Royal Lake: Meeting Agenda
Introductions and Opening Remarks Project Goal and Status Royal Lake Conditions Project Overview Site Access Dredging
– Phase I and Phase II– Dredging Alternatives
Lake Habitat and Shoreline Restoration Project Timeline Questions and Answers
![Page 3: Royal Lake Dredging and Restoration Project Update-June 2014](https://reader036.fdocuments.in/reader036/viewer/2022062300/554d39c1b4c905b0708b4801/html5/thumbnails/3.jpg)
Restore Sediment Pool Capacity– Downstream water quality benefits– Lake water quality– Aesthetics
Improve Lake Water Quality and Habitat Provide Long Term Maintenance Improvements
Project Goals and Benefits
![Page 4: Royal Lake Dredging and Restoration Project Update-June 2014](https://reader036.fdocuments.in/reader036/viewer/2022062300/554d39c1b4c905b0708b4801/html5/thumbnails/4.jpg)
Completed Data Collection Completed Lake Dredging and Management Plan Design Plans and Specifications
– Preliminary Design – Completed
– Final Design – Current design phase Permitting – In Progress Late 2014/Early 2015 – Complete Final Design and Permitting Dredging Projected to Start in Late Summer, 2015
Royal Lake: Project Status
![Page 5: Royal Lake Dredging and Restoration Project Update-June 2014](https://reader036.fdocuments.in/reader036/viewer/2022062300/554d39c1b4c905b0708b4801/html5/thumbnails/5.jpg)
Royal Lake Facts
Drainage Area = 2,477 acres (3.67 square miles)
Lake Surface Area = 37.5 acres
Sediment Pool Capacity = 416,000 cubic yards (CY)
Current Sediment in Lake = 103,000 CY*
Estimated Annual Sediment Load = 4,400 CY
50 feet
103,000 CY
* Based on a 2013 bathymetric survey
![Page 6: Royal Lake Dredging and Restoration Project Update-June 2014](https://reader036.fdocuments.in/reader036/viewer/2022062300/554d39c1b4c905b0708b4801/html5/thumbnails/6.jpg)
Royal Lake: Sediment Thickness
![Page 7: Royal Lake Dredging and Restoration Project Update-June 2014](https://reader036.fdocuments.in/reader036/viewer/2022062300/554d39c1b4c905b0708b4801/html5/thumbnails/7.jpg)
Royal Lake: Water Depth
![Page 8: Royal Lake Dredging and Restoration Project Update-June 2014](https://reader036.fdocuments.in/reader036/viewer/2022062300/554d39c1b4c905b0708b4801/html5/thumbnails/8.jpg)
Royal Lake: Sediment Sampling Results
Samples were analyzed for chemicals found in typical urban environments
All tests indicated significantly lower concentrations than state limits except for Arsenic
Nitrogen and Phosphorous levels were elevated With dredging of 103,000 CY:
– Approximately 8,500 lbs of Phosphorous will be removed– Approximately 102,000 lbs of Nitrogen will be removed
![Page 9: Royal Lake Dredging and Restoration Project Update-June 2014](https://reader036.fdocuments.in/reader036/viewer/2022062300/554d39c1b4c905b0708b4801/html5/thumbnails/9.jpg)
Total Wetlands Impact:– 0.85 Acre
All impacts within original footprint of lake
Royal Lake – Wetland Impact
![Page 10: Royal Lake Dredging and Restoration Project Update-June 2014](https://reader036.fdocuments.in/reader036/viewer/2022062300/554d39c1b4c905b0708b4801/html5/thumbnails/10.jpg)
Project Overview
Staging Areas
Sediment Forebays Lake grading to restore the original bottom elevation
![Page 11: Royal Lake Dredging and Restoration Project Update-June 2014](https://reader036.fdocuments.in/reader036/viewer/2022062300/554d39c1b4c905b0708b4801/html5/thumbnails/11.jpg)
Site Access and Staging
![Page 12: Royal Lake Dredging and Restoration Project Update-June 2014](https://reader036.fdocuments.in/reader036/viewer/2022062300/554d39c1b4c905b0708b4801/html5/thumbnails/12.jpg)
Access During Construction
Public Access: The park will remain open and existing parking lot will be available.
