Rough-Cut Capacity Planning in SCM Theories & Concepts

55
Rough-Cut Capacity Planning Rough-Cut Capacity Planning in SCM in SCM EIN 5346 Logistics Engineering EIN 5346 Logistics Engineering (MSEM, Professional) (MSEM, Professional) Fall, 2013 Fall, 2013

description

Rough-Cut Capacity Planning in SCM EIN 5346 Logistics Engineering (MSEM, Professional) Fall, 2013. Rough-Cut Capacity Planning in SCM Theories & Concepts. Material programs Supplier selection Cooperation. Plant location Production systems - Subcontractors. - PowerPoint PPT Presentation

Transcript of Rough-Cut Capacity Planning in SCM Theories & Concepts

Page 1: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Rough-Cut Capacity Planning Rough-Cut Capacity Planning in SCMin SCM

EIN 5346 Logistics Engineering EIN 5346 Logistics Engineering

(MSEM, Professional)(MSEM, Professional)Fall, 2013 Fall, 2013

Page 2: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Rough-Cut Capacity Planning Rough-Cut Capacity Planning in SCMin SCM

Theories & ConceptsTheories & Concepts

Page 3: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Hierarchical Planning Framework Hierarchical Planning Framework (review)(review)

Long term-Material programs- Supplier selection- Cooperation

- Plant location- Production systems- Subcontractors

- Physical distribution structure- Transportation strategy

- Product program- Strategic sales planning

-- Personnel training-- Contracts-- Material Requirements Planning

-- Master production Scheduling-- Capacity planning -- Distribution planning -- Mid-term sales planning

Mid term

-- Personnel scheduling-- Material ordering

-- lot-sizing- operations scheduling- shop floor control

- Warehouse replenishment- Transportation planning -- Mid-term sales planning

Short term

EXECUTION

Information FeedbackFlow of goods

Page 4: Rough-Cut Capacity Planning  in SCM Theories & Concepts

The APICS-Standard Planning The APICS-Standard Planning Framework (review)Framework (review)

Page 5: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Production Process (review)Production Process (review)

Requirements for Production Planning:• to meet the demand• to consider the resource capacities and the

material availabilities• to improve utilisation of the resources• to lower the setup time• to minimize the stock, and• to minimize the work in process (WIP)• to improve stability of the plan

Page 6: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Rough-cut Capacity PlanningRough-cut Capacity PlanningThe main goal in rough-cut capacity planning is to identify where overloading or under-loading of production capacity occurs and revise the MPS as required.

•Overloading means that too much production of products has been planned in the facility and insufficient capacity exists to produce planned quantities of products required in MPS.

•Under-loading means that not enough production of products has been planned to fully load the facility.

Page 7: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Rough-Cut Capacity Planning in Rough-Cut Capacity Planning in APO-SNPAPO-SNP

Page 8: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Order Life Cycle for Make-to-StockOrder Life Cycle for Make-to-Stock

Page 9: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Order Life Cycle for Make-to-OrderOrder Life Cycle for Make-to-Order

Page 10: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Forecast Consumption Mode and Forecast Consumption Mode and HorizonHorizon

(Backword consumption of 4 days and a forward consumption of 3 days)

Page 11: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Transactional Data for Transactional Data for TransferringTransferring• Starting from a demand plan, SNP checks the resource

capacities and delivers a medium/long-term plan for the estimated sales volumes.

• The plan includes the quantities to be transported between locations (e.g., DC-customer, or plant-DC) and the quantities to be produced (and procured), taking available capacity into consideration.

• SNP creates planned orders, purchase requisitions, and stock transfers that can be transferred directly to the connected OLTP systems.

Page 12: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Capacity LevellingCapacity LevellingCapacity leveling supports the following resource categories:

• Production resources• Transportation resources

Capacity levelling supports the following resource types:• Bucket resources• Single-mixed resources• Multi-mixed resources• Transportation resources

Page 13: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Capacity LevellingCapacity Levelling

The planner can use the following methods to adjust the plan:•Backward scheduling of the capacity load to fulfill demand using high priorities without due date violations. This rescheduling does not create any orders in the production horizon.•Forward scheduling of the capacity load for lower priority demand and use of demand priorities to minimize due date violations •A combination of backward and forward scheduling of the capacity load.

