ROOF CONSTRUCTION SOUTHERN GRANDSTAND FOOTBALL … · Football-Club FC St. Pauli, Hamburg AGN...

1
Client: Architects: Football-Club FC St. Pauli, Hamburg AGN Architects - Engineers - general planners Walter Hellmich GmbH, Dinslaken Freyler Industriebau GmbH, Kenzingen For the roof construction of the southern grandstand: Full structural design Vibration analysis Optimising calculations The construction was based on a ready planned and approved tender planning optimized and relieved by 35% steel. Construction of a new roof for the southern grandstand with standing area and seats for 5,600 spectators - roof covering an area of approx. 80 x 30.5 m - main trusses 80m in length braced by two outer supports and two inner supports - side structure made from steel trussed girders spanning 12.5 m und a cantilever of 18 m - the whole construction in very filigree i-beam sections and round pipe - taking advantage of plastic load reserves - assembly on site possible by joining prefabricated, welded subsystems and bolting with high-tensile screws Basis for this type of optimised construction, where we were able to save 35% of the originally calculated steel requirement, were the available and already planned and approved tender documents. 2008 Pictures / Illustrations: ProfessorPfeiferundPartner PartGmbB, Peters Stahlbau GmbH NEW BUILDING ROOF CONSTRUCTION SOUTHERN GRANDSTAND FOOTBALL STADIUM MILLERNTOR Hamburg (Germany) ProfessorPfeiferandPartner PartGmbB Structural engineering Building physics Fire protection Structural assessment PfeiferINTERPLAN is a registered trade mark www.pfeifer-interplan.com Our services: Brief description: Completion:

Transcript of ROOF CONSTRUCTION SOUTHERN GRANDSTAND FOOTBALL … · Football-Club FC St. Pauli, Hamburg AGN...

Client:

Architects:

Football-Club FC St. Pauli, Hamburg

AGN Architects - Engineers - general plannersWalter Hellmich GmbH, DinslakenFreyler Industriebau GmbH, Kenzingen

For the roof construction of the southern grandstand:Full structural design Vibration analysis Optimising calculations The construction was based on a ready planned and approved tender planning optimized andrelieved by 35% steel.

Construction of a new roof for the southern grandstand with standing area and seats for 5,600 spectators- roof covering an area of approx. 80 x 30.5 m- main trusses 80m in length braced by two outer supports and two inner supports- side structure made from steel trussed girders spanning 12.5 m und a cantilever of 18 m- the whole construction in very filigree i-beam sections and round pipe- taking advantage of plastic load reserves- assembly on site possible by joining prefabricated, welded subsystems and bolting with high-tensile screwsBasis for this type of optimised construction, where we were able to save 35% of the originally calculated steel requirement, were the available and already planned and approved tender documents.

2008

Pictures / Illustrations: ProfessorPfeiferundPartner PartGmbB, Peters Stahlbau GmbH

NEW BUILDING

ROOF CONSTRUCTION SOUTHERN GRANDSTANDFOOTBALL STADIUM MILLERNTOR Hamburg (Germany)

ProfessorPfeiferandPartner PartGmbB Structural engineering Building physics Fire protection Structural assessment PfeiferINTERPLAN is a registered trade mark

w w w. p f e i f e r - i n t e r p l a n . c o m

Our services:

Brief description:

Completion: