Rock Engineering Rock Engineering Practice & Design Practice & Design Lecture Lecture 13: 13: Instrumentation Instrumentation Instrumentation Instrumentation Planning & Design Planning & Design 1 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

Transcript of Rock Engineering Practice & Design · Rock Mechanics Rock Mechanics. Although the slides have been...

  • Rock EngineeringRock EngineeringPractice & DesignPractice & Design

    Lecture Lecture 13:13:InstrumentationInstrumentationInstrumentationInstrumentationPlanning & DesignPlanning & Design

    1 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

  • Author’s Note:Author’s Note:The lecture slides provided here are taken from the course “Geotechnical Engineering Practice”, which is part of the 4th year Geological Engineering program at the University of British Columbia (V C d ) Th k i i d (Vancouver, Canada). The course covers rock engineering and geotechnical design methodologies, building on those already taken by the students covering Introductory Rock Mechanics and Advanced Rock Mechanics Rock Mechanics.

    Although the slides have been modified in part to add context, they of course are missing the detailed narrative that accompanies any l l d h h l lecture. It is also recognized that these lectures summarize, reproduce and build on the work of others for which gratitude is extended. Where possible, efforts have been made to acknowledge th v ri us s urc s ith list f r f r nc s b in pr vid d t th the various sources, with a list of references being provided at the end of each lecture.

    Errors, omissions, comments, etc., can be forwarded to the

    2 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

    Errors, omissions, comments, etc., can be forwarded to the author at: [email protected]

  • Instrumentation & MonitoringInstrumentation & MonitoringThe use of geotechnical instrumentation is not merely the selection of instruments but a comprehensive step-by-step engineering process beginning with a definition of the objective and ending with implementation of the data implementation of the data.

    Engineering objectives typically encountered in soil and rock engineering projects have g g p jled to the design and commercial marketingof numerous instrument types, measuring for example:

    • temperature

    • deformation

    easing

    bi

    lity

    • groundwater/pore pressures

    • total stress in soil and stress change in rock

    decr

    ere

    liab

    3 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

    change in rock

  • Field InstrumentationField InstrumentationGeotechnical engineering projects often present the ultimate measurement challenge, in part because of their initial lack of definitionand the sheer scale of the problem. The measurement problem usually requires information ranging from a coarse scale down to a fine scale and requires information ranging from a coarse scale down to a fine scale and involving a number of instrumentation techniques.

    Th lti t l i t l t th The ultimate goal is to select the most sensitive measurement parameters with respect to theproject objectives, e.g. the ones project objectives, e.g. the ones that will change significantly at the onset of failure. However, because of physical limitations and economic c nstr ints ll p r meters c nn t constraints, all parameters cannot be measured with equal ease and success.

    4 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

    Franklin (1977)

  • Planning and DesignPlanning and Design

    Adequate planning is required before proceeding, and these plans should be logical and comprehensive – from defining the bj i l i h h objectives to planning how the measurement

    data will be implemented. The ‘red bible’

    (Dunnicliff 1993).

    1. Define the project conditions.

    The steps through which planning should proceed include:

    p j

    … these might include project type and layout, geology and structure, engineering properties of materials, engineering properties of materials, groundwater conditions, status of nearby structures or other facilities, environmental conditions, and planned construction method

    5 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

    and planned construction method.

  • Planning and DesignPlanning and Design2. Predict mechanisms that control behaviour.… may involve one or more working hypotheses based on a comprehensive knowledge

    of the project conditions.

    dt (2

    008)Existing

    FractureFracture Initiation

    Surface/SubsurfaceDisplacements

    Mi i i E i i

    Eber

    hard

    Pore Pressures(fracture permeability)

    Microseismic Emissions

    Where brittle fracture mechanisms contribute significantly to rock mass deformation and failure, microseismic monitoring may form an integral part

    6 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

    microseismic monitoring may form an integral part of the monitoring strategy.

