    This takes you to the SURVEY\ Hidden Pt

    Brg&Dist screen.

    2 In the SURVEY\ Hidden Pt Brg&Dist screen:

    You have the followingoptions for choosing thestarting point:

    Select from the existing points and proceed tostep 4.

    OR

    Press the F5 (NEWOC) button tooccupy anauxiliary point.

    This takes you to the SURVEY\ Occupy AuxiliaryPoint screen.

    3 In the SURVEY\ Occupy Auxiliary Point screen:

    Enter the point Id for the auxiliary point.

    Press the F1 (OCUPY) button to survey theauxiliary point.

    This takes you back to the SURVEY\ Hidden PtBrg&Dist screen.

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    34/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 34

    3.7.1 Hidden Point by Bearing and Distance, Continued

    Bearing and

    Distance

    The bearing used in the offset computation may be hand entered or defined using a

    second auxiliary point.

    This is done such that the two auxiliary points are in line with the hidden point.

    Step Action Display

    4 In the SURVEY\ Hidden Pt Brg&Dist screen:

    Select the Bearing field.

    Enter the bearing (Azimuth) to the hiddenpoint. Then proceed to step 6.

    OR

    Press the F6 (BRNG) button.

    This takes you to the SURVEY\ Occupy AuxiliaryPoint screen.

    5 In the SURVEY\ Occupy Auxiliary Point screen:

    Enter the point Id for the auxiliary point.

    Define the direction as Toward orAway fromthis second auxiliary point.

    Press the F1 (OCUPY) button to survey thesecond auxiliary point.

    This takes you back to the SURVEY\ Hidden PtBrg&Dist screen.

    6 In the SURVEY\ Hidden Pt Brg&Dist screen:

    Enter the distance from the starting point tothe hidden point.

    Press the ENTER button.

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    35/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 35

    3.7.1 Hidden Point by Bearing and Distance, Continued

    Step Action Display

    7 In the SURVEY\ Hidden Pt Brg&Dist screen:

    Press the F1 (CALC) button.

    This computes the hidden point and takes you tothe SURVEY\ Hidden Point screen.

    8 In the SURVEY\ Hidden Point screen:

    Enter the point Id for the Hidden Point.

    Press the F1 (STORE) button to store thehidden point.

    Press the F6 (GRAPH) button to display agraph of the hidden point offset.

    This takes you to the SURVEY\ Hidden PointGraphics screen.

    9 In the SURVEY\ Hidden Point Graphics screen:

    Ensure that the graphical display matches the

    situation on the ground.

    Press the F1 (CONT) button to return to theSURVEY\ Hidden Point screen.

    10 In the SURVEY\ Hidden Point screen, you nowhave two options:

    Press the F1 (CONT) button to end the hiddenpoint computation. This takes you back to theSURVEY\ screen.

    OR

    Press the F5 (REDO) button to computeanother hidden point. This takes you back tothe SURVEY\ Hidden Pt Brg&Dist screen.

  • 7/28/2019 Rt k Quick Guide

    36/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 36

    3.8 Auto Recorded Positions

    AutoPositioning

    The sensor can be configured to perform automatic positioning by time, horizontaldistance, or vertical distance. Here you can set the receiver to record a position at acertain time interval such as every second for example. Or have the receiver recorda position after traveling a certain horizontal distance such as every metre or recorda position after a specific change in elevation such as every foot.

    Note: The example in this section has the receiver set to automatically record pointsby horizontal distance at intervals of 10 feet.

    There are several start-up options when using this function:

    Auto Logging may be configured to automatically start immediately uponstarting a survey. It may also be configured for controlled use. In this manner,Auto Logging is invoked from the main Survey screen and may be easilystarted and stopped.

    Codes may be used with auto-logged positions.

    These points are also available for viewing in the Point Management screen, ifso configured. Be aware that choosing this option will create a large pointsdatabase in the Point Management utility.

    Configuration The Configure Logging function is available as one of the screens when editing theReal Time Rover configuration set. See Section 9.2 for instructions on creating orediting a real time rover configuration set.

    CONFIG Button The Configure Logging function can also be accessed via the CONFIG button.

    (See Chapter 8.0 The Config Button.)

    Press the CONFIG button on the keypad.

    Select menu option2Operation.

    Press the F1 (CONT) button.

    Selectmenu option3 Logging.

    Press the F1 (CONT) button.

    This takes you to the CONFIGURE\ Logging screen shown in Section 3.8, step 2 onthe following page.

    Hot-Key For this example, the Configure Logging function has been assigned to a Hot-Key.

    See Section 8.3 for instructions on configuring Hot-Keys.

    Point IDTemplate

    This example uses the time and date format as a point Id for the auto positionedpoints. However, user-defined point Id templates can be created for use with thisfunction. See Section 8.4 for instructions on configuring point Id templates.

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    37/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 37

    3.8 Auto Recorded Positions, Continued

    Configure AutoLogging This example uses a Hot-Key to invoke the Configure Logging function. The AutoLogging will be set to by Distance.

    Step Action Display

    1 From the SURVEY\ screen:

    Press a Hot-Key (F7-F10) that was assignedto the Configure Logging function (seeSection 8.3).

