42C13SW8126 63.4388 WABIKOBA LAKE 010 REPORT on DIAMOND DRILLING PROGRAM (1983) HEMLO NORTH (PINE GROVE LAKE) PROJECT THUNDER BAY MINING DIVISION PROVINCE OF ONTARIO on behalf of HARLIN RESOURCES LIMITED Vancouver, B.C. by J.H.Montgomery, Ph.D., P.Eng, January 15, 1985

Transcript of RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological...

Page 1: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

42C13SW8126 63.4388 WABIKOBA LAKE 010

REPORT

on

DIAMOND DRILLING PROGRAM (1983)

HEMLO NORTH (PINE GROVE LAKE) PROJECT

THUNDER BAY MINING DIVISION

PROVINCE OF ONTARIO

on behalf of

HARLIN RESOURCES LIMITED

Vancouver, B.C.

by

J.H.Montgomery, Ph.D., P.Eng,

January 15, 1985

Page 2: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

- Page l -

1.0 INTRODUCTION

This report summarizes the results of the 1983 diamond-drilling

program done on the Pinegrove Lake (Hemlo North) Project in Thunder Bay

Mining Division, Ontario for Harlin Resources Limited of Vancouver, B.C.

The drilling was done by N. Morissette Diamond Drilling Limited of

Haileybury, Ontario under the supervision and direction of Montgomery

Consultants Limited of Vancouver, B.C.

A total of 1707 feet were drilled in five holes during the period

October 11 to October 28, 1983. The core was collected on site, packed in

wooden core boxes and transported to Marathon, Ontario for splitting,

logging and sampling. Samples were taken at intervals of five feet,

bagged and shipped directly to Swastika Laboratories in Swastika, Ontario

where they were analyzed for gold, silver, copper, lead and zinc.

This report provides information on the location of the holes, a

description of the drill-holes, daily logs of drilling contractor, drill logs

(geological description) and assay information (Certificates of Analysis).

It also provides a summary of drilling contractor reports.

Page 3: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

- Page 2 -

2.0 LOCATION AND ACCESS

The claim group is located about 18 kilometers (11 miles)

northeast of Memlo, Ontario in Thunder Bay Mining Division. N.T.S. Map

Reference: 42 C 113; Latitude- 48o 50'N, Longitude- 85o 50'W.

The claims are accessible by travelling north on Highway 614

from Manitouwadge Corner a distance of 14 kilometers (8.6 miles). From

that point, a road runs easterly toward Dead Otter Lake and bisects the

property. See Figure 2-1.

The property lies between elevations of 335 and 500 meters (1100

to 1650 feet) and is characterized by rolling hills with low topographic

relief. Summers Lake and Luning Lake are on the claim-area as are a

number of swamps and creeks. The area is timbered with spruce and

balsam.

An old cat track is present on the property but this will need

refurbishing and extending about l mile to provide access for drilling.

Page 4: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

^iStf'tfiSM - .-*. ;.)-* ''W i

^\ p "s /^ V-i^SHsvv-';-'*. cs -o^ ^•^•^ssQr'4r vii• .-li- ^ .... .i.' ..Vt jnrc.fis ,TM -.'iJ' i^i

FIG. 2-HARLIN RESOURCES LTD.

HEMLO NORTH

LOCATION MAPSCALE l I E60.000

JL Jfi. JUL -20

MONTGOMERY CONSULTANTS LTD. I OCTOBER I9B3

Page 5: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

- Page 4 -

3.0 CLAIM INFORMATION

Ilarlin Resources Limited holds title under option agreement 40

mineral claims located in Thunder Bay Mining Division in the Province of

Ontario. The approximate location of the claims is shown in Figure 3-1.

Claim information is tabulated below:

CLAIM NO.(Number) RECORD DATE

TB660401 - 405 (5) September 27, 1982

TB660502 - 520 (19) September 27, 1982TB644129 - 144 (16) September 30, 1982

Most of the claim posts were located in the field and their locations are marked on the geological map (Figure 5-1).

Claims TB660401-405 were restaked on July 6-8, 1983 and recorded on September 16, 1983 with the following new numbers:

TB660401 - TB723597

TB660402 - TB723592

TB660403 - TB723591

TB660404 - TB723586

TB660405 - TB723585

Page 6: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

________FIG. 3-1________HARLIN RESOURCES LTD.

HEMLO NORTHCLAIM MAP

SCALE l i 31,680

l 3km

MONTGOMERY CONSULTANTS LTD. l OCTOBER 1983

Page 7: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

- Page 6 -

4.0 DRILL PROGRAM

4.1 Introduction

The 1983 diamond-drill program consisted of five holes totalling approximately 1700 feet. All core was split, logged, sampled and assayed. Drill sites were prepared prior to drilling by bulldozer. Details of the program are presented in the following sections.

4.2 Description of Drill Holes

Five holes were drilled to test combined geological, geochemical and geophysical targets. Location and orientation information are given in the following table: DRILL HOLE COLLAR ORIENTATION DEPTH

HN1 104W/850S 32QO-47O 353 ft.

HN2 102W/775S 320O-46.5O 445 ft.

HN3 98W/875S 320O-47O 276 ft.

HN4 98W/1000S 320O-47O 263 ft.

HN5 92W/725S 320O-47O 376 ft.

The locations of the drill holes are shown on Figure 4-1.

Page 8: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

l

1660402

i i1 i l i

t SRI D LINE

1 2

1 2

1 x11 1111

0

/' ~^*"~^\

f

i \ iSEASONALLY )

FLOODED jt 1

\ -L. V

V de

\

\

OHN 3

673411 f/ [-1673396 J*

^4^53442 S

i \ SUMMERS X

l iD--

\ LAKE \

- A- - - - - 1 C L A 1

^

\ \

\ v \

\ \ \

HN2

O

s

M L

^

**

\\

\

y"*" \^7)HN5

A^^

f

NE

1

660401

1~*} II

t'^

1 66040I.-1.

\ ----J - - - - - -LJ CLAIM POST

FI6.

HARLIN RESOURCES LTD.HEMLO NORTH

DRILL HOLE LOCATION MAPsea f 1 '.5000

0 250 500mMONTGOMERY CONSULTANTS LTD. |

Page 9: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

- Page 8 -

4.3 Daily Contractor Reports

Drilling was done by N. Morissette Diamond Drilling Limited during the period October 11 to October 28, 1983. Two 2-man shifts were used for the job for a total of 713 man-hours (less mobilizaton).

The following table summarizes the labor statistics for the drill crew:

DATE CREW MAN HOURS REMARKS

Oct. 11/83

Oct. 12/83

Oct. 13/83

Oct. 14/83

Oct. 15/83

Oct. 16/83

Oct. 17/83

Oct. 18/83

Oct. 19/83

Oct. 20/83

Oct. 21/83

Oct. 22/83

Oct. 23/83

Oct. 24/83

Oct. 25/83

Oct. 26/83

Oct. 27/83

Oct. 28/83

2

4

4

4

4

4

4

3

4

4

4

4

4

4

4

4

4

4

16

40

40

52

42

40

36

30

40

42

38

50

38

48

40

40

40

41

TravelPrep.Set-upDrillingDrillingDrillingDrill/MoveMoveDrillDrillDrill/MoveDrill/MoveDrill/MoveDrill/MoveDrill/MoveDrill/MoveDrill/MoveDrill/Move

TOTAL 713 man-hours (plus demob.)

Page 10: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

y^ORISSETTE DIAMOND DRILLING LTD.^^ Hoileybury, Ontario

DAILY REPORT — SURFACE

•Hirr

04

NAME

R

4//. (? /X Uftf ~FH

R

'A J '', J /l i ^ A'/ t A' H

R

H

FROM TO FEET

(PUMPMAN)

(PUMPMAN)

(OTHER)

(FOREMAN - FULL TIME)

ROCK DRILLING

OVERB^^EN

*bS'U.O

8b m

bn

8

BEYOND

ISO-

PULLING CASING

MOVING

CEMENTING 1WALKING 1

w x

uK

I

ttuo

s

x

TOTAL j

?

S

Job NAME: A,-// '': - -'/W y/fad't*/*' ffftf,- .—DATE: ^

////S /S ?REMARKS

""S .. ^ /-- f ^*-*J /^,,^

^'•//•*w /s, ( , ,./s

• ' ' (. t r i 'f*~ ' !. : ' -**

TESTS (DEPTH)

—-"

^/-/^r

M^

CASING AND PIPE

DRIVEN (FT.)

RECOVERED

(FT.)

\lJ w

———— CASING

2' IO 1

____ CASING

2 1 10'

PIPE

DIAMOND UNITS

TYPE

CORF

CONCAVE

SHELL

LUGS

CASING SHOE

CASING BIT

OTHER

PERCENT USED

EXT AXT

f

BX NX

MATERIALS AND EQUIPMENT

DRILL

TRACTOR

DIESEL FUEL

GASOLINE

STOVE OIL

PROPANE

CEMENT

MUD

WEDGE

MRS.

MRS.

GALS.

GALS.

GALS.

LBS.

BAGS

BAGS

TYPE

HOLE NO.

ANGLE

WATERLINE LENGTH

DRILL

P. PUMP

S. PUMP

TRACTOR

TYPE NO.

FOREMAN

ENGINEER

f NOTE: Moke 4 copies dolly per machine. Original (white) and first two copies to be moiled to Office, Final copy to be given to Engineer If requested. Ebgtoeer Is requested to *J slon Dolly Reports when chargeable labour and materials ore Included.

Page 11: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

^\ORISSETTE DIAMOND DRILLING LTD.Hoileybury, Ontario

DAILY REPORT — SURFACE

•Htrr

;w

NAME

R

ty.c urif&FH

r\. /J /f i(,L y;R

) K i /* w*i*s/ ^ A' H

R

H

FROM TO FEET

(PUMPMAN)

(PUMPMAN)

(OTHER)

(FOREMAN - FULL TIME)

ROCK DRILLING

O

Z t

VERB!

8

bm

•-bnt

iBEYOND

ISO-

PULLING CASING 1

MOVING

fa

/*

1*

i*

CEMENTING 1WALKING 1

OTHER 1

(SPECIFY IN REMARKS)!

TOTAL i

ft

/*

(fi

fa

J6b NAML ^

DATE: A

REMARKS

*" f^•^'•'^u

TESTS (DEPTH l

•s

. ,v/, , .4- f,;.,™****-^

CASING AND PIPE

CJJ) N3AIMQ

RECOVERED

(FT.)

Si

___ CASING

2' JO'

____ CASING

2' IO'

PIPE

DIAMOND UNITS

TYPE

CORE

CONCAVE

SHELL

LUGS

CASING SHOE

CASING BIT

OTHER

PERCENT USED

EXT AXT BX NX

MATERIALS AND EQUIPMENT

DRILL

TRACTOR

DIESEL FUEL

GASOLINE

STOVE OIL

PROPANE

CEMENT

MUD

WEDGE

HRS.

Z HRS.

GALS.

GALS.

GALS.

LBS.

BAGS

BAGS

TYPE

HOLE NO.

ANGLE

WATERLINE LENGTH

DRILL

P. PUMP

S. PUMP

TRACTOR s

TYPE

J, ,ti*

NO.

FOREMAN' t/J ' f/ 5^"*

f ~ ENGINEER

f NOTEi Moke 4 copies dally per machine. Original (white) and first two copies to be mailed to Office. Final copy to be given to Engineer If requested. Ehgfheer Is requested to /w*!; flan Dollv Reports when chargeable Jobour and materials ore Included.

Page 12: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

^WORISSETTE DIAMOND DRILLING LTD.^^ Hoileybury, Ontario

DAILY REPORT — SURFACE

sHirr

mf

T,

(.

NAME

R

'v*.(,KQf#.rH

J,/)/*/::/, /!R

J* 'LA^iJt MH

/, t j fi b t it i- y.R

H

FROM TO FEET

(PUMPMAN)

(PUMPMAN)

(OTHER)

(FOREMAN - FULL TIME)

ROCK DRILLING

OVER^^)EN

**"?

g*

bn

b nt

8

BEYOND

ISO-

PULLING CASING l

MOVING

/0

/e

/ttffi

CEMENTING 1WALKING 1

OTHER

(SPECIFY IN REMARKS)

TOTAL 1

/^

//'

/^

X/

Job NAME: ^

lL,M*s J/^,^ A . S*'/DATE: ' ^"

/1//.J//J WREMARKS

//t*. J '"Z ^/,.**/ 5.-"*'.;-;* ' f - { 1 A,,,/ l 'li'" ^-U-i-

f,** M *y*' //,-v,-^ , r ./ /. -t* )tis ."'

