ROYAL GOVERNMENT OF BHUTAN · 2017-02-14 · royal government of bhutan ministry of works and human...

29
ROYAL GOVERNMENT OF BHUTAN MINISTRY OF WORKS AND HUMAN SETTLEMENT DEPARTMENT OF ROADS, BRIDGE DIVISION YUDHIRI BAILEY BRIDGE ON TRASHIGANG - PHONGMEY GEWOG CENTER ROAD, REGIONAL OFFICE, DoR, TRASHIGANG JAN., 2017 DATE DDR 180 FT 3.277m DETAIL DRAWINGS SPAN CARRIAGE WAY

Transcript of ROYAL GOVERNMENT OF BHUTAN · 2017-02-14 · royal government of bhutan ministry of works and human...

ROYAL GOVERNMENT OF BHUTANMINISTRY OF WORKS AND HUMAN SETTLEMENT

DEPARTMENT OF ROADS, BRIDGE DIVISION

YUDHIRI BAILEY BRIDGE ON TRASHIGANG - PHONGMEY GEWOG CENTER ROAD,REGIONAL OFFICE, DoR, TRASHIGANG

JAN., 2017 DATEDDR 180 FT 3.277m

DETAIL DRAWINGS

SPAN CARRIAGE WAY

SHEET CONTENTS :

DRAWING LIST

REVISION DATE DRAWING NO.

SCALE:

FIRST ISSUE

NAME

(as Sheet A3 size)

NTS

DESIGN

DRAWN

CHECKED

APPROVED

YB-BB-01ROYAL GOVERNMENT OF BHUTAN

Ministry of Works & Human settlementDepartment of Roads, Bridge Division

Thimphu, Bhutan

BAILEY TYPE STEEL TRUSS YUDHIRI BRIDGEON TRASHIGANG - PHONGMEY GC ROAD

REGIONAL OFFICE, DoR, TRASHIGANG

TSHEWANG DORJI (CE)

NGAWANG THINLEY (Dy. EE)

REBAR CODES & SHAPE DETAILS

STD-02

7

6

5

4

3

YB-BB-01DRAWING LIST2

COVER PAGE1

DRAWING NUMBERDESCRIPTION SL

GENERAL NOTES

DRAWING LIST

8

STD-03

14

13

12

11

10

9

15

16

GENERAL PLAN OF THE BRIDGE

GENERAL ELEVATION - 01

RIGHT ABUTMENT DRAWING 01

17

18

GENERAL ELEVATION - 02

19

20

21

22

END COVER

[DDR 180 FT SPAN & 3.277 m CARRIAGEWAY]

SIGNATURE

Jan., 2017

NGAWANG THINLEY (Dy. EE)

TSHEWANG DORJI (CE)

23

24

25

26

27

28

29

RIGHT ABUTMENT DRAWING 02

RIGHT ABUTMENT DRAWING 03

RIGHT ABUTMENT DRAWING 04

RIGHT ABUTMENT DRAWING 05

REBAR SCHEDULE OF RIGHT ABUTMENT 01

REBAR SCHEDULE OF RIGHT ABUTMENT 02

LEFT ABUTMENT DRAWING 01

LEFT ABUTMENT DRAWING 02

LEFT ABUTMENT DRAWING 03

LEFT ABUTMENT DRAWING 04

LEFT ABUTMENT DRAWING 05

REBAR SCHEDULE OF LEFT ABUTMENT 01

REBAR SCHEDULE OF LEFT ABUTMENT 02

RETAINING WALL DRAWING 01

RETAINING WALL DRAWING 02

RETAINING WALL DRAWING 03

RETAINING WALL DRAWING 04

RETAINING WALL DRAWING 05

REBAR SCHEDULE OF RETAINING WALL

TYPICAL CROSS SECTION OF RRM WALL

YB-BB-04

YB-BB-05

YB-BB-06

YB-BB-07

YB-BB-08

YB-BB-09

YB-BB-10

YB-BB-11

YB-BB-12

YB-BB-13

YB-BB-14

YB-BB-15

YB-BB-16

YB-BB-17

YB-BB-18

YB-BB-19

YB-BB-20

YB-BB-21

YB-BB-22

YB-BB-23

YB-BB-24

YB-BB-25

YB-BB-26

YB-BB-27

GENERAL NOTES FOR RCC CONSTRUCTION WORK

A. GENERAL

1. THE NOTES IN THIS DRAWING SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT DRAWING PERTAINING TO THE BRIDGE.

2. UNLESS OTHERWISE SPECIFIED, ALL DIMENSIONS IN MILLIMETER (mm) AND ALL LEVELS ARE IN METER (m). DIMENSIONS ARE NOT TO BE SCALED AND ONLY WRITTEN DIMENSION ARE TO BE FOLLOWED.

3. THE CONTRACTOR SHALL VERIFY ALL CHAINAGES, REDUCED LEVELS, COORDINATES AND DIMENSIONS BEFORE START OF THE WORK. INCASE OF ANY DISCREPANCY, THE MATTER SHALL BE BROUGHT TO NOTICE OF THE ENGINEER.

4. ABUTMENTS OF THE BRIDGE IS DESIGNED AS PER IRC - 21 & IS 456 USING MIDAS CIVIL.

5. LOADING: CLASS 24R AS PER IRC.

B. CONCRETEUNLESS OTHERWISE SPECIFICALLY MENTIONED IN THE DRAWINGS OR DIRECTEDBY THE ENGINEER, CONCRETE GRADE SHALL BE AS PER THE RELATED SECTIONOF CONTRACT DOCUMENT PARTLY REPRODUCED AS BELOW :

APPLICATION LOCATION SPECIFIED COMPRESSIVE STRENGTH IN CUBE (28 DAYS) IN MPa

REINFORCED CONCRETE (RCC)FOOTING SLAB AND ABUTMENT. M25

DIRT WALL (RCC) M 25

PLAIN CEMENT CONCRETE (PCC)FOR LEVELING. M10

*** UNLESS OTHERWISE MENTIONED IN THE SPECIFICATION, THE TRIAL MIX DESIGN STRENGTH SHALL BE 31.6 MPa.

C. REINFORCEMENT1. ALL REINFORCEMENT SHALL BE OF HIGH YIELD STRENGTH DEFORMED BARS (MIN fy 500 MPa, IS 1786).

2. SCHEDULLING OF BAR IS DONE IN ACCORDANCE WITH ISO 4066:2000.

3. MINIMUM LAP LENGTH OF REINFORCEMENT SHALL BE CONFORM TO AASHTO/2007. IF 50% OF REINFORCEMENT IS TO BE SPLICED PROVIDE CLASS B AND FOR 100% SPLICING PROVIDE CLASS C AS SHOWN BELOW:

BAR DIA mm

10 300412127321692618114420138422178725224728292732

4. CLEAR CONCRETE COVER TO REINFORCEMENT IS AS FOLLOW. UNLESS OTHERWISE SPECIFIED BY ENGINEER, THIS SHALL BE FOLLOWED THROUGHOUT THE CONSTRUCTION.

ABUTMENT (ALL SIDES) = 75 MM (UP TO OUTER FACE OF MAIN REINFORCEMENT)

DIRT WALL

*** SIDES = 50 MM *** TOP = 50 MM *** BACK SIDE = 75 MM

5. SPECIFICALLY MADE COVER BLOCKS OF SAME STRENGTH AS THAT OF CONCRETE AND DIMENSION AS PROVIDED IN DRAWINGS SHALL BE ONLY USED TO OBTAIN THE UNIFORMITY OF CLEAR COVER THROUGH OUT THE CONSTRUCTION.

D. WATERWATER TO BE USED IN THE CONCRETING AND CURING SHALL BEPORTABLE WATER.

E. SUPERVISIONCONSTRUCTION WORK MUST BE SUPERVISED BY A COMPETENTSUPERVISION ENGINEER.

374538957121114951809233729313828

DEV.LENGTH, mm

SPLICE LENGTH, mm

CLASS A CLASS B CLASS C3003175637138801064137417242252

2203175637138801064137417242252

SHEET CONTENTS :

GENERAL NOTES

REVISION DATE DRAWING NO.

SCALE:

FIRST ISSUE

NAME

(as Sheet A3 size)

NTS

DESIGN

DRAWN

CHECKED

APPROVED

ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement

Department of Roads, Bridge DivisionThimphu, Bhutan

BAILEY TYPE STEEL TRUSS YUDHIRI BRIDGEON TRASHIGANG - PHONGMEY GC ROAD

REGIONAL OFFICE, DoR, TRASHIGANGJan., 2017

TSHEWANG DORJI (CE)

NGAWANG THINLEY (Dy. EE)

NGAWANG THINLEY (Dy. EE)

[DDR 180 FT SPAN & 3.277 m CARRIAGEWAY]

SIGNATURE

TSHEWANG DORJI (CE)

STD 02

DETAILED LENGTH HOOK LENGTHUNBEND HOOK LENGTH

OFFSET LENGTH

HOOK EXTENSIONBEND DIAMETER

DETAILED LENGTHUNBEND HOOK LENGTH

BEND DIAMETER

HO

OK

LE

NG

TH

HO

OK

EX

TEN

.

12BNED + BAR

DETAILED LENGTHUNBEND HOOK LENGTH

BEND DIAMETER

12 BEND + BAR

OFFSET LENGTH

HOOK EXTN.

HOOK LENGTH

DETAILED LENGTHUNBEND HOOK LENGTH

BEND DIAMETER

12 BEND + BAR

HOOK EXTENSION

HOOK LENGTH

OFF

SE

T LE

NG

THB

AR

DIA

BA

R D

IAB

AR

DIA

BA

R D

IA

45Á HOOK

90Á HOOK

135Á HOOK

180Á HOOK

REBAR HOOK SPECIFICATIONREBAR

DESIGNATION DIA, mmAREA, mm2

UNIT WT., kg/m REBAR TYPE

T10 10 79 0.617 IS : 1786 GRADE Fe 500T12 12 113 0.888T16 16 201 1.578T20 20 314 2.466T25 25 491 3.853T28 28 616 4.834T32 32 804 6.313

IS : 1786 GRADE Fe 500IS : 1786 GRADE Fe 500IS : 1786 GRADE Fe 500IS : 1786 GRADE Fe 500IS : 1786 GRADE Fe 500

TABLE 3 : STANDARD RE-BAR PROPERTIES(UNIT WT. 0.00785 kg / mmĮ /m)

IS : 1786 GRADE Fe 500

1(ART. 5.10 AASHTO LRFD 2007)

TIE/STIRRUPS OTHER 900 1350 900 1800

T10 40 60 60 75 120 65T12 48 72 72 75 144 65T16 64 96 96 96 192 65T20 - 120 240 120 240 80T25 - 150 300 150 300 100T28 - 168 168 336 112T32 - 256 192 384 128

1 ALL REINFORCEMENT SHALL BE COLD BEND

REBAR DESIGNATION

BENDING DIAMETER

TIE/STIRRUPS

STANDARD HOOK EXTENSION, mm

OTHER

TABLE 4 : STANDARD HOOK AND BEND REQUIREMENT

SHAPE CODE

SHPAE

00

a

11

b

Total Length :a

a

Total Length :

r

a

bd

c51

Total Length :2(a+b)+16d

21

b

a c

Total Length :a+b+c-r-2d

SHAPE CODE AS PER ISO 4066 : 2000

a+b - İ r-d

LEGEND :

r = BENDING RADIUS AS PER TABLE 4d = DIAMETER OF BARa/b/c/d = AS SHOWN

NOTES

A. GENERALALL THE DIMENSIONS ARE IN MILLIMETERUNLESS OTHERWISE SPECIFIED.

B. SHAPE CODE & BAR SHAPETHE STANDARD SHAPE CODES AND ITS METHODOF MEASUREMENT HAVE BEEN PREPARED AS PEREUROPEAN STANDARD BS EN ISO 4006 : 2000.

BAR MARK

40-01-T16-150-BOTT.NOS. OF

BAR

BAR MARK

TYPE OF REBAR

SPACING

DIA. OF REBAR

LOCATION/REMARK

T - HIGH YIELD DEFORMED BARY - DEFORMED MS BARR - ROUND MS BAR

INDICATES BAR CUT POINT

SHEET CONTENTS :

REBAR CODES AND SHAPEDETAILS

REVISION DATE DRAWING NO.