Page 14: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Capacity Levelling ProfileCapacity Levelling ProfileThe main settings in the capacity leveling profile are scheduling direction, prioritization, and method.

•Scheduling Direction controls whether Forward, Backward or Combined scheduling is used. •Prioritization for the heuristic run defines how leveling determines the sequence of orders. The two possible choices for prioritization (to be sorted by ascending or descending order) are

• by order size or • by product priority.

•The three Method choices are • Heuristic, • Optimizer or • Badi (Business Aided-in).

Page 15: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Time-based Capacity Time-based Capacity LevellingLevelling

Page 16: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Capacity LevellingCapacity Levelling

Page 17: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Heuristics-based Capacity LevellingHeuristics-based Capacity Levelling

• Heuristic-based capacity leveling compares, period by period, the capacity load on a resource with the requested load, either from the beginning or from the end of the planning horizon – depending on which scheduling direction is selected (forward or backward scheduling).

• If the resource is found overloaded, the system first selects all the activities or orders that cause the overload in this period. It then sorts these orders according to the priority that is defined and shifts orders or partial orders, one by one into subsequent or previous periods until the required maximum resource utilization is reached.

Page 18: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Heuristics-based Capacity LevellingHeuristics-based Capacity Levelling

• For forward scheduling, the system moves the orders so far that the first activity using the resource to be leveled only begins after the overloaded period.

• For backward scheduling, the system moves the orders so far that the last activity using the resource to be leveled actually ends before the overloaded period.

• The system takes the lot sizes and rounding values defined in the master data into account when moving the orders.

Page 19: Rough-Cut Capacity Planning  in SCM Theories & Concepts

SNP Heuristic as Location, Network, SNP Heuristic as Location, Network, and Multi-Level Heuristicand Multi-Level Heuristic

Page 20: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Scheduling in SNP HeuristicScheduling in SNP Heuristic

Page 21: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Period FactorPeriod Factor

Page 22: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Production Scheduling for Production Scheduling for Multiple BOM LevelsMultiple BOM Levels

Page 23: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Scheduling in CTMScheduling in CTM

Page 24: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Heuristics-based Capacity LevellingHeuristics-based Capacity Levelling

• Only orders that cause overloads are changed.

• This proves advantageous when a lot of orders exist but only some of them overload the resource.

• Prioritization is done by product or by product quantity.

• Select “Capacity Leveling” from the menu to balance the required work loads.

Page 25: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Benefits of SNP with SCMBenefits of SNP with SCMThe benefits of Supply Network Planning with SAP SCM are as follows:1.Cross-plant medium-term rough-cut planning2.Cross-plant optimization of resource utilization

• Simultaneous planning of procurement, production and distribution

• Simultaneous material planning and finite capacity scheduling of production, storage, and transportation resources

3.Planning of critical components and bottleneck resources4.Prioritization of demands and receipts5.Collaborative supply planning over the Internet

Page 26: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Linear Programming (LP) Linear Programming (LP)

Page 27: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Operation Research (OR)Operation Research (OR)Operation research refers to the application of quantitative methods and techniques to business problems in order to best utilize a company’s resources.

OR is used by many leading companies in recent years to optimize their limited resources in order to maximize their profits or minimize their costs.

Linear programming (LP) is one of the most important tools of operation research.

Page 28: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Linear Programming (LP)Linear Programming (LP)

Five common types of LP problems:

•Product mixed•Ingredient mix•Transportation•Production plan•Assignment

Page 29: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Five common types of LP problemsFive common types of LP problems

Page 30: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Five common types of LP problemsFive common types of LP problems

Page 31: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Steps in Formulating LP ProblemsSteps in Formulating LP Problems1. Define the objective2. Define the decision variables3. Write the mathematical function for the objective

(objective function)4. Write a one- or two-word description of each constraints5. Write the right-hand side (RHS) of each constraint,

including the unit of measure.6. Write<=, =, or >= for each equation7. Write all the decision variables on the left-hand side of

each constraints8. Write the coefficient for each decision variable in each

constraint.