TESTS i (DEPTH)

l ' t "^

;f

M i" - ^

'"'"O

.t-xf.

i * . ' **7 * ^ ^ /''* -'.--x—../^*- 3/t"*' u--'

j*0"/^'-

CASING AND PIPE

DRIVEN (FT.)

RECOVERED

(FT.)

s p3^

f-

2'

ISING

10'

f.

2'

4SINQ

10'

PIPE

DIAMOND UNITS

TYPE

CORE:

CONCAVE

SHELL

LUGS

CASING SHOE

CASING BIT

OTHER

PERCENT USED

EXT AXT BX NX

MATERIALS AND EQUIPMENT

DRILL

TRACTOR

DIESEL FUEL

GASOLINE

STOVE OIL

PROPANE

CEMENT

MUD

WEDGE

MRS.

S HR8./^*

OALS.

OALS.

GALS.

LBS.

BAGS

BAGS

TYPE

HOLE NO.. y

ANGLE /j v . fi

WATERLINE LENGTH

DRILL

P. PUMP

S. PUMP

TRACTOR *-

TYPE

//y,

•j

l^i 1*

NO.

JMjt/. "/; ' ' - "yFOREMAN fit ^fl j' ' Jfc

. /' fi ' *^f -t^t'i ''it *

ENGINEER

p NOTE: Moke 4 copies doily per machine. Original (white) ond first two copies to b* moiled to *fy slpn Dolly Reports when chargeable labour ond materials ore Included.

Office. Final copy to be given to Engineer If requested. Ehgiheer Is requested to

Page 13: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

kM^ORISSETTE DIAMOND DRILLING LTD.^^ Hoileybury, Ontario

DAILY REPORT — SURFACEl

SHIFT

#*f

NAME

R

•V}f; t'j tU tt TH

j Ov'Ct'"R

(;.;A A*,.,,-,/*H

;.. o, /. i. fit.' ^R

H

FROM

/J

tf

TO

^

y j

FEET

^

7'/

(PUMPMAN)

(PUMPMAN)

(OTHER)

(FOREMAN - FULL TIME)

ROCK DRILLING

/0

/P

OVERE^^EN

srO 1"

to1

2?

W-

t#

\*bn

l1

8

-

BEYOND

ISO-

PULLING CASING l

MOVING

, w*

•s

**

VV

CEMENTING 1WALKING 1

m ifK

IZ

(t23 li

JL.4-

TOTAL j

/5~

i'j*

rf17

J66 NAME: ^

^X . , . /i fi**/ f r. ,, /^— c . ft,'/DATE: J^ " '

I't //*J'/ *' f f f —^

REMARKS

X', c. .- ' •'•- ''-; t:i .-.-•••/s '•''•"

. i * , * '' '"'**.',~ t.iiU' '^••!^-

. . f '' s, J

TESTS (DEPTH)

~ c..' V *""

'•/,

CASING AND PIPE

DRIVEN (FT.)

RECOVERED

(FT.)

0 ?S b

CASINO

2'

* *-

•'*:

/v,

1O'

CASINO

2' l ID'

PIPE

m

DIAMOND UNITS

TYPE

CORF

CONCAVE

SHELL

LUGS

CASING SHOE

CASINO BIT

OTHER

PERCENT USED

EXT AXT BX NX

MATERIALS AND EQUIPMENT

DRILL

TRACTOR

DIESEL FUEL

GASOLINE

STOVE OIL

PROPANE

CEMENT

MUD

WEDGE

HRS.

lj HRS.

f OALS.

OALS.

OALS.

LBS.

BAGS

BAGS

TYPE

HOLENO - x.*. !ANGLE '/C*

WATERLINE LENGTH . S nffs/.f jt'-r t

DRILL

P. PUMP

S. PUMP

TRACTOR

TYPE S

r,-

ti aS .

NO.

, ,1 ,'

FOREMAN .V; '' f /' J^ . - ^IsfslsJ^tstS

ENGINEER

f NOTE' Moke 4 copies doily per machine. Original (white) and first two copies to be mailed to Office. Final copy to be given to Engineer If requested. Ehgfoeer Is requested to if*"); ' tlgn Dolly Reports when choroeoble labour and materials ore Included.

Page 14: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

A\ORISSETTE DIAMOND DRILLING LTD.Hoileybury, Ontario

DAILY REPORT — SURFACEi

•mrr

M

l- f.'H

NAME

R

H

S O A l C A f"' R

0 K J A t. V,. t A,'S H

R

H

FROM

?2

ne

TO

/?*f

t f. V~

FEET

v/

,/v

(PUMPMAN)

(PUMPMAN)

(OTHER)

(FOREMAN - FULL TIME)

ROCK DRILLING

F^^/^

l?to

VER^EN

8b n

\

8

BEYOND

ISO-

PULLING CASING j

MOVING 1CEMENTING 1

WALKING 1

Sz uK Z

uioZ w05

y-#

TOTAL J

/^//5

^/rf

J66 NAME: A"

/^ ^ F roy/fSi.t±"*t- AV^-J/^t^* -^-J -J) ^ yDATE: ' -j^ '

* ,r * f ^"^

REMARKS

;TESTS

(DEPTH)

f•y:-i .-

"7 v—

CASING AND PIPE

DRIVEN (FT.)

RECOVERED

(FT.)

LOST (FT.)

——— CASING

z- 10'

____ CASING

^' IO'

PIPE

DIAMOND UNITS

TYPE

CORF

CONCAVE

SHELL

LUGS

CASING SHOE

CASINO BIT

OTHER

PERCENT USED

EXT i AXT BX NX

MATERIALS AND EQUIPMENT

DRILL

TRACTOR

DIESEL FUEL

GASbLINE

STOVE OIL

PROPANE

CEMENT

MUD

WEDOE

HRS.

y HRS.

OALS.

GALS,

OALS.

LBS.

BAOS

BAGS

TYPE

HOLE NO.- . .——————— j-i—L —— f. —————

ANGLE . ,

WATERLINE LENGTH , ,. S. /-- x^ 's'* .

DRILL

P. PUMP

S. PUMP

TRACTOR

TYPE

//' /4

t '

•*.. ,s'*L

NO.

-4J—

. /^FOREMAN , . :- -' ^

. '' ' -- -f s' * —t j . .• J - .- ' x" r i

ENGINEER

NOTE) Moke 4 copies doily per mochlne. Orlginol (white) ond first two copies to be moiled to Daily Reports when choroeobie labour ond moterlols ore Included.

Office. Flnol copy to be given to Engineer If requested. Ehgfoeer Is requested to

Page 15: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

^UORISSETTE DIAMOND DRILLING LTD.^^ Ho/leybury, Ontario

DAILY REPORT — SURFACE

•HIFT

iMj

, ^

NAME

R

ii'i.f. /'. /.W/*H

' . IJnjfA t'R

/. i'- //i;, t-'' /XH

. "' t't,Ht''ll.t'R

H

FROM

/ft

1'!*-

TO

fy/6

J60

FEET

^^

ft

(PUMPMAN)

(PUMPMAN)

(OTHER)

(FOREMAN - FULL TIME)

ROCK DRILLING

/^

/fi/*

/#

OVERE^ft)EN

i-to

i*bn

gi

sBEYOND

ISO-

PULLING CASING 1

MOVING 1CEMENTING 1

u

1

OTHER i

(SPECIFY IN REMARKS)!

TOTAL j

/^//*/*/J

J66 NAME: -A ' "- ~

f.' l - 1' . H-' f' .'i —rf- -,'- * f* ' l

DATE: A

/^//./XJ WREMARKS TESTS

(DtrrH)

CASING AND PIPE

DRIVEN (FT.)

RECOVERED (FT.)

1- ", W V-3 t

..M.CAS'N"

z- 10'

CASINR

2' to-

PIPE

DIAMOND UNITS

TYPE

CORE

CONCAVE

SHELL

LUGS

CASING SHOE

CASING BIT

OTHER

PERCENT USED

EXT AXT BX NX

MATERIALS AND EQUIPMENT

DRILL

TRACTOR

DIESEL FUEL

GASOLINE

STOVE OIL

PROPANE

CEMENT

MUD

WEDOE

HRS.

J HRS.

OALS.

OAL8.

OALS.

LB8.

BAGS

BAGS

TYPE

HOLE NO., , i

ANGLE ,. f

WATERLINE LENGTH , /\/•- -' r * *

DRILL

P. PUMP

S. PUMP

TRACTOR

TYPE

h - .•^ *

*. ^

''- , **'.

NO.

/y

fFOREMAN j, . - *L'T|'-~

ENGINEER .' ' .' ...- . , :/. .' . , .. . '' . ' - ' i

p NOTEi Make 4 copies daily per machine. Original (white) end first two copies to be moiled to Office. Final copy to be given to Engineer if requested. Ehglheer Is requested to fa*. s!pn Dotty Reports when chargeable labour and materials are Included.

Page 16: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

A\ORISSETTE DIAMOND DRILLING LTD.Hoileybury, Ontario

DAILY REPORT — SURFACE

SHIFT

W

//'•/'J

NAME

R

V .' ' - ' ' " . '- ' !H

R

.' /' ,' /' . f.' i i \H

R

H

FROM

f /''/J

TO

•^j?"?

FEET

.r*

(PUMPMAN)

(PUMPMAN)

(OTHER)

(FOREMAN . FULL TIME)

ROCK DRILLING

,?^

0

jb 1?L. O

VERE0EN

ii

S

\

8

BEYOND

ISO-

PULLING CASING 1

MOVING

V

,

CEMENTING 1WALKING 1

n xcf uK Z

UM

J

TOTAL J

.^/^

j'

JOb NXMt: ^

.y S s*. / , ,DATir -x ' ' ^

REMARKS

i

TESTS (DEPTH)

",:v^

CASING AND PIPE

DRIVEN (FT.)

RECOVERED (FT.)

LOST (FT.)

___ CASING

2' 10'

____ CASING

2' 10'

PIPE

DIAMOND UNITS

TYPE

CORE

CONCAVE

SHELL

LUGS

CASING SHOE

CASINO BIT

OTHER

PERCENT USED

EXT AXT BX NX

MATERIALS AND EQUIPMENT

DRILL

TRACTOR

DIESEL FUEL

GASOLINE

STOVE OIL

PROPANE

CEMENT

MUD

WEDGE

HR8.

yf HRS.

OALS.

OALS.

OALS.

LBS.

BAGS

BAGS

TYPE

HOLE NO., .

ANGLEJ - f.-

WATERLINE LENGTH S

DRILL

P. PUMP

S. PUMP

TRACTOR

TYPE '

f * .' ,/

'

NO.

,/ J

FOREMAN •'"i - , '- . .S ''.'•f - .^f .-V jf

ENGINEER" vr -*-

t NOTEi Moke 4 copies doily per mochlne. Origlnol (white) ond first two copies to be moiled to Office. Flnol copy to be given to Engineer If requested. Ehgfheer/fs requested to **s sign Doily Reports when choroeoble labour ond materials ore Included.

Page 17: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

UBMORISSETTE DIAMOND DRILLING LTD.^^ Hoileybury, Ontario

DAILY REPORT — SURFACE

•NIPT

Mi

NAME

R* JU*/i/' - (- 1 1 f j/. '^ T

H

R

f j' \ H I.. i\'. MH

R

H

FROM TO FEET

(PUMPMAN)

(PUMPMAN)

(OTHER)

(FOREMAN . FULL TIME)

ROCK DRILLING

0

1?to

F '

,.

VERE0HN

8t

b m

bn•B

t

BEYOND

ISO-

PULLING CASING 1

MOVING

ft

fa

J fi

CEMENTING 1WALKING 1

OTHER 1

(•PCCIFY IN REMARKS)!

TOTAL 1

/rf

M-

?6

J6i NAME: ^

"" ' " 1* '

/^ fj'i.isfj s f j y''~ X 8.^

x ^ *

TESTS ^(OIPTH)

': ' ' J ^".

S L-*' •*.-

)

7^xr'"~

CASING AND PIPE

Zu ~

D "

OUK ^

StU "utt

Si

——— CASING

2'

\i. *'

V

/ .x^

IO'

———— CASING

2' | IO 1

PIPE

———— "

DIAMOND UNITS

TYPE

CORE

CONCAVE

SHELL

LUGS

CASINO SHOE

CASING 8IT

OTHER

PERCENT USED

EXT

•~..

