ROMANIAN GOVERNMENT COUNTY COUNCIL Project …...EUROPEAID/119083/D/SV/RO, ISPA Measure no....

25
ROMANIAN GOVERNMENT MINISTRY OF ENVIRONMENT AND SUSTAINABLE DEVELOPMENT Project financed by EUROPEAN UNION COUNTY COUNCIL BRASOV EUROPEAID/119083/D/SV/RO, ISPA Measure no. 2003/RO/16/P/PA/013-4 TECHNICAL ASSISTANCE FOR PROJECT PREPARATION IN THE WASTEWATER AND DRINKING WATER SECTOR IN ROMANIA REHABILITATION AND EXTENSION OF THE WATER SUPPLY AND SEWERAGE SYSTEMS IN BRASOV COUNTY, ROMANIA

Transcript of ROMANIAN GOVERNMENT COUNTY COUNCIL Project …...EUROPEAID/119083/D/SV/RO, ISPA Measure no....

Page 1: ROMANIAN GOVERNMENT COUNTY COUNCIL Project …...EUROPEAID/119083/D/SV/RO, ISPA Measure no. 2003/RO/16/P/PA/013-4 TECHNICAL ASSISTANCE FOR PROJECT PREPARATION IN THE WASTEWATER AND

ROMANIAN GOVERNMENT

MINISTRY OF ENVIRONMENT

AND SUSTAINABLE

DEVELOPMENT

Project financed by

EUROPEAN UNION

COUNTY COUNCIL

BRASOV

EUROPEAID/119083/D/SV/RO, ISPA Measure no. 2003/RO/16/P/PA/013-4

TECHNICAL ASSISTANCE FOR PROJECT PREPARATION IN THE WASTEWATER AND DRINKING WATER SECTOR IN ROMANIA

REHABILITATION AND EXTENSION OF THE WATER SUPPLY AND SEWERAGE SYSTEMS

IN BRASOV COUNTY, ROMANIA

Page 2: ROMANIAN GOVERNMENT COUNTY COUNCIL Project …...EUROPEAID/119083/D/SV/RO, ISPA Measure no. 2003/RO/16/P/PA/013-4 TECHNICAL ASSISTANCE FOR PROJECT PREPARATION IN THE WASTEWATER AND

COVASNA

PRAHOVA

ARGES

HARGHITA

SIBIU

GENERAL FRAME

OF THE PROJECT

Agglomerations in the project:

- Brasov (~370.000 inhab.);

- Codlea (~23.000 inhab.);

- Rupea (~19.000 inhab.);

- Prejmer (~25.000 inhab.);

- Bran-Moieciu (~7.000 inhab.).

BRASOV COUNTY

Page 3: ROMANIAN GOVERNMENT COUNTY COUNCIL Project …...EUROPEAID/119083/D/SV/RO, ISPA Measure no. 2003/RO/16/P/PA/013-4 TECHNICAL ASSISTANCE FOR PROJECT PREPARATION IN THE WASTEWATER AND
Page 4: ROMANIAN GOVERNMENT COUNTY COUNCIL Project …...EUROPEAID/119083/D/SV/RO, ISPA Measure no. 2003/RO/16/P/PA/013-4 TECHNICAL ASSISTANCE FOR PROJECT PREPARATION IN THE WASTEWATER AND

GENERAL DESCRIPTION OF THE EXISTING SITUATION

Drinking water treatment plants Old and obsolete equipment;

Frequent damages;

Drinking water does not meet the necessary quality according to the EU

Drinking Water Directive;

Transmission pipes Long sectors made of asbestos cement or steel, with frequent damages;

Considerable leakages on the transmission pipes;

Insufficient development of the systems / more transmission pipes required.

Storage tanks Damages of the storage tanks;

Hydraulic installation corroded, with long service life and with often

damages;

Insufficient development of the systems / more reservoirs required.

Page 5: ROMANIAN GOVERNMENT COUNTY COUNCIL Project …...EUROPEAID/119083/D/SV/RO, ISPA Measure no. 2003/RO/16/P/PA/013-4 TECHNICAL ASSISTANCE FOR PROJECT PREPARATION IN THE WASTEWATER AND

EXISTING SITUATION

Pumping stations Poor condition of the buildings of the pumping stations;

Equipment with long service life, low efficiency and high energy

consumption;

Insufficient development of the systems / more pumping stations required.

Distribution network Pipes made of unsuitable materials (steel, asbestos cement), with long

service life, corroded and in poor condition;

High leakages;

Insufficient coverage of the residential areas.

Page 6: ROMANIAN GOVERNMENT COUNTY COUNCIL Project …...EUROPEAID/119083/D/SV/RO, ISPA Measure no. 2003/RO/16/P/PA/013-4 TECHNICAL ASSISTANCE FOR PROJECT PREPARATION IN THE WASTEWATER AND

EXISTING SITUATION

Sewerage network Insufficient coverage of the residential areas in all agglomerations;

Considerable length of the network over 20 years old;

No adequate equipment for operation and maintenance;

Frequent blockages and damages.

Wastewater pumping stations Equipment with long service life with high energy consumption due to

low efficiency;

Mechanical and electrical installations is extensively corroded;

Frequent damages and interruptions in operation.

Wastewater treatment plant Totally or partially out of order in all agglomerations;

Non-compliance with the requirements of NTPA 001/2002 and EU

Wastewater Directive;

More WWTPs required.

Page 7: ROMANIAN GOVERNMENT COUNTY COUNCIL Project …...EUROPEAID/119083/D/SV/RO, ISPA Measure no. 2003/RO/16/P/PA/013-4 TECHNICAL ASSISTANCE FOR PROJECT PREPARATION IN THE WASTEWATER AND

OBJECTIVES AND ACHIEVEMENTS

Overall objective To improve the infrastructure in the water sector for the benefit of the

environment and man in order to meet the water compliance obligations in

the Accession Treaty and the objectives of the SOP Environment.

Main achievements In the field of water supply

Provision of drinking water meeting the standards of EC Drinking Water

Directive 98/83/EC;

Providing with good quality drinking water to the population;

Assurance of quality and availability for water related services according to

the principles of maximum cost efficiency and quality in operation and

population affordability;

Improved security of supply through replacement of structurally defective

mains;

Reduced physical water losses.

Page 8: ROMANIAN GOVERNMENT COUNTY COUNCIL Project …...EUROPEAID/119083/D/SV/RO, ISPA Measure no. 2003/RO/16/P/PA/013-4 TECHNICAL ASSISTANCE FOR PROJECT PREPARATION IN THE WASTEWATER AND

OBJECTIVES AND ACHIEVEMENTS

In the field of wastewater collection and treatment Better quality of surface waters and environment by minimizing the effects

of human settlements;

Mitigation of health risk by extending the sewerage network to serve

population currently dependent on on-plot waste disposal facilities with

reduction in associated risk of surface and ground water pollution;

Reduction of infiltration in the system;

Compliance with the treatment standards of the Urban Wastewater

Treatment Directive 91/271/EEC for discharge into non-sensitive water

body;

Reduced pollution of the rivers Vulcanita, Ghimbasel, Olt and Danube due

poorly treated wastewater effluent.