SCALE:

FIRST ISSUE

NAME

(as Sheet A3 size)

NTS

DESIGN

DRAWN

CHECKED

APPROVED

STD 03ROYAL GOVERNMENT OF BHUTAN

Ministry of Works & Human settlementDepartment of Roads, Bridge Division

Thimphu, Bhutan

BAILEY TYPE STEEL TRUSS YUDHIRI BRIDGEON TRASHIGANG - PHONGMEY GC ROAD

REGIONAL OFFICE, DoR, TRASHIGANG

TSHEWANG DORJI (CE)

NGAWANG THINLEY (Dy. EE)

[DDR 180 FT SPAN & 3.277 m CARRIAGEWAY]

SIGNATURE

Jan., 2017

NGAWANG THINLEY (Dy. EE)

TSHEWANG DORJI (CE)

0.000

5.000

10.000

15.000

20.000

25.000

30.000

35.000

40.000

45.000

50.000

55.000

60.000

65.00070.000

75.00076.120

BR

IDG

E S

PA

N =

180

FT

(54

.920

MT

RS)

PHONGMEY SIDE

RADHI SIDE

RIVER FLOW DIRECTION

EX

IST

ING

BY

PA

SS R

OA

D

GENERAL PLAN

RC Retaining wall

RC Retaining wall

RC Retaining wall

RRM wall

RRM wall

POINT ID

STN 01

BM 1

BM 2

EASTING

1000.000

NORTHING ELEVATION REMARKS

STATION 01

BENCH MARK 1

BENCH MARK 2

500.000 100.000

1051.368 553.991 100.991

1060.137 548.315 100.318

BM 3 BENCH MARK 31070.360 469.538 102.421

NOTES

1. THE BRIDGE ALIGNMENT WAS FIXED AS PROPOSED BY THE CONSULTANT WHO CARRIED OUT THE SUB SOIL INVESTIGATION (SSI) OF THE BRIDGE SITES.

2. THE ABUTMENT POSITION AT RIGHT BANK IS FIXED AT BORE HOLE LOCATION. THE DEPTH OF FOUNDATION WAS PROVIDED AS PER THE REPORT OF SSI. THE BORE HOLE WAS NOT CARRIED OUT AT LEFT BANK, HOWEVER SSI REPORT SAYS THAT AS PER EXPOSED BED ROCK, THE FIRM ROCK BASE WILL BE LOCATED AT THE DEPTH OF AROUND 2 TO 3 MTRS BELOW THE EXISTING ROAD SURFACE. THUS THE FOUNDATION DEPTH WAS PROVIDED AS PER THE SSI REPORT.

3. ON ACHIEVING THE FOUNDATION DEPTH AS GIVEN IN THE DRAWING, CONSULT BRIDGE DIVISION ABOUT STRATA ENCOUNTERED AND THEN DISCUSS IF ABUTMENTS CAN BE CONSTRUCTED. ON EXCAVATION, DEPENDING ON SOIL OR ROCK TYPE ENCOUNTERED, INITIAL DESIGN OF ABUTMENTS MAY CHANGE.

4. RC RETAINING WALL, RRM WALL, AND GABION WALLS ARE PROVIDED AS RECOMMENDED BY SSI REPORT. HOWEVER THE QUANTITY MENTIONED IN BoQ WILL VARY AS PER THE ACTUAL REQUIREMENT AT THE SITES. THE QUANTITY OF RC RETAINING MENTIONED IN BoQ IS ONLY FOR ONE WALL OF LENGTH (7 MTRS) AND HEIGHT (6.5 MTRS) BUT ACTUAL REQUIREMENT AT SITE WILL BE MORE AS TENTATIVELY AS SHOWN IN THE DRAWINGS. MOREOVER THE THE HEIGHT OF THE WALL MAY VARY AT UPSTREAM AND DOWN STREAM SITE OF BRIDGE. SIMILARLY THE QUANTITY WORK OUT FOR RRM IS ONLY FOR LENGTH (13 MTRS) AND HEIGHT (5.11 MTRS) AT RIGHT BANK AND LENGTH (6.5 MTRS) AND HEIGHT (5.622 MTRS) AT LEFT BANK. AS RECOMMENDED IN SSI REPORT, THE QUANTITY MAY BE MORE THAN THAT MENTIONED IN THE BoQ. THE QUANTITY OF GABION WALL IS FOR 12 MTRS LENGTH OF 3 MTRS EACH TOWARDS DOWN STREAM AND UPSTREAM INCLUDING 6 MTRS IN FRONT OD ABUTMENT. THIS QUANTITY MAY ALSO CHANGE AS PER THE REQUIREMENT AT THE SITE.

5. FOR STABILITY OF ENTIRE SLOPE AT RIGHT BANK OF THE RIVER, THE RECOMMENDATION OF SSI REPORT WILL HAVE TO BE IMPLEMENTED.

6. AS RECOMMENDED IN SSI REPORT THE RIVER BOTTOM AND SIDES NEEDS TO BE DREDGED AND REMOVE ALL THE MATERIALS UP TO THE DEPTH OF NATURAL BED LEVEL OF REQUIRED LENGTH ON BOTH UPSTREAM AND DOWNSTREAM SIDES OF BRIDGE AXIS LINE TO ALLOW UNHINDERED FLOW IN THE CHANNEL.

SHEET CONTENTS :

GENERAL PLAN

REVISION DATE DRAWING NO.

SCALE:

FIRST ISSUE

NAME

(as Sheet A3 size)

1:400

DESIGN

DRAWN

CHECKED

APPROVED

YB-BB-04ROYAL GOVERNMENT OF BHUTAN

Ministry of Works & Human settlementDepartment of Roads, Bridge Division

Thimphu, Bhutan

BAILEY TYPE STEEL TRUSS YUDHIRI BRIDGEON TRASHIGANG - PHONGMEY GC ROAD

REGIONAL OFFICE, DoR, TRASHIGANG

TSHEWANG DORJI (CE)

NGAWANG THINLEY (Dy. EE)

[DDR 180 FT SPAN & 3.277 m CARRIAGEWAY]

SIGNATURE

Jan., 2017

NGAWANG THINLEY (Dy. EE)

TSHEWANG DORJI (CE)

LWL = 90.168

HFL = 92.168

ABUTMENT TOPRL= 102.250

TOP OF FOOTING SLABRL= 97.037

BOTTOM OF FOOTING SLABRL= 96.037

ABUTMENT TOPRL= 102.250

TOP OF FOOTING SLABRL= 95.750

BOTTOM OF FOOTING SLABRL= 94.750

ROAD LEVELRL= 102.860

ROAD LEVELRL= 102.872

PHONGMEY SIDESRADHI SIDES

RCC dirt wall to be constructed afterbridge superstructure is launched

DDR 180 FT BAILEY TYPE STEEL TRUSS BRIDGE

GENERAL ELEVATION

NOTES

1. THE BRIDGE ALIGNMENT WAS FIXED AS PROPOSED BY THE CONSULTANT WHO CARRIED OUT THE SUB SOIL INVESTIGATION (SSI) OF THE BRIDGE SITES.

2. THE ABUTMENT POSITION AT RIGHT BANK IS FIXED AT BORE HOLE LOCATION. THE DEPTH OF FOUNDATION WAS PROVIDED AS PER THE REPORT OF SSI. THE BORE HOLE WAS NOT CARRIED OUT AT LEFT BANK, HOWEVER SSI REPORT SAYS THAT AS PER EXPOSED BED ROCK, THE FIRM ROCK BASE WILL BE LOCATED AT THE DEPTH OF AROUND 2 TO 3 MTRS BELOW THE EXISTING ROAD SURFACE. THUS THE FOUNDATION DEPTH WAS PROVIDED AS PER THE SSI REPORT.

3. ON ACHIEVING THE FOUNDATION DEPTH AS GIVEN IN THE DRAWING, CONSULT BRIDGE DIVISION ABOUT STRATA ENCOUNTERED AND THEN DISCUSS IF ABUTMENTS CAN BE CONSTRUCTED. ON EXCAVATION, DEPENDING ON SOIL OR ROCK TYPE ENCOUNTERED, INITIAL DESIGN OF ABUTMENTS MAY CHANGE.

4. RC RETAINING WALL, RRM WALL, AND GABION WALLS ARE PROVIDED AS RECOMMENDED BY SSI REPORT. HOWEVER THE QUANTITY MENTIONED IN BoQ WILL VARY AS PER THE ACTUAL REQUIREMENT AT THE SITES. THE QUANTITY OF RC RETAINING MENTIONED IN BoQ IS ONLY FOR ONE WALL OF LENGTH (7 MTRS) AND HEIGHT (6.5 MTRS) BUT ACTUAL REQUIREMENT AT SITE WILL BE MORE AS TENTATIVELY AS SHOWN IN THE DRAWINGS. MOREOVER THE THE HEIGHT OF THE WALL MAY VARY AT UPSTREAM AND DOWN STREAM SITE OF BRIDGE. SIMILARLY THE QUANTITY WORK OUT FOR RRM IS ONLY FOR LENGTH (13 MTRS) AND HEIGHT (5.11 MTRS) AT RIGHT BANK AND LENGTH (6.5 MTRS) AND HEIGHT (5.622 MTRS) AT LEFT BANK. AS RECOMMENDED IN SSI REPORT, THE QUANTITY MAY BE MORE THAN THAT MENTIONED IN THE BoQ. THE QUANTITY OF GABION WALL IS FOR 12 MTRS LENGTH OF 3 MTRS EACH TOWARDS DOWN STREAM AND UPSTREAM INCLUDING 6 MTRS IN FRONT OD ABUTMENT. THIS QUANTITY MAY ALSO CHANGE AS PER THE REQUIREMENT AT THE SITE.

5. FOR STABILITY OF ENTIRE SLOPE AT RIGHT BANK OF THE RIVER, THE RECOMMENDATION OF SSI REPORT WILL HAVE TO BE IMPLEMENTED.

6. AS RECOMMENDED IN SSI REPORT THE RIVER BOTTOM AND SIDES NEEDS TO BE DREDGED AND REMOVE ALL THE MATERIALS UP TO THE DEPTH OF NATURAL BED LEVEL OF REQUIRED LENGTH ON BOTH UPSTREAM AND DOWNSTREAM SIDES OF BRIDGE AXIS LINE TO ALLOW UNHINDERED FLOW IN THE CHANNEL.

SHEET CONTENTS :

GENERAL ELEVATION 01

REVISION DATE DRAWING NO.

SCALE:

FIRST ISSUE

NAME

(as Sheet A3 size)

1:250

DESIGN

DRAWN

CHECKED

APPROVED

ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement

Department of Roads, Bridge DivisionThimphu, Bhutan

BAILEY TYPE STEEL TRUSS YUDHIRI BRIDGEON TRASHIGANG - PHONGMEY GC ROAD

REGIONAL OFFICE, DoR, TRASHIGANG

TSHEWANG DORJI (CE)

NGAWANG THINLEY (Dy. EE)

[DDR 180 FT SPAN & 3.277 m CARRIAGEWAY]

SIGNATURE

Jan., 2017

NGAWANG THINLEY (Dy. EE)

TSHEWANG DORJI (CE)

YB-BB-05

LWL = 90.168

HFL = 92.168

ABUTMENT TOPRL= 102.250

TOP OF FOOTING SLABRL= 97.037

BOTTOM OF FOOTING SLABRL= 96.037

ABUTMENT TOPRL= 102.250

TOP OF FOOTING SLABRL= 95.750

BOTTOM OF FOOTING SLABRL= 94.750

ROAD LEVELRL= 102.860

ROAD LEVELRL= 102.872

PHONGMEY SIDESRADHI SIDES

RCC dirt wall to be constructed afterbridge superstructure is launched

DDR 180 FT BAILEY TYPE STEEL TRUSS BRIDGE

GENERAL ELEVATION

NOTES

1. THE BRIDGE ALIGNMENT WAS FIXED AS PROPOSED BY THE CONSULTANT WHO CARRIED OUT THE SUB SOIL INVESTIGATION (SSI) OF THE BRIDGE SITES.

2. THE ABUTMENT POSITION AT RIGHT BANK IS FIXED AT BORE HOLE LOCATION. THE DEPTH OF FOUNDATION WAS PROVIDED AS PER THE REPORT OF SSI. THE BORE HOLE WAS NOT CARRIED OUT AT LEFT BANK, HOWEVER SSI REPORT SAYS THAT AS PER EXPOSED BED ROCK, THE FIRM ROCK BASE WILL BE LOCATED AT THE DEPTH OF AROUND 2 TO 3 MTRS BELOW THE EXISTING ROAD SURFACE. THUS THE FOUNDATION DEPTH WAS PROVIDED AS PER THE SSI REPORT.