;AXT'

BX NX

MATERIALS AND EQUIPMENT

DRILL

TRACTOR

DIESEL FUEL

OASOLINE

STOVE OIL

PROPANE

CEMENT

MUD '

WEDOE

HRS.

2. HR8-

OAL8.

GALS.

OALS,

LBS.

BAGS

BAGS

TYPE

HOLE NO.. r, ..,

ANGLE y . ^

WATERLINE LENGTH f -- . yV X -J i*' ^* "J' C

DRILL J .,

P. PUMP

S. PUMP

TRACTOR '*

TYPE

^.-.

-rf^^ ^1 ^

.

' ^ J^

NO.

/X

,, ^FOREMAN *'.J .r *,-* -yj!-

V" X^r ' .' ^—^^a -**jt **k^^ ^^*^ f* f * *- ' ( li

ENGINEER

NOTEt Make 4 copies dally per machine. Original (white) and first two copies to be moiled to Office. Final copy to be given to Engineer If requested. Ehglheer Is requested to t)gn Dotty Report* when chargeable labour and materials ore Included.

Page 18: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

N^ORISSETTE DIAMOND DRILLING LTD.^^ Hoileybury, Ontario

DAILY REPORT — SURFACE

•Hirr

,V

NAME

;. ,;//,/*' H

i'-' ' R' '

. H/'

R

H

FROM

f)

W

TO

±4-

ifi

FEET

•r y

h?

(PUMPMAN)

; (PUMPMAN)

(OTHER)

(FOREMAN . FULL TIME)

ROCK DRILLING

4

f

fr

M

h. O

xy

VERB^EN

8i

bn

lt

l

-

BEYOND

ISO-

PULLING CASING i

MOVING

'i

CEMENTING 1WALKING 1

OTHER 1

(•PCCirr IN REMARKS)!

?

\

TOTAL j

rtr

tt

te-

J6B NAME: ,

^ Ssv * 'rj ' S ^

REMARKS TESTS (DEPTH)

1

CASING AND^ PIPE

DRIVEN (FT.)

RECOVERED (FT.)

\\

.CASINO

2'

X ;-

f

,o-

r* B ,K,n

a 1 1O'

PIPE

DIAMOND UNITS

TYPE

CORE

CONCAVE

SHELL

LUGS

CASINO SHOE

CASING BIT

OTHER

'PERCENT USED

EXT AXT

l

BX NX

MATERIALS AND EQUIPMENT

DRILL

TRACTOR

DIESEL FUEL

GASOLINE

STOVE OIL

PROPANE

CEMENT

MUD

WEDGE

HRS.

MRS.

OALS.

OALS.

OALS.

LBS.

BAO8

BAGS

TYPE

HOLE NO. ^ ,-.

ANGLE s, y/ : V

WATERLINE LENGTH , . . , ^ */ /.', S* -f X 4

DRILL

P. PUMP

S. PUMP

TRACTOR

TYPE

/r*

i

*, .^

NO.

/J

FOREMAN /i . J''/ ^iil

'/—. " ' "*"i ' ^^ , ENGINEER^/ ^.. x '

NOTEi Moke 4 copies dolly per mochlne. Originol (white) ond first two copies to be moiled to Office. Flnol copy to be given to Engineer if requested. Ehglhe^f Is revested to s!0n Dolly Reports when chargeable labour and materials are Included. ^

Page 19: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

^fevORISSETTE DIAMOND DRILLING LTD.

Holleybury, Ontorlo

DAILY REPORT — SURFACE

SHIFT

Wt

.i

f

NAME

' -t/ ^. /M ,,^'..,:/

i ' ' ' .; H

v l''*f' •*'fj.-"ff^•f p\ j) {fl ^^

i'.' H . i j ^^

R

H

FROM

-r

V/VA

r 7 ?

TO

Sn

r//

FEET

Ut

't 7

(PUMPMAN)

(PUMPMAN)

(OTHER)

(FOREMAN - FULL TIME)

ROCK DRILLING 1

teMfa/t

OVERMEN

0^ to

it

8

o ni

8

BEYOND

ISO-

PULLING CASING 1

MOVING iCEMENTING l

WALKING 1

- V;

OTHER 1

(•PCCIFT IN REMARK*) 1

ilrf*wM

te

JOB NAME: ,^^

'6AYE: ' ' A

' REMARKS

JLO— l^/;L,^,^'/-.-,

"* !* 1 '"

i ^L^^r e

^^TESTS

.' (DtPTMI f

CASING AND PIPE

DRIVEN (FT.)

RECOVERED

(FT.)

M

——— CASINO

2- 10'

———— CASING

2' 1O1

PIPE

DIAMOND UNITS

TYPE

CORE

CONCAVE

SHELL

LUGS

CASINO SHOE

CASING BIT

OTHER

PERCENT USED

EXT AXT BX NX

MATERIALS AND EQUIPMENT

DRILL

TRACTOR

DIESEL FUEL

GASOLINE

STOVE OIL

PROPANE

CEMENT

MUD

WEDGE

HR8.

j. HM-

GALS.

GALS.

GALS.

LBS.

BAGS

BAGS

TYPE

HOLEN0-- //.W.J.

ANGLE j , . #f S ''

WATERLINE LENGTH t /'/-jriJT

DRILL

P. PUMP

6. PUMP

TRACTORt f *

TYPE

//v:-;t

' . i |T.'...

- j* ^ff ±^^"k.Ari

f

.t,-..;;'i'..

NO.

yy

*

7.5 t*FOREMAN fo ,.' s^^;

/,- ' ~ ENGINEER

NOTEi Moke 4 copies dolly per mochlne. Orlglnol (white) ond first two copies to be moiled to Office. Ftnol copy to be given to Engineer If requested. Ebglheer Is requested to S(gn Dally Report* when chargeable labour ond material* are Included.

Page 20: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

•^\ORISSETTE DIAMOND DRILLING LTD.Hoileybury, Ontorlo

DAILY REPORT — SURFACE

•Hirr

t ' V

-

NAME

i; f 'S/ --^ f 'i' , ft'' f"', i-, f

H

7 R

H

R

H

FROM

'j S

TO

'f j t *

FEET

W

(PUMPMAN)

(PUMPMAN)

(OTHER)

(FOREMAN - FULL TIME)

ROCK DRILLING

(f

t

O

(LO

VER^N

|t

10

8i

8

BEYOND

ISO-

PULLING CASING 1

j

l

7y

CEMENTING lWALKING l

tt x

li

TOTAL 1

^

j,

9

f

JOB NAME: ^

*M*-. V - ^,v'

.x/./ ^- /^

* f S.*t j*:*.^,^~* * " :. " ** . f i ' "

' r ' -t T? f J? ' ''f * '

*-*2/-" -

TESTS (DEPTH)

X -.'•'•'

yf f ~ \^*

fJ ^r?

CASING AND PIPE

DRIVEN C FT.)

RECOVERED (FT.)

(

LOST (FT.)

——— CASINO

f

'.' f. ,X

1C'

———— CASING

2 1 1O1

PIPE

DIAMOND UNITS

TYPE

CORE

CONCAVE

SHELL

LUGS

CASING SHOE

CASINOBIT

OTHER

PERCENT USED

EXT AXT BX NX

MATERIALS AND EQUIPMENT

DRILL

TRACTOR

DIESEL FUEL

GASOLINE

STOVE OIL

PROPANE

CEMENT

MUD

WEDGE

MRS.

p HRS.

GALS.

GAL*.

OALS.

LBS.

BAGS

BAGS

TYPE

HOLE NO.. . ,y'/ - ,. . fjt~.

ANGLE , y ,,., f,S — '

WATERLINE LENGTH - y ,/

DRILL

P. PUMP

S. PUMP

TRACTOR ,

TYPE

y 7 /..'t'.^i M 1 t **^

.-^ n v i.**

^/t J ..yi

NO.

/y

. ^'; iFOREMAN ^ , ; v ;. ;.;7^--ENGINEER

NOTE: Moke 4 copies dolly per machine. Original (white) and first two copies to be moiled to Office. Final copy to be given to Engineer If requested. EViglheer Is requested to tlgn DoDy Reportt when ehorpeoble labour and materials ore Included.

Page 21: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

lA\ORISSETTE DIAMOND DRILLING LTD.

Hoileybury, Ontario

DAILY REPORT — SURFACE

•Hirr

*,v K

i

NAME

s)n :,,..^/^-- i ! ",..,.* /^

1 ) *' . R7 , H

jfa** f-IL*jR

H

FROM

0

3. L

TO

* 7 -'\

//*

FEET

,, ?

*/-

(PUMPMAN)

(PUMPMAN)

(OTHER)

(FOREMAN - FULL TIME)

ROCK DRILLING

f;

V

0

i?h.O

?

?

7f

VERB0EN

8-

bm

iBEYOND

ISO*

PULLING CASING

MOVING

y?iy

CEMENTING 1WALKING 1

M

Z

ttli

i

^

\j j

?t

/y/y

JOB NAME: -"A

'DATE: ' *" |K '

REMARKS

f ..V j

TESTS 4DCPTH)

•** f

.fi f* t S^M^^

CASING AND PIPE

DRIVEN (FT.}

RECOVERED

(FT.)

St*2 E

——— CASING

2'

A ^

-..y/

10'

^—— CASING

2'

t

10'

, - '

PIPE

DIAMOND UNITS

TYPE

CORE

CONCAVE

SHELL

LUGS

CASINO SHOE

CASING BIT

OTHER

PERCENT USED

EXT AXT BX NX

MATERIALS AND EQUIPMENT

DRILL

TRACTOR

DIESEL FUEL

OASOLINE

STOVE OIL

PROPANE

CEMENT

MUD

WEDGE

MRS.

^ HRS.

OALS.

OALS.

OALS.

LBS.

BAOS

BAGS

TYPE

HOLE NO.. . i , ,. ., /?-// i

ANGLE f f ^

WATERLINE LENGTH ( . /V-''

DRILL

P. PUMP

S, PUMP ' ^

TRACTOR f(-

TYPE

':" j.- A'

t ... .X

V X

^ NO.

//'

.. :

FOREMAN .'J f'- /j' . v/

ENGINEER' ///TV S . y

NOTE: Moke 4 copies doily per machine. Original (white) and first two copies to be moiled to Office. Final copy to be given to Engineer If requested. Ebglheer Is/requested to tign Dally Report* when chargeable labour and material* or* included. '

Page 22: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

MBUORISSETTE DIAMOND DRILLING LTD.^^ Hoileybury, Ontario

DAILY REPORT — SURFACE

•Hirr

V* 1s

t

NAME

v, '?' f* f, H

i/ R

Hf'*

R

H

FROM

i fa

TO

yfr

FEET

/t#

(PUMPMAN)

(PUMPMAN)

(OTHER)

(FOREMAN . FULL TIME)

ROCK DRILLING l

/v10

0

k.O

VER^EN

8bn

bni

8

BEYOND

ISO*

PULLING CASING i

MOVING 1

ij

CEMENTING lWALKING i

!z

klul Btt

?t

TOTAL j

lil!

ft

JOfi NAME: ^

DATE: f - A

'J J.'yftf /;* J.,. ^ x^ '

REMARKS . ""V /' -•••' ' * 't'f- -Se- •/".ve ./*.-v ;;^

TESTS (DEPTH)

•' i. -* '

CASING AND PIPE

DRIVEN (FT.)

RECOVERED (FT. J

Si

^—- CASINO

2' IO'

———— CASING

2' 1O'

PIPE

DIAMOND UNITS

TYPE

CORE

CONCAVE

SHELL

LUGS

CASING SHOE

CASING BIT

OTHER

PERCENT USED

EXT AXT BX NX

MATERIALS AND EQUIPMENT

DRILL

TRACTOR

DIESEL FUEL

GASOLINE

STOVE OIL

PROPANE

CEMENT

MUD

WEDGE

HRS.

J HRS.

GALS.

GALS.

GALS.

LB8.

BAGS

BAGS

TYPE

HOLE NO.. ^ j.

ANGLE f , ^

WATERLINE LENGTH ,- > /'•'f f ,'/ '

DRILL

P. PUMP

6. PUMP

f TRACTOR ,

l -

TYPE

/7.'*., ' V |. ^

/,, -...f .. i'u**

NO.

/X

'; .'- *'*^

FOREMAN /X. ,'- '-^ ^•",'. . . ./- , r

ENGINEER

NOTEi Moke 4 copies dally per machine. Original (white) and first two copies to be mailed to Office. Final copy to be given to Engineer If requested. Ehglheer Is requested to tlpn Dolly Reports when chargeable labour and materials are Included.