Page 9: ROMANIAN GOVERNMENT COUNTY COUNCIL Project …...EUROPEAID/119083/D/SV/RO, ISPA Measure no. 2003/RO/16/P/PA/013-4 TECHNICAL ASSISTANCE FOR PROJECT PREPARATION IN THE WASTEWATER AND

INVESTMENT OBJECTIVES

Item Component

TOTAL

(MEuro)

1

New transmission pipe Tarlung

– Dealul Melcilor (15.8 km, Dn

1200 mm)

21.6

2 New transmission pipe Tarlung

– Sacele (5.4 km, Dn 500 mm) 2.4

3

New transmission pipe Stupini

– Feldioara (15.5 km, Dn 315

mm)

3.7

4

New transmission pipe

Sanpetru – Bod (6.7 km, Dn

315, 500 mm)

1.6

5

Rehabilitation of the

distribution network in Brasov

(47 km)

9.3

6 Rehabilitation of distribution

network in Sanpetru (14.8 km) 1.6

7 Rehabilitation of distribution

network in Harman (16 km) 1.6

8 SCADA, automation and

control 0.6

TOTAL (MEuro) 42.4 Cohesion funds Other funds ISPA funds

ColoniaReconstructia

FELDIOARA

BOD

CabanaDimbul Morii

DUMBRAVITA

Crizbav

Cutus

HALCHIU

Satu Nou

CODLEA

GHIMBAV

CRISTIAN

RISNOV

HARMAN

SANPETRU

SACELE

Poiana Brasov

Timisu de Jos

Stupini

Colonia Bod

CLUSTER BRASOV – WATER (except Codlea agglom.)

Page 10: ROMANIAN GOVERNMENT COUNTY COUNCIL Project …...EUROPEAID/119083/D/SV/RO, ISPA Measure no. 2003/RO/16/P/PA/013-4 TECHNICAL ASSISTANCE FOR PROJECT PREPARATION IN THE WASTEWATER AND

INVESTMENT OBJECTIVES

CLUSTER BRASOV – WASTEWATER (except. Codlea aggl.)

Item Component

TOTAL

(MEuro)

1

Rehabilitation and extension of

the wastewater collection

system in Brasov (18.7 km)

1.4

2

Rehabilitation and extension of

the wastewater collection

system in Sacele (11.4 km)

2.1

3

Rehabilitation and extension of

the wastewater collection

system in Stupini (10.5 km)

1.9

4

Wastewater collector Cristian -

Brasov WWTP – Feldioara (25.5

km)

11.4

5

Rehabilitation of the wastewater

treatment plant Brasov (500.000

p.e.)

24.3

6

Extension of the wastewater

collection system in Feldioara

(11.5 km)

1.9

7 New wastewater treatment plant

in Feldioara (142.000 p.e.) 22.1

TOTAL (MEuro) 65.1

ColoniaReconstructia

AGGLOMERATION

BOD

CabanaDimbul Morii

DUMBRAVITA

Crizbav

Cutus

HALCHIU

Satu Nou

CODLEA

GHIMBAV

CRISTIAN

RISNOV

HARMANSANPETRU

SACELE

Poiana Brasov

Timisu de Jos

Stupini

Colonia Bod

Cohesion funds Other funds

WWTP Brasov

WWTP Feldioara

Main collector - cohesion funds Main collector - other funds

Limits of Agglomerations

AGGLOMERATION

BRASOV - SACELEAGGLOMERATION

FELDIOARA

CODLEA

FELDIOARA

Page 11: ROMANIAN GOVERNMENT COUNTY COUNCIL Project …...EUROPEAID/119083/D/SV/RO, ISPA Measure no. 2003/RO/16/P/PA/013-4 TECHNICAL ASSISTANCE FOR PROJECT PREPARATION IN THE WASTEWATER AND

INVESTMENT OBJECTIVES

AGGLOMERATION CODLEA - WATER

Item Component TOTAL

(MEuro)

1

Rehabilitation of drinking

water treatment plant

Codlea (chlorination)

0.8

2 New drinking water

pumping station Ghimbav 0.4

3

New drinking water

transmission pipe

Codlea-Ghimbav (6.0 km

Dn 315 mm)

2.4

4 Rehabilitation of water

reservoirs in Codlea 0.5

5

Rehabilitation and

extension of the

distribution network in

Codlea (15.1 km)

1.5

6 Water metering 0.1

7 SCADA, automation and

control 0.2

TOTAL (MEuro) 5.9

Str. L

iliac

ului

Str. Petuniei

Str. Petuniei

Str. Frezei

Str. Frezei

Str. P

anse

lute

i

E68

Fag

aras

Sib

iu

Str

. Lunga

Str

. L

unga

Str

. Lun

ga

Str. L

unga

Str.

Nou

a

Str.

Mun

tisor

Str. Muntisor

Str.

Lat

eral

a

Str. Crinului

Str. Secerii

Str. Crizantemelor

Str. Toamnei

Str. Halchiului

Str. Targului

Vulc

anita

Str. Mecanizatorilor

Str

. Nou

a

Str

. Nou

a

Str

. N

oua

Str

. Sch

eilo

r

DN

13

Hal

chiu

Feldi

oara

Str. C

ampu

l Alb

Str. Izvor

Str. C

iuca

s

Str.

Cea

hlau

Str.

Bal

ea

Str.

Post

avar

ul

Str. Salciei

Str. Plopului

Str

. Sch

eilo

r

Str. Mesteacanului

Str. R

achitei

Str. S

cheil

or

Str. S

cheil

or

Str. R

azoarelor

Str. Coaste

i

Str. Pietre

iStr. Cararii

Str. C

ampu

l Alb

PRIMARIE

Str

. Fab

rici

i

Str. Plutelor

Str. Dacia

Str

. C

him

istilo

r

Str. Dacia

Str

. V

. A

lecs

andr

i

Str. Barsei

Str. Barsei

Str. Barsei

Str. Barsei

E68

BRASOVGhimbav

112A

Zar

nes

tiR

asnov

Vulc

an

Sose

aua

Vulc

anulu

i

Sose

aua

Vulc

anulu

i

Str.L

unga

Str

. L

unga

Str

. M

. S

adovea

nu

Str. ConstitutieiStr. M

. Eminescu

Str

. M

. K

ogal

nic

eanu

Str. Crisa

n

Str

. F

anta

nii

Str. Fierarilo

rStr. C

ooperati

vei

Str. Cetatii

Str. Cetatii

Str. Cetatii

Str. Ghe. D

oja

Str. A

vram

Ianc

u

Str. A

vram Ia

ncu

Str. M. E

minescu

Str. Caprioarei Str. N

icol

ae B

alce

scu

Str. M. Em

inescu

Str. C

onstitutiei

Str. C

losca

Str. M. Sadoveanu

Str. A

l. I.

