ROADWAY / BIKE
PLAN
"ROUTE"
ROADWAY / BIKE PLAN
Title Sheet
NOT TO SCALE
LOCATION MAP
NASHVILLE, TN.
FROM 23RD AVENUE NORTH TO
BUCHANAN STREET
P.E. NO.
DESIGNER
DESIGNED BY
N/A
AND THE PROPOSAL CONTRACT.
ADDITIONAL SPECIFICATIONS AND SPECIAL PROVISIONS CONTAINED IN THE PLANS
THE TENNESSEE DEPARTMENT OF TRANSPORTATION DATED: JANUARY 1, 2015 AND
THIS PROJECT TO BE CONSTRUCTED UNDER THE STANDARD SPECIFICATIONS OF
SPECIAL NOTE:
THE BASE SURVEY AND DESIGN INFORMATION FOR ROADWAY AND UTILITIES
PRESENTED ON THIS PLAN WERE PROVIDED TO KCI TECHNOLOGIES, INC BY
________________. WHERE AVAILABLE, BASE INFORMATION HAS BEEN
SUPPLEMENTED BY PLANS OBTAINED FROM ______________ AND FIELD
OBSERVATIONS BY THE ENGINEER. KCI TECHNOLOGIES, INC MAKES NO CLAIMS
AS TO THE COMPLETENESS OR ACCURACY OF THE PROVIDED BASE
INFORMATION.
KCI TECHNOLOGIES, INC.
CONSTRUCTION
SHEET NO.
1
2
DESCRIPTION
TITLE SHEET
INDEX OF SHEETS
ESTIMATED QUANTITIES
PROPOSED PAVEMENT MARKING PLAN
2A DETAIL SHEET
3-3X
PROPOSED SIGN PLAN
4-4X
SIGN SCHEDULE
T.D.O.T. STANDARD DRAWINGS
TOTAL PROJECT LENGTH 1.43 MI.
BIKEWAY PROJECT
SHALL COORDINATE
WITH TRAFFIC DEPT
BEGIN PROJECT END PROJECT
5-5X
3RD AVENUE NORTH
JONATHAN M. CLEGHON, PE
Estimated Quantities
ROADWAY / BIKE
PLAN
SHEET LOCATION KEY
SHEET 3
U
P
D
A
T
E
P
E
R
P
R
O
J
E
C
T
P
R
O
J
E
C
T
Q
U
A
N
T
I
T
Y
S
P
R
E
A
D
S
H
E
E
T
U
P
D
A
T
E
P
E
R
P
R
O
J
E
C
T
Q
U
A
N
T
I
T
Y
F
O
O
T
N
O
T
E
S
SHEET 4
SHEET 5
SHEET 6
SHEET 7
**SPECIAL NOTE(S):
ALL PAVEMENT MARKINGS AND SIGNAGE SHALL BE IN ACCORDANCE WITH THE CURRENT EDITION OF "MANUAL ON UNIFORM
TRAFFIC CONTROL DEVICES" (M.U.T.C.D.)
· CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ROADWAY MARKINGS AND SIGNS.
·
· BIKEWAY SIGNAGE SHALL BE PLACED PER DIRECTION OF FIELD ENGINEER.
· SHARROW AND BIKE LANE PAVEMENT MARKING SHALL BE PLACED PER DIRECTION OF FIELD ENGINEER.
· SHARROW AND BIKE LANE PAVEMENT MARKING SHALL NOT BE PLACED IN FRONT OF DRIVEWAYS.
· BIKEWAY PROJECT SHALL COORDINATE WITH METRO TRAFFIC DEPARTMENT.
SHEET LOCATION KEY
ROADWAY LIMITS MPH
"XXXXXXX" "XXXXXX TO XXXXX" XXX
LEGEND
2' x 4' DOTTED PAVEMENT MARKING LINE
10' x 30' BROKEN PAVEMENT MARKING LINE
TURN LANE ARROW
8" BIKE LANE STOP LINE
2' STOP LINE
CHANNELIZATION PAVEMENT MARKING
BIKE LANE PAVEMENT MARKING SYMBOL
SHARROW PAVEMENT MARKING SYMBOL
YIELD LINE PAVEMENT MARKING
EXISTING UTILITY POLE
EXISTING LIGHT POLE
EXISTING FIRE HYDRANT
SIGN
BUS STOPB
Detail Sheet
ROADWAY / BIKE
PLAN
BUCHANAN ST.
2
2
N
D
A
V
E
. N
.
2
3
R
D
A
V
E
. N
.
B
B
4.5' BIKE LANE
2' BUFFER
10' TRAVEL LANE
5' BIKE LANE
2' BUFFER
10' TRAVEL LANE
INSTALL 10' LONGITUDINAL
CROSSWALK AND ADA
COMPLIANT CURB RAMPS
(ST-320 TYP.) (32')
(SEE DETAIL SHEET 2A)
INSTALL 10' LONGITUDINAL
CROSSWALK AND ADA
COMPLIANT CURB RAMPS
(ST-320 TYP.) (24')
(SEE DETAIL SHEET 2A)
INSTALL 2' STOP LINE (19')
(SEE DETAIL SHEET 2A)
INSTALL BIKE LANE
PAVEMENT MARKINGS (TYP.)
(SEE DETAIL SHEET 2A)
INSTALL GREEN THERMO
PAVEMENT MARKINGS (TYP.)