Page 23: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

MMMORISSETTE DIAMOND DRILLING LTD.^^ Hofleybury, Ontario

DAILY REPORT — SURFACE

•Hirr

,;, ( V

' i

.7

t

NAME

ft ' -* Sr'i ' '•''t

, ' r r H

^ l' ',,*. S,^ Rt . ' H

' y L,,:t..u4,^*

' R

H

FROM

fi

'/f*

TO

VV

/^

FEET

'/*T

/^^

(PUMPMAN)

(PUMPMAN)

(OTHER)

(FOREMAN . FULL TIME)

ROCK DRILLING

-''/.

/^/^

OVERB^^EN

8? to

'i

?

8*

8

bnt

8

BEYOND

ISO-

PULLING CASING 1

MOVING

if

10

j

jf

^

i WALKING l

aK

I

Jct un

S

il*/AS^t

Mf

J66 NAME: A y. x , y ^lw t" j-** d^//f'.f.-t i-n* Jt**ttA -•7'"^ ,* '**-4*yDATE: ^

r if XREMARKS

, y/ ^ ^,: ^^c^ '.;yz^TESTS (DirrH)

I"**S, ^ ./*; -^-

CASING AND PIPE

DRIVEN (FT.)

RECOVERED (FT.)

V) L-0 u.

.-—— CASING

2 1

XX;

1 '.'/'

3

10'

____ CASING

2 1 10'

PIPE

DIAMOND UNITS

TYPE

CORF

CONCAVE

SHELL

LUGS

CASINO SHOE

CASING BIT

OTHER

PERCENT USED

EXT AXT BX NX

MATERIALS AND EQUIPMENT

DRILL

TRACTOR

DIESEL FUEL

GASOLINE

STOVE OIL

PROPANE

CEMENT

MUD

WEDGE

MRS.

•t***' MRS.

. GALS.

GALS.

GALS.

LBS.

BAGS

BAGS

TYPE

HOLE NO.. yy ^ ^

ANGLE , j, 'f .1

WATERLINE LENGTH , s r*/ /:- jl' 0 *'f '

DRILL

P. PUMP

S. PUMP

TRACTOR jr

TYPE

.- ]f ntS* * . -

' -f

i t

NO.

jj

f

FOREMAN j , i' ' .' V x?••- ^V'/ , -, -..-1^ . "***..- ,. - -t-Jl ', - -

ENGINEER

NOTCi Moke 4 copies dolly per mochlne. Orlglnol (white) and first two copies to be moiled to Office. Final copy to be given to Engineer If requested. Ehglheer Is requested to tlpn Dolly Reports when chargeable labour and materials are Included.

Page 24: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

rJ^ORISSETTE DIAMOND DRILLING LTD.

Hoileybury, Ontario

DAILY REPORT — SURFACE

•Hirr

,-n

t . . f !,~. r i*

••'

NAME

.'•' R

'i/l -,,^,jfH

\ " i ; " -r '^ ' , . -i/ " R

H

^ "^ ' R

H

FROM

/'^r

TO

^ ?

FEET

/;/

(PUMPMAN)

(PUMPMAN)

(OTHER)

(FOREMAN - FULL TIME)

ROCK DRILLING 1

//?

^

O

i?no

vERB0EN

i1

V)

bn BEYOND

ISO-

-

PULLING CASING j

i i

^-Z-

CEMENTING lWALKING 1

M If

1Z

lil o

x

TOTAL I

/i^^

r

J6B MAME. "^ ---• ——

'TB//'^:'," ^"'J ./^ .. •rp

REMARKS

S/ ~f'ff\'{C ,; -4*1* f •••' '. . :'

^W^*y'-t^-*''^f

*

TESTS (OIPTH)

CASING AND PIPE

DRIVEN (FT.)

RECOVERED

(FT.)

1- ~.W u.

3^

——— CASINO

2' 10'

———— CASINO

2' 1O1

PIPE

D

DIAMOND UNITS

TYPE

CORF

CONCAVE

SHELL

LUGS

CASING SHOE

CASING BIT

OTHER

PERCENT USED

EXT AXT BX NX

MATERIALS AND EQUIPMENT

DRILL

TRACTOR

DIESEL FUEL

GASOLINE

STOVE OIL

PROPANE

CEMENT

MUD

WEDGE

MRS.

f MRS.

OALS.

OALS.

OALS.

LB8.

BAGS

BAGS

TYPE

HOLE NO, ^,^ ^

ANOLE /. ^ ^

WATERLINE LENGTH , . . j"? X L. ^ .*-JT

DRILL

P. PUMP

S. PUMP ^

TRACTOR J ,

TYPE

'^ - /-jf-. l

f -' f- T *

c rf -

X1

' J m . 'V

' NO.

f J

f

. .** - - . -y FOREMAN :/ - ' , .

y// -.^V'-^ ^*ENGINEER

NOTE: Moke 4 copies doily per machine. Original (white) and first two copies to be moiled to Office. Final copy to be given to Engineer If requested. Ehgheer is requested to tlgn Dally Report* when chorgeobfo labour and material* ore included.

Page 25: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

UttMORISSETTE DIAMOND DRILLING LTD.^^ Holleybury, Ontario

DAILY REPORT — SURFACE

•HI FT

W

NAME

'I., "' ,fyf *

, . ; H

5 ..!'t l .,.^'.^,- R

i; /''' * :-.-..tv..-^^4V-..^...,,,,.:R

H

FROM

^

TO

^

FEET

f ?

(PUMPMAN)

(PUMPMAN)

(OTHER)

(FOREMAN . FULL TIME)

ROCK DRILLING

OVEB^EN

Co

^

?~

p

3-

8*

b n

8t

BEYOND

ISO-

CASINO AND PIPE

DRIVEN (FT.)

RECOVERED (FT.)

\\

——— CASING ———— CASING

Z' ID' Z 1 10'

'/s:.-r't i^y*

I V^jf

lw

PIPE

DIAMOND UNITS

TYPE

CORE

CONCAVE

SHELL

LUGS

CASINO SHOE

CASING BIT

OTHER

PERCENT USED

EXT AXT

,

BK NX

PULLING CASING l

xyXX

MOVING

r7

?^-

i

CEMENTING 1WALKING i

t

l

\Z

TOTAL j

A*fi

-tt-f '

MATERIALS AND EQUIPMENT

DRILLI ' MRS.

TRACTOR ; MRS.

DIESEL FUEL . OALS.

GASOLINE OALS.

STOVE OIL OALS.

PROPANE ' L88.

CEMENT 1 BAOS

MUD BAOS

WEDGE TYPE

JOB NAME: ^

* ~/ r fREMARKS

f -t .f j

!i

Xi*Cf**V /tfo*' 3

///^y*o /rf 0** X

TESTS {OIPTMl

*( ' **-'

Jtsh*'^"**'*"1*' g /-^f&'-'f'**^

'•y Xv jf**f* *

HOLE NO.. s J t. **"

ANGLE . . x S/ * t*

WATERLINE LENGTH * ,x'V *

TYPE

DRILL , i f * i 'f-?

p. PUMP yS. PUMP * /

TRACTOR .

NO.

/yf

FOREMAN y* . " , ,. *~

ENGINEER

NOTE: Moke 4 copies dolly per mochlne. Original (white) and first two copies to be mailed to Office. Final copy to be given to Engineer If requested. EViglheer Is requested to t)gn Doily Reports when chargeable labour and materials ore Included. ,

Page 26: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

MaUORISSETTE DIAMOND DRILLING LTD.^^ Hoileybury, Ontorio

DAILY REPORT — SURFACE

•HI FT

,.,.J

1 ,

M-

NAME

V ' - ' x*t ' * H

,/ R7 , H

"" V - ? R

H

FROM

•i?

/j.

TO

•;. {

x//

FEET

^L

#yf y y —

(PUMPMAN)

(PUMPMAN)

(OTHER)

(FOREMAN - FULL TIME)

ROCK DRILLING

-t•(/f

/l^

ffi

OVERN

O.O

^-/.

,

8*

s

tENbni

8

BEYOND

ISO'

PULLING CASING 1

MOVING 1

••' '

CEMENTING J

l

sIz

1u4tf

t*

/#

J66 NAME: "•^"

'' /' v^ J6AT'E:'* II V''C" I|IM ||

REMARKS

p^?

TESTS (DKPTH)

CASING AND PIPE

DRIVEN CFT.)

RECOVERED CFT.)

Si

——— CASINO

2'

tfr*l*r- o'/S

1O 1

———— CASINO

2' to-

PIPE

DIAMOND UNITS

TYPE

CORE

CONCAVE

SHELL

LUGS

CASING SHOE

CASING BIT

OTHER

PERCENT USED

EXT i AXT BX NX

MATERIALS AND EQUIPMENTDRILL'iTRACTOR

DIESEL FUEL

GASOLINE

STOVE OIL

PROPANE

CEMENT

MUDi ' '

WEDGE

MRS.

MRS.

GALS.

OAL6.

OAL8.

LB8.

BAGS

BAGS

TYPE

HOLE NO..

ANOLE

WATERLINE LENGTH y/vX'DRILL

P. PUMP

S. PUMP

TRACTOR

TYPE

/y.NO.

FOREMAN

NOTE: Moke 4 copies dolly per machine. Original (white) and first two copies to be moiled to Office. Final copy to be given to Engineer If requested tlpn Dotty Reports when chargeable labour and materials ore included.

"Ifyr^V ^X'^^uested. Ghgiheer ^i requeited to

Page 27: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

WORISSETTE DIAMOND DRILLING Hoileybury, Ontario

DAILY REPORT —SURFAC

•HIFT

,

, ,.'

NAME ,\ " -

: '.'' ' , ' '"R.7 '.1 ;'/ -i",';-

i ' j ,* . *,

H: i ** '

• R

';J- y.- .--H

' '' l R

H

FROM ; ;

j'-"/'"'

'\P'.'.'

, Y

"t ''i*

TO

y

Ste

LTD.

E-....^.

FEET

"f y

:^,

tPUMPMAN)

. "(PUMPMAN)

• i, (OTHER j .

(FOREMAN - FULL TIME)

ROCK DRILLING

J^'

.^X^ 1

^

O

rtCo

,',:a-

•-•x- :

vERB0EN

1

8

'•i.'* If l*. V

; ;." f;

1i ,l-",-:'::

•' "p-

BEYOND ,

lso- i

,,.,,.

PULLING- CASING 1

o^ii

' 2

H,',,

r

CEMENTING 1-:* 1

••Vfjf l"..

1 1 ' r '

WALKING* 1

"* 1

^

OTHER ;' ' 1

(•PBCIFY. IN REMARKS))

-.f-

'

I

77//•-/- Q

//'

J66 NAME: ^

3''fS//'/?-?REMARKS

i

- r

TESTS

, w ... , , -.. -. .,,.. . ' .-

CASING AND PIPE

DRIVEN (FT.)

RECOVERED

(FT.)

li

——— CASINO

2' 10'

,, ...CASING

2' 1O'

r '

••..'i'

PIPE

V'

. J

•* '

i'--

DIAMOND UNITS

TYPE

CORE

CONCAVE

SHELL

LUOS

CASINOSHOE... ,CASINOBIT ; '

OTHER

,. EXT '

PERCENT USED

AXT '

- ' - ' - ' ' : '

V'Bjf"NX

MATERIALS AND EQUIPMENT

DRILL

TRACTOR

DIESEL FUEL '

GASOLINE

STOVE OIL

PROPANE

CEMENT

MUD

WEDGE

MRS.

y HRS.

OAL8.

OAL8.

OAL8.

LBB.

BAOS

BA08

TYPE

HOLE NO, -y . j, -~

ANGLE , ,

WATERLINE LENGTH , J'^ /'' S ''

DRILL

P. PUMP

S, PUMP ''

.t . TRACTOR

TYPE

/•v/

/'

NO.

. .

-V ,'

FOREMAN ^,

ENGINEER ''',**- -~

NOTEi Moke 4 copies dolly per machine. Original (white) and first two copies to be moiled to Office. Final copy to be given to Engineer If requested. Ehglheer is requested to t\on Dolly Reports when chargeable labour and materials are Included.

Page 28: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

- Page 28 -

4.4 Drill Logs

The core was logged and split by V. Koyanagi and D.F. Symonds of Montgomery Consultants Limited. Samples were taken at five feet intervals and sample numbers are noted on the following drill log sheets.

