RPTP-new[1]-2

download RPTP-new[1]-2

of 18

Transcript of RPTP-new[1]-2

  • 7/28/2019 RPTP-new[1]-2

    1/18

  • 7/28/2019 RPTP-new[1]-2

    2/18

    Outline

    Background

    Vision and Objective

    Geographical Location and SiteAdvantages

    Opportunities

    Offerings Conditions

    Overview of Petro Rabigh

  • 7/28/2019 RPTP-new[1]-2

    3/18

    Saudi Aramco

    A fully-integrated, global petroleum enterprise.

    Sumitomo ChemicalOne of the Sumitomo group company, and also one of Japan's leadingchemical manufacturers, offering a diverse range of products inworldwide.

    Background

  • 7/28/2019 RPTP-new[1]-2

    4/18

    Establishing an industrial park to convertpetrochemical further into downstream product

    with an integrated network of feedstock suppliers,

    infrastructure and service providers.

    Create more Value in Saudi ArabiaJob, Skill, Future Business Opportunity

    Vision

  • 7/28/2019 RPTP-new[1]-2

    5/18

    Objective

    Enhanced local economywith a variety of industriesand services

    Creation Job opportunitiesfor local society

    Attraction of Local & foreiginvestments for High ValueAdded & Export Orientedindustries

    A platform for broaddownstream industries

  • 7/28/2019 RPTP-new[1]-2

    6/18

    6

    Ethylene1,300 KTA

    Propylene900 KTA

    Ethane

    95 MMSCFD

    Ethane Cracker

    LLDPE

    LLDPE

    PP (Homo)

    PP (Block)

    MEG

    HDPE

    PO

    LL Density polyethylene250 KTA

    LL Density polyethylene350 KTA

    High Density Polyethylene 300 KTA

    Ethylene Glycol600 KTA

    Polypropylene - Homo 350 KTA

    Polypropylene ICP350 KTA

    Propylene Oxide 200 KTA

    Petrochemicals

    VDU

    VGOHDT

    HOFCCC4 Alky&Isom Gasoline(63 MBD)

    Fuel Oil(89 MBD)

    RefineryUpgrade

    CDU

    Naphtha

    Kerosene

    Fuel Oil

    Crude

    400,000 BPD

    Existing Refinery

    Utilities & OffsitesWaterSteam, Power

    Cooling Water

    Potable Water

    Compressed Air

    Tankage

    Flare Systems

    Marine Loading

    Misc. ProjectsPipelines

    Buildings

    Communications

    Petro RabighProcess Configuration

  • 7/28/2019 RPTP-new[1]-2

    7/18

    Geographical Location

    Saudi current and planned rail network In the same site with Petro Rabigh

    Saudi Arabia is already well connected byextensive road network. RCIP is within 7 Kmfrom the highway.

    150 Km to KAI Airport in Jeddah

    180 Km to Jeddah Islamic Port, World 28th

    (in 2004) and Saudi Arabia largest containerPort. handle 39 MM ton (exclude crude oil)and exports to 66 countries worldwide andstill growing rapidly

    20 Km to King Abdullah Economic City as anaccess to a possible future seaport and other

    facilities.

    Rail transport may be a good option from Eastto west by 2012Expansion underway

    North-South expected for 2010

    Land bridge expected for 2012-2014

    170 Km from Yanbu Industrial City

  • 7/28/2019 RPTP-new[1]-2

    8/188

    GeographicalCondition

    King Abdullah

    Economic City

    and its Sea Port

    PETRORabigh

    Rabigh Town

    N

  • 7/28/2019 RPTP-new[1]-2

    9/18

    RCIP Site

    In the same site with Petro Rabigh

    RCIP occupy's 240 ha (2,400,000 m2)

    RCIP is Isolated from Petro Rabigh withProperty Fence and has its own entranceconnected to the highway

    RCIP is divided in to 5 Zones to accommodatearound 30-40 Medium / Small industries.

    Zone I Industrial Services

    Zone II - Plastic Processing

    Zone III - Assembling

    Zone IV - High-Tech

    Zone V - Logistic and Utility

    RCIP site is equipped with high standardutilities and infrastructure network, i.e. power ,desalinated water , sewage and communicationnetworks.

    Petro Rabigh Complex

    Rabigh Conversion

    Industrial Park

  • 7/28/2019 RPTP-new[1]-2

    10/18

    Rabigh Plus Tech Park construction is based on thehighest International standards including:-

    Buildings

    Administration Building, 643 SM

    Cafeteria building, 461 SM

    Support service building, 461 SM.

    Maintenance building, 461 SM

    Substation Building, 622 SM. Massjed, 162 SM to accommodate 90 persons.