    This takes you to the CONFIGURE\ Loggingscreen.

    2 In the CONFIGURE\ Logging screen:

    Toggle the Log Auto Positionsfield to YES.

    Set the Moving Ant Height.

    Press the F3 (POS) button.

    This takes you to the CONFIGURE\ PositionLogging screen.

    3 In the CONFIGURE\ Position Logging screen, setthe following:

    Log Pos by: time, distance, or height.

    Log every: your chosen interval.

    Store Pt DB: YES to view points in PointManagement.

    Start Mode: Immediate or Controlled.

    Qlty Info: Only CQ.

    Use Beep: YES or NO.

    Monitor CQ: YES.

    3D Quality: Tolerance for storing points.

    Press the down arrow to see more parameters.

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    38/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 38

    3.8 Auto Recorded Positions, Continued

    Step Action Display

    4 Continuing in the CONFIGURE\ Position Loggingscreen:

    New to Version 4.0: The ability to addannotations to auto-recorded points. To attachannotations to the auto-recorded points:

    Highlight the Use Annot field.

    Use the left/right arrow buttons to change theselection to YES.

    Notice that the F5 (ANNOT) button nowbecomes active.

    Press the F5 (ANNOT) button.

    This takes you to the SURVEY\ Point Annotationsscreen.

    5 In the SURVEY\ Point Annotations screen:

    Here you may enter an annotation. In thisexample we entered Echosounder.

    Press the F1 (CONT) button when finished.

    This returns you to CONFIGURE\ Position Loggingscreen.

    Start and StopAuto Logging

    When configured for controlled use, Auto Logging may be started and stopped fromthe main Survey screen.

    Step Action Display

    1 From the SURVEY\ screen:

    Press the F3 (AUTO) button to invoke AutoLogging.

    This takes you to the AUTO-POS\ screen.

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    39/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 39

    3.8 Auto Recorded Positions, Continued

    Step Action Display

    2 In the AUTO-POS\ screen:

    Select a code for auto-logged points. Set the Moving Ant Height.

    Press the F6 (START) button to start AutoLogging.

    Note: You can edit the positioning parameters bypressing the F5 (POS) button.

    3 Continuing in the AUTO-POS\ screen:

    You can monitor the number of auto-logged

    positions from within the AUTO-POS\ screen.

    Note: You now have a new status indicator + atthe top of the screen to indicate that AutoLogging is active.

    Press the F3 (SURV) button to return to theSurvey\ screen without stopping AutoLogging. This allows you to manually surveypoints while still Auto Logging.

    Press the F6 (STOP) button to stop AutoLogging.

    This takes you back to the main SURVEY\ screen.

  • 7/28/2019 Rt k Quick Guide

    40/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 40

    3.9 Ending the Real Time Rover Survey

    Ending the RTKSurvey

    There are two options for ending a survey as explained below.

    Step Action Display

    1 In the SURVEY\ screen:

    You have two options for ending the survey:

    Press the SHIFT and then F6(QUIT) buttons

    OR

    Press the ESC button.

    2 To end the survey using the SHIFT button:

    Press the SHIFT button.

    Press the F6 (QUIT) button.

    This ends the survey and takes you to the MAIN\menu screen.

    3 To end the survey using the ESC button:

    Press the ESC button.

    A confirmation message appears telling us that thesurvey will be terminated.

    Press the F5 (OK) button.

    This ends the survey and takes you to the MAIN\menu screen.

    Note: Press the F1 (ABORT) button to NOTendthe survey.

    4 In the MAIN\ menu screen:

    The sensor can now be turned off.

    Press the ON button to turn off sensor.

  • 7/28/2019 Rt k Quick Guide

    41/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 41

    4.0 Real Time Stake Out

    Introduction Real time stake out is used to stake points, lines, grids, slopes, etc. The examples inthis section show the procedures for staking both points and lines.

    Target Points Points to be staked (target points) must be stored on the PCMCIA card, either in ajob or in an ASCII file.

    Staking from a job is the recommended procedure since the sensor is reading a filein a binary format and the search routines are available. This makes the stakeout

    job a lot faster to complete.

    To create a stake out job file, simply import an ASCII file of target points into SKI-Proand assign the points to either a project or a coordinate set (project is preferable).Then using the Sensor Transfer function in SKI-Pro, export the project or coordinateset to the PCMCIA card (stored in the GEODB directory). The points will now beavailable as a job on the sensor.

    OR

    An ASCII file of points may also be converted into a job on the PCMCIA card using aSystem 500 GPS receiver.

    CoordinateSystem

    Target points may be loaded in grid (Northing, Easting, & Height) or geodetic(Latitude, Longitude, & Height) format.

    When staking grid points, there must be a coordinate system attached to the job.

    This may be a coordinate system derived from a 1-step or 2-Step transformation, ora classical projection (State Plane coordinates, for example). (See Chapter 5Coordinate Systems and Chapter 6 Local Coordinate Systems.)

    Jobs If staking from a job and storing surveyed positions for the staked points, it isrecommended that you store the surveyed coordinates in another job. Storing thecoordinates to a separate job allows you to download only the surveyed pointswithout having to download the target point file.

