Rosatom Global Development, International Cooperation PerspectiveRosatom Global Development, International Cooperation Perspective
ROSATOMSTATE ATOMIC ENERGY CORPORATION “ROSATOM”
27.02.2013
www.rosatom.ru
Key Facts & Figures
2
www.rosatom.ru
Fully Integrated Nuclear Technology CompanyFully Integrated Nuclear Technology Company
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
Uraniumproduction
Uraniumenrichment
Fuelfabrication
NPP Design,Engineering
and Construction
Electricitygeneration
Power equipmentmanufacturing
Services and modernization
3
Anniversary ofRussian Nuclear
Industry2010
www.rosatom.ru
Rosatom offers complete solution from uranium supplies to NPP construction operation and decommissioningRosatom offers complete solution from uranium supplies to NPP construction operation and decommissioning
Guaranteed supply of complete life-cycle products and services
Flexible capabilities of NPP supply from components and services to turn-key and BOO projects
Being a state corporation Rosatom is taking advantage of unique industry access to privilege resources
Guaranteed supply of complete life-cycle products and services
Flexible capabilities of NPP supply from components and services to turn-key and BOO projects
Being a state corporation Rosatom is taking advantage of unique industry access to privilege resources
4The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
Key Activities of Rosatom*
Mining
Gas centrifugesmanufacturing
Fuel fabrication
Spent nuclearfuel treatment
PowerGeneration
Conversion and enrichment
NPPs engineering& construction
Power equipment and services
Research anddevelopment
ARMZ
TVELTenex
Nukem TechnologiesMayak, GHK
Rosenergoatom
AtomenergomashRusatom Service
15 research organizations
AEP ASESPbAEP GidropressNiAEP OKBMNUKEM Technologies
TVEL
TVEL
Boxes include names of key Rosatom’s subsidiaries in the relevant sector
* Boxes include names of key Rosatom’s subsidiaries in the relevant sector
www.rosatom.ru
Rosatom Global OperationsRosatom Global Operations
EuropeFinland, Sweden, the Netherlands, Belgium, Germany, France, Spain, GB, Switzerland, Czech Republic, Slovakia, Hungary, Lithuania, Bulgaria, Slovenia
EuropeFinland, Sweden, the Netherlands, Belgium, Germany, France, Spain, GB, Switzerland, Czech Republic, Slovakia, Hungary, Lithuania, Bulgaria, Slovenia
North America
USA, Canada, Mexico
North America
USA, Canada, Mexico
Latin AmericaVenezuela, Argentina, Brazil
Latin AmericaVenezuela, Argentina, Brazil
CISRussia, Ukraine, Kazakhstan, Belorussia, Armenia
CISRussia, Ukraine, Kazakhstan, Belorussia, Armenia
AsiaChina, Japan, South Korea, Vietnam, India, Bangladesh, Mongolia
AsiaChina, Japan, South Korea, Vietnam, India, Bangladesh, Mongolia
MENATurkey, Libya, Morocco, Algeria, Egypt, Iran, Jordan
MENATurkey, Libya, Morocco, Algeria, Egypt, Iran, Jordan
AustraliaAustralia
5 continents. More than 40 countries.5 continents. More than 40 countries.
