![Page 1: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/1.jpg)
Route 220 Safety Improvement Project State Project Number: 0220-011-786, 0220-011-788, 0220-011-789
UPCs: 105543, 105544, 105545
Federal Number: NH-5128(326)
March 12, 2015
Salem District
![Page 2: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/2.jpg)
Route 220 Safety Improvement Project
![Page 3: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/3.jpg)
1. Corridor
2. Previously Considered Improvements
3. Existing Conditions
4. Upgraded Two-lane Roadway
5. Project Schedule and Funding
Introduction
![Page 4: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/4.jpg)
Corridor
A. Commercial Corridor
B. Intermodal Connectivity
C. National Highway System (NHS)
D. Statewide Significance
![Page 5: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/5.jpg)
Corridor
A. Commercial Corridor
B. Intermodal Connectivity
C. National Highway System (NHS)
D. Statewide Significance Connections with
other States
![Page 6: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/6.jpg)
1964 - Study examined potential to widen Route 220 between Clifton Forge
and Roanoke.
1990’s - Study examined a section of Route 220 from Roanoke to Clifton
Forge as part of the TransAmerica Corridor to provide 4 lanes.
Funding not acquired as part of this effort.
Early 2000’s - Preliminary plans developed for three projects to 4-lane
approximately 7.2 miles. Portion of right of way acquired.
Insufficient funds to finalize design and acquire all right of way.
2012 thru 2013 - Highway Safety Improvement Projects extended shoulders where
possible, upgraded and installed guardrail, upgraded signs, added
rumble strips, and enhanced markings in roadway.
2015 - Final plans being developed as a Safety Improvement Project
replacing two narrow bridges north of Route 43 Intersection.
2015 - Begin development of preliminary plans as a safety improvement
project to upgrade the two-lane roadway from Route 43 Intersection
to Route 727 Intersection. Proposed as three (3) projects in the Six
Year Plan. Phase 1 is fully funded.
Previously Considered Improvements
6
![Page 7: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/7.jpg)
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
![Page 8: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/8.jpg)
Alignment – Horizontal Curves
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
![Page 9: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/9.jpg)
Alignment – Horizontal Curves
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
![Page 10: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/10.jpg)
Alignment – Horizontal Curves
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
![Page 11: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/11.jpg)
Alignment – Horizontal Curves
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
![Page 12: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/12.jpg)
Alignment – Horizontal Curves
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
Sight Distance around Curves
![Page 13: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/13.jpg)
Alignment – Vertical Curves
Sight Distance
Over Hills
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
![Page 14: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/14.jpg)
Alignment – Vertical Curves
Sight Distance
Over Hills
Stopping Sight
Distance
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
![Page 15: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/15.jpg)
Alignment – Vertical Curves
Sight Distance
Over Hills
Stopping Sight
Distance
Stopping Sight
Distance
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
![Page 16: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/16.jpg)
Curve Banking
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
![Page 17: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/17.jpg)
Curve Banking
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
![Page 18: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/18.jpg)
Narrow Lanes and Narrow Shoulders
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
![Page 19: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/19.jpg)
Narrow Lanes and Narrow Shoulders
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
![Page 20: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/20.jpg)
Narrow Lanes and Narrow Shoulders
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
![Page 21: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/21.jpg)
Narrow Bridges and Structures
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
![Page 22: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/22.jpg)
Narrow Bridges and Structures
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
![Page 23: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/23.jpg)
Limited Passing Opportunities
Direction
Passing
Zones
Length
(miles)
Northbound 4 1.3
Southbound 5 0.9
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
![Page 24: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/24.jpg)
Intersections
Street Name Route RT Turn LT Turn
Narrow Passage Road Route 43 Yes No
Gala Loop Road Route 694 Yes No
Gala Loop Road Route 622 (S) Yes No
Prices Bluff Road Route 622 (N) No No
Chatham Road Route 722 (S) No No
Chatham Road Route 722 (N) No No
Locust Bottom Route 696 (S) No No
Buhrman Road Route 696 (N) No No
McKinney Hollow Route 633 No No
Glen Wilton Road Route 633 No No
Simmons Lane Route 700 No No
Fork Farm Road Route 727 No No
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
![Page 25: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/25.jpg)
Intersections
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
![Page 26: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/26.jpg)
Intersections
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
![Page 27: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/27.jpg)
Intersections
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
![Page 28: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/28.jpg)
Intersections
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
![Page 29: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/29.jpg)
Intersections
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
![Page 30: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/30.jpg)
Crash History
8/1/2010 - 7/31/2014
Total Crashes 72
Fixed Object – Off Road 23
Animal 21
Rear End 14
Angle 4
Non-collision 3
Head-on 3
Sideswipe – Opposite Direction 2
Sideswipe – Same Direction 1
Pedestrian 1
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
![Page 31: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/31.jpg)
Crash History
Existing S-Curve
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
![Page 32: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/32.jpg)
32
Crash History
Existing Horizontal Curve
Existing Conditions
A. Roadway Characteristics
B. Intersections
C. Crash History
![Page 33: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/33.jpg)
Traffic Volumes
Route County 2013 AADT % Trucks Truck Volume 24 Bedford 15000 2% 300
811 Bedford 14000 2% 280
114 Montgomery 10000 1% 100
685 Montgomery 9900 2% 198
122 Franklin 9300 4% 372
40 Franklin 9200 6% 552
311 Roanoke 9100 3% 273
8 Montgomery 8500 4% 340
122 Bedford 7700 5% 385
221 Floyd 7500 3% 225
221 Bedford 7100 5% 355
221 Carroll 6900 3% 207
8 Floyd 6800 3% 204
221 Roanoke 6800 3% 204
611 Pulaski 6700 7% 469
220 Botetourt 5500 7% 385
779 Botetourt 5300 11% 583
8 Patrick 5000 7% 350
100 Pulaski 4000 9% 360 33
![Page 34: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/34.jpg)
Traffic Volumes
34
Route County 2013 AADT % Trucks Truck Volume
779 Botetourt 5300 11% 583
40 Franklin 9200 6% 552
611 Pulaski 6700 7% 469
220 Botetourt 5500 7% 385
122 Bedford 7700 5% 385
Route County 2013 AADT % Trucks Truck Volume
779 Botetourt 5300 11% 583
100 Pulaski 4000 9% 360
611 Pulaski 6700 7% 469
220 Botetourt 5500 7% 385
8 Patrick 5000 7% 350
![Page 35: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/35.jpg)
Where are we?
