ROOF GARDEN CONCEPT PLAN - edqdad.dsdip.qld.gov.au
Transcript of ROOF GARDEN CONCEPT PLAN - edqdad.dsdip.qld.gov.au
1:2500 5 10 15 20 25m
9JUBILEE HOTEL / LANDSCAPE CONCEPT
01
02
03
08
05
06
07
1. Feature paved entry area (to match
lobby)
2. Raised planters (+600mm wall height
with mounding to achieve approx
1000mm depth for trees)
3. Main gathering/event space,
positioned for city views to the SW.
Open paved area for flexibility of
use, with shade cover over.
4. Bar for informal seating as general
use, serving bar for event use with
circulation space behind.
5. Kitchen bar with BBQ.
6. Circulation space behind kitchen bar
for catering equipment & preparation
or events.
7. Bar & stool to the edge of the roof for
open views.
8. Shade structures over event/
gathering space. Informal seating
& table setting may be utilised in
general use mode for shaded seating.
9. Linear seat & tables setting
integrated with planter walls for
small informal gatherings or outdoor
meeting/work station.
10. Feature spreading shade trees -
larger specimens selected where
planter width is greatest.
11. Screen trees to buffer roof plant
equipment area.
12. Dense bank of planting to western
edge.
ROOF GARDEN CONCEPT PLAN
0304
09
09
10
11
11
12
10
02
01
10
NOTE: ROOF GARDEN CONCEPT INDICATIVE ONLY. FINAL DESIGN TO BE RESOLVED IN CONJUNCTION WITH THE TENANT.
SITE BOUNDARY
PROPOSED CANOPY
JUBILEE HOTEL
LEVEL 01
CO
NST
AN
CE
ST
SYM
ES S
T
BREWERS ST
ST PAULS TERRACE
LIFT
LIFT
WC
WC
PLANT
PLANT
PLANT
PLANT
Subject to Compliance Assessment
AMENDED IN REDBy: Date:
Tom Barker12 February 2018
The Jubilee Hotel470 St Pauls Terrace,Fortitude Valley
Landscape Concept
THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021
39paRt 2: DRaWingS
Document Issue Purpose Date Approved
20146 LC-01 A Draft 05/02/21 AG20146 LC-01 B For Information 15/02/21 AG20146 LC-01 C For Information 19/02/21 AG
For: JGL Properties + Tony Burnett Hotels
Wild Studio wildstudio.com.au
13/46 Douglas StreetMilton Qld 4064PO Box 287 Paddington Qld 4064
ABN: 38 638 202 123
© 2020 Wild Studio Australia Pty Ltd
Contents
1 Context2 Nature-Based Behaviour3 Biophyllia4 Design Response5 Planting Strategy6 Maintenance
THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021
40paRt 2: DRaWingS
WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 3
1.0 Context
“Fortitude Valley is a contradiction in itself – raw, yet sophisticated. It is where elegance and style meet grungy and offbeat, and heritage-listed properties proudly stand among contemporary buildings. From the cranking of a coffee grinder to the final closing doors of nightclubs – Fortitude Valley is the suburb that never sleeps.
The Valley, as it is affectionately known, was Australia’s first dedicated entertainment district and continues to be a hive of activity. Live music pumps and international DJs are drawn to the clubs and chic bars. From local acts at the tiniest dive bar, through to big names at The Fortitude Music Hall –Brisbane’s live music scene was born, raised and continues to thrive on these streets.”
1. Aerial 2. Jubilee Hotel3. St Pauls Terrace
1
2 3
THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021
41paRt 2: DRaWingS
WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 4
2.0 Nature-Based Behaviour
Plants generate happiness. Designing a space with a carefully considered planting strategy can have a positive impact on people’s mood and behaviour. Incorporating this into a public venue which serves alcohol is a great way to encourage positive social behaviours and generates a vibrant atmosphere.“Research shows that people who spend extended lengths of time around plants tend to have better relationships with others. This is due to measurable increases in feelings of compassion; another effect of exposure to ornamental plants.”
THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021
42paRt 2: DRaWingS
WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 5
3.0 Biophyllia
Exploring Biophilia in the public realm
“Biophilia hypothesis, idea that humans possess an innate tendency to seek connections with nature and other forms of life.”
The movement towards nature-based urban environments is growing awareness of the health and wellness benefits from contact with nature, a concept known as biophilia. Exposure to nature has been shown to lower levels of cortisol, the human stress hormone, as well as stimulate creativity. Employers competing for the best workers are using outdoor amenities to show they care about their staff’s well-being.”
Water is believed to induce nurturing energies, it pulls out negativity and balances emotions resulting with a calm and focused state. It provokes creative thoughts and new ideas whilst also aiding restoration of health.
THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021
43paRt 2: DRaWingS
4.0 Design Response
Concept Plan1:250@A3
1 Celebration of heritage wall2 Cascadingbarplanting+figtreeforest3 Street planters + climbers (Hops garden)4 Water garden5 Low planters6 Courtyard feature tree (Fiddle Leaf Fig)
B D
09
10
11
EX. FLOOR HATCH & STAIRS TO KEG ROOM
PRIVATE DINING CELLAR
BAR
PUBLIC BAR
TERRACE
OFFICE
GAMING
GAMING
WC WC
2A30.01
1A30.00
EXISTING BAR & FINISHES TO BE RETAINED
EXISTING FLOOR TO PUBLIC BAR TO BE RETAINED
NEW CARPET TO GAMING ROOM & OFFICES
NEW SLIDING GLASS DOORS
EXISTING STAIRS UP
NEW WC'S
RESTORE EXISTING WINDOW
NEW GLASS DOOR
DOSA
LIFT
NEW WINDOW TO EXISTING OPENING
A20.02
1
A20.01 1
A20.00
1
WASHUP
DRY STORE COLD ROOM FREEZER
WASTE CHUTE
KITCHEN
SERVERY
BREWERY
BOOTH SEATING
BEER GARDEN
BAR
NEW CURTAIN TO GAMING ROOM
TV SCREEN
SITE BOUNDARY
SITE
BOU
NDAR
Y
SITE
BOU
NDAR
Y
SITE BOUNDARY
SITE BOUNDARY
INFILL EXISTING OPENING
ST01AST01B
ST01C
TM01
ST01B
CP01
CP02
CP02
TM01
ST01B
ST01C
MALE
ST01C
FEMALEST01CPWD
ST02
(e)
EP01
EP01
EP01
EP01 EP01 EP01
REINSTATE DOORS
REINSTATE DOORS
STAGE 01
EXISTING WATER TANK BELOW SHOWN DASHED (INDICATIVE)
COFFEE
STORE
RAIL
SECURE LINE
QUICK SERVICE
01A71.00
2A30.00
2A30.00
01A71.15
01A71.20
1A30.02
1DA99.03
1DA99.03
ANGLED GLAZING WALL
FLOOR OVER
1A30.01
1A30.01
PENDANT LIGHTS OVER
1A54.00
3A54.00
5A54.00
FHR
DP
SIPHONIC DOWNPIPES CONCEALED IN STRUCTURE
PORTAL FRAME & GUILLOTINE DOOR
WATER FEATURES REFER HYDRAULIC ENGINEERS DRAWINGS
FOOT
PATH
BREWERS STREET
CONS
TANC
E S
TREE
T
ST PAULS TERRACE
FOOTPATH
FOOTPATH
FOOT
PATH
EXISTING LANDSCAPING
DP
FT01
BOOTH SEATING REFER DETAILS
FHR
07
08
06
05
04
03
C
01
02
A
2A30.02
3A30.02
NEW DOORS TO GAMING ROOM
MATERIALS LEGENDSCD01 – Tiled claddingCF01 – Off form concreteCF02 – Broom finish concreteCP01 - Feature carpet insert to private dining roomCP02 - Gaming room carpetCP03 - Level 01 carpetEP01 - Epoxy flooringFT01 - Frameless clear glassLV01 - Glass LouvresMA01 - White half brick - patteredMRS - Black Metal Roof SheetingST01A – Stone Tiles (to match existing Jubilee Place Plaza floor)ST01B - Stone tiles to match ST01A, smaller formatST01C- Stone tiles to match ST01B, smaller formatST02 – Thresholds TF01 - Timber Floor
0
Rev Description Date By
Drawing No.
