52A04SE2012 2.23758 PARDEE
REPORT ON DIAMOND DRILLING
DEVON AND PARDEE TOWNSHIPS
DISTRICT OF THUNDER BAY, ONTARIO, CANADA
NTS 52 A/4
FOR
NORTH ATLANTIC NICKEL CORP.
AND
DUMONT NICKEL INC.
010
fT'- '..:' ;'"' p ' V r..' :~~vl \ :-- ~..- U. ; V- '-. :~'
JUH i 7 2CC2-' ;
RECEIVED
J UN 1 7 ?CC2
GEOSCIENCE ASSESSMENT OFFICE
Jon NorthMafic Planet LimitedApril 2002
2, 237 58
TABLE OF CONTENTSpage
Table of Contents 2Introduction 3Description of the property 3Geology 7History of exploration 7Description of the drill holes 9 Conclusions and recommendations 9References 11
List of Figures
Figure 1: Claim map of Devon Township 4Figure 2: Claim map of Pardee Township 5Figure 3: Claim map of Pearson Township 6Figure 4: Project location and geology 8
APPENDIX A: Certificate of Qualifications 12 APPENDIX B: Diamond Drill Records 13
Plan maps and sections of diamond drill holes (back of report)
Introduction
Diamond drill holes BP-02-01, BP-02-02, and BP-02-03 were drilled at Devon and PardeeTownship in April 2002. The drill holes tested the Keweenawan stratigraphic section for mineralized gabbro intrusions at the base of barren Logan diabase sills. The total metreage of BQ core drilling is 1200 m. The results of the drilling are described herein.
Description of the property
The holes were drilled in Devon Township, 60 km south of Thunder Bay, Ontario. Access is by Highway 61, secondary township roads, and logging access roads. The project is a 50:50 joint venture between North Atlantic Nickel Corp. and Dumont Nickel Inc. The claim boundaries are illustrated in Figures 1, 2, and 3. The claim information is described in Table 1.
Geology
The area south of Thunder Bay is south of the boundary between the older Archean craton in the north and Paleo- to Mesoproterozoic basins in the south. In this area of the Southern Province (c.f. Ontario Geological Survey 1991, Bedrock Geology of Ontario, West-Central Sheet; Ontario Geological Survey, Map 2542, 1:1,000,000) the Paleoproterozoic Gunflint Formation and Rove Formation of the Animikie Supergroup are intruded by several Mesoproterozic gently-tilted diabase sills and subvertical dikes of the Keweenawan Supergroup. The Keweenawan intrusions of the western Lake Superior area include the Duluth Complex, Coldwell Complex, and Crystal Lake Gabbro (Figure 4).
History of exploration
The database provided by government consists of the following publications:
1962: GSC total field magnetic survey at V* mile line spacing, 1000' sensor height 1991: Ontario Geological Survey Map 2542 West-Central Sheet Bedrock Geology of Ontario scale 1:1,000,0001964: Ontario Department of Mines Map 2065, Atikokan-Lakehead Sheet, scale 1:253,4401936: Tanton (1935) Canada Department of Mines Map 356A and 355A (out of print), Pigeon River Area, Thunder Bay District, scale 1:63,360Geul, J.J.C. 1970. Geology of Devon and Pardee Townships and the Stuart Location.
Ontario Department of Mines, Geological Report 87, 52 p.