During the period of drilling, labor for logging, splitting and sampling was as follows:

V. Koyanagi - 32 man-days D.F. Symonds - 24 man-days ''

Page 29: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

- Page 60 -

4.5 Assay Certificates

Samples taken from split core were shipped to Swastika Laboratories Limited and analyzed for gold, silver, copper, lead and zinc. Copies of Certificates of Analysis are given in the following pages. A total of 321 samples were analyzed.

Page 30: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

SWASTIKA LABORAl ORES LIMITEDP.O. BOX 10, SWASTIKA, ONTARIO POK 1TO

TELEPHONE: (705)642-3244 ANALYTICAL CHEMISTS * ASSAYERS * CONSULTANTS

(Errttftrat? nf AttalyHta

Certificate No. 56641 Date: November 29 1983

Received Nov. 10/83

Submitted by Harlin

SAMPLE NO.

12308

12309

12310

12311

12312

9 12313

12314

12315

12316

12317

12318

12319

12320

12321

12322

12323

12324

12325

12326

12327

*

115 Samples of split core

Resources

GOLD Oz./ton

NilNil -

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

0.002

0.002 0.002

Nil

Nil

Nil

0.002

Nil

Nil

Nil

Nil

Nil

Ltd., Vancouver, B.C.

SILVER Oz./ton

Trace

Trace

Trace

Trace

Trace

Trace

Trace

Trace

Trace

Trace

Trace

Trace

Trace

Trace

Nil

Trace

Nil

Nil

Nil

Trace

Samples

COPPER

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.02

I

Att'n: Mr. T. Agostino

per: Mr. J. Montgomery Page 1 of 6

LEAD ZINCo/ o'/O /O

0.005 0.005

0.005 0.01

None 0.01

None 0.01

None 0.01

None 0.01

None 0.01

None 0.01

None 0.01

None 0.01

None 0.01

None 0.01

None 0.01

None 0.01

None 0.01

0.005 0.01

None 0.01

None 0.01

None 0.01

None 0.01 Cont'd....

A -flf**r S J ' \JW\

G. Lebel ManpgerESTABLISHED 1928

Page 31: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

SWASTIKA LABORATORIES LIMITEDP.O. BOX 10, SWASTIKA, ONTARIO POK 1TO

TELEPHONE: (705)642-3244 ANALYTICAL CHEMISTS * ASSAYERS * CONSULTANTS

Gterttftrat? nf

j Certificate No. 56641

j Received Nov. 10/83

Submitted bv Marl in

SAMPLE NO.

12328

12329

12330

12331

12332

9 ]2333

12334

12335

12336

12337

12338

12339

12340

12341

12342

12343

12344

12345

12346

12347

Date: November 29 1983

115 Samples of split core

Resources

GOLD Oz./ton

Nil

Nil

Nil Nil-

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil Nil

Nil

Nil

Nil

Nil

Nil

0.002

Ltd. , Vancouver

SILVER Oz./ton

Trace

Trace

Trace

Trace

Trace

Trace

Trace

Trace

Trace

Trace

Trace

Nil

Nil

0.01

0.01

Tr&ce^

Nil

0.01

0.03

0.04

, B.C.

Samples

COPPER

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.005

None

0.01

0.03

None

0.005

0.01

0.01

0.02

Attj n: Mr.

per: Mr. J.

LEAD

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

0.005

0.03

0.005

T. Aaostino

Montgomery Page 2 of 6

ZINC X

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0,01

0.01

0.01

0.005

None

0.005

0.02

0.03

0.01

0.01

0.02

0.07

0.08 Cont'd......

Per

G. Lebel — ManagerESTABLISHED 1928

Page 32: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

ZrfjW SWASTIKA LABORATORIES LIMITED/^tUs^^ P-0- BOX 10- SWASTIKA, ONTARIO POK 1TO f ^jp^ TELEPHONE: (705) 642-3244

J9 ANALYTICAL CHEMISTS * ASSAYERS * CONSULTANTS

1 Qkrttftrate of Analyaia

Certificate No. 56641

Received Nov. 10/83

Submitted bv Mar lin

SAMPLE NO.

12348123491235012351

• 123521235312354123551235612357

123581235912360123611236212363123641236512366 12367

Resources i.^^., .-..---..-,

115

Date: November 29 1983

Samples of split

Ltd., Vancouver, B.C. Att

core

'n: Mr.

Samples per: Mr.

GOLD Oz./ton

0.002NilNil0.002NilNil0.002Nil0.002Nil0.002 NilNilNilNilNilNilNilNilNilNil0.002 Nil

SILVER Oz./ton0.01NilTraceNil

TraceNilNilNilNilNil

TraceTrace0.01TraceTraceNilNilNilNil Trace

COPPER^

O.OJ?0.0050.010.01

0.010.01None0.010.010.01

0.010.010.01O.D050.0050.0050.0050.0050.01 0.01

LEADK

0.0050.0050.005None

NoneNoneNoneNoneNoneNone

None0.0050.005NoneMoneMoneMoneNoneNone None

T. Agostino

J. Montgomery Page 3 of 6

ZINC K

0.060.010.010.005

None0.0050.0050.0050.0050.005

0.010.030.040.020.0050.040.020.020.01 0.05 Cont'd.......

Per

ESTABLISHED 1928G. Lebel — Manager

Page 33: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

SVtaSTIKA LABORATORIES LIMITEDP.O. BOX 10, SWASTIKA, ONTARIO POK 1TO

TELEPHONE: (705)642-3244 ANALYTICAL CHEMISTS * ASSAYERS* CONSULTANTS

0f

Certificate No. 56641 Date: November 29 1983

Received Nov. 10/83 115 Samples of split core

Submitted by Harlin Resources

SAMPLE NO.

12368

12369

12370

12371

12372

12373

^ 12374

12375

12376

12377

12378

12379

12380

12381

12382

12383

12384

12385

12386

12387

Ltd., Vancouver, B.C. Att'n: Mr. T. Aqostino

Samples per: Mr,

GOLD Oz./ton

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil Nil

Nil

Nil

Nil

Nil

0.002

Nil

Nil

Nil

0.002 0.002

0.002

Nil

SILVER Oz./ton

Trace

Trace

Nil

NilNil

Nil

NilNil

Nil

0.02

Nil

0.01

TraceNil

Nil

Nil

Nil

Nil

0.01

Nil

COPPER ?i

0.01

0.01

0.005

0.0050.01

0.005

0.005

0.005

0.005

0.03

0.01

0.020.01O.D05

None

0.01

None

0.01

0.01

0.01

LEAD K

0.005

0.005

None

NoneNone

None

None

None

None

0.005

0.005

0.005

0.005None

None

None

None

None

0.01 0.005

. J. Montgomery Page 4 of 6

ZINC?0

0.02

0.030.020.020.005

0.0050.005

0.01

0.01

0.12

0.01

0.140.030.010.005

0.005

0.01

0.01

0.22

0.04 Cont'd.......

ESTABLISHED 1928G. Lebel — Manager

Page 34: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

SVtaSTIKA LABORATORIES LIMITEDP.O. BOX 10, SWASTIKA, ONTARIO POK 1TO

TELEPHONE: (705) 642-3244 ANALYTICAL CHEMISTS *ASSAYERS* CONSULTANTS

Gkrtffiratr of

Certificate No. 56641 Date: November 29 1983

Received Nov. 10/83

Submitted bv Ha ri in

SAMPLE NO.

12388

12389

12390

12391

12392

12393

A 12394

12395

12396

12397

12398

12399

1240012401

12402

12403

12404

12405

12406

12407

Resources

GOLD Oz./ton

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

NilNil

Nil Nil

Nil

Nil

115 SS

Ltd., Vancou

SILVER Oz./tonNil

Nil

Nil

NilNil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Trace

0.01

Nil

Nil

Nil

Nil

Nil

imples of

ver, B.C.

Samples

COPPER X

0.01

0.005

None0.0050.005

0.01

0.005

0.005

0.005

None

None0.0050.0050.005

0.01

0.005

0.005

None

0.005

None

split core

Att'n: Mr

per: Mr. J.

LEAD X

None

None

None

None

None

0.005

None

None

None

NoneNoneNoneNone0.005

0.005

0.005

None

None

None

None

. T. Agostino

Montgomery Page 5 of 6

ZINC?0

0.01

0.01

0.01

0.010.01

0.01

0.01

0.01

0.01

0.0050.01

0.010.010.01

0.04

0.010.01

0.005

0.01

0.005 Cont'd.......

G. Lebel — ManagerESTABLISHED 1928

Page 35: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

SVUSTIKA LABORAi ORES LIMITEDP.O. BOX 10, SWASTIKA, OMTARIO POK 1TO

TELEPHONE: (705) 642-3244 ANALYTICAL CHEMISTS * ASSAYERS * CONSULTANTS

Certificate No. _____ 56641

Received Nov. 10/83— " ———— —— . — . — -

Submitted by

^ SAMPLE

12408

12409

12410

12411

12412

12413

12414

12415

12416

12417

12418

1241912420

12421

12422

-^EUrL^esources^

======= N0 - GOLD

Oz./ton

Nil

Nil

Nil

Nil

Nil

Nil

Nil

NilNil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

SILVER Oz./ton

Nil

Nil

Nil

Nil

Nil

TraceNil

Nil

0.01

0.01

0.01

TraceNil

Nil

Nil

None

None

None

None

None

0.01

0.005

0.01

0.02

0.01

0.01

0.01

0.005 None

None

NoneNoneNone0.005None0.005None0.005

0.0050.005

0.005NoneNoneNoneNone

0.0050.010.0050.010.0050.020.020.02

0.11

0.09

0.06

0.02

0.010.01

0.01

ESTAB1

Per

Page 36: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

SWASTIKA LABORATORIES LIMITEDP.O. BOX 10, SWASTIKA, ONTARIO POK 1TO

TELEPHONE: (705)6423244 ANALYTICAL CHEMISTS * ASSAYERS * CONSULTANTS

(Eertfftnttr of

Certificate No. Dill

Received orr 31 J 981 SO Samples of

Submitted by Jjarlin

SAMPLE NO.

12208

12209

12210

12211

12212

^ 12213

™ 12214

12215

12216

12217

12218

12219

12220

12221

12222

12223

12224

12225

12226

12227

NOV. J/ , J.VOJ

Split Core

Resources Limited. Vancouver. British Columbia

GOLD Oz. /ton

0.03

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

SILVER Oz. /ton

Nil

Nil

Nil

0.01

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

0.01

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Attn:

COPPER

0.01

0.01

0.01

0.005

0.01

0.01

0.01

0.005

0.01

0.01

0.01

0.01

0.005

0.01

0.005

0.01

0.01

0.01

0.01

0.02

: Mr. T. AROStino

Page

LEAD

None

None

0.005

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

0.005

1 of 3

ZINCK

0.005

0.005

0.005

0.01

0.01

0.01

0.01

0.01

0.005

0.01

0.01

0.01

0.01

0.01

0.005

0.02

0.01

0.01

0.01

0.02

ESTABLISH Q D 1920

IVr

C. Lebel - Manager

Page 37: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

SWASTIKA LABORATORIES LIMITEDP.O. BOX 10, SWASTIKA, ONTARIO POK 1TO

TELEPHONE: (705)042-3244 ANALYTICAL CHEMISTS * ASSAYERS * CONSULTANTS

nf Analysts

Certificate No. 56480 Date: Nov. 17, 1983

Received Oct - 31," 1983 50 Samples of Split Core

Submitted by Harlin Resources Limited, Vancouver, British Columbia

SAMPLE NO.

12228

122291223012231

^^ 12232W 12233

1223412235122361223712238122391224012241122421224312244

1224512246

12247

GOLD Oz./ton

0.002

0.005Nil0.03Nil

Nil

0.0050.002Nil

Nil

Nil

NilNilNil

Nil

Nil

Ni 1

Ni 1

Nil

Nil

SILVER Oz./ton

0.02NilNilNilNil

Nil

Nil0.01

0.01

0.01

Nil

NilNilNil

0.02

0.01

Ni 1

Ni 1

Nil .