3. ON ACHIEVING THE FOUNDATION DEPTH AS GIVEN IN THE DRAWING, CONSULT BRIDGE DIVISION ABOUT STRATA ENCOUNTERED AND THEN DISCUSS IF ABUTMENTS CAN BE CONSTRUCTED. ON EXCAVATION, DEPENDING ON SOIL OR ROCK TYPE ENCOUNTERED, INITIAL DESIGN OF ABUTMENTS MAY CHANGE.

4. RC RETAINING WALL, RRM WALL, AND GABION WALLS ARE PROVIDED AS RECOMMENDED BY SSI REPORT. HOWEVER THE QUANTITY MENTIONED IN BoQ WILL VARY AS PER THE ACTUAL REQUIREMENT AT THE SITES. THE QUANTITY OF RC RETAINING MENTIONED IN BoQ IS ONLY FOR ONE WALL OF LENGTH (7 MTRS) AND HEIGHT (6.5 MTRS) BUT ACTUAL REQUIREMENT AT SITE WILL BE MORE AS TENTATIVELY AS SHOWN IN THE DRAWINGS. MOREOVER THE THE HEIGHT OF THE WALL MAY VARY AT UPSTREAM AND DOWN STREAM SITE OF BRIDGE. SIMILARLY THE QUANTITY WORK OUT FOR RRM IS ONLY FOR LENGTH (13 MTRS) AND HEIGHT (5.11 MTRS) AT RIGHT BANK AND LENGTH (6.5 MTRS) AND HEIGHT (5.622 MTRS) AT LEFT BANK. AS RECOMMENDED IN SSI REPORT, THE QUANTITY MAY BE MORE THAN THAT MENTIONED IN THE BoQ. THE QUANTITY OF GABION WALL IS FOR 12 MTRS LENGTH OF 3 MTRS EACH TOWARDS DOWN STREAM AND UPSTREAM INCLUDING 6 MTRS IN FRONT OD ABUTMENT. THIS QUANTITY MAY ALSO CHANGE AS PER THE REQUIREMENT AT THE SITE.

5. FOR STABILITY OF ENTIRE SLOPE AT RIGHT BANK OF THE RIVER, THE RECOMMENDATION OF SSI REPORT WILL HAVE TO BE IMPLEMENTED.

6. AS RECOMMENDED IN SSI REPORT THE RIVER BOTTOM AND SIDES NEEDS TO BE DREDGED AND REMOVE ALL THE MATERIALS UP TO THE DEPTH OF NATURAL BED LEVEL OF REQUIRED LENGTH ON BOTH UPSTREAM AND DOWNSTREAM SIDES OF BRIDGE AXIS LINE TO ALLOW UNHINDERED FLOW IN THE CHANNEL.

SHEET CONTENTS :

GENERAL ELEVATION 02

REVISION DATE DRAWING NO.

SCALE:

FIRST ISSUE

NAME

(as Sheet A3 size)

1:200

DESIGN

DRAWN

CHECKED

APPROVED

ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement

Department of Roads, Bridge DivisionThimphu, Bhutan

BAILEY TYPE STEEL TRUSS YUDHIRI BRIDGEON TRASHIGANG - PHONGMEY GC ROAD

REGIONAL OFFICE, DoR, TRASHIGANG

TSHEWANG DORJI (CE)

NGAWANG THINLEY (Dy. EE)

[DDR 180 FT SPAN & 3.277 m CARRIAGEWAY]

SIGNATURE

Jan., 2017

NGAWANG THINLEY (Dy. EE)

TSHEWANG DORJI (CE)

YB-BB-06

C LO

F A

BUTM

ENT

Construction joint

Footing slab

Abu

tmen

t wal

l (st

em)

C LO

F A

BUTM

ENT

CL OF BEARING

RCC

Dir

t wal

lA

butm

ent c

ap

DETAIL

A

FOOTING PLAN

SIDE ELEVATION

Out

line

of a

butm

ent c

ap (r

iver

sid

e)O

utlin

e of

abu

tmen

t ste

m (r

iver

sid

e)

Out

line

of a

butm

ent s

tem

(bac

kfill

sid

e)

CL OF BEARING

RCC

Dir

t wal

l

CL OF ABUTMENT

DETAIL

B

******

DETAIL 'A'SCALE 1:40

DETAIL B(SCALE 1:15)

108

184 184

5

18 DIA. x 300 LG

75 x 75 x 8 THK PL

875

[M16

Thr

ead]

Nut & Washer

PLAN OF FIXEDEND BEARING

TYP. DETAIL OF ANCHOR BOLT

108

SCALE 1 : 15

NOTES

GENERAL

1. ALL THE DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE MENTIONED.

2. DO NOT SCALE THIS DRAWINGS. USE GIVEN DIMENSIONS ONLY.

3. DURING THE CONSTRUCTION, THE CONTRACTOR MUST CHECK THE DIMENSIONS, LEVELS AND MEASUREMENTS. DISCREPANCY IF ANY TO BE REPORTED TO THE ENGINEER BEFORE EXECUTION.

MATERIALS

1. CONCRETE 28 DAYS STRENGTH IN CUBE, fck = 25 MPa. [UNLESS OTHERWISE MENTIONED IN THE SPECIFICATION, THE TRIAL MIX DESIGN STRENGTH SHALL BE 31.6 MPa]

2. YIELD STRENGTH OF STEEL, fy = 500 MPa (GRADE Fe 500, IS 1786).

3. DETAILS OF STEEL IS MENTIONED IN THE DRAWING AND ITS QUANTITY IN THE BAR BENDING SCHEDULE.

*** CONSTRUCTION ABOVE THIS LEVEL ARE TO BE DONE AFTER BRIDGE ERECTION

SHEET CONTENTS :

RIGHT ABUTMENT DRAWING 01

REVISION DATE DRAWING NO.

SCALE:

FIRST ISSUE

NAME

(as Sheet A3 size)

1:50

DESIGN

DRAWN

CHECKED

APPROVED

ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement

Department of Roads, Bridge DivisionThimphu, Bhutan

BAILEY TYPE STEEL TRUSS YUDHIRI BRIDGEON TRASHIGANG - PHONGMEY GC ROAD

REGIONAL OFFICE, DoR, TRASHIGANG

TSHEWANG DORJI (CE)

NGAWANG THINLEY (Dy. EE)

[DDR 180 FT SPAN & 3.277 m CARRIAGEWAY]

SIGNATURE

Jan., 2017

NGAWANG THINLEY (Dy. EE)

TSHEWANG DORJI (CE)

YB-BB-07

C

L

OF

ABU

TMEN

T

Weep holesø 11 cm HDPE pipes1 in 20 slope

Construction joint

Construction joint

CL OF BEARING

SECTION A - A

CL OF ABUTMENT

Filter materials50 cm thick

Weep holesø 11 cm HDPE pipes1 in 20 slope

FRONT VIEW

*** ***

NOTES

GENERAL

1. ALL THE DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE MENTIONED.

2. DO NOT SCALE THIS DRAWINGS. USE GIVEN DIMENSIONS ONLY.

3. DURING THE CONSTRUCTION, THE CONTRACTOR MUST CHECK THE DIMENSIONS, LEVELS AND MEASUREMENTS. DISCREPANCY IF ANY TO BE REPORTED TO THE ENGINEER BEFORE EXECUTION.

MATERIALS

1. CONCRETE 28 DAYS STRENGTH IN CUBE, fck = 25 MPa. [UNLESS OTHERWISE MENTIONED IN THE SPECIFICATION, THE TRIAL MIX DESIGN STRENGTH SHALL BE 31.6 MPa]

2. YIELD STRENGTH OF STEEL, fy = 500 MPa (GRADE Fe 500, IS 1786).

3. DETAILS OF STEEL IS MENTIONED IN THE DRAWING AND ITS QUANTITY IN THE BAR BENDING SCHEDULE.

*** CONSTRUCTION ABOVE THIS LEVEL ARE TO BE DONE AFTER BRIDGE ERECTION

SHEET CONTENTS :

RIGHT ABUTMENT DRAWING 02

REVISION DATE DRAWING NO.

SCALE:

FIRST ISSUE

NAME

(as Sheet A3 size)

1:50

DESIGN

DRAWN

CHECKED

APPROVED

ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement

Department of Roads, Bridge DivisionThimphu, Bhutan

BAILEY TYPE STEEL TRUSS YUDHIRI BRIDGEON TRASHIGANG - PHONGMEY GC ROAD

REGIONAL OFFICE, DoR, TRASHIGANG

TSHEWANG DORJI (CE)

NGAWANG THINLEY (Dy. EE)

[DDR 180 FT SPAN & 3.277 m CARRIAGEWAY]

SIGNATURE

Jan., 2017

NGAWANG THINLEY (Dy. EE)

TSHEWANG DORJI (CE)

YB-BB-08

600

40-01-T16-150-BOTT.30-02-T16-150-BOTT.

5-03-T12-EQ-FACE

5-04-T12-EQ-FACE

5-04-T12-EQ-FACE

1x5=5-05-T12-1000 (STIRRUPS)

3x6=18-5a-T12-1000 (STIRRUPS)

40-06-T16-150-TOP

30-07-T16-150-TOP

60-08-T20-100-BS

60-09-T16-100-RS

6x2=12-10-T12-EQ-FACE

46-11-T16-140-BS

40-12-T12-140-RS

9x14=126-13-T12-560 (STIRRUPS) 10x14=140-13a-T12-560

(STIRRUPS)

1516

17

18

18a

19

20212223

600

REINF0RCEMENT DETAILIN SECTION

110110

126 126

60-14-T16-100-TOP

10x13=130-24-T25-500(ROCK ANCHORAGE)13

75

600

60-15-T16-100-AC

9-16-T12-150-AC

5-17-T12-140-AC

14-18-T12-400 (STIRRUPS)

14-18a-T12-400 (STIRRUPS)

60-19-T12-100-DW (BS)

60-20-T12-100-DW (RS)5-21-T12-EQ-DW

4-22-T12-EQ-DW2-23-T12-EQ-DW

REINF. DETAIL (ABUTMENT CAP)Scale 1:35

NOTES

GENERAL

1. ALL THE DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE MENTIONED.

2. DO NOT SCALE THIS DRAWINGS. USE GIVEN DIMENSIONS ONLY.

3. DURING THE CONSTRUCTION, THE CONTRACTOR MUST CHECK THE DIMENSIONS, LEVELS AND MEASUREMENTS. DISCREPANCY IF ANY TO BE REPORTED TO THE ENGINEER BEFORE EXECUTION.

MATERIALS

1. CONCRETE 28 DAYS STRENGTH IN CUBE, fck = 25 MPa. [UNLESS OTHERWISE MENTIONED IN THE SPECIFICATION, THE TRIAL MIX DESIGN STRENGTH SHALL BE 31.6 MPa]

2. YIELD STRENGTH OF STEEL, fy = 500 MPa (GRADE Fe 500, IS 1786).

3. DETAILS OF STEEL IS MENTIONED IN THE DRAWING AND ITS QUANTITY IN THE BAR BENDING SCHEDULE.

COVERING

ABUTMENT WALL (ALL SIDES) = 75 MM(UP TO OUTER FACE OF MAIN BAR)

DIRT WALL (FRONT AND TOP) = 50 MM

BAR MARK

40-01-T 16-150-BOTT.

NOS. OF BAR

BAR MARK

TYPE OF REBAR

SPACING

DIA. OF REBARLOCATION / REMARK

T - HIGH YIELD DEFORMED BARY - DEFORMED MS BARR - ROUND MS BAR

INDICATES BAR CUT POINT

LEGEND:

* AC - ABUTMENT CAP* DW - DIRT WALL* BS - BACKFILL SIDE* RS - RIVER SIDE* EQ - EQUAL DISTANCE* BOTT. - BOTTOM

SHEET CONTENTS :

RIGHT ABUTMENT DRAWING 03

REVISION DATE DRAWING NO.

