RRP Resettlement Plan · The abbreviated resettlement action plan for this subproject was developed...
Transcript of RRP Resettlement Plan · The abbreviated resettlement action plan for this subproject was developed...
Resettlement Plan
December 2019
Solomon Islands: Tina River Hydropower Project Tina River 66kV Transmission Line Subproject
Prepared by the Government of Solomon Islands through Solomon Power for the Asian Development Bank.
CURRENCY EQUIVALENTS (as of 31 December 2019)
Currency unit – solomon islands dollar (SI$)
SI$ 1.00 = $ .12 $1.00 = SI$ 8.21
ABBREVIATIONS
ARAP – Abbreviated Resettlement Action Plan COL – Commissioner of Lands FTE – Fixed Term Estate LO – Land owners LTA – Land and Titles Act MLHS – Ministry of Lands Housing and Survey OP – World Bank Operation Policy PAP – Affected Person PE – Perpetual Estate PESRA – Preliminary Environmental and Social Risk Assessment SIG – Solomon Islands Government SINEP – Solomon Islands National Energy Policy SP – Solomon Power TRHDP – Tina River Hydro Development Project
NOTE
In this report, "$" refers to United States dollars This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
2
Contents DOCUMENT TRACKING ................................................................................................................................. 4
List of Abbreviations ...................................................................................................................................... 5
Definitions ..................................................................................................................................................... 5
1.0 Introduction ...................................................................................................................................... 6
1.1 Background ......................................................................................................................................... 6
1.2 Project description and Components .................................................................................................. 7
1.3 Objectives and Key principles of ARAP ................................................................................................ 8
2.0 Legal and Regulatory Frameworks .................................................................................................... 9
2.1 The Solomon Islands legislation .......................................................................................................... 9
2.2 World Bank Operation Policy OP 4.12 – ........................................................................................... 10
2.3 Legal Gap Analysis ............................................................................................................................. 10
3.0 Scope of Land Acquisition and Resettlement ................................................................................. 11
4.0 Census survey and Asset Inventory ................................................................................................ 12
4.1. Enumeration of affected people ...................................................................................................... 12
4.2 Social Baseline ................................................................................................................................... 16
4. 3 Gender Impacts ................................................................................................................................ 23
5.0 Valuation of assets .......................................................................................................................... 24
5.1. Valuation of Non-Land Assets .......................................................................................................... 24
5.2 Valuation of Land Assets ................................................................................................................... 25
6.0 Compensation and Assistance ........................................................................................................ 27
7.0 Consultations .................................................................................................................................. 30
7.1Stakeholder ........................................................................................................................................ 30
7.2 Consultation ...................................................................................................................................... 30
7.3 Disclosure of Resettlement Plan ....................................................................................................... 30
7.4 Results of Consultations .................................................................................................................... 30
8.0 Implementation .............................................................................................................................. 32
8.1 Institutional Arrangement ................................................................................................................ 32
8.2 Implementation Schedule ................................................................................................................. 33
9.0 Grievance Redress Mechanism ....................................................................................................... 35
9.1 Government Policy for Grievance Redress ....................................................................................... 35
9.2 During Construction and Operations ................................................................................................ 35
3
10.0 Monitoring Arrangements .............................................................................................................. 37
11.0 Budget and financial arrangements ................................................................................................ 38
12.0 References ...................................................................................................................................... 39
Appendix ..................................................................................................................................................... 40
Tables
Table 1: High Level Schedule for Construction of the proposed transmission line ...................................... 7
Table 2: Gap Analysis .................................................................................................................................. 10
Table 3: Estimated Population, subproject neighborhood ......................................................................... 13
Table 4: Affected people and crops ............................................................................................................ 14
Table 5: Affected People and structures..................................................................................................... 14
Table 6: Affected people and land assets ................................................................................................... 16
Table 7: Sources of Income ......................................................................................................................... 19
Table 8: Water usage in the communities .................................................................................................. 19
Table 9: Non-Land Assets ............................................................................................................................ 24
Table 10: Valuation of Shed and Building ................................................................................................... 25
Table 11: Easement Particulars ................................................................................................................... 26
Table 12: Easement Rates based initial valuation report ........................................................................... 27
Table 13: Value of Easements based on the initial valuation report .......................................................... 27
Table 14: Crops and payment values ......................................................................................................... 27
Table 15: Value of structures ...................................................................................................................... 29
Table 16: Consultation issues and measures suggested ............................................................................. 30
Table 17: Implementation schedule ........................................................................................................... 33
Table 18: Monitoring Indicators ................................................................................................................. 37
Table 19 Tentative Budget for implementation of ARAP ........................................................................... 38
Figures
Figure 1: Four (4) Route Options Studied ..................................................................................................... 6
Figure 2: Selected transmission line route.................................................................................................. 12
Figure 3: Villages along proposed Transmission Line Route ....................................................................... 13
Figure 4: Age Groups ................................................................................................................................... 17
Figure 5: Gender ......................................................................................................................................... 18
Figure 6: Household Income ....................................................................................................................... 18
Figure 7: Sanitation ..................................................................................................................................... 20
Figure 8: Religious Groups .......................................................................................................................... 21
Figure 9: Occupation ................................................................................................................................... 22
4
DOCUMENT TRACKING
Document title: Abbreviated Resettlement Action Plan: Tina 66kV Transmission Line Subproject
Document file path: G:\20. Project Management\OTHER FOLDERS AND DOCUMENTS\Environmental and social works\WB\66kV line\Draft 3
Date First Issued: June 2019
Prepared by: Solomon Power
Approved by:
Document History and Status
Revision Date issued Reviewed by Approved by Date approved
Draft1 June 2019 Jeremy, Anees and Hemant
Draft 1 July 2019 WB
Draft 2 October 2019 WB
Draft 3 November 2019 WB
Draft 4 December 2019 WB
Personal names of affected people and others met during consultations have been redacted in this version of the Resettlement Action Plan.
5
List of Abbreviations
ARAP Abbreviated Resettlement Action Plan
COL Commissioner of Lands
FTE Fixed Term Estate
LO Land owners
LTA Land and Titles Act
MLHS Ministry of Lands Housing and Survey
OP World Bank Operation Policy
PAP Affected Person
PE Perpetual Estate
PESRA Preliminary Environmental and Social Risk
Assessment
SIG Solomon Islands Government
SINEP Solomon Islands National Energy Policy
SP Solomon Power
TRHDP Tina River Hydro Development Project
WB World Bank
Definitions a. Customary land – land under custom which is owned by the community or land owned by the
indigenous people.
b. Building – House, out-house or other roofed structure whether brick, wood, mud, metal or any
other material but not tent.
c. Pole – supporting structures for overhead line conductors.