(SEE DETAIL SHEET 2A)
(OPTIONAL ACROSS DRIVEWAYS)
4" DSYL (341')
6" DWL (86')
4" DWL (86')
6" SSWL (60')
4" SSWL (60')
6" DWL (22')
4" DWL (22')
6" SSWL (72')
4" SSWL (72')
6" DWL (30')
4" DWL (30')
6" SSWL (68')
4" SSWL (68')
6" DWL (22')
4" DWL (22')
6" SSWL (101')
4" SSWL (101')
6" DWL (22')
4" DWL (22')6" SSWL (71')
4" SSWL (71')
6" DWL (22')
4" DWL (22')
6" SSWL (25')
4" SSWL (25')
6" DWL (160')
4" DWL (160')
4" DSYL (330')
6" DWL (174')
4" DWL (173')
6" SSWL (32')
4" SSWL (32')
6" DWL (22')
4" DWL (22')
6" SSWL (108')
4" SSWL (107')
6" DWL (54')
6" SSWL (15')
4" SSWL (14')
6" DWL (22')
4" DWL (22')
6" DWL (54')
4" DWL (54')
6" SSWL (143')
4" SSWL (143')
6" DWL (22')
4" DWL (22')
6" SSWL (38')
4" SSWL (38')
6" DWL (54')
D
R
.
D
.
B
.
T
O
D
D
J
R
.
B
L
V
D
.
2
1
S
T
. A
V
E
. N
.
1
6
T
H
A
V
E
.
N
.
1
6
T
H
A
V
E
.
N
.
BUCHANAN ST.
B
B
B
B
B
B
4' BIKE LANE
3' TO 0' BUFFER
10' TRAVEL LANE
10' TRAVEL LANE
11' TRAVEL LANE
10' TRAVEL LANE
5' BIKE LANE LANE
10' TRAVEL LANE
5' BIKE LANE
3' BUFFER
10' TRAVEL LANE
5' BIKE LANE
3' BUFFER
10' TRAVEL LANE
4.5' BIKE LANE
2' BUFFER
10' TRAVEL LANE
5' BIKE LANE
2' BUFFER
10' TRAVEL LANE
INSTALL BIKE LANE
PAVEMENT MARKINGS (TYP.)
(SEE DETAIL SHEET 2A)
8" SSWL (24')
INSTALL 2' STOP LINE (20')
(SEE DETAIL SHEET 2A)
8" SSWL (25')
INSTALL 2' STOP LINE (20')
(SEE DETAIL SHEET 2A)
INSTALL GREEN THERMO
PAVEMENT MARKINGS (TYP.)
(SEE DETAIL SHEET 2A)
(OPTIONAL ACROSS DRIVEWAYS)
INSTALL SHARROW
PAVEMENT MARKINGS (TYP.)
(SEE DETAIL SHEET 2A)
INSTALL ARROW PAVEMENT
MARKINGS (TYP.)
(SEE DETAIL SHEET 2A)
6" SSWL (58')
4" SSWL (58')
6" SSWL (160')
4" SSWL (160')
4" DSYL (330')
4" DSYL (169')
6" SSWL (39')
4" SSWL (38')
6" DWL (54')
6" DWL (55')
6" SSWL (111')
4" SSWL (109')
4" DWL (86')
4" SSWL (38')
4" SSWL (61')
6" DWL (48')
6" DWL (22')
4" DWL (22')
6" SSWL (63')
4" SSWL (50')
6" SSWL (156')
4" SSWL (155')
4" DWL (104')
6" DWL (46')
6" DWL (29')
4" DWL (28')
6" SSWL (41')
4" SSWL (41')
6" DWL (22')
4" DWL (22')
6" SSWL (35')
4" SSWL (35')
4" DSYL (297')
6" DWL (118')
4" DWL (118')
6" SSWL (24')
4" SSWL (24')
6" SSWL (30')
4" SSWL (30')
6" DWL (87')
4" DWL (86')
4" DSYL (47')
6" DWL (61')
4" DSYL (163')
6" SSWL (49')
4" SSWL (48')
6" DWL (72')
Proposed Pavement Marking
Plan
PROPOSED
ROADWAY / BIKE
PLAN
MA
TC
H LIN
E S
EE
T
HIS
S
HE
ET
15'
GRAPHIC SCALE
0 30' 60' 90'
15'
GRAPHIC SCALE
0 30' 60' 90'
MA
TC
H LIN
E S
EE
T
HIS
S
HE
ET
M
AT
C
H
LIN
E S
EE
S
H
EE
T 4
NOT FOR CONSTRUCTION
BUCHANAN ST.
BIK
E LA
NE
BE
GIN
S
2
2
N
D
A
V
E
. N
.
2
3
R
D
A
V
E
. N
.
SP
EE
D
LIM
IT
30
BU
S
ST
OP
P
TO
C
OR
NE
R
BU
S
ST
OP
ST
O
P
EN
DS
STOP
ALL WAY
ST
OP
ALL W
AY
S
T
O
P
A
LL W
A
Y
ST
OP
ALL W
AY
BIK
E LA
NE
B
B
BIK
E R
OU
TE
D
R
.
D
.
B
.
T
O
D
D
J
R
.
B
L
V
D
.
2
1
S
T
. A
V
E
. N
.
1
6
T
H
A
V
E
.
N
.
1
6
T
H
A
V
E
.
N
.
BIK
E L
AN
E
BUCHANAN ST.
S
T
O
P
BU
S
ST
OP
BU
S
ST
OP
B
U
S
S
T
O
P
S
T
O
P
S
T
O
P
B
B
B
B
B
B
BIK
E R
OU
TE
BIK
E L
AN
E
NO
TU
RN
ON
RE
D
ST
OP
HE
RE
O
N
RE
D
EX
CE
PT
BIC
YC
LE
S
MA
Y U
SE
FU
LL
L
AN
E
NO
TIC
E
NO
TU
RN
ON
RE
D
ST
OP
HE
RE
O
N
RE
D
EX
CE
PT
BIC
YC
LE
S
MA
Y U
SE
FU
LL
L
AN
E
NO
TIC
E
Proposed Signing Plan
PROPOSED
ROADWAY / BIKE
PLAN
MA
TC
H LIN
E S
EE
T
HIS
S
HE
ET
MA
TC
H LIN
E S
EE
T
HIS
S
HE
ET
15'
GRAPHIC SCALE
0 30' 60' 90'
M
A
TC
H
LIN
E
S
E
E
S
H
E
E
T 4A
15'
GRAPHIC SCALE
0 30' 60' 90'
1
5
T
H
A
V
E
. N
.