SCALE:

FIRST ISSUE

NAME

(as Sheet A3 size)

1:50

DESIGN

DRAWN

CHECKED

APPROVED

ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement

Department of Roads, Bridge DivisionThimphu, Bhutan

BAILEY TYPE STEEL TRUSS YUDHIRI BRIDGEON TRASHIGANG - PHONGMEY GC ROAD

REGIONAL OFFICE, DoR, TRASHIGANG

TSHEWANG DORJI (CE)

NGAWANG THINLEY (Dy. EE)

[DDR 180 FT SPAN & 3.277 m CARRIAGEWAY]

SIGNATURE

Jan., 2017

NGAWANG THINLEY (Dy. EE)

TSHEWANG DORJI (CE)

YB-BB-09

01 02 04

03

03

06 07

60-08-T20-200-BS60-09-T16-100-RS

46-1

1-T1

6-14

0-BS

40-1

2-T1

2-14

0-RS

60-08 T20-100-BS 46-11-T16-140-BS

60-09-T16-100-RS40-12-T12-140-RS

10

10

13

13a

REINF0RCEMENT DETAILFRONT VIEW

VIEW E - E

142 142

142142

NOTES

GENERAL

1. ALL THE DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE MENTIONED.

2. DO NOT SCALE THIS DRAWINGS. USE GIVEN DIMENSIONS ONLY.

3. DURING THE CONSTRUCTION, THE CONTRACTOR MUST CHECK THE DIMENSIONS, LEVELS AND MEASUREMENTS. DISCREPANCY IF ANY TO BE REPORTED TO THE ENGINEER BEFORE EXECUTION.

MATERIALS

1. CONCRETE 28 DAYS STRENGTH IN CUBE, fck = 25 MPa. [UNLESS OTHERWISE MENTIONED IN THE SPECIFICATION, THE TRIAL MIX DESIGN STRENGTH SHALL BE 31.6 MPa]

2. YIELD STRENGTH OF STEEL, fy = 500 MPa (GRADE Fe 500, IS 1786).

3. DETAILS OF STEEL IS MENTIONED IN THE DRAWING AND ITS QUANTITY IN THE BAR BENDING SCHEDULE.

COVERING

ABUTMENT WALL (ALL SIDES) = 75 MM(UP TO OUTER FACE OF MAIN BAR)

DIRT WALL (FRONT AND TOP) = 50 MM

BAR MARK

40-01-T 16-150-BOTT.

NOS. OF BAR

BAR MARK

TYPE OF REBAR

SPACING

DIA. OF REBARLOCATION / REMARK

T - HIGH YIELD DEFORMED BARY - DEFORMED MS BARR - ROUND MS BAR

INDICATES BAR CUT POINT

LEGEND:

BACKFILL SIDE BAR

RIVER SIDE BAR

LEGEND:

* AC - ABUTMENT CAP* DW - DIRT WALL* BS - BACKFILL SIDE* RS - RIVER SIDE* EQ - EQUAL DISTANCE* BOTT. - BOTTOM

SHEET CONTENTS :

RIGHT ABUTMENT DRAWING 04

REVISION DATE DRAWING NO.

SCALE:

FIRST ISSUE

NAME

(as Sheet A3 size)

1:50

DESIGN

DRAWN

CHECKED

APPROVED

ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement

Department of Roads, Bridge DivisionThimphu, Bhutan

BAILEY TYPE STEEL TRUSS YUDHIRI BRIDGEON TRASHIGANG - PHONGMEY GC ROAD

REGIONAL OFFICE, DoR, TRASHIGANG

TSHEWANG DORJI (CE)

NGAWANG THINLEY (Dy. EE)

[DDR 180 FT SPAN & 3.277 m CARRIAGEWAY]

SIGNATURE

Jan., 2017

NGAWANG THINLEY (Dy. EE)

TSHEWANG DORJI (CE)

YB-BB-10

FOOTING REINF. LAYOUTVIEW G - G

30-02-T16-150-BOTT.30-07-T16-150-TOP

40-0

1-T1

6-15

0-BO

TT.

40-0

6-T1

6-15

0-TO

P

ROCK ANCHORAGE PLAN

10x1

3=13

0-24

-T25

-500

(RO

CK A

NCH

ORA

GE)

NOTES

GENERAL

1. ALL THE DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE MENTIONED.

2. DO NOT SCALE THIS DRAWINGS. USE GIVEN DIMENSIONS ONLY.

3. DURING THE CONSTRUCTION, THE CONTRACTOR MUST CHECK THE DIMENSIONS, LEVELS AND MEASUREMENTS. DISCREPANCY IF ANY TO BE REPORTED TO THE ENGINEER BEFORE EXECUTION.

MATERIALS

1. CONCRETE 28 DAYS STRENGTH IN CUBE, fck = 25 MPa. [UNLESS OTHERWISE MENTIONED IN THE SPECIFICATION, THE TRIAL MIX DESIGN STRENGTH SHALL BE 31.6 MPa]

2. YIELD STRENGTH OF STEEL, fy = 500 MPa (GRADE Fe 500, IS 1786).

3. DETAILS OF STEEL IS MENTIONED IN THE DRAWING AND ITS QUANTITY IN THE BAR BENDING SCHEDULE.

COVERING

ABUTMENT WALL (ALL SIDES) = 75 MM(UP TO OUTER FACE OF MAIN BAR)

DIRT WALL (FRONT AND TOP) = 50 MM

BAR MARK

40-01-T 16-150-BOTT.

NOS. OF BAR

BAR MARK

TYPE OF REBAR

SPACING

DIA. OF REBARLOCATION / REMARK

T - HIGH YIELD DEFORMED BARY - DEFORMED MS BARR - ROUND MS BAR

INDICATES BAR CUT POINT

LEGEND:

BOTTOM REINFORCEMENT

TOP REINFORCEMENT

NOTES

1. THE FOOTING SLAB IS PROVIDED WITH ROCK ANCHORAGE WHERE THE ROCK UNDERNEATH FOOTING AND THE FOOTING SLAB BONDED TOGETHER.

2. THE ANCHOR HOLE OF 1375 MM DEEP FROM THE TOP OF PCC CONCRETE AND DIAMETER OF 36 MM WILL HAVE TO BE MADE INTO WHICH 25 MM DIA. BAR WILL BE PLACED. THE ANCHOR HOLE AFTER PLACING THE BAR WILL BE FILLED BY CEMENT GROUT.

3. THE ROCK ANCHORAGES ARE PROVIDED AS PER THE SUB SOIL INVESTIGATION REPORT (SSI). THIS WILL HELP TO ABUTMENT WALL AGAINST SLIDING.

SHEET CONTENTS :

RIGHT ABUTMENT DRAWING 05

REVISION DATE DRAWING NO.

SCALE:

FIRST ISSUE

NAME

(as Sheet A3 size)

1:50

DESIGN

DRAWN

CHECKED

APPROVED

ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement

Department of Roads, Bridge DivisionThimphu, Bhutan

BAILEY TYPE STEEL TRUSS YUDHIRI BRIDGEON TRASHIGANG - PHONGMEY GC ROAD

REGIONAL OFFICE, DoR, TRASHIGANG

TSHEWANG DORJI (CE)

NGAWANG THINLEY (Dy. EE)

[DDR 180 FT SPAN & 3.277 m CARRIAGEWAY]

SIGNATURE

Jan., 2017

NGAWANG THINLEY (Dy. EE)

TSHEWANG DORJI (CE)

YB-BB-11

DIAMETER (IN MM) WEIGHT (KG/M)

10 0.617

12 0.88816 1.578

20 2.46625 3.853

1. ALL THE DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE SPECIFIED.

2. DO NOT SCALE THE DRAWINGS. USE THE GIVEN DIMENSIONS ONLY.

3. DURING THE CONSTRUCTION, THE CONTRACTOR MUST CHECK THE DIMENSIONS, LEVELS AND MEASUREMENTS. DISCREPANCY IF ANY TO BE REPORTED TO THE ENGINEER BEFORE EXECUTION.

1. CONCRETE 28 DAYS STRENGTH IN CUBE FOR ABUTMENTS AND DIRT WALLS, fck = 25 MPa.

2. YIELD STRENGTH OF STEEL, fy = 500 MPa (GRADE Fe 500, IS 1786).

4. DETAILS OF STEEL IS MENTIONED IN THE DRAWINGS AND ITS QUANTITY IN THE BAR BENDING SCHEDULE.

1. ABUTMENT WALL (ALL SIDES) = 75 MM (UP TO OUTER FACE OF MAIN BAR)

2. DIRT WALL (BACK SIDE) = 75 MM (UP TO OUTER FACE OF MAIN BAR)

3. DIRT WALL (REST OF SIDES) = 50 MM

T - HIGH YIELD DEFORMED BARY - DEFORMED MS BARR - ROUND MS BAR

INDICATES BAR CUT POINT

Bottom bar in longitudinal directionFooting slab 01 T16 5470 1 40 40 218800 21 a cb 600 4350 600 Std. - 90 deg. Std. - 90 deg. 345.27

Bottom bar in transverse directionFooting slab 02 a cb Std. - 90 deg. Std. - 90 deg. 322.01

Face reinf. in longitudinal directionFooting slab 03 a cb Std. - 90 deg. Std. - 90 deg. 40.76

Face reinf. in transverse directionFooting slab 04 a cb Std. - 90 deg. Std. - 90 deg. 54.36

Footing slab 05

Footing slab 5a

105.20

29.22

Chairs in the footing slab

a cb

a cb

Top bar in longitudinal directionFooting slab 06 Std. - 90 deg. Std. - 90 deg. 343.25

Top bar in transverse directionFooting slab 07 Std. - 90 deg. Std. - 90 deg. 320.49

a

bc

Vertical bar in backfill side of abutmentAbutment stem 08 Std. - 90 deg. Std. - 90 deg. 1237.54

Std. - 90 deg. Std. - 90 deg. 762.55Abutment stem

T16 6802 1 30 30 204060 21 500 5882 500

T12 4590 1 10 10 45900 21 150 4350 150

T12 6122 1 10 10 61220 21 150 5882 150

T20 2370 1 18 18 42660 99 250 785 500

T20 2370 1 5 5 11850 99

T16 5438 1 40 40 217520 21 600 4318 600

T16 6770 1 30 30 203100 21 500 5850 500

T20 8364 1 60 60 501840 21 250 7334 880

T16 8054 1 60 60 483240 21 200 3893 600

a

bc

Std. - 90 deg. 82.14Abutment stem T12 7708 1 12 12 92496 21 150 7318

Std. - 90 deg. 508.26Abutment stem T16 7002 1 46 46 322092 21 600 5882

09

Abutment stem T12 6990 1 40 40 279600 21 600 5850 600

Vertical bar in river side of abutment

146.3513Abutment stem T12 1308 1 126 126 164808 21 110 1066 132

a

bc

a cb

a cb

10 Vertical face bar in abutment stem

Horizontal bar in backfill side of abutment

Horizontal bar in river side of abutment

11

12

ab

cde

ab

cde

ab

c

ab

c

785 250

250 785 500 785 250 Chairs in the footing slab

300 Std. - 90 deg.

600 Std. - 90 deg.

Std. - 90 deg. Std. - 90 deg. 248.28

135 deg. HookStd. - 90 deg.

162.6113aAbutment stem T12 1308 1 140 140 183120 21 135 deg. HookStd. - 90 deg.110 1066 132

Stirrups in abutment stem

Stirrups in abutment stem

a cb

135.3914Abutment stem T16 1430 1 60 60 85800 21 Std. - 90 deg.200 1110 200 Std. - 90 deg. Top bar in abutment stem

THIS SCHEDULE HAS BEEN PREPARED IN ACCORDANCE WITH ISO 4066:2000 TOTAL : 1560.56 Kg (All diameters)

THIS SCHEDULE HAS BEEN PREPARED IN ACCORDANCE WITH ISO 4066:2000 TOTAL : 3283.13 Kg (All diameters)

SHEET CONTENTS :

REBAR SCHEDULE OF RIGHTABUTMENT 01

REVISION DATE DRAWING NO.