Project No.
Revision
Drawn by
Date
Checked by
ScaleSheet Name
© BLIGHT RAYNER ARCHITECTURE PTY LTD ACN 614335956Use figured dimensions only. Do not scale. Check all dimensions on site prior to fabrication or setout.These designs, drawings and specifications are copyright and must not be used, kept or copied by any means without permission.
6.33.81.3
Client Project Name
Project Address@A3 1 : 250
15.02.21
8
15/0
2/20
21 6
:20:
19 P
M@A1 1 : 12519039
A10.00 JZ
JB
GROUND FLOOR
470 St Pauls Terrace, Fortitude Valley QLD 4006
JUBILEE HOTELLevel 2, 88 Creek Street, Brisbane Qld 4000 Ph.39056500 [email protected]
1 Preliminary Issue 10.03.20 JZ2 ISSUE FOR REVIEW 19.03.203 ISSUE FOR REVIEW 23.03.20 JZ4 ISSUE FOR REVIEW 24.05.20 JZ5 ISSUE FOR INFORMATION 19.06.20 JZ6 100%SD ISSUE 16.09.20 JZ7 ISSUE FOR INFORMATION 28.01.21 JZ8 ISSUE FOR PRICING 15.02.21 JZ
1
2
2
3
3
4
5
6
THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021
44paRt 2: DRaWingS
WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 8
Jubilee Beer Garden
through to courtyard
Bar
Kitchen
Brewery
1 Beer garden entry + bar - feature paving2 Cascading plants over bar3 Street planters + climbers (Hops)4 Water garden5 Low planters6 Stool seating7 Bench seats8 Booth seating (8-10 people)9 Booth seating (6-8 people)10 Booth seating (4-6 people)11 Lift12 Restrooms13 Planting threshold14 Booth planters15 Feature tree
1
1
1
2
2
3
4
4
5
5
8
8
8
8
89
9
9
7
76
6
6
6
11
10
10
13
10
14
10
15
15
12
Plan - Upper Ground1:100@A3Joins page 09
Foot
path
Prop
erty
Bou
ndar
y
+11.450
+11.450
+10.340
+10.340
+10.340
02
03
THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021
45paRt 2: DRaWingS
WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 10
Plan - Level 011:100@A3
1 Fig tree forest2 Cascading plants over bar3 Water garden below4 Balcony stool seating5 Booth seating below6 Function area7 Terrace
1
2
2
2
3
3
4
6 7
+15.760
+15.760
Jubilee Beer Garden below
Con
stan
ce S
treet
foot
path
bel
ow
5
5
5
THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021
46paRt 2: DRaWingS
WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 12
Section 021:100@A3
1 Feature lift shaft2 Booth seating and water garden behind3 Jubilee beer garden main floor4 Cascading plants over bar5 Feature tree behind6 Cascading planters behind
FFL 10.340
1
2
3
45
6
3
THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021
47paRt 2: DRaWingS
WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 13
Section 031:100@A3
1 Feature wall / main TV screen2 Level 01 function room behind3 Seating niches / planters4 Main floor / low planting behind5 Cascading plants over bar6 Feature tree7 Stool seating8 Booth seating (4-6 people)9 Booth seating (8-10 people)10 Street planters (deep planting) (Humulus lupulus) or
similar - 300mm pots @ 1m centres11 Water garden12 Fig tree forest (Ficus lyrata)13 Bar14 Constance Street footpath15 Existing street light16 Cellar behind
Con
stan
ce S
treet
1
3
4
5 6
7
8 910 14 15
16
11
12
13
Prop
erty
Bou
ndar
y
FFL 10.340
FFL 11.450
FFL 10.400
2
THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021
48paRt 2: DRaWingS
WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 14
Section 041:100@A3
1 Brewery (by architect)2 Street planters (deep planting) (Humulus lupulus) or
similar - 300mm pots @ 1m centres3 Footpath4 Street planting (Liriope evergreen giant) (Dietes grandiflora)(Lomatiasilafolia)5 Street tree (Harpullia hillii)Pr
oper
ty B
ound
ary
1
2
3
4
5
Brew
ers
Stre
et
FFL 10.340FFL9.900
THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021
49paRt 2: DRaWingS
WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 15