•j l'
Tablet.TOWNSHIP/
AREADEVON
DEVON
DEVON
DEVON
DEVON
DEVON
DEVON
DEVON
DEVON
DEVON
DEVON
DEVON
DEVON
DEVON
DEVON
DEVON
DEVON
'PARDEE
PARDEE
PARDEEPARDEEPARDEE
PARDEE
'PARDEE
PARDEE
PARDEE
PEARSON
PEARSON
PEARSON
PARDEE
PARDEE
PARDEE
PARDEE
PARDEE
PARDEE
PARDEE
DEVON
DEVON
DEVON
DEVON
DEVON
ClaimNumber
TB 121 8881
TB 1231682
TB 123 1728
TB 123 1729
TB 1231730
TB 1231 731
TB 1231 931
TB 1232760
TB 1232761
TB 1232762
TB 1232763
TB 1232764
TB 1232791
TB 1232792
TB 1232793
TB 1232794
TB 1239442
TB 1207995
TB 1238085
TB 1239758
TB 1239759
TB 1239761
TB 1239762
TB 1239763
TB 1239764
TB 1239773
TB 1209668
3001525
3001526
3001527
3001528
3001529
3001530
3001531
3001532
3001533
3001534
3001535
3001536
3001537
3001538
Units
8
16
5
16
16
16
16
5
10
10
10
12
16
16
16
16
8
12
4
8
16
16
16
8
8
16
16
10
6Q
16
16
4
4
8
4
2
2
4
3
4
Recordina Date
1998-MAY-12
1998-MAY-12
1997-SEP-17
1997-SEP-17
1997-SEP-17
1997-SEP-17
1998-MAY-12
1998-MAY-12
1998-MAY-12
1998-MAY-12
1998-MAY-12
1998-MAY-12
1998-MAY-12
1998-MAY-12
1998-MAY-12
1998-MAY-12
1999-SEP-27
1998-AUG-05
1999-SEP-13
1999-SEP-20
1999-SEP-20
1999-SEP-20
1999-SEP-20
1999-SEP-20
1999-SEP-20
1999-SEP-20
1995-JUL-31
2002-feb-14
2002-feb-14
2002-feb-14
2002-feb-14
2002-feb-14
2002-feb-14
2002-feb-14
2002-feb-14
2002-feb-14
2002-feb-14
2002-feb-14
2002-feb-14
2002-feb-14
2002-feb-14
Claim Due Date
2002-MAY-12
2002-MAY-12
2002-JUN-17
2002-JUN-17
2002-JUN-17
2002-JUN-17
2002-MAY-12
2002-MAY-12
2002-MAY-12
2002-MAY-12
2002-MAY-12
2002-MAY-12
2002-MAY-12
2002-MAY-12
2002-MAY-12
2002-MAY-12
2002-SEP-27
2002-AUG-05
2002-SEP-13
2002-SEP-20
2002-SEP-20
2002-SEP-20
2002-SEP-20
2002-SEP-20
2002-SEP-20
2002-SEP-20
2002-JUL-31
2004-feb-14
2004-feb-14
2004-feb-14
2004-feb-14
2004-feb-14
2004-feb-14
2004-feb-14
2004-feb-14
2004-feb-14
2004-feb-14
2004-feb-14
2004-feb-14
2004-feb-14
2004-feb-14
Status
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
AA
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
WorkReauired3200
6400
2000
6400
6400
6400
6400
2000
4000
4000
4000
4800
6400
6400
6400
6400
3200
9600
1600
3200
6400
6400
6400
3200
3200
6400
635
4000
2400
3200
6400
6400
1600
1600
3200
1600
1600
800
1600
1200
1600
Total Applied
6400
12800
4000
12800
12800
12800
12800
4000
8000
8000
8000
9600
12800
12800
12800
12800
3200
4800
1600
3200
6400
6400
6400
3200
3200
6400
37765
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Total Reserve
0
1
0
0
1205
0
0
0
0
0
0
0
0
0
0
o l0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
ADMMISTRATIVE DISTRICTS l DIVISIONS
MMng DmtatHi Thuw)*i BIT
THUHOEM BAT
HlnMry tl N*w*J Knuixa* OWItlcl TMUHDM KAY
MINING LAND TENURE
MAP
DM* tnuoftaMM Jan4 MM t1:llhlM
TOWNSHIP r AREA PLAN
PEARSON G-OW2
ADMINISTRATIVE DISTRICTS ' DIVISIONS• Inlng ttvltbfi Thufldw Miy
(.(ltd THlMfllMKttt DtoMlo* THUHOCH BATMMUHif el (taw* Uneven CWHit! TttUHOEH BAY
TOTOOIUPHIC
Q -——H ——D ~.—
UWDTENLMI
Bs
Q
QaQQ
LAND TIMUHC MTTt1DltAW*L9
MPOHTMIT NOTKU
LAND TfHUMt tMTHORAWAL DUCMTOOM
IMPORTANT HOTICEI
toCO
en oo
2. 237 58
Figure 4. Proterozoic geology of the Lake Superior area, and location of Blake Project
Logan Sills (traps
N Blake Channels*.J——K————————————————————————————,
Duluth Complex L—v
Nipigon Picrites50" N
Coldwell Complex
Lower Osler Group.*-''' \ ; Upper Osler Group (traps)
N. — \ ——.^ Portage Lake Volcanics (traps) \
Crystal Lake Gabbro Pigeon River dikes
North Shore Volcanics (traps)
modified from Sutcliffe (1991)
Mamainse Point Group (traps)
870W
237 58j*
The previous exploration by the private sector is as follows:
In 1962, Denison Mines conducted a magnetic survey (Lalonde, 1962) and prospecting/geology (Sozanski, 1962) on an easterly-trending dike of the Pigeon River suite (see below) that passes through claim 1232764. The dike shows up as a magnetic high, and small showings with up to Q.46% Cu and Q.38% Ni were noted.