    The configuration for staking from one job and storing in another is shown in Step 2 ofSections 4.1 and 4.2.

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    42/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 42

    4.0 Real Time Stake Out, Continued

    In this chapter The following sections of this chapter explain the procedures for staking out pointsand lines.

    Section Topic

    4.1 Stake Out Points

    4.2 Stake Out Lines

  • 7/28/2019 Rt k Quick Guide

    43/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 43

    4.1 Stake Out Points

    Step Action Display

    1 In the MAIN\ menu:

    Select menu option 2 Stake-Out.

    This takes you to the STAKE-OUT\ Begin screen.

    2 In the STAKE-OUT\ Begin screen:

    Here we can select:

    Config Set: RTK rover configuration

    Stake Pts: Job with target points

    Store Pts: Job to store surveyed points

    Stake Type: Point

    Codelist: Code list

    Antenna: Antenna type, and

    Ant Height: Antenna height.

    Press the F3 (LOG) button to activate a logfile (optional). (See Step 3 below.)

    If we were to stake from an ASCII file, we wouldpress the F4 (ASCII) button to select that file, butin this example we are staking from a job.

    3 In the STAKE-OUT\ Define Log File screen:

    Optional Log File

    Use the left/right arrow buttons to change theType from none.

    Choose Short orLong form of the log file.

    Enter a file name for the log file.

    Press the F1 (CONT) button.

    This returns you to the STAKE-OUT\ Begin screen.

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    44/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 44

    4.1 Stake Out Points, Continued

    Step Action Display4

    In the STAKE-OUT\ Begin screen:

    Press the F6 (CSYS) button to attach acoordinate system to the stakeout job.

    This takes you to the COORDSYS\ Coord Sysscreen

    5 In the COORDSYS\ Coord Sys screen:

    Use the up/down arrow buttons to select a

    coordinate system.

    Press the F1 (CONT) button.

    This returns you to the STAKE-OUT Begin screen.

    Press the F1 (CONT) button.

    This takes you to the STAKE-OUT\ screen.

    6 In the STAKE-OUT\ screen:

    Select a method to orient the job.

    Here you can select what will be the orientation ofthe survey. Or in other words, what will be yourNorth up.

    In this example we are orienting our survey to aknown point. In many instances the referencestation is a good orientation point because you cansee it from your project area.

    Select an orientation point.

    In the display to the right, the orientation field is thehighlighted field.

    In this example we are using the point ref as ourorientation point. It will now be our North in thestake out display.

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    45/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 45

    4.1 Stake Out Points, Continued

    Step Action Display

    7 Continuing in the STAKE-OUT\ screen:

    Select a point to be staked out.

    In this example the point 5 is to be staked out.

    Once you are close enough to the point (when theOut, Right, and Cut fields are acceptably close to0.0):

    Press the F1 (OCUPY) button to survey thetarget stake out point.

    This takes you to the STAKE-OUT\ Occupy Pointscreen.

    8 In the STAKE-OUT\ Occupy Point screen:

    Because Auto Store was set to No in this realtime rover configuration (see Chapter 9Configurations), the display on the right appears.

    Change the Point Id if desired.

    The F2 (Diff) button appears because in theCONFIGURE\ Stake-Out screen, Diff Check wasset to Pos + Hgt and a limit of 0.07m was used.(See Chapter 9 Configurations.)

    Press the F2 (DIFF) button to see coordinatedifferences.

    This takes you to the STAKE-OUT\ OccupyDifferences screen.

    9 In the STAKE-OUT\ Occupy Differences screen:

    The sensor will display the differences betweendesign and staked coordinates.

    Press the F1 (STORE) button to store the

    coordinates.

    This returns you to the main STAKE-OUT\ screen.

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    46/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 46

    4.1 Stake Out Points, Continued

    Step Action Display

    10 In the MAIN\ STAKE-OUT\ screen:

    Notes on the available function buttons:

    F2 (POLAR orORTHO) switches navigationdisplay from Orthogonal to Polar view.

    F3 (REVRS) - reverses orientation by 180degrees.

    F4 (REDRW) - redraws the graphical display.

    F6 (INIT) - forces a new initialization.

    F5 (PCKUP) allows you to survey non-targetpoints. This allows you to measure points thatare not in your stake out job. This is usefulwhen you come upon an unexpected surveymonument during your stake out job and you

    must measure it.

    Press the F5 (PCKUP) button.

    This takes you to the STAKE-OUT\ Occupy Pointscreen.

    11 In the STAKE-OUT\ Occupy Point screen:

    Here you can measure as many points as you likethat are not in your stake out job.

    To measure a point:

    Press the F1 (OCUPY) button.

    Press the F5 (ADD) button to add annotations(optional).

    Press the F6 (INIT) button to re-initialize(optional).

    Once measurement of non-stake out points iscompleted,

    Press the SHIFT button.

    This makes the F2 (STAKE) button active.

    Press the F2 (STAKE) button.

    This returns you to the STAKE-OUT\ screen.