Entry - Beer Garden + Bar
THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021
50paRt 2: DRaWingS
WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 16
Water Garden
THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021
51paRt 2: DRaWingS
WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 17
Water Garden - Evening
THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021
52paRt 2: DRaWingS
WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 18
Water Garden
THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021
53paRt 2: DRaWingS
WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 19
Bar + Fig Tree Forest
THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021
54paRt 2: DRaWingS
WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 21
Constance Street Hops Garden
THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021
55paRt 2: DRaWingS
WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 22
5.0 Planting Strategy
Trees and PalmsFicus lyrata Fiddle Leaf Fig
Shrubs and AccentsAlocasia brisbanensis CunjevoiDietesgrandiflora Wild IrisColocasia gigantea Giant Elephant EarColocasia ‘Black Beauty’ Black Beauty Elephant Ears
Liriope Evergreen Giant Evergreen GiantMacrozamia lucida Burrawang PalmPhyllanthusmultiflorus Waterfall Plant
Groundcovers, Ferns + Climbers
Blechnum cartilagineum Gristle FernHumulus lupulus Common hop
Epipremnum pinnatum Native monstera
Microsorum punctatum Strapleaf FernAsplenium nidus Bird’s Nest FernPteris umbrosa Jungle BrackenBlechnum indicum Swamp Water Fern
Nephrolepis exaltata Sword FernHildewintera Colademononis Soft Monkey TailCyathea cooperi Tree Fern
1
3
8
7
6
2
5
4
1 7 8
5 6
2 3
4
The plant palette is dominated by calm and cool species which create breathable semi-indoor spaces and drive a sub-tropical, authentic character of the proposed landscape.
The canopy comprises sculptural species such as the Fiddle Leaf Fig, while structures and trellises are softened by climbers such as the Native Monstera.
A reference to the process of brewing craft beer is given by the Com-mon Hops to the exterior of the building.
THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021
56paRt 2: DRaWingS
WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 23
6.0 Maintenance
Maintenance issues are considered an integral part of the landscape design and a sustainable maintenance regime is implemented and re-evaluated over time. It is imperative the landscape thrives after installation with minimal maintenance and on-going cost to owners.
The following are some of the initiatives adopted to help ensure the long-term sustainability of the landscape:
• Choosing plant species which are suitable to the location and differing microclimates on site with long life expectancy and minimal pruning, watering and fertilising requirements.
• Designing all ground level planters to be accessible from pathways and paved areas and any balcony planters, where not accessible from the adjacent balcony, to be accessed using rooftop abseiling or safety lines provided.
• Requiring plant suppliers have an industry accreditation and third-party assessed QA system.
• Certifying that all trees comply with the NATSPEC Guide – Specifying Trees: A Guide to Assessment of Tree Quality (2003) to avoid any long-term structural issues.
• Using a quality, tested and certified, soil blend that complies with Soils for Landscape Development guidelines and AS4419, constructed with a duel-horizon to minimise slumping, maximise plant survival rates, and minimise maintenance.
• Ensuring all planters are adequately drained and drainage is connected to the stormwater system.