  • Planning and DesignPlanning and Design3. Define the geotechnical

    questions that need to be answered.

    i j … every instrument on a project should be selected and placed to assist in answering a specific question: if there is no question, h h ld b i ithere should be no instrumentation.

    Monitoring serves a number of important functions including:functions, including:

    (i) Investigative Monitoring: To provide an understanding of the rock mass behaviour and thus enable appropriate actions to be pp pimplemented.

    (ii) Predictive Monitoring: To provide a warning of a change in behaviour and thus enable the possibility of limiting damage or

    7 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

    Imrie et al. (1992)enable the possibility of limiting damage or intervening to prevent failure.

  • Planning and DesignPlanning and Design4 D fi th f th i t t ti4. Define the purpose of the instrumentation.… Peck (1984) stated that, “The legitimate uses of instrumentation are so many,

    and the questions that instruments and observation can answer so vital, that we should not risk discrediting their value by using them improperly or should not risk discrediting their value by using them improperly or unnecessarily.”

    … monitoring the performance of a waste barrier system designed to prevent the

    8 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

    g p y g ppolluting of a major aquifer from a chemical waste dump in Switzerland.

  • Planning and DesignPlanning and Design

    5. Select the parameters to be monitored.… Parameters include pore water pressure, joint water pressure, total stress,

    stress change, deformation, load and strain in structural members, and gtemperature.

    … high precision joint water pressure measurements at the Bedretto tunnel adit, Switzerland.

    9 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

  • Planning and DesignPlanning and Design6. Predict magnitudes of change.… Predictions are necessary so that the required instrument ranges and required

    instrument sensitivities or accuracies can be selected.

    … 1999 Eibelschrofen rockfall in f fthe Austrian alps. Post-failure monitoring of the slope

    included the installation of a fibre-optic extensometer capable of measuring displacements on the scale

    10 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

    measuring displacements on the scale of m. Was this practical?

  • Planning and DesignPlanning and DesignBurland et al. (2001)

    7. Devise remedial action.… Inherent in the use of

    instrumentation for construction i th b l t it purposes is the absolute necessity

    for deciding in advance, a positive means for solving any problem that may be disclosed by the results of th b ti nthe observation.

    11 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

  • Planning and DesignPlanning and Design8. Assign tasks for design, construction and operation phases.… Instrumentation specialists may be employees of the owner or the design

    consultant or may be consultants with special expertise in geotechnical h k f h h h instrumentation. When assigning tasks for monitoring, the party with the

    greatest vested interest in the data should be given direct line responsibility for producing it accurately.

    12 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

  • Planning and DesignPlanning and Design9. Select Instruments.… When selecting instruments, the overriding desirable feature is reliability!

    Inherent in reliability is maximum simplicity.

    ng

    ty

    • Optical

    • Mechanical

    incr

    easin

    complex

    it M chan ca

    • Hydraulic

    • Pneumatic

    • Electrical

    Instruments should be: … reliable, rugged and capable of functioning for long periods of time without repair or replacement;… capable of responding rapidly and precisely to changes so

    13 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

    that a true picture of events can be maintained at all times.

  • Planning and DesignPlanning and Design

    10. Select instrument locations.… The selection of instrument locations should reflect predicted behaviour and p

    should be compatible with the method of analysis that will later be used when interpreting the data.

    … instrumentation layout at the Randa Rockslide Laboratory in the Swiss Alps.

    Willenberg et al. (2008b)

    14 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

    W llenberg et al. ( 008b)

  • Planning and DesignPlanning and Design

    11. Account for factors that may influence measured data.

    … Details of each instrument installation should be recorded, because local or unusual conditions often influence measured variables.

    12. Establish procedures for ensuring reading correctness.

    … When reading an instrument, one should be able to answer the question: Is the instrument functioning correctly? The answer can sometimes be provided by answer can sometimes be provided by visual observations, duplication of instruments, data consistency or through the use of instruments that internally check their own correct functioning.

    Dunnicliff (1993)

    15 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

    ch c th r own corr ct funct on ng.