Cuza

Str. A

l. I.

Cuz

a

Str. Horia

Str. Horia

Str. A

vram

Ianc

u

Str. Horia

Str

. Nic

olae

Bal

cesc

u

Str. Magurii

Str. G

aroa

felo

r

Str. G

aroa

felo

r

Str.

Dup

a Zid

uri

Str. Brazilor

Str. Magurii

Str. Magurii

Str. Libertatii

Str

. 9 M

ai

Spitalul

Municipal

Str

. Pri

mav

erii

Str

. Nor

dulu

i

Str. E

duar

d M

orre

sSt

r. Ion

Ale

xand

ruSt

r. A

urel

Bor

dena

che

Str. A

. Zig

ler

Str. M

. Kon

iges

Str. F. Reimesch

Str. Pietii

WATER FACILITIES (Pumping Station)

PROPOSED INDUSTRIAL AREA

EXISTENT REZERVOIR 2 X 2500 MCIN PROPERTY OF S.C. COLOROM S.A.

EXISTENT REZERVOIR 2 X 750 MC

R

Dn 100 m

m

Dn 100 m

m

Dn 100 mm

Dn

250

mm

Dn 100 m

m

Dn 100 m

m

Dn 100 mm

Dn 100 mm

Dn 100 m

m

Dn 100 mm

Dn 1

25 m

mD

n 1

25 m

m

Dn

100

mm

Dn

150

mm

Dn

100

mm

Dn 110 m

m

Dn 100 mm

Dn

110

mm

Dn 400 mm

Dn 275 mm

Dn 1

00 m

m

Dn 100 mm

Dn 1

00 m

m

Dn 100 mm

Dn 100 m

m

Dn 2

00 m

m

Dn 100 m

m

Dn 110 mm

Dn 100 mm

Dn 100 m

m

Dn 100 m

m

Dn 60 mm

Dn

150

mm

Dn

200

mm

Dn

200

mm

Dn 100 mm

Dn 100 m

m

Dn 100 mm

Dn 120 PE mm

Dn 160 PE mm

Dn 160 PE mm

Dn

160

PE m

m

Dn

160

PE m

m

Dn

200

PE m

m

Dn

100

mm

Dn

100

mm

Dn

160

mm

Dn

100

mm

Dn 100 mm

Dn

100

mm

Dn 100 mm

Dn 60 mm

Dn 100 mm

Dn 100 mm

Dn

100

mm

Dn 1

00 m

m

Dn

100

mm

Dn 100 mm

Dn 100 mm

Dn 100 mm

Dn 100 mm

Dn 100 mm

Dn 100 mm

Dn 100 mm

Dn 100 mm

Dn

100

mm

Dn 1

00 m

m

Dn

100

mm

Dn 200 m

m

Dn 200 mm

Dn 100 m

m

Dn

200

mm

Dn

200

mm

Dn

100

mm

Dn

200

mm

Dn

100

mm

Dn 100 mm

Dn

100

mmDn

100

mmDn

100

mmDn

100

mm

Dn 160 mm

Dn 140 PE mm

Dn

160

PE

mm

Dn

140

PE

mm

Dn

160

PE

mm

Dn

160

PE

mm

Dn

160

PE

mm

Dn

160

PE

mm

Dn

160

PE

mm

Dn 160 PE mm

Dn

160

PE

mm

Dn

140

PE

mm

Dn

140

PE

mm

Dn

160

PE

mm

Dn

160

PE

mm

Dn

140

PE

mm

Dn 160 PE mm

Str. Garii

Dn

160

PE m

m Dn

160

PE m

m

Dn

160

PE

mm

Dn

160

mm

Dn 160 P

E m

m

Dn 160 PE

mm

Dn

160

PE

mm

ZONA INDUSTRIALA PROPUSA

Str. Carpati

Str. Negoiu

Str. Cararii

SP 1

Dn 100 mm

226

Dn 200

Dn 100 mm

Dn 100 mm

Dn 100 mm

Dn

100

mm

Dn 1

25 m

m

Dn 200 mm

Dn 100 mm

Dn 160 PE mm

Dn 160 PE mm

Dn

100

mm

Dn 160 PE m

m

Dn

100

mm

Dn

100

mm

Dn 100 m

m

Dn 100 m

m

Dn

100

mm

Dn 100 mm

Dn

160

PE mm

Dn

100

mm

Dn

160

PE

mm

Dn 275 mm

Dn 400 mm

Dn 100 mm

Dn 100 mm

Dn 175 m

mD

n 150 mm

Dn

100

mm

Dn 100 mm

Dn 100 mm

Dn

100

mm

Dn

100

mm

Dn 100 mm

Dn 100 m

m

Dn 100 mm

Dn

160

PE

mm

Dn 140 PE mm

Dn 1

00 m

m

Dn

100

mm

Dn

100

mm

Dn 16

0 PE

mm

Dn

100

mm

Dn

100

mm

Dn

100

mm

Dn

100

mm

Dn 1

00 m

m

Dn

100

mm

Dn 100 m

m

Dn 100 m

m

Dn 100 mm

Dn 160 PE

mm

Dn 160 P

E m

m

Zona Industriala 20 Ha

36 parcele x 5000 mp

Str. Halchiului

16 locuinte noi

Str. Iosif Comanescu

Str. A

gricultorilor

Str. Negoiu

Str. Carpati

Str. Bucegi

Str

. 9 M

ai

Str. Podul de Piatra

Str. Venus

1 2

3

4

5

6

789

10

11

12

13

14

15

16

17

1918

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

Dn 100 mm

Dn 100 mm

Dn 100 mm

Dn 100 m

m

Dn 400 mm

41

42

43

44

45

46

47

48

495051

52

53

54

5556

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

74

75

76

77

78

79

81

80

82

83

84

85

86

87

88

89

90

91

92

93

94

9596

97

98

99100

101

102

103

104

105

106

107

108

109 110

111

112

113

114

115

116

117

118

119

120

121

122

123

124

125

126

127

128

129 130131

132

133

134

SP 2

NEW RESERVOIR

CPS

CPU

Str

.

Lat

eral

a

Str.