• Installing of a fully-automatic, multi-station, reticulated irrigation system to all landscape and recreation areas including podium planters.
• Using a minimum of 75mm of organic mulch to reduce weed growth and water loss in garden areas.
• Providing hose cocks in all outdoor areas (communal and private) to enable additional plant watering and surface washdown when necessary.
• Submitting a Planting Maintenance Program by the Landscape Contractor at the completion of construction.
• Incorporating a minimum 12 week establishment and maintenance period by the Landscape Contractor and a 52 week defects period for advanced tree stock.
• Ensuring a training program is carried out by the Landscape Contractor at handover to ensure that maintenance staff can operate irrigation the system and maintain the landscape.
THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021
57paRt 2: DRaWingS
1 Existing street tree - Kauri Pine2 New street tree - Kauri Pine3 Stone paving - Juperana granite4 Low planting5 Hops garden6 Water garden7 Plaza seating + planters8 Courtyard9 Bar10 Existing street light11 BCC footpath - honed concrete12 BCC footpath - asphalt13 BCC seat14 BCC waste bin15 New street tree in tree grate (Tulipwood)16 Existing street trees and understory planting made good17 Alternate paving as part of public art strategy
1 1 2 2
3
4
5
5
6
7
10
111314
15
17
17
17
15
15
1616
16
12
11
11
10
10
8
9
7
3
2 2 2
St Pauls Terrace
Brewers Street
Sym
es S
treet
Jubilee Hotel Plaza
Beer Garden
Jubilee Place
Neighbouring Property
Brewery
C
onst
ance
Stre
et
Property Boundary
Property Boundary
Prop
erty
Bou
ndar
y
Property Boundary
Prop
erty
Bou
ndar
y
Prop
erty
Bou
ndar
y
Legend
Landscape Concept Plan Ground Level + Streetscape1:250@A3
WILDSTUDIO.COM.AU I JUBILEE PLACE 20105 RFI [B] I 2021-04-20 I
01
Planter Sections - Upper Ground1:100@A3
WILDSTUDIO.COM.AU I JUBILEE PLACE 20105 RFI [B] I 2021-04-20 I
UPPER GROUND
10100
LEVEL 01
16100
BB
5
LD-01
1
LD-01
JUBILEE HOTEL
MOUNDED PL1
PL2
S2W1
S2W1
2 00
900
300
300
5 00
UPPER GROUND
10100
LEVEL 01
16100
44
PRO
PER
TY B
OU
ND
ARY
MOUNDED PL15
LD-01
MOUNDED PL15
LD-01
ST P
AUL'
S TE
RR
ACE
S2
W1
S2
W1
E
LEVEL 01
16100
44
BENCH SEAT BY ARCHITECT
5
LD-01 MOUNDED PL1
PRO
PER
TY B
OU
ND
ARY
5
LD-01 PL1
E
LEVEL 03
25250
44
5
LD-01 MOUNDED PL1PR
OPE
RTY
BO
UN
DAR
Y
LEVEL 03
25250
11
5
LD-01 MOUNDED PL1
Project No.