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    47/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 47

    4.1 Stake Out Points, Continued

    Near Function The near function compares the receivers antennas current position with the co-

    ordinates of all points stored in the currently active job. Once the point closest to theusers current position is found, the point ID of this point is copied into the Point IDfield in the survey/stake-out screen.

    Step Action Display

    12 In the STAKE-OUT\ screen:

    Press the SHIFT button.

    This displays more F key functionality.

    13 Continuing in the STAKE-OUT\ screen:

    Press the F2 (NEAR) button.

    This causes the sensor to search the database

    and select the closest point to the current locationof the receivers antenna.

    14 Continuing in the STAKE-OUT\ screen:

    In this example the point ref was found to be theclosest.

  • 7/28/2019 Rt k Quick Guide

    48/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 48

    4.2 Stake Out Lines

    Line Definition Lines can be defined in a number of ways: (Start and End Point) or(Start Point + Bearingand Distance), etc. The start and end point coordinates can be manually entered during linedefinition or imported from Point Management. Other parameters that can be set include:

    Station along the line to begin stake out Horizontal and Vertical offset

    Station increment for stake out, and

    Scale factor for distance along the line.

    Step Action Display

    1 In the MAIN\ menu:

    Select menu option 2 Stake-Out.

    This takes you to the STAKE-OUT\ Begin screen.

    2 In the STAKE-OUT\ Begin screen, select:

    Config Set: RTK Rover Configuration

    Stake Pts: Job with target points

    Store Pts: Job to store surveyed points

    Stake Type: Grid

    Codelist: Code List

    Antenna: Antenna type, and

    Ant Height: Antenna Height

    Press the F4 (ASCII) button to switch from jobto ASCIIfileto stake from.

    Press the F6 (CSYS) button to selectcoordinate system.

    Press the F3 (LOG) button to activate a logfile.

    This takes you to the STAKE-OUT\ Define Log Filescreen.

    3 In the STAKE-OUT\ Define Log File screen:

    Choose Short orLong formof the log file.

    Enter a file name for the log file.

    Press the F1 (CONT) button.

    This takes you to the STAKE-OUT\ screen.

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    49/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 49

    4.2 Stake Out Lines, Continued

    Step Action Display

    4 In the STAKE-OUT\ screen:

    Set Orient to: Line.

    Use the up/down arrow buttons to highlight theLine field.

    Press the ENTER button to list all lines in theLine list box.

    This brings up a Line list box showing all availablelines.

    5 In the Line list box:

    Select the line to be staked and proceed toStep 10.

    OR

    Press the F2 (NEW) button to create a newline.

    This takes you to the STAKE-OUT\ Line Definitionscreen.

    6 In the STAKE-OUT\ Line Definition screen:

    Enter a name for the line. (In this example theline is called Line 1.)

    Select the line type.

    Arrow down to the first coordinate value.

    Press the F4 (IMPRT) button to select thestart point of the line.

    This takes you to the Local Points list box.

    7 In the Local Points list box:

    Select the start point of the line.

    Press the F1 (CONT) button.

    This takes you back to the STAKE-OUT\ LineDefinition screen.

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    50/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 50

    4.2 Stake Out Lines, Continued

    Step Action Display

    8 In the same STAKE-OUT\ Line Definition screen:

    Arrow down to the second coordinate value.

    Press the F4 (IMPRT) button to select the endpoint of the line.

    This takes you to the Local Points list box.

    9 In the Local Points list box:

    Select the end point of the line.

    Press the F1 (CONT) button.

    This takes you back to the STAKE-OUT\ LineDefinition screen.

    10 In the STAKE-OUT\ Line Definition screen:

    After defining the line type and choosing the startand end points of the line:

    Press the F1 (CONT) button.

    This takes you back to the list box from step 5.

    11 In the list box:

    Select the line.

    Press the F5 (PARAM) button to define lineparameters.

    This takes you to the STAKE-OUT\ Grid screen.

    12 In the STAKE-OUT\ Grid screen, set the:

    Station Beg: 1st

    Station to stake

    Horz Offset: Horizontal offset to

    staked line Vert Offset: Vertical offset to

    staked line

    Station Inc: Increment to stake

    Scale Factor: optional.

    Press the F1 (CONT) button to return to theSTAKE-OUT\ screen.

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    51/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 51

    4.2 Stake Out Lines, Continued

    13 In the STAKE-OUT\ screen:

    Navigate to the first station on line.

    Note: The system is oriented to the line and:

    In/Out refer to distances along the line.

    Left/Right refer to distance perpendicularto the line.

    Press the F1 (OCUPY) button to survey thestation.

    This takes you to the STAKE-OUT\ Occupy Pointscreen.

    14 In the STAKE-OUT\ Occupy Point screen:

    Change the Point Id if desired.

    Enter the Point Code.

    Press the F2 (DIFF) button to see coordinatedifferences.

    This takes you to the STAKE-OUT\ OccupyDifferences screen.

    Note: This screen may not appear dependingon the configuration for stake out parameters.

    15 In the STAKE-OUT\ Occupy Differences screen:

    The sensor will display the differences betweendesign and staked coordinates.