Cominco drilled vertical holes DEV-1 and DEV-2 into the above Pigeon River dike immediately west of claim 1232764 (Fig.4; Tanaka, 1968). Hole DEV-1 was 50.57 m long, passed through 1.2 m of overburden, and then encountered gabbro dike for the entire hole. A weakly mineralized zone with fine-grained, disseminated pyrrhotite, chalcopyrite and pentlandite was intersected from 58.82 to 99.97 m. This 41.15m long section (presumably down the dip of the mineralization) averages Q.07% Cu and Q.05% Ni. Hole DEV-2 was 309.07 m long, and passed through less than 3.5 m of overburden before reaching the gabbroic dike which persisted for the length of the hole. Only minor specks of chalcopyrite were noted in this hole, and no assays were recorded.
In 1971 Olavi Isotalo excavated a trench on present claim 1231729, and drilled two closely-spaced holes on claim 1232760. Hole 1-1 was 76.20 m long, with a dip of -450 and an azimuth of 3350 (Kelly, 1971). The hole penetrated 4.09 vertical m of overburden, followed by a 29.3 m vertical thickness of diabase (likely a sill according to the map of Geul, 1970), and ended in sediments of the Rove Formation. Minor disseminated sulphides are reported in the diabase, but no assays are recorded. Hole I-2 was 76.35 m long, and likewise dipped -45" toward 3350 . The hole penetrated 5.60 vertical m of overburden, followed by a 7.77 m thick (vertical thickness) sill, argillite of the Rove Formation, a 20.26 m thick diabase sill commencing at a true depth of 31.89 m, and then ended in Rove Formation. Minor disseminated sulphides were noted in both sills, but no assays are provided.
Fleck Resources examined Isotalo's property in 1990, concentrating on ground in Pardee Township, immediately east of North Atlantic's claims. They completed a magnetic and a soil geochemistry, neither of which discovered anything of interest (McGoran, 1991).
North Atlantic Nickel drilled BP-99-2 in March, 1999 (North 1999). The drill hole was deepened as BP-00-01 by Dumont Nickel (North 2000). In BP-99-2 and 00-01 a gabbro channel approximately 200 m thick was intersected. Dumont Nickel also drilled BP-00-02 northwest of BP-99-2. In 2001 Dumont Nickel drilled BP-01-01 and BP-01-02 respectively 150 m southeast and 150 m northeast of BP-99-2 (North 2001).
Description of the drill holes
BP-02-01 and BP-02-02 tested the continuity of the gabbro channel intersected in BP- 01-01 and BP-01-02. The channel is interpreted as striking NE. The drill hole logs, sections, and assay certificates are in Appendix B. BP-02-03 was a test of the NE strike extension of the stratigraphy intersected in BP-01-01 and BP-01-02.
Several diabase and gabbro sills hosted within the Rove Formation were intersected however appreciable accumulations of sulphide minerals were not discovered.
10 Conclusions
There is wide variation in the nature and abundance of diabase/gabbro in the section, however in the area of these drill holes there are no appreciable sulphide accumulations and no further work is recommended.
Respectfully submitted,
MAFIC PLANET LIM&fED
Jon North, Ph.D. Geologist
11References
Geul, J.J.C. 1970. Geology of Devon and Pardee Townships and the Stuart Location. Ontario Department of Mines, Geological Report 87, 52 p.
Lalonde, E. J. 1962. Report of a magnetic investigation in the vicinity of Pigeon River, Ontario. Unpublished Assessment Report, Denison Mines, 2 p. Afri No. 52A04SW0073.
Lightfoot, P.C., and Lavigne, M.J., 1995. Nickel, copper, and platinum group element mineralization in Keweenawan intrusive rocks: new targets in the Keweenawan of the Thunder Bay region, north western Ontario. Ontario Geological Survey Open File Report 5928, 32 p.
McGoran, J.P. 1991. 1990 exploration program, Isotalo Property, Pardee Township, Thunder Bay Mining Division, Ontario. Unpublished Assessment Report, Fleck Resources Ltd., 84 p. AFRI No. 52A04SW0101.
North, J., 1999. Report on diamond drilling, Devon Township, District of Thunder Bay, Ontario, Canada, NTS 52 A/4, for North Atlantic Nickel Corp., Unpublished assessment report, 10 p.
North, J., 2000. Report on diamond drilling, Devon and Pardee Townships, District of Thunder Bay, Ontario, Canada, NTS 52 A/4, for Dumont Nickel Inc., Unpublished assessment report, 9 p.
North, J., 2001. Report on diamond drilling, Devon Township, District of Thunder Bay, Ontario, Canada, NTS 52 A/4, for Dumont Nickel Inc., Unpublished assessment report, 13 p. plus Appendices.