13/46 Douglas Street, Milton Qld 4064PO Box 287, Paddington Qld [email protected]
wildstudio.com.au
©2020 Wild Studio Australia Pty Ltd
Client Drawing Issue Scale
@A3E 1 : 100
JUBILEE PLACE470 ST PAULS TERRACE, FORTITUDE VALLEY QLD 4006
Credit Suisse 20105 LS01
SECTIONS
1 : 100
SECTION 11
1 : 100
SECTION 22
1 : 100
SECTION 33
1 : 100
SECTION 44
1 : 100
SECTION 550 0.5 1 2 3 5m
LEGENDB1 STREET BINBK BOTTOM OF KERBPA1 HONED CONCRETE PAVEMENTPA2 ASPHALTPA3 STONE PAVEMENT - REFER ARCHITECT'S DRAWINGSPA4 STONE PAVEMENT - REFER ARCHITECT'S DRAWINGSPL1 PLANTING AREA TYPE 1PL2 PLANTING AREA TYPE 2S1 BCC STREET BENCHS2 PRECAST CONCRETE SEATTP TACTILE PAVINGTR1 VERTICAL STEEL WIRE MESHTR2 OVERHEAD STEEL WIRE MESHTG1 TREE GRATE 1200 x 1600mmTG2 TREE GRATE 1200 x 1200mmTK TOP OF KERB
TREE
0.000 EX EXISTING SURFACE LEVEL0.000 FINISHED SURFACE LEVELPD PLANTER DRAINW1 INSITU CONCRETE WALL
Issue Date Purpose Drawn ApprovedA 04/12/2020 PRELIMINARY AG OMB 29/01/2021 PRELIMINARY AG OMC 1/02/2021 PRELIMINARY AG OMD 02/03/2021 FOR INFORMATION AG OME 06/04/2021 FOR INFORMATION AG OM
NOT FOR CONSTRUCTION
UPPER GROUND
10100
LEVEL 01
16100
BB
5
LD-01
1
LD-01
JUBILEE HOTEL
MOUNDED PL1
PL2
S2W1
S2W1
2 00
900
300
300
5 00
UPPER GROUND
10100
LEVEL 01
16100
44
PRO
PER
TY B
OU
ND
ARY
MOUNDED PL15
LD-01
MOUNDED PL15
LD-01
ST P
AUL'
S TE
RR
ACE
S2
W1
S2
W1
E
LEVEL 01
16100
44
BENCH SEAT BY ARCHITECT
5
LD-01 MOUNDED PL1
PRO
PER
TY B
OU
ND
ARY
5
LD-01 PL1
E
LEVEL 03
25250
44
5
LD-01 MOUNDED PL1PR
OPE
RTY
BO
UN
DAR
Y
LEVEL 03
25250
11
5
LD-01 MOUNDED PL1
Project No.
13/46 Douglas Street, Milton Qld 4064PO Box 287, Paddington Qld [email protected]
wildstudio.com.au
©2020 Wild Studio Australia Pty Ltd
Client Drawing Issue Scale
@A3E 1 : 100
JUBILEE PLACE470 ST PAULS TERRACE, FORTITUDE VALLEY QLD 4006
Credit Suisse 20105 LS01
SECTIONS
1 : 100
SECTION 11
1 : 100
SECTION 22
1 : 100
SECTION 33
1 : 100
SECTION 44
1 : 100
SECTION 550 0.5 1 2 3 5m
LEGENDB1 STREET BINBK BOTTOM OF KERBPA1 HONED CONCRETE PAVEMENTPA2 ASPHALTPA3 STONE PAVEMENT - REFER ARCHITECT'S DRAWINGSPA4 STONE PAVEMENT - REFER ARCHITECT'S DRAWINGSPL1 PLANTING AREA TYPE 1PL2 PLANTING AREA TYPE 2S1 BCC STREET BENCHS2 PRECAST CONCRETE SEATTP TACTILE PAVINGTR1 VERTICAL STEEL WIRE MESHTR2 OVERHEAD STEEL WIRE MESHTG1 TREE GRATE 1200 x 1600mmTG2 TREE GRATE 1200 x 1200mmTK TOP OF KERB
TREE
0.000 EX EXISTING SURFACE LEVEL0.000 FINISHED SURFACE LEVELPD PLANTER DRAINW1 INSITU CONCRETE WALL
Issue Date Purpose Drawn ApprovedA 04/12/2020 PRELIMINARY AG OMB 29/01/2021 PRELIMINARY AG OMC 1/02/2021 PRELIMINARY AG OMD 02/03/2021 FOR INFORMATION AG OME 06/04/2021 FOR INFORMATION AG OM
NOT FOR CONSTRUCTION
Soil Specification
WILDSTUDIO.COM.AU I JUBILEE PLACE 20105 RFI [B] I 2021-04-20 I
(on podium)
(on ground)