Constitutiei

Str

. G. C

osbu

c

Str

. T

rand

afir

ilor

Str

. I. L

. Car

agia

le

Str

. Nuf

erilor

Str. Serelor

Str. Izvor

Str.

Mun

tisor

Str.

Plevn

ei

Str. Aurel Vlaicu

A

A

A

A

A

A

A

A

A

A

A

A

A

C

PS

PD

N

559,1

sere

sere

sere

549,3

evanghelica

casa culturatesatoria Codlea

Casa reglare

gaze

CAP Codlea

CODLEA

Intrep.

Magura(sect. mobila)

mobila

Stadion"Magura"

tribuna

teren volei

santier

cimitirortodox

cimitr

evanghelic

rezervor

apa

depozit

lemne

GOSPODARIA DE APA POTABILA (SP)

rampa

T.B.M.

statie utilaj

hala

intrep.

dereparatii

penitenciar

rezervor apa

teren volei

teren

handbal

teren baschet

sc.

hala

S.M.A.

S.M.T.

Codlea

Gra

dina

rilo

r

Str

.

Garii

Str.

Str. Libertatii

Vladimirescu

Tudor

Str.

piata

intr.

mobila

4

3

3

3

3

3

3

3

3

3

3

3

3

3

REZERVOR EXISTENT 2 X 2500 MC

APARTINAND S.C. COLOROM S.A.

P. V

ulc

anit

a

3

3

4

R. V

ulca

nita

Str.Florilor

Nicolae Balcescu

Str. M. Viteazu

peco

depozitlemne

R2 - REZERVOR EXISTENT 2 X 75 MC

TAMPON PENTRU SP2

R1 - REZERVOR EXISTENT 2 X 40 MC

PENTRU ZONA DE INALTA PRESIUNE

REZERVOR EXISTENT 2 X 750 MC

Str. Unirii

Str

.

15 N

oiem

brie

135

136

137

138

139

140

141

142

143

144

145

146

147

148

149 150

151

152

153

154

155

156

157

158

159

160161

162163

164

165

166

167

168

169

170

171

172

173

174

175

176177

178

179

180

181

182

183

184

185

186

187188

189

190191

192

193

194

195196197

198

199

200

201

202

203

204

205

206

207

208

209

210

211

212

213

214

215

216

217

218

219

220

221

222223

224

225

Page 12: ROMANIAN GOVERNMENT COUNTY COUNCIL Project …...EUROPEAID/119083/D/SV/RO, ISPA Measure no. 2003/RO/16/P/PA/013-4 TECHNICAL ASSISTANCE FOR PROJECT PREPARATION IN THE WASTEWATER AND

INVESTMENT OBJECTIVES

AGGLOMERATION CODLEA - WASTEWATER

Item Component TOTAL

(MEuro)

1

Rehabilitation and

extension of the

wastewater collection

system in Codlea

(12.2 km)

2.3

2

Wastewater collector

Codlea-Feldioara

(18.6 km)

6.4

TOTAL (MEuro) 8.7

Gra

din

aril

or

Str.

Garii

Str.

Str. Libertatii

Vladimirescu

Tudor

Str.

Str.

Florilor

Nicolae Balcescu

Str. M. Viteazu

Str.

Late

rala

Str.

Constitutiei

Str. G

. C

osb

uc

Str. Tra

ndafir

ilor

Str. I. L

. C

ara

gia

le

Str. N

ufe

rilor

Str. Serelor

Str. Izvor

Str.

Mun

tisor

Str.

Plevn

ei

Str. Aurel Vlaicu

Str. Unirii

Str.

15

Noie

mbrie

37

Dn 4

00 m

m

Dn 4

00 m

m

Dn

400

mm

Dn 400 m

m

38

41

40

39

26

48

4749

50

46

45

44

55

51

52

53

54

43

56

CV-1542.15

544.50

CV-5542.70

545.00

CV-2

CS-1

CV-3

CS-2

CV-4

CV-6543.65

546.10

CV-15546.47

549.00

CV-18547.60(549.51)

551.25

CV-14

CV-13

CV-12

CV-11

CS-4

CV-10

CV-9

CV-8

CS-3

CV-7

CS-6

CV-17

CV-16

CS-5

CV-20549.45

552.10

CV-19548.38

551.60

547.37

551.00

547.15

550.40

546.92

550.00

546.70

549.50

546.22

548.50

545.97

548.30

545.72

548.20

545.48

548.10

545.23

548.00

544.80

547.60

544.66

547.20

544.41

547.00

544.16

546.70

543.91

546.30

542.60

544.90

542.50

544.80

542.41

544.70

542.31

544.60

542.22

544.50

CV-21549.71

552.30

CV-22549.90

552.40

CV-23550.88

552.80

CS-7551.75

553.00

CV-24552.83

555.50

CV-25553.80

558.00

CV-26554.78

561.50

CV-27556.05

563.00

561.25563.00CV-28

CS-8558.92

563.00

561.30563.25CV-29

1

2

3

4

5

6

278

9

10

11

12

131415

16

17

18

19

20

21

22

23

24

25

42

7

28

29

30

31

35

33

32

36

34

564.56

566.50CV-30

568.12570.70CV-31

568.90

571.20CV-32

569.87572.50CS-9

570.83573.50CV-33

571.78574.65CV-34

586.30588.40CV-35

582.48585.40CV-36

578.66582.40CV-37

574.84

579.40CS-10

571.03.30

576.40CV-38

568.48571.35CV-39

566.18

568.90CV-40

563.87566.43CS-11

561.57563.97CV-41

558.65560.86CV-42

567.90569.80CV-43

566.23569.19CV-44

564.57

566.58CS-12

562.90

564.97CV-45

561.23

563.36CV-46

559.57

561.75CV-47

556.20

557.85CV-50

557.18560.05CV-48

556.69558.96CV-49

555.04

556.70CV-51

553.87555.56CV-52

552.75554.45CV-53

552.17554.09CV-54

551.60

553.73CV-55

551.02

553.38CV-56

550.44

553.02CS-13

549.87552.66CV-57

549.29552.30CV-58

548.71551.94CV-59

548.14551.68CV-60

559.50

561.00CV-61

557.83

559.40CV-62

557.75561.20CV-64

556.96559.48CV-63

557.70561.15CV-65

559.65

562.45CV-66

561.05563.25CV-68

559.65562.45CV-67

561.56563.25CV-70

561.37563.25CS-14

561.17563.25CV-71

561.00563.70CV-72

40'