SCALE:

FIRST ISSUE

NAME

(as Sheet A3 size)

NTS

DESIGN

DRAWN

CHECKED

APPROVED

ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement

Department of Roads, Bridge DivisionThimphu, Bhutan

BAILEY TYPE STEEL TRUSS YUDHIRI BRIDGEON TRASHIGANG - PHONGMEY GC ROAD

REGIONAL OFFICE, DoR, TRASHIGANG

TSHEWANG DORJI (CE)

NGAWANG THINLEY (Dy. EE)

[DDR 180 FT SPAN & 3.277 m CARRIAGEWAY]

SIGNATURE

Jan., 2017

NGAWANG THINLEY (Dy. EE)

TSHEWANG DORJI (CE)

YB-BB-12

DIAMETER (IN MM) WEIGHT (KG/M)

10 0.617

12 0.88816 1.578

20 2.46625 3.853

1. ALL THE DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE SPECIFIED.

2. DO NOT SCALE THE DRAWINGS. USE THE GIVEN DIMENSIONS ONLY.

3. DURING THE CONSTRUCTION, THE CONTRACTOR MUST CHECK THE DIMENSIONS, LEVELS AND MEASUREMENTS. DISCREPANCY IF ANY TO BE REPORTED TO THE ENGINEER BEFORE EXECUTION.

1. CONCRETE 28 DAYS STRENGTH IN CUBE FOR ABUTMENT AND RETURN WALL, fck = 25 MPa.

2. YIELD STRENGTH OF STEEL, fy = 500 MPa (GRADE Fe 500, IS 1786).

4. DETAILS OF STEEL IS MENTIONED IN THE DRAWINGS AND ITS QUANTITY IN THE BAR BENDING SCHEDULE.

T - HIGH YIELD DEFORMED BARY - DEFORMED MS BARR - ROUND MS BAR

INDICATES BAR CUT POINT

331.68

1. ABUTMENT WALL (ALL SIDES) = 75 MM (UP TO OUTER FACE OF MAIN BAR)

2. DIRT WALL (BACK SIDE) = 75 MM (UP TO OUTER FACE OF MAIN BAR)

3. DIRT WALL (REST OF SIDES) = 50 MM

Abutment cap 15 T16 4233 1 60 60 253980 99 1425 1360 302 1226

Std. - 90 deg. Std. - 90 deg.

Std. - 90 deg. Std. - 90 deg.

a

bc

b

a

a cb

a cb

a cb

Dirt wall Std. - 90 deg. Std. - 90 deg.

Std. - 90 deg. None

19 T12 2465 1 60 60 147900 21 2060 75 390 131.34 Vertical bar in backfill side of dirt wall

Vertical bar in river side of dirt wall

Horizontal bar in backfill side of dirt wall

Horizontal bar in river side of dirt wall

260 1942 115.34

ab cd

Reinforcement bar in the abutment capof shape as shown

a cb

a cb

48.86Abutment cap 16 T12 6114 1 9 9 55026 21 150 5874 150 Horizontal bar at top of abutment cap intransverse direction

Horizontal bar at along taper section ofabutment cap in transverse direction27.15Abutment cap 17 T12 6114 1 5 5 30570 21 150 5874 150

ab

c

ab

c

20.18Abutment cap 18 T12 1623 1 14 14 22722 21 110 1381 132

17.88Abutment cap 18a T12 1438 1 14 14 20132 21 110 1196 132

135 deg. HookStd. - 90 deg.

135 deg. HookStd. - 90 deg.

Stirrups in abutment cap

Stirrups in abutment cap

THIS SCHEDULE HAS BEEN PREPARED IN ACCORDANCE WITH ISO 4066:2000 TOTAL : 514.84 Kg (All diameters)

Horizontal bar in river side of dirt wall

THIS SCHEDULE HAS BEEN PREPARED IN ACCORDANCE WITH ISO 4066:2000 TOTAL : 305.80 Kg (All diameters)

b

a

In footing Std. - 90 deg. None24 T25 2502.5 1 130 130 325325 11 300 2265 1253.48 Vertical bar in backfill side of dirt wall

THIS SCHEDULE HAS BEEN PREPARED IN ACCORDANCE WITH ISO 4066:2000 TOTAL : 1253.48 Kg

Dirt wall

Dirt wall

Dirt wall

Dirt wall

20 T12 2172 1 60 60 130320 11

21 T12 6014 1 5 5 30070 21 150 5874 150

22 T12 6014 1 4 4 24056 21

23 T12 6014 1 2 2 12028 21

Std. - 90 deg. Std. - 90 deg. 26.70

Std. - 90 deg. Std. - 90 deg. 21.36

Std. - 90 deg. Std. - 90 deg. 10.68

150 5874 150

150 5874 150

SHEET CONTENTS :

REBAR SCHEDULE OF RIGHTABUTMENT 02

REVISION DATE DRAWING NO.

SCALE:

FIRST ISSUE

NAME

(as Sheet A3 size)

NTS

DESIGN

DRAWN

CHECKED

APPROVED

ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement

Department of Roads, Bridge DivisionThimphu, Bhutan

BAILEY TYPE STEEL TRUSS YUDHIRI BRIDGEON TRASHIGANG - PHONGMEY GC ROAD

REGIONAL OFFICE, DoR, TRASHIGANG

TSHEWANG DORJI (CE)

NGAWANG THINLEY (Dy. EE)

[DDR 180 FT SPAN & 3.277 m CARRIAGEWAY]

SIGNATURE

Jan., 2017

NGAWANG THINLEY (Dy. EE)

TSHEWANG DORJI (CE)

YB-BB-13

of

abutm

ent

stem

C Lo

f b

eari

ng

Outl

ine

of

abutm

ent

stem

(

bac

kfi

ll si

de)

Outl

ine

of

abutm

ent

stem

(r

iver

sid

e)

C L

Construction joint

Footing slab

Abutment stem

Ab

utm

ent

cap

Dir

t w

all

of

abutm

ent

stem

C L

***

FOOTING PLAN

SIDE ELEVATION

Detail

C

Detail

D

DETAIL 'C'

***

Scale 1:20

DETAIL 'D'Scale 1:15

MATERIALS

1. CONCRETE 28 DAYS STRENGTH IN CUBE, fck = 25 MPa. [UNLESS OTHERWISE MENTIONED IN THE SPECIFICATION, THE TRIAL MIX DESIGN STRENGTH SHALL BE 31.6 MPa]

2. YIELD STRENGTH OF STEEL, fy = 500 MPa (GRADE Fe 500, IS 1786).

3. DETAILS OF STEEL IS MENTIONED IN THE DRAWING AND ITS QUANTITY IN THE BAR BENDING SCHEDULE.

NOTES

GENERAL

1. ALL THE DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE MENTIONED.

2. DO NOT SCALE THIS DRAWINGS. USE GIVEN DIMENSIONS ONLY.

3. DURING THE CONSTRUCTION, THE CONTRACTOR MUST CHECK THE DIMENSIONS, LEVELS AND MEASUREMENTS. DISCREPANCY IF ANY TO BE REPORTED TO THE ENGINEER BEFORE EXECUTION.*** CONSTRUCTION ABOVE THIS LEVEL

ARE TO BE DONE AFTER BRIDGE ERECTION

SHEET CONTENTS :

LEFT ABUTMENT DRAWING 01

REVISION DATE DRAWING NO.

SCALE:

FIRST ISSUE

NAME

(as Sheet A3 size)

1:40

DESIGN

DRAWN

CHECKED

APPROVED

ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement

Department of Roads, Bridge DivisionThimphu, Bhutan

BAILEY TYPE STEEL TRUSS YUDHIRI BRIDGEON TRASHIGANG - PHONGMEY GC ROAD

REGIONAL OFFICE, DoR, TRASHIGANG

TSHEWANG DORJI (CE)

NGAWANG THINLEY (Dy. EE)

[DDR 180 FT SPAN & 3.277 m CARRIAGEWAY]

SIGNATURE

Jan., 2017

NGAWANG THINLEY (Dy. EE)

TSHEWANG DORJI (CE)

YB-BB-14

A

A

FRONT ELEVATIONSECTION 'A - A'

Construction joint

Weep hole (dia. 110 mm)HDPE pipe (1 in 20 slope)

******

Wee

p h

ole

(d

ia. 110 m

m)

HD

PE

pip

e (1

in

20 s

lop

e)

Filter materials60 cm thick

NOTES

GENERAL

1. ALL THE DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE MENTIONED.

2. DO NOT SCALE THIS DRAWINGS. USE GIVEN DIMENSIONS ONLY.

3. DURING THE CONSTRUCTION, THE CONTRACTOR MUST CHECK THE DIMENSIONS, LEVELS AND MEASUREMENTS. DISCREPANCY IF ANY TO BE REPORTED TO THE ENGINEER BEFORE EXECUTION.

MATERIALS

1. CONCRETE 28 DAYS STRENGTH IN CUBE, fck = 25 MPa. [UNLESS OTHERWISE MENTIONED IN THE SPECIFICATION, THE TRIAL MIX DESIGN STRENGTH SHALL BE 31.6 MPa]

2. YIELD STRENGTH OF STEEL, fy = 500 MPa (GRADE Fe 500, IS 1786).

3. DETAILS OF STEEL IS MENTIONED IN THE DRAWING AND ITS QUANTITY IN THE BAR BENDING SCHEDULE.

*** CONSTRUCTION ABOVE THIS LEVEL ARE TO BE DONE AFTER BRIDGE ERECTION

SHEET CONTENTS :

LEFT ABUTMENT DRAWING 02

REVISION DATE DRAWING NO.

SCALE:

FIRST ISSUE

NAME

(as Sheet A3 size)

1:40

DESIGN

DRAWN

CHECKED

APPROVED

ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement

Department of Roads, Bridge DivisionThimphu, Bhutan

BAILEY TYPE STEEL TRUSS YUDHIRI BRIDGEON TRASHIGANG - PHONGMEY GC ROAD

REGIONAL OFFICE, DoR, TRASHIGANG

TSHEWANG DORJI (CE)

NGAWANG THINLEY (Dy. EE)

[DDR 180 FT SPAN & 3.277 m CARRIAGEWAY]

SIGNATURE

Jan., 2017

NGAWANG THINLEY (Dy. EE)

TSHEWANG DORJI (CE)

YB-BB-15

83 83

67 67

30-01-T16-200-BOTT.

27-02-T12-110-BOTT.

3x2=6-03-T12-EQ-FACE

3-04-T12-EQ-FACE

3-04-T12-EQ-FACE2x6=12-05-T20-1000 (CHAIRS)

1x5=5-5a-T20-1000 (CHAIRS)

30-06-T16-200-TOP

27-07-T12-110-TOP

43-08-T20-140-BS

43-09-T16-140-RS

17-11-T16-200-BS 17-12-T16-200-RS

4x10=40-13a-T12-400 (STIRRUPS) 4x11=44-13-T12-400

(STIRRUPS)

3x2=6-10-T12-EQ-FACE

7x13=91-24-T25-500(ROCK ANCHORAGE)

1375

REINF. DETAILSIN SECTION

400

500

145 145

17

18

1919a

19b

20

22

21

23

565 (splice length)

43-14-T16-140-TOP

15

16

FF

400

500

145 145

10-17-T12-EQ-AC

12-18-T12-150-AC

1x11=11-19-T12-280

(STIRRUPS)1x10=10-19a-T12-280

(STIRRUPS)

1x11=11-19b-T12-280

(STIRRUPS)

43-20-T12-140-DW(BS)

6-22-T12-EQ-DW

43-21-T12-140-DW(RS)

5-23-T12-EQ-DW

565 (splice length)

43-15-T16-140-(AC)BS

43-16-T16-140-(AC)RS

REINF. DETAILS (ABUTMENT CAP)Scale 1:25

NOTES

GENERAL

1. ALL THE DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE MENTIONED.

2. DO NOT SCALE THIS DRAWINGS. USE GIVEN DIMENSIONS ONLY.

3. DURING THE CONSTRUCTION, THE CONTRACTOR MUST CHECK THE DIMENSIONS, LEVELS AND MEASUREMENTS. DISCREPANCY IF ANY TO BE REPORTED TO THE ENGINEER BEFORE EXECUTION.

MATERIALS

1. CONCRETE 28 DAYS STRENGTH IN CUBE, fck = 25 MPa. [UNLESS OTHERWISE MENTIONED IN THE SPECIFICATION, THE TRIAL MIX DESIGN STRENGTH SHALL BE 31.6 MPa]

2. YIELD STRENGTH OF STEEL, fy = 500 MPa (GRADE Fe 500, IS 1786).

3. DETAILS OF STEEL IS MENTIONED IN THE DRAWING AND ITS QUANTITY IN THE BAR BENDING SCHEDULE.

COVERING

ABUTMENT WALL (ALL SIDES) = 75 MM(UP TO OUTER FACE OF MAIN BAR)

DIRT WALL (FRONT AND TOP) = 50 MM

BAR MARK

30-01-T 16-200-BOTT.