Nil

Attn:

COPPER •l,

0.010.0050.010.010.010.010.010.030.01NoneNone0.0050.010.01NoneNone0.010.010.01O.O.'J

Mr. T. Agostino

Page

LEAD7,

None0.005NoneNoneNoneNoneNoneNone0.005None0.005None0.0050.005None0.005Noil c1

None

None

None

2 of 3

ZINCz

, 0.010.010.0050.0050.0050.0050.0050.0050.0050.005None0.0050.0050.0050.0050.0050.005None

0.010.01

ESTABLISHED I'J2H

C. I.ebel - Manager

Page 38: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

SWASTIKA LABORAl'ORIES LIMITEDP.O. BOX 10, SWASTIKA, ONTARIO POK 1TO

TELEPHONE: {705)642-3244 ANALYTICAL CHEMISTS * ASSAYERS* CONSULTANTS

(Errtifirate nf Analyfifa

Certificate No. 56435 Date: November 7, 1983

87 Samples ofReceived October 26, 1983 _

Submitted by _Harlin Resources Limited, Vancouver, British Columbia

Split Core

Attn: Mr. T. Agostino

Page l of 5

SAMPLE NO.

12121

12122

12123

12124

12125

12126

12127

12128

12129

12130

12131

12132

12133

12134

32135

12136

12137

12138

12139

12140

GOLD Oz./ton

Nil

Nil

Nil

Nil

Nil

Nil

0.002 Nil

Nil

Nil

0.002Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil Nil

SILVER Oz./ton

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil Nil

COPPER\

0.01

0.01

0.01

0.01

0.005

None0.005

0.005

0.01

0.005

None

None0.010.005

0.01

0.01

0.01

0.01

0.01

0.01

LEAD *

0.005

0.005

0.005

None

NoneNoneNone

NoneNone

NoneNoneNoneNoneNoneNone

0.0050.01

NoneNone

None

ZINC fk

0.005

0.005

0.005

None

0.005

0.005

0.005

0.005

0.005

0.005

0.005

0.01

0.01

0.005

0.005

0.005

0.005

0.005

0.005

0.005

PerG. Lebel - JManag

ESTABLISHED 1928

Page 39: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

SWASTIKA LABORATORIES LIMITEDP.O. BOX 10, SWASTIKA, ONTARIO POK 1TO

TELEPHONE: (705)642-3244 ANALYTICAL CHEMISTS * ASSAYERS * CONSULTANTS

of Attalgaia

Certificate No. 56435 Date: November 7, 1983

Received October 26,

Submitted by Mar lin

SAMPLE NO.

12141

12142

12143

12144

^ 12145

12146

12147

12148

12149

12150

12151

12152

12153

12154

12155

12156

12157

12158

12159

12160

1983

Resources

GOLD Oz./ton

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

0.002Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

87 Samples of

Limited, Vancouver, British

SILVER Oz./ton

Nil

Nil

Nil

Nil

Nil

Nil

0.01

Nil

0.01

0.01

Nil

Nil

Trace

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Attn

COPPER \

0.01

None

0.01

None

0.01

0.01

0.01

0.005

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

None

0.01

0.005

0.01

Split

Columbia

Core

: Mr. T. Agostino

LEAD\

NoneNone

None

None

None

None

None

None

None

None

0.005

None

None

None

None

None

None

None

None

None

Page 2 of 5

ZINC \

0.01

0.01

0.005

0.005

0.005

0.005

0.08

0.02

0.02

0.03

0.02

0.01

0.03

0.02

0.01

0.01

0.01

0.01

0.01

0.005

Per .—. -.G. Lebel -

ESTABLISHED 1928

Page 40: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

SWASTIKA LABORATORIES LIMITEDP.O. BOX 10, SWASTIKA, ONTARIO POK 1TO

TELEPHONE: (705)642-3244 ANALYTICAL CHEMISTS* ASSAYERS * CONSULTANTS

of AnalgBta

Certificate No. 56435 Date: November 7, 1983

Received October 26, 1983 87 Samples of Split Core

Submitted by Harlin Resources Limited, Vancouver, British Columbia——————————————

Attn: Mr. T. Agostino

Page 3 of 5

SAMPLE NO.

12161

12162

12163

12164

12165

12166

12167

12168

12169

12170

12171

12172

12173

12174

12175

12176

12177

12178

12179

12180

GOLD Oz./ton

Nil

Nil

Nil

Nil

Nil

Nil

Nil Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

0.002

Nil

Nil

0.002 0.002

SILVER Oz./ton

Nil

Trace0.01

Nil

0.01

0.04

0.01

0.01

Trace

0.01

0.02

Nil

Trace0.01

Nil

0.01

Trace

Nil

0.01

Nil Nil

COPPER

None

0.01

0.01

0.005

0.01

0.02

0.01

0.02

0.005

0.01

0.03

None

0.01

0.01

0.01

0.02

0.01

0.01

0.02

0.005

Per

LEAD

None

ZINC

None

NoneNoneNone0.005

0.005

0.005

0.005

None

0.005

0.01

0.005

0.005

None

None

0.01

0.005

None0.005

0.005

0.06

0.02

0.01

0.13

0.09

0.05

0.20

0.04

0.08

0.49

0.01

0.08

0.11

0.05

0.20

0.02

0.03

0,04

0.01

G. Lebel -'Manager

ESTABLISHED 1928

Page 41: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

SWASTIKA LABORATORIES LIMITEDP.O. BOX 10, SWASTIKA, ONTARIO POK 1TO

TELEPHONE: (705)642-3244 ANALYTICAL CHEMISTS * ASSAYERS * CONSULTANTS

Of

Certificate No. 564 3 S Date: November 7 1QR3

Received October 26.

Submitted by Marl in

SAMPLE NO.

12181

12182

12183

12184

A 12185

12186

12187

12188

12189

12190

12191

12192

12193

12194

12195

12196

12197

12198

12199

A 12200

1983

Resources L

GOLD Oz./ton

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil Nil

Nil

Nil

87 Samples of

imited, Vanroiiv^r,

SILVER Oz./ton

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil

British

Attn:

COPPER

0.005

0.005

0.005

0.01

0.01

0.005

0.005

0.005

0.01

0.01

0.01

0.005

0.01

0.005

None0.005

None0.02

0.01

0.01

Split f

-Columbia

Inr**

Mr. T. Agostino

LEAD

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

None

Page 4 of 5

ZINC

0.01

0.01

0.01

0.005

0.005

0.005

0.005

0.005

0.005

0.005

0.01

0.005

0.005

0.01

0.005

0.01

0.03

0.02

0.01

0.01

PerG. Lebel - Manager

ESTABLISHED 1928

Page 42: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

SWASTIKA LABORATORIES LIMITEDP.O. BOX 10, SWASTIKA, ONTARIO POK 1TO

TELEPHONE: (705) 642-3244 ANALYTICAL CHEMISTS * ASSAYERS * CONSULTANTS

nf

Certificate No. 56435 Date: November 7, 1933

87 Samples ofReceived October 26, 1983 _

Submitted by Harlin Resources Limited, Vancouver, British Columbia

Split Core

Attn: Mr. T. Agostino

Page 5 of 5

SAMPLE NO.

12201

12202

12203

12204

12205

12206

12207

GOLD Oz./ton

Nil

Nil

Nil

Nil

Nil

Nil

Nil

SILVER Oz./ton

Nil

Nil

Nil

Nil

Nil

Nil

Nil

COPPER \

None

None None

None None

None None

LEAD \

None

None

None

None

None

None None

ZINC \

0.005

0.005

0.01

0.01

0.005

0.005

0.005

ESTABLISHED 1928

G. Lebel - Manage

Page 43: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

SI J\STIKA LABORATORIES LIMITEDP.O. BOX 10, SWASTIKA, ONTARIO POK 1TO

TELEPHONE: (705) 6*12-3244 ANALYTICAL CHEMISTS * ASSAYERS * CONSULTANTS

of Analgnifl

Certificate No. 56399 November 4, 1983

Received October 24. 1983 69 of Split Core

Submitted by Harlin Resources Limited, Vancouver, British Colimibia

Attn: Mr. T. Agostino

SAMPLE NO.

12052

12053

12054

12055

12056

A 12057

12058

12059

12060

12061

12062

12063

12064

1 12065

12066

12067

12068

12069

12070

12071

GOLD Oz./ton

Nil

Nil

Nil

Nil

Nil

Nil

Nil

Nil Nil

Nil

Nil

Nil

Nil

NilNil

Nil

Nil

Nil

0.002 Nil

Nil

0.002

SILVER Oz./ton

NilTraceNilTrace

TraceTraceTraceTrace

TraceTrace

TraceTraceTrace0.010.01TraceTrace0.05

0.010.04

COPPER

0.01

0.01

None

0.005

None0.005

0.005

None

0.005

0.01

0.005

0.005

0.01

0.01

0.01

0.005

0.005

0.01

0.01

0.02

LEAD

0.01

0.005

NoneNoneNoneNoneNoneNone

NoneNone

NoneNone0.005None0.0050.010.005

0.04

0.005

0.01

Page 1 of 4

ZINC

0.020.020.005None

0.0050.0050.0050.01

0.0050.005

0.0050.010.040.040.060.03.

0.01

0.20

0.04

0.27 j

l',. r

ESTABLISHED VJ2L'

G. lobel -

Page 44: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

en ,AO i sr\M LIMI l tuI'.O. BOX H). SWASTIKA, ONTARIO POK 1TO

TFLl'PHONI: . t70!i) 04? 3244 ANALYTICAL CUT MISTS * ASSAYF: RS * CONSULTANTS

(fkrttftratr nf Analysis

Certificate No. 56399 DaUv November 4, 1983

Received October 24, 1983 69 Samples of Split Core

Submitted by — Harlin Resources Limited, Vancouver, British ColurnbiaAttn: Mr. T. Agostino

SAMPLE; NO.

1207212073

12074

12075

• 12076

12077

12078

12079

12080

12081

12082

12083

12084

12085

1208612087

12088

12089

12090

12091

GOLD Oz./ton

NilNil

0.002Nil

Nil

0.002NilNilNil

Nil

Nil

Nil

Nil

Nil

Nil

0.002Nil

Nil

Nil

0.002 Nil

Nil

SILVER Oz./ton

0.05

0.01

0.01

0.01

0.04

0.01

0.010.02

0.02

0.01

0.01

0.01

0.02

0.03

0.030.01

Trace0.010.02

Nil

COPPER%

0.030.01

0.01

0.005

0.02

0.005

0.0050.01

0.02

None0.010.020.010.030.030.01

NoneNone

0.02

None

LEAD %

0.005None

None

0.005

None

0.01

0.005None0.005

0.005

0.005

0.005

None0.010.01None

None

None0.005

None

Page 2 of 4

ZINC %

0.180.02

0.03

0.12

0.12

0.07

0.020.03

0.07

0.03

0.04

0.06

0.11

0.24

0.36

0.08

0.01

0.01

0.16

0.01

l vrk,..-' NT

G. Label - Manage:ESTABLISHED

Page 45: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

l IKA LABOR/TORIES LIMITEDP.O. BOX K). SWASTIKA. ONTARIO POK 1TO

TELEPHONE!: (705)642-3244 ANALYTICAL CHEMISTS * ASSAYEKS * CONSULTANTS

(dprttftratr nf

56399Certificate No. ___^————-

Received October 24, 1983

Submitted by HarlJLn Itasourccs Limited, Vancouver, British ColumbiaSamples of

Date: Noyontoerj^, 1983

Split Core

SAMPLE NO.

12092

12093

12094

12095

12096

A 12097

12098

12099

12100

12101

12102

12103

12104

12105

12106

12107

12108

12109

12110

12111

GOLDOz./ton

Nil

Nil

Nil

Nil

Nil

Nil

Nil

0.002

0.002Nil

Nil

Nil

Nil

0.002

Nil

Nil

Nil

Nil

Nil

NilNil

Nil

Attn: Mr. T. Agostino

SILVER Oz./tonTraceTraceTraceTrace0.010.01TraceTrace0.01

0.010.010.01TraceNilTraceTraceTraceTraceTrace

Trace

COPPER %

NoneNone0.0050.0050.010.0050.010.010.01

0.010.010.010.010.0050.0050.0050.0050.010.005

0.005

IVr

LEAD %

None0.005NoneNoneNone0.0050.010.010.005

NoneNoneNoneNoneNoneNoneNoneNoneNoneNone

None

ZINC %

0.010.010.010.005None0.010.140.060.16

0.030.010.010.030.010.0050.0050.0050.0050.005

0.005

ESTABLISH t DLebel - Manager

Page 46: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

SWASTIKA LABOR/TORIES LIMITEDP.O BOX 10, SWAP,] IKA, ONTARIO I'OK 1 TO

TELEPHONE. (-'Ob) 612-3244 ANALYTICAL CHEMISTS * AI-.SAYCRS * CONSULTANTS

(Errttftratr nf Analyme

Certificate No. November 4, 1983

Kwcivfd Octdxir 24,

Submitted by Harlin

SAMPLE NO.