6
1.0 INTRODUCTION
1.1 Background
The Government of Solomon Islands (SIG), through Solomon Power (SP) as the agency responsible for
generation and transmission of electricity in Solomon Islands, is embarking on the construction of a 66kV
transmission line from the proposed Tina Hydro Plant to its existing Lungga Power Station. This activity
falls under component 3 of the Tina River Hydro Development Project (TRHDP).
TRHDP is composed of four (4) project components as outlined below:
• Component 1 – Tina River Hydropower Facility
• Component 2 – Access Roads
• Component 3 – Transmission lines
• Component 4 – Technical Assistance
SP has completed a detailed concept design together with consultants from Entura, which includes risk
assessment of four (4) route options. The assessment concluded option 2 has minimal and least
environment and social impacts compared to the other options.
Figure 1: Four (4) Route Options Studied
In June 2019, SP conducted an assessment of the selected route and made minor changes to sections of
the route to avoid resettlement issues, gardens and creeks.
This ARAP describes procedures, entitlements, implementation arrangements on land acquisition and
compensation for affected people and communities. The ARAP is based on the World Bank (WB)
Involuntary Resettlement Policy OP 4.12 and the ARAP guidance note designed for this subproject. The
7
ARAP guidance note was developed according to WB safeguards policies and the Solomon Islands Land
Titles Act procedures for land acquisition purposes. It will be collectively implemented by the Ministry of
Lands, Housing and Survey (MLHS) and SP. Updating the ARAP will be the responsibility of SP at the
detailed design stage and resubmitted to WB for approval.
1.2 Project description and Components
The 66kV subproject is a transmission line project to connect the proposed Tina Hydro Plant to be located
in East Guadalcanal to Lungga Power Station (East of Honiara). At a later stage a teed connection will be
made to the above line which will be extended to a proposed 66kV/33kV substation at Tanagai (West of
Honiara). This teed line to Tanagai is not part of Component 3. The TRHDP is a national commitment and
SP is responsible for component 3 of the project. The TRHDP aims to provide consistent, reliable and clean
energy supply to meet the demand for power in Honiara City. This is in response to growing energy
demand exacerbated by urbanization, the high cost of fuel and global commitment to reduction of carbon
emission.
As per the detailed concept design, a dual single circuit configuration for N-1 contingency with 3-4m
concrete foundation and Krypton AAA/1120 cable conductors is proposed. Pole types will be rectified at
the detail design stage when further engineering information is available. Relevant apparatus including
cross-arms, surge arrestors, insulators, and guy wires to name a few will be installed on the poles. Given
the distance of some spans, an appropriate technology is recommended for stringing the conductors. The
tension should not exceed maximum horizontal tension or tension recommended by the manufacturer.
Access to construction sites can be through air and land. On land, SP will need to upgrade the existing
roads to access the transmission route and the poles. SP survey recorded a few road networks that could
be upgraded to minimum road standards to facilitate movements during construction and maintenance.
In the air, a helicopter can be used for transportation and stringing of conductors.
SP is responsible for construction of the full length of the transmission line from proposed Tina Hydro
Plant to Lungga Power Station. As for the environmental, social assessments and easement acquisitions,
SP is only responsible for the portion of the line from Malango junction to Lungga power station. Tina
Hydro Project Office is responsible for environmental, social assessments and easement acquisitions in
remaining areas between the proposed Tina Hydro Plant to Malango junction.
According to the tentative schedule below, SP is planning to complete detailed design stage of the
proposed transmission line by second quarter of 2020 and construction work to commence in the first
quarter of 2021. The construction and commissioning of the transmission line is expected to be completed
by the fourth quarter of 2023.
Table 1: High Level Schedule for Construction of the proposed transmission line
Activities 2020 2021 2022 2023
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Detailed Design
Tender
Construction
Commissioning
8
1.3 Objectives and Key principles of ARAP
Provide support to the SIG enabling connectivity from Tina Hydro to Lungga Power station and Tanagai
substation through the construction of transmission lines and its associated apparatus.
Key objective in the resettlement planning and implementation established by OP/BP 4.12
• Avoid or reduce involuntary resettlement where feasible.
• Helping affected people improving their previous standard of living.
• Encourage community participation in planning and implementing the ARAP.
The key principle in the ARAP established is based on the WB OP 4.12;
• Explore all alternative subproject designs to avoid or reduce involuntary resettlement where
feasible.
• This ARAP and subproject design should be conceived as sustainable development programs to
help the affected people benefit from the subproject activities.
• Where monetary compensation is appropriate, all affected people are given compensation at
replacement cost for loss of assets.
• Affected person whether regardless of the legal status of their land use are given compensation
for non-land asset loss.
9
2.0 LEGAL AND REGULATORY FRAMEWORKS
The abbreviated resettlement action plan for this subproject was developed based on the Solomon Islands
Law on land acquisition and the WB’s Safeguard Policy (WB OP 4.12 – Involuntary Resettlement).
2.1 The Solomon Islands legislation
▪ Constitution of Solomon Islands – SI Constitution provides additional safeguards for the
compulsory acquisition of customary land. As the project will have minor impacts on the area and
requires small area of customary land for acquisition, it will follow the process in the constitution
(Chapter XI – Land, 112-Customary Land).
▪ Solomon Islands National Energy Policy, 2014 – SINEP provides bases for proper coordination,
planning, promotion, development and management, and efficient use of energy resources (sub-
section 2.2). SINEP regulates all supply of energy resources in the Solomon Islands, thus the
subproject will follow the procedures in the policy as it will provide efficient supply of electricity
to the people.
▪ Environment Act 1998 & Environment Regulations 2008 – In the Solomon Islands, the
environment is governed by the Environmental Act & the Environment Regulations. These two
encompass the process, procedures and the establishment of Ministry of Environment
Conservation Disaster Management and Meteorology (MECDM) to regulate them. In any
development project proposal, the Environmental Act and Environmental Regulations are
necessarily required to assess the potential environmental and social impacts likely to occur. The
subproject will have some influence on the natural environment as the poles or towers require
clearing of land. Thus, the project will also be guided by the Environmental Act.
▪ Labor Act 1978 – Labor relations in the Solomon Islands are guided by the Labor Act, to secure
workers’ rights from being overlooked by their employers. The subproject involves clearing of
vegetation along the transmission route and engineering construction, this requires considering
the rights of the workers in terms of wages. Thus, the subproject will comply with the Labour Act,
section 19 & 22.
▪ Safety at Work Act 1996 – In the Solomon Islands, employees’ health and safety is safeguarded
by the Safety at Work Act 1996 (part I & II). Since the subproject involve clearing of site and
engineering construction, hence, the safety and work act is mandatory. Thus, the subproject will
ensure the Safety at Work Act is complied.
▪ Lands and Title Act 1988 (amended 1996) – In the Solomon Islands land tenure system is based
on the Lands and Title Act 1988. It covers management of land, defines customary land, and sets
out procedures for land acquisition. About 85% of the total land is under customary ownership.