    Press the F1 (STORE) button to store thecoordinates.

    This returns you to the main STAKE-OUT\ screen.

  • 7/28/2019 Rt k Quick Guide

    52/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 52

    5.0 Coordinate Systems with Map Projections

    Introduction Coordinate systems are used to transform WGS84 coordinates into localcoordinates. Coordinate systems, as defined on the GPS receiver, consist of thefollowing components:

    Map Projection

    Ellipsoid

    Transformation, and

    Geoid Model.

    Depending on the type of coordinate system you wish to create, you must first defineseveral of the coordinate system components, as follows:

    MapProjections

    A map projection is used to project a curved surface (earths surface) onto a plane(map).

    Map projection examples include:

    Lambert

    Transverse Mercator (TM), and

    Universal Transverse Mercator (UTM).

    State PlaneNAD 83

    State Plane (NAD 83) coordinate systems are based on pre-defined map projectionsand the GRS80 ellipsoid. The GRS80 and WGS 1984 ellipsoids are considered tobe the same. Typical State Plane coordinate system components are:

    Ellipsoid: WGS 1984.

    Projection: Lambert or Transverse Mercator, as defined for each StatePlane Zone.

    Geoid Model: Optional required for conversion from ellipsoidal toorthometric heights.

    Transformation: None.

    Note: No transformation is necessary when converting to NAD 83 State Planecoordinates since the WGS84 and GRS80 ellipsoids are considered essentially thesame (very minor difference in the flattening parameter).

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    53/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 53

    5.0 Coordinate Systems with Map Projections, Continued

    Transform-ations

    When a coordinate system uses an ellipsoid other than WGS 1984, we may define atransformation to account for the shifts in origin and rotations between the twoellipsoids.

    An example of this is the conversion to NAD27 State Plane coordinate system, whichis based on the Clark 1866 ellipsoid.

    UTMCoordinates

    UTM coordinate systems are created in a similar fashion to the State Planecoordinate systems. The user must select the ellipsoid, map projection, and geoidmodel (if required). A transformation is necessary only when converting to anellipsoid other than WGS84.

    Geoid Models Geoid models may also be included in the coordinate system when conversion fromellipsoidal to orthometric heights is required.

    Important Note: All surveyed points are stored in the WGS84 coordinate format regardless of thecoordinate system attached. Non-WGS84 coordinates are always available as longas there is a coordinate system attached.

    A coordinate system must be attached to a job:

    In order to view grid coordinate values of the surveyed points.

    In order to navigate to target points that are stored in grid coordinates.

    In this Chapter The following sections of this chapter describe creating coordinate systems and itscomponents.

    Section Topic

    5.1 Creating a State Plane Coordinate System

    5.2 State Plane Zones

    5.3 Creating a State Plane Projection

    5.3.1 The Lambert Projection

    5.3.2 The Transverse Mercator (TM) Projection

    5.4 The Geoid Model

    5.5 The Classical 3-D Transformation

    5.5.1 Computing the Classical Transformation

  • 7/28/2019 Rt k Quick Guide

    54/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 54

    5.1 Creating a State Plane Coordinate System

    Create NewCoordinateSystem

    State Plane coordinate systems on the GPS receiver consist of several parameters:

    Transformation: If working with a map projection using an ellipsoid other than

    WGS84 or GRS80 (i.e. NAD27). Ellipsoid: Default is WGS84.

    Map Projection: Lambert or Transverse Mercator for U.S. State Plane zones.

    Geoid Model: To model separations between WGS84 ellipsoid heights andNAVD88 orthometric heights.

    Step Action Display

    1 In the MAIN\ menu screen:

    Select menu option 1 Survey.

    Press the F1 (CONT) button.

    This takes you to the SURVEY\ Begin screen.

    2 In the SURVEY\ Begin screen:

    Press the F6 (CSYS) button.

    This takes you to the COORDSYS\ Coord Sys listbox.

    3 In the COORDSYS\ Coord Sys list box:

    Here you may edit or delete an existing coordinatesystem or create a new coordinate system.

    Press the F2 (NEW) button to create a newcoordinate system.

    This takes you to the CONFIGURE\ New CoordSystem screen.

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    55/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 55

    5.1 Creating a State Plane Coordinate System, Continued

    NAD 83

    State PlaneParameters

    When creating State Plane (NAD 83) coordinate systems:

    No transformation is required. Ellipsoid is WGS 1984.

    A State Plane map projection is required (see Sections 5.2 and 5.3).

    The geoid model is only required if you wish to have orthometric heights,otherwise the coordinate system will display ellipsoidal heights.

    Step Action Display

    4 In the CONFIGURE\ New Coord System screen:

    Enter the coordinate system name.

    Select the following:

    Transformation, if required

    Ellipsoid

    Projection

    Geoid Model, if required.

    Press the F1 (CONT) button to store thecoordinate system and return to theCOORDSYS\ Coord Sys list box.

    5 In the COORDSYS\ Coord Sys list box:

    Verify that the new coordinate system is listed.

    Press the ESC button two times to return to

    the MAIN\ menu screen.