  • Planning and DesignPlanning and Design13. List the specific purpose of each instrument.… It is useful to question whether all planned instruments are justified. If no

    viable purpose can be found for a planned instrument, it should be deleted.

    14. Prepare budget.… A budget should be prepared for all

    instrumentation-related tasks to ensure sufficient funds are indeed available. A frequent error in budget preparation is to underestimate the duration of the project and the real data collection and processing costs.

    15. Prepare instrument procurement specifications.15. Prepare instrument procurement specifications.… There are several competing instrumentation manufacturers, each offering

    products designed for similar geotechnical purposes. Be aware of an instrument’s capabilities (and limitations), as well as those of competing products.

    16 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

    Instruments should be purchased from established manufacturers.

  • Planning and DesignPlanning and Design

    16. Plan installation, regular calibration & maintenance.

    … Installation procedures should be … Installation procedures should be planned well in advance of scheduled installation dates. The step-by-step procedures should include a detailed list of required include a detailed list of required materials and tools, and installation record sheets for documenting factors that may influence measured data.influence measured data.

    8)ha

    rdt

    (200

    8

    … schematic diagram of the borehole instrumentation and installation design developed for the Randa Rockslide Laboratory in Switzerland

    17 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

    EberLaboratory in Switzerland.

  • Planning and DesignPlanning and Design17. Plan data collection, processing, presentation, interpretation, reporting

    and implementation.… The effort required for these tasks should not be underestimated. Many

    consulting firms have files filled with large quantities of partially processed and undigested data because sufficient time/funds were not available for these tasks.

    18 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

  • Instrumentation Instrumentation –– Geodetic MonitoringGeodetic MonitoringGeodetic monitoring provides a means to measure the magnitude and rate of horizontal and vertical ground movements. Methods are well established and are often entirely well established, and are often entirely adequate for performance monitoring.

    Advantages: automated (total station), inexpensive, versatile.Accuracy: typically ±2mm + 2 ppm x D mm over 3000 m

    (200

    7)za

    nigo

    et a

    l.

    19 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

    Bonz

  • Geodetic Monitoring Geodetic Monitoring -- BenchmarksBenchmarks

    else

    n(1

    978)

    Measurement accuracy (and reliability) is controlled by the characteristics of reference

    lson

    & M

    ikkecharacteristics of reference

    datums and measuring points. Checks are required to make sure these datums are located on stable ground

    20 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

    Wion stable ground.

  • Instrumentation Instrumentation –– Global Positioning SystemsGlobal Positioning Systems

    … satellite measurements and base-stations at known locations are used to provide simultaneous corrections and refinements to the computed locations of one or several differential global positioning system (DGPS) g p g ystations positioned on the slide body.

    Advantages: automated, economical (especially over large areas).S iti it b tt th 1 i id l diti

    21 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

    Sensitivity: better than 1 cm in ideal conditions

  • Instrumentation Instrumentation –– CrackmetersCrackmeters

    … used to measure and monitor the opening of surface fractures and tension crackstension cracks.

    Advantages: simple, ideally suited for early warning systems.Sensitivity:

  • Instrumentation Instrumentation –– Convergence IndicatorsConvergence IndicatorsConvergence is one of the most frequently made underground measurements. Made between two or more fixed points around the excavation perimeter, repeat monitoring provides rates of convergence changes in monitoring provides rates of convergence, changes in rate and total convergence values.

    Ad t : i l i i d b t i Advantages: simple, inexpensive and robust in anunderground environment.

    Sensitivity:

  • Borehole Instrumentation Borehole Instrumentation –– InclinometersInclinometers

    Inclinometers monitor differential subsurface deformations by means of a probe that measures changes in inclination along the length of a borehole.

    93)

    unni

    clif

    f(1

    99

    Advantages: can detect and monitor complex slope deformations and displacements along multiple shear planes.

