Rosecrans/Marquardt Grade Separation...
Transcript of Rosecrans/Marquardt Grade Separation...
![Page 1: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans](https://reader034.fdocuments.in/reader034/viewer/2022051510/5ff200bcc5b4be704e4c6f97/html5/thumbnails/1.jpg)
Rosecrans/Marquardt Grade Separation ProjectCommunity Open House Meeting
October 17, 2017
![Page 2: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans](https://reader034.fdocuments.in/reader034/viewer/2022051510/5ff200bcc5b4be704e4c6f97/html5/thumbnails/2.jpg)
Rosecrans/Marquardt Presentation Agenda
1. Welcome Remarks & Introductions2. Community Outreach3. Project Goals and Objectives
a) Safety, safety, safetyb) Improve mobility and access
4. Funding5. Project Overview
a) Environmentalb) ROW Acquisition Statusc) Preferred Alternative – Final Designd) Aesthetic Featurese) Project Schedule
6. Next Steps & Closing Remarks
![Page 3: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans](https://reader034.fdocuments.in/reader034/viewer/2022051510/5ff200bcc5b4be704e4c6f97/html5/thumbnails/3.jpg)
Rosecrans/Marquardt Community Outreach
Three community outreach meetings:1. September 2015
a) Alternatives under evaluation
b) Environmental process review (CEQA)
2. March 2016 a) Locally Preferred Alternative was selected and
approved by City of Santa Fe Springs in December 2015 and approved by Metro Board in February 2016
b) Initial ROW efforts
3. October 2017 a) Status of the environmental and design process
b) Update on ROW acquisition
![Page 4: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans](https://reader034.fdocuments.in/reader034/viewer/2022051510/5ff200bcc5b4be704e4c6f97/html5/thumbnails/4.jpg)
Rosecrans/Marquardt Goals and Objectives
1. Improve safety by separating pedestrians and vehicles from trains at the railroad crossing.
2. Enhance mobility and quality of life for the community.
3. Minimize disruption to residents, businesses, and community during construction.
4. Alleviate existing traffic congestion
![Page 5: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans](https://reader034.fdocuments.in/reader034/viewer/2022051510/5ff200bcc5b4be704e4c6f97/html5/thumbnails/5.jpg)
Rosecrans/Marquardt Funding
Proposed Life of Project Budget($155.3 million)
1. TIGER Grant - $15 M2. Proposition 1A - $76.665 M3. Measure R 20% - $26.5 M4. California Freight Investment
Program - $8.135 M5. State Transportation Improvement
Program - $7 M6. BNSF Railway – Up to $7 M7. California Public Utilities Commission
(CPUC) Section 190 - $15 M TIGER Grant Prop 1A Measure R 20%Section 190 Railroad Share CFIPSTIP
![Page 6: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans](https://reader034.fdocuments.in/reader034/viewer/2022051510/5ff200bcc5b4be704e4c6f97/html5/thumbnails/6.jpg)
Rosecrans/Marquardt Overview
1. Crossing Locationa) Rosecrans Ave / Marquardt Ave in Santa Fe
Springsb) Diagonal rail crossing at the intersection
2. Existing Traffic Conditionsa) Most hazardous grade crossing in California
(CPUC)b) Over 112 trains and 45,000 vehicles use this
crossing dailyc) 21 hours gate down time per week = 45 days
per year
3. Project Challenges & Opportunitiesa) Industrial area (SFS) with residential to the
North (LA Mirada)b) Constraints at Coyote Creekc) Does not preclude future High-Speed Rail &
BNSF third main track project
![Page 7: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans](https://reader034.fdocuments.in/reader034/viewer/2022051510/5ff200bcc5b4be704e4c6f97/html5/thumbnails/7.jpg)
Rosecrans/Marquardt Environmental
1. The project was environmentally cleared under the California Environmental Quality Act (CEQA) with a Statutory Exemption (February of 2016).
2. Finalize environmental clearance under the National Environmental Policy Act (NEPA). Environmental Assessment (EA) will be completed by the end of 2017 to early 2018, along with an associated Finding of No Significant Impact (FONSI).
![Page 8: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans](https://reader034.fdocuments.in/reader034/viewer/2022051510/5ff200bcc5b4be704e4c6f97/html5/thumbnails/8.jpg)
Rosecrans/Marquardt Right-of-Way Status
Timeline:
1. Right-of-way (ROW) acquisitions began in 2016.
2. However, the State experienced a delay in appropriating funding for
the project, resulting in a temporary hold on real estate acquisition
activities.3. CAHSR board approved funding in June 2017.4. Upon execution of the funding agreement with CAHSR, Right-of-Way
acquisition activities will resume in Winter 2017.