    Important Note: SKI-Pro: If you selected North America at the Coordinate System Definitionscreen during the installation of SKI-Pro, you have access to all of the State Planezone map projections. Create a coordinate system in SKI-Pro using a State Plane

    zone and use the Sensor Transfer function in SKI-Pro to transfer the coordinatesystem onto the PCMCIA card and then transfer the coordinate system to thereceivers system RAM (see Section 6.4 for using the Transferfunction).

    If the map projection or Geoid model are not already on the system, they can also becreated on the receiver as shown in the following sections.

  • 7/28/2019 Rt k Quick Guide

    56/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 56

    5.2 State Plane Zones

    Introduction In previous firmware versions, US State-Plane map projections were not directlyavailable on the GPS receiver. To have a State Plane map projection to use in theGPS receiver, in the past we either transferred a coordinate system containing theState Plane map projection from SKI-Pro or created a State Plane map projection onthe GPS receiver and then attached it to a coordinate system (see Sections 5.1 and5.3).

    New to Firmware Version 4.0: We can now install all the US State Plane mapprojections on the GPS receiver to use to create State Plane coordinate systems.

    Recommended In most cases you will not need all the US State Plane zones available to you onyour GPS receiver. We still recommend using SKI-Pro to create the coordinatesystems you require and transfer them to the GPS receiver as needed.

    If you do wish to have all the State Plane zones available on your GPS receiver,please follow the State Plane map projection installation procedure below.

    Step Action Display

    1 In the CONFIGURE\ New Coord System screen(see Section 5.1, Steps 1-4):

    Use the arrow buttons toselect theProjection field.

    Press the ENTER button.

    This takes you to the Projection list box.

    2 In the Projection list box:

    Press the F2 (NEW) button.

    Press the F5 (DEFLT) button.

    This takes you to the Confirmation box in the

    CONFIGURE\ New Coord System screen.

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    57/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 57

    5.2 State Plane Zones, Continued

    Step Action Display

    3 In the Confirmation box of the CONFIGURE\ New

    Coord System screen:

    Press the F5 (OK) button to accept the newState Plane zones

    OR

    Press the F1 (ABORT) button to decline thenew State Plane zones.

    Either button returns you to the CONFIGURE\ New

    Coord System Projection list box.

    4 If you pressed F5 (OK) in the last step, all theState Plane zones are now listed in the Projectionlist box.

  • 7/28/2019 Rt k Quick Guide

    58/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 58

    5.3 Creating a State Plane Projection

    Step Action Display

    1 In the CONFIGURE\ New Coord System screen(see Section 5.3.1):

    Use the arrow buttons toselect theProjection field.

    Press the ENTER button.

    This takes you to the Projection list box.

    2 In the Projection list box:

    Press the F2 (NEW) button.

    This takes you to the CONFIGURE\ NewProjection screen.

    3 In the CONFIGURE\ New Projection screen:

    Select the type of projection you wish tocreate.

    This will bring up a different template depending onthe type of projection selected.

    Enter the projection parameters.

    Press the F1 (CONT) button.

    This returns you to the CONFIGURE\ New CoordSystem screen.

    State PlaneProjections

    The next two sections give examples on creating the following State Plane map projections:

    Lambert 2 Standard Parallel.

    Transverse Mercator (TM).

    Note: UTM Projections: As shown above, the UTM Projection can easily be created.Simply choose the UTM zone and hemisphere. The remaining parameters arepermanently stored and are always available in the system.

  • 7/28/2019 Rt k Quick Guide

    59/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 59

    5.3.1 The Lambert Projection

    ColoradoCentral Zone

    This section lists the steps in creating a Lambert 2 standard parallel projection. Thisexample shows the State Plane projection for Colorado, Central Zone (0502), NAD83.

    Step Action Display

    1 In the CONFIGURE\ New Projection screen, selectthe projection type. Then enter:

    Projection Name

    False Northing

    False Easting, and

    Latitude of Origin.

    Use the down arrow button to scroll to the

    remaining parameters.

    2 In the CONFIGURE\ New Projection screen (no.2):

    Enter the longitude at central meridian.

    Press the F6 (WEST) button to togglelongitude = West.

    Continue below.

    3 In the CONFIGURE\ New Projection screen (no.2):

    Enter the latitude of the 1st

    parallel.

    Enter the latitude of the 2nd

    parallel.

    Press the F1 (CONT) button.

    This takes you back to the Projections list box.

    4 In the Projections list box:

    Check that the new projection is listed.

    Press the F1 (CONT) button.

    This returns you to the CONFIGURE\ New CoordSystem screen.

    Note: See Section 5.1 for instructions on creatingand storing the coordinate system.

  • 7/28/2019 Rt k Quick Guide

    60/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 60

    5.3.2 The Transverse Mercator (TM) Projection

    Arizona WestNAD 83

    This section lists the steps in creating a Transverse Mercator projection. Thisexample shows the State Plane projection for Arizona West, NAD83.

    Step Action Display

    1 In the CONFIGURE\ New Projection screen, selectthe Projection Type. Then enter:

    Projection Name

    False Northing

    False Easting, and

    Latitude of Origin.

