RPC tasks and manpower 2011-2012 P. Paolucci. DPG Not covered tasks 7/12/10RPC IB - Pigi Paolucci2...

6
RPC tasks and manpower 2011-2012 P. Paolucci

Transcript of RPC tasks and manpower 2011-2012 P. Paolucci. DPG Not covered tasks 7/12/10RPC IB - Pigi Paolucci2...

Page 1: RPC tasks and manpower 2011-2012 P. Paolucci. DPG Not covered tasks 7/12/10RPC IB - Pigi Paolucci2 DPG 2011 (FTE)2012 (FTE) WBM0.70.3Berzano* + ? Offline.

RPC tasks and manpower2011-2012

P. Paolucci

Page 2: RPC tasks and manpower 2011-2012 P. Paolucci. DPG Not covered tasks 7/12/10RPC IB - Pigi Paolucci2 DPG 2011 (FTE)2012 (FTE) WBM0.70.3Berzano* + ? Offline.

RPC IB - Pigi Paolucci 2

DPG Not covered tasks

7/12/10

DPG 2011 (FTE) 2012 (FTE)

WBM 0.7 0.3 Berzano* + ?

Offline DB 1.0 0.5 ?

DCS 0.7 0.3 ?

Upgrade Sim 0.5 0.5 ?

Run quality 0.5 0.3 ?

Detector perf. 2 2 Calabria + ?

Trigger perf. 2 2 Warsaw + ?

DQM 1 1 A. Cimmino + ?

Noise 0.3 + 0.5 0.3 + 0.5 S. Costantini + ?

Page 3: RPC tasks and manpower 2011-2012 P. Paolucci. DPG Not covered tasks 7/12/10RPC IB - Pigi Paolucci2 DPG 2011 (FTE)2012 (FTE) WBM0.70.3Berzano* + ? Offline.

RPC IB - Pigi Paolucci 3

TC covered tasks

7/12/10

DPG 2011 (FTE) 2012 (FTE)

TC Buontempo

RB 1.0 1.0 Anton

RE 1.0 1.0 Hassan

Gas 0.5 0.5 Luigi

Cooling 0.3 0.3 Ian

Trigger 2 2 Karol + ?

Electronic 0.4 0.4 Pigi + ?

DB 0.7 0.3 ?

Test Beam 0.3 + 0.5 0.3 + 0.5 ?

Page 4: RPC tasks and manpower 2011-2012 P. Paolucci. DPG Not covered tasks 7/12/10RPC IB - Pigi Paolucci2 DPG 2011 (FTE)2012 (FTE) WBM0.70.3Berzano* + ? Offline.

RPC IB - Pigi Paolucci 4

2011 Manpower• Korea Univ: Taejong (70%), Mee Hee Cho (50%), Hyung Chul Kim (30%)• SKK Univ:• Chandigar:• Mumbai BARC:• Pavia: Vitulo• China:• Sofia Univ: Litov, Dimitrov, Pavlov, Petkov, Hadjiisk• INRNE: Stoianov, Genchev, Sultanov• Egypt:• Ghent: Tytgat, Costantini, Cimmino, Zaganidis, Phd• Napoli: Buontempo, Paolucci, Carrillo, Fabozzi• LNF: Benussi, Piccolo, Bianco, Caponero, Felli, Saviano• Uniandes: Ocampo, Gomez (Phd new), Phd ?• Pakistan: Horani, Shahzad• Brussels: Van Doninck, Luc Van Lancker• Bari: Pugliese, Iaselli, Maggi, Colaleo, Calabria, Lusito, Abbrescia, Nuzzo

7/12/10

Page 5: RPC tasks and manpower 2011-2012 P. Paolucci. DPG Not covered tasks 7/12/10RPC IB - Pigi Paolucci2 DPG 2011 (FTE)2012 (FTE) WBM0.70.3Berzano* + ? Offline.

RPC IB - Pigi Paolucci 5

Steering Committee• I would like to introduce the concept of having a steering

committee to solve, for ever, open questions and/or important issues.

• Two Steering Committees proposed at RPC CW:Run quality criteria (M. Maggi, D. Piccolo, A. Cimmino, Taejong)

Endcap efficiency studies (D. Piccolo, A. Colaleo, M. Abbrescia, Hassan, C. Carrillo, C. Calabria)

• Requirements and goals at the first DPG meeting in Jan.• Be-weekly Report at PDG • Deadline (report) for March CMS week

7/12/10

Page 6: RPC tasks and manpower 2011-2012 P. Paolucci. DPG Not covered tasks 7/12/10RPC IB - Pigi Paolucci2 DPG 2011 (FTE)2012 (FTE) WBM0.70.3Berzano* + ? Offline.

RPC IB - Pigi Paolucci 6

ConclusionsTasks• A tasks table, similar to the PDG table, will be provided by TC, RC

and Upgrade as soon as possible.• We do have few important tasks not covered. I would like to ask

the RPC Institution to make a big effort trying to cover all before end of January 2011

• I’ll present the final list at the next MB (Feb 2011)• I’ll ask CMS to look for new Institutions joining the RPC project

(under discussion)Manpower• Many Institution already sent to me the list of people in the RPC

(percentage), the one “resident” at CERN and their interests.• Pavia, Chandigar, BARC and SKK will be contacted asap

7/12/10