1
2
T
H
A
V
E
. N
.
1
4
T
H
A
V
E
.
N
.
1
4
T
H
A
V
E
. N
.
PE
D
BIK
E
XIN
G
PE
D
BIK
E
XIN
G
BUCHANAN ST.
B
B
SEE BUCHANAN PEDESTRIAN
CROSSING PLANS FOR
DETAILS AT THIS LOCATION
5' BIKE LANE
3' BUFFER
10' TRAVEL LANE
5' BIKE LANE
3' BUFFER
10' TRAVEL LANE
5' TO 4' BIKE LANE
10' TRAVEL LANE
0' TO 8' CHANNELIZATION
5' TO 4' BIKE LANE
10' TRAVEL LANE
4' TO 5' BIKE LANE
5' BIKE LANE
3' BUFFER
10' TRAVEL LANE
5' BIKE LANE
3' BUFFER
10' TRAVEL LANE
0' TO 2' BUFFER
INSTALL BIKE LANE
PAVEMENT MARKINGS (TYP.)
(SEE DETAIL SHEET 2A)
INSTALL GREEN THERMO
PAVEMENT MARKINGS (TYP.)
(SEE DETAIL SHEET 2A)
(OPTIONAL ACROSS DRIVEWAYS)
30' X 6' ISLAND
INSTALL BIKE YIELD LINE (TYP.)
(SEE DETAIL SHEET 2A)
INSTALL YIELD LINE (TYP.)
(SEE DETAIL SHEET 2A)
INSTALL 10' LONGITUDINAL
CROSSWALK BETWEEN
PEDESTRIAN RAMPS (30')
(SEE DETAIL SHEET 2A)
INSTALL WORD PAVEMENT
MARKINGS (TYP.)
(SEE DETAIL SHEET 2A)
4" DSYL (163')
6" DWL (46')
4" DWL (46')
6" SSWL (102')
4" SSWL (101')
6" DWL (46')
6" SSWL (88')
4" SSWL (87')
6" DWL (13')
4" DWL (69')
6" SSWL (57')
6" DWL (18')
6" SSWL (49')
4" SSWL (48')
6" DWL (38')
6" DWL (56')
4" DWL (55')
6" SSWL (53')
4" SSWL (53')
6" DWL (168')
4" DWL (167')
6" SSWL (104')
4" SSWL (103')
6" DWL (46')
4" DSYL (75')
4" DSYL (75')
4" DSYL (101')
6" SSWL (49')
4" SSWL (48')
6" DWL (30')
4" DWL (30')
6" SSWL (105')
4" SSWL (105')
6" DWL (51')
4" DWL (51')
6" SSWL (134')
4" SSWL (84')
4" DWL (50')
6" DWL (19')
6" DWL (73')
4" DYL (78')
4" DYL (78')
6" SSWL (51')
4" SSWL (50')
6" DWL (86')
4" DWL (86')
6" DWL (10')
4" DWL (10')
6" SSWL (64')
4" SSWL (64')
6" SSWL (176')
4" SSWL (175')
4" DSYL (260')
4" DSYL (44')
6" DWL (19')
BUCHANAN ST.
C
E
P
H
A
S
S
T
.
1
1
T
H
A
V
E
. N
.
O
W
E
N
S
T
.
1
2
T
H
A
V
E
.
N
.
PE
D
BIK
E
XIN
G
PE
D
BIK
E
XIN
G
A
R
T
H
U
R
A
V
E
.
B
B
B
5' BIKE LANE
3' BUFFER
10' TRAVEL LANE
5' BIKE LANE
3' BUFFER
10' TRAVEL LANE
5' BIKE LANE
3' BUFFER
10' TRAVEL LANE
5' BIKE LANE
3' BUFFER
10' TRAVEL LANE
5' TO 4' BIKE LANE
10' TRAVEL LANE
0' TO 8' CHANNELIZATION
5' TO 4' BIKE LANE
10' TRAVEL LANE
INSTALL WORD PAVEMENT
MARKINGS (TYP.)
(SEE DETAIL SHEET 2A)
INSTALL YIELD LINE (TYP.)
(SEE DETAIL SHEET 2A)
INSTALL BIKE LANE
PAVEMENT MARKINGS (TYP.)
(SEE DETAIL SHEET 2A)
INSTALL BIKE YIELD LINE (TYP.)
(SEE DETAIL SHEET 2A)
INSTALL GREEN THERMO
PAVEMENT MARKINGS (TYP.)