Customary land tenure supports the village-based subsistence farming. Land easement for the
subproject will follow the processes described on negotiated land purchase within the Lands and
Title Act.
▪ Electricity Act 1969 (edited-1996) – The supply of electricity in the Solomon Islands is guided by
the Electricity Act. It covers the power to the authority, among others to enter and dig out and
consult with relevant parties and provide notice prior work will be conducted (Part VI, section 34).
Construction of the electrical transmission will follow the process in the Electricity Act and the
Lands and Title Act.
10
2.2 World Bank Operation Policy OP 4.12 –
The WB involuntary resettlement policy OP 4.12 has been triggered for the subproject. As a result, this
ARAP was developed. OP 4.12 requires WB-supported subprojects to (i) avoid resettlement impacts
wherever possible; (ii) minimize impacts by exploring subproject and design alternatives; (iii) enhance,
or at least restore, the livelihoods of all affected peoples (APs) in real terms relative to pre-subproject
levels; and (iv) improve the standards of living of the affected poor and other vulnerable people. It
covers both physical displacement and economic displacement.
2.3 Legal Gap Analysis
The gaps between OP 4.12 and Solomon Islands law requirements on land acquisition and resettlement
have been identified and required gap-filling measures developed to meet the requirements of OP
4.12.The Gap Analysis is shown in Table 2 below:
Table 2: Gap Analysis
Solomon Islands Laws World Bank Safe guide Policies Gap-Filling Measures
Lands and Title Act 1988 –
ignores informal settlers from
receiving compensation if they
do not have a valid license of
occupation or land title.
Does not provide for
compensation for structures if
they are illegal or encroaching.
Op 4.12 – Involuntary Resettlement
– states that, compensation is
provided to any party that loses
access to livelihood, including
informal settlers.
Compensation will be applied to
both formal and informal settlers.
All APs including non-titled will be
entitled to compensation for
existing structures or assets within
the transmission corridor identified
before the cut-off date.
Compensation for crops/trees
based on MAL rates.
The use of market rates or
replacement cost.
Crops/trees compensated at
replacement rates.
Does not provide for lost
income/livelihoods resulting
from acquisition of land or
assets.
Livelihoods to be restored to at least
pre-project conditions.
SP will restore livelihoods and
mitigate any lost income.
Does not require preparation of
a plan or report setting out
acquisition, compensation or
other measures.
Requires plan prepared to elaborate
APs’ entitlements, livelihood
restoration measures,
implementation arrangements, and
budget.
The assessment and planning will be
based on level of significance of
impacts.
11
3.0 SCOPE OF LAND ACQUISITION AND RESETTLEMENT
The subproject does not involve displacement of people. A screening exercise conducted for the
subproject indicated that it would require only the removal of 1 shed and 1 incomplete building. There
will be possibility of loss of these structures and some trees and crops being removed. Affected persons
will be compensated at full replacement value for all such losses.
There will be land acquisition under the subproject for easement of the 50m corridor. The corridor passes
through registered lands with substantial sections on perpetual owned land. Perpetual Estate lands are
freehold lands. A registered PE holder owns the land forever. The most significant perpetual land areas
are owned by the Commissioner of Lands and the Seventh Day Adventist Church. Other owners
of perpetual land affected by the subproject include Levers Solomon Limited and five individuals are
Fix term Estates holders who own coconut and cocoa plantations in the initial 6.7km of the route.
Majority of the people who settled or do farming in the area are either informal or have some kind
of understanding with the FTEs and PEs owners. These people are from Malango, Weather coast
of Guadalcanal and a few others from other provinces in the country. The Bebe and Kongha
communities comprised of families and households who shared a common descendant.
In compliance with the national legislation, SP in this project will deal with registered owners only for
land matters, however SP will ensure informal settlers are properly compensated for non-land assets
affected by the subproject. A topo/cadastral survey will commence soon to determine legal corridor/
route.
Efforts will be made to minimize the impacts associated with construction and operation of the
transmission line. Impacts will be avoided where possible, which will be achieved by leaving and crops or
trees in place if their removal is not essential. This is particularly the case for small scale gardens or low
height crops. Consultation will take place once detailed design is confirmed and measure to minimize
impacts will be further documented.
12
Figure 2: Selected transmission line route
4.0 CENSUS SURVEY AND ASSET INVENTORY
4.1. Enumeration of affected people
The subproject is located in Malango ward that has population of 10532 people1. Four communities are
located immediately along and near the transmission corridor. The estimated population of the three
communities is shown in Table 3 below. There are several villages located further inland.
1 Solomon Island Government, Ministry of Finance &Treasury, Census bulletin report 2010.
13
Figure 3: Villages along proposed Transmission Line Route
Table 3: Estimated Population, subproject neighborhood
Village/Community Location Population
Grass 160.080298°, -9.465163° 132
Bebe 160.050085°, -9.474245° 240
Konga 160.102673°, -9.471760° 180
Kolina 2 160.039066°, -9.465491° 132
Total 684
During the preparation phase, Levers Solomon Limited, five individuals and 20 informal settlers will be
compensated for losses caused to their crops. Refer to table 4 below. These people stand to lose
coconut and cocoa plantations including gardens, comprising bananas, pawpaws, potatoes, cassavas,
taros, kakakes, melons, pumpkins, corns, tomatoes and eggplants. The inventory list shown in Table 4
is an initial list of owners and crops identified (redacted for privacy). It is likely that during the detail
design there maybe additional crops affected and this RP will be updated accordingly.
There are no major impacts being anticipated on the affected people as they stand to lose few
crops, some of which will be harvested even before the transmission line is constructed. The easement
will be signed for a period of sixty (60) years and will be renewed when it expires. No impacts are
anticipated in the future since the easement area will be accessible to the landowners except in the
situation where there is a need for maintenance that some crops will be affected.
14
The buildings likely to be affected have no people living in them and are abandoned to certain extent.
The Levers Solomon Limited and five individual's cocoa and coconut plantations were abandoned
after the civil arrest in 2000 and since then no one is managing the cocoa and coconut plantations.
From consultations with the owners of the crops, these losses will not affect their livelihoods
including income generating activity or subsistence. Among the affected there are no disadvantaged
or vulnerable persons involved. Most of the affected people are middle age person between 20 to 50
years old, who are still active.
Table 4: Affected people and crops
Affected People Types of Assets Village/Location
Coconut and cocoa planation Initial 4km of the route
Coconut and cocoa plantation
land.