Ontario Geological Survey 1991. Bedrock Geology of Ontario, West-Central Sheet; Ontario Geological Survey, Map 2542, 1:1,000,000.
Pufahl, P.K., 1996. Stratigraphic architecture of a Paleoproterozoic iron formation depositional system: The Gunflint, Mesabi, and Cayuna iron ranges. Unpublished M.Se. thesis, Lakehead University, 167 p.
Sozanski, A.G. 1962. Geological Report EX.538. Unpublished Assessment Report, Denison Mines, 4 p. AFRI No. 52A04SW0073.
Tanaka, V.A. 1968. Drill logs, holes DEV-1 and DEV-2. Unpublished Assessment Information, 7 p. AFRI No.52A04SW0070.
12APPENDIX A
CERTIFICATE OF QUALIFICATION
As the author of the report entitled "REPORT ON DIAMOND DRILLING, DEVON AND PARDEE TOWNSHIPS, DISTRICT OF THUNDER BAY, ONTARIO, CANADA", l hereby make the following statements:
1. My name is Jon William North, l am a Geologist and employed by Mafic Planet Limited, a mineral exploration consulting company. My office address is 1413 Jefferson Cres., Oakville, Ontario, L6H 3G5.
2. l have received the following degrees in Geology/Earth Sciences:B.Sc., awarded in 1984 by the University of Western Ontario, London, Ontario;M.Se., awarded in 1988 by Memorial University of Newfoundland, St. John's,Newfoundland;Ph.D., awarded in 1993 by the University of Western Ontario, London, Ontario.
3. l am a member of the Prospectors and Developers Association of Canada, the Association of Geoscientists of Ontario, the Society of Economic Geologists, and a Fellow of the Geological Association of Canada.
4. l have been a practicing professional Exploration Geologist and research scientist since 1984.
5. l have read National Instrument 43-101 (Standards of Disclosure for Mineral Exploration and Development of Mining Properties), and l am a "Qualified Person" for the purposes of that instrument. This report has been prepared in compliance with Parts 5, 6 and 7 of National Instrument 43-101.
6. This report is based on field work personally supervised by the writer between April 11 th and May 2, 2002 and from information in the public record in the Ministry of Northern Development and Mines Assessment files.
Dated at Oakville, Onta/lo this l *-f day of ^~v*.— , 2002.
Jon North
13 APPENDIX B
Diamond Drill Records BP-02-01, BP-02-02, and BP-02-03
North Atlantic Nickel Corp.Diamond Drill Core Record
Project: BlakeHole Number: BP-02-01Claim Number: 1231729Target: C2Core recovery^ 95"XoCore storage: Gorham TownshipDrilled by: NorexNotes:
MetresFrom
0.0021.0039.95
174.22
191.97
198.20
207.85
213.60
248.40
Unit NameTo21.0039.95
174.22
191.97
198.20
207.85
213.60
248.40
259.43
BW CasingRove FormationDiabase
Taxitic Gabbro
Diabase
Taxitic Gabbro
Diabase
Taxitic Gabbro
Rove formation
Date Started: 13 April 2002Date Completed: 22 April 2002Logged By: Jon NorthCore Size: BQ
Description
siltstone member, grey, thickly-bedded
UTM: 297270 E S328272 NCollar Elevation: 415 mAzimuth: n/a Inclination: -90Survey Type: HF
m0
350
baked siltstone for 22cm on ucon, chilled upper marginweakly mt., homogeneous, fg-mgfew micaceous intervals slightly hydrated ————
Az. Incl.-90-90
Sample
at 89.0 the unit becomes increasingly gabbroic and eg granular, traces of fg-mgpy from 89.0 to 95.0 j | 1
164.0 to 174.22 start to see more of a porphyritic texture with cpx+spinelweakly to moderately pegmatoidal, eg cpx-plag-amphlbole cm-scate patcheswith mg spinel and tr cpy |
m
From
— ———
unusual spinifex-like texture of sheafs of femag mineral in a couple of short intervalsat 179.0 and 187.5from 191.35 to 191.38 a purple glass chill possibly a small, late diabase injectionucon 20cm glass, otherwise fg aphanitic, black, wmt, cpx and plag-phyric in centretr.-.50A diss. py and po throughoutNB: Icon of overlying gabbro is not fg suggesting the diabase is laterIcon 20cm of glassas above but weakly taxiticIcon not altereducon 20cm glass, black, aphanitic to fghighly fractured, blocky, talcose, apparently a high Mg phaseIcon 20cm of glass 1as above, weakly taxitic, ucon slightly baked, some talcose intervalsfrom 214.7 to 217.4 granophyric phase, red kspar gives pigmentation, and kspar in fracturescpy droplets appear at 241.86po appears in the droplets at 245.54, never more than tr.-0.5 0A total sulphidelast m has granular texture and Icon at 360 teaSiltstone member, ucon baked for 1 mthickly-bedded perp. tea
Sheet 1of 2Total Depth: 353 m
Az.