![Page 13: Royal Lake Dredging and Restoration Project Update-June 2014](https://reader036.fdocuments.in/reader036/viewer/2022062300/554d39c1b4c905b0708b4801/html5/thumbnails/13.jpg)
Access During Construction
Public Access: Pedestrian gates will be provided. Access through work areas and trails around the lake will be possible after work hours.
![Page 14: Royal Lake Dredging and Restoration Project Update-June 2014](https://reader036.fdocuments.in/reader036/viewer/2022062300/554d39c1b4c905b0708b4801/html5/thumbnails/14.jpg)
Staging Area 1 Potential Expansion
Berm/Cofferdam to be built
Area to be dewatered and backfilled to expand staging area after berm/cofferdam is built
![Page 15: Royal Lake Dredging and Restoration Project Update-June 2014](https://reader036.fdocuments.in/reader036/viewer/2022062300/554d39c1b4c905b0708b4801/html5/thumbnails/15.jpg)
Royal Lake: Dewatering Basin
Inactive dewatering basinto be filled in and restored
Staging area potential
expansion
![Page 16: Royal Lake Dredging and Restoration Project Update-June 2014](https://reader036.fdocuments.in/reader036/viewer/2022062300/554d39c1b4c905b0708b4801/html5/thumbnails/16.jpg)
Phase I and Phase II Dredging
PHASE II48,000 CY
PHASE I15,000 CY
PHASE I40,000 CY
![Page 17: Royal Lake Dredging and Restoration Project Update-June 2014](https://reader036.fdocuments.in/reader036/viewer/2022062300/554d39c1b4c905b0708b4801/html5/thumbnails/17.jpg)
Dredging Alternatives
1. Wet Dredging: Mechanically dredge deposited sediment and haul wet. Normal pool maintained. (Note: This option will still require lake drawdown for a short period of time to build the forebay berms)
2. Dry Dredging: Drain the lake and dry deposited sediment in place prior to hauling
3. Project will be bid out with the option to dredge wet or dry
Partial drawdown for Phase I dry dredging: drawing the lake partially to the Phase I dredging limits would leave a 15 acre pool; sediment would be dried in the dewatered section of the lake in place prior to hauling. Approximately 1/2 of the deposited sediment volume would be removed.
![Page 18: Royal Lake Dredging and Restoration Project Update-June 2014](https://reader036.fdocuments.in/reader036/viewer/2022062300/554d39c1b4c905b0708b4801/html5/thumbnails/18.jpg)
General Sequence– Establish access and staging areas– Conduct dredging utilizing barges– Haul wet sediment to disposal site
for drying
Pros– Less weather dependent– Quicker initial start to dredging– Less potential for schedule
extensions or delay
Concerns– Increased sediment handling effort
at disposal area– Potentially higher cost
Wet Dredging
![Page 19: Royal Lake Dredging and Restoration Project Update-June 2014](https://reader036.fdocuments.in/reader036/viewer/2022062300/554d39c1b4c905b0708b4801/html5/thumbnails/19.jpg)
General Sequence– Initiate drawdown of lake– Establish access and staging areas– Establish diversion channels within lake– Conduct dredging
Benefits– Higher daily sediment removal rates– Minimal sediment handling effort at disposal
area– Potentially lower cost
Concerns– Very weather dependent– Higher potential for delays due to weather– Even with a reduced pool, there will be a need
to relocate/salvage fish
Dry Dredging (Full or Partial Drawdown)
![Page 20: Royal Lake Dredging and Restoration Project Update-June 2014](https://reader036.fdocuments.in/reader036/viewer/2022062300/554d39c1b4c905b0708b4801/html5/thumbnails/20.jpg)
