Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

24
Route 47 Missouri River Bridge Bridgescape, LLC

Transcript of Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

Page 1: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

Route 47 Missouri River Bridge

Bridgescape, LLC

Page 2: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

Bridge Typical Section

Page 3: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

• Distinctive appearance so that bridge remains a symbol

• Stay within budget: “German Simple”

• Recognize views to bridge from downtown/riverfront

• Maintain views to downtown from the bridge

• Keep design subtle; historic feel with minimal detailing

• Light pedestrian/ bicycle trail but not entire roadway;

• Lighting should enhance structure, not draw attention to itself.

Committee Design Goals (4/18/2013)

Page 4: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

Previous Committee Selections:

• Variable Depth Girders ** ** MoDOT Funded

• Pier Shape – Gothic Pier **

• One (1) Overlook Located at Pier 7 **

• Railing – 27” Concrete Wall with Vertical Railing Element

• Girder Lighting – Girder Wash Fade

• Pier Lighting

• Overhead Pier Element – Curved Truss w/ Sun Shade

• Low Level Trail Lighting

Page 5: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

Previous Committee Prioritization:

Enhancement Priority

Decorative Railing 1

Girder Lighting 2

Pier Lighting 3

Overhead Element 4

Trail Lighting 5

Page 6: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

View from Washington Riverfront Park

Page 7: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

View from Washington Riverfront Park

Page 8: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

Aerial View of Overlook

Page 9: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

Aerial View of Overlook

Page 10: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

View from Pedestrian/ Bicycle Trail

Page 11: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

View from Pedestrian/ Bicycle Trail

Page 12: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

View from Northbound Traffic Lane

Page 13: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

View From Northbound Traffic Lane

Page 14: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

View from South Approach of Existing Bridge

Page 15: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

View from South Approach of Existing Bridge

Page 16: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

View from South Approach of Existing Bridge (w/ East Face Girder Lighting )

Page 17: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

View from Trail Below Bridge

Page 18: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

View from Trail Below Bridge

Page 19: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

Preferred Enhancement Package Decorative Rail + Girder Lighting + Pier Lighting + Overhead Element + Trail Lighting

Prioritization Enhancement Estimated Cost (4) Estimated Cost (4A)

1 Decorative Railing (Addition to MoDOT Credit) $120,000 $120,000

2 Girder Lighting – Fade (west face only) $587,000

Girder Lighting – Fade(east and west face) $1,133,000

3 Pier Lighting $172,000 $172,000

4 Overhead Element (w/ lighting) $225,000 $225,0005 Trail Lighting (full length) $137,000 $137,000

SUBTOTAL $1,241,000 $1,787,0003% Inflation for 3 years (9.27%) $115,000 $166,000

TOTAL $1,355,000 $1,953,000

Page 20: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

Preferred Enhancement Package $1,355,000Decorative Rail + Girder Lighting + Pier Lighting + Overhead Element + Trail Lighting (west face only)

Page 21: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

Preferred Enhancement Package $1,355,000Decorative Rail + Girder Lighting + Pier Lighting (west face only)+ Overhead Element + Trail Lighting

Page 22: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

Preferred Enhancement Package $1,953,000Decorative Rail + Girder Lighting + Pier Lighting + Overhead Element + Trail Lighting (east & west face)

Page 23: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

Project Schedule

• Final Enhancement Commitment August 16, 2013

• Public Hearing (Right-of-Way) October 2013

• Final Enhancement Funds Secured August 2014

• Open Construction Bids September 2016

• New Bridge Open to Traffic Fall 2018

• Project Complete Summer 2019

Page 24: Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.

Thank You for your Participation