To
—————
Incl.
Total
"~r- —— ——
Project: BLAKEHole Number: BP-02-01
MetresFrom259.43
280.78328.53350.00353.00
Unit NameTo
280.78
328.53350.00353.00
EOH
Gabbro
Rove SiltstoneGabbroRove Siltstone
Description
1m chill, ucon perp. teamg granular, tr. po+cpy, 1m chill at Iconas above, bedding and ucon perp. teaas aboveas above
Sample From
Sheet 2 of 2
To Total
."X
J-.p'-'
NORTH ATLANTIC NICKEL CORP.Diamond Drill Core Record
Project: BLAKEHole Number: BP-02-02Claim Number: 1231729
rCore recovery:Core storage: Gorham Twp.
Notes:
MetresFrom
0.0020.00
156.04
182.21
187.47195.70
198.90
258.26
279.83
Unit NameTo
20.00156.04
182.21
187.47
195.70198.90
258.26
279.83
320.00
320.00 EON
lBW casingRove Formation
Gabbro (C2)
Diabase
Gabbro (C2)Diabase
Gabbro (C2)
Diabase
Gabbro
Date Started: 22 Apr. 2002Date Completed: 25 Apr. 2002Logged By: Jon NorthCore Size: BQ
Description
grey siltstone, thickly-bedded, S"*, graphitic laminaecontact thermal metamorphism starts at 147.0dk green mgupper 2 m are micaceousminor red feldspar in upper 10mphyric cpx and spineltrace sulphidefg glassy diabase sill injection 1 81 .7-1 81.8fg with glassy contacts, prismatic cpx phenocrystsweakly magnetic, clearly later than the gabbroas aboveas abovexenolith of gabbro from 198.27 to 198.4as above
UTM: 297492E 5328197 NCollar Elevation: 420 metresAzimuth: Inclination: -90Survey Tm
0320
224.4-229.4 somewhat fractured, with red feldspar alterationminor diss pyas above2'fa diss py at top 1 mas above304.1- 304.16 diabase, glassycontact at 31 1 .26 changes to chilled margin for 1 m
l
ype:HFAz. Incl.
.90-90
Sample
m
From
Sheet 1of1Total Depth: 320 rt
Az.
To
————
Incl.
Total
NORTH ATLANTIC NICKEL CORP.Diamond Drill Core Record
Project: BLAKEHole Number: BP-02-03Claim Number: 1207995
Core recovery: >95%Core storage: Gorham Township
Notes:
MetresFrom
0.0023.00
54.6164.6469.63153.05176.64315.35323.00327.14387.65389.63457.00468.22527.00
To23.0054.61
64.6469.63153.05176.64315.35323.00327.14387.65389.63457.00468.22527.00EOH
Unit Name
CasingGabbro/Logan
Rove SiltstoneLogan diabaseRove SiltstoneLogan diabaseRove SiltstoneRove graphitic argilliteLogan diabaseRove graphitic argilliteLogan diabaseRove graphitic argilliteLogan diabaseRove graphitic argillite
Date Started: 25 Apr. 2002Date Completed: 30 Apr. 2002Logged By: Jon NorthCore Size: BQ
Description
blotchy, mg, with eg dark green femagand light pegmatoidal plag patchesImchillatperp. Icontypical1m chill at perp. uconas aboveas aboveas abovefinely laminated, graphitic, pyritic argilliteas aboveas aboveas aboveas aboveas aboveas above
UTM: 301502 E 5330742 NCollar Elevation: 320 metresAzimuth: Inclination: -90Survey Tm
0527
ype:HFAz. Incl.
-90-90
Sample
m
From
Sheet 1of 1Total Depth: 527 m
Az.
To
—— ——
Incl.