    Use the down arrow to scroll to the remainingparameters.

    2 In the CONFIGURE\ New Projection screen (no.2):

    Enter thelongitude at Central Meridian,

    Press the F6 (WEST) button to togglelongitude = West.

    Continue below.

    3 In the CONFIGURE\ New Projection screen (no.2):

    Enter the Scale at the Central Meridian.

    Enter the Zone Width (in degrees).

    Press the F1 (CONT) button.

    This takes you back to the Projections list box.

    4 In the Projections list box:

    Check that the new projection is listed.

    Press the F1 (CONT) button.

    This returns you to the CONFIGURE\ New Coord

    System screen.

    Note: See Section 5.1 for instructions on creatingand storing the coordinate system.

  • 7/28/2019 Rt k Quick Guide

    61/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 61

    5.4 The Geoid Model

    Transfer theGeoidField File

    The geoid model on the GPS receiver is created from a geoid field file. This is asubset of the main geoid model created to cover a particular project area perhapseven a particular state or county.

    The size of the geoid field file is limited to approx 300KB since the receiver haslimited RAM available for storing such files.

    The geoid field file is created in SKI-Pro and transferred to the receiver via thePCMCIA card see Section 1.1.

    Step Action Display

    1 In the MAIN\ menu screen:

    Select menu option 7 Transfer.

    Press the F1 (CONT) button.

    This takes you to the TRANSFER\ Menu screen.

    2 In the TRANSFER\ Menu screen:

    Select menu option 08 Geoid Field File.

    Press the F1 (CONT) button.

    This takes you to the TRANSFER\ Geoid Field Filescreen.

    3 In the TRANSFER\ Geoid Field File screen, selectthe following:

    From: PC-Card

    To: Sensor

    Geoid File: Geoid field file to transfer.

    Press the F1 (CONT) button to transfer thefile.

    This returns you to the MAIN\ menu screen.

    Note: The geoid model is automatically created onthe sensor with the same name as the geoid fieldfile.

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    62/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 62

    5.4 The Geoid Model, Continued

    Attach theGeoid Model

    The geoid model must be attached to a coordinate system to be able to access orthometricheights.

    Step Action Display

    4 In the COORDSYS\ screen (see Section 5.1):

    Select the coordinate system to edit.

    Press the F3 (EDIT) button.

    This takes you to the CONFIGURE\ Edit CoordSystm screen.

    5 In the CONFIGURE\ Edit Coord Systm screen:

    Select the Geoid Model field.

    Press the ENTER button.

    This takes you to the Geoid Model list box.

    6 In the Geoid Model list box:

    Selectthe geoid model to attach.

    Press the F1 (CONT) button.

    This returns you to the CONFIGURE\ Edit CoordSystm screen:

    7 In the CONFIGURE\ Edit Coord Systm screen:

    Verify that all parameters have been properlyentered.

    Press the F1 (CONT) button several times tostore the coordinate system and return to thescreen where you started.

  • 7/28/2019 Rt k Quick Guide

    63/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 63

    5.5 The Classical 3-D Transformation

    Introduction A Classical3-D Transformation can be defined on board the sensor.

    It is only required when converting to a coordinate system that is defined with anellipsoid other than WGS 1984.

    This example shows the conversion to NAD27 State Plane coordinates.

    TransformationParameters

    The Classical 3-D is a seven parameter transformation, which includes:

    3 shifts,

    3 rotations, and

    1 scale.

    Hand EnteringTransformationParameters

    If the transformation parameters are known, the transformation can be setup usingthese values. The procedure for hand entering the transformation parameters is thesame as for creating a new projection (See Section 5.3). The only difference is thatyou must choose transformation instead ofprojection from the CONFIGURE\ NewCoord System screen.

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    64/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 64

    5.5 The Classical 3-D Transformation, Continued

    ComputingTransformationParameters

    When the transformation parameters are not known, the transformation can becomputed on-board the sensor. Accurate height information is required in order tocompute an accurate 3-D transformation.

    The following must be available on the sensor in the WGS84 coordinate system:

    WGS84 Coordinate System:

    WGS84 ellipsoid (This stored in the permanent memory of the receiver).

    Points with WGS84 geodetic coordinates (latitude, longitude, & ellipsoidheight).

    These may be surveyed positions or previously known values.

    Coordinates must be stored in a job.

    The following is required on the sensor in the local coordinate system:

    Local Coordinate System (grid):

    Local ellipsoid (Clark 1866 for NAD27 for example).

    Local projection.

    Points with local grid coordinates (North, East, & Height).

    Note: Coordinates may be stored in a job or an ASCII file.

    OR

    Local Coordinate System (geodetic):

    Local ellipsoid (Clark 1866 for NAD27 for example).

    Points with local geodetic coordinates (latitude, longitude, and ellipsoidheight).

  • 7/28/2019 Rt k Quick Guide

    65/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 65

    5.5.1 Computing the Classical Transformation

    Name theTransformation

    Name the transformation and coordinate system to be created. Select the job containing theWGS84 points and the job (or ASCII file) containing the local points.

    Step Action Display

    1 In the MAIN\ menu screen:

    Select menu option 3 Applications.