5
in uranium enrichment
in new NPPs construction
Russian electricity generation company, 25,2 GWe installed capacity
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
#1 in key segments#1 in key segments
AfricaNamibia, South Africa, Tanzania
AfricaNamibia, South Africa, Tanzania
www.rosatom.ru 6
Nuclear Icebreaker Fleet- #1 nuclear fleet in the world- Assures stable functioning of Northern Sea Route
Fast Reactors (Gen IV)- #1 fast neutron reactor in the world
- #1 operating fast neutron reactor in the world - Broad development programme
Nuclear Innovation – Variety of ApplicationsNuclear Innovation – Variety of Applications
Small and Medium Size Reactors- Variety of different designs with referent parameters- #1 floating NPP in the world is being built- #1 successful public-private partnership for developing SMR
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
Radiation Technologies- Isotope production- Nuclear medicine
- Irradiation facilities
www.rosatom.ru
- Origination and execution of Investment projects in fields of medical isotopes and equipment
- Medical equipment sales and servicing
- R&D management
Nuclear medicine
- Security and nondestructive testing solutions
Detection systems
- Contract irradiation- Equipment production, engineering and maintenance- Production of radiation modified materials
Irradiation facilities Ecology
Rosatom Radiation Technologies Business
7The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
Radiation Technologies – one of the most promising areas of nuclear applicationsRadiation Technologies – one of the most promising areas of nuclear applications
- Waste management - Water treatment
www.rosatom.ru The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
Russian Experience in Design and Construction of Research Reactors in Foreign CountriesRussian Experience in Design and Construction of Research Reactors in Foreign Countries
- Channel in Pool
China
RFR-10, 10MW
Czech Republic
LVR-15, 10MW
Germany
RFR-10, 10MW
Romania
VVR-S, 2MW
Serbia
RA, 6.5MW
Georgia
IRT-M, 8MW
Hungary
BRR, 10MW
Bulgaria
IRT-2000, 2MW
Ukraine
VVR-M, 10MW Uzbekistan
VVR-SM, 10MW
Ukraine
IR-100, 0.2MW
LatviaIRT-M, 5MW
Egypt
ETRR-1, 2MW
Belarus
IRT-M, 4MW
North Korea
IRT, 8MW
Iraq
IRT-5000, 5MW
Libya
IRT-1, 10MW
KazakhstanVVR-K, 6MW
KazakhstanIVG, 1.60MW
KazakhstanIGR
Poland
EVA,10MW
Poland
MARIA, 30MW
Vietnam
DRR, 0.5MW
Reactor Type: - Tank - Heavy Water - Pool - Pulse8
www.rosatom.ru
More than 25% of revenue is generated by overseas assets
More than 50% of revenue comes from global operations
Rosatom is among Top 3 nuclear companies (by revenue in key segments)
9
Rosatom in 2020Rosatom in 2020
Localize all business segments operations in key markets
Establish multiple alliances and partnerships with global and local players
Benefit from global talents and local workforce
Source, develop and transfer technologies to maintain global leadership
Take full advantage of global capital market
Ensure business transparency as a key operating standard
Key ActionsKey Actions
2020 Targets2020 Targets
Globalization of operations is the key priorityGlobalization of operations is the key priority
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
www.rosatom.ru 10
Promotion of Rosatom global development is implemented by Rusatom OverseasPromotion of Rosatom global development is implemented by Rusatom Overseas
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
Rosatom overseas NPP & RR new build projects developmentRosatom overseas NPP & RR new build projects developmentRosatom overseas NPP & RR new build projects developmentRosatom overseas NPP & RR new build projects development
Rosatom global marketing management andRosatom global marketing management andmarketing offices network development and operationmarketing offices network development and operationRosatom global marketing management andRosatom global marketing management andmarketing offices network development and operationmarketing offices network development and operation
Key Activities of Rusatom Overseas
Management of Rosatom Globalization programManagement of Rosatom Globalization programManagement of Rosatom Globalization programManagement of Rosatom Globalization program