Banana, Eggplant, corn, melon,
corn, tomato, cassava, potato,
Bean and pumpkin
100m from the Tina Betivatu
junction (160.104316, -
9.468212)-Levers Solomon
Limited land
Casava, Potatoe, Banana,
Pawpaw, Taro, Corn, Kakake
160.081127, -9.463537, Levers
Solomon Limited land
Betel Nut, Sago Palm Kolina 2
Tobacco plant Kolina 2
Tobacco plant Kolina 2
Cocoa Kolina 2
Casava Plot 1 (Bearing and Non
Bearing)
160.023919, -9.446959, SDA
land (Between pole 44 and 45)
Casava Plot 2 (Bearing and Non-
bearing
160.023596, -9.442543, SDA
land (between Pole 45 and 46)
Casava Plot 3 (bearing and Non
Bearing)
160.023596, -9.442543, SDA
land (Between Pole 45 and 46)
Casava Plot 4 (bearing and Non-
Bearing)
160.023596, -9.442543, SDA
land(Between 46 and 47)
Casava and Potato 160.023705, -9438612, SDA
land (between pole 47 and 48)
Table 5: Affected People and structures
Building No 1
Location: 160.067722, -9.465613
Owner: TBC
Address/Phone: TBC
15
Comments: Overhead lines
Building No 2
Location: 160.060731, -9.469217
Owner: TBC
Address/Phone: area
Comments: Overhead lines. Location approximately 15m west from Pole 27.
16
The transmission lines pass through 5 registered lands with legal description and estate particulars
shown in table below. Registered owners have agreed in principle for SP to acquire the land as
easements. See figure 2 for locations of parcels.
Table 6: Affected people and land assets
Parcel Number Registered Owner Tenure
192-015-127 Lever Solomon Islands Fixed Term Estate
192-015-11
Fixed Term Estate
192-15-12 Commissioner of Lands Perpetual Estate
192-017-9 Commissioner of Lands Perpetual Estate
192-007-260 SI Adventist Association Limited Perpetual Estate
Source: Evaluation Report
4.2 Social Baseline
4.2.1 Background
The four communities near the transmission line are exclusively Solomon Islands Melanesian and are
originated from Weather coast, Mbelaha and Malatoha regions in Guadalcanal. According to the Survey,
Grass and Kolina 2 are people from Weather coast by originality. They have moved to Levers land and SIG
land in 2006 and 2007. These informal settlers are using the registered owners’ assets to cultivate and
generate income. This has become part of their daily livelihood.
17
4.2.2 Population and Household
4.2.2.1 Population
The subproject is located in Malango ward that has population of 10532 people2. Four communities are
located immediately along and near the transmission corridor. The estimated population of the four
communities is shown in Table 3.
4.2.2.2 Demographic characteristics
Figure 4 (age distribution) shows that the population is heavily weighted towards young people –
especially those 20-40 years. According to the survey there are more men than women, see figure 5.
Figure 4: Age Groups
In terms of marital status, 2% of local females aged 15 and over in 2019 were widowed, compared with
2% of males, suggesting that women have remain in the area due to the matrilineal system. The current
dependency ratio (1. Elderly (60 yrs. + and below 15 yrs.) is 82%.
2 Census report, 2009
0%
5%
10%
15%
20%
25%
30%
35%
10<= >10 to <=20 >20 to<=40 >40 to <=60 >60
Pe
rce
ntg
ae
Age Catogories
Population distirbution by age groups
18
Figure 5: Gender
4.2.3 Livelihood and Economy
The economy at the subproject site is both cash and subsistence. Almost all households are engaged in
subsistence livelihood and productive activities. Most households in the area have small garden plots. The
main crops being grown include cassava, kumara, taro, pana, Lekona (home tobacco) and fruits. There
are also teak, sago palms, betel nut, pumpkins, tomatoes, bean, pawpaw and bananas being grown in the
area.
Majority of the locals are farmers and public servants who are mainly teachers and nurses.
Figure 6: Household Income
47%
53%
Gender
Female Male
0%
5%
10%
15%
20%
25%
30%
0-200 201-500 501-800 801-1300 1301-2000 2001>
Pe
rce
nta
ge
Household Range (SBD)
Household Incomes/week
19
The main source of cash income for local households is the sale of root crops, sale of fruits (melon and
green coconut), Lekona (Home Tobacco), livestock, betel nut, wages and salaries, cocoa, remittance,
royalties, transport services, shop/canteen, and bottle shop.
Table 7: Sources of Income
Source of Income Percentage
Market/Vegetables &root crops/Betel Nut/Cake/Dry
coconut/Flower/
50%
Cocoa (wet beans) 14%
Tobacco leaves-Lekona 11%
Others/Casual/Transport/Fuel Depot/Piggery/Gold
Panning/Chicken/Pub
7%
Canteen 8%
Salary 10%
Lekona (Home Tobacco) is increasingly important source of income for people in the area. Generally, the
price producers get is SBD150 dollars for a processed tobacco leave roll. Lekona is generally collected and
processed for market by women and children. This source of cash income is controlled by women who
use the income to meet the food and basic needs of the family.
4.2.4 Household and Standard of Living
4.2.4.1 Dwellings
Fifty percent (50%) of the household surveyed are leaf houses (traditional leaf houses with dirt floors,
woven walls and thatched roofs), thirty percent (30%) semi-permanent (timber walls and floors, with a
thatched roof) and twenty percent (20%) permanent buildings (concrete piles, timber framing, timber
walls, and iron roofs).
4.2.4.2 Water
For drinking water, almost every household in the district relies on rain water tanks, typically from tanks
owned by several households and are shared between families.
Table 8: Water usage in the communities
Water sources Percentage
1. Piped Connection 0
2. Shared neighbourhood 11%
3. Rain water tank 27%
4. buy from venders 0
5. Well 27%
6. Others (boreholes, rivers and streams) 35%
20
Five percent (5%)( of the households use toilet inside house, Ten percent(10%) communal toilet, thirty six
(36%) use toilet outside the house and the majority forty percent (40%) use the bush.
Figure 7: Sanitation
4.2.4.3 Energy usage
All household use solar lighting either donated by the Member of Parliament or bought by individual
households. Clinics, schools and shops do have diesel or petrol generators, however can only be used only
at important or special occasions. Dry cell battery hand torches are common and are used for venturing
beyond the house at night. The majority of households (97%) surveyed rely on solid fuel fires (wood,
coconut shell, and charcoal) and gas (3%) for cooking and baking. During the SP 2019 survey, no one
reported in the district that they used electricity for cooking.
4.2.5 Social Organization
4.2.5.1 Tribal Affiliation
The Konga and Bebe communities share a common descendant and are affiliated to tribal groups in the
Malango Area. The Kolina 2 and Grass communities comprise a mixture of cultural groups. The majority
are people from weather coast in Guadalcanal.
4.2.5.2 Leadership
There is a sense of communal affiliation at the subproject neighborhood. Just like any Melanesian society,
the area does have big men who were charismatic leaders or focal points able to use their personal
abilities and enterprise to organize community activities. The subproject neighborhood is under the North
Guadalcanal Constituency.