(SEE DETAIL SHEET 2A)
(OPTIONAL ACROSS DRIVEWAYS)
INSTALL 20' LONGITUDINAL
CROSSWALK BETWEEN
PEDESTRIAN RAMPS (28')
(SEE DETAIL SHEET 2A)
6" SSWL (104')
4" SSWL (103')
4" DSYL (44')
6" DWL (22')
4" DWL (22')
6" SSWL (117')
4" SSWL (116')
6" DWL (46')
6" SSWL (128')
4" SSWL (77')
4" DWL (50')
6" DWL (48')
6" SSWL (84')
4" DWL (50')
6" DWL (18')
4" SSWL (33')
4" DSYL (138')
4" DSYL (67')
4" DSYL (78')
4" DWL (50')
4" DSYL (78')
6" DWL (48')
6" SSWL (122')
4" SSWL (72')
6" SSWL (62')6" SSWL (176')
4" SSWL (175')
6" DWL (74')
6" SSWL (45')
4" SSWL (44')
4" DSYL (62')
4" DYL (54')
4" DYL (54')
6" DWL (22')
4" DWL (22')
6" SSWL (91')
4" SSWL (91')
6" DWL (110')
4" DWL (110')
6" SSWL (125')
4" SSWL (124')
6" SSWL (165')
4" SSWL (164')
6" DWL (54')
6" SSWL (20')
4" SSWL (19')
4" DWL (22')
6" DWL (22')
4" SSWL (72')
6" SSWL (72')
4" DWL (37')
6" DWL (38')
4" SSWL (71')
6" SSWL (72')
6" DWL (43')
6" DWL (46')
4" DWL (XX')
6" DWL (XX')
4" DSYL (128')
4" DSYL (147')
4" DSYL (38')
SEE BUCHANAN PEDESTRIAN
CROSSING PLANS FOR
DETAILS AT THIS LOCATION
Proposed Pavement Marking
Plan
PROPOSED
ROADWAY / BIKE
PLAN
MA
TC
H LIN
E S
EE
T
HIS
S
HE
ET
MA
TC
H LIN
E S
EE
T
HIS
S
HE
ET
15'
GRAPHIC SCALE
0 30' 60' 90'
MA
TC
H LIN
E S
EE
S
HE
ET
5
15'
GRAPHIC SCALE
0 30' 60' 90'
MA
TC
H LIN
E S
EE
S
HE
ET
3
NOT FOR CONSTRUCTION
1
5
T
H
A
V
E
. N
.
1
2
T
H
A
V
E
. N
.
1
4
T
H
A
V
E
.
N
.
1
4
T
H
A
V
E
. N
.
PE
D
BIK
E
XIN
G
PE
D
BIK
E
XIN
G
BUCHANAN ST.
MP
H
20
S
T
O
P
BU
S
ST
OP
BU
S
ST
OP
S
T
O
P
ST
O
P
S
T
O
P
BIK
E L
AN
E
B
B
BIK
E L
AN
E
SEE BUCHANAN PEDESTRIAN
CROSSING PLANS FOR
DETAILS AT THIS LOCATION
BUCHANAN ST.
C
E
P
H
A
S
S
T
.
1
1
T
H
A
V
E
. N
.
O
W
E
N
S
T
.
1
2
T
H
A
V
E
.
N
.
PE
D
BIK
E
XIN
G
PE
D
BIK
E
XIN
G
A
R
T
H
U
R
A
V
E
.
S
T
O
P
S
T
O
P
P
OR
S
TA
ND
IN
G
AN
YT
IM
E
P
OR
S
TA
ND
IN
G
AN
YT
IM
E
BU
S
ST
OP
BU
S
ST
OP
S
T
O
P
S
T
O
P
SP
EE
D
LIM
IT
30
SP
EE
D
LIM
IT
30
B
B
B
BIK
E R
OU
TE
BIK
E R
OU
TE
SEE BUCHANAN PEDESTRIAN
CROSSING PLANS FOR
DETAILS AT THIS LOCATION
Proposed Signing Plan
PROPOSED
ROADWAY / BIKE
PLAN
MA
TC
H LIN
E S
EE
T
HIS
S
HE
ET
MA
TC
H LIN
E S
EE
T
HIS
S
HE
ET
15'
GRAPHIC SCALE
0 30' 60' 90'
MA
TC
H LIN
E S
EE
S
HE
ET
5A
MA
TC
H LIN
E S
EE
S
HE
ET
3A
15'
GRAPHIC SCALE
0 30' 60' 90'
1
0
T
H
A
V
E
. N
.
9
T
H
A
V
E
. N
.
D
E
L
T
A
A
V
E
.
BUCHANAN ST.
B
B
5' BIKE LANE
3' BUFFER
10' TRAVEL LANE
5' BIKE LANE
3' BUFFER
10' TRAVEL LANE
5' BIKE LANE
11' TRAVEL LANE
4' BIKE LANE
10' TRAVEL LANE
10' TRAVEL LANE
0' TO 4' CHANNELIZATION
10' TRAVEL LANE
4' BIKE LANE
2' BUFFER
5' BIKE LANE
2' BUFFER
11' TRAVEL LANE
10' TO 7' TO 11' CHANNELIZATION
10' TRAVEL LANE
INSTALL BIKE LANE
PAVEMENT MARKINGS (TYP.)
(SEE DETAIL SHEET 2A)
INSTALL 10' LONGITUDINAL
CROSSWALK BETWEEN
PEDESTRIAN RAMPS (44')
(SEE DETAIL SHEET 2A)
INSTALL YIELD LINE (TYP.)
(SEE DETAIL SHEET 2A)
INSTALL GREEN THERMO
PAVEMENT MARKINGS (TYP.)
(SEE DETAIL SHEET 2A)
(OPTIONAL ACROSS DRIVEWAYS)
INSTALL 2' STOP LINE (10')
(SEE DETAIL SHEET 2A)
INSTALL 2' STOP LINE (14')
(SEE DETAIL SHEET 2A)
INSTALL ARROW PAVEMENT
MARKINGS (TYP.)
(SEE DETAIL SHEET 2A)
4" DWL (38')
6" SSWL (72')
4" SSWL (71')
6" DWL (38')
4" DWL (36')
6" DWL (37')
6" DWL (54')
4" DSYL (128')
4" SSWL (25')
6" SSWL (25')
4" DWL (68')
6" DWL (69')
4" SSWL (18')
6" SSWL (18')
4" DWL (38')
6" DWL (125')
4" SSWL (41')
4" DWL (46')
4" SSWL (20')
6" SSWL (20')
4" DWL (99')
6" DWL (128')
INSTALL BIKE YIELD LINE (TYP.)