561.75563.25CV-69

560.77563.40CS-15

560.56563.00CV-73

559.79

562.00CV-74

559.02

561.00CV-75 558.75

560.85CV-76

558.61560.83CV-77

558.55560.80CV-78

557.65561.65CV-79

557.50

564.15CV-80

574.30

575.75CV-81

572.09

574.00CV-82

569.87

572.00CS-16

567.18

568.00CV-83

564.85

566.00CS-17

562.63564.50CV-84

575.00

577.00CV-85

572.76

576.00CV-86

570.51573.50CS-18

567.74579.40CV-87

565.50567.00CS-19

563.25565.00CV-88

557.05559.25CV-89

555.37

559.45CV-91

556.21559.35CV-90

547.30549.90CV-98

543.50545.70

SPAU

554.55

563.40CV-156

CV-157

578.84580.00

CV-158

578.17579.00

CV-159

577.69578.60

CV-160

601.74602.90

CV-161

598.23599.34

CV-162

594.71595.79

CS-35

591.19592.23

CV-163

587.67588.68

CV-164

584.15585.12

CV-165

580.63581.56

CV-166

576.34577.25

CV-167

574.79575.70

CV-168

584.99586.15

CV-169

582.11583.00

CV-170

579.23580.00

CV-171

579.89581.05

CV-172

577.11578.00

CV-173

573.72575.15

CV-174

571.49573.00

CS-36

569.27571.00

CV-175

567.04569.00

CV-176

564.82566.50

CV-177

572.59564.00

CV-178

560.37563.00

CV-179

558.40561.00

CV-180

557.25559.75

CV-181

550.35

552.00

WW

TP Feld

ioara

New main

sewer t

o

559.40CV-92

553.72559.35CS-20

552.90559.10CV-93

552.07558.45CV-94

551.24557.00CS-21

550.42

555.00CV-95

549.59

555.45CV-96

548.96

555.50CS-22

547.94553.45CV-97

CV-99

H=10 mQ= 1... 2 l/s

575.09576.25CV-100

574.02576.95CV-101

572.94

577.00CV-102

571.87576.25CS-23

571.04576.92CV-104

569.97575.75CV-105

568.89

575.50CV-106

567.82575.20CS-24

566.83575.40CV-107

566.03

CV-108574.52

564.95

CV-109572.25

563.88

CS-25570.00

562.80

CV-110567.25

561.73

CV-111564.50

560.65

CV-112562.75

(560.00)

550.99552.15

CV-113

550.59552.05

CV-114

550.19551.85

CS-26

549.78551.50

CV-115

CV-116

557.34

558.50

CV-117

556.95

558.40

CS-27

556.55

558.30

CV-118

556.15

558.10

CV-119

555.75

557.80

CV-120

555.36

557.60

CV-121

554.96

557.50

CS-28

554.56

557.30

CV-122

554.16

557.20

CV-123

553.76

557.00

CV-124

553.37

556.80

CV-125

552.97

556.60

CV-126

552.57

556.30

CV-127

552.16

556.10

CV-128

551.70

555.80

CS-29

551.40555.40

CV-129

550.90555.00

CV-130

550.42554.30

CV-131

550.02553.50

CV-132

549.62553.10

CV-133

549.22553.00

CS-30

548.81552.80

CV-134

541.41552.50

CV-135

548.01552.00

557.84

559.00CV-136

557.06

558.50CV-137

556.22558.20CV-138

555.44

557.50CV-139

554.66

556.70CS-31

553.88556.00CV-140

553.07554.50CV-141

552.29554.00CV-142

551.51553.70CS-32

550.73553.40CV-143

549.95553.70CV-144

549.20551.50CV-145

556.15558.75CV-146

555.33559.00CV-147

554.50

559.00CV-148

553.67558.90CS-33

552.84

558.60CV-149

552.01558.00CV-150

551.18

556.50CV-151

550.35554.60CV-152

549.52555.00CS-34

548.69555.00CV-153

547.86553.00CV-154

547.20549.80CV-155

560.95

Str. Negoiu

Str. Carpati

Str. Bucegi

Str. 9 M

ai

Str. Podul de Piatra

Str. Venus

Str.

Cam

pul A

lb

Str. Izvor

Str.

Ciu

cas

Str.

Cea

hlau

Str.

Bal

ea

Str.

Pos

tava

rul

Str. Salciei

Str. Plopului

Str. S

cheilo

r

Str. Mesteacanului

Str. R

ach

itei

Str. S

cheilor

Str. S

cheilor

Str. R

azo

are

lor

Str. Coastei

Str. Pietre

i

Str. Cararii

Str.

Cam

pul A

lb

Str. Fabric

ii

Str. Plutelor

Str. Dacia Str

. C

him

istil

or

Str. Dacia

Str. V

. A

lecs

andri

Str. Barsei

Str. Barsei

Str. Barsei

Sose

aua V

ulc

anulu

i

Soseau

a V

ulc

anulu

i

Str

.Lunga

Str

. Lunga

Str

. M

. S

adoveanu

Str. ConstitutieiStr. M

. Eminescu

Str

. M

. K

ogaln

iceanu

Str. Crisan S

tr.

Fa

nta

nii

Str. FierarilorStr.

Coopera

tivei

Str. Cetatii

Str. Cetatii

Str. C

etatii

Str. G

he. Doja

Str. A

vram

Ianc

u

Str. A

vram Ia

ncu

Str. M

. Em

inescu

Str. Caprioarei

Str. N

icola

e B

alce

scu

Str. M. Em

inescu Str. C

onstitu

tiei

Str. C

losca

Str. M

. Sadoveanu

Str. A

l. I. C

uza

Str.

Al. I.

Cuz

a

Str. H

oria

Str. H

oria

Str. A

vram

Iancu

Str. Horia

Str. N

icola

e B

alc

esc

u

Str. Magurii

Str. G

aro

afe

lor

Str. G

aro

afe

lor

Str. D

upa

Zid

uri

Str. Brazilor

Str. Magurii

Str. Magurii

Str. Libertatii Str. 9 M

ai

Str. P

rimave

riiStr. 9 M

ai

Str. N

ord

ulu

i

Str. Edua

rd M

orre

sStr. I

on A

lexa

ndru

Str. A

urel

Bor

dena

che

Str. A. Zig

ler

Str. M

. Kon

iges

Str. F. Reimesch

Str. Pietii

Str. Li

liacu

lui

Str. Petuniei

Str. Petuniei

Str. Frezei

Str. Freziei

Str. Pan

selu

tei

Str. L

unga

Str

. Lunga

Str. Lunga

Str. L

unga

Str.

Nou

a

Str.

Mun

tisor

Str. Muntisor

Str.