12112

12113

12114

1211512116

9 12117

12118

12119

12120

MM .. ..W* S:.II.|.I,.S ,

Resources Limited, Vancouver

GOLD Oz./ton

Nil

Nil

Nil

NilNilNil

Nil

Nil Nil

Nil

SILVER Oz./ton

Nil

Nil

Nil

NilNil

Nil

Nil

Nil

Nil

, British CcAttn:

COPPER

NoneNoneNoneNoneNoneNoneNoneNone

None

Spl

)luntoiaMr. T.

LEAD

NoneNoneNoneNoneNoneNoneNoneNone

None

it Core —

Agostino

Page 4 of 4

ZINC

0.0050.0050.0050.0050.01NoneNoneNone

None

Ivr

G. IjGbel - Manager!

Page 47: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

- Page 78 -

4.6 Summary of Results

Drill Hole HN1 - 353 ft.

-encountered mainly intercalated intermediate mafic volcanics and metasediments with a few dykes of granodiorite and minor felsic

volcanic rocks. Samples 12052 to 12120 showed trace amounts of zinc at depths of 175 feet and 245 feet. These values are in intermedite to felsic volcanics with minor pyrite and pyrrhotite.

Drill Hole HN2 - 445 ft.

-encountered mainly mafic to intermediate volcanics with minor metasediments and numerous monzonite dykes. Samples numbered 12121 to

12207 show minor zinc values at depths from 235 to 298 feet. Mineralization consist of traces of pyrite in volcanic rocks.

Drill Hole HN3 - 276 ft.

-encounterd mainly diabase. Samples numbered 12208 to 12247

and 12301 to 12307 detected no mineralization of significance.

Page 48: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

- Page 79 -

Drill Hole HN4 - 263 ft.-encountered initially about 180 feet of diabase and then

intermediate to mafic volcanics to the end of the hole. Samples numbered 12308 to 12357 detected no mineralization of significance.

Drill Hole HN5 - 376 ft.

-encountered mainly intercalated mafic to intermediate volcanics and metasediments. Samples numbered 12358 to 12422 showed only traces of zinc in metasediments at depths of 150 and 200 feet.

Respectfully submitted

J.jH. Montgomery, Ph

Page 49: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

P fa-.(a c eh "b&iu \4out

Page 50: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

//l

fe^MIM. V./LX ^

^iv * B i

ii^K^4l^^'C^x^

Page 51: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

D R 1 '.l '.O G

PAGE

M O'-E

7 o f 6 S T AI?T!NG DATE /t-COMPIET'ON DATE n 83

1-2.062.

1 CNG^M ?5:54-fc. DRILL /^^^ - 7 CORE ^ Q?

'OCA T -ON rlc/y.LO AJoC^-i CONTRACTOR /V - W a rr/st'TTt,A TT ! T 'JDE : ^ i ^^^ ^^JD SOGGED /' sT'ef ^ A^^7. Ci l

J 'J

; , , j /%/tr iS&ccrA 3P -.; ^^^.w/r? 3*,J^ :

3SSi?ij GSMCTZIOR. /rr - /r.or!.rjyi~~z 4^,4^J

OFROM T O

ROCK

" Y oc

S T RUC T URE

f5

-w Xi y z ;AL T ERAT!ON

i ,,ANALYSIS

NOTES

i n ,. tt

- 7 'o" /i'o"' ' "' d*!

/fT 7/0 '73/0

i— ' 5ov?r our ^ ^ , .

r .

OF ff^ffff \jy^f^:'f'^. j"i~ M i-Ut'

\- -!

. ^j

50-

ff

V u.

-

S p y f! re

l

yl^HK ,'A' VSJ

Page 52: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

DRILL LOG

E 3 STARTING DA^E 14-•OLE

L ENGTH

COMPLETION DATE

DR!L L ^5S — /'

/7 nCORE

LOCAT'ON.

AT T'TUDE, 32LC?

CONTRACTOR

LOGGED —-J

5 ROOTAGE oX C ?OM i

jcore ; %

1!ena*h'REC.

ROCK

TYPE

S T Rl!C T URE ALT ERATiON MiNERALiZATiON ANALYSiS

U

.r

NOTES NO.

/--i- rf.f-.f-^

<ate.irl6.0if.

6 /r, 6ft c-

tt,

w

:- ;l

- Cootff^^

&W85 ac fet^ic, /rJTSje/vsD'ffre

*,.....fy#n

? 3b

l l./rift?* yotcs Xtf

^——i-

YOLCMI& w i

-- -'

H i l l^4 i l !frt l l i

j UT* JHr

Page 53: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

O 1?'L L LOG

PAG? STARTING DATE J 4-

COMPLETION DATE

DRILL. CORE B a

AT T m, n c 47— -3ZCONTRACTOR —-—

LOGGED_____/J

B i C OOTAGEQ ;———————

ROCK

0 length REG.

STRUCTURE ALTERATION MINERALIZATION ANALYSiSNOTES NO.

i *.Jf \ V^'"-- k^ -- f r*--

-Vf^Xv: r/-'-. .

l -/*)#

2/5

i m fi fi f,\

nti^'-m.

2d'/

l l /r/m /B*"i -^' .——as.'

^11011

-nfs, 4

^-W*i

mi/vat gaga^3*#

p-ttsrt. i 5j, fJLO

j i I/TV*

:DTXP•IRA

exxjots.fi.

fifK,

H

i H i -i

30. •

•nw i' l \-rra•" j TKH

m/rt! l TO

Tmrl~

/nftfc. //VTE^e/voX^ -^'tj*fttzsi- ————"—-XXfifiUfeJO ~

Page 54: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

DR!L L LOG

D AGE 4

u OLE

START'NG DATE /^

L ENGTH

COMPLETION DATE DRILL -— -- 1 CORE

CONTRACTOR

V-

COQTAGEoX

%

T O eng'VREC.;

ROCKType

S T R'JCTURE ALTERATION MINERALIZATION ANALYSIS

:P4 Pft :

t'

t

-" JFr?"* r

K:

Page 55: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

DRILL LOG

PAGE 5 C-

HOLE ^'J

STARTING DATE J 4—0^5^*5-

COMPLETION DATE ?7

' LENGTH 353 -^•A,

LOCATION i-i'S/^LD /

ATTITUDE 4.7-^-^32

i B j" FOOTAGE j core i %

DRILL S-^S- t.

V^feTM CONTRACTOR

- LOGGED V. ^

ROCK ! STRUCTURE j ALTERATION

CORE S& ——————— M^c^^-s^-^ i?y^A'iP*; i

j

————

1

. ! jMINERALIZATION | ANALYSIS :

Page 56: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

DRILL LOG

PAGE , 'q——————-HOLE Tfi~;Vi So ^Af" l

STARTING DATE

L ENGTH

COMPLETION^DATE

DRILL. CORE

LOCATION -JH-

ATTITUDE 32Q

CONTRACTORIQGGEP V.

B !" FOOTAGE ! CO re iO ! 'X i F ROM TO 'length REG.

ROCK

TYPE

STRUCTURE Tt ALTERATION ' MINERALIZATION ANALYSISNOTES

! NO. T

i 5'

l

i; z.///

-i-i i

** i-v^

i-F;--3 St"

-i-;-

sr i i-

L

-i

Page 57: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

DR'LL LOG

STARTING DATE T /9 . !

HOLE 1^- :^~ --/V-

L EN'GTH 44^^

AT T l TUP E ^4.3 ±±~

DATE

DRILL SBS- ~

CONTRACTOR -—— LOGGED__LL

CORE

~S !- FOOTAGE i core~T

i STRUCTURE ALTERATION MiNERALiZATiON ANALYSiSNOTES NO.

j

l

x?s flByif^h

-i

l i

h*|

Page 58: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

DRILL LOG

•'0AGE~ 2. CXr 3 STARTING DATE OCTZ&SZ. f? f 'Y&3

HOLE "Sfoti 88 H*t ~ Si COMPLETION DATE flZTCfeX? Zl 'f f&S

i CNOTH 44S-&- - DRILL 8&S- f CORE &Q

LOCATION Ufnr.if) No^-r^ CONTRACTOR fftQ&JSS&TriZrATTITUDE ^,5-*-*-*3tf2 LOGGED O- foVfPifl&t

'^\ FOOTAGE j Core ! % ROCK i STRUCTURE ALTERATION MINERALIZATION

————————————————— .. -T——— ——— .. , . . —— - . ————————— —— — ——————————————

j :i

; ; .

li 'i

t i

i ANALYSIS

X iFROM TO leng'hiREC. TYPE PC,l ' NOTES

NO.

p ml

m

;#)37

'Z)S1

-77

i ' j- ^rg cftuzrrs

X: ;/ im

t l

! l I-i i r*'1j j p py&re nr L h

3JM,

* if- ! p

'

.S en-tussive

i dg1- ^7 jSte •-15A

••TUB;

Page 59: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

DRILL LOG

'P' A G t

HOLE

L E

STARTING DATE

t-' 33 f-' A/ -

445COMPLETION DATE

DRILL

2.1 /8

CORE

LOCATION

ATTITUDE

CONTRACTOR

LOGGED ———

'3 ; FOOTAGEo i-X IP ROM

core

;REC.ROCK

T YPE

STRUCTURE l ALTERATION i MINERALIZATIONNOTES

ANALYSIS

NO. l T

Ma-

i; -i /Z7ffifi&C

i i

/oilis~ '

, H l -l

(hi

96"Scv

iriob

l i

f-

fmrt

in q"] %

A.

12153

Page 60: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

DRILL LOG

LOCATION ATTITUDE 4&.S

/X, j/'//* rt f-^™^--^^

STARTING DATE Per /.9,COMPLETION DATE

DRILL CORE

CONTRACTOR

LOGGED ——

A/-i/.

STRUCTURE i ALTERATION i MiNERALiZATiON ANALYSISNOTES

- NO.

i !!-K-i4 ii '—w^'C

i i

irtiWM-/!

W-Tfetj

l Li ^i2t4;

•Ufa

TX*

•ItA]

aa?!

SWraj-TEft

HO*T

urn)

I21W

2"** l

p^

Page 61: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

DRILL LOG

STARTING DATE

COMPLETION DATE

DRILL 86S-;

LOCATIONATTITUDE

CONTRACTOR

ion GF D V.

MINERALIZATIONALTERATION

/wraefltGDrttre AHB

Page 62: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

DRILL LOG

: - ' T , PAGE b STARTING DATE

Per 21, 1985COMPLETION DATE

DRILL

CONTRACTOR

LOG GEO

LOCATION ——

AT TITUDE 44-O

5 "FOO-AGEcore o

i STRUCTURE MiNERALiZATiONALTERATION

length! REC. TYPEFROM ' TO

pnenocK.ts.-K. ~ CX. -So

PassnaaMae <4rRtKTuK.es

Page 63: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

'- AGE? 7 QfZ. g STARRING DATE

.DP ri &3HA/-Z

DRILL LOG

19,1983

COMPLETION DATE

-HKT -

r "i

C*

L E N G T H ^\ t? DRILL O-fcS^ -L CORE o^

LOCATION ±\E.ff,L3 Afof?T!4 CONTRACTOR ^' /^ O^'-SSETTB

ATTITUDE 4-&.0— *-,5ZO LOGGED V- WOYM] A^r /'

si '"FOOTAGE ; core ! % i ROCK | STRUCTURE [ ALTERATION MINERALIZATIONX FROM ! TO ''eng'h:REC.; TYPE | \ jt j | j | j ! ! i j fy !^P f|P

f)- ; ^ i ^ri •jy,W*C'S ^ 1 i 1 j ! ' ' ! i ' j

''^'^ ' |T" : v "-1 ' ' J ' ' , i i i i i '

^- ' \ ^S . ! i ; ' ' ' l ,-J\

1 IP * NOTES

-

l ————————————————————————————————————————— 1 ———————— ' ————————————————————————————————— ' ———— " t

j

F l

I '

———————————————————————————————————— j ——————— j ——————————————————————————————————— .

! ANALYSIS-j J j j i

' ! i i iJ i

! ' :l : ;

Page 64: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

DRILL LOG

f A G E- - 8 OF 8

HOLE

STARTING DATE Osr 19,198386 fW-Z

L ENGTH

.LOCATION.

ATTITUDE. 32.C*

COMPLETION DATE

DRILL fiBS- l

CONTRACTOR l

LOG GEO_____li.

T 21.CORE

l 8 l FOOTAGE O

i X iFROM TO

core

lengfh REC.

