Outline
Background
Vision and Objective
Geographical Location and SiteAdvantages
Opportunities
Offerings Conditions
Overview of Petro Rabigh
-
7/28/2019 RPTP-new[1]-2
3/18
Saudi Aramco
A fully-integrated, global petroleum enterprise.
Sumitomo ChemicalOne of the Sumitomo group company, and also one of Japan's leadingchemical manufacturers, offering a diverse range of products inworldwide.
Background
-
7/28/2019 RPTP-new[1]-2
4/18
Establishing an industrial park to convertpetrochemical further into downstream product
with an integrated network of feedstock suppliers,
infrastructure and service providers.
Create more Value in Saudi ArabiaJob, Skill, Future Business Opportunity
Vision
-
7/28/2019 RPTP-new[1]-2
5/18
Objective
Enhanced local economywith a variety of industriesand services
Creation Job opportunitiesfor local society
Attraction of Local & foreiginvestments for High ValueAdded & Export Orientedindustries
A platform for broaddownstream industries
-
7/28/2019 RPTP-new[1]-2
6/18
6
Ethylene1,300 KTA
Propylene900 KTA
Ethane
95 MMSCFD
Ethane Cracker
LLDPE
LLDPE
PP (Homo)
PP (Block)
MEG
HDPE
PO
LL Density polyethylene250 KTA
LL Density polyethylene350 KTA
High Density Polyethylene 300 KTA
Ethylene Glycol600 KTA
Polypropylene - Homo 350 KTA
Polypropylene ICP350 KTA
Propylene Oxide 200 KTA
Petrochemicals
VDU
VGOHDT
HOFCCC4 Alky&Isom Gasoline(63 MBD)
Fuel Oil(89 MBD)
RefineryUpgrade
CDU
Naphtha
Kerosene
Fuel Oil
Crude
400,000 BPD
Existing Refinery
Utilities & OffsitesWaterSteam, Power
Cooling Water
Potable Water
Compressed Air
Tankage
Flare Systems
Marine Loading
Misc. ProjectsPipelines
Buildings
Communications
Petro RabighProcess Configuration
-
7/28/2019 RPTP-new[1]-2
7/18
Geographical Location
Saudi current and planned rail network In the same site with Petro Rabigh
Saudi Arabia is already well connected byextensive road network. RCIP is within 7 Kmfrom the highway.
150 Km to KAI Airport in Jeddah
180 Km to Jeddah Islamic Port, World 28th
(in 2004) and Saudi Arabia largest containerPort. handle 39 MM ton (exclude crude oil)and exports to 66 countries worldwide andstill growing rapidly
20 Km to King Abdullah Economic City as anaccess to a possible future seaport and other
facilities.
Rail transport may be a good option from Eastto west by 2012Expansion underway
North-South expected for 2010
Land bridge expected for 2012-2014
170 Km from Yanbu Industrial City
-
7/28/2019 RPTP-new[1]-2
8/188
GeographicalCondition
King Abdullah
Economic City
and its Sea Port
PETRORabigh
Rabigh Town
N
-
7/28/2019 RPTP-new[1]-2
9/18
RCIP Site
In the same site with Petro Rabigh
RCIP occupy's 240 ha (2,400,000 m2)
RCIP is Isolated from Petro Rabigh withProperty Fence and has its own entranceconnected to the highway
RCIP is divided in to 5 Zones to accommodatearound 30-40 Medium / Small industries.
Zone I Industrial Services
Zone II - Plastic Processing
Zone III - Assembling
Zone IV - High-Tech
Zone V - Logistic and Utility
RCIP site is equipped with high standardutilities and infrastructure network, i.e. power ,desalinated water , sewage and communicationnetworks.
Petro Rabigh Complex
Rabigh Conversion
Industrial Park
-
7/28/2019 RPTP-new[1]-2
10/18
Rabigh Plus Tech Park construction is based on thehighest International standards including:-
Buildings
Administration Building, 643 SM
Cafeteria building, 461 SM
Support service building, 461 SM.
Maintenance building, 461 SM
Substation Building, 622 SM. Massjed, 162 SM to accommodate 90 persons.