(SEE DETAIL SHEET 2A)
6" DWL (97')
4" DDYL (98')
6" DWL (97')
4" DDYL (8')INSTALL 2' STOP LINE (28')
(SEE DETAIL SHEET 2A)
4" SSWL (102')
6" SSWL (100')
4" SSWL (50')
6" DWL (46')
6" DWL (46')
4" SSWL (693')
6" SSWL (694')
4" DWL (68')
4" DSYL (746')
6" SSWL (125')
4" SSWL (124')
6" SSWL (125')
4" SSWL (124')
6" DWL (67')
6" DWL (22')
4" DWL (22')
6" SSWL (49')
4" SSWL (49')
6" DWL (22')
4" DWL (22')
6" SSWL (78')
4" SSWL (77')
4" DSYL (312')
4" DSYL (47')
4" DSYL (45')
4" SSWL (50')
6" SSWL (84')
4" DWL (104')
6" SSWL (113')
4" SSWL (85')
6" DWL (38')
4" DWL (38')
6" SSWL (526')
4" SSWL (526')
4" DSYL (754')
4" DWL (104')
PE
D
XIN
G
PE
D
XIN
G
IN
TE
RS
TA
TE
65
G
A
R
F
I
E
L
D
S
T
.
D
E
L
T
A
A
V
E
.
GARFIELD ST.
SEE BUCHANAN PEDESTRIAN
CROSSING PLANS FOR
DETAILS AT THIS LOCATION
5' BIKE LANE
2' BUFFER
11' TRAVEL LANE
5' BIKE LANE
2' BUFFER
11' TRAVEL LANE
12' CHANNELIZATION
2' BUFFER
11' TRAVEL LANE
12' TRAVEL LANE
5' BIKE LANE
5' BIKE LANE
2' BUFFER
11' TRAVEL LANE
INSTALL BIKE LANE
PAVEMENT MARKINGS (TYP.)
(SEE DETAIL SHEET 2A)
INSTALL ARROW PAVEMENT
MARKINGS (TYP.)
(SEE DETAIL SHEET 2A)
INSTALL BIKE YIELD LINE (TYP.)
(SEE DETAIL SHEET 2A)
INSTALL GREEN THERMO
PAVEMENT MARKINGS (TYP.)
(SEE DETAIL SHEET 2A)
(OPTIONAL ACROSS DRIVEWAYS)
INSTALL 10' LONGITUDINAL
CROSSWALK BETWEEN
PEDESTRIAN RAMPS (65')
(SEE DETAIL SHEET 2A)
INSTALL 10' LONGITUDINAL
CROSSWALK BETWEEN
PEDESTRIAN RAMPS (38')
(SEE DETAIL SHEET 2A)
INSTALL 10' LONGITUDINAL
CROSSWALK BETWEEN
PEDESTRIAN RAMPS (64')
(SEE DETAIL SHEET 2A)
INSTALL 10' LONGITUDINAL
CROSSWALK BETWEEN
PEDESTRIAN RAMPS (48')
(SEE DETAIL SHEET 2A)
6" SSWL (694')
4" SSWL (693')
4" DWL (68')
4" DSYL (746')
6" SSWL (526')
4" SSWL (526')
4" DSYL (754')6" DWL (18')
4" DWL (18')
6" SSWL (237')
4" SSWL (237')
4" DSYL (65')
4" SSWL (66')
4" SSWL (20')
6" SSWL (23')
4" SSWL (23')
6" SSWL (22')
6" DWL (81')
6" DWL (77')
4" SSYL (124')
6" DWL (66')
6" DWL (62')
6
"
D
W
L
(
3
4
'
)
6
"
D
W
L
(
3
4
'
)
4
"
S
S
W
L
(
6
0
'
)
4
"
D
S
Y
L
(
5
3
'
)
Proposed Pavement Marking
Plan
PROPOSED
ROADWAY / BIKE
PLAN
M
A
T
C
H
L
I
N
E
S
E
E
T
H
I
S
S
H
E
E
T
MA
TC
H LIN
E S
EE
S
HE
ET
4
15'
GRAPHIC SCALE
0 30' 60' 90'
15'
GRAPHIC SCALE
0 30' 60' 90'
MA
TC
H LIN
E S
EE
T
HIS
S
HE
ET
M
A
T
C
H
L
I
N
E
S
E
E
S
H
E
E
T
6
NOT FOR CONSTRUCTION
1
0
T
H
A
V
E
. N
.
9
T
H
A
V
E
. N
.
D
E
L
T
A
A
V
E
.
BIK
E L
AN
E
B
IK
E
L
A
N
E
BIK
E L
AN
E
BUCHANAN ST.
S
T
O
P
S
T
O
P
BU
S
ST
OP
BU
S
ST
OP
ZO
NE
EN
D
SC
HO
OL
R
IG
H
T
L
A
N
E
M
U
S
T
T
U
R
N
R
IG
H
T
R
I
G
H
T
L
A
N
E
M
U
S
TT
U
R
N
R
I
G
H
T
B
B
Y
IE
L
D
T
O
B
IK
E
S
B
E
G
I
N
R
IG
H
T
T
U
R
N
L
A
N
E
N
O
T
IC
E
PE
D
XIN
G
PE
D
XIN
G
IN
TE
RS
TA
TE
65
G
A
R
F
I
E
L
D
S
T
.
D
E
L
T
A
A
V
E
.
B
IK
E
LA
N
E
GARFIELD ST.