Lat

eral

a

Str. Crinului

Str. Secerii

Str. Crizantemelor

Str. Toamnei

Str. Halchiului

Str. Targului

Str. N

oua

Str. N

oua

Str

. N

oua

Str. S

cheilo

r

Str. Halchiului

Str. Iosif Comanescu

Str. A

gricu

ltorilor

Dn 300 m

m

Dn 300 mm

Dn 2

50 m

m

Dn 250 m

m

Dn 250 mm

Dn 250 mm

Dn 250 m

m

Dn 250 mm

Dn 2

50 m

m

Dn 2

50 m

m

Dn 300 mm

Dn

250

mm

Dn 300 m

m

Dn 300 m

m

Dn 250 m

m

Dn

250

mm

Dn 200 mm

Dn 2

50 m

m

Dn 250 mm

Dn 250 mm

Dn

250

mm

Dn 200 m

m

Dn 250 m

m

Dn 250 m

m

Dn 250 m

mDn 300 mm

Dn

300

mm

PVC 400

mm

PVC 4

00 m

m

PVC

400

mm

Dn

300

mm

Dn 250 mm

Dn 250 m

m

Dn

200

mm

Dn 250 m

m

Dn 2

50 m

m

Dn 2

50 m

m

Dn 300 mm

Dn 250 mm

Dn 250 m

m

Dn 25

0 mm

Dn 300 mm

Dn 300 mm

Dn 2

50 m

m

Dn 2

50 m

m

Dn 250 mm

Dn 250 mm

Dn 250 mm

Dn 2

50

mm

Dn 2

50 m

m

Dn 300 m

m

Dn 3

00 m

m

Dn 30

0 mm

Dn 250 mm

Dn 250 mm

Dn

250

mm

Dn 250 mm

Dn

250

mm

Dn 250 mm

Dn 250 mm

Dn 2

50 m

m

Dn 250 mm

Dn 250 mm Dn 2

50 m

m

Dn 2

50 m

m

Dn 2

50 m

m

590650

630

590

600

620

600

620

630

640

650

690

710

730

590

550

550

580

590

565

550

640

610

570

590

580

600

630

560

555

560

555

560570

Str. Carpati

Str. Negoiu

560,4

ZONA INDUSTRIALA PROPUSA

Page 13: ROMANIAN GOVERNMENT COUNTY COUNCIL Project …...EUROPEAID/119083/D/SV/RO, ISPA Measure no. 2003/RO/16/P/PA/013-4 TECHNICAL ASSISTANCE FOR PROJECT PREPARATION IN THE WASTEWATER AND

INVESTMENT OBJECTIVES

AGGLOMERATION RUPEA - WATER

Item

Component TOTAL

(MEuro)

1

Rehabilitation of Dopca

transmission pipe (3.0

km, Dn 400 mm)

1.8

2

Rehabilitation of drinking

water treatment plant

Bogata

2.6

3

Rehabilitation of the

distribution network

Hoghiz (9.0 km)

1.1

4

Rehabilitation of the

distribution network

Rupea (12.7 km)

1.1

5 Water metering 0.1

6 SCADA, automation and

control 0.2

TOTAL (MEuro) 6.9 Lupsa

Mercheasa

Cuciulata

Fintina

UNGRA

HOMOROD

DopcaBogata Olteana

Gara Rupea

Baile Homorod

Cohesion funds Other funds

HOGHIZ

RUPEA

BogataOlteanaDWTP

Page 14: ROMANIAN GOVERNMENT COUNTY COUNCIL Project …...EUROPEAID/119083/D/SV/RO, ISPA Measure no. 2003/RO/16/P/PA/013-4 TECHNICAL ASSISTANCE FOR PROJECT PREPARATION IN THE WASTEWATER AND

INVESTMENT OBJECTIVES

AGGLOMERATION RUPEA - WASTEWATER

Item

Component TOTAL

(MEuro)

1

Rehabilitation of the

wastewater collection

system in Rupea (18 km)

4.3

2

Extension of the

sewerage collection

system in Cart. Gara

Rupea (1.0 km)

0.2

3

Sewerage collection

system in Homorod (5.7

km)

1.1

4 Sewerage collection

system in Hoghiz (9.5 km) 1.8

5

New wastewater

treatment plant in Hoghiz

(22.000 p.e.)

5.2

TOTAL (MEuro) 12.6 Lupsa

Mercheasa

Cuciulata

Fintina

UNGRA

HOGHIZ

HOMOROD

Dopca

Bogata Olteana

Gara Rupea

Baile Homorod

Cohesion funds Other funds

WWTP Hoghiz

Main collector cohesion funds Limits of Agglomeration

RUPEAAGGLOMERATION

RUPEA

GARA RUPEAAGGLOMERATION

HOGHIZAGGLOMERATION

HOMORODAGGLOMERATION

Page 15: ROMANIAN GOVERNMENT COUNTY COUNCIL Project …...EUROPEAID/119083/D/SV/RO, ISPA Measure no. 2003/RO/16/P/PA/013-4 TECHNICAL ASSISTANCE FOR PROJECT PREPARATION IN THE WASTEWATER AND

INVESTMENT OBJECTIVES

AGGLOMERATION PREJMER - WATER

Item

Component TOTAL

(MEuro)

1

Extension of distribution

network in Prejmer (32.6

km)

3.0

2 SCADA, automation and

control 0.2

TOTAL (MEuro) 3.2

Stupinii Prejmerelui

Lunca Calnicului

Zizin

Purcareni

Carpinis

TELIU

BUDILA

Cohesion funds Other funds

TARLUGENI

PREJMER

Page 16: ROMANIAN GOVERNMENT COUNTY COUNCIL Project …...EUROPEAID/119083/D/SV/RO, ISPA Measure no. 2003/RO/16/P/PA/013-4 TECHNICAL ASSISTANCE FOR PROJECT PREPARATION IN THE WASTEWATER AND

INVESTMENT OBJECTIVES

AGGLOMERATION PREJMER - WASTEWATER

Item

Component TOTAL

(MEuro)

1

Extension of wastewater

collection system in

Prejmer (32.0 km)

5.4

2

Extension of the

wastewater treatment

plant Lunca Calnicului

(16.000 p.e.)