    Guard house, 26 SM

    Rabigh Plus Tech Park

  • 7/28/2019 RPTP-new[1]-2

    11/18

    Roads and Parking areas

    Total length of roads at park is around 15KM with 5 categories asfollows:

    Primary road: 3.6 KM length, with 35 M width

    Secondary road: 2.9 KM length, with 25 M width

    Collector road: 3.9 KM length, with 20 M width

    Patrol road: 4 KM length, with 4 M width.

    Side walk: 25 KM length with 2 M width around park Site

    Rabigh Plus Tech Park

  • 7/28/2019 RPTP-new[1]-2

    12/18

    Sanitary networksTotal length of sanitary net work around 9 KM with 3 lifting station,89 Sewer manholes and 89 inspection chamber box.

    Storm Water drainageTotal length of storm water drainage around 8.4 KM including 4concrete culvert box.

    Water networksDesalinated water net works for RCIP site is around 14.5 KM. Theraw water is provided by Petro Rabigh at 300 CM per HR through 12pipe line with total length 5.6 KM.

    Rabigh Plus Tech Park

  • 7/28/2019 RPTP-new[1]-2

    13/18

    Electrical networksTotal length of electrical cable network is around 39 KM Providingpower to site at 13.8 KV. The network will include 4 transformers, 4switchgears and 48 RMU.

    The Power is provided by Petro Rabigh to the park site through 29KM of Electrical Cable at 34.5 KV.

    Communication net works

    Total length of primary communication net works is around 35 KMand secondary network is around 13.6 KM with 13 communicationmanhole, 10 hand hole, 121 pulling hole and 6 cabinet base.

    Landscaping

    Landscaping area covers 500 SM with water concrete fountain inthe center of the Park.

    Rabigh Plus Tech Park

  • 7/28/2019 RPTP-new[1]-2

    14/18

    Refinery

    PetrochemicalProcessing

    Integrated Refinery &Petrochemical Center

    Supporting

    Business / IndustrialServices

    Feedstock supplyLong term agreements

    Competitive prices

    High value added /

    Export oriented industries

    Housing

    Commercial

    ServicesHotels & Other

    Business

    Services

    Training

    Facilities

    Social

    ServicesUrban Amenities &

    Environment

    Outside Park Facilities / Services

    Logistic

    Services

    One stop

    service centerTechnical support

    Services (PTC)

    Utilities SupplyAt cost

    ConceptFully Integrated Industrial park

    Industrial Park

  • 7/28/2019 RPTP-new[1]-2

    15/18

    15

    Diversification of Industries

  • 7/28/2019 RPTP-new[1]-2

    16/18

    Identified Opportunities for Plastic Processing

    I. Non-Woven Fabrics (Hygienic & Medical)

    II. Geo synthetic Materials

    III. Dry Bulk PE Container Liners

    IV. Medical Solution Bottles & Sharp Containers

    V. Woven Fabric for Flat Jumbo Bags

    VI. Automobile Small Parts

    VII. BOPP Film

    VIII. HDPE Composite Pipes

    OpportunitiesFirst : Selection of Opportunities (Plastic Processing)

  • 7/28/2019 RPTP-new[1]-2

    17/18

    1. Children related -Infant care-Toys-Stationery-Baby stroller-Child seat

    2. Automobile parts: - Battery container

    - Accessories

    - Replacement parts

    3. Tires -Automobile tires

    4. Medical & health: -IV solution bag-Supplements-Barrier film-Disposable medicalanalytical products

    5. Water related: -Water purification plant-Membrane

    -Rigid pipe-Chemical additives

    6. Construction -Plastic flooring- Domestic -Wall paper

    -Water proof sheet

    7. Construction -Specialty film- Export (window, construction,

    agriculture)

    8. Household -Household appliancesElectric -Switches, wire and

    Appliances cables-LCD (long term goal)

    9. Paints -Construction paints-Repair paints forautomotive-Paint for plastic

    10. Others -Plastic in general-Recycling system

    Suggested Products by Category

    OpportunitiesSecond : Selection of Opportunities (Wide Range)

  • 7/28/2019 RPTP-new[1]-2

    18/18

    18

    Offering Conditions

    Land

    Lease Rate (for 30 Years) include industrial park management fee

    (6) SR/sq m/year , to be revised every 5 years

    Lots are of multiple of 5000 sq m.

    Utilitieso Electricity unit Supplied @ 13.8 KV 10 Halalah / Kwh

    o Desalinated Water 4.5 SR / m3

    Feedstockfrom Petro Rabigh at market based competitive prices and through long

    term supply agreements. Tenants has the option to use feedstock from

    other than Petro Rabigh