RPS Data Products Status

2
1 RPS Data Products Status The RPS team has been working towards delivery on the higher-order data products that have been part of the RPS plan since PDR Our progress is consistent with impacts from higher priority analyses for programs and relatively limited staff and budget Recent milestones: Development of 1-minute average spectra (new level 2 product) Working on consistency check between two methods of computing flux We will provide quick-look products on request while we focus on our production codes

description

RPS Data Products Status. The RPS team has been working towards delivery on the higher-order data products that have been part of the RPS plan since PDR Our progress is consistent with impacts from higher priority analyses for programs and relatively limited staff and budget Recent milestones: - PowerPoint PPT Presentation

Transcript of RPS Data Products Status

Page 1: RPS Data Products Status

1

RPS Data Products Status

• The RPS team has been working towards delivery on the higher-order data products that have been part of the RPS plan since PDR

• Our progress is consistent with impacts from higher priority analyses for programs and relatively limited staff and budget

• Recent milestones:– Development of 1-minute average spectra (new level 2 product)– Working on consistency check between two methods of computing flux

• We will provide quick-look products on request while we focus on our production codes

Page 2: RPS Data Products Status

RPS Data ProductsData Level

Name Contents Latency Reprocessing Status

0 (L0) Level 0 Data

RPS PTP/CCSDS packets (decoded in CDF version, includes space weather data)

1-3 days By MOC Done

1 (L1) Level 1 Data

Nearly all L0 data, UTC, energy/photon deposits, singles and coincidence rates, s/c location, RPS boresight vector, magnetic field vector, dead times (including quota effects), minimal OPQ coordinates

L0 + 1-3 days

Daily up to L0+5 days, and on-demand

Quick look code mature, developing production code

2 (L2) Energy Spectra

UTC, flux versus energy spectrum (once per 5 degrees rotation), pitch-angle and full magnetic coordinates (e.g., Lm, MLT, I,

Blocal, Bequ, F) of RPS boresight in OPQ

and TS models. Separate 1-minute spin averaged flux spectra.

L1 + 1-2 days

Daily up to L0+7 days and on-demand

Developing quick look

3 (L3) Energy-Angle Spectra

UTC, energy-pitch angle spectrum (once per spin and once per minute), full magnetic coordinates in OPQ, and TS models

L2 + 1-2 days

Daily up to L0+10 days and on-demand

4 (L4) Global Maps

UTC, flux vs E/aeq/Lm, flux vs E/K/F, PSD

vs M/K/F maps (once per orbit leg) in multilple field models

L3 + 1-2 days

Daily up to L0+14 days and on-demand