3.7

TOTAL (MEuro) 9.1

Stupinii Prejmerelui

Lunca Calnicului

Zizin

Purcareni

Carpinis

TELIU

BUDILA

TARLUGENI

Cohesion funds Other funds

WWTP L. Calnicului

Limits of Agglomeration

PREJMERAGGLOMERATION

Page 17: ROMANIAN GOVERNMENT COUNTY COUNCIL Project …...EUROPEAID/119083/D/SV/RO, ISPA Measure no. 2003/RO/16/P/PA/013-4 TECHNICAL ASSISTANCE FOR PROJECT PREPARATION IN THE WASTEWATER AND

INVESTMENT OBJECTIVES

AGGLOMERATION BRAN-MOIECIU - WATER

Item

Component TOTAL

(MEuro)

1 Water treatment plant

Moieciu (chlorination) 0.4

2 Water reservoir Moieciu 0.2

3

Extension of distribution

network in Moieciu (17.5

km)

1.9

4 Water metering 0.1

5 SCADA, automation and

control 0.2

TOTAL (MEuro) 2.8

FUNDATA

DrumulCarului

Pestera

Magura

Moieciude Sus

CheiaSimon

Predelut

BRAN

MOIECIUDE JOS

Sohodol

Tohanu Nou

Poarta

Cohesion funds Other funds

MOIECIU

Page 18: ROMANIAN GOVERNMENT COUNTY COUNCIL Project …...EUROPEAID/119083/D/SV/RO, ISPA Measure no. 2003/RO/16/P/PA/013-4 TECHNICAL ASSISTANCE FOR PROJECT PREPARATION IN THE WASTEWATER AND

INVESTMENT OBJECTIVES

AGGLOMERATION BRAN-MOIECIU - WASTEWATER

Item

Component TOTAL

(MEuro)

1

Extension of the

wastewater collection

system in Moieciu (16.9

km)

3.1

2

Wastewater treatment

plant Bran-Moieciu (5.800

p.e.)

1.2

TOTAL (MEuro) 4.3

FUNDATA

DrumulCarului

Pestera

Magura

Moieciude Sus

CHEIA Simon

Predelut

BRAN

MOIECIUDE JOS

Sohodol

Tohanu Nou

Poarta

WWTP

Cohesion funds Other funds

Moieciu

Limits of Agglomeration

BRAN-MOIECIUAGGLOMERATION

Page 19: ROMANIAN GOVERNMENT COUNTY COUNCIL Project …...EUROPEAID/119083/D/SV/RO, ISPA Measure no. 2003/RO/16/P/PA/013-4 TECHNICAL ASSISTANCE FOR PROJECT PREPARATION IN THE WASTEWATER AND

INVESTMENT OBJECTIVES

Item

Component TOTAL

(MEuro)

1 Cluster Brasov – Water (except Codlea) 42.4 107.5

2 Cluster Brasov – Wastewater (except Codlea) 65.1

3 Agglomeration Codlea - Water 5.9 14.6

4 Agglomeration Codlea - Wastewater 8.7

5 Agglomeration Rupea - Water 6.9 19.5

6 Agglomeration Rupea - Wastewater 12.6

7 Agglomeration Prejmer - Water 3.2 12.3

8 Agglomeration Prejmer - Wastewater 9.1

9 Agglomeration Bran-Moieciu - Water 2.8 7.1

10 Agglomeration Bran-Moieciu - Wastewater 4.3

TOTAL (MEuro) 161.0

Page 20: ROMANIAN GOVERNMENT COUNTY COUNCIL Project …...EUROPEAID/119083/D/SV/RO, ISPA Measure no. 2003/RO/16/P/PA/013-4 TECHNICAL ASSISTANCE FOR PROJECT PREPARATION IN THE WASTEWATER AND

Institutional: IDA - Brasov Local Council Decision 10.12.2007

ROC – Brasov Local Council Decision 10.12.2007

Constitutional set-up of IDA

Delegation contract of IDA to the ROC, Controls exercised by IDA over the ROC

Constitutional set-up of the ROC and provided management structure.

Separation of operational and contracting management departments

Staffing and recruitment

Accountability

Tariff settings

Definition of financial responsibilities

Cooperation with other procurement institution- launch of tenders in order to test acquaintance to new national procurement law

Cooperation with other local public utility departments

Page 21: ROMANIAN GOVERNMENT COUNTY COUNCIL Project …...EUROPEAID/119083/D/SV/RO, ISPA Measure no. 2003/RO/16/P/PA/013-4 TECHNICAL ASSISTANCE FOR PROJECT PREPARATION IN THE WASTEWATER AND

No. Contract

Estimated

value of the

contract (lei)

Value of the

budget

published in

SEAP

(lei)

Value of the

contract (lei)

Type of

contract

Tender notice

(date)

Submission

deadline for the

tenders

Contract

signing (date)

Date of

contract

commencement

Contract

completion date

(without Defect

Notification

Period)

CS1

Technical

Assistance for

project

management/for

project

implementation

6.174.477

17.674.193 5.770.000,00 services 23.09.2011 30.11.2011 18.04.2012 03.05.2012 03.05.2015

CS2

Technical

Assistance for

Supervision of

Works

19.055.648 27.354.051 17.807.352,26 services 22.07.2009 23.09.2009 26.10.2009 08.02.2010 31.12.2015

CW1

Rehabilitation of

Brasov

wastewater

treatment plant

72.526.751 84.150.000 69.835.339,05 works 16.06.2010 09.08.2010 16.03.2011 12.04.2011 12.06.2014

CW2

New wastewater

treatment plant

in Feldioara 54.352.071 73.000.000 53.760.703,55 works 09.09.2009 25.11.2009 05.03.2010 12.04.2010 15.03.2014

CW3

Rehabilitation of

water treatment

plants in Codlea,

Moieciu and

Bogata-Rupea

28.848.949 34.492.437 27.921.940,87 works 12.03.2011 28.04.2011 20.06.2011 11.08.2011 27.06.2014

CW4

(terminated)

New wastewater

treatment plant

in Hoghiz, for

Rupea

Agglomeration

16.035.381 17.100.000 15.773.540,00 works 08.10.2009 20.01.2010 15.06.2010 29.07.2010 21.02.2014

CW4A

Structures work

completion -

Wastewater

treatment plant

in Hoghiz

NA 439.978,00 works Finished

contract - 25.11.2013 02.12.2013 31.01.2014

CW4B

Wastewater

treatment plant

Hoghiz

14.393.260 works 12.03.2014 12.05.2014

CW5

Extension of

Lunca

Calnicului

WWTP (line2)

and new WWTP

in Moieciu

11.745.934 15.800.000 11.368.499,75 works 30.10.2009 17.02.2010 17.05.2010 07.06.2010 15.05.2014

CW6

New

transmission

pipe Sânpetru -

Bod

1.776.670

1.776.669,81 works Finished

contract - 25.06.2007 01.10.2007 05.07.2008

Page 22: ROMANIAN GOVERNMENT COUNTY COUNCIL Project …...EUROPEAID/119083/D/SV/RO, ISPA Measure no. 2003/RO/16/P/PA/013-4 TECHNICAL ASSISTANCE FOR PROJECT PREPARATION IN THE WASTEWATER AND

No. Contract

Estimated

value of the

contract (lei)

Value of the

budget

published in

SEAP

(lei)

Value of the

contract (lei)

Type of

contract

Tender notice

(date)

Submission

deadline for the

tenders

Contract

signing

(date)

Date of contract

commencement

Contract

completion date

(without Defect

Notification

Period)