NOS. OF BAR

BAR MARK

TYPE OF REBAR

SPACING

DIA. OF REBARLOCATION / REMARK

T - HIGH YIELD DEFORMED BARY - DEFORMED MS BARR - ROUND MS BAR

INDICATES BAR CUT POINT

LEGEND:

* AC - ABUTMENT CAP* DW - DIRT WALL* BS - BACKFILL SIDE* RS - RIVER SIDE* EQ - EQUAL DISTANCE* BOTT. - BOTTOM

SHEET CONTENTS :

LEFT ABUTMENT DRAWING 03

REVISION DATE DRAWING NO.

SCALE:

FIRST ISSUE

NAME

(as Sheet A3 size)

1:35

DESIGN

DRAWN

CHECKED

APPROVED

ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement

Department of Roads, Bridge DivisionThimphu, Bhutan

BAILEY TYPE STEEL TRUSS YUDHIRI BRIDGEON TRASHIGANG - PHONGMEY GC ROAD

REGIONAL OFFICE, DoR, TRASHIGANG

TSHEWANG DORJI (CE)

NGAWANG THINLEY (Dy. EE)

[DDR 180 FT SPAN & 3.277 m CARRIAGEWAY]

SIGNATURE

Jan., 2017

NGAWANG THINLEY (Dy. EE)

TSHEWANG DORJI (CE)

YB-BB-16

217 217

201 201

01 02 04

0607

03

03

43-08-T20-140-BS

43-09-T16-140-RS

17-1

1-T

16-2

00-B

S

17-1

2-T

16-2

00-R

S

EE

115 115

101 101

43-08-T20-140-BS

22-11-T16-200-BS 13

43-09-T16-140-RS17-12-T16-200-RS13a

REINF. DETAILSFRONT VIEW

VIEW E - E

NOTES

GENERAL

1. ALL THE DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE MENTIONED.

2. DO NOT SCALE THIS DRAWINGS. USE GIVEN DIMENSIONS ONLY.

3. DURING THE CONSTRUCTION, THE CONTRACTOR MUST CHECK THE DIMENSIONS, LEVELS AND MEASUREMENTS. DISCREPANCY IF ANY TO BE REPORTED TO THE ENGINEER BEFORE EXECUTION.

MATERIALS

1. CONCRETE 28 DAYS STRENGTH IN CUBE, fck = 25 MPa. [UNLESS OTHERWISE MENTIONED IN THE SPECIFICATION, THE TRIAL MIX DESIGN STRENGTH SHALL BE 31.6 MPa]

2. YIELD STRENGTH OF STEEL, fy = 500 MPa (GRADE Fe 500, IS 1786).

3. DETAILS OF STEEL IS MENTIONED IN THE DRAWING AND ITS QUANTITY IN THE BAR BENDING SCHEDULE.

COVERING

ABUTMENT WALL (ALL SIDES) = 75 MM(UP TO OUTER FACE OF MAIN BAR)

DIRT WALL (FRONT AND TOP) = 50 MM

BAR MARK

30-01-T 16-200-BOTT.

NOS. OF BAR

BAR MARK

TYPE OF REBAR

SPACING

DIA. OF REBARLOCATION / REMARK

T - HIGH YIELD DEFORMED BARY - DEFORMED MS BARR - ROUND MS BAR

INDICATES BAR CUT POINT

LEGEND:

* AC - ABUTMENT CAP* DW - DIRT WALL* BS - BACKFILL SIDE* RS - RIVER SIDE* EQ - EQUAL DISTANCE* BOTT. - BOTTOM

LEGEND:

BACKFILL SIDE BAR

RIVER SIDE BAR

SHEET CONTENTS :

LEFT ABUTMENT DRAWING 04

REVISION DATE DRAWING NO.

SCALE:

FIRST ISSUE

NAME

(as Sheet A3 size)

1:35

DESIGN

DRAWN

CHECKED

APPROVED

ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement

Department of Roads, Bridge DivisionThimphu, Bhutan

BAILEY TYPE STEEL TRUSS YUDHIRI BRIDGEON TRASHIGANG - PHONGMEY GC ROAD

REGIONAL OFFICE, DoR, TRASHIGANG

TSHEWANG DORJI (CE)

NGAWANG THINLEY (Dy. EE)

[DDR 180 FT SPAN & 3.277 m CARRIAGEWAY]

SIGNATURE

Jan., 2017

NGAWANG THINLEY (Dy. EE)

TSHEWANG DORJI (CE)

YB-BB-17

7x1

3=

91-2

4-T

25-5

00 (

RO

CK

AN

CH

OR

AG

E)

ROCK ANCHORAGE PLANFOOTING REINF. LAYOUT

27-02-T12-110-BOTT.27-07-T12-110-TOP

30-0

1-T1

6-20

0-BO

TT.

30-0

6-T1

6-20

0-TO

P

NOTES

GENERAL

1. ALL THE DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE MENTIONED.

2. DO NOT SCALE THIS DRAWINGS. USE GIVEN DIMENSIONS ONLY.

3. DURING THE CONSTRUCTION, THE CONTRACTOR MUST CHECK THE DIMENSIONS, LEVELS AND MEASUREMENTS. DISCREPANCY IF ANY TO BE REPORTED TO THE ENGINEER BEFORE EXECUTION.

MATERIALS

1. CONCRETE 28 DAYS STRENGTH IN CUBE, fck = 25 MPa. [UNLESS OTHERWISE MENTIONED IN THE SPECIFICATION, THE TRIAL MIX DESIGN STRENGTH SHALL BE 31.6 MPa]

2. YIELD STRENGTH OF STEEL, fy = 500 MPa (GRADE Fe 500, IS 1786).

3. DETAILS OF STEEL IS MENTIONED IN THE DRAWING AND ITS QUANTITY IN THE BAR BENDING SCHEDULE.

COVERING

ABUTMENT WALL (ALL SIDES) = 75 MM(UP TO OUTER FACE OF MAIN BAR)

DIRT WALL (FRONT AND TOP) = 50 MM

BAR MARK

30-01-T 16-200-BOTT.

NOS. OF BAR

BAR MARK

TYPE OF REBAR

SPACING

DIA. OF REBARLOCATION / REMARK

T - HIGH YIELD DEFORMED BARY - DEFORMED MS BARR - ROUND MS BAR

INDICATES BAR CUT POINTLEGEND:

* AC - ABUTMENT CAP* DW - DIRT WALL* BS - BACKFILL SIDE* RS - RIVER SIDE* EQ - EQUAL DISTANCE* BOTT. - BOTTOM

LEGEND:

BOTTOM REINFORCEMENT

TOP REINFORCEMENT

SHEET CONTENTS :

LEFT ABUTMENT DRAWING 05

REVISION DATE DRAWING NO.

SCALE:

FIRST ISSUE

NAME

(as Sheet A3 size)

1:35

DESIGN

DRAWN

CHECKED

APPROVED

ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement

Department of Roads, Bridge DivisionThimphu, Bhutan

BAILEY TYPE STEEL TRUSS YUDHIRI BRIDGEON TRASHIGANG - PHONGMEY GC ROAD

REGIONAL OFFICE, DoR, TRASHIGANG

TSHEWANG DORJI (CE)

NGAWANG THINLEY (Dy. EE)

[DDR 180 FT SPAN & 3.277 m CARRIAGEWAY]

SIGNATURE

Jan., 2017

NGAWANG THINLEY (Dy. EE)

TSHEWANG DORJI (CE)

YB-BB-18

DIAMETER (IN MM) WEIGHT (KG/M)

10 0.617

12 0.88816 1.578

20 2.46625 3.853

1. ALL THE DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE SPECIFIED.

2. DO NOT SCALE THE DRAWINGS. USE THE GIVEN DIMENSIONS ONLY.

3. DURING THE CONSTRUCTION, THE CONTRACTOR MUST CHECK THE DIMENSIONS, LEVELS AND MEASUREMENTS. DISCREPANCY IF ANY TO BE REPORTED TO THE ENGINEER BEFORE EXECUTION.

1. CONCRETE 28 DAYS STRENGTH IN CUBE FOR ABUTMENTS AND DIRT WALLS, fck = 25 MPa.

2. YIELD STRENGTH OF STEEL, fy = 500 MPa (GRADE Fe 500, IS 1786).

4. DETAILS OF STEEL IS MENTIONED IN THE DRAWINGS AND ITS QUANTITY IN THE BAR BENDING SCHEDULE.

1. ABUTMENT WALL (ALL SIDES) = 75 MM (UP TO OUTER FACE OF MAIN BAR)

2. DIRT WALL (BACK SIDE) = 75 MM (UP TO OUTER FACE OF MAIN BAR)

3. DIRT WALL (REST OF SIDES) = 50 MM

T - HIGH YIELD DEFORMED BARY - DEFORMED MS BARR - ROUND MS BAR

INDICATES BAR CUT POINT

Bottom bar in longitudinal directionFooting slab 01 T16 3770 1 30 30 113100 21 a cb 500 2850 500 Std. - 90 deg. Std. - 90 deg. 178.47

Bottom bar in transverse directionFooting slab 02 a cb Std. - 90 deg. Std. - 90 deg. 157.23

Face reinf. in longitudinal directionFooting slab 03 a cb Std. - 90 deg. Std. - 90 deg. 16.12

Face reinf. in transverse directionFooting slab 04 a cb Std. - 90 deg. Std. - 90 deg. 32.02

Footing slab 05

Footing slab 5a

55.63

23.18

Chairs in the footing slab

a cb

a cb

Top bar in longitudinal directionFooting slab 06 Std. - 90 deg. Std. - 90 deg. 176.96

Top bar in transverse directionFooting slab 07 Std. - 90 deg. Std. - 90 deg. 156.66

a

bc

Vertical bar in backfill side of abutmentAbutment stem 08 Std. - 90 deg. Std. - 90 deg. 620.53

Std. - 90 deg. Std. - 90 deg. 373.67Abutment stem

T12 6558 1 27 27 177066 21 400 5818 400

T12 3026 1 6 6 18156 21 150 2786 150

T12 6010 1 6 6 36060 21 150 5770 150

T20 1880 1 12 12 22560 99 250 590 400

T20 1880 1 5 5 9400 99

T16 3738 1 30 30 112140 21 500 2818 500

T12 6534 1 27 27 176418 21 400 5794 400

T20 5852 1 43 43 251636 21 250 4822 880

T16 5507 1 43 43 236801 21 200 4822 565

a

bc

Std. - 90 deg. 27.88Abutment stem T12 5232 1 6 6 31392 21 150 4822

Std. - 90 deg. 182.47Abutment stem T16 6802 1 17 17 115634 21 500 5882

09

Abutment stem T16 6770 1 17 17 115090 21 500 5850 500

Vertical bar in river side of abutment

35.4813Abutment stem T12 908 1 44 44 39952 21 110 666 132

a

bc

a cb

a cb

10 Vertical face bar in abutment stem

Horizontal bar in backfill side of abutment

Horizontal bar in river side of abutment

11

12

ab

cde

ab

cde

ab

c

ab

c

590 250

250 250 Chairs in the footing slab

320 Std. - 90 deg.

500 Std. - 90 deg.

Std. - 90 deg. Std. - 90 deg. 181.61

135 deg. HookStd. - 90 deg.

32.2513aAbutment stem T12 908 1 40 40 36320 21 135 deg. HookStd. - 90 deg.110 666 132

Stirrups in abutment stem

Stirrups in abutment stem

a cb

56.5914Abutment stem T16 834 1 43 43 35862 21 Std. - 90 deg.100 714 100 Std. - 90 deg. Top bar in abutment stem

THIS SCHEDULE HAS BEEN PREPARED IN ACCORDANCE WITH ISO 4066:2000 TOTAL : 796.28 Kg (All diameters)

THIS SCHEDULE HAS BEEN PREPARED IN ACCORDANCE WITH ISO 4066:2000 TOTAL : 1510.48 Kg (All diameters)

590 400 590

SHEET CONTENTS :

REBAR SCHEDULE OF LEFTABUTMENT 01

REVISION DATE DRAWING NO.

