RPC Data Certification
-
Upload
marah-weiss -
Category
Documents
-
view
23 -
download
0
description
Transcript of RPC Data Certification
RPC Data Certification
M. MaggiINFN Bari
Goals
• RPC system should provide understood Data and Performance to get any CMS result
• Interface the RPC with Physics Validation Team (PVT) flagging each DataSet of Data and MonteCarlo processing
The overall view
DQM Online
Online Stream
PromptDQM
Offline
StreamExpress
DQM Offline
Primary DatasetTo Be Certified
P5 T0T0
Reco
CM
S
RUN Registry
PVT
RPC Certification
The DQM RR
The DQM role (Anna Cimmino)
• Used by Central Shifter– Provide a clear set of Histogram coping
with each individual case:• Deal with HV bit• Deal with Statistics• Appropriate use of Noise and Signal
• Used by RPC Shifter– Provide more deeper insight to potential
problem. RPC needs WBM tools for Online Diagnostic
The DQM Framework
• P5 Online System. Code must be performing and synthetic…
• Offline T0 for Stream and Reco. Code must be robust
Not everything can go to DQM system!but can use DQM style
Automatic Certification
• DQM Shifter Based• Learning phase, with have still to get a
coherent picture
Last Re-Reco May27 with CMSSW 361p3BAD in StreamExpress, GOOD in May27132471 132473 132474 132477 132478
BAD in May27, GOOD in StreamExpress132572 132648 132959 132960 132961133036 133081 133242 136080 136087136097
The Release Validation Role (JungHwan Goh)
• The RPC Software is Degradable– CMS Framework Changes – Connections to DB– OS and Compiler upgrades– Stricter Coding rules
For Each Release
Set of Standard DQM-like Plots in different areas: Geometry/SimHit/Digis/LocalReco/…. /DQM?
Certification
MC & DataProcessed withA given Release
FULLY VALIDATED RPC SW
WBM
OnlineDQM
OfflineDQM
RRELogs
PromptAnalyses Occupancy++
SegmentExtrapolation++Noise++Emulator On NoiseTrigger++Non Event Data Analysis++RPC use on MuonsAtypical Cluster….
twiki:RPCModulesTasks
Conclusion
• Certification is a task that needs Diagnostic Tools DQM,WBM
• There is a clear interplay among SW Validation, DQM, and Prompt Analysis
• There is a continuous Data Processing
Open Issues
• WBM needs to be finalized and we need to clarify the use for Certification
• DQM needs consolidation for muon based quantities
• Prompt Analysis requires a redesign…. (DQM/CAF, CRAB based, ….)