Royal Lake: Partial Drawdown
A partial drawdown would leave 15 acre pool with a maximum depth of 8 feet
Sediment to be removed = 55,000 CY
DRAW-DOWN 55,000 CY
![Page 21: Royal Lake Dredging and Restoration Project Update-June 2014](https://reader036.fdocuments.in/reader036/viewer/2022062300/554d39c1b4c905b0708b4801/html5/thumbnails/21.jpg)
Huntsman Lake (29 acres)
Huntsman Lake – Currently being dredged in the dry
![Page 22: Royal Lake Dredging and Restoration Project Update-June 2014](https://reader036.fdocuments.in/reader036/viewer/2022062300/554d39c1b4c905b0708b4801/html5/thumbnails/22.jpg)
Huntsman Lake Dam Rehabilitation Project Fish Relocation (May, 2013)
![Page 23: Royal Lake Dredging and Restoration Project Update-June 2014](https://reader036.fdocuments.in/reader036/viewer/2022062300/554d39c1b4c905b0708b4801/html5/thumbnails/23.jpg)
Huntsman Lake Improvements
forebay
forebay berms
dam embankment
Phase I dredging limits (34,500 CY)
Huntsman Lake Improvements
![Page 24: Royal Lake Dredging and Restoration Project Update-June 2014](https://reader036.fdocuments.in/reader036/viewer/2022062300/554d39c1b4c905b0708b4801/html5/thumbnails/24.jpg)
Huntsman Lake Dredging June, 2014
![Page 25: Royal Lake Dredging and Restoration Project Update-June 2014](https://reader036.fdocuments.in/reader036/viewer/2022062300/554d39c1b4c905b0708b4801/html5/thumbnails/25.jpg)
In-lake forebay Wetland planting Shoreline stabilization Fish habitat Fish stocking
Royal Lake Restoration
Fish habitat created from salvaged trees
Lake Barton: Fish stocking by Virginia Game and Inland Fisheries
![Page 26: Royal Lake Dredging and Restoration Project Update-June 2014](https://reader036.fdocuments.in/reader036/viewer/2022062300/554d39c1b4c905b0708b4801/html5/thumbnails/26.jpg)
Royal Lake: Shoreline Restoration
![Page 27: Royal Lake Dredging and Restoration Project Update-June 2014](https://reader036.fdocuments.in/reader036/viewer/2022062300/554d39c1b4c905b0708b4801/html5/thumbnails/27.jpg)
Shoreline Protection
![Page 28: Royal Lake Dredging and Restoration Project Update-June 2014](https://reader036.fdocuments.in/reader036/viewer/2022062300/554d39c1b4c905b0708b4801/html5/thumbnails/28.jpg)
Fish Habitat Structures
![Page 29: Royal Lake Dredging and Restoration Project Update-June 2014](https://reader036.fdocuments.in/reader036/viewer/2022062300/554d39c1b4c905b0708b4801/html5/thumbnails/29.jpg)
Community coordination at design and construction phase– Pardon Our Dust meeting to be scheduled after contractor selection
Late 2014/Early 2015: Complete final design Spring 2015: Bid advertisement Late summer 2015: Begin dredging Project Duration:
– Phase 1, Base Dredge: Dredge approximately 55,000 CY = 5 to 6 Months
– Phase 2, Full Dredge: 9 to 12 Months (total)
Lake may be drained/partially drained for project depending on bid results For the wet dredge option, the lake will still require lowering for a short period
to construct the forebays
Royal Lake Dredging and Restoration Project Timeline and Coordination
![Page 30: Royal Lake Dredging and Restoration Project Update-June 2014](https://reader036.fdocuments.in/reader036/viewer/2022062300/554d39c1b4c905b0708b4801/html5/thumbnails/30.jpg)
Contacts:Martin Chang [email protected] [email protected] [email protected]
Stormwater Planning DivisionFairfax County DPWES(703)324-5500, TY 711
Partners:
Royal Lake Dredging and Restoration