RPC Data Certification

11
RPC Data Certification M. Maggi INFN Bari

description

RPC Data Certification. M. Maggi INFN Bari. Goals. RPC system should provide understood Data and Performance to get any CMS result I nterface the RPC with Physics Validation Team (PVT) flagging each DataSet of Data and MonteCarlo processing. The overall view. P5. T0. T0 Reco. - PowerPoint PPT Presentation

Transcript of RPC Data Certification

Page 1: RPC Data Certification

RPC Data Certification

M. MaggiINFN Bari

Page 2: RPC Data Certification

Goals

• RPC system should provide understood Data and Performance to get any CMS result

• Interface the RPC with Physics Validation Team (PVT) flagging each DataSet of Data and MonteCarlo processing

Page 3: RPC Data Certification

The overall view

DQM Online

Online Stream

PromptDQM

Offline

StreamExpress

DQM Offline

Primary DatasetTo Be Certified

P5 T0T0

Reco

CM

S

RUN Registry

PVT

RPC Certification

Page 4: RPC Data Certification

The DQM RR

Page 5: RPC Data Certification

The DQM role (Anna Cimmino)

• Used by Central Shifter– Provide a clear set of Histogram coping

with each individual case:• Deal with HV bit• Deal with Statistics• Appropriate use of Noise and Signal

• Used by RPC Shifter– Provide more deeper insight to potential

problem. RPC needs WBM tools for Online Diagnostic

Page 6: RPC Data Certification

The DQM Framework

• P5 Online System. Code must be performing and synthetic…

• Offline T0 for Stream and Reco. Code must be robust

Not everything can go to DQM system!but can use DQM style

Page 7: RPC Data Certification

Automatic Certification

• DQM Shifter Based• Learning phase, with have still to get a

coherent picture

Last Re-Reco May27 with CMSSW 361p3BAD in StreamExpress, GOOD in May27132471 132473 132474 132477 132478

BAD in May27, GOOD in StreamExpress132572 132648 132959 132960 132961133036 133081 133242 136080 136087136097

Page 8: RPC Data Certification

The Release Validation Role (JungHwan Goh)

• The RPC Software is Degradable– CMS Framework Changes – Connections to DB– OS and Compiler upgrades– Stricter Coding rules

For Each Release

Set of Standard DQM-like Plots in different areas: Geometry/SimHit/Digis/LocalReco/…. /DQM?

Page 9: RPC Data Certification

Certification

MC & DataProcessed withA given Release

FULLY VALIDATED RPC SW

WBM

OnlineDQM

OfflineDQM

RRELogs

PromptAnalyses Occupancy++

SegmentExtrapolation++Noise++Emulator On NoiseTrigger++Non Event Data Analysis++RPC use on MuonsAtypical Cluster….

twiki:RPCModulesTasks

Page 10: RPC Data Certification

Conclusion

• Certification is a task that needs Diagnostic Tools DQM,WBM

• There is a clear interplay among SW Validation, DQM, and Prompt Analysis

• There is a continuous Data Processing

Page 11: RPC Data Certification

Open Issues

• WBM needs to be finalized and we need to clarify the use for Certification

• DQM needs consolidation for muon based quantities

• Prompt Analysis requires a redesign…. (DQM/CAF, CRAB based, ….)