Total
ONTARIO MINISTRY OF NORTHERN DEVELOPMENT AND MINES
Work Report Summary
Transaction No: W0240.01032 Status: APPROVED
Recording Date: 2002-JUN-17 Work Done from: 2002-APR-11
Approval Date: 2002-JUL-25 to: 2002-MAY-03
Client(s):
303588 NORTH ATLANTIC NICKEL CORP
Survey Type(s):
PDRILL
Work Report Details:
Claim*
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
1207995
1218881
1231682
1231728
1231729
1231730
1231731
1231931
1232760
1232761
1232762
1232763
1232764
1232791
1238085
1239442
1239773
Perform
541,976
SO
SO
SO
553,605
SO
SO
SO
SO
SO
SO
sosososososo
595,581
External Credits:
Perform Approve
841,976
SO
SO
SO
S53.605
SO
SO
SO
SO
SO
SO
soSO
soSO
soso
595,581
so
Applied
S9.600
S3.200
S6.400
S2.000
S6.400
S6.400
56,400
S6,400
52,000
54,000
S4.000
54,000
54,800
S6.400
51,600
53,200
56,400
583,200
Applied Approve
S9.600
53,200
56,400
52,000
S6.400
56,400
S6.400
S6.400
S2.000
S4.000
54,000
54,000
54,800
56,400
51,600
53,200
56,400
583,200
Assign
519,995
SO
SO
SO
547,205
50
SO
SO
SO
SO
SO
SO
SO
SO
so50so
567,200
Assign Approve
19,995
0
0
0
47,205
0
0
0
0
0
0
0
0
0
0
0
0
567,200
Reserve
512,381
SO
SO
SO
SO
SO
SO
SO
SO
SO
so50sosoSO
so50
512,381
Reserve Approve
S12.381
SO
SO
SO
SO
SO
SO
SO
50
50
50
SO
SO
sosososo
512,381
Due Date
2003-AUG-05
2003-MAY-12
2003-MAY-12
2002-SEP-17
2002-SEP-17
2002-SEP-17
2002-SEP-17
2003-MAY-12
2003-MAY-12
2003-MAY-12
2003-MAY-12
2003-MAY-12
2003-MAY-12
2003-MAY-12
2003-SEP-13
2003-SEP-27
2003-SEP-20
Reserve:S12
S12
,381 Reserve of Work Report*: W0240.01 032
,381 Total Remaining
Status of claim is based on information currently on record.
52A04SE2012 2.23758 PARDEE 900
2002-Aug-07 14:01 Armstrong-d Page 1 of 1
Ministry ofNorthern Developmentand Mines
Date: 2002-JUL-25
Ministers du Developpement du Nord et des Mines
JON WILLIAM NORTHNORTH ATLANTIC NICKEL CORP1413 JEFFERSON CRESCENTOAKVILLE, ONTARIOL6H 3G5 CANADA
OntarioGEOSCIENCE ASSESSMENT OFFICE 933 RAMSEY LAKE ROAD, 6th FLOOR SUDBURY, ONTARIO P3E6B5
Tel: (888) 415-9845 Fax:(877)670-1555
Dear Sir or Madam
Submission Number: 2.23758 Transaction Number(s): W0240.01032
Subject: Approval of Assessment Work
We have approved your Assessment Work Submission with the above noted Transaction Number(s). The attached Work Report Summary indicates the results of the approval.
At the discretion of the Ministry, the assessment work performed on the mining lands noted in this work report may be subject to inspection and/or investigation at any time.
The revisions outlined in the Notice dated June 19, 2002 have been corrected. Accordingly, assessment work credit has been approved as outlined on the Declaration of Assessment Work Form that accompanied this submission.
If you have any question regarding this correspondence, please contact BRUCE GATES by email at [email protected] or by phone at (705) 670-5856.
Yours Sincerely,
Ron GashinskiSenior Manager, Mining Lands Section
Cc: Resident Geologist
North Atlantic Nickel Corp (Claim Holder)
Assessment File Library
North Atlantic Nickel Corp (Assessment Office)
Visit our website at http://www.gov.on.ca/MNDM/LANDS/mlsmnpge.htm Page: 1 Correspondence 10:17308
o o(N
H m
COin r- fi MM
(NH Orq H ea * o i*Min
I DEVELOPMENT
PFlOVMtlAi HIKING
MINING LAND TENURE
MAP
Data/Time of Issue Jun82D02
TOWNSHIP/AREA
PARDEE
11:24h Eastern
PLAN
Q-O 681
oTIhiland*rtivrmMlwn. ri**m*|i l**[il*i#nfl*iHiii rw^i*ni^miv^i3 ur imdHIH diHrrnlnrilDii pni|ini****tn iFiiormiinn tNninoh.if.i.m^i li cajmpliitd fFom virlLinwjuicn, CiHtipMinHB md jLcutKV ErviNlimirwlMd. AddlHnnd hiaimrfkm.niw *l"i ** o^ilnwUhrijugfi Di* tt* L ml* TKkt D-r B.*jltTn- Olflci. or Itii Hhlt^'yorHuibl RIIDUICII,
T h* ktfBimMtn *ho*jri*d*iw*( (rum d 14! 11 dita Kdai^ln thiPrtvbictatnflflfeM RK*r4tf*' Crffici
General Information and Limitations
ADMINISTRATIVE DISTRICTS l DIVISIONSMining Division Thunder Bay
Land Titles/Registry Dlvtolon THUNDER BAY
Mlnlttry of Nt(ur*l Rttourc** Dittrfct THUNDER BAY
TOPOGRAPHIC
E3
LAND TENURE
El
^:^ Uhlr, CUfni' l; v' i 'i 11; "iK;,^'^ 1,, ^'^'i
LAND TENURE WITHDRAWALS
IMPORTANT NOTICES
LAND TENURE WITHDRAWAL. DESCRIPTIONS
rn.xio.-i IH n n-i t.nmi jmnDm n-i mmK. (J mi SEC.H 1*1 H1!0™™1 MTIM1 11,1 . Hdllt.,1111 *IM™J .1- U.