www.rosatom.ru
Rosatom intends to open 21 foreign marketing offices all over the world by the year 2014Rosatom intends to open 21 foreign marketing offices all over the world by the year 2014
Rosatom marketing offices map2012-2014
United Kingdom
CEE China
India
South Africa
Czech Republic
Slovakia
Hungary
Bulgaria
USAUkraine
Canada
Netherlands Kazakhstan
Vietnam
Korea Japan
Regional office Country officeCategories of marketing offices
as of end year 2012 (10)
as of end of year 2013 (7)
as of end of year 2014 (4)
Rosatom marketing offices opened / adjusted according to
the Policy
(Amount)
Mexico
Chili
Argentina
Malaysia
Thailand
Philippines
Australia
Belorussia
SingaporeIndonesia
MENA
UAE
Saudi ArabiaBrazil
Jordan
Egypt
*In italics are the countries included in zone of responsibility of a country office
Bangladesh
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information. 11
www.rosatom.ru
Post Fukushima: responsible vendor approach
12
www.rosatom.ru
Fukushima accident haven’t strongly affected the plans for nuclear energy development globallyFukushima accident haven’t strongly affected the plans for nuclear energy development globally
2030
588
652
2020
460515
2012
365365
2030
135
150
2020
123120
2012
114114
2030
1212
20202012
2030
9,47
20202012
2030
99114
2020
111114
2012
113113
2030
3138
2020
2932
2012
2424
203020202012
Installed capacityGW, reference scenario 2030
2218
2020
1013
2012
2030
34
66
2020
36
62
2012
3737
2030
2726
2020
1919
2012
2030
1117
2020
710
2012
55
20302020
30
2030
124120
2020
5474
2012
World
Source: Rosatom
-12%
-11%
Rosatom’s scenario after Fukushima
Rosatom’s scenario before Fukushima
The content of this preсоsentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
Latin America
Western Europe
MENA
South Africa
Eastern Europe
Russia
South-East Asia
Japan*
Korea
India
North America
China
* Does not include national nuclear power program potential strategy revision (to be revised shortly)
2012
4447
32342424
3838
31
2121
13
-12%
2010 2011
12
21
Rosatom’s portfolio
www.rosatom.ru 14
Rosatom safe and mature VVER technology is one of the most referenced…Rosatom safe and mature VVER technology is one of the most referenced…
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
Russia
ChinaIran
Ukraine
Bulgaria
Germany
CzechRepublic
Slovakia
Hungary
Country Constructed In operation
Armenia 2 1
Bulgaria 6 2
China 2 2
Czech Republic
6 6
Finland 2 2
Germany 6 -
Hungary 4 4
Iran 1 1
Russia 17 17
Slovakia 6 4
Ukraine 15 15
TOTAL 67 54
VVER Global Fleet
Armenia
Finland
All Russian designed reactors, including 37 VVER units operating outside Russia, successfully passed
stress-tests, among those - 18 VVER units in 5 EU countries
Rosatom actively supported and is confident in the results
www.rosatom.ru 15The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
Rosatom operating NPP fleet in Russia Rosatom operating NPP fleet in Russia
Balakovo NPPBalakovo NPP
Beloyarsk NPPBeloyarsk NPP
Bilibino NPPBilibino NPP
Kalinin NPPKalinin NPP
Kola NPPKola NPP
Kursk NPPKursk NPP
Leningrad NPPLeningrad NPP
Novovoronezh NPPNovovoronezh NPPSmolensk NPPSmolensk NPP
Rostov NPPRostov NPP
- VVER- RBMK- BN- EGP
- VVER- RBMK- BN- EGP
Balakovo NPP
Units in operation: 4
Capacity: 4000 MW
Kalinin NPP
Units in operation: 4
Capacity: 4000 MW
Kola NPP
Units in operation: 4
Capacity: 1760 MW
Novovoronezh NPP
Units in operation: 3
Capacity: 1880 MW
Kursk NPP
Units in operation: 4
Capacity: 4000 MW
Rostov NPP
Units in operation: 2
Capacity: 2000 MW
Leningrad NPP
Units in operation: 4
Capacity: 4000 MW
Smolensk NPP
Units in operation: 3
Capacity: 3000 MW
Beloyarsk NPP
Units in operation: 1
Capacity: 600 MW
Bilibino NPP
Units in operation: 4
Capacity: 48 MW
www.rosatom.ru
Construction NPP in RussiaConstruction NPP in Russia
16
Rostov NPP, unit 1: VVER-1000 First criticality: Jan2001. Grid connection: Mar2001
Rostov NPP, unit 2: VVER-1000 First criticality: Jan2010. Grid connection: Mar2010
Kalinin NPP, unit 3: VVER-1000 First criticality: Okt2004. Grid connection: Dec2004
Kalinin NPP, unit 4: VVER-1000 First criticality: Nov2011. Grid connection: Nov2011