    Du

    24 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

    p g p pSensitivity: ±10 arc seconds (±0.05mm/m)

  • Inclinometer CasingInclinometer Casing

    25 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

  • Inclinometer InstallationInclinometer Installation

    26 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

  • Inclinometer Inclinometer MeasurementsMeasurements

    27 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

    Bonzanigo et al. (2007)

  • Borehole Instrumentation Borehole Instrumentation –– ExtensometersExtensometers

    … extensometers measure the relative change in position between several fixed points.

    Advantages: simple to install, inexpensive, can measure larger slope displacements than inclinometers.

    Accuracy: ±0.01 mm/m

    28 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

  • Borehole Instrumentation Borehole Instrumentation –– TDRTDR

    ang

    (199

    4)ow

    ding

    & H

    u

    Time Domain Reflectometry (TDR) - uses characteristics of returned electrical pulses to determine the amount of strain, or the existence

    Do

    29 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

    of a rupture, in a coaxial cable.

  • Borehole Instrumentation Borehole Instrumentation -- PiezometersPiezometers

    Vibrating wire piezometers consist of a diaphragm, which when deflected by pore

    b d b pressures,can be measured by an electrical transducer. These have the advantage of a negligible time lag and being a negligible time lag and being extremely sensitive.

    30 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

  • Emerging Technologies Emerging Technologies –– Fiber Fiber OpticesOptices

    Fiber-Optics - light that is launched into and confined to the fiber core Fiber Optics light that is launched into and confined to the fiber core propagates along the length of the fiber unperturbed unless acted upon by an external influence. Any disturbance of the fiber alters the guided light which can then be related to the magnitude of the disturbing influence.

    31 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

  • Case History: Investigative Slope MonitoringCase History: Investigative Slope Monitoring

    current instabilitycurrent instability1991 Randa Rockslide

    32 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

    Courtesy - H.Willenberg

  • Case History: Investigative Slope MonitoringCase History: Investigative Slope Monitoringbrass rings for brass rings for electromagnetic

    induction extensometer

    brass rings for brass rings for electromagnetic

    induction extensometer

    h

    inclinometercasing

    33 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

    piezometergeophone

  • Case History: Investigative Slope MonitoringCase History: Investigative Slope Monitoring

    t al

    .(20

    08b)

    Will

    enbe

    rget

    W

    34 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

  • Case History: Investigative Slope MonitoringCase History: Investigative Slope Monitoring

    Geological investigations

    Geophysical investigations

    3-D geological model

    )

    Rock Slope Instability

    t al

    .(20

    08a)

    Will

    enbe

    rg e

    t

    35 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

    W

  • Case History: Investigative Slope MonitoringCase History: Investigative Slope Monitoring

    Geological investigations

    Geophysical investigations

    3-D geological model

    topp

    ling

    Rock Slope Instability

    liding

    Geotechnical Mi i i

    Kinematics of the rockslide

    slng Geotechnical

    monitoringMicroseismic monitoring

    Numerical modelling

    rota

    ting

    36 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

    g

    Willenberg et al. (2008b)

  • Case History: Investigative Slope MonitoringCase History: Investigative Slope Monitoring

    37 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

    Willenberg et al. (2008b)

  • Case History: Investigative Slope MonitoringCase History: Investigative Slope Monitoring

    raw event signal

    cece

    100-500 Hz bandpass filter

    geophones

    fro

    m s

    ourc

    e f

    rom s

    ourc

    e

    increasing distance from source

    ing

    dist

    ance

    ing

    dist

    ance

    t al

    .(20

    04)

    boreholegeophones

    incr

    easin

    incr

    easin

    berh

    ardt

    et

    E

    Frequency content of attenuated microseismicsignals suggest the presence of large open

    38 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

    fractures, deep (>100 m) below surface.

  • Case History: Investigative Slope MonitoringCase History: Investigative Slope MonitoringInt t d d t m d l: P b bilit d nsit f n ti ns Integrated data model: Probability density functions (PDF) of microseismic event locations, and relative displacement rates of ongoing block movements.

    Kinematic model defined by the

    39 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

    Willenberg et al. (2008b) Kinematic model defined by the collective measurements.