RIG
HT
L
AN
E
MU
ST
TU
RN
R
IG
HT
MP
H
20
500 F
T
SP
EE
D
LIM
IT
15
WH
EN
CH
IL
DR
EN
A
RE
P
RE
SE
NT
D
E
A
D
E
N
D
2
0
S
T
O
P
S
T
O
P
SEE BUCHANAN PEDESTRIAN
CROSSING PLANS FOR
DETAILS AT THIS LOCATION
O
N
L
Y
SEE BUCHANAN PEDESTRIAN
CROSSING PLANS FOR
DETAILS AT THIS LOCATION
SEE BUCHANAN PEDESTRIAN
CROSSING PLANS FOR
DETAILS AT THIS LOCATION
Proposed Signing Plan
PROPOSED
ROADWAY / BIKE
PLAN
M
A
T
C
H
L
I
N
E
S
E
E
T
H
I
S
S
H
E
E
T
MA
TC
H LIN
E S
EE
T
HIS
S
HE
ET
MA
TC
H LIN
E S
EE
S
HE
ET
4A
15'
GRAPHIC SCALE
0 30' 60' 90'
M
A
T
C
H
L
I
N
E
S
E
E
S
H
E
E
T
6
A
15'
GRAPHIC SCALE
0 30' 60' 90'
PE
D
XIN
G
PE
D
XIN
G
NA
SS
AU
S
T.
RO
SA
L. P
AR
KS
B
LV
D.
GARFIELD ST.
B
B
4' BIKE LANE
4.5' TO 10' BUFFER
10.5' TRAVEL LANE
10' 2-WAY LEFT TURN LANE
2' BUFFER
7.5' ON-STREET PARKING
10' TRAVEL LANE
8' to 0' CHANNELIZATION
2' BUFFER
8' ON-STREET PARKING
10.5' TRAVEL LANE
10' TWO-WAY LEFT TURN LANE
4.5' BIKE LANE
4.5' BIKE LANE
4' BIKE LANE
2' BUFFER
8' ON-STREET PARKING
10.5' TRAVEL LANE
10' BUFFER
9.5' BUFFER 10' BUFFER
5' BIKE LANE
10' TRAVEL LANE
10' TRAVEL LANE
10' TRAVEL LANE
4.5' BIKE LANE
1.5' BUFFER
10' TRAVEL LANE
4.5' BIKE LANE
1.5' BUFFER
10' TRAVEL LANE
I
N
S
T
A
L
L
B
I
K
E
Y
I
E
L
D
L
I
N
E
(
T
Y
P
.
)
(
S
E
E
D
E
T
A
I
L
S
H
E
E
T
2
A
)
INSTALL BIKE LANE
PAVEMENT MARKINGS (TYP.)
(SEE DETAIL SHEET 2A)
INSTALL 10' LONGITUDINAL
CROSSWALK BETWEEN
PEDESTRIAN RAMPS (64')
(SEE DETAIL SHEET 2A)
8" SSWL (38')
INSTALL 2' STOP LINE (35')
(SEE DETAIL SHEET 2A)
INSTALL ARROW PAVEMENT
MARKINGS (TYP.)
(SEE DETAIL SHEET 2A)
INSTALL YIELD LINE (TYP.)
(SEE DETAIL SHEET 2A)
INSTALL GREEN THERMO
PAVEMENT MARKINGS (TYP.)
(SEE DETAIL SHEET 2A)
(OPTIONAL ACROSS DRIVEWAYS)
I
N
S
T
A
L
L
1
0
'
L
O
N
G
I
T
U
D
I
N
A
L
C
R
O
S
S
W
A
L
K
B
E
T
W
E
E
N
P
E
D
E
S
T
R
I
A
N
R
A
M
P
S
(
6
5
'
)
I
N
S
T
A
L
L
1
0
'
L
O
N
G
I
T
U
D
I
N
A
L
C
R
O
S
S
W
A
L
K
B
E
T
W
E
E
N
P
E
D
E
S
T
R
I
A
N
R
A
M
P
S
(
3
8
'
)
(
S
E
E
D
E
T
A
I
L
S
H
E
E
T
2
A
)
8" SSWL (16')
INSTALL 2' STOP LINE (10')
(SEE DETAIL SHEET 2A)
4
"
S
S
W
L
(
2
3
'
)
6
"
S
S
W
L
(
2
2
'
)
6" DWL (34')
6" DWL (34')
4" SSWL (60')
4" DSYL (53')
6" SSWL (165')
4" SSWL (168')
4" SSYL (129')
4" SBYL (129')
6" SSWL (251')
4" SSWL (229')
4" DSYL (185')
4" SSYL (104')
4" SBYL (90')
4" SSWL (241')
6" SSWL (263')
4" SSYL (200')
4" SBYL (200')
6" DWL (16')
6" DWL (42')
4" DWL (44')
6" DWL (49')
6" DWL (48')
4" SBYL (200')
6" SSWL (200')
4" SSWL (174')
4" SSYL (200')
6" DWL (16')
4" SSWL (154')
6"SSWL (179')
4" DSYL (134')
4" SSWL (89')
6"SSWL (97')
4" SSWL (160')
6" SSWL (160')
4" DSYL (330')
4" SSWL (144')
6" SSWL (144')
6" DWL (74')
6" DWL (74')
6" DWL (74')
6" DWL (74')
6" SSWL (45')
INTERSECTION BULB-OUT AREAS
TO BE COORDINATED WITH MPW
SEE BUCHANAN PEDESTRIAN
CROSSING PLANS FOR
DETAILS AT THIS LOCATION
GARFIELD ST.
7T
H A
VE
. N
.
6T
H A
VE
. N
.