ninlHMnvullM w tCflmmiwii Mm, ciMMIkiMlriM hiwrflwl
ofnnltatMfHi'Ari kiuwfln H Kfnw.fti vivoidtliHWhMMml Oita.
H..S1W3 IUIW*ttflnHH*IIIHBB*1WfBWttlMllO g(UJ6HWrB-lMJHM!lM
10 FtfeQ LEUHAtC.AnENUJtTION EDHE JMUMB VASIE DMPOSML HTE
JMiz snunKBHIm J-Jur.om B.I IKISI .n.miii MI WMB-OBTI o* y wniniiwiFnoiiiriiiKO.OMnii
MCHM2 ClltO UnHiCWFLK V HI OWIEBIHP.
nu.Limmi OUT, un. HMni mm: ™ HM*I t"i* rimIbH k mn.nriinlUBri W*"i" l"" BK H UIWI II IMW
*WIL JWIII OUT.NX. 21.2111 IUV: HI DO M In e H l MI rWHUI HI m*
IMPORTANT NOTICESHraM nrivr frttfc* i |MfM.'Hi*viHt*, iir.rn.WaiN it unditkoni MM lh*t *BO mnnai fFK^iatq,
H VIV o
1Mm
PHOVWCUL HMWU
MINING LAND TENURE
MAP
Date; Tims of Issue May 31 2001
TOWNS H IP/AREA
DEVON
16:3Sh Eastern
PLAN
Q-0650
ADMINISTRATIVE DISTRICTS t DIVISIONS
Mining Division Thunder Bay Land Tillesf Registry Dlvbkm THUNDER BAY
Mlnldry ol Nttunl Rnourctt Dtotrlct THUNDER BAY
TOPOGRAPHIC
j Lil IndOflft*
!a ™.,.
LAND TENURE
LAND TENURE WITHDRAWALS
IMPORTANT NOTICES
LAKD TENURE WITHDRAWAL DESCRIPTIONS
M w 34 a DO!
Nw i; m*
Nw.eitv* e i *uiMct IIMIMG onof *.wii
;A(URmC WmEVmHI}RAWM.FFlOMilMlK OROSRWTi 13*4
wu Mie D n*w*4T0 two if c r FOHFJII R FM ARCH UMPI E PLOTS! iCUHMCC.nfrHTEVMHDFUVMFflOHtT*HIKi ORMRWIB IMM
*WLDAlED[ttAd*4ra AnOTECrfOREllREHARCH SAMPLE *1OT|
J* 1.1 W^ VMtTt DBPOfH. BITE WTHraUH S.Hfl.OmWflHHOUD L D r* L 411D ROLL
TOFLACLEHCHATf h i ED H MtOUHD HWSIt DHPOfML HTi
IMPORTANT NOTICES
General Information and Limitations^
Ihi iikimidon ihow*iiHrM*i If* m fllqlil ri M Iviliti * In tm PinvincMI HIH*t Mcjr ri Wi *is ut nownl*ainig mm ItH liuHttry at Flantmri.DHBianmini aid H kit* t**D Bil.
hna U*H thai re sir Id nr.^nHM (Vi* nby li ri i In nfeilna c W*" i m*tnol hi Iki^Uri
1231730
BP-01-02BP-99-2 BP-00-01
BP-01-01LEGEND
Logan Diabase(1731 Rove Formation SiltstoneBP-02-02
ephemeral creek
escarpment
geologic contact
drill collar, vertical holeclaim corner post
UTM registration
12317292 .23758
North Atlantic Nickel Corp.Devon Township, Ontario
DETAIL OF DRILLING PLANMAP REF. NO.: DPLANSM.DWG
DRAWN: MPH TORONTO
•vi International Exploration & Mining Consultant*295000 298000297000296 DOG OONBULTINO LIMITBD
o~
1207995 BP-02-03
BP-99-03
LEGEND
0) drill hole
claim boundary
creek
O 250 500meters
North Atlantic Nickel Corp.Pardee Township, Ontario
DRILL PLAN DDH BP-02-03
MAP REF. NO.: BPQ203.WG
SCALE: 1:5000
MAP:
DROJ.;UTM ZONE 16 NAD83
DRAWN: MPH TOROMTO
DATE: JUNE 2002
International Exploration Mining Consultants
LU
Oxl CMr- cnCSJ
LU
CM
O5 CM
BP-02-01
400m a.s.l.o/b
RFss
DEL
200m a.s.l.