Guard house, 26 SM
Rabigh Plus Tech Park
-
7/28/2019 RPTP-new[1]-2
11/18
Roads and Parking areas
Total length of roads at park is around 15KM with 5 categories asfollows:
Primary road: 3.6 KM length, with 35 M width
Secondary road: 2.9 KM length, with 25 M width
Collector road: 3.9 KM length, with 20 M width
Patrol road: 4 KM length, with 4 M width.
Side walk: 25 KM length with 2 M width around park Site
Rabigh Plus Tech Park
-
7/28/2019 RPTP-new[1]-2
12/18
Sanitary networksTotal length of sanitary net work around 9 KM with 3 lifting station,89 Sewer manholes and 89 inspection chamber box.
Storm Water drainageTotal length of storm water drainage around 8.4 KM including 4concrete culvert box.
Water networksDesalinated water net works for RCIP site is around 14.5 KM. Theraw water is provided by Petro Rabigh at 300 CM per HR through 12pipe line with total length 5.6 KM.
Rabigh Plus Tech Park
-
7/28/2019 RPTP-new[1]-2
13/18
Electrical networksTotal length of electrical cable network is around 39 KM Providingpower to site at 13.8 KV. The network will include 4 transformers, 4switchgears and 48 RMU.
The Power is provided by Petro Rabigh to the park site through 29KM of Electrical Cable at 34.5 KV.
Communication net works
Total length of primary communication net works is around 35 KMand secondary network is around 13.6 KM with 13 communicationmanhole, 10 hand hole, 121 pulling hole and 6 cabinet base.
Landscaping
Landscaping area covers 500 SM with water concrete fountain inthe center of the Park.
Rabigh Plus Tech Park
-
7/28/2019 RPTP-new[1]-2
14/18
Refinery
PetrochemicalProcessing
Integrated Refinery &Petrochemical Center
Supporting
Business / IndustrialServices
Feedstock supplyLong term agreements
Competitive prices
High value added /
Export oriented industries
Housing
Commercial
ServicesHotels & Other
Business
Services
Training
Facilities
Social
ServicesUrban Amenities &
Environment
Outside Park Facilities / Services
Logistic
Services
One stop
service centerTechnical support
Services (PTC)
Utilities SupplyAt cost
ConceptFully Integrated Industrial park
Industrial Park
-
7/28/2019 RPTP-new[1]-2
15/18
15
Diversification of Industries
-
7/28/2019 RPTP-new[1]-2
16/18
Identified Opportunities for Plastic Processing
I. Non-Woven Fabrics (Hygienic & Medical)
II. Geo synthetic Materials
III. Dry Bulk PE Container Liners
IV. Medical Solution Bottles & Sharp Containers
V. Woven Fabric for Flat Jumbo Bags
VI. Automobile Small Parts
VII. BOPP Film
VIII. HDPE Composite Pipes
OpportunitiesFirst : Selection of Opportunities (Plastic Processing)
-
7/28/2019 RPTP-new[1]-2
17/18
1. Children related -Infant care-Toys-Stationery-Baby stroller-Child seat
2. Automobile parts: - Battery container
- Accessories
- Replacement parts
3. Tires -Automobile tires
4. Medical & health: -IV solution bag-Supplements-Barrier film-Disposable medicalanalytical products
5. Water related: -Water purification plant-Membrane
-Rigid pipe-Chemical additives
6. Construction -Plastic flooring- Domestic -Wall paper
-Water proof sheet
7. Construction -Specialty film- Export (window, construction,
agriculture)
8. Household -Household appliancesElectric -Switches, wire and
Appliances cables-LCD (long term goal)
9. Paints -Construction paints-Repair paints forautomotive-Paint for plastic
10. Others -Plastic in general-Recycling system
Suggested Products by Category
OpportunitiesSecond : Selection of Opportunities (Wide Range)
-
7/28/2019 RPTP-new[1]-2
18/18
18
Offering Conditions
Land
Lease Rate (for 30 Years) include industrial park management fee
(6) SR/sq m/year , to be revised every 5 years
Lots are of multiple of 5000 sq m.
Utilitieso Electricity unit Supplied @ 13.8 KV 10 Halalah / Kwh
o Desalinated Water 4.5 SR / m3
Feedstockfrom Petro Rabigh at market based competitive prices and through long
term supply agreements. Tenants has the option to use feedstock from
other than Petro Rabigh