SCALE:

FIRST ISSUE

NAME

(as Sheet A3 size)

NTS

DESIGN

DRAWN

CHECKED

APPROVED

ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement

Department of Roads, Bridge DivisionThimphu, Bhutan

BAILEY TYPE STEEL TRUSS YUDHIRI BRIDGEON TRASHIGANG - PHONGMEY GC ROAD

REGIONAL OFFICE, DoR, TRASHIGANG

TSHEWANG DORJI (CE)

NGAWANG THINLEY (Dy. EE)

[DDR 180 FT SPAN & 3.277 m CARRIAGEWAY]

SIGNATURE

Jan., 2017

NGAWANG THINLEY (Dy. EE)

TSHEWANG DORJI (CE)

YB-BB-19

DIAMETER (IN MM) WEIGHT (KG/M)

10 0.617

12 0.88816 1.578

20 2.46625 3.853

1. ALL THE DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE SPECIFIED.

2. DO NOT SCALE THE DRAWINGS. USE THE GIVEN DIMENSIONS ONLY.

3. DURING THE CONSTRUCTION, THE CONTRACTOR MUST CHECK THE DIMENSIONS, LEVELS AND MEASUREMENTS. DISCREPANCY IF ANY TO BE REPORTED TO THE ENGINEER BEFORE EXECUTION.

1. CONCRETE 28 DAYS STRENGTH IN CUBE FOR ABUTMENT AND RETURN WALL, fck = 25 MPa.

2. YIELD STRENGTH OF STEEL, fy = 500 MPa (GRADE Fe 500, IS 1786).

4. DETAILS OF STEEL IS MENTIONED IN THE DRAWINGS AND ITS QUANTITY IN THE BAR BENDING SCHEDULE.

T - HIGH YIELD DEFORMED BARY - DEFORMED MS BARR - ROUND MS BAR

INDICATES BAR CUT POINT

202.00

1. ABUTMENT WALL (ALL SIDES) = 75 MM (UP TO OUTER FACE OF MAIN BAR)

2. DIRT WALL (BACK SIDE) = 75 MM (UP TO OUTER FACE OF MAIN BAR)

3. DIRT WALL (REST OF SIDES) = 50 MM

Abutment cap 15 T16 2977 1 43 43 128011 99 1125 292 1600

Std. - 90 deg. Std. - 90 deg.

Std. - 90 deg. Std. - 90 deg.

a

bc

b

a

a cb

a cb

Dirt wall Std. - 90 deg. Std. - 90 deg.

Std. - 90 deg. None

T12 1137 1 43 43 48891 21 972 75 150 43.42 Vertical bar in backfill side of dirt wall

Vertical bar in river side of dirt wall

Horizontal bar in backfill side of dirt wall

Horizontal bar in river side of dirt wall

121 954 39.90

ab

c

Reinforcement bar in the abutment capof shape as shown at backfill side

a cb

a cb

54.36

Abutment cap

16

T12 6122 1 10 10 61220 21 150 5882 150 Horizontal bar at top of abutment cap intransverse direction

Horizontal bar at along taper section ofabutment cap in transverse direction65.24

Abutment cap

17

T12 6122 1 12 12 73464 21 150 5882 150

19.03

Abutment cap

18

T12 1948 1 11 11 11803 21 150 1708 152

14.66

Abutment cap

19a T12 1651 1 10 10 16510 21 140 1371 140

135 deg. HookStd. - 90 deg.

180 deg. Hook

Stirrups in abutment cap

Stirrups in abutment cap

THIS SCHEDULE HAS BEEN PREPARED IN ACCORDANCE WITH ISO 4066:2000 TOTAL : 568.18 Kg (All diameters)

THIS SCHEDULE HAS BEEN PREPARED IN ACCORDANCE WITH ISO 4066:2000 TOTAL : 143.12 Kg (All diameters)

b

a

In footing Std. - 90 deg. None24 T25 2307.5 1 91 91 209982.5 11 300 2070 809.06 Vertical bar in backfill side of dirt wall

THIS SCHEDULE HAS BEEN PREPARED IN ACCORDANCE WITH ISO 4066:2000 TOTAL : 809.06 Kg

Dirt wall

Dirt wall

Dirt wall

20

T12 1045 1 43 43 44935 1121

T12 6122 1 6 6 36732 21 150 5882 15022

T12 6122 1 5 5 30610 2123

Std. - 90 deg. Std. - 90 deg. 32.62

Std. - 90 deg. Std. - 90 deg. 27.18150 5882 150

Abutment cap

Abutment cap

19

19b

a b

c202.41

Reinforcement bar in the abutment capof shape as shown at river sideT16 2983 1 43 43 128269 99 1125 294 1604

a cb

a c

ba c

b

180 deg. Hook

10.48T12 1073 1 11 11 11803 21 140 793 140 180 deg. Hook Stirrups in abutment cap180 deg. Hook

SHEET CONTENTS :

REBAR SCHEDULE OF LEFTABUTMENT 02

REVISION DATE DRAWING NO.

SCALE:

FIRST ISSUE

NAME

(as Sheet A3 size)

NTS

DESIGN

DRAWN

CHECKED

APPROVED

ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement

Department of Roads, Bridge DivisionThimphu, Bhutan

BAILEY TYPE STEEL TRUSS YUDHIRI BRIDGEON TRASHIGANG - PHONGMEY GC ROAD

REGIONAL OFFICE, DoR, TRASHIGANG

TSHEWANG DORJI (CE)

NGAWANG THINLEY (Dy. EE)

[DDR 180 FT SPAN & 3.277 m CARRIAGEWAY]

SIGNATURE

Jan., 2017

NGAWANG THINLEY (Dy. EE)

TSHEWANG DORJI (CE)

YB-BB-20

FOOTING PLAN

Consruction joint

40 cm thickfilter material

Weep holes Ï 11cm(HDPE Pipes) 1 in 20 slope

Vertical wall (stem)

Footing slab

W W

SECTION "W-W"Side Elevation

XX

NOTES

GENERAL

1. ALL THE DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE MENTIONED.

2. DO NOT SCALE THIS DRAWINGS. USE GIVEN DIMENSIONS ONLY.

3. DURING THE CONSTRUCTION, THE CONTRACTOR MUST CHECK THE DIMENSIONS, LEVELS AND MEASUREMENTS. DISCREPANCY IF ANY TO BE REPORTED TO THE ENGINEER BEFORE EXECUTION.

MATERIALS

1. CONCRETE 28 DAYS STRENGTH IN CUBE, fck = 20 MPa. [UNLESS OTHERWISE MENTIONED IN THE SPECIFICATION, THE TRIAL MIX DESIGN STRENGTH SHALL BE 26.6 MPa]

2. YIELD STRENGTH OF STEEL, fy = 500 MPa (GRADE Fe 500, IS 1786).

3. DETAILS OF STEEL IS MENTIONED IN THE DRAWING AND ITS QUANTITY IN THE BAR BENDING SCHEDULE.

COVERING

RETAINING WALL (ALL SIDES) = 40 MM

SHEET CONTENTS :

RETAINING WALL DRAWING 01

REVISION DATE DRAWING NO.

SCALE:

FIRST ISSUE

NAME

(as Sheet A3 size)

1:45

DESIGN

DRAWN

CHECKED

APPROVED

ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement

Department of Roads, Bridge DivisionThimphu, Bhutan

BAILEY TYPE STEEL TRUSS YUDHIRI BRIDGEON TRASHIGANG - PHONGMEY GC ROAD

REGIONAL OFFICE, DoR, TRASHIGANG

TSHEWANG DORJI (CE)

NGAWANG THINLEY (Dy. EE)

[DDR 180 FT SPAN & 3.277 m CARRIAGEWAY]

SIGNATURE

Jan., 2017

NGAWANG THINLEY (Dy. EE)

TSHEWANG DORJI (CE)

YB-BB-21

Weep holes Ï 11cm(HDPE Pipes) 1 in 20 slope

Consruction joint

FRONT ELEVATIONView "X - X"

NOTES

GENERAL

1. ALL THE DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE MENTIONED.

2. DO NOT SCALE THIS DRAWINGS. USE GIVEN DIMENSIONS ONLY.

3. DURING THE CONSTRUCTION, THE CONTRACTOR MUST CHECK THE DIMENSIONS, LEVELS AND MEASUREMENTS. DISCREPANCY IF ANY TO BE REPORTED TO THE ENGINEER BEFORE EXECUTION.

MATERIALS

1. CONCRETE 28 DAYS STRENGTH IN CUBE, fck = 20 MPa. [UNLESS OTHERWISE MENTIONED IN THE SPECIFICATION, THE TRIAL MIX DESIGN STRENGTH SHALL BE 26.6 MPa]

2. YIELD STRENGTH OF STEEL, fy = 500 MPa (GRADE Fe 500, IS 1786).

3. DETAILS OF STEEL IS MENTIONED IN THE DRAWING AND ITS QUANTITY IN THE BAR BENDING SCHEDULE.

COVERING

RETAINING WALL (ALL SIDES) = 40 MM

SHEET CONTENTS : REVISION DATE DRAWING NO.

SCALE:

FIRST ISSUE

NAME

(as Sheet A3 size)

1:40

DESIGN

DRAWN

CHECKED

APPROVED

ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement

Department of Roads, Bridge DivisionThimphu, Bhutan

BAILEY TYPE STEEL TRUSS YUDHIRI BRIDGEON TRASHIGANG - PHONGMEY GC ROAD

REGIONAL OFFICE, DoR, TRASHIGANG

TSHEWANG DORJI (CE)

NGAWANG THINLEY (Dy. EE)

[DDR 180 FT SPAN & 3.277 m CARRIAGEWAY]

SIGNATURE

RETAINING WALL DRAWING 02

Jan., 2017

NGAWANG THINLEY (Dy. EE)

TSHEWANG DORJI (CE)

YB-BB-22

lap

leng

th

REINFORCEMENT DETAILFront Elevation

YY

47-08-T16-150-back

47-09-T12-150-vall.

47-10-T12-150-back

40-12-T12-150-back

34-13-T12-180-vall.

NOTES

GENERAL

1. ALL THE DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE MENTIONED.

2. DO NOT SCALE THIS DRAWINGS. USE GIVEN DIMENSIONS ONLY.

3. DURING THE CONSTRUCTION, THE CONTRACTOR MUST CHECK THE DIMENSIONS, LEVELS AND MEASUREMENTS. DISCREPANCY IF ANY TO BE REPORTED TO THE ENGINEER BEFORE EXECUTION.

MATERIALS

1. CONCRETE 28 DAYS STRENGTH IN CUBE, fck = 20 MPa. [UNLESS OTHERWISE MENTIONED IN THE SPECIFICATION, THE TRIAL MIX DESIGN STRENGTH SHALL BE 26.6 MPa]

2. YIELD STRENGTH OF STEEL, fy = 500 MPa (GRADE Fe 500, IS 1786).

3. DETAILS OF STEEL IS MENTIONED IN THE DRAWING AND ITS QUANTITY IN THE BAR BENDING SCHEDULE.

COVERING

RETAINING WALL (ALL SIDES) = 40 MM

BAR MARK

47-01-T 12-150-BOTT.

NOS. OF BAR

BAR MARK

TYPE OF REBAR

SPACING

DIA. OF REBARLOCATION / REMARK

T - HIGH YIELD DEFORMED BARY - DEFORMED MS BARR - ROUND MS BAR

INDICATES BAR CUT POINT

Outer Bar (Valley Side)

Inner Bar (Backfill Side)

Legend

SHEET CONTENTS : REVISION DATE DRAWING NO.

SCALE:

FIRST ISSUE

NAME

(as Sheet A3 size)

1:45

DESIGN

DRAWN

CHECKED

APPROVED

ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement

Department of Roads, Bridge DivisionThimphu, Bhutan

BAILEY TYPE STEEL TRUSS YUDHIRI BRIDGEON TRASHIGANG - PHONGMEY GC ROAD

REGIONAL OFFICE, DoR, TRASHIGANG

TSHEWANG DORJI (CE)

NGAWANG THINLEY (Dy. EE)

[DDR 180 FT SPAN & 3.277 m CARRIAGEWAY]

SIGNATURE

RETAINING WALL DRAWING 03

Jan., 2017

NGAWANG THINLEY (Dy. EE)

TSHEWANG DORJI (CE)

YB-BB-23

lap

leng

th

47-01-T12-150-bott.

26-02-T12-150-bott.

2-03-T12-face

4x5=20-05-T16-1500 (chair)

2-05-T12-face

2-04-T12-face

50-06-T12-140-top

26-07-T12-150-top

47-08-T16-150-back

47-09-T12-150-vall.