35
![Page 36: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/36.jpg)
Where are we?
36
Multiple Studies – spread over a half a century
Four-lane Dropped…
Highway Safety Improvements Funded and
Constructed
Highway Safety Improvements Funded
Past Environmental Studies Conducted
2015 Safety Improvements
No Four-lane?
Two-lane upgrade
Environmental
Status
![Page 37: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/37.jpg)
Where are we?
37
Multiple Studies – spread over a half a century
Four-lane Dropped…
Highway Safety Improvements Funded and
Constructed
Highway Safety Improvements Funded
Past Environmental Studies Conducted
2015 Safety Improvements
No Four-lane?
Two-lane upgrade
Environmental
Status
![Page 38: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/38.jpg)
Where are we?
38
Multiple Studies – spread over a half a century
Four-lane Dropped…
Highway Safety Improvements Funded and
Constructed
Highway Safety Improvements Funded
Past Environmental Studies Conducted
2015 Safety Improvements
No Four-lane?
Two-lane upgrade
Environmental
Status
(Focus on Safety Improvements)
![Page 39: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/39.jpg)
Upgraded Two-Lane Roadway
A. Proposed Roadway
Characteristics
B. Intersections
C. Schedule and Funding
![Page 40: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/40.jpg)
Alignment – Horizontal Curves
Upgraded Two-Lane Highway
1) Proposed Roadway Characteristics
2) Intersections
3) Scheduling and Funding
Improve Geometrics
![Page 41: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/41.jpg)
Alignment – Horizontal Curves
Upgraded Two-Lane Highway
1) Proposed Roadway Characteristics
2) Intersections
3) Scheduling and Funding
Improve Geometrics
![Page 42: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/42.jpg)
Alignment – Horizontal Curves
Upgraded Two-Lane Highway
A. Proposed Roadway Characteristics
B. Intersections
C. Scheduling and Funding
“Straighten” Curves
![Page 43: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/43.jpg)
Curve Banking (Super-elevation)
Upgraded Two-Lane Highway
1) Proposed Roadway Characteristics
2) Intersections
3) Scheduling and Funding
![Page 44: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/44.jpg)
44
Wider Lanes and
Wider Shoulders
![Page 45: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/45.jpg)
Additional Passing Opportunities
Upgraded Two-Lane Highway
A. Proposed Roadway Characteristics
B. Intersections
C. Scheduling and Funding
Direction
Existing
Length
(miles)
Added
Length
(miles)
Proposed
Length
(miles)
Northbound 1.3 +1.3 2.6
Southbound 0.9 +1.4 2.3
Direction
Existing
Zones
Proposed
Zones
Northbound 5 8
Southbound 4 8
![Page 46: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/46.jpg)
Upgraded Two-Lane Highway
A. Proposed Roadway Characteristics
B. Intersections
C. Scheduling and Funding
Funding (Six Year Plan) Estimated Cost: $10 Million
Available Funding: $10 Million
Schedule* Design – Underway
Right of Way – Summer 2015
Advertisement – Fall 2016
Bridge (Structure) Replacement Project
![Page 47: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/47.jpg)
Upgraded Two-Lane Highway
A. Proposed Roadway Characteristics
B. Intersections
C. Scheduling and Funding
Funding (Six Year Plan) Estimated Cost: $10 Million
Available Funding: $10 Million
Schedule* Design – Underway
Right of Way – Summer 2015
Advertisement – Fall 2016
Bridge (Structure) Replacement Project
![Page 48: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/48.jpg)
Upgraded Two-Lane Highway
A. Proposed Roadway Characteristics
B. Intersections
C. Scheduling and Funding
Funding (Six Year Plan) Estimated Cost: $10 Million
Available Funding: $10 Million
Schedule* Design – Underway
Right of Way – Summer 2015
Advertisement – Fall 2016
Bridge (Structure) Replacement Project
![Page 49: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/49.jpg)
Intersections
Upgraded Two-Lane Highway
A. Proposed Roadway Characteristics
B. Intersections
C. Scheduling and Funding
Street Name Route RT Turn LT Turn
Narrow Passage Road Route 43 Yes Yes
