Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox 7500 Amp HTS Lead  ROUTING AND BEND RADIUS FOR CABLE.

Transcript of Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION BY: ROY...

Page 1: Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.

October 23-24, 2002 RFP Review DFBX Feedbox Roy Hannaford

LEAD SPLICE SPECIFICATION

BY: ROY HANNAFORD

Page 2: Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.

October 23-24, 2002 RFP Review DFBX Feedbox Roy Hannaford

7500 Amp HTS Lead

SOLDER BOX MOUNTING PLATE 7500 AMP.

Page 3: Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.

October 23-24, 2002 RFP Review DFBX Feedbox Roy Hannaford

7500 Amp HTS Lead

ROUTING AND BEND RADIUS FOR CABLE.

Page 4: Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.

October 23-24, 2002 RFP Review DFBX Feedbox Roy Hannaford

7500 Amp HTS Lead

Layout with four cables in solder box.

Page 5: Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.

October 23-24, 2002 RFP Review DFBX Feedbox Roy Hannaford

7500 Amp HTS Lead

Assemble cables and

solder in box.

Page 6: Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.

October 23-24, 2002 RFP Review DFBX Feedbox Roy Hannaford

7500 Amp HTS Lead

Place aluminum push block over the top

piece of conductor.

Page 7: Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.

October 23-24, 2002 RFP Review DFBX Feedbox Roy Hannaford

7500 Amp HTS Lead

Install top plate to

hold tension while

soldering.

Page 8: Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.

October 23-24, 2002 RFP Review DFBX Feedbox Roy Hannaford

7500 Amp HTS Lead

Insert cartridge

heater and heat joint to 240 C and

tighten clamp bolts.

Page 9: Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.

October 23-24, 2002 RFP Review DFBX Feedbox Roy Hannaford

7500 Amp HTS Lead

Clean joint install

voltage taps and insulate

cables.

Page 10: Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.

October 23-24, 2002 RFP Review DFBX Feedbox Roy Hannaford

600 /120 Amp Lead

Remove Kapton

insulation and prep joint for

soldering.

Page 11: Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.

October 23-24, 2002 RFP Review DFBX Feedbox Roy Hannaford

600 /120 Amp Lead

Tin wire and insert into solder

fixture.

Page 12: Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.

October 23-24, 2002 RFP Review DFBX Feedbox Roy Hannaford

600 /120 Amp Lead

Assemble wire and lead into

solder fixture.

Page 13: Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.

October 23-24, 2002 RFP Review DFBX Feedbox Roy Hannaford

600 /120 Amp Lead

Install solder

fixture top plate.

Page 14: Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.

October 23-24, 2002 RFP Review DFBX Feedbox Roy Hannaford

600 /120 Amp Lead

Insert cartridge

heater and heat joint to

240 C, tighten

screws on fixture.

Page 15: Roy Hannaford October 23-24, 2002 RFP Review DFBX Feedbox LEAD SPLICE SPECIFICATION  BY: ROY HANNAFORD.

October 23-24, 2002 RFP Review DFBX Feedbox Roy Hannaford

600 /120 Amp Lead

Clean joint install

voltage taps and insulate