Robert Pak, FVTX Annual Review Nov 2008
1
Mechanical IntegrationWBS 1.8.1
Robert PakBrookhaven National Laboratory
Robert Pak, FVTX Annual Review Nov 2008
2
WBS 1.8.1 Mechanical Integration
• Personnel:– Walt Sondheim:
Mechanical Project Engineer– Don Lynch:
PHENIX Chief Engineer– Robert Pak:
Integration Manager• WBS 1.8.1:
– 3Q FY08 through 4Q FY11
Robert Pak, FVTX Annual Review Nov 2008
3Integration Manager’sPrimary Responsibilities:
• Coordinate mechanical design reviews with HYTEC and PHENIX engineering staff
• Coordinate safety reviews
• Coordinate installation of infrastructure in PHENIX IR
• Coordinate assembly and installation of VTX/FVTX detectors
• Work with subsystem managers to keep project on schedule and at cost
Robert Pak, FVTX Annual Review Nov 2008
4
Off Project
Robert Pak, FVTX Annual Review Nov 2008
5
Smaller dia Be section
Robert Pak, FVTX Annual Review Nov 2008
6
New Be beam pipe schedule
• Sole source justification completed• BNL paperwork for procurement in progress
– PPM will push for sole source– In parallel, ad placed in Fed Biz Ops
• ~ 9 mos. delivery schedule ARO– 6 mos. gun-drill Be tube– 3 mos. electron-beam weld stainless steel
cuffs• Deliver to BNL and reship to Europe for NEG
coating (6 wks.)• Install prior to RHIC Run-10
Robert Pak, FVTX Annual Review Nov 2008
7NEG coating & bake-out of beam pipe
• $106k for entire 47 ft warm straight section in PHENIX• Also add ~$20k for heating jackets and misc. M&S
|------+-------------------------------------------+------------|| Item | Description | Price ||------+-------------------------------------------+------------|| 1 | 5 m long pipe CF125/CF75 (dwg 44035003-03)| $23,250.00 ||------+-------------------------------------------+------------|| 2 | 1.75 m conical pipe CF125/CF75 (dwg | $12,450.00 || | 44035003-04) | ||------+-------------------------------------------+------------|| 3 | 0.55 m pipe CF75/CF40 (dwg 105-0500-40 | $12,000.00 || | -part 01) | ||------+-------------------------------------------+------------|| 4 | 2.03 m pipe CF75/CF40 (dwg 105-0500-40- | $12,000.00 || | part 02) | ||------+-------------------------------------------+------------|| 5 | 1.8 m long pipe, CF 125 | $12,450.00 ||------+-------------------------------------------+------------|| 6 | 2.57 m long Be-section pipe, CF 35 ( dwg | $27,750.00 || | 002 0500-019) | ||------+-------------------------------------------+------------|
• Quote from SAES Getters SpA, Lainate, Italy :
Robert Pak, FVTX Annual Review Nov 2008
8Additional stainless sections
D. Lynch has RFQ into Central Shop
Robert Pak, FVTX Annual Review Nov 2008
9A-frame Support Structure
• BNL responsibility• HYTEC to provide
tolerance and mechanical requirements along with STEP translation files for the isolation mounts
• Kick-off on Sept. 11th BNL, LANL & HYTEC
Robert Pak, FVTX Annual Review Nov 2008
10
Magnet Bridge
Shared infrastructure for VTX/FVTX/RPC electronics
Robert Pak, FVTX Annual Review Nov 2008
11
Platform InfrastructureCooling manifolds and cable trays
Cooling watersupply and return
Electrical service for the bridge
Photos by D. Lynch
Robert Pak, FVTX Annual Review Nov 2008
12
Rack lay-out
New Platform
HBD/RXNP(not shown)
MuTrgrFEE N
MuTrgrFEE S
VTX Power
FVTX
RPC1 S
RPC1 N
New Platform
RPC1 NS
VTX FEM
CAD courtesy of D. Lynch
More details in next talk from
E. Mannel
Robert Pak, FVTX Annual Review Nov 2008
13
Bleed the boil-off5200 gal. capacity
LN2 Storage Dewar for Dry Nitrogren System shared by BBC/VTX/FVTX
Dry N2 System
Robert Pak, FVTX Annual Review Nov 2008
14
Summary
• Beam pipe procurement underway
• External cooling system falls under VTX project (to start later in FY09)
• Detector support structure started in FY08
• Power & water in IR: progress off project
• Infrastructure for dry N2 system completed
Robert Pak, FVTX Annual Review Nov 2008
15Summary:WBS 1.8.1 Cost & Schedule
• Cost $271k• Cost Basis Labor rates• Cost Contingency 14%• Schedule 3Q FY08 – 4Q FY11• Schedule Contingency None• Risk Low
Robert Pak, FVTX Annual Review Nov 2008
16
Summary: WBS 1.8.1 Technical
• Specification Document: TDR
• Workforce (On project): – WBS 1.8.1, Mech. Eng. 1/3 FTE/Year– Scope: Duration of project
• Institutions Involved: LANL/BNL
• Infrastructure Defined: Draft