9 Units under construction:Novo-Voronez NPP-2, unit 1: VVER-1200; unit 2: VVER-1200Beloyarskaya NPP, unit 4: BN-800 (fast reactor, capasity 800 MW)Leningrad NPP-2, unit 1: VVER-1200; unit 2: VVER-1200Rostov NPP, unit 3: VVER-1000; unit 4: VVER-1000Baltic NPP, unit 1: VVER-1200; unit 2: VVER-1200
6 Units in license stage:Leningrad NPP-2/ 3&4; Nizhniy Novgorod NPP/ 1&2; Kursk NPP-2/ 1&2
www.rosatom.ru
Reactor design: VVER-1000
Total Gross Capacity: 2120 MW (2 x
1060 MW)First criticality:
20 Dec 2005 (unit 1) 01 May 2007 (unit 2)First grid connection:
12 May 2006 (unit 1) 14 May 2007 (unit 2)Commercial operation date:
17 May 2007 (unit 1) 16 Aug 2007 (unit 2)
Legal basis: IGA (1992)
Key Parameters
Tianwan NPP, ChinaTianwan NPP, China
Tianwan
1
2
Lianyungang, Jiansu provinceLianyungang, Jiansu province
17The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
www.rosatom.ru
Reactor design: VVER-1000
Total Gross Capacity: 1000 MW (1 x
1000 MW)First criticality:
08 May 2011First grid connection:
03 Sep 2011Commercial Operation Date:
30 Jul 2012 (anticipated date)
Legal basis: IGA (1992)
Construction on the “turn-key” basis
Key Parameters
Busher NPP, IranBusher NPP, Iran
18The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
www.rosatom.ru
Reactor design: VVER-1000
Total Gross Capacity: 2000 MW (2 x
1000 MW)Fuel loading:
nov 2012First grid connection:
febr 2013 (anticipated date)
Legal basis: IGA (1998)
Key Parameters
Kudankulam NPP, IndiaKudankulam NPP, India
19The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
www.rosatom.ru 20
…and is highly welcomed worldwide……and is highly welcomed worldwide…
30 22
In progress Tendering process/
negotiations
34
Potential
China
India
TurkeyArmenia
Czech Republic
Jordan
KazakhstanUkraine
Slovakia
Hungary
Finland
Malaysia
Brazil
Bangladesh
Vietnam
Argentina
Indonesia
4
2
1
2
2
2
2
22
412
2
229
14
2
1
2
Belorussia2
South Africa8
Saudi Arabia2
Rosatom NPP construction perspective backlog – more than 80 unitsRosatom NPP construction perspective backlog – more than 80 units
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
9Russia
28
2
Bulgaria1
Nigeria
www.rosatom.ru 21The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
RosatomIntegrated Solution
Energy Solution
Knowledge, skills,human capital
IndustrialSolution
FinancialSolution
Regulation,Infrastructure and Public acceptance
Personnel education & training (incl. traineeship on NPP sites),
R&D base development,
NPP operation experience exchange
BOO projects implementation;
State credits,
Partnership projects
NPP equipment manufacturing, service & works localization,
Technology transfer,
Certification of local suppliers, participation in Rosatom third countries projects
Creation and development of regulatory base
NFC facilities construction,
SNF & RW management,
Social-political programmes support
Modern NPP design (Gen III+)
NPP construction and life cycle management support (fuel, services, modernization)
Operation & maintenance
… being a part of Rosatom unique integrated NPP construction solution… being a part of Rosatom unique integrated NPP construction solution
www.rosatom.ru 17
Meets all current Russian and international safety standards and the IAEA requirements
Widely referenced by utilities EUR certified
Hurricanes, tornadoes
Earthquakes
Airplane crash
Tsunamis, floods
Protection from outer impactsProtection from outer impacts
Rosatom Gen III+ NPP designRosatom Gen III+ NPP design
Forefront of nuclear technology – Generation 3+ reactor
Proven and mature solutions – 1400 reactor years of total operating time
A high level of internal safety gained through evolution of design
Most demanded capacity suitable for various grid conditions – 1000-1200 MWe
Long – run facility – design lifetime of the main equipment: 60 years
High performing source of supply – availability factor ≈ 92 %
What is VVER?(Water-Water Power Reactor)
What is VVER?(Water-Water Power Reactor)
Outside explosions
Snow load
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
www.rosatom.ru
Key NPP Construction Projects Overview
23
www.rosatom.ru 24
• Project value – $ 20 bn.
• Implementation period – 2011-2021
• Legal basis – Intergovernmental Agreement of May 12, 2010
• Reactor design – NPP-2006 (VVER-1200)
• Total capacity – 4 800 MW (4 units)
• PPA period –15 years, fixed price terms
Project highlights
• First NPP project in Turkey
• Sound Russian and Turkish State encouragement
• Strong support to Turkey with regulatory system establishment and personnel training
• The project is implemented in close cooperation with Turkish partners, involvement of Turkish suppliers mainly in civil construction
• International investors are welcome to join the project with up to 49% Akkuyu SPV stake
Key parameters
Site – Akkuyu, province Mersin, Turkey
Turkey
Akkuyu is the first Rosatom’ foreign NPP
project configured on BOO principles
Akkuyu NPP project profileAkkuyu NPP project profile
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
www.rosatom.ru 20
• CAPEX– € 5 bn.
• Construction period – 2010-2018
• Legal basis – Resolution of the Government of Russian Federation, № 1353-p, 25.09.2009.
• Reactor design – NPP-2006 (VVER-1200)
• Total capacity –2 units x 1184 MW
Project highlights
• Unique exclave territorial location
• Fully complies with EC energy policy and EC supported
• Meets EUR requirements
• Significant export potential due to expected deficit of generation in the region
• Involvement of foreign investors is envisaged
• Strong political support from the Russian government
Key parameters
Baltic is the first Rosatom homeland NPP
construction project open for involvement of foreign
investors
Baltic NPP project profileBaltic NPP project profile
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
Russia
Site – Kaliningrad region, Russian Federation
www.rosatom.ru
Reinventing supply chain
26
www.rosatom.ru
Construction of a nuclear power plant brings numerous opportunities to suppliers
Examples of realized suppliesExamples of realized supplies
27
* Including design, project management, erection and commissioning works, training , etc.**Nuclear steam supply system
• Valves, pumps and piping (6%)• Other equipment (5%)• Air cooling systems (3%)• Turbine and generator equipment (6%)• Electrical equipment (9%)• I&C (6%)
Exclusive Russian supplyExclusive Russian supply
Rosatom is ready for and has extensive experience in localizing&sourcing production for new NPP projects
Civil construction & engineering*
~50%
NSSS**
~10-15%
Other Equipment
~35-40%
Potential for external sourcing
Project Country Capacity Cost
Akkuyu 1-4 Turkey 4 x 1200 MW 20 bil. USD
Belene 1-2 Bulgaria 2 x 1050 MW 6.3 bil. Euro
Examples of projects
The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
www.rosatom.ru
Order volume for NPP construction for Rosatom global projectsOrder volume for NPP construction for Rosatom global projects
28The content of this presentation is for discussion purposes only, shall not be considered as an offer and doesn’t lead to any obligations to Rosatom and its affiliated companies. Rosatom disclaims all responsibility for any and all mistakes, quality and completeness of the information.
43,4
17,4
26,0
8,7
145,0
14,5
17,4
17,4
Orders volume for 2011-2030 ≈ $290 bln.
Civil construction & engineering
NSSS (Russian suppliers)
Turbine and generator equipment
Valves, pumps and piping
Electrical equipment
I&C
Other equipment
Air cooling systems
Rosatom needs to re-invent its global supply chain and is open for cooperationRosatom needs to re-invent its global supply chain and is open for cooperation
~ 15% - Russian supply
~ 30-40% - local content
~ 45-50% - global sourcing