4.2.5.3 Religion
The subproject neighborhood comprises of representatives from Church of Melanesia-Anglican, South Sea
Evangelical Church (SSEC), Seventh Day Adventist (SDA) Church and Roman Catholics. Others in the area
5%
36%
10%
40%
9%
Sanitation
1. Toilet in side the house 2. Toilet outside the house 3. Communal toilet
4. Bush 5. other (river)
21
normally travel to Lungga, Burns Creek and other locations in Henderson or in Honiara City to commune
with other church members.
Figure 8: Religious Groups
4.2.5.4 Women, Youth and Gender
The women and youth in the subproject neighborhood are either part of a church based group or women’s association. Guadalcanal practice a matrilineal system, where land inheritance is passed on through the
women. Women are a vital socio-economic instrument in this area because they do almost everything to
support their household. The women have farms and they sell their farm produce to local markets and
the Honiara market to earn income. This income supports their household needs such as school fees,
foods and clothes. Apart from gardening, women are also responsible for cooking, washing and collecting
water and firewood, and to ensure that family needs are met on daily basis.
Women say they have equal right as men but they are not able to express the right in the affairs of daily
life. Psychologically and culturally they feel they have to ‘give in’ to men or step back a little in deference
to man because men have always been the leaders in the person of tribal chiefs. Traditionally men have
always been the chiefs or tribal leaders. The mantle of chief always passed on from father to son. In
traditional societies a chief had to be strong and brave, good at hunting and fishing, expert in adjudicating
disputes, firm in maintaining law and order, and quick defending his people from head hunters and foreign
invaders and intruders. These traits were passed on from father to son; daughters were never involved in
these masculine affairs of the tribe. They were required to assist the mother in domestic duties.
4.2.6 Services
4.2.6.1 Health
There are clinics, at Mbelaha and Malango. People travel to Honiara clinics for medical attention.
Emergency cases are referred to the Honiara Central Hospital. Health challenges for the local population
tend to be malaria, respiratory conditions (pneumonia, colds & flu) and gastrointestinal infections.
22%
33%
40%
5%
Religous groups
1. Roman Catholic 2. Aglican 3. SSEC 4. Seventh Day
22
6.2.6.2 Education
People in the area have access to basic health care and education. In terms of education services, two
community high schools and two primary schools, Rate and Malango – are located in Tina and Malango
communities. Along the St Martins Road and approaching Lungga are Mbelaha primary school, Tenaru
national secondary school, Lunga Primary and Secondary Schools, and Betikama National Secondary
School.
6.2.6.3 Communication
The subproject area is well serviced with both Telecom and Bmobile Services. Forty one percent of the
households’ interviewed have mobile phones.
6.2.6.4 Employment
Majority of the locals are farmers and public servants are mainly teachers and nurses. Formal employment
in the public service and private sector accounts to 4% of the population.
Figure 9: Occupation
4. 2.6.5 Access to transportation
The main mode of transport for the people in the subproject is by trucks or bus, providing return trips
daily to and from Honiara carrying both cargo and passengers. Bus fares cost SBD 20 one way from Tina
and Mbelaha areas. The subproject does not have difficulties in accessing transportation; rather it is the
poor infrastructure conditions, resulting from lack of maintenance, that hampers accessibility for the
people in the subproject area. To ensure that impacts to existing road users are managed, SP will upgrade
the network of feeder roads in the area to access transmission lines, poles and towers. Possible road
access routes will be considered in the detail design stage and negative impacts will be adequately
managed, including through the use of air transport (helicopter).
0%
5%
10%
15%
20%
25%
30%
35%
40%
45%
Pe
rce
nta
ge
Occupation
23
4.2.6.6 Access to markets
All most all households in the subproject are engaged in markets activities. A high proportion of trips
associated with the outputs of livelihood and productive activities are made by truck for selling crops and
vegetables.
4. 2.7 Indigenous Peoples
Most of the population in the subproject area are original descendants of the people of Guadalcanal. Like
most of Solomon Islands, most islands comprise of the indigenous people of the land, except for a few
provinces like Western and Choiseul where there are immigrants from Kiribati. Thus, there are no issues
in respect of indigenous people being marginalized as a result of the subproject activities.
4. 3 Gender Impacts
The women and youth in the subproject neighborhood are either part of a church based group or women’s association. Guadalcanal practice a matrilineal system, where land inheritance is passed on through the
women. Women are a vital socio-economic instrument in this area because they do almost everything to
support their household. The women have farms and they sell their farm produce to local markets and
the Honiara market to earn income. This income supports their household needs such as school fees,
foods and clothes. Apart from gardening, women are also responsible for cooking, washing and collecting
water and firewood, and to ensure that family needs are met on daily basis.
For the purpose of this ARAP, there are no significant impacts in terms of gender considerations. Possible
impacts on the affected women are minimal or no impact at all. However, during actual construction if
there arises a need for gender consideration, this ARAP will be updated.
24
5.0 VALUATION OF ASSETS
5.1. Valuation of Non-Land Assets
According to the survey, there will be compensation of non-land assets including 2 structures, crops and
fruit trees. A survey will be carried out to update the ARAP when the detailed design is available.
Table 9: Non-Land Assets
Owners Crops Number of
Crops
Replacement Cost
(SBD)
Coconut 231 150
Cocoa (B) 265 100
Cocoa (N) 155 250
Sago Palm 1 100
Oil Palm (N) 41 10
Banana (B) 30 50
Banana (N) 50 50
Eggplant (N) 45 10
Bean (N) 3 10
Tomatoe (N) 10 10
Melon (N) 1 20
Casava (N) 30 10
Corn (N) 80 10
Pumkin (N) 5 20
Banana (B) 30 30
Banana (N) 55 30
Papaw (B) 1
Casava (N) 130 10
Potato (B) 3035 10
Banana (N) 279 30
Papaw (N) 130 50
Papaw (B) 15 50
Eggplant (N) 30 10
Corn (B) 100 5
Tomatoe (N) 10 10
Cabbage 10 150
Lekona 20 100
coconut (B) 150 10
cocoa (B) 190 10
Bread fruit (B) 2 10
25
Casava plot 1 (B) 30 10
Casava plot 1 (N) 105 10
Casava plot 2 (B) 80 10
Casava plot 2 (N) 50 100
Casava plot 3 (B) 90 100
Casava plot 3(N) 50 30
Teak tree 1 100
Cocoa (B) 30 100
Betel Nut (N) 50 150
Sago palm tree 5 100
Tobacco plant 20 100
Tobacco plant 15 100
Potato (N) 25 10
Casava (N) 20 10
*B-Bearing Crops
*N-Non Bearing Crops
Table 10: Valuation of Shed and Building
Structure Owner Type
Shed TBC Local materials (leaf structure),
used by locals to cover from rain.