CW7

Extension and

rehabilitation of water

transport in

Agglomeration Braşov

- Săcele

66.110.289 91.523.000 61.779.543,11 works 01.03.2012 08.05.2012 02.04.2013 14.05.2013 14.11.2014

CW8

(terminated)

New wastewater

collectors Ghimbav -

Braşov WWTP -

Feldioara WWTP,

Codlea - Feldioara

WWTP and new

transmission pipe

Stupini - Feldioara

84.930.725 93.134.765 81.320.111,67 works 05.08.2011 29.09.2011 07.03.2012 17.04.2012 16.06.2014

CW8A

Wastewater collectors

Ghimbav - Braşov

WWTP -

Feldioara WWTP,

Codlea - Feldioara

WWTP and new

transmission pipe

Stupini - Feldioara

100.542.326 works

CW9

Extension and

rehabilitation of

drinking water

distribution

networks and

sewerage networks in ,

Sanpetru and Harman

71.048.755 75.803.163 68.211.170,33 works 14.02.2012 09.04.2012 04.07.2012 10.08.2012 25.11.2014

CW10

Extension and

rehabilitation of

drinking water

distribution

networks and

sewerage networks in

Codlea and Moieciu

29.052.334 32.850.858 27.817.247,77 works 14.02.2012 19.04.2012 23.10.2012 04.12.2012 03.06.2014

CW11

Extension and

rehabilitation of

drinking water

distribution

networks and

sewerage networks in

Agglomeration Rupea

and Prejmer

44.762.315 68.158.643 44.275.286,88 works 9.02.2011 29.03.2011 27.07.2011 09.09.2011 08.09.2014

Audit Project

“Rehabilitation and

extension of the water

supply and sewerage

systems in brasov

county”

180.000 572.218 180.000 services 19.01.2011 14.02.2011 17.03.2011 28.03.2011 01.03.2015

TOTAL 506.600.299 488.037.383,05

Page 23: ROMANIAN GOVERNMENT COUNTY COUNCIL Project …...EUROPEAID/119083/D/SV/RO, ISPA Measure no. 2003/RO/16/P/PA/013-4 TECHNICAL ASSISTANCE FOR PROJECT PREPARATION IN THE WASTEWATER AND

Proposed Investments for the period 2014-2020

Page 24: ROMANIAN GOVERNMENT COUNTY COUNCIL Project …...EUROPEAID/119083/D/SV/RO, ISPA Measure no. 2003/RO/16/P/PA/013-4 TECHNICAL ASSISTANCE FOR PROJECT PREPARATION IN THE WASTEWATER AND

Brașov

Replacement of water distribution pipes

Replacement of main water supply pipes

Rehabilitation of sewerage network

Rehabilitation of sewerage network

Extension of sewerage network

Construction of new wastewater pumping stations

DE 110-315mm

DE 315-500mm

DN 800-1000mm

DN 400-500mm

DN 240-400mm

75 km

18 km

12 km

17 km

11 km

5 pcs.

Poiana Brașov Replacement of water distribution pipes

Rehabilitation of sewerage network

DE 110-200mm

DN 250-400mm

11 km

4 km

Săcele Replacement of water distribution pipes

Extension of water distribution pipes

Rehabilitation of sewerage network

Extension of sewerage network

DE 110-250mm

DE 110-250mm

DN 250-500mm

DN 250-500mm

46 km

20 km

24 km

38 km

Prejmer Extension of water distribution pipes

Extension of sewerage network

DE 110-250mm

DN 250-400mm

20 km

11 km

Hărman Extension of water distribution pipes

Extension of sewerage network

Construction of new wastewater pumping stations

DE 110-160mm

DN 250mm

7 km

7 km

1 pc.

Sânpetru Extension of water distribution pipes

Extension of sewerage network

Construction of new wastewater pumping stations

DE 110-160mm

DN 250mm

2 km

2 km

1 pc.

Bod Extension of water distribution pipes

Extension of sewerage network

DE 110mm

DN 250mm

2 km

2,5 km

Hălchiu Replacement of water distribution pipes

Extension of water distribution pipes

Rehabilitation of sewerage network

Extension of sewerage network

DE 110mm

DE 160mm

DN 250mm

DN 250mm

10 km

3 km

9 km

7 km

Feldioara Replacement of water distribution pipes

Extension of sewerage network

Construction of new wastewater pumping stations

DE 110-160mm

DN 250mm

13 km

1 km

1 pc.

Page 25: ROMANIAN GOVERNMENT COUNTY COUNCIL Project …...EUROPEAID/119083/D/SV/RO, ISPA Measure no. 2003/RO/16/P/PA/013-4 TECHNICAL ASSISTANCE FOR PROJECT PREPARATION IN THE WASTEWATER AND

Ghimbav Replacement of water distribution pipes

Extension of water distribution pipes

Extension of sewerage network

Construction of new wastewater pumping stations

DE 110-200mm

DE 110mm

DN 250mm

8 km

6 km

7 km

1 pc.

Codlea Replacement of water distribution pipes

Rehabilitation of sewerage network

DE 110-160mm

DN 200-300mm

5 km

10 km

Moieciu de Sus Extension of water distribution pipes

Extension of sewerage network

DE 110-160mm

DN 200-250mm

11 km

10 km

Apața Extension of water distribution pipes

Extension of sewerage network

DE 110mm

DN 250mm

0,55 km

0,55 km

Rupea Replacement of main water supply pipes

Replacement of water distribution pipes

Extension of sewerage network

DE 400mm

DE 110-160mm

DN 250mm

16 km

6 km

0,33 km

Mercheașa Extension of water distribution pipes

Extension of sewerage network

Construction of new wastewater pumping stations

DE 110mm

DN 200-250mm

8 km

3,5 km

2 pcs.

Hoghiz Extension of water distribution pipes

Extension of sewerage network

DE 110mm

DN 250mm

1 km

0,5 km

Fântâna Replacement of main water supply pipes

Extension of sewerage network

DE 110-160mm

DN 200-250mm

3,5 km

3 km

Cuciulata Extension of water distribution pipes

Extension of sewerage network

Construction of new wastewater pumping stations

DE 110-125mm

DN 250mm

9 km

6 km

2 pcs.

Bogata Replacement of main water supply pipes

Extension of sewerage network

Construction of new wastewater pumping stations

DE 110mm

DN 250mm

2,3 km

2,3 km

2 pcs.

Dopca Extension of water distribution pipes

Extension of sewerage network

Construction of new wastewater pumping stations

DE 110mm

DN 250mm

2,8 km

2,8 km

2 pcs.

Racoș Extension of sewerage network

Construction of new wastewater pumping stations

Construction of new wastewater treatment plant

DN 250mm

4.000 PE

12 km

2 pcs.

1 pcs.