4.5' BIKE LANE
1.5' BUFFER
10' TRAVEL LANE
4.5' BIKE LANE
1.5' BUFFER
10' TRAVEL LANE
5' BIKE LANE
10' TRAVEL LANE
7' ON-STREET PARKING
10' TRAVEL LANE
4' BIKE LANE
2' BUFFER
10' TRAVEL LANE
4' BIKE LANE
2' BUFFER
10' TRAVEL LANE
INSTALL BIKE LANE
PAVEMENT MARKINGS (TYP.)
(SEE DETAIL SHEET 2A)
INSTALL SHARROW
PAVEMENT MARKINGS (TYP.)
(SEE DETAIL SHEET 2A)
INSTALL 2' STOP LINE (10')
(SEE DETAIL SHEET 2A)
INSTALL 2' STOP LINE (10')
(SEE DETAIL SHEET 2A)
4" DWL (32')
6" SSWL (144')
4" SSWL (144')
6" DWL (32')
4" SSWL (144')
6" SSWL (144')
4" DSYL (330')
4" DWL (30')
6" SSWL (160')
4" SSWL (160')
6" DWL (30')
4" SSWL (147')
6" SSWL (147')
7' X 30' CHANNELIZATION
7' X 30' CHANNELIZATION
4" SSWL (69')
4" DSYL (356')
4" SSWL (161')
4" SSWL (7')
4" SSWL (7')
4" DWL (30')
4" SSWL (165')
4" SSWL (7')
4" SSWL (7')
4" DWL (26') 4" SSWL (65') 4" DWL (30')
4" SSWL (166') 4" DSYL (375')
6" SSWL (196')
4" SSWL (180')
6" SSWL (196')
4" SSWL (180')
Proposed Pavement Marking
Plan
PROPOSED
ROADWAY / BIKE
PLAN
M
A
T
C
H
L
I
N
E
S
E
E
S
H
E
E
T
5
15'
GRAPHIC SCALE
0 30' 60' 90'
MA
TC
H LIN
E S
EE
T
HIS
S
HE
ET
MA
TC
H LIN
E S
EE
S
HE
ET
7
15'
GRAPHIC SCALE
0 30' 60' 90'
MA
TC
H LIN
E S
EE
T
HIS
S
HE
ET
NOT FOR CONSTRUCTION
PE
D
XIN
G
PE
D
XIN
G
NA
SS
AU
S
T.
RO
SA
L. P
AR
KS
B
LV
D.
B
IK
E
L
A
N
E
BIK
E L
AN
E
BIK
E L
AN
E
BIK
E L
AN
E
GARFIELD ST.
M
P
H
20
SP
EE
D
LIM
IT
15
WH
EN
CH
IL
DR
EN
A
RE
P
RE
SE
NT
SP
EE
D
LIM
IT
15
WH
EN
CH
IL
DR
EN
A
RE
P
RE
SE
NT
SP
EE
D
LIM
IT
30
P
P
ZO
NE
EN
D
SC
HO
OL
P
TO
C
OR
NE
R
STOP
B
B
MAY USE
FULL LANE
NOTICE
MAY USE
FULL LANE
NOTICE
ST
OP
HE
RE
O
N
RE
D
EX
CE
PT
BIC
YC
LE
S
N
O
T
U
R
N
O
N
R
E
D
YIE
LD
T
O B
IK
ES
BE
GIN
RIG
HT
T
UR
N LA
NE
NO
TIC
E
ST
OP
HE
RE
O
N
RE
D
EX
CE
PT
BIC
YC
LE
S
N
O
T
U
R
N
O
N
R
E
D
SEE BUCHANAN PEDESTRIAN
CROSSING PLANS FOR
DETAILS AT THIS LOCATION
S
E
E
B
U
C
H
A
N
A
N
P
E
D
E
S
T
R
I
A
N
C
R
O
S
S
I
N
G
P
L
A
N
S
F
O
R
D
E
T
A
I
L
S
A
T
T
H
I
S
L
O
C
A
T
I
O
N
SEE BUCHANAN PEDESTRIAN
CROSSING PLANS FOR
DETAILS AT THIS LOCATION
GARFIELD ST.
7T
H A
VE
. N
.
6T
H A
VE
. N
.
BIK
E LA
NE
BIK
E LA
NE
SP
EE
D
LIM
IT
30
P
HE
RE
T
O
CO
RN
ER
P
HE
RE
T
O
CO
RN
ER
P
HE
RE
T
O
CO
RN
ER
P
HE
RE
T
O
CO
RN
ER
STOP
STOP P
HE
RE
T
O
CO
RN
ER
CL
AIM
C
AR
12
01
FR
EIG
HT
LIN
ER
D
R.
PH
8
62
-7
80
0
P
HE
RE
T
O
CO
RN
ER
STOP
STOP
P
HERE TO
CORNER
P
HE
RE
T
O
CO
RN
ER
P
HE
RE
T
O
CO
RN
ER
BE
GIN
S
BIK
E LA
NE
EN
DS
MA
Y U
SE
FU
LL
L
AN
E
NO
TIC
E
Proposed Signing Plan
PROPOSED
ROADWAY / BIKE
PLAN
MA
TC
H LIN
E S
EE
T
HIS
S
HE
ET
M
A
T
C
H
L
I
N
E
S
E
E
S
H
E
E
T
5
A
MA
TC
H LIN
E S
EE
T
HIS
S
HE
ET
MA
TC
H LIN
E S
EE
S
HE
ET
7A
15'
GRAPHIC SCALE
0 30' 60' 90'
15'
GRAPHIC SCALE
0 30' 60' 90'
5T
H A
VE
. N
.
4T
H A
VE
. N
.
GARFIELD ST.
4' BIKE LANE
2' BUFFER
10' TRAVEL LANE
4' BIKE LANE
2' BUFFER
10' TRAVEL LANE
4' BIKE LANE
2' BUFFER
10' TRAVEL LANE
10' TRAVEL LANE
INSTALL BIKE LANE
PAVEMENT MARKINGS (TYP.)