Incomplete Structure Louise Tito Timber, without roofing,
abandoned for sometimes now.
The rates in Table 9 are based on research conducted by the main hydro Project Office (PO). This
enables a consistent approach to be taken across project components and allows for transparency in
compensation. The PO appointed a LARAP livelihood mapping consultant to undertake this task, who
also conducted the asset survey for the access road and main dam site. The consultant report indicates
that there is an active market for crops and trees but that rates fluctuate depending on the time of year
or crop availability. The rates provided are an average of those found in Honiara and around the Project
site and are inclusive of taxes and local transport. These rates will be reviewed once detailed design is
completed. Where necessary, additional measures will be adopted if impacts to livelihood are
identified. This could include for example, support for planting of new gardens or crops.
5.2 Valuation of Land Assets
Solomon Power conducted a preliminary valuation of land assets assisted by a registered valuation expert,
Guadalcalnal province and MLHS, based on the concept drawings. Solomon Power has facilitated the
identification of affected landowners, consultations and negotiations with affected people on the manner
of land access agreement and compensation. The values in this report are based on preliminary
assessment of the route, however will be reviewed again at the detailed design stage. With the help of
26
qualified experts, relevant authorities particularly the MLHS, SP will survey the site, and ensure the
smooth implementation of land acquisition and compensation.
All the lands affected by the subproject are registered FTEs and PEs. The cadastral boundaries are known,
however the land may need resurveying to confirm boundary pegs, and ensure that the size of the land is
accurately recorded and mapped. The negotiations between SP and the registered land owners will be
facilitated by the MLHS who is responsible for all land transfers. Valuation work will be carried out to
determine the premium and annual rental value for each affected FTE and PEs within the project corridor.
Table 11: Easement Particulars
Parcel Number Easement particulars
Width (m) Length (km) Area (ha)
192-015-127 50 4.59 22.95
192-015-12 50 0.003 0.15
192-015-11 50 1.32 6.6
192-017-9 50 2.13 10.65
192-007-260 50 4.08 20.4
Total Easement 60.75
Source, Evaluation Report
27
6.0 COMPENSATION AND ASSISTANCE
SP will acquire the route as easement based on particulars above at negotiated and agreed values with
registered land owners. Initial values here are based on the concept drawings for budgeting purposes.
Whether the route is updated now or at the detailed design stage, a revaluation will have to be made
before land acquisitions are carried out.
Table 12: Easement Rates based initial valuation report
Parcel Number Easement Rate (SBD)
192-015-127 58,000/ha
192-015-11 65,000/ha
192-15-12 65,000/ha
192-017-9 75,000/ha
192-007-260 95,000/ha
Table 13: Value of Easements based on the initial valuation report
Parcel Number Registered Owner Easement Value (SBD)
192-015-127 Lever Solomon Islands 1,331,000
192-015-11
429,000
192-15-12 Commissioner of Lands 9,750
192-017-9 Commissioner of Lands 692,250
192-007-260 SI Adventist Association Limited 1,938,000
Total Easement Value 4,400,100
The updated crop inventory will be reviewed and endorsed by an Agriculture Extension Officer (AEO) from
the Guadalcanal Provincial Administration. Coconut, cocoa and bananas trees identified to be within the
route will be removed during clearing. APs will be compensated for any loss to crops or income source
trees prior to mobilization of contractor. Here within table 14 is the initial crop inventory for the selected
route.
Initial discussion with communities reveal, people from the area willingly surrender crops particularly
bananas and pawpaw to name a few. AP will be compensated on what has been lost and they must agree
with the payments. All affected persons who are entitled to compensation will sign a Memorandum of
Understanding (MOU). Payments to AP will be based on this ARAP and will be disseminated in a
transparent manner.
Table 14: Crops and payment values
Owners Crops Number of
Crops
Market Rate Total based on
Replacement
Value
Coconut 231 150 34650
Cocoa (B) 265 100 26500
28
Cocoa (N) 155 250 38750
Sago Palm 1 100 100
Oil Palm (N) 41 10 410
Banana (B) 30 50 1500
Banana (N) 50 50 2500
Eggplant (N) 45 10 450
Bean (N) 3 10 30
Tomatoe (N) 10 10 100
Melon (N) 1 20 20
Casava (N) 30 10 300
Corn (N) 80 10 800
Pumkin (N) 5 20 100
Banana (B) 30 30 900
Banana (N) 55 30 1650
Papaw (B) 1
0
Casava (N) 130 10 1300
Potato (B) 3035 10 30350
Banana (N) 279 30 8370
Papaw (N) 130 50 6500
Papaw (B) 15 50 750
Eggplant (N) 30 10 300
Corn (B) 100 5 500
Tomatoe (N) 10 10 100
Cabbage 10 150 1500
Lekona 20 100 2000
coconut (B) 150 10 1500
cocoa (B) 190 10 1900
Bread fruit (B) 2 10 20
Casava plot 1 (B) 30 10 300
Casava plot 1
(N)
105 10 1050
Casava plot 2 (B) 80 10 800
Casava plot 2
(N)
50 100 5000
Casava plot 3 (B) 90 100 9000
Casava plot 3(N) 50 30 1500
Teak tree 1 100 100
Cocoa (B) 30 100 3000
Betel Nut (N) 50 150 7500
29
Sago palm tree 5 100 500
Tobacco plant 20 100 2000
Tobacco plant 15 100 1500
Potato (N) 25 10 250
Casava (N) 20 10 200
Total SBD196,550
*N-Non Bearing Crops or trees
*B-Bearing crops or trees
Table 15: Value of structures
Structure Owner Type Valuations
Shed TBC Local materials (leaf
structure), used by locals
to cover from rain.
200
Incomplete Structure Louise Tito Timber, without roofing,
abandoned for some time
now.
1000
30
7.0 CONSULTATIONS
7.1Stakeholder
The stakeholder can be categorized as; i) primary stakeholders are the people, landowners, resource
owners in the subproject area ii) government authorities including MLHS and Guadalcanal provincial ii)
other interested groups. Refer to Annex 2 for the list of households and individuals that were consulted.
7.2 Consultation
Information regarding the subproject objectives, processes and timeframes has been disclosed to
communities during initial consultation meetings. Specific consultation and meetings were held with the
affected persons regarding crop or building removals and compensation payments for these losses. The
affected people were informed during initial discussions and will again at detailed design stage of their
rights to be compensated for any losses to their properties or land at full replacement value. There will
be ongoing consultation and meetings throughout the implementation of the subproject.