GBtx
DBu
GBtx
DBu
GBtx
400m a.s.l.
RFss
GBu
RFss
GBu
RFss
353m EOH
Om a.s.l.
DRILLHOLE LEGENDHole Number
GFmt
So GBu
Length (m)
LITHOLOGIC LEGENDo/b Overburden RFss Rove siltstone
Rove graphitic argilliteGunflint Formation - chertyGunflint Formation - magnetite richLogan Diabase SillTaxitic gabbroDiabase dikeDiabase, unsubdividedGabbro, unsubdividedGranophyrePlagioclase-phryic diabaseVari-textured gabbroQuartz-carbonate stockworkArchean basement
RFgrGFchGFmtDBLGBtxDBdDBuGBuDBgranDBplagGBvarqtz-ccA
e; Q D O
O 50 100meters
52A04SE2012 2.2375S PARDEE 240
NORTH ATLANTIC NICKEL CORP.
Blake Project, Ontario
DRILL HOLE BP-02-01MAP REF, NO,:ALLSECTS.DWG
SCALE: I:IOOOFIGURE:
DRAFTED BY: MC
DRAWN: MPH TORONTO
DATE: MAY 2002
International Exploration Mining Consultants
Lil
OJ CNJ
LU
a
BP-02-02
o/b
400m a,s.l.
RFss
GBtx
DBuGBtxDBu
400m a.s.l.
200m a.s.l.GBtx
DBu
GBu
320m EOH
Om a.s.l.
DRILLHOLE LEGENDHole Number
GFmt
.
5 GBU•*3
J"
-T .T J J J J J
Length (m)
LITHOLOGIC LEGEND
LL
o/bRFssRFgrGFchGFmtDBLGBtxDBdDBuGBuDBgranDBplagGBvarqtz-ccA
OverburdenRove siltstoneRove graphitic argilliteGunflint Formation - chertyGunflint Formation - magnetite richLogan Diabase SillTaxitic gabbroDiabase dikeDiabase, unsubdividedGabbro, unsubdividedGranophyrePlagioclase-phryic diabaseVari-textured gabbroQuartz-carbonate stockworkArchean basement
O O Q i-y er r\** * ^ o ^ 5 8
O 50 100meters
52A04SE2012 2.23758 PARDEE 250
NORTH ATLANTIC NICKEL CORP.
Blake Project, Ontario
DRILL HOLE BP-02-02MAP REF. NO.:ALLSECTS.DWG
SCALE: I:IOOOFIGURE:
DRAFTED BY: MC
DRAWN: MPH TORONTO
DATE: MAY 2002
•ULTIMO UMITBD
International Exploration Mining Consultants
Lil
l
oCO
LU
BP-02-03
o/b
300m a.s.l. 300m a.s.l.
GBu
RFss
DBL
RFss
DBL
100m a.s.l.
RFss
RFgr DBL
RFgr
DBL
-100m a.s.l. RFgr
DBL
RFgr
DRILLHOLE LEGENDHole Number
GFmt
j? O GBu \
JJJ J.T J J J
Length (m)
LITHOLOGIC LEGEND
LL
o/bRFssRFgrGFchGFmtDBLGBtxDBdDBuGBuDBgranDBplagGBvarqtz-ccA
OverburdenRove siltstoneRove graphitic argilliteGunflint Formation - chertyGunflint Formation - magnetite richLogan Diabase SillTaxitic gabbroDiabase dikeDiabase, unsubdividedGabbro, unsubdividedGranophyrePlagioclase-phryic diabaseVari-textured gabbroQuartz-carbonate stockworkArchean basement
o 50 100meters
527m EOH
52A04SE2012 2.23758 PARDEE 260
NORTH ATLANTIC NICKEL CORP.
Blake Project, Ontario
DRILL HOLE BP-02-03MAP REF. NO.:ALLSECTS.DWG
SCALE: 1:1000
FIGURE:
DRAFTED BY: MC
DRAWN: MPH TORONTODATE; MAY 20Q2
•VI PHI International Exploration Mining Consultants