Page 32: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Formulating LPFormulating LP

Page 33: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Formulating LPFormulating LP

Page 34: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Formulation LPFormulation LP

Page 35: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Formulation of ProblemFormulation of Problem

Page 36: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Objective and ConstraintsObjective and Constraints

Page 37: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Steps in Graphical Solution Steps in Graphical Solution MethodMethod

Page 38: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Graphical SolutionGraphical Solution

Page 39: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Graphical SolutionGraphical Solution

Page 40: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Graphical SolutionGraphical Solution

Page 41: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Graphical SolutionGraphical Solution

Page 42: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Transportation (Network) ProblemTransportation (Network) Problem

Page 43: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Requirement Assumption Requirement Assumption

Page 44: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Feasible Solutions PropertyFeasible Solutions Property

Page 45: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Cost AssumptionCost Assumption

Page 46: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Parameter Table for Parameter Table for Transportation ProblemTransportation Problem

Supply

S1

S2

.Sm

Page 47: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Transportation Problem ModelTransportation Problem Model

Any problems (whether involving transportation or not) fits the model for a transportation problem if it can be described completely in term of a parameter table like Table 8.5 and it satisfies both the requirements assumption and cost assumption.

The objective is to minimize the total cost of distributing the units. All the parameters of the model are included in this parameter table.

Page 48: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Objective Function & ConstraintsObjective Function & Constraints

Page 49: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Rough-Cut Planning in SCM Rough-Cut Planning in SCM

SAP Implementation SAP Implementation

Page 50: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Planning Book and ViewsPlanning Book and Views

Page 51: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Capacity Check viewCapacity Check viewNow switch to the CAPACITY CHECK view. In the Selection profile section double click on ## RESOURCES. Double click on the work center (plant ##A1). Switch the TB Profile to 12MONTH. We appear to have enough capacity in the work center at the aggregated monthly level.

Now change the TB Profile to 180 DAYS. We are overloaded in the first couple days as SCM has tried to produce all that is needed to satisfy safety stock in those days.

Page 52: Rough-Cut Capacity Planning  in SCM Theories & Concepts

Key Figures and Category Group Key Figures and Category Group in SNP Standard Planning Bookin SNP Standard Planning Book

Page 53: Rough-Cut Capacity Planning  in SCM Theories & Concepts

HW 6: Exercises: HW 6: Exercises: (Due date: 11/30/13)(Due date: 11/30/13)1 Setup Transactional Data Transfer between SCM and ERP

1) Maintain integration settings in SCM system Maintain distribution definitions in SCM system Maintain Objects specifics settings in SCM system Define transfer of SNP orders in SCM system

2) Create integration model for transactional data in SAP ERP system Create and activate integration model for planned orders and production orders in SAP ERP system Create and activate integration model for purchase orders and purchase requisitions in SAP ERP

system Define transfer of SNP orders in SCM system

2. Supply Chain Modeling 1) Global Bike Company (GBC) Supply Chain2) Transactional data used in supply chain planning

Interactive SNP planning Selection profile Review forecast values for production

Page 54: Rough-Cut Capacity Planning  in SCM Theories & Concepts

2. Please solve the following LP problem. 

Objective: Min Z = 10,000 X1 + 15,000 X2

S.T. X1 + 2X2 >= 4

X 1+ X2 >= 2.5

 1) Draw a graph2) Plot the constraint function3) Outline the feasible solution4) Circle the optimal solution point.

Page 55: Rough-Cut Capacity Planning  in SCM Theories & Concepts

3. The Green Up Fertilizer Company ships fertilizer from three manufacturing plants to four distribution centers (DC). The shipping cost per truckload of fertilizer from each plant to each DC is:

Plant Distribution Center (DC)A B C D

1 $464 $513 $654 $8672 $352 $416 $690 $7913 $995 $682 $388 $685

Plant 1 has a monthly capacity of 75 truckload, Plant 2 has a monthly capacity of 125 truckload, and the Plant 3 has a monthly capacity of 100 truckload. The monthly DC demand is A = 80 truckload, B = 65 truckload, C = 70 truckload, and D = 85 truckload. Please formulate an LP problem to determine how much truckload of fertilizer should be shipped from each plant to each DC per month to minimize monthly shipping cost.

1) Define the objective.2) Define the decision variables.3) Write the mathematical function for the objective.4) Write the constraints.5) Solve the LP problem