    Press the F1 (CONT) button.

    This takes you to the APPLICATION\ Menu

    screen.

    2 In the APPLICATIONS\ Menu screen:

    Select menu option 01Determine CoordSystem.

    Press the F1 (CONT) button.

    This takes you to the COORDSYS\ DeterminationBegin screen.

    3 In the COORDSYS\ Determination Begin screen:

    Name the coordinate system to be created.

    Select the WGS84 points.

    Select the local points (Job or ASCII file).

    Press the F1 (CONT) button.

    This takes you to the COORDSYS\ Type Selectionscreen.

    Notes:

    The local points refer to the coordinates in the

    target coordinate system. Use the F4 (LOCAL) button to switch from

    ASCII to Job format for the local points.

    Although the F5(AUTO) button can be usedto automatically match all common points andcompute the transformation, this is NOTarecommended procedure.

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    66/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 66

    5.5.1 Computing the Classical Transformation, Continued

    Match CommonPoints

    Match common points in both coordinate systems. Points may be matched inposition only, height only, or both position and height.

    Step Action Display

    4 In the COORDSYS\ Type Selection screen:

    Toggle the Trans Type = Classical.

    Then, select the:

    Ellipsoid = ellipsoid for target coordinatesystem.

    Projection = projection for target system.

    Press the F1 (CONT) button.

    This takes you to the COORDSYS\ DetermineClassical screen.

    5 In the COORDSYS\ Determine Classical screen:

    Match common points in position and/orheight.

    Press the F1 (CONT) button to compute thetransformation.

    This takes you to the COORDSYS\ Residualsscreen.

    Notes:

    Use the down arrow button to view all points.

    The system will automatically match pointswith identical point Ids.

    Use the F2 (NEW) buttonto match commonpoints that do not have identical point Ids.

    Use the F4 (DEL) button to delete points from

    the match list.

    Use the F5 (MATCH) button to change howpoints are matched.

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    67/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 67

    5.5.1 Computing the Classical Transformation, Continued

    Store theTransformation

    Examine the residuals and store the coordinate system and transformation.

    Step Action Display

    6 In the COORDSYS\ Residuals screen:

    Examine the residuals to determine how theGPS coordinates fit the local control points.

    Use the down arrow button to view allresiduals.

    Press the F5 (INFO) button to view the height

    residuals.

    This takes you to the Height Residuals list.

    7 In the Height Residuals list box:

    Examine the height residuals.

    Use the up/down arrow buttons to see allresiduals.

    Press the F3 (RESLT) button to view the

    transformation parameters.

    This takes you to the COORDSYS\ Parametersscreen.

    Continued on next page

  • 7/28/2019 Rt k Quick Guide

    68/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 68

    5.5.1 Computing the Classical Transformation,Continued

    Step Action Display

    8 In the COORDSYS\ Parameters screen:

    Examine the transformation parameters.

    Use the up/down arrow buttons to view allparameters.

    Press the F1 (CONT) button.

    This takes you to the COORDSYS\ Save CoordSystem screen.

    9 In the COORDSYS\ Save Coord System:

    Verify the number of matched points.

    Verify that the largest residuals are withinacceptable tolerances.

    Press the F1 (CONT) button to store thetransformation and coordinate system.

    This returns you to the MAIN\ menu screen.

  • 7/28/2019 Rt k Quick Guide

    69/167

    System 500 Real Time Surveying Quick Guide Version 4.0

    Leica Geosystems Inc.June, 2002 69

    6.0 Local Coordinate Systems

    Introduction A local coordinate system can be created to use on projects where ground basedgrid coordinates are required. The distance between such grid coordinates willmatch measured ground distances without the need to apply a scale factor. Theselocal coordinate systems can be created using one of the following methods:

    the Local Transverse Mercator (TM) projection

    the 1-Step Transformation, and

    the 2-Step Transformation.

    Local TMProjection

    A coordinate system using the Local Transverse Mercator projection is designed foruse on projects where existing grid coordinates are not available.

    This coordinate system uses a modified Transverse Mercator (TM) projection whichemploys a height scale factor for conversion to ground based grid coordinates.This requires manual computation of a height scale factor for use in the projection.

    1-StepTransformation

    The 1-Step Transformation is used to map the GPS derived WGS84 coordinatesonto an existing local-grid coordinate system.

    This is a two-stage transformation:

    2-D Helmert for horizontal transformation.

    1-D vertical height shift.

    The 1-Step transformation is the only component required in creating this coordinatesystem. No ellipsoid, map projection, or geoid model is required.

    2-StepTransformation The 2-Step Transformation is similar to a 1-Step, however, positions and height can

    be treated separately or together.

    This is a three-stage transformation:

    1. WGS 84 coordinates are transformed using a Classical 3-D pre-transformation.2. The Cartesian coordinates are projected onto a preliminary grid using the local

    ellipsoid and projection.3. 2-D Helmert transformation is applied to transform preliminary coordinates to

    real local coordinates.

    MaximumProject Size

    To minimize scale distortions, the project area for Local TM and 1-StepTransformations must not exceed a maxim