ROCK

TYPE

STRUCTURE ALTERATION MINERALIZATION ANALYSISNOTES

NO.

fi

4:i i

ft/eft!Kf O

OBWCMS

u-

3?".ia.

i

u '1

j j

!

- HODi- St3- SX5-f5^

:t

j

: J-j

! H

Page 65: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

DRILL LOG4 •~.~'

PAGE X OF 5

HOLE DP A/' 33 f^

L ENGTH 27^

LOCATION ^.Z/f.LI f

AT TITUDE -47* — *b-

'3

lopri^.320

STARTING DATE

COMPLETION DATE

DRILL 863-'

CONTRACTOR A/.

LOGGED V- ^C

Orr 22, *'OZT-&,

CORE

r^f^-s^*M*bi

3Z&'1983

&QT^

frfredVgyQ'^ Mb^CA*llcS, IL j i/^5/C VOiCAfJlC'S 2JoCtiedf (&&LI I~?P 3a. ?gfy-Stf* //fTl&SSitJf; 4C.Lj(iZ'f&'SC ^

— '

_ iJ

j

B i" FOOTAGE O* ;FROM ! TO length; R EC.

STRUCTURE ALTERATION MINERALIZATION

ty CP Ef

ANALYSISNOTES ; MO.-t-

-j-i-l-i

! -J

i l

H

47

57

/2ZO?

70

--ravy

173.12.

122./3

1221^ .-3*.

\

Page 66: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

DRILL LOG

P AC?E

HOLE

Z OF v5

83 H^i-

L ENGTH____J-tb

LOCATION ^STiO

ATTITUDE ^7 ——*"

STARTING DATE OCX'22/82

COMPLETION DATE —

DRILL SSS-tL_____ CORE

320

CONTRACTOR ——

LOGGED_____V.

g ;- FOOTAGEO i-X i F ROM TO

7

-q

i -iH -i

i li j

core

length REG.

n

IGl

4;H

f//

W

X"fieAS5

STRUCTURE ALTERATION

l i

MINERALIZATIONNOTES

t-

Il l

ANALYSIS

! NO. i

! 122.15l

'22J^ l

57220

te)

1222Z

12225

Page 67: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

DRILL LOG

P AGE ^

HOLE ,

L ENGTH,

LOCATIOf

ATTITUDE

STARTING DATE r 22,COMPLETION DATE

DR.LL SBS-1

Qrr-23/35CORE 3Q

CONTRACTOR

LOGGED ___

B ! FOOTAGE,O h

core STRUCTURE l ALTERATION MINERALiZATiON

SP eftANALYSIS

NOTESNO.

j j l fiff0#SIKS'.

wt

•mull

i l

12230

-' V'G&f

- -T&XK

PINS pen

12233

Page 68: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

DRILL LOG

p A G'E A- OP -5HOLE

STARTING DATE

L ENGTH 2~i'h

COMPLETION DATE ^ DRILL — CORE

LOCATION

ATTITUDE 31&

CONTRACTOR

LOGGED

S j FOOTAGE STRUCTURE ALTERATION MINERALIZATION

I l l

ANALYSISNOTES

NO.

-w.

l i

l hi r ; u

Cofr,fteiT'c*i

TO met) (tet?fiE?

Page 69: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

DRILL LOGr — s — — — f ———— - ——————————— "

PAGE 5 Of- 5

HOLE t&ti 82tihJ-3

L ENGTH 274*

1 . LOCATION H&f-tS AOfc--

: ATTITUDE -47* — *" 5/-0

STARTING DATE OQ7V&&L *22-, 1^82,

COMPLETION DATE Oof 2-^2 t S^S

DRILL ^S'j. CORE #c*

CONTRACTOR ^- ^0^^"3 ~H~g-

l 0 G r, F D \/ i'C'O 'Mtrt-i ll1i

i

i B ! FOOTAGEO i—————,———

T———rcore

X FROM j TO length REG.

STRUCTURE ALTERATION MINERALIZATION

H——h fv ep f R. SP mg;NOTES

ANALYSIS

NO.

Z&-

-mi*

- f f'Orr~ //J

h

I230Z!

^2303

1230V

1123O5

123C&

Page 70: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

DRILL LOG

PAGE J Df 5-————

HOLE Kpi-/ #3/-W-4-STARTING DATE

LENGTH 2A3

COMPLETION DAT1

DRILL BBS- 7

12308

CORE

- LOCATION 'r.iir.LO

ATTITUDE 47 "~** -

CONTRACTOR

LOGGED

A/,V-

B '" FOOTAGE O

T T

/vsflr/c

'C. VOLC?A*JiC6 zb

core

: X i F ROM j TO |lengthjREC.O:-

ROCK

TYPE

STRUCTURE ALTERATION j MINERALIZATION

PYCP PR SLNOTES

ANALYSIS

NO.

0.0r h-r

t

ii/4

mp i-

t i r 12308

i 24-

i! 24 i1 i

i-u l-

34-

m

*H

So

Page 71: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

DRILL LOG

rPAGE

HOLE

2 6P -5" STARTING DATE

LENGTH

COMPLETION DATE

DRILL CORE SQ

LOCATION.

ATT!TUDE -

CONTRACTOR

LOGGED___

FOOTAGE

FROM TO

core

length REG.

ROCK

TYPE

STRUCTURE ALTERATION MINERALlZATiONNOTES

ANALYSIS

NO.

m /Z318

74

1 -"f! fO

i t- 12322;

i 1 W

'07101

123^5

4 9 'to

117

Page 72: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

DRILL LOG

P A G E ci 57 ^

HOLE -

STARTING DATE

4-

L ENGTH.

LOCATION.

ATTITUDE.

COMPLETION DATE

DRILL BBS-'

CONTRACTOR .A

LOGGED ———

CORE St2

7, 'i

8 i FOOTAGE

X j F ROM TO

core

length; REC.

ROCK

TYPE

STRUCTURE ALTERATION MINERALIZATIONNOTES

ANALYSIS

l NO.

©3

'2T7

rr

i 1^329

l j /37fi./]___

f'/O 9807 l

to

i i

f/D

767

H/ft i

S'/o '2S33

V/v m1253^

Page 73: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

DRILL LOG

rPAGE - 4

HOLE

STARTING DATE Z4-

L ENGTH

COMPLETION DATE

DRILL___'

LOCATION. AT TITUDE.

CONTRACTOR ^'

IQG GF P \/'

CORE .

l" FOOTAGE

FROM TO

core %

lengthREC.

ROCK

TYPE

STRUCTURE ALTERATION MINERALIZATION

A; \ep CfiNOTES

ANALYSIS

i NO.

mZfcV

l f'/D '

l fr*i t-rJ •-wr-7ZA!

"TO /tf/

H1

H

• •mtl '

t , 0

fs vote *foas, (2^45

\ H

&B4-

mo

- WHO*.LOCAU* -rfe

FPLS,t gAHfc

i q COM c. /A

HI-Tan

- tnmioe. irtT&tsrteD iffr? Mb ~ ~'

!3^^75tf j c^Jo

i 255;

Page 74: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

DRILL LOG

P,AGE 5 CC D

HOLE fN' 4-

L ENGTH

STARTING DATE —

COMPLETION DATE

DRILL

2S_ i CORE BO

ATTITUDE, 4 STO

CONTRACTOR ——

LOGGED____^JL

±

! 0i X

FOOTAGE

FROM TO

core "/o

length! REC.

ROCK

TYPE

STRUCTURE

l

————

ALTERATION MINERALIZATION

fi cf lANALYSIS

NOTES ! NO.i i

l i im!

i/2S53

f-

ul

(ft?l

g/trrtrp #jei* • ' i '2365 i

^i-i

END or

1

- Nore-

* 5-15*7,, E)cr ~

j-rrr

t

Page 75: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

DRILL LOG

P AGE

HOLE

J OP 1 STARTING DATE 3g ^7 ;

L ENGTH

COMPLETION DATE

DRILL - CORE 8Q

NO"SrrM

AT T

CONTRACTOR ^'

LOGGEDlI___V: 'f

5 l FOOTAGEO —————.——X IFROM j TO

*5±—————l————ength REC.

ROCK

TYPE

STRUCTURE ALTERATION MINERALIZATJON

py \w\fi. 6t NOTESANALYSIS

: NO. I

(S-

f-

t-l

, H1 -|! -1

i 1

i ^-miKTW

2JC.V

- 6ft\ff*e^ LocAu*y .-7&X& py W&MD/H vfev/s.12369

Page 76: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

DRILL LOG

P AGE

HOLE

7 STARTING DATE 2-7.- 5

LENGTH

COMPLETION DATE DRILL CORE SQ

LOCATION f-terru-o AT TITUDE 47* —

CONTRACTOR

LOGGED V.

STRUCTUREl T

ALTERATION MINERALIZATION

TSL

NOTESNO.

*W

l ll l

i l

l . GReiNtVC^.

l i r

f-TRA

FfKtc

i

-Itefe!

VotXJxWfeL.

~ •Sorntl -IS 1

[I #wos.^~ I-

AfifD

1234)7

&ATJQ&

12349

TPft

TSfiIZ570

Page 77: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

DRILL LOG

rOP 7P AGE

HOLE tSDU 8&VAM-5L E

LOCATI

STARTING DATE

COMPLETION DATE

DRILL SSSS-JL CORE 8Q

ATTITUDE,

CONTRACTOR

LOGGED ——

Nk

\B r FOOTAGEO

l F ROM TO

STRUCTURE

length REG

ALTERATION MINERALIZATION

CP SLNOTES

ANALYSIS

NO.

A27inf3o ] 2'H W

U

9BGiorm? fiwfiif

t 6ft4rNeb-

/?1CU/Z375

: Wo\q'ro

150-Rlk

I-

i-

POuftrttrNS

72377

~"*"*-iq'/o

ft

®J±

170

q '/o

moo

ffiff).3EB

•nw

mopes - rto

J2SSO

4/so WtfSS

Page 78: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

DRILL LOG

PAGE 4 OF 1

HOLE

STARTING DATE

L ENGTH. 37^ PT

COMPLETION DATE

DRILL 5SS- ± CORE BO

LOCATION.

ATTITUDE

CONTRACTOR

l OP, GF D M.

STRUCTURE ALTERATION MiNERALiZATiON

TW CP PR

ANALYSISNOTES

i NO.

t-&ONOS

rtrt

i stiitt i•re

mot16

ffifB

inreetfK of votes.

•M1 t

MJH

-m*

i-ffijd

auimtt- Prix c.*-4o

Page 79: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

DRILL LOG

P AGE

HOLE

-7STARTING DATE QcT O?7,

L ENGTH 576

COMPLETION DATE

DRILL CORE

LOCATION

ATTITUDE

CONTRACTOR

i or, r,EP V.

i 5 l FOOTAGE core T

X i F ROM l TO 'length REC

ROCK

TYPE

STRUCTURE ALTERATION MINERALIZATION

CP P*. NOTESANALYSIS

NO. T

TtA TOA

\ i

\l73ft

.-reft

Page 80: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

DRILL LOG

PAGE

HOLE

L E

Of- ~ STARTING DATE

COMPLETION DATE

DRILL —— CORELOCATION.

AT Tl

AjocTr CONTRACTOR

LOGGED

A) sserrg:V.

B r FOOTAGEO H

STRUCTURE ALTERATION MINERALiZATiON

fi iceANALYSIS

NOTESNO.

z fidnr

y.f r*

MCO

i

fre/

S-*asctA)Ei

KAV& OUT Of

ma /HOP

• •ea" 25?

M/g

Page 81: RPT ON DD PROG (1983) HEMLO NORTH (PINE GROVE LAKE) … · locations are marked on the geological map (Figure 5-1). Claims TB660401-405 were restaked on July 6-8, 1983 and recorded

DRILL LOG

P AGE

HOLE

"7 Of^ ~7 STARTING DATE

S5W-.5L ENGTH

COMPLETION DATE —

DRILL 36S- 1~ CORE

LOCATION CONTRACTOR

ATTITUDE 4-7 32O V.

3 i* FOOTAGEO hX FROM TO length REC.

ROCK

TYPE

STRUCTURE ALTERATION MiNERALiZATiON

PV C? Si,

ANALYSISNOTES ; NO.

f/D ftllftft.-ST. UffilK\

—l !2H

\IM2] i

(-,X \f2H22. \

: ; -j-iH

' -H

' 1

.... j^ -^ flf-jf-3%-3- 570

1

-i

?

gfiseixxj etv&r OF

36305-