47-10-T12-150-back

3-11-T12-face

40-12-T12-150-back

34-13-T12-180-vall. 35-14-T12-200-top

8-15-T12-1000 (spacer)

8-16-T12-1000 (spacer)

8-17-T12-1000 (spacer)

8-18-T12-1000 (spacer)

8-19-T12-1000 (spacer)

REINFORCEMENT DETAILSection "Y-Y"

ZZ

6x10=60-20-T25-700-both direction

NOTES

GENERAL

1. ALL THE DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE MENTIONED.

2. DO NOT SCALE THIS DRAWINGS. USE GIVEN DIMENSIONS ONLY.

3. DURING THE CONSTRUCTION, THE CONTRACTOR MUST CHECK THE DIMENSIONS, LEVELS AND MEASUREMENTS. DISCREPANCY IF ANY TO BE REPORTED TO THE ENGINEER BEFORE EXECUTION.

MATERIALS

1. CONCRETE 28 DAYS STRENGTH IN CUBE, fck = 20 MPa. [UNLESS OTHERWISE MENTIONED IN THE SPECIFICATION, THE TRIAL MIX DESIGN STRENGTH SHALL BE 26.6 MPa]

2. YIELD STRENGTH OF STEEL, fy = 500 MPa (GRADE Fe 500, IS 1786).

3. DETAILS OF STEEL IS MENTIONED IN THE DRAWING AND ITS QUANTITY IN THE BAR BENDING SCHEDULE.

COVERING

RETAINING WALL (ALL SIDES) = 40 MM

BAR MARK

47-01-T 12-150-BOTT.

NOS. OF BAR

BAR MARK

TYPE OF REBAR

SPACING

DIA. OF REBARLOCATION / REMARK

T - HIGH YIELD DEFORMED BARY - DEFORMED MS BARR - ROUND MS BAR

INDICATES BAR CUT POINT

Outer Bar (Valley Side)

Inner Bar (Backfill Side)

Legend

SHEET CONTENTS : REVISION DATE DRAWING NO.

SCALE:

FIRST ISSUE

NAME

(as Sheet A3 size)

1:45

DESIGN

DRAWN

CHECKED

APPROVED

ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement

Department of Roads, Bridge DivisionThimphu, Bhutan

BAILEY TYPE STEEL TRUSS YUDHIRI BRIDGEON TRASHIGANG - PHONGMEY GC ROAD

REGIONAL OFFICE, DoR, TRASHIGANG

TSHEWANG DORJI (CE)

NGAWANG THINLEY (Dy. EE)

[DDR 180 FT SPAN & 3.277 m CARRIAGEWAY]

SIGNATURE

RETAINING WALL DRAWING 04

Jan., 2017

NGAWANG THINLEY (Dy. EE)

TSHEWANG DORJI (CE)

YB-BB-24

47-01-T12-150-bott.

26-02-T12-150-bott.

50-06-T12-140-top

26-07-T12-150-top

FOOTING SLAB REINF. LAYOUTView "Z - Z"

ROCK ANCHORAGE PLAN

Diameter of anchorhole must be at least

32 mm

NOTES

GENERAL

1. ALL THE DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE MENTIONED.

2. DO NOT SCALE THIS DRAWINGS. USE GIVEN DIMENSIONS ONLY.

3. DURING THE CONSTRUCTION, THE CONTRACTOR MUST CHECK THE DIMENSIONS, LEVELS AND MEASUREMENTS. DISCREPANCY IF ANY TO BE REPORTED TO THE ENGINEER BEFORE EXECUTION.

MATERIALS

1. CONCRETE 28 DAYS STRENGTH IN CUBE, fck = 20 MPa. [UNLESS OTHERWISE MENTIONED IN THE SPECIFICATION, THE TRIAL MIX DESIGN STRENGTH SHALL BE 26.6 MPa]

2. YIELD STRENGTH OF STEEL, fy = 500 MPa (GRADE Fe 500, IS 1786).

3. DETAILS OF STEEL IS MENTIONED IN THE DRAWING AND ITS QUANTITY IN THE BAR BENDING SCHEDULE.

COVERING

RETAINING WALL (ALL SIDES) = 40 MM

BAR MARK

47-01-T 12-150-BOTT.

NOS. OF BAR

BAR MARK

TYPE OF REBAR

SPACING

DIA. OF REBARLOCATION / REMARK

T - HIGH YIELD DEFORMED BARY - DEFORMED MS BARR - ROUND MS BAR

INDICATES BAR CUT POINTTop Reinforcement

Bottom Reinforcement

Legend

SHEET CONTENTS : REVISION DATE DRAWING NO.

SCALE:

FIRST ISSUE

NAME

(as Sheet A3 size)

1:45

DESIGN

DRAWN

CHECKED

APPROVED

ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement

Department of Roads, Bridge DivisionThimphu, Bhutan

BAILEY TYPE STEEL TRUSS YUDHIRI BRIDGEON TRASHIGANG - PHONGMEY GC ROAD

REGIONAL OFFICE, DoR, TRASHIGANG

TSHEWANG DORJI (CE)

NGAWANG THINLEY (Dy. EE)

[DDR 180 FT SPAN & 3.277 m CARRIAGEWAY]

SIGNATURE

RETAINING WALL DRAWING 05

Jan., 2017

NGAWANG THINLEY (Dy. EE)

TSHEWANG DORJI (CE)

YB-BB-25

DIAMETER (IN MM) WEIGHT (KG/M)

10 0.617

12 0.88816 1.578

20 2.46625 3.853

1. ALL THE DIMENSIONS ARE IN MILLIMETER UNLESS OTHERWISE SPECIFIED.

2. DO NOT SCALE THE DRAWINGS. USE THE GIVEN DIMENSIONS ONLY.

3. DURING THE CONSTRUCTION, THE CONTRACTOR MUST CHECK THE DIMENSIONS, LEVELS AND MEASUREMENTS. DISCREPANCY IF ANY TO BE REPORTED TO THE ENGINEER BEFORE EXECUTION.

1. CONCRETE 28 DAYS STRENGTH IN CUBE FOR ABUTMENTS AND DIRT WALLS, fck = 20 MPa.

2. YIELD STRENGTH OF STEEL, fy = 500 MPa (GRADE Fe 500, IS 1786).

4. DETAILS OF STEEL IS MENTIONED IN THE DRAWINGS AND ITS QUANTITY IN THE BAR BENDING SCHEDULE.

RETAINING WALL (ALL SIDES) = 40 MM

T - HIGH YIELD DEFORMED BARY - DEFORMED MS BARR - ROUND MS BAR

INDICATES BAR CUT POINT

Bottom bar in longitudinal directionFooting slab 01 T12 4460 1 47 47 209620 21 a cb 400 3720 400 Std. - 90 deg. Std. - 90 deg. 186.14

Bottom bar in transverse directionFooting slab 02 a cb Std. - 90 deg. Std. - 90 deg. 176.85

Face reinf. in longitudinal directionFooting slab 03 a cb Std. - 90 deg. Std. - 90 deg. 14.07

Face reinf. in transverse directionFooting slab 04 a cb Std. - 90 deg. Std. - 90 deg. 25.43

Footing slab 05 39.70 Chairs in the footing slab

a cb

a cb

Top bar in longitudinal directionFooting slab 06 Std. - 90 deg. Std. - 90 deg. 198.02

Top bar in transverse directionFooting slab 07 Std. - 90 deg. Std. - 90 deg. 176.85

a

bc

Vertical bar in backfill side of abutment(bottom)

Vertical wall(stem) 08 Std. - 90 deg. Std. - 90 deg. 169.10

Std. - 90 deg. Std. - 90 deg. 297.08

T12 7660 1 26 26 199160 21 400 6920 400

T12 3960 1 4 4 15840 21 150 3720 150

T12 7160 1 4 4 28640 21 150 6920 150

T16 1258 1 20 20 25160 99 150 384 350

T12 4460 1 50 50 223000 21 400 3720 400

T12 7660 1 26 26 199160 21 400 6920 400

T16 2280 1 47 47 107160 21 300 1460 600

T12 7118 1 47 47 334546 21 250 6428 500

a

bc

Std. - 90 deg. 257.93T12 6180 1 47 47 290460 11 250 5960

Std. - 90 deg. 272.08T12 7660 1 40 40 306400 21 400 6920

09

T12 6770 1 34 34 260440 21 400 6920 400

Vertical bar in river side of abutment

a cb

a cb

10

Vertical face bar in abutment stem

Horizontal bar in backfill side of abutment

Horizontal bar in river side of abutment

12

13

ab

cde

384 150

None

400 Std. - 90 deg.

Std. - 90 deg. Std. - 90 deg. 231.27

a cb

THIS SCHEDULE HAS BEEN PREPARED IN ACCORDANCE WITH ISO 4066:2000 TOTAL : 1290.42 Kg (All diameters)

THIS SCHEDULE HAS BEEN PREPARED IN ACCORDANCE WITH ISO 4066:2000 TOTAL : 1315.61 Kg (All diameters)

SHEET CONTENTS : REVISION DATE DRAWING NO.

SCALE:

FIRST ISSUE

NAME

(as Sheet A3 size)

NTS

DESIGN

DRAWN

CHECKED

APPROVED

ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement

Department of Roads, Bridge DivisionThimphu, Bhutan

BAILEY TYPE STEEL TRUSS YUDHIRI BRIDGEON TRASHIGANG - PHONGMEY GC ROAD

REGIONAL OFFICE, DoR, TRASHIGANG

TSHEWANG DORJI (CE)

NGAWANG THINLEY (Dy. EE)

[DDR 180 FT SPAN & 3.277 m CARRIAGEWAY]

SIGNATURE

a

b

a

bc

Std. - 90 deg. 36.28T12 6810 1 6 6 40860 21 150 642011 300 Std. - 90 deg.

Vertical bar in backfill side of abutment(top)

a cb

a cb

a cb

a cb

a cb

T12 692 1 35 35 24220 21 150 422 150 Top bar on vertical wall (stem)14 Std. - 90 deg. Std. - 90 deg. 21.51

T12 742 1 8 8 5936 21 150 472 150 Spacers in vertical wall (stem)15 Std. - 90 deg. Std. - 90 deg. 5.27

T12 792 1 8 8 6336 21 150 522 150 Spacers in vertical wall (stem)16 Std. - 90 deg. Std. - 90 deg. 5.63

T12 842 1 8 8 6736 21 150 572 150 Spacers in vertical wall (stem)17 Std. - 90 deg. Std. - 90 deg. 5.98

T12 892 1 8 8 7136 21 150 622 150 Spacers in vertical wall (stem)18 Std. - 90 deg. Std. - 90 deg. 6.34

T12 942 1 8 8 7536 21 150 672 150 Spacers in vertical wall (stem)19 Std. - 90 deg. Std. - 90 deg. 6.69

a

bFooting slab 20 T25 2047.5 1 60 60 122850 11 300 1810 Std. - 90 deg. None Rock anchorage bar473.34

Vertical wall(stem)

Vertical wall(stem)

Vertical wall(stem)

Vertical wall(stem)

Vertical wall(stem)

Vertical wall(stem)

Vertical wall(stem)

Vertical wall(stem)

Vertical wall(stem)

Vertical wall(stem)

Vertical wall(stem)

REBAR SCHEDULE OFRETAINING WALL

Jan., 2017

NGAWANG THINLEY (Dy. EE)

TSHEWANG DORJI (CE)

YB-BB-26

RRM SECTION AT RIGHT BANK RRM SECTION AT LEFT BANK

SHEET CONTENTS :

TYPICAL CROSS SECTION OFRRM WALL

REVISION DATE DRAWING NO.

SCALE:

FIRST ISSUE

NAME

(as Sheet A3 size)

1:35

DESIGN

DRAWN

CHECKED

APPROVED

ROYAL GOVERNMENT OF BHUTANMinistry of Works & Human settlement

Department of Roads, Bridge DivisionThimphu, Bhutan

BAILEY TYPE STEEL TRUSS YUDHIRI BRIDGEON TRASHIGANG - PHONGMEY GC ROAD

REGIONAL OFFICE, DoR, TRASHIGANG

TSHEWANG DORJI (CE)

NGAWANG THINLEY (Dy. EE)

[DDR 180 FT SPAN & 3.277 m CARRIAGEWAY]

SIGNATURE

Jan., 2017

NGAWANG THINLEY (Dy. EE)

TSHEWANG DORJI (CE)

YB-BB-27