(SEE DETAIL SHEET 2A)
INSTALL SHARROW
PAVEMENT MARKINGS (TYP.)
(SEE DETAIL SHEET 2A)
INSTALL 2' STOP LINE (16')
(SEE DETAIL SHEET 2A)
INSTALL 2' STOP LINE (10')
(SEE DETAIL SHEET 2A)
4" DSYL (375')
6" SSWL (177')
4" SSWL (177')
6" DWL (21')
4" DWL (21')
6" SSWL (196')
4" SSWL (180')
6" SSWL (177')
4" SSWL (177')
6" DWL (21')
4" DWL (21')
6" SSWL (196')
4" SSWL (180')
6" SSWL (163')
4" SSWL (163')
4" DSYL (360')
6" DWL (28')
4" DWL (28')
6" SSWL (170')
4" SSWL (170')
INSTALL 2' STOP LINE (10')
(SEE DETAIL SHEET 2A)
INSTALL 2' STOP LINE (16')
(SEE DETAIL SHEET 2A)
6" SSWL (166')
4" SSWL (166')
4" DSYL (351')
3R
D A
VE
. N
.
GARFIELD ST.
4' BIKE LANE
2' BUFFER
10' TRAVEL LANE
10' TRAVEL LANE
INSTALL BIKE LANE
PAVEMENT MARKINGS (TYP.)
(SEE DETAIL SHEET 2A)
INSTALL SHARROW
PAVEMENT MARKINGS (TYP.)
(SEE DETAIL SHEET 2A)
INSTALL 2' STOP LINE (13')
(SEE DETAIL SHEET 2A)
4" DSYL (351')
6" SSWL (40')
4" SSWL (40')
6" SSWL (147')
4" SSWL (147')
Proposed Pavement Marking
Plan
PROPOSED
ROADWAY / BIKE
PLAN
MA
TC
H LIN
E S
EE
T
HIS
S
HE
ET
MA
TC
H LIN
E S
EE
T
HIS
S
HE
ET
15'
GRAPHIC SCALE
0 30' 60' 90'
15'
GRAPHIC SCALE
0 30' 60' 90'
MA
TC
H LIN
E S
EE
S
HE
ET
6
NOT FOR CONSTRUCTION
5T
H A
VE
. N
.
4T
H A
VE
. N
.
BIK
E LA
NE
BIK
E LA
NE
BIK
E LA
NE
EN
DS
GARFIELD ST.
P
HE
RE
T
O
CO
RN
ER
CL
AIM
C
AR
12
01
FR
EIG
HT
LIN
ER
D
R.
PH
8
62
-7
80
0
P
OR
S
TA
ND
IN
G
AN
YT
IM
E
CL
AIM
C
AR
12
01
FR
EIG
HT
LIN
ER
D
R.
PH
8
62
-7
80
0
P
OR
S
TA
ND
IN
G
AN
YT
IM
E
CL
AIM
C
AR
12
01
FR
EIG
HT
LIN
ER
D
R.
PH
8
62
-7
80
0
P
OR
S
TA
ND
IN
G
AN
YT
IM
E
CL
AIM
C
AR
12
01
FR
EIG
HT
LIN
ER
D
R.
PH
8
62
-7
80
0
P
OR
S
TA
ND
IN
G
AN
YT
IM
E
CL
AIM
C
AR
12
01
FR
EIG
HT
LIN
ER
D
R.
PH
8
62
-7
80
0
P
HE
RE
T
O
CO
RN
ER
CL
AIM
C
AR
12
01
FR
EIG
HT
LIN
ER
D
R.
PH
8
62
-7
80
0
P
OR
S
TA
ND
IN
G
AN
YT
IM
E
CL
AIM
C
AR
12
01
FR
EIG
HT
LIN
ER
D
R.
PH
8
62
-7
80
0
P
OR
S
TA
ND
IN
G
AN
YT
IM
E
CLA
IM
C
AR
1201F
RE
IG
HT
LIN
ER
D
R.
PH
862-7800
STOP
ALL WAY
ST
OP
ALL W
AY
STOP
ALL WAY
ST
OP
ALL W
AY
STOP
ALL WAY
ST
OP
ALL W
AY
STOP
ALL WAY
ST
OP
ALL W
AY
MA
Y U
SE
FU
LL LA
NE
NO
TIC
E
MA
Y U
SE
FU
LL LA
NE
NO
TIC
E
3R
D A
VE
. N
.
BIK
E LA
NE
GARFIELD ST.
P
OR
S
TA
ND
IN
G
AN
YT
IM
E
CLA
IM
C
AR
1201F
RE
IG
HT
LIN
ER
D
R.
PH
862-7800
P
OR
S
TA
ND
IN
G
AN
YT
IM
E
CLA
IM
C
AR
1201F
RE
IG
HT
LIN
ER
D
R.
PH
862-7800
P
OR
S
TA
ND
IN
G
AN
YT
IM
E
CLA
IM
C
AR
1201F
RE
IG
HT
LIN
ER
D
R.
PH
862-7800
P
OR
S
TA
ND
IN
G
AN
YT
IM
E
CLA
IM
C
AR
1201F
RE
IG
HT
LIN
ER
D
R.
PH
862-7800
Proposed Signing Plan
PROPOSED
ROADWAY / BIKE
PLAN
MA
TC
H LIN
E S
EE
T
HIS
S
HE
ET
MA
TC
H LIN
E S
EE
T
HIS
S
HE
ET
15'
GRAPHIC SCALE
0 30' 60' 90'
15'
GRAPHIC SCALE
0 30' 60' 90'
MA
TC
H LIN
E S
EE
S
HE
ET
6A