Rome, july 5, 2006
Observing project implementation and conducting project analysis
(UVER)
Presentation byLuigi Guerci
Public Investments Verification Unit (UVER)
The Unit performs controls during implementation and after completion of projects with:
• On site control
• Desk monitoring
Public Investments Verification Unit (UVER)
During the implementation
On site control
The activity consists of inspections on the construction sites and periodic contacts with project managers to find out potential problems and suggest solutions.
Public Investments Verification Unit (UVER)
During the implementation
On site control
Provides support and technical assistance to selected implementing administrations to accelerate the execution of projects.
Public Investments Verification Unit (UVER)
During the implementation
Single project solution• facilitation on project achievement• raising up potential problems• speed up procedures
General solution • feed back on general procedures • suggestion of changes in laws
Public Investments Verification Unit (UVER)
Projects are usually grouped with regard to the financial sources e.g. :
• National additional resourses
• EU funds
• Legge Obiettivo funds
During the implementation
Public Investments Verification Unit (UVER)
During the implementation
Framework programme agreements consist of:
• more than 60 bil €
• more than 10.000 projects
Public Investments Verification Unit (UVER)
During the implementation
-All projects are verified with a monitoring procedure (performed by SPTSI)
- 450 projects (selected among the most critical and important) were verified on site
Framework programme agreements
Public Investments Verification Unit (UVER)
Checking 450 projects we found out some common operational impediments as:
•financial problems (flows and coverage)
•design deficiency
•failure of the permission procedure
•inability of the implementing
administration
Public Investments Verification Unit (UVER)
During the implementation -Effect of the operational impediments
Some results579
730
472
519
448
315
1308
1663
1171
1921
722
830
962
1367
948
1218
395
380
0 500 1000 1500 2000 2500 3000 3500 4000
Media prevista
Media effettiva
Media prevista
Media effettiva
Media prevista
Media effettiva
Inter
venti
verifi
cati
Inter
venti
non
verifi
cati S
up. 5
Meur
o
Inter
venti
non
verifi
cati I
nf. 5
Meur
o
Predisposizione ed approvazioneprogetto preliminare
Periodo intercorrente tral'approvazione del preliminare el'inizio dei lavoriEsecuzione lavori
Public Investments Verification Unit (UVER)
During the implementation
In the period after the preliminary design (which usualy represents the inclusion of the project in the Framework Programme Agreement) and before the start of the construction work, there are nearly no expenditures
Public Investments Verification Unit (UVER)
After the preliminary design andbefore the construction
292
411
234
323
238
484
165
283
183
266
59
154
0 500 1000 1500 2000 2500
Media prevista
Media effettiva
Inte
rven
ti no
n ve
rific
ati S
up. 5
Meu
ro
Progettazione definitiva Approvazione progettazione definitiva Progettazione esecutiva
Approvazione progettazione esecutiva Aggiudicazione Approvazione aggiudicazione
Tot. 3,2 Anni
Tot. 5,2 Anni
Public Investments Verification Unit (UVER)
Risk
Financial programmes can be ineffective with the assigned resourses unemployed for 2 years (average).
Public Investments Verification Unit (UVER)
Feed back
The ex ante evaluation must consider the real capacity of a project of being implemented in a specific period.
Public Investments Verification Unit (UVER)
After the completion of a project
To answer to the questions • “ Was it worth it?”• “Is the service offered congrous with
the preset target ?”• “Are users satisfied?”
Effectiveness Evaluation (in progress activity)
Why ?
Public Investments Verification Unit (UVER)
GENERAL GOALS
Disseminating effectiveness evaluation culture (self monitoring)
Improve the governance of projects
Building a participatory process of evaluation (involvement of key stakeholders at all stages)
Create a public interest disseminating evaluation results
Providing guidelines for decision making by selecting best practices and quantitative indicators with their targets
Public Investments Verification Unit (UVER)
After the completion of a project
Verify and measure actual product and impact of concluded projects in terms of improved or added services to beneficiary communities.
Effectiveness Evaluation(in progress acitivity)
Public Investments Verification Unit (UVER)
After the completion of a project
Check of physical realization, direct results and indirect results with quantitative indicators.
Effectiveness Evaluation (in progress acitivity)
Public Investments Verification Unit (UVER)
HOW DO WE DOApply a standardized but flexible conceptual framework
through the following stages
Desk reviews of project related documents
Brainstorming with key stakeholders (objectives and needs identification)
Selection of performance indicators (process, outputs, outcomes, impacts)
Data collection (administrative and statistical sources, structured interviews, ad hoc questionnaires)
Fill up standardized projects forms containing summary information
Presentation and dissemination of evaluation results in specific and general reports
Public Investments Verification Unit (UVER)
After the completion of a project
Effectiveness Evaluation (in progress acitivity)
Project selection from a group of 310 called “Completamenti” (1,8 bil €).It is a group of non completed projects, that in 1999, we decided to carry on after an ex ante evaluation made by UVAL.
Public Investments Verification Unit (UVER)
After the completion of a project
Effectiveness Evaluation (in progress acitivity)
Totale
Non avviati
In corso
Conclusi non in esercizio
Conclusi in esercizio
Interventi di completamento
310 7 82 74 147
Interventi oggetto di valutazione d’efficacia
228 7 // 74 147
Interventi esaminati al 28/02/2006
60 7 // 9 44
Public Investments Verification Unit (UVER)
After the completion of a project
Effectiveness Evaluation (in progress acitivity)
Interventi conclusigià in esercizio
(44 casi)
Valutazionedi efficacia
Positiva40 casipari a
167,91 Mln €
Negativa4 casipari a
3,30 Mln €
Public Investments Verification Unit (UVER)
After the completion of a project
Effectiveness Evaluation (in progress acitivity)
For the uneffective projects the department suggested Cipe to deduct an equal amount of funds from the next assignment to the administrations involved.
Public Investments Verification Unit (UVER)
Quality results
• General achievement of results related to the construction
• Lack of targets related to operational results and impact
• Presence of gaps between construction and operation
Public Investments Verification Unit (UVER)
Basic Ideas
• Evaluate the real capacity of a project of being implemented in a specific period
• Keep control on the main step of a project, especially during the period after the preliminary design and before the start of construction (with nearly no expenditures)
• Fill the gap between the physical implementation and the working phase thinking from the beginning the services the project will provide and finding indicators to qualify the targets to be achieved