Whilst preliminary discussions have been initiated with the land users and affected persons, about the
subproject, negotiation processes for land acquisition have yet to be finalized. Future consultations will
focus on a detailed census, notification and negotiation. The notification process will be guided by the
procedures for acquisition of land as outlined in the Lands and Titles Act (LTA). In advance of notification,
Solomon Power and the Provincial Governments will formally verify land users and their ownership of
trees, crops, and other assets, as a basis for claiming compensation. It should be noted that initial
consultations have been largely with male informants, except for service providers in health and
education, and some land users. All women land users supported the subproject and said that there was
sufficient gardening land elsewhere, if the transmission line had to be constructed on some gardens.
7.3 Disclosure of Resettlement Plan
In compliance with WB requirements, SP will publicly disclose both draft and final LARAP. The LARAP will
be made available in English and Pidgin, in an accessible public location. The draft and final ARAP are also
disclosed on the WB website upon submission by SP.
7.4 Results of Consultations
The main issues raised during the village meetings can be distilled into common themes:
Table 16: Consultation issues and measures suggested
Issues raised Measures Suggested During Consultation
• Valuation of Assets. • SP and landowner will agree on value based
on replacement cost.
• Vegetation clearing for transmission line in
particular will require felling of important
crops or trees along road corridor.
Communities feel that SP and its contractor
must compensate affected owners based on
SIG rates.
• SP will compensate crops and trees affected
by the subproject based on replacement cost.
• Safety risks associated with fault on the
transmission lines. • It is important during faults and natural
disaster to contact SP immediately when an
31
incident occurs. SP will continue to carry out
awareness and training to local communities
on emergency response when such incident
occurs.
• Safety standards. • The designs and materials are based on
standard specification and Geotech features
of the site.
• Public safety during construction and
operation-There are concerns over noise and
access during construction.
• Contractor will submit a traffic management
plan ensuring safety signs and speed limits.
Sunday will be observed as a rest day unless
something important requires action.
• Casual work during construction. • Unskilled labor will be sourced from the
communities.
32
8.0 IMPLEMENTATION
8.1 Institutional Arrangement
8.1.1 Solomon Power
SP will be responsible for the implementation of this ARAP. Consultations and negotiations regarding land
issues and loss of crops will be executed in accordance with the guidelines and procedures outlined in this
LARAP. SP recently recruited a lands officer (LO) who will be responsible for the day to day
implementation of this RP and land matters.
• Following detailed design and the cadastral survey, update the ARAP according to the safeguard
policies of WB and the government.
• In coordination with MLHS, provincial executives and other stakeholders, undertake land survey,
valuation, negotiation and other activities not yet completed, to update and implement the ARAP.
• Undertake adequate consultations with and dissemination of relevant information to APs,
including public disclosure of draft and final safeguard plans.
• Ensure that the design engineers take into account safeguard issues and try to avoid or minimize
social impacts through appropriate design. The social safeguard team will brief technical design
team in this regard.
• Address any subproject-related grievances of APs and facilitate in resolving disputes on
landownership.
• Undertake public consultation to inform APs of the subproject scope and schedule of the
project activities, including land acquisition and compensation activities.
• Following the award of the civil works contract, the safeguard team will arrange a briefing to the
contractors to raise their awareness on safeguard requirements.
• Coordinate with relevant authorities including the MLHS/COL to ensure that land acquisition and
compensation activities are completed prior to start of the construction activities.
• Undertake regular monitoring and reporting on implementation progress on safeguards activities.
• Liaise with relevant government, donor agencies and private sector groups to provide the
community access to social services and income generation activities to improve the living
standards of APs.
8.1.2 Ministry of Lands, Housing and Survey
Ministry of Land, Housing and Survey (MLHS) and its relevant divisions, including the COL, will provide
necessary support to Solomon Power in carrying out land acquisition activities. As the subproject
requires acquisition of land, the MLHS/COL will appoint a Land Acquisition Officer (LO) to undertake land
acquisition activities.
8.1.3 Guadalcanal Province
The Province will provide
• Endorsement on crops and trees affected by the subproject.
33
• The Province through the agriculture extension officer will provide support to SP during the
detail crop inventory and consultation with affected communities/person.
8.2 Implementation Schedule Table 17: Implementation schedule
S.N. Activities Schedule
1 Preparatory Activities
1.1 Review of engineering design, layout of site, land easements for transmission lines, and updating of land requirements
Month 1
1.2 Request to MLHS for designation of Land Acquisition Officer (LO) responsible for facilitating subproject land acquisition and compensation.
Month 1
1.3 Cadastral and topographical surveys - with authorization from MLHS Month 2
1.4 Valuation for easement and improvements. Establish premium and annual
rental
Month 2
1.5 Negotiations for lease of land and signing of Memoranda of Agreements
(MOA) with Levers Solomon Limited,
, SI Adventist Association Limited and
the Commissioner of lands.
Month 3
1.6 Execution of land acquisition. Payments completed and registered land titles transferred to Solomon Power
Month 4
1.7 Meeting with affected communities as prescribed in the LTA on agreement on land use/acquisition. Disclosure of subproject details, land requirements, timeline and GRM.
Month 3
1.8 Census of land users and affected people and Update Inventory of Loss (IOL)
for all trees, crops, and structures on the land.
Month 3-4
1.9 Establish mechanism for compensation payment to land user. Month 4
1.10 Agreement on compensation rates with land users. Month 4
1.11 Solomon Power updates the ARAP including agreements on compensation rates with land users, and discloses updated ARP to APs and other stakeholders.
Month 5
1.12 SP submits the updated ARP to WB for approval. Month 5
1.13 A notice to harvest crops will be sent to all land users, with a deadline of one
month.
Month 4
2 Resettlement Plan Implementation
2.1 Compensation implemented prior to clearance or civil works activities. Month 5
2.2 Solomon Power submits the land acquisition completion report and compensation completion report to WB.
Month 6
2.3 Payment of adjusted compensation, as required, for unforeseen damages and losses.
During construction
34
2.4 Ongoing Implementation of Grievance Redress Mechanism. Ongoing
3 Monitoring
3.1 Conduct regular monitoring and Solomon Power shall submit quarterly safeguard’s monitoring reports to the WB.
Ongoing
35
9.0 GRIEVANCE REDRESS MECHANISM
9.1 Government Policy for Grievance Redress
Any disputes arising over alienated land, usually in relation to compensation as ownership is clear, are
referred to the Magistrates Court and follow the procedure set out in the Lands and Titles Act and Civil
Code. Disputes over the award of compensation for resumed title, or where an FTE holder seeks to get
compensation for “unimproved” land, are settled in the High Court.
For disputes over customary land, there is a two-step process: (i) the civil procedure through the
Magistrates Court, and (ii) the customary procedure. The hearing in the Magistrates Court will determine
whether the case can be dealt with through civil proceedings or whether the case is better handled
through the customary process. If the case cannot be resolved after the Local Court hearing, it is presented
as a case before the Customary Land Appeal Court (CLAC), which usually settles the case.
9.2 During Construction and Operations
During the construction and to a lesser extent, operation of the subproject it is possible that people may
have concerns with the subproject’s social performance. Given the nature of this subproject it is likely
that more concerns may arise during the construction phase of the subproject than in later operations.
In order to capture and address these concerns the grievance management procedure will allow affected
persons to register their complaints and concerns by lodging them with the SP or the Contractor on site
usually through the Project Manager. A GRM Register in which complaints are recorded, will be kept on
site. Details of the complaint will be recorded by date, name, contact address and reason for the
complaint. A duplicate copy of the entry will be given to the affected person for their record at the time
of registering the complaint and a summary is to be attached to SP’s quarterly progress reports.
The grievance will be assessed by SP to confirm that it is related to the project. If it is urgent or can be
immediately resolved, action will be taken and this will be recorded in the GRM Register, and the
complainant informed of the outcome. The aim will be for complaints to be acted on within one week.
Where this cannot occur, the complainant will be advised within one week of making the complaint, what
action is to be taken. If a complainant approaches the Contractor directly, the Contractor will receive the
information and must forward it to SP. The Contractor will take any immediate action necessary to resolve
the issue if practical and appropriate. Where there is urgency in terms of safety, damage to property or
environment, then the complaint will be acted on urgently.
A brief summary of complaints will be given in regular reports and any outstanding grievances identified.
The SP Lands Officer will review the GRM Register for complaints and confirm that they are resolved
satisfactorily. Any outstanding complaints will be investigated. SP and the Contractor will work together
proactively to ensure grievances are satisfactorily resolved. It will be the responsibility of SP’s Lands
Officer to ensure that the GRM is working as intended, and that the Contractor is responding to
community concerns.
Where complaints cannot be resolved by the GRM process, or, where a person is not satisfied with the
outcome, the complainant will be able to take their complaint through the normal SI legal processes.
The GRM will be publicized, with awareness provided by SP and Contractor staff. No fees or charges will
be made in relation to lodging complaints or otherwise accessing the GRM.
36
Typical grievances that may occur in subprojects of this nature include (but are not limited to) damage to,
or use of, public or private property, and communal resources; safety risks or incidents; noise, dust, fumes,
or water pollution; litter, rubbish dumping, or unauthorized land use; unauthorized tree cutting or
vegetation removal; hunting, fishing, or collecting fruit and nuts; anti-social or criminal behavior; and
harassment or abuse.
37
10.0 MONITORING ARRANGEMENTS
Based on the ARAP, SP will monitor all activities and associated payment of compensation to APs. The
scope of monitoring is outlined in Table 18.
Table 18: Monitoring Indicators
Aspect Indicators
ARAP implementation • General and overall compliance of resettlement activities with the
ARP, including payment of compensation: i) full payment to be made
to all affected persons before commencement of works; ii) adequacy
of payment to replace affected assets; and
• The level of satisfaction of APs with various aspects of the ARP
process.
Consultation, participation,
disclosure and grievance
redress
• Public information dissemination and consultation procedures
conform to the process established in the RP;
• The participatory process and various mechanism as well as measure
taken, both in terms of the quality and meaningfulness of this process,
and the extent that primary stakeholders actively participate in the
process;
• The disclosure of the ARAPs, whether APs know their entitlements
and whether they have received all of their entitlements’ and • Monitor the effectiveness of the grievance mechanism, types of
grievances, if and how resolved and satisfaction of APs with the
process.
Gender Issues • The institutional and staffing mechanisms;
• Collection of and disaggregation of gender sensitive data;
• Women’s representation and participation in the detailed planning and implementation process;
• Gender inclusivity such as technical training to both men and women;
• Delivery of replacement leases or land titles in the names of both
husband and wife;
• Whether compensation has been delivered to both husband and wife,
together and
• The effectiveness of livelihoods programs for restoring and developing
women’s income and living standards.
Vulnerable groups issues • Assessment of the appropriateness and effectiveness of various
entitlements, programs and activities and methods of delivery for
various vulnerable households and groups, and the need for
adjustment or additional measures.
Transparency • How information is distributed and to whom, in order to make sure
that all APs have the proper information and access to knowledge;
Functioning of decision-making bodies and how this information is
properly recorded and made available.
38
11.0 BUDGET AND FINANCIAL ARRANGEMENTS
All costs related to implementation and monitoring of this ARAP including but not limited to: i)
consultations and negotiations ii) legal costs iii) Easement Negotiation and Acquisition, iv) Assets/crops
cost. A tentative budget is shown in Table 19. These provisional costs can only be determined during
actual implementation. Where there will be additional cost required, this budget will be reviewed and
revised accordingly.
Table 19 Tentative Budget for implementation of ARAP
S.N Item Amount (SBD)
1 Consultation and negotiation
cost $20,000
2 Legal Cost to complete contracts
for easement and title search $600,000
3 Easement Negotiation &
Acquisition $6,000,000
4 Assets/Crops Cost $196,550
5 Contingencies (20%) $1,363,310.0
Total $8,179,860
To this end, APs identified to be affected will receive compensation for damage to crops or trees based
on the market rates. Table 10, 11 and 12 shows the APs entitlements for the land easement, crops/ trees
and structures likely to be affected. If during actual construction any additional crops or assets requires
removal, this list will be revised.
39
12.0 REFERENCES
SIG (2011), Solomon Islands National Statistics Bulletin 06/2011, Report on 2009 Population and Housing
Census, Basic Tables and Census Description, Honiara: Solomon Islands.
40
APPENDIX
Annex 1: Photographs
Grass community gardens
41
coconuts and cocoa
SI Adventist Association Ltd land. People who own these gardens reside in Burns Creeks, Honiara.
42
Betel Nuts, Kolina 2
43
Annex 2: List of Households Consulted
Respondent Age Gender Contact Household Head
50+ Female
22 Female
50+ Female 7765847
28 Female
20+ Female 7688815
21 Male
30 Female 7977420
34 Female 7237497
33 Female 7442986
50+ Female
40+ Female
24 Female
32 Female
35 Male
40+ Female
56 Male
17 Male
29 Female
30 Male
65 Male 7769614
63 Male 7854266
36 Female 7502444
28 Male 7191299
59 Female
38 Male
40+ Female
33 Female 7157768
50+ Female
35 Female 7344184
40+ Female
20 Male 7479164
20 Female
38 Male
50 Female 7273203
50+ Male
50+ Male 7765847
31 Male
44
17 Female
44 Male 7517918
19 Female
49 Male 7388969
Male 7160590
50 Female
34 Male 7222320
48 Male 7739926
57 Female
66 Male 8699532
46 Male 8966151
121* Female
38 Male 8583126
20 Female
80 Male
32 Female 7722823
30 Male
40+ Male
30+ Female
22 Male
25 Female 7378105