  • Case History: Investigative Slope MonitoringCase History: Investigative Slope MonitoringMonitoring data provides a key means to constrain numerical models. At the same time, numerical modelling provides an ideal means to g psupport and/or refute interpretations drawn from investigative monitoring, as well as to explore possible future behaviour.

    )ha

    rdt

    (200

    8)

    40 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

    Eber

    h

  • Lecture ReferencesLecture ReferencesBonzanigo L Eberhardt E & Loew S (2007) Long term investigation of a deep seated creepingBonzanigo, L, Eberhardt, E & Loew, S (2007). Long-term investigation of a deep-seated creepinglandslide in crystalline rock – Part 1: Geological and hydromechanical factors controlling the CampoVallemaggia landslide. Canadian Geotechnical Journal 44(10): 1157-1180.

    Brady, BHG & Brown, ET (2006). Rock Mechanics for Underground Mining (3rd Edition). Chapman &Hall: LondonHall: London.

    Burland JB, Standing JR & Jardine FM (2001). Building Response to Tunnelling - Case Studies fromConstruction of the Jubilee Line Extension, London. Thomas Telford: London.

    Dowding, CH & Huang, FC (1994). Early detection of rock movement with time domainDowd ng, H & Huang, F ( 99 ). Early detect on of rock movement w th t me doma nreflectometry. Journal of Geotechnical Engineering, ASCE 120(8): 1413–1427.

    Dunnicliff, J (1993). Geotechnical Instrumentation for Monitoring Field Performance. John Wiley &Sons: New York.

    Eb h d E (2008) T Ni h C di G h i l C ll i Th l f d dEberhardt, E (2008). Twenty-Ninth Canadian Geotechnical Colloquium: The role of advancednumerical methods and geotechnical field measurements in understanding complex deep-seated rockslope failure mechanisms. Canadian Geotechnical Journal 45(4): 484-510.

    Eberhardt, E., Spillmann, T., Maurer, H., Willenberg, H., Loew, S. & Stead, D. (2004). TheR d R k lid L b E bli hi b i l d d il i bili h i i i lRanda Rockslide Laboratory: Establishing brittle and ductile instability mechanisms using numericalmodelling and microseismicity. In Proc., 9th International Symposium on Landslides, Rio de Janeiro.A.A. Balkema: Leiden, pp. 481-487.

    Franklin, JA (1977). Some practical considerations in the planning of field instrumentation. InP di f h I i l i Fi ld M i R k M h i Z i h A A

    41 of 42 Erik Eberhardt – UBC Geological Engineering ISRM Edition

    Proceedings of the International Symposium on Field Measurements in Rock Mechanics, Zurich. A.A.Balkema: Rotterdam, pp. 3-13.

  • Lecture ReferencesLecture ReferencesImrie, AS, Moore, DP & Energen, EG (1992). Performance and maintenance of the drainage systemat Downie Slide. In Proceedings, Sixth International Symposium on Landslides, Christchurch. A.A.Balkema: Rotterdam, pp. 751-757.

    Peck, RB (1984). Observation and instrumentation, some elementary considerations, 1983 postscript.In Judgement in Geotechnical Engineering: The Professional Legacy of Ralph B. Peck. Wiley: New York,pp. 128-130.

    Willenberg, H, Loew, S, Eberhardt, E, Evans, KF, Spillmann, T, Heincke, B, Maurer, H &Green, AG (2008a). Internal structure and deformation of an unstable crystalline rock mass aboveRanda (Switzerland): Part I - Internal structure from integrated geological and geophysicalinvestigations. Engineering Geology 101(1-2): 1-14.

    Willenberg, H, Evans, KF, Eberhardt, E, Spillmann, T & Loew, S (2008b). Internal structure anddeformation of an unstable crystalline rock mass above Randa (Switzerland): Part II – Three-dimensional deformation patterns. Engineering Geology 101(1-2): 15-32.

    Wilson, SD & Mikkelsen, PE (1978). Field instrumentation. In Landslides: Analysis and Control -Special Report 176. National Research Council: Washington, D.C., pp. 112-138.