![Page 9: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans](https://reader034.fdocuments.in/reader034/viewer/2022051510/5ff200bcc5b4be704e4c6f97/html5/thumbnails/9.jpg)
Rosecrans/Marquardt Existing Conditions
Existing Plan View
![Page 10: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans](https://reader034.fdocuments.in/reader034/viewer/2022051510/5ff200bcc5b4be704e4c6f97/html5/thumbnails/10.jpg)
Rosecrans/MarquardtFinal Design - Offset Overpass
1. Raise Rosecrans Ave. (four lanes) over the tracks, with a realignment to the south.
2. Connect Marquardt Ave. (south of the crossing) to Rosecrans Ave. under the bridge.
3. Connect Marquardt Ave. (north of the crossing) to Stage Rd.
4. Access to Rosecrans Ave. on the east side is provided via Iseli Rd.
![Page 11: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans](https://reader034.fdocuments.in/reader034/viewer/2022051510/5ff200bcc5b4be704e4c6f97/html5/thumbnails/11.jpg)
Rosecrans/Marquardt Existing Aerial View - Looking Westerly
Existing Aerial View
![Page 12: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans](https://reader034.fdocuments.in/reader034/viewer/2022051510/5ff200bcc5b4be704e4c6f97/html5/thumbnails/12.jpg)
Rosecrans/Marquardt Final Design Offset Overpass – Looking Westerly
Photosimulation
![Page 13: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans](https://reader034.fdocuments.in/reader034/viewer/2022051510/5ff200bcc5b4be704e4c6f97/html5/thumbnails/13.jpg)
Rosecrans/Marquardt Existing Aerial View - Looking Northerly
Existing Aerial View
![Page 14: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans](https://reader034.fdocuments.in/reader034/viewer/2022051510/5ff200bcc5b4be704e4c6f97/html5/thumbnails/14.jpg)
Rosecrans/Marquardt Photosimulation - Looking Northerly
Photosimulation
![Page 15: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans](https://reader034.fdocuments.in/reader034/viewer/2022051510/5ff200bcc5b4be704e4c6f97/html5/thumbnails/15.jpg)
Aesthetic Features
1. City Council forms Aesthetic Subcommittee
2. Subcommittee reviews and selects aesthetic features
3. Operated and maintained by City of Santa Fe Springs
![Page 16: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans](https://reader034.fdocuments.in/reader034/viewer/2022051510/5ff200bcc5b4be704e4c6f97/html5/thumbnails/16.jpg)
Aesthetic Features
• River Rocks• Landscape Boulders• Decomposed
Granite Colors
• Groundcover• Variety of Trees
• Bailey Acacia• Palo Verde
• “Sunrise Yellow” Gazania
![Page 17: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans](https://reader034.fdocuments.in/reader034/viewer/2022051510/5ff200bcc5b4be704e4c6f97/html5/thumbnails/17.jpg)
Aesthetic Features
![Page 18: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans](https://reader034.fdocuments.in/reader034/viewer/2022051510/5ff200bcc5b4be704e4c6f97/html5/thumbnails/18.jpg)
Chain Link Railing Type 6 –I-5 Bridges
Aesthetic Features
![Page 19: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans](https://reader034.fdocuments.in/reader034/viewer/2022051510/5ff200bcc5b4be704e4c6f97/html5/thumbnails/19.jpg)
Decorative Lighting on Bridge – I-5
Bridges
Aesthetic Features
![Page 20: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans](https://reader034.fdocuments.in/reader034/viewer/2022051510/5ff200bcc5b4be704e4c6f97/html5/thumbnails/20.jpg)
Barrier Motif – I-5 Bridges
Aesthetic Features
![Page 21: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans](https://reader034.fdocuments.in/reader034/viewer/2022051510/5ff200bcc5b4be704e4c6f97/html5/thumbnails/21.jpg)
Fractured Fin Texture –Valley View Ave
Aesthetic Features
![Page 22: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans](https://reader034.fdocuments.in/reader034/viewer/2022051510/5ff200bcc5b4be704e4c6f97/html5/thumbnails/22.jpg)
Split State Texture –
I-5 Bridges
Aesthetic Features
![Page 23: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans](https://reader034.fdocuments.in/reader034/viewer/2022051510/5ff200bcc5b4be704e4c6f97/html5/thumbnails/23.jpg)
Minimize Construction Impacts
1. Building off alignment to maintain existing traffic patterns
2. Maintain business access during construction
![Page 24: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans](https://reader034.fdocuments.in/reader034/viewer/2022051510/5ff200bcc5b4be704e4c6f97/html5/thumbnails/24.jpg)
Rosecrans/Marquardt Schedule
![Page 25: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans](https://reader034.fdocuments.in/reader034/viewer/2022051510/5ff200bcc5b4be704e4c6f97/html5/thumbnails/25.jpg)
Next Steps
1. Finalize environmental clearance under the National Environmental Policy Act (NEPA)
2. Continue right-of-way process3. Finalize Plans, Specifications, and Estimates (PS&E)4. Begin early utility relocations5. Bidding & Construction6. Pre-construction meeting occurs after contract award
![Page 26: Rosecrans/Marquardt Grade Separation Projectmedia.metro.net/projects_studies/regionalrail/rosecrans... · 2017. 10. 31. · Rosecrans/Marquardt Overview 1. Crossing Location a) Rosecrans](https://reader034.fdocuments.in/reader034/viewer/2022051510/5ff200bcc5b4be704e4c6f97/html5/thumbnails/26.jpg)
Rosecrans/Marquardt Stay Connected
Dan Mahgerefteh, P.E.Project Manager, Regional Rail One Gateway Plaza, 99-17-2Los Angeles, CA 90012-2952
888.512.1198
metro.net/regionalrail
facebook.com/regionalrail