Gala Loop Road Route 694 Yes Yes
Gala Loop Road Route 622 (S) Yes Yes
Prices Bluff Road Route 622 (N) Yes Yes
Chatham Road Route 722 (S) Yes Yes
Chatham Road Route 722 (N) Yes Yes
Locust Bottom/
Buhrman Road Route 696 Yes Yes
McKinney Hollow/
Glen Wilton Road Route 633 Yes Yes
Simmons Lane Route 700 Yes Yes
Fork Farm Road Route 727 Yes No
Add Left and Right Turn
Tapers/Lanes
![Page 50: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/50.jpg)
Intersections
Upgraded Two-Lane Highway
A. Proposed Roadway Characteristics
B. Intersections
C. Scheduling and Funding
Street Name Route RT Turn LT Turn
Narrow Passage Road Route 43 Yes Yes
Gala Loop Road Route 694 Yes Yes
Gala Loop Road Route 622 (S) Yes Yes
Prices Bluff Road Route 622 (N) Yes Yes
Chatham Road Route 722 (S) Yes Yes
Chatham Road Route 722 (N) Yes Yes
Locust Bottom/
Buhrman Road Route 696 Yes Yes
McKinney Hollow/
Glen Wilton Road Route 633 Yes Yes
Simmons Lane Route 700 Yes Yes
Fork Farm Road Route 727 Yes No
Add Left and Right Turn
Tapers/Lanes
![Page 51: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/51.jpg)
Add Left and Right Turn Lanes
Upgraded Two-Lane Highway
A. Proposed Roadway Characteristics
B. Intersections
C. Scheduling and Funding
![Page 52: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/52.jpg)
Add Left and Right Turn Lanes
Upgraded Two-Lane Highway
A. Proposed Roadway Characteristics
B. Intersections
C. Scheduling and Funding
![Page 53: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/53.jpg)
Re-aligning
Intersections
Upgraded Two-Lane Highway
A. Proposed Roadway Characteristics
B. Intersections
C. Scheduling and Funding
![Page 54: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/54.jpg)
Re-aligning
Intersections
Upgraded Two-Lane Highway
A. Proposed Roadway Characteristics
B. Intersections
C. Scheduling and Funding
![Page 55: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/55.jpg)
Project Summary
Length: 10 miles
Estimated Cost: $150 Million
SYP Funding: $78 Million
Project Schedule and Funding
A. Project Schedule
Phase 1 – Advertise Summer 2019
Phase 2 – Advertise Fall 2021
Phase 3 – Advertise Fall 2022
B. Funding
Phase 1 – Fully Funded
Phase 2 – Partially Funded
Phase 3 – Partially Funded
Upgraded Two-Lane Highway
A. Proposed Roadway Characteristics
B. Intersections
C. Scheduling and Funding
![Page 56: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/56.jpg)
56
Phase 1
Funding (Six Year Plan) Design (PE) - Funded
Right of Way (RW) - Funded
Construction (CN) - Funded
Estimated Cost: $65 Million
Available Funding: $65 Million
*Schedule dependent on funding
Schedule* Design – Spring 2015
Right of Way – Summer 2017
Advertisement – Summer 2019
![Page 57: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/57.jpg)
Funding (Six Year Plan) Design (PE) - Funded
Right of Way (RW) - Funded
Construction (CN) - No Funds
Estimated Cost: $40 Million
Available Funding: $8 Million
57
Phase 2
Schedule* Design – Fall 2015
Right of Way – Summer 2018
Advertisement – Fall 2021
*Schedule dependent on funding
![Page 58: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/58.jpg)
58
Phase 3
Funding (Six Year Plan) Design (PE) - Funded
Right of Way (RW) - No Funds
Construction (CN) - No Funds
Estimated Cost: $45 Million
Available Funding: $5 Million
*Schedule dependent on funding
Schedule* Design – Fall 2016
Right of Way – Summer 2019
Advertisement – Fall 2022
![Page 59: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/59.jpg)
59
Project Summary Approximately 10 miles
Estimated Cost: $150 Million
Funding: $78 Million
Build on previous work
Improved Alignment
Wider Lanes
Wider Shoulders
Improved Intersections
Realignment
Turn Lane
![Page 60: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/60.jpg)
Summary
60
![Page 61: Route 220 Safety Improvement Project · 2015. 3. 12. · 2015 - Final plans being developed as a Safety Improvement Project replacing two narrow bridges north of Route 43 Intersection.](https://reader035.fdocuments.in/reader035/viewer/2022063013/5fcc2232406c0e75a96e7547/html5/thumbnails/61.jpg)
Summary
61